Sunteți pe pagina 1din 88

FIBER INDUSTRY DEVELOPMENT AUTHORITY

Region VIII, Tacloban City

Job Order:
Date: 40525

VICENTE M. JABON
Brgy Doña Maria, Albuera, Leyte

Dear Mr. Jabon

Please execute the job order called for in our canvass of prices dated
which was awarded to you.

Price: Php 9,600.00

Particulars: Labor services for the maintenance of 1.0 ha semi high density
abaca nursery in Brgy Doña Maria, Albuera, Leyte to include: underbrushing,
ringweeding, fertilizer application, spraying with insecticide and replanting
of missing hills.

Area: 1.0 ha

Very truly yours,

JEFFREY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
Department of Agriculture
FIBER INDUSTRY DEVELOPMENT AUTHORITY
3F YUTANGCO BLDG., P. BURGOS ST
Tacloban City

DISBURSEMENT VOUCHER
MODE OF PAYMENT
MDS Check X Commercial Check

Payee/Office
WILARDO O. SINAHON

Address Tacloban City

PARTICULARS

To reimbursement of per diems and travelling expenses incurred w


official business assisting in the training on safe use and maintenance of abaca
mobile spindle stripping machine in the amount of …………………….

A Certified: Supporting Documents complete and prope

Cash Available

Subject to ADA (where applicable)

Signature

Printed Name LOLITA R. COTONER


Position Bookkeeper Designate

Date

C Received Payment:

Signature

Printed Name WILARDO O. SINAHON


No.:
Commercial Check ADA Others Date:

TIN/Employee No.: OS No.

Date:
Responsibility Center

Title

expenses incurred while on


maintenance of abaca
……………. Php

Amount Due

complete and proper B Approved for Payment:

applicable)

Signature

Printed Name JEFFREY G. ESPEÑA


Position OIC-Regional Director

Date

Check/ADA No.

Date

Bank Name

O.R. No./other relevant document

Issued:
Code

Amount

4620

4620

or Payment:

EFFREY G. ESPEÑA
OIC-Regional Director

D Journal Entry Voucher

No. ________________

Date: ________________
JOB ORDER REQUEST

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

DepartmentAgriculture Date: 40434


Section: Extension J.O. No.

Job Order Description

JOB ORDER
Labor services for the hauling and distribution
of suckers, basal application of fertilizer and
planting of abaca suckers in the establishment of a
semi-high density abaca nursery in Brgy
Brgy Doña Maria, Albuera, Leyte.

TERMS AND CONDITIONS:


1. The winning bidder shall provide manpower
and tools needed in the following labor services:
a. Hauling and distribution of planting materials in
each holes. (5 man-days)
b. Basal application of fertilizer and planting
(30 man-days).
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU personnel.
3. The winning bidder shall perform the job within
a period of five (5) days.
4. The FIDA shall provide the payments after the
completion of the job duly certified by FIDA
field personnel.

Purpose: For establishment of one (1) hectare semi-high density abaca


nursery in Brgy. Doña Maria, Albuera, Leyte.
Requested by: Approved by:
Signature
Printed Name:
WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation:
PFO-Leyte OIC-Regional Director

JOB ORDER REQUEST

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

DepartmentAgriculture Date: 40392


Section: Extension J.O. No.

Job Order Description

1 has JOB ORDER


Labor services for the land preparation
and production of stakes for the establishment
of one (1) hectare semi-high density abaca
nursery in Brgy Tagaytay, Kananga, Leyte

TERMS AND CONDITIONS:


1.     The winning bidder
1.    
shall
Theprovide
winningmanpower
bidder shall
andprovide
tools manpower and tools
needed in the land preparation and production of stakes
in the estalishment of a one (1) hectare abaca
semi high density nursery inclusive of the following
activities:
a.  Clearing the area with grasses, vines and unwanted shrubs.
b. Prepation of bamboo sticks 3cm x 100cm, pointed at one end.
5,000 pcs.
c.Lining and staking with a distance of 2.0m x 1.0m
d. Digging of holes with dimension of 20cm x 20cm x20cm
2.     The winning bidder shall perform the job under the
supervision of FIDA or LGU technicians.
3.     The winning bidder shall perform the job within a period of
ten (10) days.
5.     The FIDA shall provide the payments after completion of the jo
duly certified by FIDA field personnel.
Purpose: For establishment of one (1) hectare semi-high density abaca
nursery in Brgy Tagaytay, Kananga, Leyte
Requested by: Approved by:
Signature
Printed Name:
WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation:
PFO-Leyte OIC-Regional Director

JOB ORDER REQUEST

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

DepartmentAgriculture Date: 40392


Section: Extension J.O. No.

Job Order Description

1 has JOB ORDER


Labor services for the land preparation
and production of stakes for the establishment
of one (1) hectare semi-high density abaca
nursery in Brgy Natubgan, Kananga, Leyte

TERMS AND CONDITIONS:


1.     The winning bidder
1.    
shall
Theprovide
winningmanpower
bidder shall
andprovide
tools manpower and tools
needed in the land preparation and production of stakes
in the estalishment of a one (1) hectare abaca
semi high density nursery inclusive of the following
activities:
a.  Clearing the area with grasses, vines and unwanted shrubs.
b. Prepation of bamboo sticks 3cm x 100cm, pointed at one end.
5,000 pcs.
c.Lining and staking with a distance of 2.0m x 1.0m
d. Digging of holes with dimension of 20cm x 20cm x20cm
2.     The winning bidder shall perform the job under the
supervision of FIDA or LGU technicians.
3.     The winning bidder shall perform the job within a period of
ten (10) days.
5.     The FIDA shall provide the payments after completion of the jo
duly certified by FIDA field personnel.

Purpose: For establishment of one (1) hectare semi-high density abaca


nursery in Brgy Natubgan, Kananga, Leyte
Requested by: Approved by:
Signature
Printed Name:
WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation:
PFO-Leyte OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

DepartmentAgriculture Date: 40392


Section: Extension J.O. No.

Job Order Description

1 has JOB ORDER


Labor services for the land preparation
and production of stakes for the establishment
of one (1) hectare semi-high density abaca
nursery in Brgy Rizal, Kananga, Leyte

TERMS AND CONDITIONS:


1.     The winning bidder
1.    
shall
The
provide
winning
manpower
bidder shall
andprovide
tools manpower and tools
needed in the land preparation and production of stakes
in the estalishment of a one (1) hectare abaca
semi high density nursery inclusive of the following
activities:
a.  Clearing the area with grasses, vines and unwanted shrubs.
b. Prepation of bamboo sticks 3cm x 100cm, pointed at one end.
5,000 pcs.
c.Lining and staking with a distance of 2.0m x 1.0m
d. Digging of holes with dimension of 20cm x 20cm x20cm
2.     The winning bidder shall perform the job under the
supervision of FIDA or LGU technicians.
3.     The winning bidder shall perform the job within a period of
ten (10) days.
5.     The FIDA shall provide the payments after completion of the jo
duly certified by FIDA field personnel.

Purpose: For establishment of one (1) hectare semi-high density abaca


nursery in Brgy Rizal, Kananga, Leyte
Requested by: Approved by:
Signature
Printed Name:
WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation:
PFO-Leyte OIC-Regional Director

JOB ORDER REQUEST

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

DepartmentAgriculture Date: 40392


Section: Extension J.O. No.

Job Order Description


1 has JOB ORDER
Labor services for the land preparation
and production of stakes for the establishment
of one (1) hectare semi-high density abaca
nursery in Brgy Hiluctugan, Kananga, Leyte

TERMS AND CONDITIONS:


1.     The winning bidder
1.    
shall
Theprovide
winningmanpower
bidder shall
andprovide
tools manpower and tools
needed in the land preparation and production of stakes
in the estalishment of a one (1) hectare abaca
semi high density nursery inclusive of the following
activities:
a.  Clearing the area with grasses, vines and unwanted shrubs.
b. Prepation of bamboo sticks 3cm x 100cm, pointed at one end.
5,000 pcs.
c.Lining and staking with a distance of 2.0m x 1.0m
d. Digging of holes with dimension of 20cm x 20cm x20cm
2.     The winning bidder shall perform the job under the
supervision of FIDA or LGU technicians.
3.     The winning bidder shall perform the job within a period of
ten (10) days.
5.     The FIDA shall provide the payments after completion of the jo
duly certified by FIDA field personnel.

Purpose: For establishment of one (1) hectare semi-high density abaca


nursery in Brgy Hiluctugan, Kananga, Leyte
Requested by: Approved by:
Signature
Printed Name:
WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation:
PFO-Leyte OIC-Regional Director
Estimated Cost
Estimated Cost

wer and tools

under the

within a period of

r completion of the job


Estimated Cost

wer and tools


under the

within a period of

r completion of the job

Estimated Cost

wer and tools


under the

within a period of

r completion of the job

Estimated Cost
wer and tools

under the

within a period of

r completion of the job


FIBER INDUSTRY DEVELOPMENT AUTHORITY

PURCHASE REQUEST

PR No. Date: Feb 18, 2011


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
15 bot Betadine (Big)
15 bot Ethyl Rubbing Alcohol, 500ml
15 bot Off-Lotion (Big)
150 pcs Paracetamol
20 pcs Lozartan potassium(lifezar,50mg)
150 pcs Loperamide (Imodium)
150 pcs Antacid (Kremil S)
75 pcs Anti-allergy (Claritin)
10 pcs Combizar 100mg
20 pcs Fivecranes inhaler (Big)
2 boxes Vitamin C (Ceecon) 500mg
15 bot Omega pain killer (Big)
15 pack Absorbent Cotton,10 grams
2 boxes Band Aid
15 rolls gauze bandage
15 rolls plaster (Big)
100 pcs Amoxicylin 500mg
50 pcs Sinutab

Purpose: To be used in the implementation of GAA-ADMP in Mahaplag, Leyte

Requested by: Approved by:

Signature:
Printed Name: ROMEO O. BORDEOS JR. JEFFREY G. ESPEÑA
Designation: Project Director,GAA-ADMP Mahaplag OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY

PURCHASE REQUEST

PR No. Date: Feb 18, 2011


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
1 unit Water Dispenser, hot and cold (GE)
3 units Water Jugs

Purpose: To be used in the implementation of GAA-ADMP in Mahaplag, Leyte

Requested by: Approved by:

Signature:
Printed Name: ROMEO O. BORDEOS JR. JEFFREY G. ESPEÑA
Designation: Project Director,GAA-ADMP Mahaplag OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY

PURCHASE REQUEST

PR No. Date: Feb 18, 2011


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
50 meters Floor Mat (Linoleum)
15 sets Mosquito nets (single)
1 set Lockset (door knob),Kwik set

Purpose: To be used in the implementation of GAA-ADMP in Mahaplag, Leyte

Requested by: Approved by:


Signature:
Printed Name: ROMEO O. BORDEOS JR. JEFFREY G. ESPEÑA
Designation: Project Director,GAA-ADMP Mahaplag OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY

PURCHASE REQUEST

PR No. Date: Feb 18, 2011


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
1 unit LPG Gas Stove, 2 burners (3D)
1 unit LPGTank with contents,FV ,11 kg
2 meters LPG Hose , Japan
1 unit LPG regulator,FV
2 pcs Hose clip

Purpose: To be used in the implementation of GAA-ADMP in Mahaplag, Leyte

Requested by: Approved by:


Signature:
Printed Name: ROMEO O. BORDEOS JR. JEFFREY G. ESPEÑA
Designation: Project Director,GAA-ADMP Mahaplag OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY

PURCHASE REQUEST

PR No. Date: Feb 18, 2011


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
2 boxes Ballpen, pilot, color black and blue
20 pcs Permanent markers,assorted colors
5 pcs Permanent markers,broad tip,black,pilot
15 pcs Notebooks,50 leaves

Purpose: To be used in the implementation of GAA-ADMP in Mahaplag, Leyte


Requested by: Approved by:

Signature:
Printed Name: ROMEO O. BORDEOS JR. JEFFREY G. ESPEÑA
Designation: Project Director,GAA-ADMP Mahaplag OIC-Regional Director

Purpose: To be used in conducting Abaca Farmers' Training in Brgy Kagumay, Baybay


City, Leyte
Requested by: Approved by:

Signature:
Printed Name: ROMEO O. BORDEOS JEFFREY G. ESPEÑA
Designation: Project Director-GAA ADMP OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

PR No. Date: 40236


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
10 kgs Whole Chicken
2.03 kgs Pork Chop
2 kgs Fish
5 kgs Fish
10 kgs bihon
5 kgs miki
10 packs Crispy Fry
Assorted spices
5 bundles Firewood
10 gantas Rice
1 units Motor Hire
1 units Motor Hire
Purpose: To be used in the CONDUCT OF Abaca Farmers Training
in Brgy Villa Solidaridad
Requested by: Approved by:

Signature:
Printed Name: ROMEO O. BORDEOS, JR JEFFREY G. ESPEÑA
Designation: Project Director-GAA ADMP OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)
PR No. Date: 40236
Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
11.7 kgs Chicken
3 kgs Pork Chop
75 pcs Bread
3 kgs Fish
10 kgs bihon
5 kgs miki
10 packs Crispy Fry
Assorted spices
1 bot Cooking oil
1 bot soy sauce
10 gantas Rice
1 units Motor Hire
1 units Motor Hire
Purpose: To be used in the CONDUCT OF Abaca Farmers/Training in Brgy Balao, Baybay City
Leyte.
Requested by: Approved by:

Signature:
Printed Name: ROMEO O. BORDEOS, JR. JEFFREY G. ESPEÑA
Designation: Project Director-HVCC ADMP OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

PR No. Date: 40236


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
1 roll Scotch tape
1 roll masking tape
1 pc Pentel pen
1 roll packing tape
4 pcs flourescent paper
1 pc cutter
30 pcs Bread
3 packs Coffee
1 units meals
100 pcs photocopy
3 pcs Akari Bulb
2 pcs Battery AA
1 pcs safety hasps
1 units Transportation
1 units welding/repair of electrical
wiring (Tamaraw FX)
photocopy
1 units Gasulette refill
1 units Donation for the use of
training hall

Purpose: To be used in conducting Orientation Training and Implementation of Abaca Disease


Management Project, Brgy Kambonggan, Baybay City, Leyte
Requested by: Approved by:

Signature:
Printed Name: DANILO E. OCAYO JEFFREY G. ESPEÑA
Designation: Project Director-GAA ADMP OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

PR No. Date: 40309


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
55 pcs Photocopy
1 pcs cellcard
1 pcs Printing and Computer rental
7 pcs Plastic Container
1 pcs ink refill
10 pcs Photocopy
1 pcs LBC
15 pcs Photocopy
15 pcs Photocopy
24 pcs Photocopy
70 pcs Photocopy
60 pcs Photocopy
24 pcs Photocopy
38 pcs Photocopy
20 pcs Photocopy
1.5 pcs Internet rental
152 pcs Photocopy
21 pcs Photocopy
12 pcs Photocopy
20 pcs Photocopy
1 pcs SHM3300 Headset
1 pcs Notebook cooler
1 pcs HP#28 Color ink
2 pcs CD-R

Purpose: To be used in the implementation of Abaca Disease Management Project in Baybay

Requested by: Approved by:

Signature:
Printed Name: WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation: PFO-Team Leader Baybay OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)
PR No. Date: 40309
Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
1 lot Hauling (Amguhan)
1 lot Hauling (Amguhan)
1 lot Hauling (Sapa)
1 lot Hauling (Sapa)
1 lot Hauling (Monterico)
1 lot Hauling (Monterico)
1 lot Hauling (Pansagan)
1 lot Hauling (Pansagan)
1 lot Hauling (Altavista)
1 lot Hauling (Altavista)
1 lot Hauling (Ambacan)
1 lot Hauling (Ambacan)
1 lot Hauling (Kagumay)
1 lot Hauling (Kagumay)
1 lot Hauling (Kabungaan)
1 lot Hauling (Kabungaan)
1 lot Hauling (Ampihanon)
1 lot Hauling (Ampihanon)
1 lot Hauling (Villa Solidaridad)
1 lot Hauling (Villa Solidaridad)

Purpose: To be used in the implementation of Abaca Disease Management Project in Baybay

Requested by: Approved by:

Signature:
Printed Name: WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation: PFO-Team Leader Baybay OIC-Regional Director

FIBER INDUSTRY DEVELOPMENT AUTHORITY


(Agency)

PR No. Date: 40309


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
15 pax Meals for 15 participants attending the briefing
on Revisiting/retreatment of infected abaca
farms.

Purpose: To be used in the implementation of Abaca Disease Management Project in Baybay

Requested by: Approved by:

Signature:
Printed Name: WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation: PFO-Team Leader Baybay OIC-Regional Director
FIBER INDUSTRY DEVELOPMENT AUTHORITY
(Agency)

PR No. Date: 40381


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
6 units Knapsack type sprayer, 16 li capacity,
stainless, Tung Ho Golden Agin

Purpose: To be used in the establishment of semi-high density abaca


nurseries in Kanangga and Albuera, Leyte
Requested by: Approved by:

Signature:
Printed Name: WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation: PFO-Team Leader Baybay OIC-Regional Director
FIBER INDUSTRY DEVELOPMENT AUTHORITY
(Agency)
PURCHASE REQUEST

PR No. Date: 40515


Department: Agriculture SAI No. Date:
Section: Extension ALOBS No. Date:

Quantity Unit of Item Description Stock No. Estimated


Issue Unit Cost
30 bags UREA, 48-00-00
30 bags Complete fertilizers, 14-14-14

Purpose: To be used in the maintenance of semi-high density abaca


nurseries in Albuera and Kananga, Leyte.
Requested by: Approved by:

Signature:
Printed Name: WILARDO O. SINAHON JEFFREY G. ESPEÑA
Designation: PFO-Leyte OIC-Regional Director
Estimated
Cost
Estimated
Cost
Estimated
Cost
Estimated
Cost
Estimated
Cost
Estimated
Cost
Estimated
Cost
ao, Baybay City

Estimated
Cost
of Abaca Disease
Estimated
Cost

roject in Baybay
Estimated
Cost

roject in Baybay
Estimated
Cost

roject in Baybay
Estimated
Cost
Estimated
Cost
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

CERTIFICATION

TO WHOM IT MAY CONCERN:

This is to CERTIFY that the JOB Order which was awarded to


JORGE V. LUMANGTAD per RIV and Canvass of Prices made has been
most reasonable and justifiable.

I further certify to have accepted the services rendered by the above


mentioned person/firm listed in the attached RER No.
dated which has been inspected and found to be in accordance with
the specifications stipulated therein.

ISSUED this day of September 2010 at


Tacloban City, Leyte.

WILARDO O. SINAHON
PFO-Leyte
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUHTORITY
Region VIII, Tacloban City

40485
Date

_____________________
_____________________
_____________________
_____________________

GENTLEMEN:

Please quote your best lowest government price for each of the following items specified
subject to Administrative Order No. 66 Office of the President particularly by Letter of Confirmation a
Clearance.
ITEM NO. QTY UNIT ITEM DESCRIPTION
UNIT PRICETOTAL

1 has JOB ORDER:


Labor services
Phpfor
__________
the initial
___________
maintenance
of one (1) hectare semi high density abaca
nursery in Brgy San Pedro, Albuera Leyte
TERMS AND CONDITIONS:
1. The winning bidder shall provide manpower
and tools needed in the following labor services
maintenance of one (1) hectare semi-high
density abaca nursery:
a. Underbrushing and ring weeding, 25 man-days
b. Application of fertilizer, 15 man-days
c. Spraying with insecticide, 3 man-days
d. Replanting in missing hills, 5 man-days
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU technicians
3. The winning bidder shall perform the job within
a oeriod of five (5) working days
4. The FIDA shall provide payment after the
completion of the job duly certified by the
FIDA field personnel.
NOTED BY: BY AUTHORITY OF THE ADMINISTRATOR:

WILARDO O. SINAHON JEFFREY G. ESPEÑA


PFO-Leyte OIC-Regional Director

SIGFREDO C. VELOSO, JR.


Dealer Canvasser
wing items specified below,
ter of Confirmation and Tax
ADMINISTRATOR:
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

CERTIFICATE OF EMERGENCY PURCHASE/JOB ORDER

THIS IS TO CERTIFY that this purchase/job order wa not done in the usual
manner because the delay would be detrimental to the best interest of the service besides
being more economical in regard to transportation expenses and necessary documents
required hereof and time saving.

THIS CERTIFIES further that the rate was lowest in the locality at the
time of purchase/job order.

Issued this day of 2010, at Tacloban City

WILARDO O. SINAHON
PFO-Leyte
ce besides
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR REYNALDO TITO


BERNAL
CAINDOC
RICARDO B. MONTALB

1 has JOB ORDER: 9850 10000 9600


Labor services for the initial maintenance
of one (1) hectare semi high density abaca
nursery in Brgy San Pedro, Albuera Leyte
TERMS AND CONDITIONS:
1. The winning bidder shall provide manpower
and tools needed in the following labor services
maintenance of one (1) hectare semi-high
density abaca nursery:
a. Underbrushing and ring weeding, 25 man-days
b. Application of fertilizer, 15 man-days
c. Spraying with insecticide, 3 man-days
d. Replanting in missing hills, 5 man-days
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU technicians
3. The winning bidder shall perform the job within
a oeriod of five (5) working days
4. The FIDA shall provide payment after the
completion of the job duly certified by the
FIDA field personnel.

AWARDED TO: RICARDO B. MONTALBAN

JOSELINA L. ELLE VICTOR A. ROMERO


WILARDO O. SINAHON
Member End
Member
user-Province of Leyte
CARLOS P. DADO
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFREY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR ADRIAN L. BRAGAT,


MARLITOIII
BATHONAN
REY GOMEZ

1 has JOB ORDER: 9600 9800 10000


Labor services for the initial maintenance
of one (1) hectare semi high density abaca
nursery in Brgy Hiluctugan, Kananga, Leyte
TERMS AND CONDITIONS:
1. The winning bidder shall provide manpower
and tools needed in the following labor services
maintenance of one (1) hectare semi-high
density abaca nursery:
a. Underbrushing and ring weeding, 25 man-days
b. Application of fertilizer, 15 man-days
c. Spraying with insecticide, 3 man-days
d. Replanting in missing hills, 5 man-days
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU technicians
3. The winning bidder shall perform the job within
a oeriod of five (5) working days
4. The FIDA shall provide payment after the
completion of the job duly certified by the
FIDA field personnel.
AWARDED TO: ADRIAN L. BRAGAT III

JOSELINA L. ELLE VICTOR A. ROMERO


WILARDO O. SINAHON
Member End
Member
user-Province of Leyte

CARLOS P. DADO
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFREY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR ARLAN JABON


ROSALINDAVICENTE
M. CAGOYONG
M. JABON

1 has JOB ORDER: 9800 10000 9600


Labor services for the initial maintenance
of one (1) hectare semi high density abaca
nursery in Brgy Doña Maria, Albuera Leyte
TERMS AND CONDITIONS:
1. The winning bidder shall provide manpower
and tools needed in the following labor services
maintenance of one (1) hectare semi-high
density abaca nursery:
a. Underbrushing and ring weeding, 25 man-days
b. Application of fertilizer, 15 man-days
c. Spraying with insecticide, 3 man-days
d. Replanting in missing hills, 5 man-days
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU technicians
3. The winning bidder shall perform the job within
a oeriod of five (5) working days
4. The FIDA shall provide payment after the
completion of the job duly certified by the
FIDA field personnel.

AWARDED TO: VICENTE M. JABON

JOSELINA L. ELLE VICTOR A. ROMERO


WILARDO O. SINAHON
Member End
Member
user-Province of Leyte

CARLOS P. DADO
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFREY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR DENNIS CAMPOS


RANDY M. ABSALON
LIEZL OCAMPO

1 has JOB ORDER: 10000 9600 9800


Labor services for the initial maintenance
of one (1) hectare semi high density abaca
nursery in Brgy Natubgan, Kananga, Leyte
TERMS AND CONDITIONS:
1. The winning bidder shall provide manpower
and tools needed in the following labor services
maintenance of one (1) hectare semi-high
density abaca nursery:
a. Underbrushing and ring weeding, 25 man-days
b. Application of fertilizer, 15 man-days
c. Spraying with insecticide, 3 man-days
d. Replanting in missing hills, 5 man-days
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU technicians
3. The winning bidder shall perform the job within
a oeriod of five (5) working days
4. The FIDA shall provide payment after the
completion of the job duly certified by the
FIDA field personnel.

AWARDED TO: RANDY M. ABSALON

JOSELINA L. ELLE VICTOR A. ROMERO


WILARDO O. SINAHON
Member End
Member
user-Province of Leyte

CARLOS P. DADO
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFREY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR ARSENIO ALLERA


MARIFE URBANIZA
ISABELO R. BUANTE, J

1 has JOB ORDER: 9800 9500 10000


Labor services for the initial maintenance
of one (1) hectare semi high density abaca
nursery in Brgy Tagaytay, Kananga, Leyte
TERMS AND CONDITIONS:
1. The winning bidder shall provide manpower
and tools needed in the following labor services
maintenance of one (1) hectare semi-high
density abaca nursery:
a. Underbrushing and ring weeding, 25 man-days
b. Application of fertilizer, 15 man-days
c. Spraying with insecticide, 3 man-days
d. Replanting in missing hills, 5 man-days
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU technicians
3. The winning bidder shall perform the job within
a oeriod of five (5) working days
4. The FIDA shall provide payment after the
completion of the job duly certified by the
FIDA field personnel.

AWARDED TO: MARIFE URBANIZA


JOSELINA L. ELLE VICTOR A. ROMERO
WILARDO O. SINAHON
Member End
Member
user-Province of Leyte

CARLOS P. DADO
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFREY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR JAMESON C.CRISTITUTO


FERNANDEZEDWIN
CODILLA
ABSALON

1 has JOB ORDER: 10200 10000 9600


Labor services for the initial maintenance
of one (1) hectare semi high density abaca
nursery in Brgy Rizal, Kananga, Leyte
TERMS AND CONDITIONS:
1. The winning bidder shall provide manpower
and tools needed in the following labor services
maintenance of one (1) hectare semi-high
density abaca nursery:
a. Underbrushing and ring weeding, 25 man-days
b. Application of fertilizer, 15 man-days
c. Spraying with insecticide, 3 man-days
d. Replanting in missing hills, 5 man-days
2. The winning bidder shall perform the job under
the supervision of FIDA or LGU technicians
3. The winning bidder shall perform the job within
a oeriod of five (5) working days
4. The FIDA shall provide payment after the
completion of the job duly certified by the
FIDA field personnel.

AWARDED TO: EDWIN ABSALON

JOSELINA L. ELLE VICTOR A. ROMERO


WILARDO O. SINAHON
Member End
Member
user-Province of Leyte

CARLOS P. DADO
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFREY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR SOTICO RAYMUNDO


RAUL ANITON
ROVELITO CANO

5000 pcs Abaca Suckers 10.00 per pcs


11.00 per pcs
10.50 per pcs

Note: delivered to project site at


Brgy San Pedro, Albuera, Leyte

Awarded to:SOTICO RAYMUNDO

VICTOR A. ROMERO ELIZABETH CARLOS


L. ARINTO
P. DADO
Member Member
Member

JOSELINA LL. ELLE


Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFRFEY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR SOTICO RAYMUNDO


RAUL ANITON
ROVELITO CANO

5000 pcs Abaca Suckers 10.00 per pcs


11.00 per pcs
10.50 per pcs

Note: delivered to project site at


Brgy San Pedro, Albuera, Leyte

Awarded to:SOTICO RAYMUNDO

VICTOR A. ROMERO ELIZABETH CARLOS


L. ARINTO
P. DADO
Member Member
Member
JOSELINA LL. ELLE
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFRFEY G. ESPEÑA
OIC-Regional Director
Republic of the Philippines
FIBER INDUSTRY DEVELOPMENT AUTHORITY
Region VIII, Tacloban City

ABSTRACT
of sealed canvass for the following items urgently needed in

QTY UNIT PARTICULAR FERGINO TRADING


MARMEL TRADING
PACIFICA AGRIVET SU

30 bags Complete Fertilizer, 14-14-14


1,289.00/bag
1,295.00/bag
1,290.00/bag

30 bags Urea, 48-00-00 1,129.00/bag


1,135.00/bag
1,130.00/bag

AWARDED TO:
FERGINO TRADING
Kananga, Leyte
VICTOR A. ROMERO JOSELINA LL.
WILARDO
ELLE O. SINAHON
Member Vice Chairman
End-user, Leyte

CARLOS P. DADO
Vice Chairman

EMMA V. BRAZIL
Chairman

JEFFRFEY G. ESPEÑA
OIC-Regional Director
ICARDO B. MONTALBAN
EY GOMEZ
ICENTE M. JABON
IEZL OCAMPO
SABELO R. BUANTE, JR.
DWIN ABSALON
OVELITO CANO

0.50 per pcs


OVELITO CANO

0.50 per pcs


ACIFICA AGRIVET SUPPLIES, INC.

,290.00/bag

,130.00/bag
FIBER INDUSTRY DEVELOPMENT AUTHORITY

INSPECTION AND ACCEPTANCE REPORT

Supplier
PO No. Date Invoice No.
Requisitioning Officer/Dept.

Item No. Unit Particulars

1 pcs Phone bills


2 set Drawer lock
3 set Padlock
4 set Barrel
5 pcs LPG Refill, 2.7 kg

INSPECTION
Date Inspected Date Received

Inspected, verified and found OK Complete


as to quality and specifications. Partial

BENJAMIN S. RIVERA WILARDO O. SINAHON


Inspection Officer Team Leader
FIBER INDUSTRY DEVELOPMENT AUTHORITY

INSPECTION AND ACCEPTANCE REPORT

Supplier FERGINO TRADING


PO No. Date Invoice No.
Requisitioning Officer/Dept. Extension

Item No. Unit Particulars


1 bags Complete fertilizers, 14-14-14
2 bags UREA, 48-00-00
INSPECTION ACCEPTANCE
Date Inspected Date Received

Inspected, verified and found OK Complete


as to quality and specifications. Partial

ISABELITA G. PAA WILARDO O. SINAHON


Inspection Officer PFO-Leyte

FIBER INDUSTRY DEVELOPMENT AUTHORITY


RITY

AR No.
Date

Quantity

2
1
1
2
1

DO O. SINAHON
AR No.
Date

Quantity
30
30
DO O. SINAHON

Date

S-ar putea să vă placă și