2x10MIG RCC WATER TANK & PUMPING STATION

1W09
Project code: 1W09
Date: 20-02-2011

Designer: Vishveswar Dutt, vishveswar@gmail.com

The nominal values shown in this report are the result of precision calculations, based upon precisely positioned luminaires in a fixed
relationship to each other and to the area under examination. In practice the values may vary due to tolerances on luminaires, luminaire
positioning, reflection properties and electrical supply.

CalcuLuX Road 7.5.0.1


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

Table of Contents

1. Project Description 3

1.1 3-D Project Overview 3


1.2 Top Project Overview 4
1.3 Front Project Overview 5

2. Overview of Schemes 6

3. Summary 7

3.1 Main Road 7

4. Calculation Results 8

4.1 Main L (O1): Textual Table 8


4.2 Main L (O1): Graphical Table 9
4.3 Main L (O1): Iso Contour 10
4.4 Main L (O1): Filled Iso Contour 11
4.5 Main L (O1): Mountain Plot 12
4.6 Main L (O2): Textual Table 13
4.7 Main L (O2): Graphical Table 14
4.8 Main L (O2): Iso Contour 15
4.9 Main L (O2): Filled Iso Contour 16
4.10 Main L (O2): Mountain Plot 17
4.11 Main Eh: Textual Table 18
4.12 Main Eh: Graphical Table 19
4.13 Main Eh: Iso Contour 20
4.14 Main Eh: Filled Iso Contour 21
4.15 Main Eh: Mountain Plot 22

5. Luminaire Details 23

5.1 Project Luminaires 23

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 2/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

1. Project Description

1.1 3-D Project Overview

Z Y

A 611HGV AC TP P15

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 3/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

1.2 Top Project Overview


30
29
28

A
27
26
25
24
23
22
21
20
19
18
17
16
15
Y(m)
14
13
12
11
10
9
8
7
6
5
4
3
2
1

A
0
-1
-2

-8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
X(m)

A 611HGV AC TP P15

Scale
1:150

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 4/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

1.3 Front Project Overview


13
12
11
10

A
9
8
7
6
Z(m)
5
4
3
2
1
0
-1
-2
-3

-2 -1 0 1 2 3 4 5 6 7 8 9 10 11
X(m)

A 611HGV AC TP P15

Scale
1:75

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 5/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

2. Overview of Schemes
The overall maintenance factor used for this project is 0.90.

Main Field grid is based on the CEN Luminance grid method.

Code Luminaire Type Lamp Type Power (W) Flux (lm)


A 611HGV AC TP P15 1 * SON-T400W 431.0 1 * 48000

Unit Scheme 1
Carriageway Single Carriageway
Road Width m 9.00
Number of Lanes 2
Reflection Table CIE C1
Q0 of Table 0.100
Maintenance Factor 0.90
Luminaire Code A
Installation Single Sided Right
Height m 10.00
Spacing m 28.00
Overhang m 0.85
Tilt90 deg 18.0
L ave cd/m2 4.96
L min cd/m2 2.69
L max cd/m2 6.64
L min/max 0.39
L min/ave 0.53
Ul 0.52
TI % 9.2
G 4.9
Eh ave lux 51.4
Eh min lux 21.7
Eh max lux 72.3
Eh min/max 0.30
Eh min/ave 0.42

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 6/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

3. Summary

3.1 Main Road

Luminaire Type : 611HGV AC TP P15


Lamp Type : 1 * SON-T400W
Lamp Flux : 48000 lumen
Tilt90 (T) : 18.0 deg
Grid Method : CEN Luminance
Project Maintenance Factor : 0.90

H S

O
W

Carriageway : Single Carriageway


Road Width (W) : 9.00 m
Number of Lanes : 2
Reflection Table : CIE C1
Q0 of Table : 0.100
Maintenance Factor : 0.90
Installation : Single Sided Right
Height (H) : 10.00 m
Spacing (S) : 28.00 m
Overhang (O) : 0.85 m

Overall quality figures for the above road scheme.

Luminance Glare
Average = 4.96 cd/m2 TI = 9.2 %
Minimum = 2.69 cd/m2 G = 4.9
Maximum = 6.64 cd/m2
Minimum/Maximum = 0.39
Minimum/Average = 0.53
Ul = 0.52
Horizontal Illuminance
Average = 51.4 lux
Minimum = 21.7 lux
Maximum = 72.3 lux
Minimum/Maximum = 0.30
Minimum/Average = 0.42

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 7/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4. Calculation Results

4.1 Main L (O1): Textual Table

Grid : Main at Z = -0.00 m TI ( 2.25,-23.38, 1.50) = 9.2%


Calculation : Luminance towards CEN Observer (O1) (2.25,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

X (m) 0.75 2.25 3.75 5.25 6.75 8.25


Y (m)
26.60 5.6 6.3 6.5 6.2 5.8 5.2
23.80 5.4 6.0 5.9 5.3 4.9 4.5
21.00 6.2 6.5 5.9 4.8 4.1 3.7
18.20 5.6 5.8 5.2 4.1 3.5 3.0
15.40 4.9 5.3 4.7 3.8 3.1 2.7<
12.60 5.0 5.5 4.8 3.9 3.1 2.7
9.80 5.9 6.2 5.4 4.3 3.5 3.0
7.00 6.6 6.9> 6.2 5.2 4.2 3.8
4.20 5.7 6.3 6.3 5.7 5.1 4.6
1.40 5.7 6.5 6.7 6.4 5.9 5.3

Average Min/Ave Min/Max Project maintenance factor


5.11 0.53 0.39 0.90

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 8/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.2 Main L (O1): Graphical Table

Grid : Main at Z = -0.00 m TI ( 2.25,-23.38, 1.50) = 9.2%


Calculation : Luminance towards CEN Observer (O1) (2.25,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

A
210

A
160

A
110

A
60
Y(m)

A
5.6 6.3 6.5 6.2 5.8 5.2

5.4 6.0 5.9 5.3 4.9 4.5

6.2 6.5 5.9 4.8 4.1 3.7

5.6 5.8 5.2 4.1 3.5 3.0

4.9 5.3 4.7 3.8 3.1 2.7

5.0 5.5 4.8 3.9 3.1 2.7


10

5.9 6.2 5.4 4.3 3.5 3.0

6.6 6.96.2 5.2 4.2 3.8

5.7 6.3 6.3 5.7 5.1 4.6

5.7 6.5 6.7 6.4 5.9 5.3

A
-40

A
-90

A
-140

-160 -110 -60 -10 40 90 140


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


5.11 0.53 0.39 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 9/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.3 Main L (O1): Iso Contour

Grid : Main at Z = -0.00 m TI ( 2.25,-23.38, 1.50) = 9.2%


Calculation : Luminance towards CEN Observer (O1) (2.25,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

A
210

A
160

A
110

A
60
Y(m)

A
66
4 5 3
10

6
6

A
-40

A
-90

A
-140

-160 -110 -60 -10 40 90 140


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


5.11 0.53 0.39 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 10/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.4 Main L (O1): Filled Iso Contour

Grid : Main at Z = -0.00 m TI ( 2.25,-23.38, 1.50) = 9.2%


Calculation : Luminance towards CEN Observer (O1) (2.25,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

A
210

A
160

A 6

A
110

5
60
Y(m)

A
10

4
A

A
-40

A
3

A
-90

A
-140

-120 -70 -20 30 80 130


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


5.11 0.53 0.39 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 11/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.5 Main L (O1): Mountain Plot

Grid : Main at Z = -0.00 m TI ( 2.25,-23.38, 1.50) = 9.2%


Calculation : Luminance towards CEN Observer (O1) (2.25,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

28
26
24
22
20
18
16
14 )
12 Y(m
-0 10
2 8
4 6
X( 4
m) 6
8 2
10 0

Average Min/Ave Min/Max Project maintenance factor


5.11 0.53 0.39 0.90

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 12/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.6 Main L (O2): Textual Table

Grid : Main at Z = -0.00 m TI ( 6.75,-23.38, 1.50) = 5.4%


Calculation : Luminance towards CEN Observer (O2) (6.75,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

X (m) 0.75 2.25 3.75 5.25 6.75 8.25


Y (m)
26.60 5.5 6.1 6.2 6.0 5.7 5.3
23.80 5.3 5.8 5.6 5.1 4.8 4.6
21.00 6.0 6.3 5.6 4.6 4.1 3.8
18.20 5.4 5.6 4.9 3.9 3.4 3.1
15.40 4.7 5.1 4.4 3.6 3.1 2.8<
12.60 4.8 5.2 4.5 3.6 3.1 2.8
9.80 5.8 5.9 5.1 4.0 3.5 3.2
7.00 6.4 6.6> 5.9 4.8 4.2 3.9
4.20 5.6 6.1 5.9 5.4 5.0 4.8
1.40 5.6 6.2 6.4 6.1 5.8 5.4

Average Min/Ave Min/Max Project maintenance factor


4.96 0.56 0.41 0.90

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 13/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.7 Main L (O2): Graphical Table

Grid : Main at Z = -0.00 m TI ( 6.75,-23.38, 1.50) = 5.4%


Calculation : Luminance towards CEN Observer (O2) (6.75,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

A
210

A
160

A
110

A
60
Y(m)

A
5.5 6.1 6.2 6.0 5.7 5.3

5.3 5.8 5.6 5.1 4.8 4.6

6.0 6.3 5.6 4.6 4.1 3.8

5.4 5.6 4.9 3.9 3.4 3.1

4.7 5.1 4.4 3.6 3.1 2.8

4.8 5.2 4.5 3.6 3.1 2.8


10

5.8 5.9 5.1 4.0 3.5 3.2

6.4 6.65.9 4.8 4.2 3.9

5.6 6.1 5.9 5.4 5.0 4.8

5.6 6.2 6.4 6.1 5.8 5.4

A
-40

A
-90

A
-140

-160 -110 -60 -10 40 90 140


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


4.96 0.56 0.41 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 14/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.8 Main L (O2): Iso Contour

Grid : Main at Z = -0.00 m TI ( 6.75,-23.38, 1.50) = 5.4%


Calculation : Luminance towards CEN Observer (O2) (6.75,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

A
210

A
160

A
110

A
60
Y(m)

A
6

6
4 5
5
10

3
6
6

A
-40

A
-90

A
-140

-160 -110 -60 -10 40 90 140


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


4.96 0.56 0.41 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 15/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.9 Main L (O2): Filled Iso Contour

Grid : Main at Z = -0.00 m TI ( 6.75,-23.38, 1.50) = 5.4%


Calculation : Luminance towards CEN Observer (O2) (6.75,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

A
210

A
160

A 6

A
110

5
60
Y(m)

A
10

4
A

A
-40

A
3

A
-90

A
-140

-120 -70 -20 30 80 130


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


4.96 0.56 0.41 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 16/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.10 Main L (O2): Mountain Plot

Grid : Main at Z = -0.00 m TI ( 6.75,-23.38, 1.50) = 5.4%


Calculation : Luminance towards CEN Observer (O2) (6.75,
-60.00, 1.50) (cd/m2)
Road Surface : CIE C1 with Q0 = 0.100

28
26
24
22
20
18
16
14 m)
12 Y(
-0 10
2 8
4 6
X( 4
m) 6
8 2
10 0

Average Min/Ave Min/Max Project maintenance factor


4.96 0.56 0.41 0.90

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 17/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.11 Main Eh: Textual Table

Grid : Main at Z = -0.00 m


Calculation : Horizontal Illuminance (lux)

X (m) 0.75 2.25 3.75 5.25 6.75 8.25


Y (m)
26.60 65 72 72> 68 65 62
23.80 61 66 63 56 52 51
21.00 69 69 59 46 39 37
18.20 59 58 47 35 29 27
15.40 48 50 40 29 23 22
12.60 48 50 40 29 23 22<
9.80 59 58 47 35 29 27
7.00 69 69 59 46 39 37
4.20 61 66 63 56 52 51
1.40 65 72 72 68 65 62

Average Min/Ave Min/Max Project maintenance factor


51.4 0.42 0.30 0.90

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 18/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.12 Main Eh: Graphical Table

Grid : Main at Z = -0.00 m


Calculation : Horizontal Illuminance (lux)
260

A
210

A
160

A
110

A
60
Y(m)

A
65 727268 65 62

61 6663 56 52 51

69 6959 46 39 37

59 5847 35 29 27

48 5040 29 23 22

48 5040 29 23 22
10

59 5847 35 2927

69 6959 46 39 37

61 6663 56 52 51

65 7272 68 65 62

A
-40

A
-90

A
-140

-160 -110 -60 -10 40 90 140


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


51.4 0.42 0.30 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 19/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.13 Main Eh: Iso Contour

Grid : Main at Z = -0.00 m


Calculation : Horizontal Illuminance (lux)
260

A
210

A
160

A
110

A
60
Y(m)

A
70
405060
30
10

50

70
A

A
-40

A
-90

A
-140

-160 -110 -60 -10 40 90 140


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


51.4 0.42 0.30 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 20/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.14 Main Eh: Filled Iso Contour

Grid : Main at Z = -0.00 m


Calculation : Horizontal Illuminance (lux)
260

A
210

A
160

70

A
110

60

A
60
Y(m)

50
A
10

40
A
-40

30
A
-90

A
-140

-120 -70 -20 30 80 130


X(m)

A 611HGV AC TP P15

Average Min/Ave Min/Max Project maintenance factor Scale


51.4 0.42 0.30 0.90 1:2000

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 21/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

4.15 Main Eh: Mountain Plot

Grid : Main at Z = -0.00 m


Calculation : Horizontal Illuminance (lux)

28
26
24
22
20
18
16
14 )
12 Y(m
-0 10
2 8
4 6
X( 4
m) 6
8 2
10 0

Average Min/Ave Min/Max Project maintenance factor


51.4 0.42 0.30 0.90

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 22/23


2x10MIG RCC WATER TANK & PUMPING STATION
1W09 1W09 Date: 20-02-2011

5. Luminaire Details

5.1 Project Luminaires

Manta Luminous Intensity Diagram (candela/1000 lumen)


611HGV AC 1xSON-T400W TP P15 120o 150o 180o 150o 120o

90o 90o

60o 60o

Light output ratios


DLOR : 0.85
ULOR : 0.00 500
TLOR : 0.85
Ballast : Conventional
Lamp flux : 48000 lm
Luminaire wattage : 431.0 W
Measurement code : LVF05012
30o 0o 30o
C = 180o C = 0o
C = 270o C = 90o
C = 195o Imax C = 15o

Philips Lighting B.V. - CalcuLuX Road 7.5.0.1 Page: 23/23