Introduction
Methodology 2
Basis of the Costings 3
Headline Table 5
Table of Assumptions 6
Outstanding Issues
Conclusion
Next Steps 9
GoM / Malawi: Growth and Development Strategy / MGDS Costings Final Report /
February 2006
Contents
5 Costing Tables
Summary
Table 1 P1s Additional
Table 2 all P1s
Table 3 all Priorities Additional
Table 4 all Activities
Appendices
Terms of Reference
A1
Revised ToR
Original ToR
GoM / Malawi: Growth and Development Strategy / MGDS Costings Final Report /
February 2006
Abbreviations and Acronyms
CG Central Government
CHAM Christian Health Association of Malawi
COM College of Medicine
COMESA Common Market for Eastern and Southern Africa
EIA Environmental Impact Assessment
EHP Essential Health Package
GDP Gross Domestic Product
GoM Government of Malawi
IMF International Monetary Fund
ITN Insecticide Treated Nets
MGDS Malawi Growth and Development Strategy
MK Malawian Kwacha
NGOs Non Governmental Organisations
NRA National Roads Authority
PRGF Poverty Reduction and Growth Facility
PRSP Poverty Reduction Strategy Paper
PSIP Public Sector Investment Programme
SADC South African Development Community
SWAp Sector Wide Approach
This report has been prepared by Enterplan Limited for the Government of
Malawi by Helen Tilley of Enterplan Limited and Karl Livingstone, through the
DFID Economist Resource Centre framework. The views expressed herein are
those of the authors and do not necessarily represent the views of Enterplan
Limited.
GoM / Malawi: Growth and Development Strategy / MGDS Costings Final Report /
February 2006
Introduction
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Introduction
Introduction
1 This report has been prepared as part of the Government’s exercise to cost
and prioritise key policy based actions from the Malawi Growth and Development
Strategy (MGDS). The MGDS is the Government’s overarching policy framework for
the next five years (2006-2011).
2 Section 2 outlines the approach and the rationale for the work, and sets out a
detailed methodology on how the exercise was conducted, including the basis for
the
costings. Section 3 identifies key outstanding issues that must be addressed in
order
to progress the work further. Section 4 is the conclusion. The detailed costing
tables
are contained at the back of the report, in Section 5.
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
2 Approach and Methodology
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Approach and Methodology
7 The aim of this process is to produce better alignment between the budget,
the policy framework and expenditure ceilings. Correspondingly inter and intra
sectoral resource allocations will, over time, increasingly reflect policy
priorities.
8 The MGDS therefore has the potential to become a key tool for influencing
pubic expenditure priorities, and in doing so can increasingly move Malawi
towards a
policy driven budget process.
Methodology
• workshop for costing exercise convened for all key government departments
responsible for sub themes of MGDS activity matrix. The participants worked
in sectoral groups, according to the structure of the MGDS matrix;
• where feasible departments have costed proposed MGDS activities based on
existing sector expenditure plans, for example, the Health SWAp has been
used for health related activities;
• stakeholders were encouraged, where feasible, to use a bottom-up approach
to the costings using unit costs and then applying this to the quantity
required;
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Approach and Methodology
• prices – 2005/06 prices have been used to derive a constant price series for
the costings. This will be adjusted for inflation when projections are available
from the macro-fiscal framework;
• exchange rate – Stakeholders were requested to cost in the original currency
of the actions, which were later converted to Malawi Kwacha at the official
exchange rate;
• stakeholders were instructed to prioritise activities based on a ranking of P1
(considered the most important); P2 (of less importance/urgency than P1
activities); and P3 (considered to be the least important of the activities);
• stakeholders were advised to think about the priority ranking very carefully
as
ultimately all needs were unlikely to be covered by the available resources
and thus tough choices over which activities could be afforded would have to
be made;
• stakeholders were also advised to consider the sequencing of the required
measures as some would need to be implemented first in order that other
activities could follow;
• at the outset, it was stressed that the costing should be done in a
constrained
manner, based on an understanding of resource availability, using the
2005/06 budget allocations as a guide. Therefore any resource increase
should be realistic, rather than representing an ideal unconstrained scenario;
• furthermore, stakeholders were asked to consider carefully the issue of
absorptive capacity and the ability of institutions to use resources effectively
in the amounts envisaged and in the time frame proposed;
• after data was received from all the contributing departments it was ‘cleaned’
in order to create a consistent costed matrix compliant with the above
instructions;
• a series of follow-up meetings were held with the departments in order to
discuss the costings and proposed priority ranking. Where necessary,
costings were challenged on the basis of accuracy and realism. Departments
where encouraged to ‘scale back’ estimates where these were considered to
be unrealistic given the likely resource availability and compared to what may
have been available historically.
Basis of the Costings
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Approach and Methodology
11 For purposes of this exercise, the actions have been categorised broadly into
three types:
• firstly, those actions which are currently ongoing and which are fully funded
by the Government (and by donors and the private sector where applicable);
• secondly, actions which are ongoing but which are only partially funded and
therefore contain an element of additionality if they are to be implemented
over the five year MGDS period; and
• third, actions which are completely new and which will require additional
resources over and above those already available if they are to be
implemented over the MGDS period.
12 Where actions are on going but only partially funded (the second bullet
above) it has been difficult, in the time available and with certain data
limitations, to
determine accurately the amount of additionality required. This exercise has
therefore focussed most attention on distinguishing between actions, which are
ongoing and fully funded (the first bullet above) and actions, which are ‘new’
and thus
completely additional in nature (the third bullet).
13 For those additional actions, new funding will have to be secured through a
combination of domestic resource mobilisation (revenues, fees, loans), funding
from
the private sector and from externally contracted loans and grants. The amount
of
additional financing available for new activities will only be known when:
4) funding available from external grants and loans, and private sector sources
is confirmed.
• The first table presents a summary of all tables by theme and by share of
total Government expenditure and by share of real GDP;
• Table 1 comprises only P1 (the highest priority) activities for which
additional
funding is required;
• Table 2 shows all P1 actions. This table therefore includes P1 actions that
are ongoing and fully funded, those which are ongoing but only partially
funded, and those which are new and thus additional in nature;
• Table 3 shows all priorities (P1, P2 and P3) for which additional funding is
required;
• Table 4 is a reference table that comprises all activities. Any gaps in this
table
reflect the absence of submissions by the sectors, (for example see Theme
five, Sub Themes three and four and some missing actions in Theme five,
Sub Theme two). Data required to fill these gaps are under preparation but
have not been submitted in time for completion of this report.
16 Tables 1 and 3 capture some activities that are partially funded, therefore
not
all of the total requires additional funding. However, we judge that the
proportion of
those measures containing some degree of pre-committed funding is relatively
small,
compared to the total additionality requirement.
17 The tables contain formulas for those costings that originated in currencies
other than the Malawi Kwacha. Therefore as the exchange rates fluctuate the
corresponding reference cells for the US Dollar and the Euro can be easily
changed,
to automatically adjust the costings in all of the tables. The exchange rate can
be
changed by putting a different value in cells C1 or C2 (USD and EUROs
respectively) in Tables 1 to 4. The exchange rate has to be adjusted manually in
each of the main tables, although the summary table is linked and therefore does
not
have to be adjusted separately.
18 At the time of this costing exercise the official exchange rate used was
USD130 and EURO 165.
Headline Table
19 Table 1 (P1 Additional) is taken here as being the headline table as this
identifies the amount of new resources that will be required to implement the
highest
priority MGDS activities over its five year period. . We have assumed that the
activities of the National Aids Commission (NAC) are not fully funded and these
have
therefore been included as additional requirements in Table 1. Similarly, we
have
assumed that education activities are not fully funded and these have also been
included in Table 1. However, we have assumed that health sector activities are
fully
funded through the Health SWAp and these have therefore been excluded from
Table 1.
20 Furthermore, for purposes of this analysis, the Shire Zambezi Waterway has
been removed from the grand total, as this is a very large investment item,
which
skews the overall additionality requirement if it is retained.
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Approach and Methodology
21 Table 1 shows that the grand total for additional financing of the highest
priority activities under all themes of the MGDS is MK138.1 billion for the five
year
period (MK28.8 billion for 2006/07) or USD 1.1 billion for the five year period.
Over
the five year MGDS period, this represents an average of 21 percent of total
Government expenditure and 8.1 percent of real GDP.
22 Including the Shire Zambezi Waterway the total additionality requirement for
P1s rises to MK463.1 billion or USD3.6 billion. This equates to 70 percent of
total
Government expenditure for the five years or 27 percent of real GDP.
23 The following table sets out the key assumptions applied to the costings.
Table of Assumptions
Ongoing ORT Assumed to be captured in the ORT budget. Only new ORT costs have
been captured.
Prices 2005/06 prices have been used to derive a constant price series for the
costings. Values are shown in absolute Malawi Kwacha.
Exchange rate For costings originating in currencies other than the Malawian
Kwacha,
the costing tables allow for adjustments to be made in the exchange
rate applied. For current purposes it has been set at the official
exchange rate in mid February 2006 of USD 130 and EURO 165.
Funding status of actions Table 1 (P1 Additional) assumes that: (i) actions of
NAC are not fully
funded and have therefore been included; (ii) that health sector actions
are fully funded through the SWAp and have therefore been excluded;
and (iii) that primary and secondary education actions are not fully
funded, as the SWAp preparation is in its early stages, and have
therefore been included.
The treatment of large
investments
The Shire Zambezi Waterway has been removed from the grand totals
in each table as this is a very large investment item which skews the
overall additionality requirement if it is retained.
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
3 Outstanding Issues
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Outstanding Issues
3 Outstanding Issues
24 This costing and prioritisation exercise has been part of a process that
seeks
to translate MGDS policy priorities into programmes and activities which are
affordable and which can therefore be implemented. This process is iterative and
will
require further rounds of prioritisation over and above the initial one
undertaken here.
27 The crucial step in achieving this is for the Government of Malawi to extend
the macro-fiscal projections, which will allow multi-year expenditure ceilings
to be
derived.
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Outstanding Issues
these capital investments, the recurrent cost implications are considered and a
test is
made as to whether these are sustainable from a recurrent budget perspective.
This
means ensuring that there is an appropriate balance between MGDS driven capital
investments and the recurrent budget.
31 For this alignment to take place, the costing and prioritisation exercise
should
be undertaken prior to the budget formulation process, including before the
annual
review of the PSIP. This underscores the importance of synchronising effectively
the
costing and prioritisation exercise with the fiscal planning and budget
formulation part
of the expenditure management cycle. The exercise should therefore be included
at
an appropriate point in time in the Government’s budget calendar.
32 Alignment of the MGDS with the budget also requires a link to be made at the
mechanical level. For this, MGDS programmes and activities need to be allocated
expenditure codes in the budget, which should also be consistent with those used
in
the accounting system.
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Conclusion
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Conclusion
37 We recommend that the following next steps are undertaken to move the
process forward.
Next Steps
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Summary of all Tables Malawi Kwacha
Table 1 P1s Additional
SUMMARY BY THEME Total 2006/07 % of all themes Total 5 Years % of all themes
THEME 1 TOTAL: Sustainable Economic Growth 6,178,995,489 21.5% 29,661,469,603
21.5%
THEME 2 TOTAL: Social Protection 320,797,697 1.1% 1,115,073,460 0.8%
THEME 3 TOTAL: Social Development 13,833,384,207 48.1% 68,470,450,961 49.6%
THEME 4 TOTAL: Infrastructure 5,138,873,333 17.9% 31,142,526,193 22.6%
THEME 5 TOTAL: Good Governance 3,312,977,724 11.5% 7,702,614,000 5.6%
TOTAL B: ALL THEMES 28,785,028,449 100.0% 138,092,134,217 100.0%
SUMMARY 2006/07 2007/08 2008/09 2009/10 2010/11 TOTAL
TOTAL B: all themes 28,785,028,449 27,765,191,157 28,495,502,656 27,552,121,382
25,494,290,573 138,092,134,217
Total Government expenditure 124,995,000,000 127,757,884,001 132,399,753,000
133,307,529,001 139,306,368,001 657,766,534,003
% of total expenditure 23.0% 21.7% 21.5% 20.7% 18.3% 21.0%
Real GDP 307,800,000,000 325,652,400,000 344,865,891,001 360,384,856,001
376,602,175,000 1,715,305,322,002
% of GDP 9.4% 8.5% 8.3% 7.6% 6.8% 8.1%
SUMMARY BY THEME Total 2006/07 % of all themes Total 5 Years % of all themes
THEME 1 TOTAL: Sustainable Economic Growth 6,300,880,520 15.6% 30,194,195,008
15.1%
THEME 2 TOTAL: Social Protection 4,591,997,697 11.4% 22,407,073,460 11.2%
THEME 3 TOTAL: Social Development 20,495,021,434 50.7% 107,445,311,096 53.6%
THEME 4 TOTAL: Infrastructure 5,570,173,333 13.8% 32,005,126,193 16.0%
THEME 5 TOTAL: Good Governance 3,443,627,724 8.5% 8,323,364,000 4.2%
TOTAL B: ALL THEMES 40,401,700,707 100.0% 200,375,069,757 100.0%
SUMMARY 2006/07 2007/08 2008/09 2009/10 2010/11 TOTAL
TOTAL B: all themes 40,401,700,707 39,981,850,415 40,714,324,914 40,330,415,640
38,946,778,081 200,375,069,757
Total Government expenditure 124,995,000,000 127,757,884,001 132,399,753,000
133,307,529,001 139,306,368,001 657,766,534,003
% of total expenditure 32.3% 31.3% 30.8% 30.3% 28.0% 30.5%
Real GDP 307,800,000,000 325,652,400,000 344,865,891,001 360,384,856,001
376,602,175,000 1,715,305,322,002
% of GDP 13.1% 12.3% 11.8% 11.2% 10.3% 11.7%
SUMMARY BY THEME Total 2006/07 % of all themes Total 5 Years % of all themes
THEME 1 TOTAL: Sustainable Economic Growth 8,610,565,089 20.9% 40,452,055,228
21.1%
THEME 2 TOTAL: Social Protection 1,752,999,197 4.3% 7,736,134,960 4.0%
THEME 3 TOTAL: Social Development 20,555,934,551 50.0% 97,327,677,038 50.8%
THEME 4 TOTAL: Infrastructure 6,671,783,333 16.2% 37,464,324,578 19.5%
THEME 5 TOTAL: Good Governance 3,529,644,057 8.6% 8,667,168,251 4.5%
TOTAL B: ALL THEMES 41,120,926,226 100.0% 191,647,360,055 100.0%
SUMMARY 2006/07 2007/08 2008/09 2009/10 2010/11 TOTAL
TOTAL B: all themes 41,120,926,226 40,182,918,032 38,794,457,321 36,845,732,418
34,703,326,059 191,647,360,055
Total Government expenditure 124,995,000,000 127,757,884,001 132,399,753,000
133,307,529,001 139,306,368,001 657,766,534,003
% of total expenditure 32.9% 31.5% 29.3% 27.6% 24.9% 29.1%
Real GDP 307,800,000,000 325,652,400,000 344,865,891,001 360,384,856,001
376,602,175,000 1,715,305,322,002
% of GDP 13.4% 12.3% 11.2% 10.2% 9.2% 11.2%
SUMMARY BY THEME Total 2006/07 % of all themes Total 5 Years % of all themes
THEME 1 TOTAL: Sustainable Economic Growth 9,033,395,976 15.5% 41,829,514,020
14.9%
THEME 2 TOTAL: Social Protection 7,059,599,197 12.1% 34,205,134,960 12.1%
THEME 3 TOTAL: Social Development 31,270,854,778 53.6% 156,550,648,174 55.6%
THEME 4 TOTAL: Infrastructure 7,325,229,333 12.5% 39,437,654,578 14.0%
THEME 5 TOTAL: Good Governance 3,683,694,057 6.3% 9,542,352,626 3.4%
TOTAL B: ALL THEMES 58,372,773,340 100.0% 281,565,304,358 100.0%
SUMMARY 2006/07 2007/08 2008/09 2009/10 2010/11 TOTAL
TOTAL B: all themes 58,372,773,340 57,981,745,046 56,536,730,335 55,096,214,772
53,577,840,865 281,565,304,358
Total Government expenditure 124,995,000,000 127,757,884,001 132,399,753,000
133,307,529,001 139,306,368,001 657,766,534,003
% of total expenditure 46.7% 45.4% 42.7% 41.3% 38.5% 42.8%
Real GDP 307,800,000,000 325,652,400,000 344,865,891,001 360,384,856,001
376,602,175,000 1,715,305,322,002
% of GDP 19.0% 17.8% 16.4% 15.3% 14.2% 16.4%
Table 1 P1s Additional Malawi Kwacha
Agriculture
31 Promote large scale agricultural farming 0 P1 Majority of cost borne by the
private sector
33 Promote new farming technologies including farm
mechanization and oxanization programmes 194,728,394 194,728,394 194,728,394
194,728,394 194,728,394 973,641,968 P1 Productivity enhancing initiatives
40 Facilitate the provision of business support services to
agro-processors in Malawi 15,000,000 15,000,000 15,000,000 15,000,000 10,000,000
70,000,000 P1 Equipment, training of artisans, consultancy,
accommodation etc
42 Enhance capacity building for entrepreneurs in agroprocessing 4,500,000
4,500,000 5,000,000 5,000,000 5,000,000 24,000,000 P1 Funding includes that from
GoM
49 Construction of irrigation structures such as earth dams,
schemes etc 646,529,000 646,529,000 646,529,000 646,529,000 646,529,000
3,232,645,000 P1 Cost based on the current irrigation and water
management for food security programme.
50 Rehabilitation of existing irrigation structures 78,080,000 78,080,000
78,080,000 78,080,000 78,080,000 390,400,000 P1
100% additionality. Other existing projects
ongoing, with GoM counterpart funding. Cost
based on the current irrigation and water
management for food security programme. ORT
50m MK pa.
51 Promote modern irrigation technologies such as motorised
and treadle pumps 817,600,000 817,600,000 100,000,000 100,000,000 100,000,000
1,935,200,000 P1
Substantial part of this cost has already been
paid for. 100m MK pa GoM average contribution
towards acquisition of the pumps
58 Establish cooperatives/associations 18,000,000 18,000,000 20,000,000
20,000,000 20,000,000 96,000,000 P1
Mobilisation, residential member education,
registration and management, monitoring and
evaluation
60 Establish small scale cottage industry units in selected
areas 0 25,000,000 10,000,000 5,000,000 0 40,000,000 P1 Equipment, training of
artisans and linking them
to loans
64 Expand small stock (poultry, goats, sheep) populations
through procurement and distribution of start-up stocks 16,845,095 9,450,000
6,320,000 4,520,000 4,520,000 41,655,095 P1
High initial investment costs followed by lower
injections complimented by revolving funds. 2
goats/10 chickens for 100,000
beneficiaries+feeds. Implemented under
MASAF, Social Support Programmes
53 Reach farmers with extension services 8,718,931 8,718,931 8,718,931 8,718,931
8,718,931 43,594,655 P1F Ongoing programme
62 Put in place strategies to help livestock farmers reach
markets 2,650,000 2,650,000 2,650,000 2,650,000 2,650,000 13,250,000 P1F Ongoing
activity
63 Strengthen advisory services in the production and
marketing of livestock and its products 12,116,100 12,116,100 12,116,100
12,116,100 12,116,100 60,580,500 P1F Ongoing activity
Natural Resources
66 Increase use of modern technology by local communities
and private sector for deep water fishing 14,020,000 12,920,000 0 0 0 26,940,000
P1 Expanding scale of project. Purchase of boats,
nets and engines. Additional to donor project.
68 Promote fish production from fish farming 83,700,000 98,200,000 42,500,000
48,875,000 56,206,250 329,481,250 P1
Fish ponds, fingerlings, equipment. Construction
and rehab and stocking of 500 fish ponds in
total. Presidential initiative. Costs based on
project concept note
71 Promote regional and international trade 20,900,000 46,600,000 30,900,000
35,535,000 40,865,250 174,800,250 P1F
Trade regulatory framework, policy, competent
authority. Impact studies and consultations for
EPA and afterwards. Donor funded 1.6m Euros
for studies and consultations (240m MK)
uncertain.
Forestry
Table 2 all P1s Malawi Kwacha
108
Expand capacity of existing vocational training institutions,
including training more instructors in vocational training
areas (TEVET)
225,000,000 225,000,000 500,000,000 500,000,000 500,000,000 1,950,000,000 P1
Infrastructure, training, recruitment. Training unit
cost is MK600,000 pa. 350 trained within 5 yr
period. Building unit cost 5.8m MK pa.
Workshop cost min 30m MK. Increase from
07/08 to 08/09 due to recruitment, holding
expenses for more students and upgrading of
institutions. Some donor assistance anticipated
but most of this is additional requirement
111 Increase efficiency of one-stop-shop for attracting outside
investors and clarify laws to enable this 2,000,000 2,500,000 2,500,000
3,000,000 10,000,000 P1
112 Develop and implement the National Export Strategy 20,000,000 20,000,000 P1
Partly funded by donors. Travel,
accommodation, meetings, consultations etc
113 Design, develop and implement Private Sector
Development Strategy and action matrix 7,000,000 60,000,000 80,000,000
100,000,000 100,000,000 347,000,000 P1
Yr 1 strategy design. Establishment of new
department, yr 2. 14 core staff. Additional
recurrent costs for last 3 years. Ongoing work to
mainstream PSD. Partially private sector and
other non GoM funded
117 Review of policies and laws affecting domestic trade 10,000,000 8,000,000
1,000,000 1,000,000 0 20,000,000 P1
118 Develop employment and labour policy 30,000,000 15,000,000 45,000,000 P1
Labour market surveys (120m MK for labour
force sample survey), policy development,
documentation, advocacy, and labour market
system development. 100% additional
requirement. To be undertaken in 1st two years
119 Integrate message of good governance into promotional
themes 15,000,000 25,000,000 25,000,000 15,000,000 5,000,000 85,000,000 P1
Social partnership programmes
SUB THEME 2 TOTAL 314,000,000 355,500,000 628,500,000 639,000,000 620,000,000
2,557,000,000
SUB THEME 3 Food Security
120 Improve reliability of fertilizer markets 3,467,000 3,467,000 3,467,000
3,467,000 3,467,000 17,335,000 P1 Ongoing activity
122 Manage strategic grain reserve effectively (NFRA) 72,000,000 72,000,000
72,000,000 72,000,000 72,000,000 360,000,000 P1
Operations and salaries. Physical presence of at
least 60,000 MT of maize at all times. Based on
05/06 requirement - reduced to MK50m for
budget. PE 22m, i.e. 70% of total is not PE
123 Develop a reliable agricultural statistics and an early
warning system 8,377,000 8,377,000 2,750,000 2,750,000 2,750,000 25,004,000 P1
Statistics to feed into early warning system
124 Promote a coordinated approach to planning and
management of food aid 3,653,000 3,653,000 3,653,000 3,653,000 3,653,000
18,265,000 P1
SUB THEME 3 TOTAL 87,497,000 87,497,000 81,870,000 81,870,000 81,870,000
420,604,000
SUB THEME 4 Regional Integration
126 Increase trade information and access to market 75,000,000 50,000,000
20,000,000 15,000,000 15,000,000 175,000,000 P1 Project to be co-funded by
donors and GoM.
After 2008/09 totally GoM funded
132 Establish Fair Trade Commission 112,480,000 112,480,000 50,000,000
50,000,000 50,000,000 374,960,000 P1 Project funded for 1st two yrs. Last 3 yrs
running
costs of Commission, self generated
Table 2 all P1s Malawi Kwacha
133
Export Promotion Council enabled to coordinate
adequately export promotion activities in Malawi/Re orient
MEPC
90,000,000 90,000,000 70,000,000 70,000,000 70,000,000 390,000,000 P1 Export
development Initiatives. Need to
reinvigorate council: build capacity, equipment
SUB THEME 4 TOTAL 277,480,000 252,480,000 140,000,000 135,000,000 135,000,000
939,960,000
SUB THEME 5 Economic Empowerment
134 Strengthen the policy environment for micro finance 8,000,000 1,000,000
1,000,000 0 0 10,000,000 P1
135
Strengthen core function of ADMARC in geographical
areas which are underserved by the private sector
including through reform of ADMARC
540,000,000 540,000,000 540,000,000 540,000,000 540,000,000 2,700,000,000 P1
Average annual Government contribution to
ADMARC operations. PE only, 04/05 and 05/06
budget. Not adjusted yr on yr
139 Develop a national economic empowerment act 15,000,000 20,000,000 20,000,000
10,000,000 10,000,000 75,000,000 P1
141 Provide technical support from private sector programs
(related to off farm employment) 50,000,000 50,000,000 60,000,000 40,000,000
50,000,000 250,000,000 P1 100% additional requirement. To be funded by
private sector
145 Review the role played by public institutions such as
SEDOM, DEMAT in the Empowerment Programme 12,000,000 15,000,000 0 0 0 27,000,000
P1
146 Strengthen institutions providing entrepreneurial and
business training 45,000,000 50,000,000 5,000,000 0 0 100,000,000 P1
149
Formulate and execute an improved training programme
on small scale business management (OVOP) - capacity
building
66,600,000 66,600,000 66,600,000 39,100,000 39,100,000 278,000,000 P1 OVOP
project. To be donor funded and also
GoM
150 Promote marketing of goods and services (OVOP) 51,900,000 51,900,000
51,900,000 26,400,000 26,400,000 208,500,000 P1
151 Develop a programme that will oversee the establishment
of cooperatives in rural areas 2,000,000 750,000 750,000 750,000 750,000
5,000,000 P1
157 Establish Credit Reference Bureau 50,000,000 10,000,000 10,000,000
10,000,000 10,000,000 90,000,000 P1 Set up costs (MFI). Private sector funded
158 Establish network of practitioners in MFI 2,000,000 3,000,000 3,000,000
3,000,000 3,000,000 14,000,000 P1
165
Improve capacity of the Malawi Council for the
Handicapped and other similar institutions that deliver
services to people with disabilities
25,000,000 25,000,000 25,000,000 25,000,000 25,000,000 125,000,000 P1
166 Vocational training and skills 210,000,000 210,000,000 150,000,000
150,000,000 150,000,000 870,000,000 P1
Community Skill Centres or Village Polytechnics.
Infrastructure and training. Rehabilitation centres
for people with disabilities
SUB THEME 5 TOTAL 1,077,500,000 1,043,250,000 933,250,000 844,250,000
854,250,000 4,752,500,000
SUB THEME 6 Land Issues
169 Implement public awareness activities regarding property
rights of vulnerable groups 30,000,000 25,000,000 13,000,000 0 0 68,000,000 P1
100% additional
170 Intensify resettlement and land development programmes 300,000,000
400,000,000 600,000,000 1,000,000,000 1,000,000,000 3,300,000,000 P1
Funding for this activity is already secured and
represented here but will require additional
resources if pilot (currently covering 4 districts) is
to be rolled out to all districts
172 Customary land regularisation, titling and registration 280,000,000
282,250,000 400,000,000 162,500,000 0 1,124,750,000 P1 100% additional
174 Promote public awareness on land rights and land policy
in general 15,000,000 20,000,000 20,000,000 5,000,000 5,000,000 65,000,000 P1
100% additional
175 Finalise and enact the Land Bill 15,000,000 5,000,000 0 0 0 20,000,000 P1
100% additional
176 Develop a Land Use Policy 15,000,000 10,000,000 0 0 0 25,000,000 P1 100%
additional
183 Improve capacity in the land sector for implementing a
National Land Reform Programme 20,000,000 15,000,000 15,000,000 10,000,000
10,000,000 70,000,000 P1 As currently shown this is 100% additional but
there is a high chance of donor funding
185 Review all charges on land services rendered 10,000,000 20,000,000 5,000,000
0 0 35,000,000 P1 100% additional
Table 2 all P1s Malawi Kwacha
186
Review the 1999 National Housing Policy in order to realign it to the new
National Land Policy and other
Government policies and protocols
10,000,000 15,000,000 0 0 0 25,000,000 P1 100% additional
189 Review the draft Building Regulations and Standards 15,000,000 5,000,000 0 0
0 20,000,000 P1 100% additional
167 Review and reconcile existing laws to ensure compatibility
with the land policy 10,000,000 20,000,000 10,000,000 0 0 40,000,000 P1F Funding
for this activity is secured thus this is not
additional
SUB THEME 6 TOTAL 720,000,000 817,250,000 1,063,000,000 1,177,500,000
1,015,000,000 4,792,750,000
THEME 1 GRAND TOTAL 6,300,880,520 6,474,252,425 5,897,217,175 5,720,391,225
5,801,453,665 30,194,195,008
THEME 2 SOCIAL PROTECTION
SUB THEME 1 Protecting the Vulnerable
193 Create an enabling environment for child protection 71,000,000 71,000,000
71,000,000 71,000,000 71,000,000 355,000,000 P1 Represents 100% additionality
201
Practice better prioritisation, design, delivery, and review
of safety nets/social protection programmes framework to
be consistent with MGDS
12,000,000 6,000,000 3,000,000 1,500,000 1,500,000 24,000,000 P1 Consultancy
costs, workshops
206 Review effectiveness of current public works programs,
feeding programs, targeted input programs 7,000,000 7,000,000 P1 1 study
208 Increased access to rehabilitation services by persons
with disabilities 53,750,000 53,750,000 53,750,000 53,750,000 53,750,000
268,750,000 P1
209 Develop braille literacy programmes 25,000,000 25,000,000 P1
Equipment for braille printing and workshops.
print chichewa braille primers K500,000;
purchase of a braille emboss K2,000,000; braille
writing slates 100 x K2,500 =K250,000
210 Improving access to and quality of adult education
programme for illiterate adults in Malawi 65,381,030 16,551,730 16,374,800
16,567,070 60,448,830 175,323,460 P1 100% additionality
211 Fight against child labour 86,666,667 86,666,667 86,666,667 0 0 260,000,000
P1
Donor project. 2m $ over 3yrs, 20m MK GoM
contribution needed (this is the additionality
requirement)
203
Implement productivity enhancing interventions (e.g.
public works programmes: river diversion for irrigation,
afforestation, reservoir/dam construction, dykes, roads)
3,500,000,000 3,500,000,000 3,500,000,000 3,500,000,000 3,500,000,000
17,500,000,000 P1F
Employment cost 250,000 beneficiaries @
K125/day for 60 days+administrative cost.
MASAF and other donor funded. Fully funded
204 Enhance non-traditional PWP (e.g. manure making, bush
clearing) 750,000,000 750,000,000 750,000,000 750,000,000 750,000,000
3,750,000,000 P1F
100,000 beneficiaries @ K125/day for 60
days+administrative cost. Mainly urban based.
Donor and GoM funded
SUB THEME 1 TOTAL 4,570,797,697 4,483,968,397 4,480,791,467 4,392,817,070
4,436,698,830 22,365,073,460
SUB THEME 2 Disaster Management
213 Promote integration of disaster management into
sustainable development programming at all levels 21,200,000 11,200,000
3,200,000 3,200,000 3,200,000 42,000,000 P1F
Development of plans for disaster response.
Donor funded, 7-8m MK. Additional. Funds not
usually provided through the GoM budget, until
disaster arrives.
SUB THEME 2 TOTAL 21,200,000 11,200,000 3,200,000 3,200,000 3,200,000 42,000,000
THEME 2 GRAND TOTAL 4,591,997,697 4,495,168,397 4,483,991,467 4,396,017,070
4,439,898,830 22,407,073,460
THEME 3 SOCIAL DEVELOPMENT
SUB THEME 1 Health
Table 2 all P1s Malawi Kwacha
Secondary
287 Identify and rehabilitate all existing dilapidated school
facilities, construct new schools 306,881,250 306,881,250 306,881,250
306,881,250 306,881,250 1,534,406,250 P1 $8000 per class room, 600 class rooms
for
approved comm day secondary schools (CDSS)
290 Train and supply adequate number of qualified teachers
and improve terms and conditions 622,050,000 635,050,000 645,450,000 660,400,000
678,600,000 3,241,550,000 P1
Aiming for teacher pupil ratio of 1:40, aim to
increase supply of teachers to 5600 (2015) from
2500 (2005). Takes account of attrition rate and
increasing numbers of pupils
291 Up-grade under qualified teachers through in service
education 58,500,000 58,500,000 58,500,000 58,500,000 58,500,000 292,500,000 P1
296 Review policies related to orphans, other vulnerable
children and SN education 1,392,857 1,392,857 1,392,857 1,392,857 1,392,857
6,964,286 P1
2 workshops per year at 500,000 each. Needs
assessment 400,000. Writing the report policy at
100,000. Altogether 1.5 million per year
298
Introduce and implement curriculum responsive to needs
of individuals and the nation by including academic and
non-academic subjects
6,500,000 6,500,000 6,500,000 71,500,000 46,428,571 137,428,571 P1 TA $1m in
2009/10 plus capital exp
302 Improve District Educational Management Information
System (DEMIS) 12,714,000 12,714,000 12,714,000 12,714,000 12,714,000 63,570,000
P1 Roll out of EMIS to districts - training cost
involved. $100 per school pa, 978 schools
304 Improve flow of funds and train managers in financial
management in public schools 0 0 0 0 0 0 P1
305 Train school managers in financial management 1,300,000 1,300,000 1,300,000
1,300,000 1,300,000 6,500,000 P1
292 Provide girl-friendly environment, in particular
accommodation in 90 secondary schools 557,142,857 557,142,857 557,142,857
557,142,857 557,142,857 2,785,714,286 P1F
This is assuming constructing 15
accommodation hostels a year at 40 million MK
pa. Donor funded
293 Increase bursaries for the needy secondary students 88,400,000 93,600,000
97,500,000 101,400,000 105,300,000 486,200,000 P1F Expected to be in the budget.
Taken from
Education Sector Plan
Tertiary
307 Rehabilitate and expand physical infrastructure 45,230,000 214,000,000
259,230,000 P1 From strategic plan
309 Develop a student financing policy including a student
loan scheme 6,678,000 8,468,000 140,000 140,000 140,000 15,566,000 P1 Funding
through financial institutions. Not GoM
funded
314 Develop comprehensive policies on research and
development 25,000,000 25,000,000 50,000,000 P1 Consultancy costs
315 Provide adequate teaching and learning materials 9,385,800 13,836,400
12,756,300 13,076,200 13,370,800 62,425,500 P1
320 Improve procurement and distribution system and monitor
delivery of supplies 1,120,000 2,100,000 1,260,000 1,120,000 1,190,000 6,790,000
P1
322 Strengthen financial management 300,000,000 300,000,000 P1
SUB THEME 4 TOTAL 3,546,748,812 2,436,702,310 2,501,484,116 2,651,252,410
2,671,678,347 13,807,865,994
SUB THEME 5 Gender
323 Strengthen institutional capacity for effective co-ordination
of gender policy implementation 64,220,000 64,220,000 64,220,000 64,220,000
64,220,000 321,100,000 P1 Represents 100% additional requirement
326 Break the cultural/traditional factors that create and
perpetuate gender inequalities 28,600,000 28,925,000 30,875,000 33,475,000
35,100,000 156,975,000 P1 100 % additionality requirement
SUB THEME 5 TOTAL 92,820,000 93,145,000 95,095,000 97,695,000 99,320,000
478,075,000
THEME 3 GRAND TOTAL 20,495,021,434 21,357,395,282 21,521,598,288 21,708,471,722
22,362,824,371 107,445,311,096
THEME 4 INFRASTRUCTURE
SUB THEME 1 Transport
Roads
Table 2 all P1s Malawi Kwacha
327
Routine maintenance, periodic maintenance, rehabilitation
and upgrading of the road network, replacement of timber
decked bridges
1,387,880,000 1,489,020,000 1,523,730,000 1,587,170,000 1,625,910,000
7,613,710,000 P1
This item is budgeted at MK10 billion in 05/06.
This run of data is taken from the NRA business
plan and represents 100% additional
requirement
328 Develop an integrated approach to road safety 6,500,000 4,000,000 4,200,000
5,800,000 5,900,000 26,400,000 P1 100% additional
330 Infrastructure development 20,000,000 20,000,000 2,000,000 2,000,000
2,000,000 46,000,000 P1
This item relates to construction of new testing
centres and provision of required equipment.
100% additional in each year
333 Improved mobility and accessibility of rural communities to
goods and services in the rural areas 540,000,000 594,060,000 653,466,000
718,812,600 790,694,260 3,297,032,860 P1 06/07 should be covered in the budget.
Other
years 100% additional
Shipping
334 Provide navigations and hydrographic charts 195,000,000 65,000,000 0 0 0
260,000,000 P1 100% additional
339 Strengthen the national maritime administration 6,500,000 6,500,000 0 0
13,000,000 P1 100% additional
341 Shire Zambezi waterway 65,000,000,000 65,000,000,000 65,000,000,000
65,000,000,000 65,000,000,000 325,000,000,000 P1 100% additional
Civil Aviation
342 Implement conventions to benefit Malawi and to fulfil
obligations to international organisations 32,500,000 500,000 500,000 500,000
500,000 34,500,000 P1 100% additional
344 Construct targeted landing strips for tourism related areas 10,000,000
10,000,000 10,000,000 5,000,000 5,000,000 40,000,000 P1 100% additional
345 Institute and monitor maintenance programmes for both
aerodromes and aviation equipment 1,000,000,000 500,000,000 500,000,000
500,000,000 500,000,000 3,000,000,000 P1
About MK1 billion has been secured but has not
been allocated to any particular year for
rehabilitation of Kamuzu International Airport so
remaining MK4 billion of this for 06/07-10/11 is
additional requirement
SUB THEME 1 TOTAL 68,191,880,000 67,689,080,000 67,700,396,000 67,819,282,600
67,930,004,260 339,330,642,860
SUB THEME 2 Energy
358 Accelerate the establishment of the Malawi Energy
Regulatory Authority 25,000,000 0 0 0 0 25,000,000 P1 Indicator: Authority
established
360
Implement framework for private sector to operate with the
Government (PPP) to participate in the electricity sector
(institutional framework, etc.)
7,500,000 7,500,000 7,500,000 7,500,000 7,500,000 37,500,000 P1 Indicator:
Independent Power operators
363 Expand network to rural growth centres 70,000,000 70,000,000 70,000,000
70,000,000 70,000,000 350,000,000 P1 Indicator: No. of centres electrified
349
Rehabilitate two more stations for power distribution and
complete the ones under construction (e.g. Kapichira
power station) and upgrade existing ones (Nkula A and B)
431,300,000 431,300,000 0 0 0 862,600,000 P1F Indicator: Generation capacity.
Donor funded
SUB THEME 2 TOTAL 533,800,000 508,800,000 77,500,000 77,500,000 77,500,000
1,275,100,000
SUB THEME 3 Water Supply and Sanitation
365
Empower national authority to manage water resources
using IWRM approach and establish monitoring systems
including the establishment and maintenance of a register
of all actors in water and sanitation, conduct research to
establish resource potential and guides
3,250,000 16,250,000 21,666,667 16,250,000 7,583,333 65,000,000 P1 100%
additional
Table 2 all P1s Malawi Kwacha
366
Promote water resource conservation, harvesting and
protection in an integrated manner including development
of small community and large dams (conservation areas
defined), and the development of lake-level regulatory
structures at Liwonde and Mangochi
4,333,333 9,316,667 17,604,167 38,404,167 32,175,000 101,833,333 P1 100%
additional
367
Proactively implement management of water resources
and incorporate local governments and communities in
planning and management of water and sanitation
including catchment protection and rehabilitation
2,166,667 16,250,000 9,100,000 9,100,000 9,100,000 45,716,667 P1 100% additional
370 Revise Water Resources Act of 1969 and Water Works
Act 21,666,667 13,000,000 34,666,667 P1 100% additional
371 Provide incentives for LA to promote community watershed rehabilitation
programs 10,833,333 16,250,000 21,666,667 21,666,667 21,666,667 92,083,333 P1
100% additional
372 Build capacity in IWRM 10,833,333 10,833,333 10,833,333 10,833,333
10,833,333 54,166,667 P1 100% additional
373 Develop integrated water resources management master
plans and investment strategies 21,666,667 13,000,000 34,666,667 P1
Water quality and pollution control
374 Rehabilitate, construct and equip water laboratories 54,166,667 54,166,667
108,333,333 P1 100% additional
Urban, Peri-Urban and Market Centres
380 Develop national water and sanitation services regulatory
framework 10,833,333 21,666,667 32,500,000 P1 100% additional
381 Rehabilitate existing water supply systems 66,516,667 399,750,000
399,750,000 333,233,333 66,516,667 1,265,766,667 P1 100% additional
382 Extend existing urban water supply systems 13,000,000 270,833,333
1,083,333,333 813,583,333 270,833,333 2,451,583,333 P1 100% additional
383 Construct new water supply systems 3,250,000 189,583,333 812,500,000
1,354,166,667 352,083,333 2,711,583,333 P1 100% additional
Rural Water Services
387 Construct and rehabilitate and extend rural piped water
systems 130,000,000 270,833,333 452,833,333 396,500,000 227,500,000
1,477,666,667 P1 100% additional
388 Construct and rehabilitate boreholes and shallow wells 86,666,667
162,500,000 390,000,000 390,000,000 97,500,000 1,126,666,667 P1 100% additional
SUB THEME 3 TOTAL 439,183,333 1,464,233,333 3,219,287,500 3,383,737,500
1,095,791,667 9,602,233,333
SUB THEME 4 Information, Communication and
Technology
394 Enact appropriate legislation that promotes and
participation in the information age and economy 26,000,000 0 0 0 0 26,000,000
P1
395 Create a working and efficient government wide area
network (GWAN) 208,000,000 208,000,000 208,000,000 208,000,000 208,000,000
1,040,000,000 P1
397 Promote local and foreign investment, innovative
production, R&D and diffusion of ICTs – private sector 13,000,000 13,000,000
13,000,000 13,000,000 13,000,000 65,000,000 P1 Private sector funded
401
Improve public access to information and services to
facilitate business and administrative processes to
increase productivity and economic growth
65,000,000 65,000,000 65,000,000 65,000,000 65,000,000 325,000,000 P1
403 Promote the deployment and exploitation of ICTs in the
public and private sector (improve E-governance) 9,650,000 9,650,000 9,650,000
9,650,000 9,650,000 48,250,000 P1
Telecommunications
405 Telecommunications fund provided for rural
telecommunications 330,000 330,000 330,000 330,000 330,000 1,650,000 P1
Table 2 all P1s Malawi Kwacha
258
Strengthen an integrated ART infrastructure and logistic
systems and a national quality assurance program for
ART
95,048,200 119,384,200 29,918,200 25,888,200 25,888,200 296,127,000 P2
259 Expand provision and access to high quality and
integrated community home-based care (CHBC) services 193,505,000 708,500,000
129,376,000 94,276,000 94,276,000 1,219,933,000 P2
260 Establish mechanisms and Expand delivery of nutritional
support/ therapy to PLHA 949,053,300 1,467,772,800 1,468,097,800 1,457,372,800
1,457,372,800 6,799,669,500 P2
Mitigation of socio-economic and psychosocial
impacts of HIV/AIDS
264 Improve OVC access to essential social and community
based services 1,914,218,800 1,821,138,800 1,843,628,800 1,704,788,800
1,704,788,800 8,988,564,000 P1
261 Promote sustainable income generation and advocacy for
micro-finance programs for the infected and affected 377,858,000 454,675,000
253,500,000 245,180,000 245,180,000 1,576,393,000 P2
262 Promote and protect the rights of those infected and
affected 85,930,000 91,780,000 66,430,000 52,780,000 52,780,000 349,700,000 P2
263
Strengthen capacities of communities, districts, PLHA
Associations and FBOs to provide psychosocial support
and counselling
406,608,800 342,076,800 332,846,800 224,965,000 224,965,000 1,531,462,400 P2
265 Promote food security and nutrition among HIV affected
households 8,242,000 8,242,000 6,292,000 6,292,000 6,292,000 35,360,000 P2
Effective and efficient implementation of HIV/AIDS
response across the public and private sectors
266
Develop capacity and partnerships for a shared and
common understanding of mainstreaming in both public
and private sectors including civil society, NGOs, CBOs
and FBOs
927,392,700 145,293,200 89,048,700 80,650,700 80,650,700 1,323,036,000 P2
267 Increase the capacity of District Assemblies to oversee
HIV/AIDS activities in their districts 93,394,600 62,324,600 64,326,600
15,849,600 15,849,600 251,745,000 P2
268 Improve HIV/AIDS data collection, dissemination and
utilization at both national and district levels 288,611,700 705,424,200
396,492,200 137,532,200 137,532,200 1,665,592,500 P2
269 Improve planning, coordination and resource mobilisation
in the spirit of the three ones 541,937,500 433,420,000 340,080,000 333,190,000
333,190,000 1,981,817,500 P2 Y1 and Y2 include costs for integrating HIV/AIDS
in GoM plans and policies
270 Implement strategic approach to research and
development 534,472,900 566,668,700 585,707,200 613,072,200 613,072,200
2,912,993,200 P2
SUB THEME 3 TOTAL 15,339,581,335 17,386,191,485 15,604,122,885 14,531,179,585
14,531,075,585 77,392,150,875
SUB THEME 4 Education
Primary
272 Reduce primary school cycle to 7 years from 8 years 117,000,000 117,000,000
117,000,000 117,000,000 117,000,000 585,000,000 P1
Reorganize curriculum, construction of schools.
$10m for 10y. Capital (55%): Needs feeder
schools K. 1500 satellite schools 6 class rooms
each. ORT (45%): $2 per studentx400000pa
274
Train new and current teachers, provide attractive terms /
conditions, especially to go to rural area, & professional
development
357,825,000 328,110,714 627,110,714 692,110,714 714,396,429 2,719,553,571 P1
Train 45000 existing teachers; train 4000 new
teachers; 3000 new housing ($8000). Training
costs 33%; PE 39%; capital 29%
276 Improve overall management and monitoring of
inspection, supervision and advisory 15,759,366 15,759,366 15,759,366 15,759,366
15,759,366 78,796,830 P1
Primary school inspection: 84 new inspectors;
25$ per headteacher (5159). PE 73%; training
cost 27%
Table 3 all Priorities Additional Malawi Kwacha
Shipping
334 Provide navigations and hydrographic charts 195,000,000 65,000,000 0 0 0
260,000,000 P1 100% additional
339 Strengthen the national maritime administration 6,500,000 6,500,000 0 0
13,000,000 P1 100% additional
341 Shire Zambezi waterway 65,000,000,000 65,000,000,000 65,000,000,000
65,000,000,000 65,000,000,000 325,000,000,000 P1 100% additional
335 Review concession agreements for inland shipping 0 5,200,000 0 0 0 5,200,000
P2 100% additional
336 Develop, rehabilitate and maintenance of port facilities 195,000,000
390,000,000 455,000,000 390,000,000 227,500,000 1,657,500,000 P2 100% additional
337 Strengthen the marine search and rescue 0 26,000,000 26,000,000 13,000,000 0
65,000,000 P2 100% additional
340 Resuscitate the National Shippers Council and maintain
selective membership in international organisations 0 130,000,000 65,000,000 0
195,000,000 P2 100% additional
338 Establish international shipping line and negotiate with
Mozambique on ports 0 0 0 0 0 0 P3 100% additional
Civil Aviation
342 Implement conventions to benefit Malawi and to fulfil
obligations to international organisations 32,500,000 500,000 500,000 500,000
500,000 34,500,000 P1 100% additional
344 Construct targeted landing strips for tourism related areas 10,000,000
10,000,000 10,000,000 5,000,000 5,000,000 40,000,000 P1 100% additional
345 Institute and monitor maintenance programmes for both
aerodromes and aviation equipment 1,000,000,000 500,000,000 500,000,000
500,000,000 500,000,000 3,000,000,000 P1
About MK1 billion has been secured but has not
been allocated to any particular year for
rehabilitation of Kamuzu International Airport so
remaining MK4 billion of this for 06/07-10/11 is
additional requirement
343 Establish where feasible autonomous airport or Civil
Aviation authorities 260,000,000 130,000,000 130,000,000 0 0 520,000,000 P2 100%
additional
346 Strengthen safety and security measures at all airports 50,000,000
10,000,000 10,000,000 10,000,000 10,000,000 90,000,000 P2 100% additional
347 Strengthen safety oversight provision in the aviation sector 3,000,000
2,000,000 1,000,000 500,000 500,000 7,000,000 P2 100% additional
Railways
348 Review the railways act 0 1,000,000 1,000,000 0 0 2,000,000 P2 100%
additional
SUB THEME 1 TOTAL 68,755,080,000 68,289,080,000 68,478,596,000 68,333,582,600
68,204,004,260 342,060,342,860
SUB THEME 2 Energy
358 Accelerate the establishment of the Malawi Energy
Regulatory Authority 25,000,000 0 0 0 0 25,000,000 P1 Indicator: Authority
established
360
Implement framework for private sector to operate with the
Government (PPP) to participate in the electricity sector
(institutional framework, etc.)
7,500,000 7,500,000 7,500,000 7,500,000 7,500,000 37,500,000 P1 Indicator:
Independent Power operators
363 Expand network to rural growth centres 70,000,000 70,000,000 70,000,000
70,000,000 70,000,000 350,000,000 P1 Indicator: No. of centres electrified
351 Rehabilitate and expand the transmission and distribution 30,000,000
30,000,000 30,000,000 0 0 90,000,000 P2 Indicator: Level of outage
354
Prepare a plan and delineate implementation
responsibilities for the reduction of siltation in reservoirs
and protect catchment area to lake Shire
20,000,000 20,000,000 40,000,000 P2 Indicator: Level of outage
355 Explore alternative energy sources (gas, coal, solar, etc.) 70,000,000
29,375,000 29,375,000 29,375,000 29,375,000 187,500,000 P2 Indictor:
Availability of alternative sources
362
Accelerate the rural electrification programme (promote
grid and off-grid rural electrification by public and private
providers)
125,000,000 125,000,000 125,000,000 125,000,000 125,000,000 625,000,000 P2
Indicator: No. of centres electrified
352 Protect the catchment area along the lake and Shire river 50,000,000
30,000,000 30,000,000 20,000,000 20,000,000 150,000,000 P3 Indicator: Level of
outage
Table 3 all Priorities Additional Malawi Kwacha
353
Reduce the cost of connection by using affordable
connection and metering methods (e.g. use of pre-wired
boards and pre-paid meters)
100,000,000 68,750,000 68,750,000 68,750,000 68,750,000 375,000,000 P3
Indicator: Cost of connection
356 Implement pumped storage power plant at Livingstonia 0 0 0 0 120,000,000
120,000,000 P3 Indicator: Generation capacity
359
Improved management of ESCOM (including reform
electricity tariff structure) and improve the financial and
operational performance of ESCOM
36,300,000 36,300,000 0 0 0 72,600,000 P3 Indicator: Operational Efficiency
361 Rural communities use alternative energy supplies for
power in under served areas 0 0 0 0 0 0 Fully funded
SUB THEME 2 TOTAL 533,800,000 416,925,000 360,625,000 320,625,000 440,625,000
2,072,600,000
SUB THEME 3 Water Supply and Sanitation
365
Empower national authority to manage water resources
using IWRM approach and establish monitoring systems
including the establishment and maintenance of a register
of all actors in water and sanitation, conduct research to
establish resource potential and guides
3,250,000 16,250,000 21,666,667 16,250,000 7,583,333 65,000,000 P1 100%
additional
366
Promote water resource conservation, harvesting and
protection in an integrated manner including development
of small community and large dams (conservation areas
defined), and the development of lake-level regulatory
structures at Liwonde and Mangochi
4,333,333 9,316,667 17,604,167 38,404,167 32,175,000 101,833,333 P1 100%
additional
367
Proactively implement management of water resources
and incorporate local governments and communities in
planning and management of water and sanitation
including catchment protection and rehabilitation
2,166,667 16,250,000 9,100,000 9,100,000 9,100,000 45,716,667 P1 100% additional
370 Revise Water Resources Act of 1969 and Water Works
Act 21,666,667 13,000,000 34,666,667 P1 100% additional
371 Provide incentives for LA to promote community watershed rehabilitation
programs 10,833,333 16,250,000 21,666,667 21,666,667 21,666,667 92,083,333 P1
100% additional
372 Build capacity in IWRM 10,833,333 10,833,333 10,833,333 10,833,333
10,833,333 54,166,667 P1 100% additional
373 Develop integrated water resources management master
plans and investment strategies 21,666,667 13,000,000 34,666,667 P1
368 Develop Management Information System (MIS) for the
water and sanitation 43,333,333 65,000,000 45,500,000 10,833,333 10,833,333
175,500,000 P2 100% additional
369 Recognize and implement obligations to international
agreements 2,166,667 3,250,000 4,333,333 4,333,333 4,333,333 18,416,667 P3 100%
additional
Water quality and pollution control
374 Rehabilitate, construct and equip water laboratories 54,166,667 54,166,667
108,333,333 P1 100% additional
375 Establish database on water quality 3,250,000 5,416,667 5,416,667 2,166,667
2,166,667 18,416,667 P2 100% additional
376
Improve skills, technologies, techniques in water quality
monitoring and pollution control (catchment rehabilitation,
determining water quality)
2,166,667 2,166,667 3,250,000 3,250,000 2,166,667 13,000,000 P2 100% additional
378 Develop and disseminate guidelines and standards on
water quality and pollution control 10,833,333 10,833,333 10,833,333 10,833,333
10,833,333 54,166,667 P2 100% additional
377 Strengthen institutional arrangements for environmental
management 3,250,000 2,166,667 2,166,667 2,166,667 2,166,667 11,916,667 P3 100%
additional
379 Provide TA to local government and stakeholders on
water quality and pollution control 2,708,333 3,250,000 3,250,000 2,708,333
2,166,667 14,083,333 P3 100% additional
Table 3 all Priorities Additional Malawi Kwacha
402
Promote active participation of all Malawians including
women, youth and persons with disabilities in developing
the information society
13,000,000 13,000,000 13,000,000 13,000,000 13,000,000 65,000,000 P2
391 Establish a wide area network for all organizations
involved in disaster management 5,000,000 5,000,000 5,000,000 5,000,000
5,000,000 25,000,000 P3
392 Provide radios to communities to be used for transmitting
early warning messages 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
10,000,000 P3
396
Encourage collaboration between local and international
educational institutions to facilitate educational exchange
and the promotion of ICT education and training
26,000,000 26,000,000 26,000,000 26,000,000 26,000,000 130,000,000 P3
Telecommunications
405 Telecommunications fund provided for rural
telecommunications 330,000 330,000 330,000 330,000 330,000 1,650,000 P1
407 Procurement and installation of modern
telecommunications equipment 330,000 330,000 330,000 330,000 330,000 1,650,000
P1
404 Continue liberalization of telecommunications sector 6,500,000 6,500,000
6,500,000 6,500,000 6,500,000 32,500,000 P2
406 Provision of model telecentres 26,000,000 26,000,000 26,000,000 26,000,000
26,000,000 130,000,000 P2
409 Facilitate research on issues of self regulation 1,200,000 1,200,000
1,200,000 1,200,000 1,200,000 6,000,000 P2
Broadcasting
410 Acquisition of broadcasting equipment 13,000,000 13,000,000 13,000,000
13,000,000 13,000,000 65,000,000 P1
411 Building of purpose built stations 26,000,000 26,000,000 26,000,000
26,000,000 26,000,000 130,000,000 P1
412 Human capacity building through training 10,000,000 10,000,000 10,000,000
10,000,000 10,000,000 50,000,000 P2
413 Promotion of private sector participation in broadcasting 1,300,000
1,300,000 1,300,000 1,300,000 1,300,000 6,500,000 P3
414 Rehabilitate and computerise the existing TV and radio
stations 26,000,000 26,000,000 26,000,000 26,000,000 26,000,000 130,000,000 P3
SUB THEME 4 TOTAL 673,970,000 519,010,000 511,790,165 505,226,679 499,259,874
2,709,256,718
SUB THEME 5 Science, Technology, Research and
Development
415 Establish the Lilongwe University of Science and
Technology 1,000,000,000 1,000,000,000 1,000,000,000 1,000,000,000 1,000,000,000
5,000,000,000 P1 Presidential initiative. 100% additional
417 Train staff in specialized science and technology fields 25,000,000
25,000,000 25,000,000 25,000,000 25,000,000 125,000,000 P1 100% additional
418 Establishment of a technology park and incubation centre 8,000,000 6,000,000
200,000 200,000 200,000 14,600,000 P1 100% additional
419 Support STI programs in the local communities 15,000,000 15,000,000
15,000,000 15,000,000 10,000,000 70,000,000 P1 100% additional
422 Review policy and regulatory framework science and
technology 0 3,000,000 0 0 0 3,000,000 P1 100% additional
423 Review S&T Act 0 2,000,000 0 0 0 2,000,000 P1 100% additional
427 Strengthen public/private partnership in usage of science,
technology and innovation 5,000,000 0 0 0 0 5,000,000 P1 100% additional
429 Development of an intellectual property policy 5,000,000 0 0 0 0 5,000,000
P1 100% additional
432 Support multidisciplinary research and development 5,000,000 5,000,000
5,000,000 5,000,000 5,000,000 25,000,000 P1 100% additional
435 Strengthening of Malawi industrial research and
technology development centre 20,000,000 20,000,000 40,000,000 P1 100%
additional
420 Design and implement STI capacity building programs to
produce S&T expertise 15,000,000 15,000,000 15,000,000 2,000,000 2,000,000
49,000,000 P2 100% additional
421 Promote recruitment and retention of qualified S&T
experts 15,000,000 10,000,000 5,000,000 0 0 30,000,000 P2 100% additional
424 Promote innovative schemes and culture 5,000,000 5,000,000 5,000,000
5,000,000 0 20,000,000 P2 100% additional
Table 3 all Priorities Additional Malawi Kwacha
493
Control proliferation of firearms (with NGOs to set up
national focal point to deal with issues of illicit trafficking
and firearms)
494 Conduct drug control programs (awareness raising
through faith based organizations)
495 Amend the Immigration Act
496 Introduce national registration and identification system
497 Establish joint programs with companies and communities
to tackle issues of anti-vandalism
498 Integration of police protection into industrial site plans
499 Educate Malawian establishments on the benefits for risk
management for protection of assets
500 Develop Private Security Policy and Act that provides
standards for inspection of private security firms
501 Generate funding support from Government and
development partners
502 Develop a harmonized approach to budget formulation,
presentation, allocation, distribution and accountability
503 Allocate resources between sector institutions effectively
to achieve the sector mission
504 Review, and where appropriate reform, business and
commercial-related laws
507 Design and implement a strategy to address the
administration and distribution of deceased estates
SUB THEME 4 TOTAL 1,022,894,800 197,023,133 182,682,997 192,224,516 177,748,040
1,772,573,486
THEME 5 GRAND TOTAL 3,529,644,057 1,702,423,930 1,489,610,724 985,768,719
959,720,821 8,667,168,251
TOTAL A: ALL THEMES 106,120,926,226 105,182,918,032 103,794,457,321
101,845,732,418 99,703,326,059 516,647,360,055
TOTAL B: ALL THEMES Less Shire Zambezi waterway 41,120,926,226 40,182,918,032
38,794,457,321 36,845,732,418 34,703,326,059 191,647,360,055
SUMMARY BY THEME Total 2006/07 % of all themes Total 5 Years % of all themes
THEME 1 TOTAL: Sustainable Economic Growth 8,610,565,089 20.9% 40,452,055,228
21.1%
THEME 2 TOTAL: Social Protection 1,752,999,197 4.3% 7,736,134,960 4.0%
THEME 3 TOTAL: Social Development 20,555,934,551 50.0% 97,327,677,038 50.8%
THEME 4 TOTAL: Infrastructure 6,671,783,333 16.2% 37,464,324,578 19.5%
THEME 5 TOTAL: Good Governance 3,529,644,057 8.6% 8,667,168,251 4.5%
TOTAL B: ALL THEMES 41,120,926,226 100.0% 191,647,360,055 100.0%
SUMMARY 2006/07 2007/08 2008/09 2009/10 2010/11 TOTAL
TOTAL B: all themes 41,120,926,226 40,182,918,032 38,794,457,321 36,845,732,418
34,703,326,059 191,647,360,055
Total Government expenditure 124,995,000,000 127,757,884,001 132,399,753,000
133,307,529,001 139,306,368,001 657,766,534,003
% of total expenditure 32.9% 31.5% 29.3% 27.6% 24.9% 29.1%
Real GDP 307,800,000,000 325,652,400,000 344,865,891,001 360,384,856,001
376,602,175,000 1,715,305,322,002
% of GDP 13.4% 12.3% 11.2% 10.2% 9.2% 11.2%
Table 4 all Activities Malawi Kwacha
231
Promotion of adoption of appropriate diet and healthy
lifestyles through education and counselling
367,617 367,617 367,617 367,617 367,617 1,838,085 P1 Estimate based on Nutrition
Policy
232
Promotion of control, prevention and treatment of
micronutrient deficiency disorders particularly those caused
by Vitamin A, Iodine and iron deficiencies
213,000 213,000 113,000 113,000 100,000 752,000 P1 Estimate based on activities
in Nutrition Policy
233
Promotion of control, prevention and treatment of diseases
that have direct impact on nutrition and health status
346,000 346,000 276,800 221,440 177,152 1,367,392 P1 Estimate based on ruling
average commercial
rates
234
Policy coordination, implementation and monitoring of
nutrition programmes
300,000 300,000 300,000 300,000 300,000 1,500,000 P1 Based on policy
235
Build capacity of nutritionists, dieticians and community
nutrition workers
150,000 100,000 100,000 100,000 100,000 550,000 P1 Estimated cost of training
236 Nutrition surveillance 45,000 50,000 50,000 50,000 50,000 245,000 P1
Estimated cost of spot checks etc
237
Establishment of nutrition resource centres at all levels (i.e.
central, districts and community levels)
350,000 300,000 300,000 300,000 300,000 1,550,000 P1 Cost of number of centres
to be established and
their requirements
238
Enhance data collection, analysis and dissemination on
nutrition
60,000 60,000 60,000 60,000 60,000 300,000 P1 Cost of data collection, analysis
and
dissemination
239
Increase access and availability of services and information
to prevent consumers from health hazards
140,000 140,000 140,000 140,000 140,000 700,000 P2 Based on estimated cost of
quantity food
inspection, analysis, information dissemination
and clinical trials on new food
240
Review and include nutrition in the curricula of all learning
and training institutions
600,000 50,000 40,000 30,000 100,000 820,000 P2 Based on estimated cost
241
Policy design, dissemination, legislation and enforcement 350,000 20,000 20,000
25,000 100,000 515,000 P2 Based on policy
242 Advocacy and lobbying 250,000 120,000 120,000 120,000 120,000 730,000 P2
Estimated cost of planned activities
243
Initiate research on socio-economic impact of Nutrition 90,000 90,000 90,000
90,000 90,000 450,000 P2 20000/Study/Year
244
Harmonize and improve and nutrition security information
system for evidence based intervention
125,000 20,000 20,000 20,000 20,000 205,000 P3 Estimate based on the cost of a
similar exercise
245 Conduct Nutrition fairs at all levels 50,000 50,000 50,000 50,000 50,000
250,000 P3 Estimated cost of 10/S, 7/C, 6/N Fairs
246 Observe international Nutrition days 30,000 30,000 30,000 30,000 30,000
150,000 P3 Based on estimated cost
SUB THEME 2 TOTAL 3,466,617 2,256,617 2,077,417 2,017,057 2,104,769 11,922,477
SUB THEME 3 HIV/AIDs
Prevention and Behaviour change
247 Expand and scale up the scope and depth of HIV and AIDS
communication at local level 3,275,609,350 3,950,670,750 2,353,423,150
1,189,598,150 1,189,598,150 11,958,899,550 P1
248 Promote and support HIV protective interventions
especially designed for young people 165,945,000 147,745,000 147,745,000
148,232,500 148,232,500 757,900,000 P1
249 Reduce the vulnerability of Malawians to HIV infection,
especially girls and women 282,029,735 119,042,235 282,029,735 119,042,235
119,042,235 921,186,175 P1
250 Strengthen socio-cultural values and practices that prevent
the spread of HIV 6,630,000 14,430,000 10,725,000 14,917,500 14,917,500
61,620,000 P1
251 Promote safer sex practices among the high-risk groups
and in high-risk settings 264,030,000 253,539,000 318,916,000 357,266,000
357,266,000 1,551,017,000 P1
252 Increase district and community level outreach for changing
practices 256,061,000 330,161,000 263,373,500 232,661,000 232,661,000
1,314,917,500 P1
253 Increase access to quality STI syndromic management,
counselling and information 410,579,000 383,037,200 387,353,200 379,462,200
379,358,200 1,939,789,800 P1
254
Expand the scope, coverage and equal access by all
Malawians to HIV testing and counselling services
especially in rural areas
990,748,200 1,193,203,700 1,338,498,200 1,512,178,200 1,512,178,200
6,546,806,500 P1
255 Expand the scope, quality and coverage of PMTCT
services throughout the country 316,782,050 242,093,800 238,583,800 139,965,800
139,965,800 1,077,391,250 P1
Table 4 all Activities Malawi Kwacha
256
Increase access to safe blood, blood products and tissue
services throughout the country including availability of
adequate infection prevention materials and procedures
168,018,500 169,318,500 132,106,000 51,018,500 51,018,500 571,480,000 P1
Equitable treatment for PLHA and mitigate the health
impacts of HIV/AIDS
257 Increase equitable access to ARVs and OI drugs 2,786,875,000 3,656,250,000
4,525,625,000 5,395,000,000 5,395,000,000 21,758,750,000 P1
258 Strengthen an integrated ART infrastructure and logistic
systems and a national quality assurance program for ART 95,048,200 119,384,200
29,918,200 25,888,200 25,888,200 296,127,000 P2
259 Expand provision and access to high quality and integrated
community home-based care (CHBC) services 193,505,000 708,500,000 129,376,000
94,276,000 94,276,000 1,219,933,000 P2
260 Establish mechanisms and Expand delivery of nutritional
support/ therapy to PLHA 949,053,300 1,467,772,800 1,468,097,800 1,457,372,800
1,457,372,800 6,799,669,500 P2
Mitigation of socio-economic and psychosocial impacts
of HIV/AIDS P2
261 Promote sustainable income generation and advocacy for
micro-finance programs for the infected and affected 377,858,000 454,675,000
253,500,000 245,180,000 245,180,000 1,576,393,000 P2
262 Promote and protect the rights of those infected and
affected 85,930,000 91,780,000 66,430,000 52,780,000 52,780,000 349,700,000 P2
263
Strengthen capacities of communities, districts, PLHA
Associations and FBOs to provide psychosocial support
and counselling
406,608,800 342,076,800 332,846,800 224,965,000 224,965,000 1,531,462,400 P2
264 Improve OVC access to essential social and community
based services 1,914,218,800 1,821,138,800 1,843,628,800 1,704,788,800
1,704,788,800 8,988,564,000 P1
265 Promote food security and nutrition among HIV affected
households 8,242,000 8,242,000 6,292,000 6,292,000 6,292,000 35,360,000 P2
Effective and efficient implementation of HIV/AIDS
response across the public and private sectors
266
Develop capacity and partnerships for a shared and
common understanding of mainstreaming in both public and
private sectors including civil society, NGOs, CBOs and
FBOs
927,392,700 145,293,200 89,048,700 80,650,700 80,650,700 1,323,036,000 P2
267 Increase the capacity of District Assemblies to oversee
HIV/AIDS activities in their districts 93,394,600 62,324,600 64,326,600
15,849,600 15,849,600 251,745,000 P2
268 Improve HIV/AIDS data collection, dissemination and
utilization at both national and district levels 288,611,700 705,424,200
396,492,200 137,532,200 137,532,200 1,665,592,500 P2
269 Improve planning, coordination and resource mobilisation in
the spirit of the three ones 541,937,500 433,420,000 340,080,000 333,190,000
333,190,000 1,981,817,500 P2 Y1 and Y2 include costs for integrating HIV/AIDS
in GoM plans and policies
270 Implement strategic approach to research and development 534,472,900
566,668,700 585,707,200 613,072,200 613,072,200 2,912,993,200 P2
SUB THEME 3 TOTAL 15,339,581,335 17,386,191,485 15,604,122,885 14,531,179,585
14,531,075,585 77,392,150,875
SUB THEME 4 Education
Primary
271 Expand and improve existing infrastructure and maximize
its use 845,000,000 845,000,000 845,000,000 845,000,000 845,000,000
4,225,000,000 P2
272 Reduce primary school cycle to 7 years from 8 years 117,000,000 117,000,000
117,000,000 117,000,000 117,000,000 585,000,000 P1
Reorganize curriculum, construction of schools.
$10m for 10y. Capital (55%): Needs feeder
schools K. 1500 satellite schools 6 class rooms
each. ORT (45%): $2 per studentx400000pa
273 Undertake social awareness campaigns and whole school
development 24,375,000 24,375,000 24,375,000 24,375,000 24,375,000 121,875,000
P3 $250/schoolx1500 primary schools whole country
Table 4 all Activities Malawi Kwacha
274
Train new and current teachers, provide attractive terms /
conditions, especially to go to rural area, & professional
development
357,825,000 328,110,714 627,110,714 692,110,714 714,396,429 2,719,553,571 P1
Train 45000 existing teachers; train 4000 new
teachers; 3000 new housing ($8000). Training
costs 33%; PE 39%; capital 29%
275 Provide adequate supply of teacher learning materials and
a child friendly environment 436,888,179 233,423,113 238,091,575 242,853,407
247,710,475 1,398,966,748 P2 $3.5 m 10 Y
276 Improve overall management and monitoring of inspection,
supervision and advisory 15,759,366 15,759,366 15,759,366 15,759,366 15,759,366
78,796,830 P1
Primary school inspection: 84 new inspectors; 25$
per headteacher (5159). PE 73%; training cost
27%
277 Mobilize community participation in primary school
management 33,533,500 16,766,750 16,766,750 16,766,750 16,766,750 100,600,500 P3
278 Review policies related to girls 1,392,857 1,392,857 1,392,857 1,392,857
1,392,857 6,964,286 P2
2 workshops per year at 500,000 each. Needs
assessment 400,000. Writing the report policy at
100,000. Altogether 1.5 million per year
279 Provide block grants to schools to address equity issues 73,567,000
85,174,143 73,567,000 73,567,000 73,567,000 379,442,143 P2 200 000$ pa. $400 per
school for 5159 primary
schools
280 Review policies related to SN Education 1,392,857 1,392,857 1,392,857
1,392,857 1,392,857 6,964,286 P2
2 workshops per year at 500,000 each. Needs
assessment 400,000. Writing the report policy at
100,000. Altogether 1.5 million per year
281 Establish a college for special needs teacher education 975,000,000 0 0 0 0
975,000,000 P1 One off cost of $7.5m for establishing one school
282 Provide direct assistance to schools to address equity
issues (relevant textbooks, brail, etc.) 14,760,000 14,760,000 14,760,000
14,760,000 14,760,000 73,800,000 P2
15 visually impaired schools (50,000MK per
month each, 9m MK total); 4 hearing impaired
schools (120,000MK per month each, a total of
5.76m MK) Total for both schools 14.76m MK pa.
A one-off grant of $600 per primary school per
year.
283 Design and standardized sign language for the deaf and
dumb 6,500,000 0 0 0 0 6,500,000 P3 One off grant $50,000
284
Continually revise and improve the relevance of the
curriculum to include academic and non academic needs of
pupils and the effective orientation of teachers – introduce
PCAR curriculum
35,687,282 36,164,465 36,894,371 37,632,765 38,379,817 184,758,700 P1
Prim Cur under Assessmt Reform, new
curriculum starts in 2006, outcome based for the
pupil. ORT - $2 per 1or2 pupils; training - $10 per
teacher pa. TA 28%; ORT 63%; training 9%
285 Provide in service training and incentives to school
managers, inspectors and senior teachers 3,182,400 3,182,400 3,182,400 3,182,400
3,182,400 15,912,000 P1 $240pc pa for 1020 master teachers. Covers also
managers, inspectors. Training only
286 Equip school planners with appropriate knowledge and
skills in micro-planning, monitoring and data management 10,011,105 10,011,105
10,011,105 2,956,005 2,956,005 35,945,325 P3
$100 pa for officials of the MoE for 3 years. 3867
officials involved in decentralization. information
on the decentralization process 5200 schools, $30
per school pa. PE 83%; training 17%
Secondary
287 Identify and rehabilitate all existing dilapidated school
facilities, construct new schools 306,881,250 306,881,250 306,881,250
306,881,250 306,881,250 1,534,406,250 P1 $8000 per class room, 600 class rooms
for
approved comm day secondary schools (CDSS)
288 Introduce double shift in urban school 6,500,000 6,500,000 6,500,000
6,500,000 6,500,000 32,500,000 P3 10 double schools x$5000
289 Increase access to secondary distance education 32,500,000 32,500,000
32,500,000 32,500,000 32,500,000 162,500,000 P3 10000 students $50 pa per school
290 Train and supply adequate number of qualified teachers
and improve terms and conditions 622,050,000 635,050,000 645,450,000 660,400,000
678,600,000 3,241,550,000 P1
Aiming for teacher pupil ratio of 1:40, aim to
increase supply of teachers to 5600 (2015) from
2500 (2005). Takes account of attrition rate and
increasing numbers of pupils
291 Up-grade under qualified teachers through in service
education 58,500,000 58,500,000 58,500,000 58,500,000 58,500,000 292,500,000 P1
Table 4 all Activities Malawi Kwacha
359
Improved management of ESCOM (including reform
electricity tariff structure) and improve the financial and
operational performance of ESCOM
36,300,000 36,300,000 0 0 0 72,600,000 P3 Indicator: Operational Efficiency
360
Implement framework for private sector to operate with the
Government (PPP) to participate in the electricity sector
(institutional framework, etc.)
7,500,000 7,500,000 7,500,000 7,500,000 7,500,000 37,500,000 P1 Indicator:
Independent Power operators
361 Rural communities use alternative energy supplies for
power in under served areas 0 0 0 0 0 0 Fully funded
362
Accelerate the rural electrification programme (promote grid
and off-grid rural electrification by public and private
providers)
125,000,000 125,000,000 125,000,000 125,000,000 125,000,000 625,000,000 P2
Indicator: No. of centres electrified
363 Expand network to rural growth centres 70,000,000 70,000,000 70,000,000
70,000,000 70,000,000 350,000,000 P1 Indicator: No. of centres electrified
364 Create awareness of the use of renewable energy (solar,
wind, biomass, and micro hydro) 4,000,000 4,000,000 4,000,000 4,000,000
4,000,000 20,000,000 P2F Indicator: No. of people using renewables. Fully
funded
SUB THEME 2 TOTAL 1,185,400,000 1,068,525,000 580,925,000 540,925,000
660,925,000 4,036,700,000
SUB THEME 3 Water Supply and Sanitation
365
Empower national authority to manage water resources
using IWRM approach and establish monitoring systems
including the establishment and maintenance of a register
of all actors in water and sanitation, conduct research to
establish resource potential and guides
3,250,000 16,250,000 21,666,667 16,250,000 7,583,333 65,000,000 P1 100%
additional
366
Promote water resource conservation, harvesting and
protection in an integrated manner including development of
small community and large dams (conservation areas
defined), and the development of lake-level regulatory
structures at Liwonde and Mangochi
4,333,333 9,316,667 17,604,167 38,404,167 32,175,000 101,833,333 P1 100%
additional
367
Proactively implement management of water resources and
incorporate local governments and communities in planning
and management of water and sanitation including
catchment protection and rehabilitation
2,166,667 16,250,000 9,100,000 9,100,000 9,100,000 45,716,667 P1 100% additional
368 Develop Management Information System (MIS) for the
water and sanitation 43,333,333 65,000,000 45,500,000 10,833,333 10,833,333
175,500,000 P2 100% additional
369 Recognize and implement obligations to international
agreements 2,166,667 3,250,000 4,333,333 4,333,333 4,333,333 18,416,667 P3 100%
additional
370 Revise Water Resources Act of 1969 and Water Works Act 21,666,667 13,000,000
34,666,667 P1 100% additional
371 Provide incentives for LA to promote community watershed rehabilitation
programs 10,833,333 16,250,000 21,666,667 21,666,667 21,666,667 92,083,333 P1
100% additional
372 Build capacity in IWRM 10,833,333 10,833,333 10,833,333 10,833,333
10,833,333 54,166,667 P1 100% additional
373 Develop integrated water resources management master
plans and investment strategies 21,666,667 13,000,000 34,666,667 P1
Water quality and pollution control 0 0 0 0 0 0
374 Rehabilitate, construct and equip water laboratories 54,166,667 54,166,667
108,333,333 P1 100% additional
375 Establish database on water quality 3,250,000 5,416,667 5,416,667 2,166,667
2,166,667 18,416,667 P2 100% additional
376
Improve skills, technologies, techniques in water quality
monitoring and pollution control (catchment rehabilitation,
determining water quality)
2,166,667 2,166,667 3,250,000 3,250,000 2,166,667 13,000,000 P2 100% additional
377 Strengthen institutional arrangements for environmental
management 3,250,000 2,166,667 2,166,667 2,166,667 2,166,667 11,916,667 P3 100%
additional
378 Develop and disseminate guidelines and standards on
water quality and pollution control 10,833,333 10,833,333 10,833,333 10,833,333
10,833,333 54,166,667 P2 100% additional
379 Provide TA to local government and stakeholders on water
quality and pollution control 2,708,333 3,250,000 3,250,000 2,708,333 2,166,667
14,083,333 P3 100% additional
Table 4 all Activities Malawi Kwacha
402
Promote active participation of all Malawians including
women, youth and persons with disabilities in developing
the information society
13,000,000 13,000,000 13,000,000 13,000,000 13,000,000 65,000,000 P2
403 Promote the deployment and exploitation of ICTs in the
public and private sector (improve E-governance) 9,650,000 9,650,000 9,650,000
9,650,000 9,650,000 48,250,000 P1
Telecommunications
404 Continue liberalization of telecommunications sector 6,500,000 6,500,000
6,500,000 6,500,000 6,500,000 32,500,000 P2
405 Telecommunications fund provided for rural
telecommunications 330,000 330,000 330,000 330,000 330,000 1,650,000 P1
406 Provision of model telecentres 26,000,000 26,000,000 26,000,000 26,000,000
26,000,000 130,000,000 P2
407 Procurement and installation of modern
telecommunications equipment 330,000 330,000 330,000 330,000 330,000 1,650,000
P1
408 Strengthen the regulatory body (MACRA) 1,846,000 1,846,000 1,846,000
1,846,000 1,846,000 9,230,000 P2F Fully funded
409 Facilitate research on issues of self regulation 1,200,000 1,200,000
1,200,000 1,200,000 1,200,000 6,000,000 P2
Broadcasting
410 Acquisition of broadcasting equipment 13,000,000 13,000,000 13,000,000
13,000,000 13,000,000 65,000,000 P1
411 Building of purpose built stations 26,000,000 26,000,000 26,000,000
26,000,000 26,000,000 130,000,000 P1
412 Human capacity building through training 10,000,000 10,000,000 10,000,000
10,000,000 10,000,000 50,000,000 P2
413 Promotion of private sector participation in broadcasting 1,300,000
1,300,000 1,300,000 1,300,000 1,300,000 6,500,000 P3
414 Rehabilitate and computerise the existing TV and radio
stations 26,000,000 26,000,000 26,000,000 26,000,000 26,000,000 130,000,000 P3
SUB THEME 4 TOTAL 675,816,000 520,856,000 513,636,165 507,072,679 501,105,874
2,718,486,718
SUB THEME 5 Science, Technology, Research and
Development
415 Establish the Lilongwe University of Science and
Technology 1,000,000,000 1,000,000,000 1,000,000,000 1,000,000,000 1,000,000,000
5,000,000,000 P1 Presidential initiative. 100% additional
416
Establish the National Science and Technology
Commission to coordinate technology research,
development, dissemination, evaluation and utilization
0 10,000,000 0 0 0 10,000,000 P3 100% additional
417 Train staff in specialized science and technology fields 25,000,000
25,000,000 25,000,000 25,000,000 25,000,000 125,000,000 P1 100% additional
418 Establishment of a technology park and incubation centre 8,000,000 6,000,000
200,000 200,000 200,000 14,600,000 P1 100% additional
419 Support STI programs in the local communities 15,000,000 15,000,000
15,000,000 15,000,000 10,000,000 70,000,000 P1 100% additional
420 Design and implement STI capacity building programs to
produce S&T expertise 15,000,000 15,000,000 15,000,000 2,000,000 2,000,000
49,000,000 P2 100% additional
421 Promote recruitment and retention of qualified S&T experts 15,000,000
10,000,000 5,000,000 0 0 30,000,000 P2 100% additional
422 Review policy and regulatory framework science and
technology 0 3,000,000 0 0 0 3,000,000 P1 100% additional
423 Review S&T Act 0 2,000,000 0 0 0 2,000,000 P1 100% additional
424 Promote innovative schemes and culture 5,000,000 5,000,000 5,000,000
5,000,000 0 20,000,000 P2 100% additional
425 Identify and transfer competitive technologies 10,000,000 10,000,000
10,000,000 0 0 30,000,000 P2 100% additional
426 Establish financing mechanism that supports
commercialisation of technologies 1,000,000 0 0 0 0 1,000,000 P2 100% additional
427 Strengthen public/private partnership in usage of science,
technology and innovation 5,000,000 0 0 0 0 5,000,000 P1 100% additional
428 Promote utilization and development of beneficial
indigenous technology 5,000,000 10,000,000 10,000,000 5,000,000 5,000,000
35,000,000 P2 100% additional
429 Development of an intellectual property policy 5,000,000 0 0 0 0 5,000,000
P1 100% additional
430 Mainstreaming of S&T in Government and private sector
operations 3,000,000 2,500,000 2,500,000 2,000,000 0 10,000,000 P2 100%
additional
Table 4 all Activities Malawi Kwacha
431 Establish and update a data bank on STI 5,000,000 0 0 0 0 5,000,000 P3 100%
additional
432 Support multidisciplinary research and development 5,000,000 5,000,000
5,000,000 5,000,000 5,000,000 25,000,000 P1 100% additional
433 Promote gender equity in STI activities 5,000,000 0 0 0 0 5,000,000 P2 100%
additional
434 Strengthen technology information services 35,000,000 35,000,000 0 0 0
70,000,000 P2 100% additional
435 Strengthening of Malawi industrial research and technology
development centre 20,000,000 20,000,000 40,000,000 P1 100% additional
SUB THEME 5 TOTAL 1,182,000,000 1,173,500,000 1,092,700,000 1,059,200,000
1,047,200,000 5,554,600,000
THEME 4 GRAND TOTAL 72,325,229,333 72,635,361,000 73,995,102,999 73,901,976,113
71,579,985,134 364,437,654,578
THEME 5 GOOD GOVERNANCE
SUB THEME 1 Macroeconomic Stability
436 Improve financial management systems and skills to
operate them, MoF and AGD 130,000,000 195,000,000 130,000,000 65,000,000
97,500,000 617,500,000 P1F
This item has been budget for and supported by
donors. MoF does not consider this to be
additional
437 Enforce adherence of line ministries and parastatals to
Public and Finance Management Act 650,000 650,000 650,000 650,000 650,000
3,250,000 P1F
This is a small item but important nonetheless.
Implementation will not require significant
additional resources and will be covered under
existing resource provision
438 Negotiate multilateral debt write-downs 650,000 650,000 650,000 1,950,000
P2F This is an existing activity and will not require
additional resources
439 Strengthen the capacity of Treasury’s Public Expenditure
Monitoring Unit 1,300,000 1,300,000 1,300,000 1,300,000 1,300,000 6,500,000 P1
100% additional
440 Receive better donor aid assistance projections and
improve funding flows 6,500,000 6,500,000 3,250,000 1,625,000 1,625,000
19,500,000 P2F Donors have funded consultants to develop data
base for MoF
441
Strengthen the capacity of Debt and Aid Management
Division to better co-ordinate donors and manage aid
inflows
13,000,000 13,000,000 13,000,000 6,500,000 6,500,000 52,000,000 P3F This is
already budgeted for under donor project
and is not therefore considered additional by MoF
442 Negotiate with donors an action plan for harmonization,
alignment and better aid coordination 3,250,000 65,000,000 48,750,000 36,562,500
27,421,875 180,984,375 P3F Cost will be covered by donors
443
Undertake tax reforms to improve the incentives for
household saving and investment and the equity of tax
administration
9,750,000 9,750,000 9,750,000 9,750,000 9,750,000 48,750,000 P1 100% additional
SUB THEME 1 TOTAL 165,100,000 291,850,000 207,350,000 121,387,500 144,746,875
930,434,375
SUB THEME 2 Public Sector Management
444
Implement performance management systems, and
transparent appointment and promotion of personnel based
on merit and performance
158,010,924 158,010,924 142,209,832 127,988,848 115,189,964 701,410,491 P1 100%
additional
445 Implement pay reforms, address recruitment and retention
problems, non-salary incentives 16,133,358 16,133,358 14,520,022 13,068,020
11,761,218 71,615,976 P2
446
Control size and cost of public sector and focuses them on
its priority areas, including donor funding for the public
sector
10,000,000 10,000,000 11,000,000 12,100,000 13,310,000 56,410,000 P2
447 Enforce human resource policies and systems 650,000 650,000 650,000 650,000
650,000 3,250,000 P3
448
Implement the monitoring and evaluation roadmap
(includes coordination of donors, national statistical plan,
etc.)
3,768,975 3,768,975 4,145,873 4,560,460 5,016,506 21,260,789 P3
449 Enforce greater clarity on separation of roles between
Ministers and PSs
450
Develop and implement national anti-corruption strategy
addressing root causes of corruption and involving public
and private sectors
15,000,000 15,750,000 16,537,500 17,364,375 18,232,594 82,884,469 P2 100%
additional
451 Strengthen the media capacity through training and access
to and distribution of public inform Min of Information
452 Establish community information centres Min of Information
453 Promote professionalism of media that delivers politically
impartial news coverage Min of Information
Table 4 all Activities Malawi Kwacha
A1
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
Revised Terms of Reference
A1
1. Key sectors to be jointly identified for the costing exercise, based on the
largest budgetary allocations and MGDS priorities; and
2. Determine the cost to the Government of implementing the MGDS in these
sectors, entailing estimating the cost of implementing the priority focus
actions to achieve the medium term expected outcomes. The cost estimates
will form part of input in the process of prioritising the strategies. This will
be
an iterative process of costing, priority setting and target setting.
Ultimately,
the cost estimates will also help the government in mobilizing resources for
the implementation of the strategy.
Possible Follow up Activities (new contract)
A1-1
GoM / Malawi: Growth and Development Strategy / MDGS Costings Final Report /
February 2006
TERMS OF REFERENCE
Phase Two: Malawi Growth and Development Strategy
Macro-framework and Costing of MGDS
A. Background
The Government of Malawi is in the process of developing the Malawi Growth and
Development Strategy. The strategy defines comprehensively the actions that the
government intends to undertake in the medium term (2006 – 2011) in order to
achieve
its growth and development objectives. Development of the strategy is being
guided by a
Steering Committee. The Steering Committee is comprised of representatives from
Ministry of Finance, Ministry of Economic Planning and Development, the Reserve
Bank, Ministry of Trade and Private Sector Development, and Malawi Investment
Promotion Agency (MIPA). The committee reports directly to the Economic
Management Subcommittee of the Cabinet. The Steering Committee has in turn
instituted a Technical Working Group that is responsible for the actual
formulation of the
strategy.
The formulation of the strategy is in two phases. The first phase focused on
identifying
the government’s long term goals and the medium term objectives to attain those
goals.
Constraints and strategies for achieving the medium-term objectives were then
identified.
To this end, the team consulted various existing strategy documents such as the
Malawi
Economic Growth Strategy, the Malawi Poverty Reduction Strategy, and other
strategies;
sector policy documents, MPRS progress reports and reports from other existing
analytical pieces of work. The team also held consultations with line
ministries, civil
society, private sector and donors on the longer-term goals, medium term
outcomes, key
constraints, and focus actions. The framework for consultations was a matrix
indicating
the long-term goals, intermediate objectives, constraints, and strategies for
addressing the
constraints.
Phase II will build on and deepen the work of Phase I. This includes (a) filling
gaps in
the strategy matrix where they still exist (b) identifying target variables
(indicators) (c)
establishing their baseline values (d) setting their target values (e)
estimating the cost of
reaching the targets set (f) prioritization of strategies (g) drafting of the
strategy
document. The Steering Committee has established a Phase II Working Group to
work
with the Technical Working Group in most of the work lined up for phase two. The
Phase II Working Group will comprise: Ministry of Finance, Monitoring and
Evaluation
Department in the Ministry of Economic Planning and Development , The Reserve
Bank,
Members of the MGDS Technical Working Group, and the IMF. These terms of
reference will guide their work.
B. Expected Outputs of the Phase II Working Group
The Phase II Working Group is expected to work closely with the Steering
Committee to
ensure that the work is consistent with the strategy process and deepens the
strategy. It is
expected that this work will feed into the strategy and meet the end December
timeline.
The Working Group will identify consultants to assist in undertaking the
following tasks:
ii) Indicators and Targets: Identify monitoring indicators for the MGDS,
establish their
baseline values, and then set their target values. The indicators can be
qualitative and
quantitative, but where feasible should be SMART (i.e. specific, measurable,
achievable,
relevant, and time bound). These indicators and targets will be used to monitor
and
evaluate implementation and performance of the MGDS.
iii) Costing of the MGDS: Determine the cost of implementing the MGDS. This will
entail estimating the cost of implementing the priority focus actions to achieve
the
medium term expected outcomes. The cost estimates will form part of input in the
process of prioritizing the strategies. This will be an iterative process of
costing, priority
setting and target setting. Ultimately, the cost estimates will also help the
government in
mobilizing resources for the implementation of the strategy.
The Working Group will not only determine the cost of implementing the strategy,
but
will also define the role that the costings are supposed to play in the budget
process. In
particular, the Working Group will be expected to develop clear guidelines for
the
alignment of the budget to the MGDS. This will entail (a) reviewing the current
system of
translating MPRS strategies into budgetary activities, (b) developing guidelines
on how
the MGDS costings are expected to provide input into the budget process, and (c)
developing guidelines for assessing the extent to which the budget is aligned to
the
MGDS;
iv) Prioritization of the MGDS: Prioritize the long-term goals, the intermediate
objectives, and the strategies for achieve the objectives. The process of
determining the
priorities will benefit from projections of the resource envelope, the costing
exercise, and
from more robust analyses of consequences of medium- and long-run strategies on
other
components of the economy.1
CONSULTANCY DETAILS
ii) Review the methodology used in costing the MPRSP. After reviewing the
methodology, the consultant will need to decide whether or not to use the same
methodology in costing the MGDS or whether to use a completely different
approach.2
iii) Outline all the main assumptions made in arriving at the costings;
iv) Develop detailed and clear guidelines for revising the costs when the main
underlying
assumptions change;
v) Define the role that the costings are supposed to play in the budget process.
In
particular, develop clear guidelines for the alignment of the budget to the
MGDS. This
will entail (a) reviewing the current system of translating MPRS strategies into
budgetary
activities, (b) developing guidelines on how the MGDS costings are expected to
provide
input into the budget process,3 and (c) developing guidelines for assessing the
extent to
which the budget is aligned to the MGDS;
vi) Recommend, whether the MGDS costings should be presented as costs for
achieving
certain targets or as costs for implementing the strategies/actions for
achieving those
targets, or in terms of both;
vii) Advise on how the Working Group should respond to the proposal by the
UNDP’s
Millennium Project that the exercise of costing the MGDS be linked to that of
costing the
MDGs;
viii) Propose ways in which capacity can be developed in government to carry out
this
type of work in-house.
3.0 Outputs
The consultant is expected to produce a report with costing, guidelines, and
recommendations in line with these terms of reference.
5.0 Experience/Qualifications
3 In developing these guidelines, the consultant will also need to make
recommendations on how, on top of
the MGDS costings, other sources of input into the budget, such as Public
Expenditure Reviews will have
to be dealt with.
The consultant must be a holder of at least a masters degree in a relevant field
and will
have demonstrable experience in costing projects. Experience in costing country
strategies will be an added advantage.
The Phase II Working Group is scheduled to present its progress and findings at
a high
level meeting in Malawi on 22 December. Accordingly an early start to the
consultancy
support is required, though given the time constraints some elements of the work
may run
into early 2006.