Sunteți pe pagina 1din 20

Chapter 1100

Design Matrix Procedures


 *HQHUDO
 6HOHFWLQJ D 'HVLJQ 0DWUL[
 8VLQJ D 'HVLJQ 0DWUL[

1100.01  General
7KH Design Manual SURYLGHV JXLGDQFH IRU WKUHH OHYHOV RI GHVLJQ IRU KLJKZD\
SURMHFWV EDVLF PRGL¿HG DQG IXOO GHVLJQ OHYHOV 7KH GHVLJQ PDWULFHV LQ WKLV FKDSWHU
DUH XVHG WR LGHQWLI\ WKH GHVLJQ OHYHO V IRU D SURMHFW DQG WKH DVVRFLDWHG SURFHVVHV IRU
DOORZLQJ GHVLJQ YDULDQFHV 7KH PDWULFHV DGGUHVV WKH PDMRULW\ RI 3UHVHUYDWLRQ DQG
,PSURYHPHQW SURMHFWV DQG IRFXV RQ WKRVH GHVLJQ HOHPHQWV WKDW DUH RI JUHDWHVW FRQFHUQ
LQ SURMHFW GHYHORSPHQW
7KH GHVLJQ PDWULFHV DUH ¿YH WDEOHV WKDW DUH LGHQWL¿HG E\ URXWH W\SH 7ZR RI WKH
PDWULFHV DSSO\ WR ,QWHUVWDWH KLJKZD\V WKH RWKHU WKUHH DSSO\ WR QRQ,QWHUVWDWH
KLJKZD\V DQG DGGUHVV 3UHVHUYDWLRQ DQG ,PSURYHPHQW SURMHFWV
$ GHVLJQ PDWUL[ LV XVHG WR GHWHUPLQH WKH GHVLJQ OHYHO IRU WKH GHVLJQ HOHPHQWV RI D
SURMHFW $SSO\ WKH DSSURSULDWH GHVLJQ OHYHOV DQG GRFXPHQW WKH GHVLJQ GHFLVLRQV DV
UHTXLUHG E\ WKLV FKDSWHU DQG &KDSWHU 

1100.02  Selecting a Design Matrix


6HOHFWLRQ RI D GHVLJQ PDWUL[ VHH ([KLELW 1 LV EDVHG RQ KLJKZD\ V\VWHP
,QWHUVWDWH 1+6 H[FOXGLQJ ,QWHUVWDWH DQG QRQ1+6 DQG ORFDWLRQ PDLQ OLQH
DQGLQWHUFKDQJH 
Location
+LJKZD\6\VWHP
Main Line Interchange Area
Interstate Matrix 1 Matrix 2
NHS* Matrix 3 Matrix 4
Non-NHS Matrix 5 Matrix 4
*  Except Interstate.

Design Matrix Selection Guide


Exhibit 1100-1

(1)  Interstate System


7KH ,QWHUVWDWH 6\VWHP 0DWULFHV  DQG  LV D QHWZRUN RI URXWHV VHOHFWHG E\ WKH VWDWH
DQG WKH )+:$ XQGHU WHUPV RI WKH IHGHUDODLG DFWV 7KHVH URXWHV DUH WKH SULQFLSDO
arterials that are the most important to the economic welfare and defense of the
8QLWHG 6WDWHV 7KH\ FRQQHFW DV GLUHFWO\ DV SUDFWLFDEOH WKH IROORZLQJ
‡ 3ULQFLSDO PHWURSROLWDQ DUHDV DQG FLWLHV
‡ ,QGXVWULDO FHQWHUV
‡ ,QWHUQDWLRQDO ERUGHU FURVVLQJV

WSDOT Design Manual  M 22-01.05 Page 1100-1


June 2009
Design Matrix Procedures Chapter 1100

7KH ,QWHUVWDWH 6\VWHP LQFOXGHV LPSRUWDQW URXWHV LQWR WKURXJK DQG DURXQG XUEDQ
DUHDV VHUYHV WKH QDWLRQDO GHIHQVH DQG ZKHUH SRVVLEOH FRQQHFWV ZLWK URXWHV RI
FRQWLQHQWDO LPSRUWDQFH ,W DOVR VHUYHV LQWHUQDWLRQDO DQG LQWHUVWDWH WUDYHO DQG PLOLWDU\
PRYHPHQWV
7KH ,QWHUVWDWH 6\VWHP LV UHSUHVHQWHG RQ WKH OLVW RI 1+6 KLJKZD\V VHH ([KLELW
 ZLWK WKH OHWWHU ³,´ EHIRUH WKH URXWH QXPEHU

(2)  National Highway System (NHS)


7KH 1DWLRQDO +LJKZD\ 6\VWHP 0DWULFHV  DQG  LV DQ LQWHUFRQQHFWHG V\VWHP
RI SULQFLSDO DUWHULDO URXWHV DQG KLJKZD\V LQFOXGLQJ WROO IDFLOLWLHV WKDW VHUYHV WKH
IROORZLQJ
‡ 0DMRU SRSXODWLRQ FHQWHUV
‡ ,QWHUQDWLRQDO ERUGHU FURVVLQJV
‡ ,QGXVWULDO FHQWHUV
‡ 3RUWV
‡ $LUSRUWV
‡ 3XEOLF WUDQVSRUWDWLRQ IDFLOLWLHV
‡ 2WKHU LQWHUPRGDO WUDQVSRUWDWLRQ IDFLOLWLHV
‡ 2WKHU PDMRU WUDYHO GHVWLQDWLRQV
7KH 1+6 LQFOXGHV WKH ,QWHUVWDWH 6\VWHP DQG WKH 6WUDWHJLF +LJKZD\ &RUULGRU 1HWZRUN
675$+1(7 DQG LWV KLJKZD\ FRQQHFWRUV WR PDMRU PLOLWDU\ LQVWDOODWLRQV ,QWHUVWDWH
DQG QRQ,QWHUVWDWH 
7KH 1+6 PHHWV QDWLRQDO GHIHQVH UHTXLUHPHQWV DQG VHUYHV LQWHUQDWLRQDO LQWHUVWDWH
DQG LQWHUUHJLRQDO WUDYHO VHH ([KLELW  

(3)  Non-NHS Highways


7KH 1RQ1+6 KLJKZD\V 0DWULFHV  DQG  DUH VWDWH URXWHV WKDW IRUP D KLJKZD\
QHWZRUN WKDW VXSSOHPHQWV WKH 1+6 V\VWHP E\ SURYLGLQJ IRU IUHLJKW PRELOLW\
DQGUHJLRQDO DQG LQWHUUHJLRQDO WUDYHO 1RQ1+6 KLJKZD\V DUH QRW VKRZQ RQ ([KLELW
 7KH\ DUH VKRZQ RQ WKH :DVKLQJWRQ 6WDWH 'HSDUWPHQW RI 7UDQVSRUWDWLRQ
:6'27 2I¿FLDO 6WDWH +LJKZD\ 0DS

1100.03  Using a Design Matrix


7KH GHVLJQ PDWULFHV DUH VKRZQ LQ ([KLELWV  WKURXJK  )ROORZ
Design Manual JXLGDQFH IRU DOO SURMHFWV H[FHSW DV QRWHG LQ WKH GHVLJQ PDWULFHV
DQG HOVHZKHUH DV DSSOLFDEOH  7KH GH¿QLWLRQV SUHVHQWHG LQ WKLV FKDSWHU DUH
PHDQW WR SURYLGH FODUL¿FDWLRQ RI WHUPLQRORJ\ XVHG LQ WKH Design Manual 7KHUH
LV QR DVVXUDQFH WKDW WKHVH WHUPV DUH XVHG FRQVLVWHQWO\ LQ UHIHUHQFHV RXWVLGH WKH
Design Manual

(1)  Project Type


)RU SURMHFW W\SHV VXFK DV XQVWDEOH VORSHV QRW OLVWHG LQ WKH GHVLJQ PDWULFHV FRQVXOW
WKH +HDGTXDUWHUV +4 'HVLJQ 2I¿FH IRU JXLGDQFH
,Q WKH GHVLJQ PDWULFHV URZ VHOHFWLRQ LV EDVHG RQ 3URMHFW 7\SH 7KH 3URMHFW 6XPPDU\
VHH &KDSWHU  GH¿QHV WKH SXUSRVH DQG QHHGV IRU WKH SURMHFW DQG GHVFULEHV WKH
SURMHFW )RU 1+6 DQG QRQ1+6 URXWHV 0DWULFHV   DQG   WKH SURMHFW¶V SURJUDP

Page 1100-2 WSDOT Design Manual  M 22-01.05


June 2009
Chapter 1100 Design Matrix Procedures

VXESURJUDP PLJKW SURYLGH VXI¿FLHQW LQIRUPDWLRQ WR LGHQWLI\ WKH 3URMHFW 7\SH 6HH
the Programming Manual IRU GHWDLOV DERXW EXGJHW SURJUDPV DQG VXESURJUDPV
7KH YDULRXV VRXUFHV RI IXQGV IRU WKHVH VXESURJUDPV FDUU\ HOLJLELOLW\ UHTXLUHPHQWV
WKDW WKH GHVLJQHUV DQG SURMHFW GHYHORSHUV PXVW LGHQWLI\ DQG PRQLWRU WKURXJKRXW
SURMHFW GHYHORSPHQW 7KLV LV HVSHFLDOO\ LPSRUWDQW WR HQVXUH DFFXUDF\ ZKHQ ZULWLQJ
DJUHHPHQWV DQG WR DYRLG GHOD\LQJ DGYHUWLVHPHQW IRU ELGV LI WKH 3URMHFW 7\SH FKDQJHV
6RPH SURMHFWV LQYROYH ZRUN IURP VHYHUDO VXESURJUDPV ,Q VXFK FDVHV LGHQWLI\ WKH
YDULRXV OLPLWV RI WKH SURMHFW WKDW DSSO\ WR HDFK VXESURJUDP :KHUH WKH SURMHFW OLPLWV
RYHUODS DSSO\ WKH KLJKHU GHVLJQ OHYHO WR WKH RYHUODSSLQJ SRUWLRQ
Project Types LQ DOSKDEHWLFDO RUGHU DUH
At Grade: 6DIHW\ ,PSURYHPHQW SURMHFWV RQ 1+6 KLJKZD\V  PSK RU KLJKHU WR
EXLOG JUDGHVHSDUDWLRQ IDFLOLWLHV WKDW UHSODFH WKH H[LVWLQJ LQWHUVHFWLRQV
Bike Routes (Shldrs): 0DLQ OLQH HFRQRPLF GHYHORSPHQW ,PSURYHPHQW SURMHFWV
WR SURYLGH D VWDWHZLGH QHWZRUN RI UXUDO ELF\FOH WRXULQJ URXWHV ZLWK VKRXOGHUV D
PLQLPXP RI  IHHW ZLGH
Bike/Ped Connectivity: ,PSURYHPHQW SURMHFWV WR SURYLGH ELF\FOHSHGHVWULDQ
FRQQHFWLRQV DORQJ RU DFURVV VWDWH KLJKZD\V ZLWKLQ XUEDQ JURZWK DUHDV WR FRPSOHWH
ORFDO QHWZRUNV
Bridge Deck Rehab: 6WUXFWXUHV 3UHVHUYDWLRQ SURMHFWV WKDW UHSDLU GHODPLQDWHG EULGJH
GHFNV DQG DGG SURWHFWLYH RYHUOD\V WR SURYLGH D VRXQG VPRRWK VXUIDFH SUHYHQW IXUWKHU
FRUURVLRQ RI WKH UHLQIRUFLQJ VWHHO DQG SUHVHUYH RSHUDWLRQDO DQG VWUXFWXUDO LQWHJULW\
Bridge Rail Upgrades: 6DIHW\ ,PSURYHPHQW SURMHFWV WR XSGDWH ROGHU EULGJH UDLOV WR
LPSURYH VWUHQJWK DQG UHGLUHFWLRQDO FDSDELOLWLHV
Bridge Repl. (Multilane): 1RQ1+6 PDLQ OLQH VWUXFWXUHV 3UHVHUYDWLRQ SURMHFWV WKDW
UHSODFH EULGJHV RQ PXOWLODQH KLJKZD\V WR LPSURYH RSHUDWLRQDO DQG VWUXFWXUDO FDSDFLW\
Bridge Replacement: 1+6 DQG WZRODQH QRQ1+6 PDLQ OLQH DQG LQWHUFKDQJH
VWUXFWXUHV 3UHVHUYDWLRQ SURMHFWV WKDW UHSODFH EULGJHV WR LPSURYH RSHUDWLRQDO DQG
VWUXFWXUDO FDSDFLW\
Bridge Restrictions: 0DLQ OLQH HFRQRPLF GHYHORSPHQW ,PSURYHPHQW SURMHFWV WKDW
UHPRYH YHUWLFDO RU ORDG FDSDFLW\ UHVWULFWLRQV WR EHQH¿W WKH PRYHPHQW RI FRPPHUFH
BST: 1RQ1+6 URDGZD\ 3UHVHUYDWLRQ SURMHFWV WR GR ELWXPLQRXV VXUIDFH WUHDWPHQW
%67 ZRUN RQO\ WR SURWHFW WKH SXEOLF LQYHVWPHQW
BST Routes/Basic Safety: 1RQ1+6 URDGZD\ 3UHVHUYDWLRQ SURMHFWV WKDW UHVXUIDFH
KLJKZD\V DW UHJXODU LQWHUYDOV DQG UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV WR SURWHFW WKH SXEOLF
LQYHVWPHQW
Collision Analysis Locations (CALs): 6LWHV LGHQWL¿HG WKURXJK D V\VWHPZLGH
DQDO\VLV WKDW KDYH D KLJKVHYHULW\ FROOLVLRQ KLVWRU\ 7KHVH VLWHV DUH FUHDWHG ZLWK WKH
LQWHQW WR PRGLI\ ZKHUH DSSURSULDWH VSHFL¿F KLJKZD\ HOHPHQWV WKDW KDYH D JUHDWHU
SRWHQWLDO WR UHGXFH WKH LGHQWL¿HG KLJKVHYHULW\ FROOLVLRQV
Corridor: 0DLQ OLQH ,PSURYHPHQW SURMHFWV WR UHGXFH DQG SUHYHQW YHKLFXODU
QRQPRWRUL]HG DQG SHGHVWULDQ FROOLVLRQV ZLWKLQ DYDLODEOH UHVRXUFHV 
Diamond Grinding: *ULQGLQJ D FRQFUHWH SDYHPHQW XVLQJ JDQJPRXQWHG GLDPRQG
VDZ EODGHV WR UHPRYH VXUIDFH ZHDU RU MRLQW IDXOWLQJ

WSDOT Design Manual  M 22-01.05 Page 1100-3


June 2009
Design Matrix Procedures Chapter 1100

Dowel Bar Retrofit: 5HHVWDEOLVKLQJ WKH ORDG WUDQVIHU HI¿FLHQFLHV RI WKH H[LVWLQJ
FRQFUHWH MRLQWV DQG WUDQVYHUVH FUDFNV E\ FXWWLQJ VORWV SODFLQJ HSR[\FRDWHG GRZHO
EDUV DQG SODFLQJ KLJKHDUO\ VWUHQJWK QRQVKULQN FRQFUHWH
Four-Lane Trunk System: 1+6 HFRQRPLF GHYHORSPHQW ,PSURYHPHQW SURMHFWV WR
FRPSOHWH FRQWLJXRXV IRXUODQH OLPLWHG DFFHVV IDFLOLWLHV RQ D WUXQN V\VWHP FRQVLVWLQJ
RI DOO )UHLJKW DQG *RRGV 7UDQVSRUWDWLRQ 5RXWHV )*76 ZLWK D FODVVL¿FDWLRQ RI
 WRQV\HDU
Freight & Goods (Frost Free): Main line economic development Improvement
SURMHFWV WR UHGXFH GHOD\ IURP ZHDWKHUUHODWHG FORVXUHV RQ KLJKSULRULW\ IUHLJKW DQG
JRRGV KLJKZD\V
Guardrail Upgrades: 6DIHW\ ,PSURYHPHQW SURMHFWV OLPLWHG WR WKH VSHFL¿HG URDGVLGH
GHVLJQ HOHPHQWV 7KHVH SURMHFWV IRFXV RQ :EHDP ZLWK IRRWLQFK VSDFLQJ DQG
RQ JXDUGUDLO V\VWHPV ZLWK FRQFUHWH SRVWV 7KH OHQJWK RI QHHG LV H[DPLQHG DQG PLQRU
DGMXVWPHQWV DUH PDGH 5HPRYDO LV DQ RSWLRQ LI JXDUGUDLO LV QR ORQJHU QHHGHG )RU
,QWHUVWDWH PDLQ OLQH DGGUHVV OHQJWK RI QHHG DV VSHFL¿HG LQ &KDSWHU )RU QRQ
,QWHUVWDWH URXWHV DGGLWLRQDO OHQJWK RI PRUH WKDQ  RI WKH H[LVWLQJ OHQJWK LV EH\RQG
WKH LQWHQW RI WKLV SURJUDP ,Q WKHVH LQVWDQFHV FRQVLGHU IXQGLQJ LQ DFFRUGDQFH ZLWK
SULRULW\ SURJUDPPLQJ LQVWUXFWLRQV DQG LI WKH OHQJWK RI QHHG LV QRW PHW GRFXPHQW WR
WKH 'HVLJQ 'RFXPHQWDWLRQ 3DFNDJH ''3 WKDW WKH OHQJWK RI QHHG LV QRW DGGUHVVHG
EHFDXVH LW LV EH\RQG WKH LQWHQW RI WKLV SURJUDP
HMA/PCCP: 1RQ1+6 URDGZD\ 3UHVHUYDWLRQ SURMHFWV WR UHVXUIDFH KLJKZD\V DW
UHJXODU LQWHUYDOV DQG UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV WR SURWHFW WKH SXEOLF LQYHVWPHQW
HMA/PCCP/BST Overlays: 1+6 PDLQ OLQH URDGZD\ 3UHVHUYDWLRQ SURMHFWV WKDW
UHVXUIDFH WKH H[LVWLQJ VXUIDFHV DW UHJXODU LQWHUYDOV WR SURWHFW WKH SXEOLF LQYHVWPHQW
HMA/PCCP/BST Overlays Ramps: 1+6 DQG QRQ1+6 UDPS URDGZD\
3UHVHUYDWLRQ SURMHFWV WKDW UHVXUIDFH WKH H[LVWLQJ VXUIDFHV DW UHJXODU LQWHUYDOV DQG
UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV WR SURWHFW WKH SXEOLF LQYHVWPHQW
HMA Structural Overlays: +RW PL[ DVSKDOW RYHUOD\V WKDW DUH SODFHG WR LQFUHDVH WKH
ORDGFDUU\LQJ DELOLW\ RI WKH SDYHPHQW VWUXFWXUH 6WUXFWXUDO RYHUOD\ WKLFNQHVV LV JUHDWHU
WKDQ  IRRW
HOV: 0DLQ OLQH PRELOLW\ ,PSURYHPHQW SURMHFWV FRPSOHWLQJ WKH IUHHZD\ &RUH +29
ODQH V\VWHP LQ WKH 3XJHW 6RXQG UHJLRQ DQG SURYLGLQJ OHYHO RI VHUYLFH & RQ +29
ODQHV LQFOXGLQJ EXVLQHVV DFFHVV WUDQVLW ODQHV ZLWKLQ FRQJHVWHG KLJKZD\ FRUULGRUV
HOV Bypass: 1+6 DQG QRQ1+6 UDPS PRELOLW\ ,PSURYHPHQW SURMHFWV WR LPSURYH
PRELOLW\ ZLWKLQ FRQJHVWHG KLJKZD\ FRUULGRUV E\ SURYLGLQJ +29 E\SDVV ODQHV RQ
IUHHZD\ UDPSV &RQJHVWHG KLJKZD\ FRUULGRUV KDYH KLJK FRQJHVWLRQ LQGH[ YDOXHV DV
GHVFULEHG LQ WKH +LJKZD\ 6\VWHP 3ODQ IRRWQRWH LQ WH[W IRU ,PSURYHPHQW0RELOLW\ 
Intersection: 6DIHW\ ,PSURYHPHQW SURMHFWV WR UHGXFH DQG SUHYHQW FROOLVLRQV LQFUHDVH
WKH VDIHW\ RI KLJKZD\V DQG LPSURYH SHGHVWULDQ VDIHW\ ZLWKLQ DYDLODEOH UHVRXUFHV 
Median Barrier: /LPLWHG VDIHW\ ,PSURYHPHQW SURMHFWV PDLQO\ QHZ PHGLDQ EDUULHU
ZLWK D IRFXV RQ FDEOH EDUULHU WR UHGXFH PHGLDQ FURVVRYHU DFFLGHQWV
Milling with HMA Inlays: 5HPRYLQJ D VSHFL¿HG WKLFNQHVV RI WKH H[LVWLQJ +0$
SDYHPHQW W\SLFDOO\ IURP WKH WUDYHOHG ODQHV DQG WKHQ RYHUOD\LQJ ZLWK +0$ DW WKH
VDPH VSHFL¿HG WKLFNQHVV

Page 1100-4 WSDOT Design Manual  M 22-01.05


June 2009
Chapter 1100 Design Matrix Procedures

New/Reconstruction SURMHFWV LQFOXGH WKH IROORZLQJ W\SHV RI ZRUN


‡ &DSDFLW\ FKDQJHV DGG D WKURXJK ODQH FRQYHUW D JHQHUDOSXUSRVH *3 ODQH WR
DVSHFLDOSXUSRVH ODQH VXFK DV DQ +29 ODQH  RU FRQYHUW D KLJKRFFXSDQF\
YHKLFOH +29 ODQH WR *3
‡ 2WKHU ODQH FKDQJHV DGG RU HOLPLQDWH D FROOHFWRUGLVWULEXWRU RU DX[LOLDU\ ODQH
DUXUDO WUXFNFOLPELQJ ODQH WKDW IRU LWV HQWLUH OHQJWK PHHWV WKH ZDUUDQWV LQ
&KDSWHU  LV QRW FRQVLGHUHG QHZUHFRQVWUXFWLRQ 
‡ 3DYHPHQW UHFRQVWUXFWLRQ IXOO GHSWK 3&&3 RU +0$ UHSODFHPHQW
‡ 1HZ LQWHUFKDQJH
‡ &KDQJHV LQ LQWHUFKDQJH W\SH VXFK DV GLDPRQG WR GLUHFWLRQDO RU DGGLQJ D UDPS
‡ 1HZ RU UHSODFHPHQW EULGJH RQ RU RYHU PDLQ OLQH RU LQWHUFKDQJH UDPS 
Non-Interstate Freeway (mobility): 2Q QRQ1+6 DQG 1+6 LQWHUFKDQJHV DQG
RQ 1+6 PDLQ OLQH WKHVH DUH PRELOLW\ ,PSURYHPHQW SURMHFWV RQ PXOWLODQH GLYLGHG
KLJKZD\V ZLWK OLPLWHG DFFHVV FRQWURO ZLWKLQ FRQJHVWHG KLJKZD\ FRUULGRUV
Non-Interstate Freeway (roadway preservation): 5RDGZD\ 3UHVHUYDWLRQ SURMHFWV
RQ QRQ1+6 DQG 1+6 LQWHUFKDQJHV DQG RQ 1+6 PDLQ OLQH WR RYHUOD\ RU LQOD\ ZLWK
+0$3&&3%67 RQ PXOWLODQH GLYLGHG KLJKZD\V ZLWK OLPLWHG DFFHVV FRQWURO WR
PLQLPL]H ORQJWHUP FRVWV DQG UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV
Non-Interstate Freeway (safety): 1+6 DQG QRQ1+6 PDLQ OLQH DQG LQWHUFKDQJHV
VDIHW\ ,PSURYHPHQW SURMHFWV RQ PXOWLODQH GLYLGHG KLJKZD\V ZLWK OLPLWHG DFFHVV
FRQWURO WR LQFUHDVH WKH VDIHW\ ZLWKLQ DYDLODEOH UHVRXUFHV
Nonstructural Overlay: $Q +0$ SDYHPHQW RYHUOD\ WKDW LV SODFHG WR PLQLPL]H
WKH DJLQJ HIIHFWV DQG PLQRU VXUIDFH LUUHJXODULWLHV RI WKH H[LVWLQJ +0$ SDYHPHQW
VWUXFWXUH 7KH H[LVWLQJ +0$ SDYHPHQW VWUXFWXUH LV QRW VKRZLQJ H[WHQVLYH VLJQV RI
IDWLJXH ORQJLWXGLQDO RU DOOLJDWRU FUDFNLQJ LQ WKH ZKHHO SDWKV  1RQVWUXFWXUDO RYHUOD\V
DUH OHVV WKDQ RU HTXDO WR IRRW WKLFN DQG IUHTXHQWO\ OHVV WKDQ IRRW WKLFN
PCCP Overlays: 3RUWODQG FHPHQW FRQFUHWH SDYHPHQW RYHUOD\V RI H[LVWLQJ 3&&3 RU
+0$ VXUIDFHV
Preventive Maintenance: ,QFOXGHV URDGZD\ ZRUN VXFK DV SDYHPHQW SDWFKLQJ
UHVWRUDWLRQ RI GUDLQDJH V\VWHP SDQHO UHSODFHPHQW DQG MRLQW DQG VKRXOGHU UHSDLU DQG
EULGJH ZRUN VXFK DV FUDFN VHDOLQJ MRLQW UHSDLU VORSH VWDELOL]DWLRQ VHLVPLF UHWUR¿W
VFRXU FRXQWHUPHDVXUHV DQG SDLQWLQJ 3UHYHQWLYH PDLQWHQDQFH SURMHFWV PXVW QRW
GHJUDGH DQ\ H[LVWLQJ VDIHW\ RU JHRPHWULF DVSHFWV RI WKH IDFLOLW\ $Q\ HOHPHQWV WKDW
ZLOO EH UHFRQVWUXFWHG DV SDUW RI D SUHYHQWLYH PDLQWHQDQFH SURMHFW DUH WR EH DGGUHVVHG
LQ DFFRUGDQFH ZLWK IXOO GHVLJQ OHYHO
Replace HMA w/PCCP at I/S (intersections): 1+6 DQG QRQ1+6 PDLQ OLQH
URDGZD\ 3UHVHUYDWLRQ SURMHFWV WKDW UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV DQG UHSODFH
H[LVWLQJ +0$ LQWHUVHFWLRQ SDYHPHQW WKDW KDV UHDFKHG WKH SRLQW RI ORZHVW OLIH F\FOH
FRVW ± \HDUV ROG ZLWK 3&&3 WKDW KDV DERXW D \HDU OLIH F\FOH
Rest Areas (New): 1+6 DQG QRQ1+6 PDLQ OLQH HFRQRPLF GHYHORSPHQW DQG
VDIHW\ ,PSURYHPHQW SURMHFWV WR SURYLGH UHVW DUHDV HYHU\  PLOHV DQG VRPH 59
GXPSVWDWLRQV
Risk: Realignment: ,PSURYHPHQW SURMHFWV LQWHQGHG WR LPSURYH DOLJQPHQW DW VSHFL¿F
ORFDWLRQV ZKHUH WKH 5LVN SURJUDP KDV LGHQWL¿HG D KLJK SUREDELOLW\ RI FROOLVLRQV
DFFLGHQWV

WSDOT Design Manual  M 22-01.05 Page 1100-5


June 2009
Design Matrix Procedures Chapter 1100

Risk: Roadside: ,PSURYHPHQW SURMHFWV LQWHQGHG WR PLWLJDWH URDGVLGH FRQGLWLRQV


DW VSHFL¿F ORFDWLRQV ZKHUH WKH 5LVN SURJUDP KDV LGHQWL¿HG D KLJK SUREDELOLW\ RI
YHKLFXODU HQFURDFKPHQW
Risk: Roadway Width: ,PSURYHPHQW SURMHFWV LQWHQGHG WR DGMXVW WKH URDGZD\ ZLGWK
DW VSHFL¿F ORFDWLRQV ZKHUH WKH 5LVN SURJUDP KDV LGHQWL¿HG D KLJK SUREDELOLW\ RI D
YHKLFOH OHDYLQJ LWV ODQH RI WUDYHO
Risk: Sight Distance: ,PSURYHPHQW SURMHFWV LQWHQGHG WR LPSURYH VLJKW GLVWDQFH
DW VSHFL¿F ORFDWLRQV ZKHUH WKH 5LVN SURJUDP KDV LGHQWL¿HG D KLJK SUREDELOLW\ RI
FROOLVLRQVDFFLGHQWV
Rural: 0RELOLW\ ,PSURYHPHQW SURMHFWV SURYLGLQJ XQFRQJHVWHG OHYHO RI VHUYLFH RQ
UXUDO KLJKZD\V ZLWKLQ FRQJHVWHG KLJKZD\ FRUULGRUV 6HH +29 %\SDVV IRU FURVV
UHIHUHQFH UHJDUGLQJ ³FRQJHVWHG´
Urban: 1+6 DQG WZRODQH QRQ1+6 PDLQ OLQH DQG LQWHUFKDQJH PRELOLW\
,PSURYHPHQW SURMHFWV ZLWKLQ FRQJHVWHG XUEDQ KLJKZD\ FRUULGRUV 6HH +29 %\SDVV
IRU FURVV UHIHUHQFH UHJDUGLQJ ³FRQJHVWHG´
Urban (multilane): 1RQ1+6 PRELOLW\ ,PSURYHPHQW SURMHFWV ZLWKLQ FRQJHVWHG
XUEDQ PXOWLODQH KLJKZD\ FRUULGRUV 6HH +29 %\SDVV IRU FURVV UHIHUHQFH UHJDUGLQJ
³FRQJHVWHG´

(2)  Design Elements


7KH FROXPQ KHDGLQJV RQ D GHVLJQ PDWUL[ DUH Design Elements 1RW DOO SRWHQWLDO
GHVLJQ HOHPHQWV KDYH EHHQ LQFOXGHG LQ WKH PDWULFHV
7KH GHVLJQ HOHPHQWV WKDW DUH LQFOXGHG DUH EDVHG RQ WKH IROORZLQJ WKLUWHHQ )HGHUDO
+LJKZD\ $GPLQLVWUDWLRQ )+:$ FRQWUROOLQJ GHVLJQ FULWHULD GHVLJQ VSHHG ODQH
ZLGWK VKRXOGHU ZLGWK EULGJH ZLGWK VWUXFWXUDO FDSDFLW\ KRUL]RQWDO DOLJQPHQW
YHUWLFDO DOLJQPHQW JUDGH VWRSSLQJ VLJKW GLVWDQFH FURVV VORSH VXSHUHOHYDWLRQ
YHUWLFDO FOHDUDQFH DQG KRUL]RQWDO FOHDUDQFH )RU WKH FROXPQ KHDGLQJV VRPH RI
WKHVH FRQWUROOLQJ FULWHULD KDYH EHHQ FRPELQHG IRU H[DPSOH GHVLJQ VSHHG LV SDUW RI
KRUL]RQWDO DQG YHUWLFDO DOLJQPHQW 
,I XVLQJ D GHVLJQ HOHPHQW WKDW LV QRW RQ WKH DVVLJQHG PDWUL[ XVH IXOO GHVLJQ OHYHO DV
IRXQG HOVHZKHUH LQ WKLV PDQXDO
,I XVLQJ D GHVLJQ HOHPHQW WKDW LV QRW FRYHUHG LQ WKLV PDQXDO XVH DQ DSSURYHG PDQXDO
RU JXLGDQFH RQ WKH VXEMHFW DQG GRFXPHQW WKH GHFLVLRQ DQG WKH EDVLV IRU WKH GHFLVLRQ
7KH IROORZLQJ HOHPHQWV DUH VKRZQ RQ WKH GHVLJQ PDWULFHV ,I WKH IXOO GHVLJQ
OHYHO DSSOLHV VHH WKH FKDSWHUV OLVWHG EHORZ ,I WKH EDVLF GHVLJQ OHYHO DSSOLHV
see &KDSWHU DQG LI WKH PRGL¿HG GHVLJQ OHYHO DSSOLHV VHH &KDSWHU 
Horizontal Alignment: 7KH KRUL]RQWDO DWWULEXWHV RI WKH URDGZD\ LQFOXGLQJ
KRUL]RQWDO FXUYDWXUH VXSHUHOHYDWLRQ DQG VWRSSLQJ VLJKW GLVWDQFH DOO EDVHG RQ
GHVLJQ VSHHG 6HH &KDSWHU  for horizontal alignment, &KDSWHU for
VXSHUHOHYDWLRQ &KDSWHU  for stopping sight distance, and Chapters  or 
IRU GHVLJQVSHHG
Vertical Alignment: 7KH YHUWLFDO DWWULEXWHV RI WKH URDGZD\ LQFOXGLQJ YHUWLFDO
FXUYDWXUH SUR¿OH JUDGHV DQG VWRSSLQJ VLJKW GLVWDQFH DOO EDVHG RQ GHVLJQ VSHHG
6HH&KDSWHU for vertical alignment, Chapters , , , and  for
grades, Chapters  and  for stopping sight distance, and Chapters , ,
or  IRU GHVLJQ VSHHG

Page 1100-6 WSDOT Design Manual  M 22-01.05


June 2009
Chapter 1100 Design Matrix Procedures

Lane Width: Defined in Chapter 1140 (also see Chapters 1130, 1230, 1240,
and 1360).
Shoulder Width: Defined in Chapter 1140 (also see Chapters 1130, 1230, and 1360).
For shy distance requirements when barrier is present, see Chapter 1610.
Lane Transitions (pavement transitions): The rate and length of transition of
changes in width of lanes (see Chapter 1210).
On/Off Connection: The widened portion of pavement at the end of a ramp
connecting to a main lane of a freeway (see Chapter 1360).
Median Width: The distance between inside edge lines (see Chapters 1140
and 1230).
Cross Slope: Lane: The rate of elevation change across a lane. This element includes
the algebraic difference in cross slope between adjacent lanes (see Chapters 1130
and 1230).
Cross Slope: Shoulder: The rate of elevation change across a shoulder
(see Chapters 1130 and 1230).
Fill/Ditch Slopes: The downward slope from edge of shoulder to bottom of ditch
or catch (see Chapters 1130 and 1230).
Access: The means of entering or leaving a public road, street, or highway with
respect to abutting private property or another public road, street, or highway
(see Chapter 520).
Clear Zone: The total roadside border area, starting at the edge of the traveled
way, available for use by errant vehicles. This area may consist of a shoulder, a
recoverable slope, a nonrecoverable slope, and/or a clear run-out area. The median
is part of a clear zone (see Chapter 1600).
Signing, Delineation, Illumination, ITS: Signs, guideposts, pavement markings,
lighting, and intelligent transportation systems equipment. (See Chapters 720 for
bridge signs and 1020 for signing, Chapter 1030 for delineation, Chapter 1040 for
illumination, and Chapter 1050 for ITS.)
Vertical Clearance: Defined in Chapter 720.
Basic Safety: The list of safety items is in Chapter 1120.
Bicycle and Pedestrian: Defined in Chapter 1510, Pedestrian Design Considerations,
Chapter 1515, Shared-Use Paths, and Chapter 1520, Roadway Bicycle Facilities.
Bridges: Lane Width: The width of a lane on a structure (see Chapters 720, 1130,
1140, 1230, 1240, and 1360).
Bridges: Shoulder Width: The distance between the edge of traveled way and the
face of curb or barrier, whichever is less (see Chapters 720, 1130, 1140, 1230, and
1360; also see Chapter 1610 for shy distance requirements).
Bridges/Roadway: Vertical Clearance: The minimum height between the roadway,
including shoulder, and an overhead obstruction (see Chapter 720).
Bridges: Structural Capacity: The load-bearing ability of a structure (see
Chapter 720).
Intersections/Ramp Terminals: Turn Radii: Defined in Chapter 1310.

WSDOT Design Manual M 22-01.07 Page 1100-7


July 2010
Design Matrix Procedures Chapter 1100

Intersections/Ramp Terminals: Intersection Sight Distance: 'H¿QHG LQ


&KDSWHU, Intersections at Grade, and &KDSWHU  ,QWHUFKDQJHV
Barriers: Terminals and Transition Sections:
‡ 7HUPLQDOV &UDVKZRUWK\ HQG WUHDWPHQWV IRU ORQJLWXGLQDO EDUULHUV WKDW DUH GHVLJQHG
WR UHGXFH WKH SRWHQWLDO IRU VSHDULQJ YDXOWLQJ UROOLQJ RU H[FHVVLYH GHFHOHUDWLRQ
RI LPSDFWLQJ YHKLFOHV IURP HLWKHU GLUHFWLRQ RI WUDYHO ,PSDFW DWWHQXDWRUV DUH
FRQVLGHUHG WHUPLQDOV %HDP JXDUGUDLO WHUPLQDOV LQFOXGH DQFKRUDJH
‡ 7UDQVLWLRQ 6HFWLRQV 6HFWLRQV RI EDUULHUV XVHG WR SURGXFH D JUDGXDO VWLIIHQLQJ RI
DÀH[LEOH RU VHPLULJLG EDUULHU DV LW FRQQHFWV WR D PRUH ULJLG EDUULHU RU ¿[HG REMHFW
VHH &KDSWHUV , , and  
Barriers: Standard Run: *XDUGUDLO DQG RWKHU EDUULHUV DV VKRZQ LQ WKH Standard
Plans for Road Bridge and Municipal Construction, H[FOXGLQJ WHUPLQDOV WUDQVLWLRQV
DWWHQXDWRUV DQG EULGJH UDLOV VHH &KDSWHU 
Barriers: Bridge Rail: %DUULHU RQ D EULGJH H[FOXGLQJ WUDQVLWLRQV VHH &KDSWHU 

(3)  Design Level


,Q WKH QRQ,QWHUVWDWH PDWULFHV GHVLJQ OHYHOV DUH QRWHG LQ WKH FHOOV E\ % 0 )
DQG VRPHWLPHV ZLWK D QXPEHU FRUUHVSRQGLQJ WR D IRRWQRWH RQ WKH PDWUL[ )RU
,PSURYHPHQW SURMHFWV IXOO GHVLJQ OHYHO DSSOLHV WR DOO GHVLJQ HOHPHQWV H[FHSW DV QRWHG
LQ WKH GHVLJQ PDWULFHV DQG LQ RWKHU FKDSWHUV DV DSSOLFDEOH ,Q WKH ,QWHUVWDWH PDWULFHV
RQO\ IXOO GHVLJQ OHYHO DSSOLHV
7KH GHVLJQ OHYHOV RI EDVLF PRGL¿HG DQG IXOO % 0 DQG ) ZHUH XVHG WR GHYHORS
WKH GHVLJQ PDWULFHV (DFK GHVLJQ OHYHO LV EDVHG RQ WKH LQYHVWPHQW LQWHQGHG IRU WKH
KLJKZD\ V\VWHP DQG 3URMHFW 7\SH )RU H[DPSOH WKH LQYHVWPHQW LV JUHDWHU IRU DQ
,QWHUVWDWH RYHUOD\ WKDQ IRU DQ RYHUOD\ RQ D QRQ1+6 URXWH
(a) Blank Cell
$ EODQN FHOO LQ D GHVLJQ PDWUL[ URZ VLJQL¿HV WKDW WKH GHVLJQ HOHPHQW ZLOO QRW EH
DGGUHVVHG EHFDXVH LW LV EH\RQG WKH VFRSH RI WKH W\SLFDO SURMHFW ,Q UDUH LQVWDQFHV
D GHVLJQ HOHPHQW ZLWK D EODQN FHOO PD\ EH LQFOXGHG LI WKDW HOHPHQW LV OLQNHG WR WKH
RULJLQDO QHHG WKDW JHQHUDWHG WKH SURMHFW DQG LV LGHQWL¿HG LQ WKH 3URMHFW 6XPPDU\
RU D 3URMHFW &KDQJH 5HTXHVW )RUP
(b) Basic Design Level (B)
%DVLF GHVLJQ OHYHO SUHVHUYHV SDYHPHQW VWUXFWXUHV H[WHQGV SDYHPHQW VHUYLFH OLIH
DQG PDLQWDLQV VDIH KLJKZD\ RSHUDWLRQV 6HH &KDSWHU  IRU GHVLJQ JXLGDQFH
(c) 0RGL¿HG'HVLJQ/HYHO 0
0RGL¿HG GHVLJQ OHYHO SUHVHUYHV DQG LPSURYHV H[LVWLQJ URDGZD\ JHRPHWULFV
VDIHW\ DQG RSHUDWLRQDO HOHPHQWV 6HH &KDSWHU  IRU GHVLJQ JXLGDQFH 8VH
IXOO GHVLJQ OHYHO IRU GHVLJQ HOHPHQWV RU SRUWLRQV RI GHVLJQ HOHPHQWV WKDW DUH QRW
covered in &KDSWHU 
(d) Full Design Level (F)
)XOO GHVLJQ OHYHO LPSURYHV URDGZD\ JHRPHWULFV VDIHW\ DQG RSHUDWLRQDO
HOHPHQWV 6HH &KDSWHU and other applicable Design Manual chapters for
GHVLJQJXLGDQFH

Page 1100-8 WSDOT Design Manual  M 22-01.05


June 2009
Chapter 1100 Design Matrix Procedures

(4)  Scoping Safety Improvement Projects


,Q DQ HIIRUW WR SURYLGH WKH JUHDWHVW VDIHW\ EHQH¿W ZLWK OLPLWHG IXQGLQJ LW LV :6'27
SROLF\ WR IRFXV KLJKZD\ VDIHW\ SURMHFW PRGL¿FDWLRQV RQ LPSURYHPHQWV WKDW KDYH WKH
JUHDWHVW SRWHQWLDO WR UHGXFH VHYHUH RU IDWDO LQMXULHV 7KH LQWHQW RI WKLV SROLF\ LV WR
‡ $GGUHVV WKH HOHPHQWV WKDW DUH DVVRFLDWHG ZLWK VHYHUHLQMXU\ FUDVKHV
‡ &RQVLGHU D UDQJH RI VROXWLRQV WKDW LQFOXGH PLQRU RSHUDWLRQDO PRGL¿FDWLRQV
ORZHUFRVW LPSURYHPHQWV VXFK DV FKDQQHOL]DWLRQ DQG KLJKHUFRVW LPSURYHPHQWV
VXFK DV VLJQDOL]DWLRQ DQG ZLGHQLQJ
‡ 5HFRJQL]H WKH VXEVWDQWLDO WUDGHRIIV WKDW PXVW EH PDGH ZLWK WKH QXPHURXV
FRPSHWLQJ QHHGV DQG FRVWV D KLJKZD\ GHVLJQHU IDFHV LQ SURMHFW GHYHORSPHQW
%HFDXVH WKHVH SURMHFWV DUH GHYHORSHG RQ D ³QHHG´ EDVLV D PDWUL[ DSSURDFK LV QRW WKH
PRVW HI¿FLHQW PHWKRG RI VFRSLQJ WKHP &RQGXFW D SURMHFW DQDO\VLV WR GHWHUPLQH DQG
GRFXPHQW WKRVH GHVLJQ HOHPHQWV DQG OHYHOV WR EH LQFOXGHG LQ WKH SURMHFW 7KLV SURMHFW
DQDO\VLV ZLOO
‡ ,QFOXGH DQ DQDO\VLV RI WKH FUDVK KLVWRU\
‡ ,GHQWLI\ RSHUDWLRQDO ORZFRVW DQG KLJKFRVW VROXWLRQV
‡ 3URSRVH WKH DSSURSULDWH VROXWLRQ EDVHG RQ D EHQH¿WFRVW DQDO\VLV DV SDUW RI WKH
SURMHFW DQDO\VLV
(a) Sites With Potential for Improvement (SWPIs)
6LWHV :LWK 3RWHQWLDO IRU ,PSURYHPHQW DUH GHYHORSHG IRU WKH SXUSRVH RI
LGHQWLI\LQJ SRWHQWLDO SURMHFW ORFDWLRQV 7KHVH VLWHV DUH LGHQWL¿HG WKURXJK D
V\VWHPZLGH DQDO\VLV 2QO\ WKH VLWHV ZLWK FRUUHFWLEOH FRQWULEXWLQJ IDFWRUV WUDI¿F
PRYHPHQWV RU ORFDWLRQV ZLOO EH DGGUHVVHG 7KH 6:3,V WKDW PD\ EHQH¿W IURP D
VDIHW\IRFXVHG KLJKZD\ PRGL¿FDWLRQ LQFOXGH WKH IROORZLQJ
‡ &ROOLVLRQ 3UHYHQWLRQ
‡ &ROOLVLRQ 5HGXFWLRQ LQFOXGLQJ &ROOLVLRQ $QDO\VLV /RFDWLRQV >&$/@
‡ 6\VWHP ,PSURYHPHQWV VXFK DV VDIHW\ LQLWLDWLYHV
$OO 6:3,V DUH DQDO\]HG LQFRUSRUDWLQJ DGGLWLRQDO FROOLVLRQ DQG ULVN GDWD WR
GHWHUPLQH FRQWULEXWLQJ IDFWRUV 3URSRVHG FRXQWHUPHDVXUHV DUH GHYHORSHG WR
VSHFL¿FDOO\ DGGUHVV WKRVH FRQWULEXWLQJ IDFWRUV DQG ORFDWLRQV
$QDO\]H WKH 6:3,V DQG SURSRVHG FRXQWHUPHDVXUHV XVLQJ WKH SURMHFW DQDO\VLV
HDUO\ LQ WKH VFRSLQJ SURFHVV (QVXUH WKHUH LV HQRXJK GHWDLO IRU D UHDVRQDEOH FRVW
HVWLPDWH DQG KDYH VFRSLQJ UHYLHZHG E\ WKH UHVSRQVLEOH DSSURYDO DXWKRULWLHV IRU
WKH 'HVLJQ RU 7UDI¿F RI¿FHV 7KRVH SURMHFWV LGHQWL¿HG WKURXJK WKH SURFHVV DERYH
ZLOO IDOO XQGHU VHYHUDO FDWHJRULHV DV VKRZQ LQ ([KLELW 
‡ )RU ,IXQGHG SURMHFWV VHH WKH 'HVLJQ 0DWULFHV
‡ )RU VSRW LPSURYHPHQWV LQ 3 VHH &KDSWHU 
‡ )RU 4 SURMHFWV VHH Chapter 111

WSDOT Design Manual  M 22-01.05 Page 1100-9


June 2009
Design Matrix Procedures Chapter 1100

Sites With Potential for Improvement


Exhibit 1100-2

(5)  Design Variances


7\SHV RI GHVLJQ YDULDQFHV DUH GHVLJQ H[FHSWLRQV HYDOXDWH XSJUDGHV DQG GHYLDWLRQV
6HH &KDSWHU  UHJDUGLQJ WKH 'HVLJQ 9DULDQFH ,QYHQWRU\ 6\VWHP '9,6 
(a) Design Exception (DE)
A design H[FHSWLRQ LQ D PDWUL[ FHOO LQGLFDWHV WKDW :6'27 KDV GHWHUPLQHG WKH
GHVLJQ HOHPHQW LV XVXDOO\ RXWVLGH WKH VFRSH RI WKH 3URMHFW 7\SH 7KHUHIRUH DQ
H[LVWLQJ FRQGLWLRQ WKDW GRHV QRW PHHW RU H[FHHG WKH GHVLJQ OHYHO VSHFL¿HG LQ WKH
PDWUL[ PD\ UHPDLQ LQ SODFH XQOHVV D QHHG KDV EHHQ LGHQWL¿HG LQ WKH +LJKZD\
6\VWHP 3ODQ DQG SULRULWL]HG LQ DFFRUGDQFH ZLWK WKH SURJUDPPLQJ SURFHVV
6HH&KDSWHU  UHJDUGLQJ GRFXPHQWDWLRQ
(b) Evaluate Upgrade (EU)
An HYDOXDWH XSJUDGH LQ D PDWUL[ FHOO LQGLFDWHV WKDW :6'27 KDV GHWHUPLQHG WKH
GHVLJQ HOHPHQW LV DQ LWHP RI ZRUN WKDW LV WR EH FRQVLGHUHG IRU LQFOXVLRQ LQ WKH
SURMHFW )RU DQ H[LVWLQJ HOHPHQW WKDW GRHV QRW PHHW RU H[FHHG WKH VSHFL¿HG GHVLJQ
level, an analysis LV UHTXLUHG WR GHWHUPLQH WKH LPSDFWV DQG FRVWHIIHFWLYHQHVV RI
LQFOXGLQJ WKH HOHPHQW LQ WKH SURMHFW 7KH (8 DQDO\VLV PXVW VXSSRUW WKH GHFLVLRQ
UHJDUGLQJ ZKHWKHU RU QRW WR XSJUDGH WKDW HOHPHQW 6HH &KDSWHU  regarding
GRFXPHQWDWLRQ
(c) Deviation
A GHYLDWLRQ LV UHTXLUHG ZKHQ DQ H[LVWLQJ RU SURSRVHG GHVLJQ HOHPHQW GLIIHUV IURP
WKH VSHFL¿HG GHVLJQ OHYHO IRU WKH SURMHFW DQG QHLWKHU '( QRU (8 SURFHVVLQJ LV
LQGLFDWHG 6HH &KDSWHU  UHJDUGLQJ GRFXPHQWDWLRQ

Page 1100-10 WSDOT Design Manual  M 22-01.05


June 2009
Chapter 1100 Design Matrix Procedures

(d) DE or EU with /F or /M
'( RU (8 ZLWK ) RU 0 LQ D FHOO PHDQV WKDW WKH GHVLJQ HOHPHQW LV WR EH DQDO\]HG
ZLWK UHVSHFW WR WKH VSHFL¿HG GHVLJQ OHYHO )RU LQVWDQFH D '() LV DQDO\]HG ZLWK
UHVSHFW WR IXOO GHVLJQ OHYHO DQG PLJKW EH UHFRUGHG DV KDYLQJ DQ H[LVWLQJ GHVLJQ
HOHPHQW WKDW GRHV QRW PHHW RU H[FHHG FXUUHQW IXOO GHVLJQ OHYHO $Q (80 LV
DQDO\]HG WR GHFLGH ZKHWKHU RU QRW WR XSJUDGH DQ\ H[LVWLQJ GHVLJQ HOHPHQW WKDW
GRHV QRW PHHW RU H[FHHG WKH FXUUHQW PRGL¿HG GHVLJQ OHYHO

(6)  Terminology in Notes


F/M Full for freeways/Modified for nonfreeway XVHV WKH ZRUG freeway to mean a
GLYLGHG KLJKZD\ IDFLOLW\ WKDW KDV D PLQLPXP RI WZR ODQHV LQ HDFK GLUHFWLRQ IRU WKH
H[FOXVLYH XVH RI WUDI¿F DQG ZLWK IXOO FRQWURO RI DFFHVV )RU PDWUL[ FHOOV ZLWK DQ )0
GHVLJQDWLRQ DQDO\]H IUHHZD\ URXWHV DW IXOO GHVLJQ OHYHO DQG QRQIUHHZD\ URXWHV DW
PRGL¿HG GHVLJQ OHYHO
7KH Access Control Tracking System PHQWLRQHG LQ QRWH >@ LQ 'HVLJQ 0DWULFHV
DQG  LV D GDWDEDVH OLVW UHODWHG WR KLJKZD\ URXWH QXPEHUV DQG PLOHSRVWV
7KH GDWDEDVH LV DYDLODEOH DW  ZZZZVGRWZDJRYGHVLJQDFFHVVDQGKHDULQJs 6HH
&KDSWHU IRU DFFHVV FRQWURO EDVLFV DQG &KDSWHUV  DQG  IRU OLPLWHG DQG
PDQDJHG DFFHVV UHVSHFWLYHO\
7KH corridor or project analysis PHQWLRQHG LQ QRWHV >@ DQG >@ LQ 'HVLJQ 0DWULFHV
  DQG  LV WKH GRFXPHQWDWLRQ QHHGHG WR VXSSRUW D FKDQJH LQ GHVLJQ OHYHO IURP WKH
LQGLFDWHG GHVLJQ OHYHO DQG WR VXSSRUW GHFLVLRQV WR LQFOXGH H[FOXGH RU PRGLI\ GHVLJQ
HOHPHQWV 7KH ¿UVW VWHS LV WR FKHFN IRU UHFRPPHQGDWLRQV IRU IXWXUH LPSURYHPHQWV LQ
DQ DSSURYHG URXWH GHYHORSPHQW SODQ RU RWKHU DSSURYHG VWXG\ ,I QR DSSURYHG SODQV RU
VWXGLHV DUH DYDLODEOH DQ DQDO\VLV FDQ EH EDVHG RQ URXWH FRQWLQXLW\ DQG RWKHU H[LVWLQJ
IHDWXUHV 6HH &KDSWHU  UHJDUGLQJ GRFXPHQWDWLRQ $ SURMHFW DQDO\VLV LV DOVR XVHG
IRU PXOWLSOH UHODWHG GHVLJQ YDULDQFHV &KHFN ZLWK WKH +4 'HVLJQ 2I¿FH EHIRUH XVLQJ
WKLV DSSURDFK $ FRUULGRU DQDO\VLV LV DOVR XVHG WR HVWDEOLVK GHVLJQ VSHHG DV GLVFXVVHG
in Chapters  and 
1RWH >@ Analyses required DSSHDUV RQO\ RQ 'HVLJQ (OHPHQWV IRU 5LVN SURMHFWV RQ
'HVLJQ 0DWULFHV   DQG  7KHVH GHVLJQ HOHPHQWV DUH WR EH HYDOXDWHG XVLQJ EHQH¿W
FRVW %& WR FRPSDUH DQG UDQN HDFK RFFXUUHQFH RI WKH GHVLJQ HOHPHQW 7KH %&
HYDOXDWLRQ VXSSRUWV HQJLQHHULQJ GHFLVLRQV UHJDUGLQJ ZKLFK SURSRVHG VROXWLRQV DUH
LQFOXGHG LQ D 5LVN SURMHFW
0RVW FRPSRQHQWV RI D 5LVN SURMHFW ZLOO KDYH D %& RI  RU JUHDWHU 3URSRVHG
VROXWLRQV ZLWK D %& UDWLR OHVV WKDQ  PD\ EH LQFOXGHG LQ WKH SURMHFW EDVHG RQ
HQJLQHHULQJ MXGJPHQW RI WKHLU VLJQL¿FDQW FRQWULEXWLRQ WR FRUULGRU FRQWLQXLW\ 5LVN
SURJUDP VL]H SXUSRVH DQG QHHG RU SURMHFW SULRULWL]DWLRQ PD\ OHDG WR LQVWDQFHV
ZKHUH GHVLJQ HOHPHQWV ZLWK D UDWLR JUHDWHU WKDQ  DUH H[FOXGHG IURP D SURMHFW 7KH
DQDO\VLV GHVLJQ GHFLVLRQV DQG SURJUDP IXQGLQJ GHFLVLRQV DUH WR EH GRFXPHQWHG LQ
WKH 'HVLJQ 'RFXPHQWDWLRQ 3DFNDJH 'HFLVLRQV UHJDUGLQJ ZKLFK GHVLJQ HOHPHQWV WR
LQFOXGH LQ D SURMHFW DUH DXWKRUL]HG DW WKH :6'27 UHJLRQ OHYHO

WSDOT Design Manual  M 22-01.05 Page 1100-11


June 2009
Design Matrix Procedures Chapter 1100

Begin Begin End SR End


State Route NHS Route Description
SR MP ARM MP ARM
US 2 I-5 to Idaho State Line 0.00B 0.00 334.51 326.64
US 2 Couplet Brown Street Couplet 287.45 0.00 288.08 0.63
US 2 Couplet Division Street Couplet 289.19 0.00 290.72 1.53
SR 3 US 101 to SR 104 0.00 0.00 60.02 59.81
SR 4 US 101 to I-5 0.00 0.00 62.28 62.27
I-5 Oregon State Line to Canadian Border 0.00 0.00 276.56 276.62
SR 8 US 12 to US 101 0.00 0.00 20.67 20.67
SR 9 SR 546 to Canadian Border 93.61 93.52 98.17 98.08
SR 9 Spur Sumas Spur 98.00 0.00 98.25 0.24
SR 11 I-5 to Alaskan Ferry Terminal 19.93 19.93 21.28 21.28
US 12 US 101 to Idaho State Line 0.00 0.00 434.19 430.76
US 12 Couplet Aberdeen Couplet 0.33 0.00 0.68 0.35
SR 14 I-5 to US 97 0.00 0.00 101.02 100.93
SR 14 Spur Maryhill Spur 100.66 0.00 101.05 0.39
SR 16 I-5 to SR 3 0.00 0.00 29.19 27.01
SR 16 Spur SR 16 to SR 3 28.74 0.00 29.13 0.39
SR 17 US 395 to I-90 7.43 0.00 50.89 43.40
SR 18 SR 99 to I-5 2.20B 0.00 0.00 0.53
SR 18 I-5 to I-90 0.00 0.53 27.91 28.41
SR 20 US 101 to I-5 0.00 0.00 59.54 59.49
SR 20 Spur SR 20 to San Juan Ferry 47.89 0.00 55.67 7.78
SR 22 US 97 to I-82 0.70 0.00 4.00 3.31
SR 26 I-90 to US 195 0.00 0.00 133.53 133.61
SR 26 Spur SR 26 to US 195 133.44 0.00 133.51 0.07
SR 28 US 2 to SR 281 0.00B 0.00 29.77 33.91
I-82 I-90 to Oregon State Line 0.00 0.00 132.60 132.57
I-90 I-5 to Idaho State Line 1.94 0.00 299.82 297.52
I-90 Reverse Lane Reversible lane 1.99 0.00 9.44 7.45
SR 96 I-5 to McCollum Park and Ride 0.00 0.00 0.52 0.52
US 97 Oregon State Line to SR 22 0.00B 0.00 61.44 61.30
US 97 I-90 to Canadian Border 133.90 118.80 336.48 321.62
US 97 Couplet Maryhill Couplet 2.59 0.00 2.68 0.09
US 97 Spur US 97 to US 2 (Orondo) 213.36 0.00 213.62 0.26
SR 99 188th to SeaTac Airport 18.35 14.70 18.77 15.12
SR 99 SR 509 to SR 104 26.04 22.40 43.60 39.84
US 101 Oregon State Line to SR 401 0.00 0.00 0.46 0.46
US 101 SR 4 to I-5 28.89 28.89 367.41 365.78
US 101 Couplet Aberdeen Couplet 87.49 0.00 91.66 4.17
US 101 Couplet Port Angeles Couplet 249.65 0.00 251.32 1.67
SR 104 US 101 to I-5 0.20 0.00 29.67 29.14
SR 109 Pacific Beach Access 0.00 0.00 30.25 30.29
SR 125 Oregon State Line to SR 125 Spur 0.00 0.00 6.09 6.08
SR 125 Spur SR 125 to US 12 6.09 0.00 6.76 0.67
SR 127 US 12 to SR 26 0.03 0.00 27.05 27.05
SR 128 US 12 to Idaho State Line 0.00 0.00 2.30 2.30
SR 166 SR 16 to Bay St 0.02 0.00 3.40 3.38
1+6+LJKZD\VLQ:DVKLQJWRQ
Exhibit 1100-3

Page 1100-12 WSDOT Design Manual  M 22-01.05


June 2009
Chapter 1100 Design Matrix Procedures

Begin Begin End SR End


State Route NHS Route Description
SR MP ARM MP ARM
SR 166 SR 16 to Bay St 0.02 0.00 3.40 3.38
SR 167 I-5 to SR 900 / S 2nd St 0.00 0.00 27.28 28.60
I-182 I-82 to US 395 0.00 0.00 15.19 15.19
US 195 Idaho State Line to I-90 0.00B 0.00 95.99 93.37
US 195 Spur US 195 to Idaho State Line 0.06 0.00 0.60 0.54
I-205 Oregon State Line to I-5 26.59 0.00 37.16 10.57
SR 240 I-182 to Coast St / Bypass Hwy – 30.63 28.86 34.87 33.10
Hanford Access
SR 270 US 195 to Idaho State Line 0.00 0.00 9.89 9.89
SR 270 Pullman Couplet 2.67 0.00 2.90 0.23
SR 281 I-90 to SR 28 0.00 0.00 10.55 10.55
SR 281 Spur SR 281 to I-90 2.65 0.00 4.34 1.69
SR 303 SR 304 to SR 3 0.00B 0.00 9.16 9.32
SR 304 SR 3 to Bremerton Ferry 0.00 0.00 3.51 3.24
SR 305 Winslow Ferry to SR 3 0.02 0.00 13.52 13.50
SR 307 SR 305 to SR 104 0.00 0.00 5.25 5.25
SR 310 SR 3 to SR 304 0.00 0.00 1.84 1.84
US 395 Congressional High-Priority Route / I-82 13.05 19.81 270.26 275.09
to Canadian Border
SR 401 US 101 to SR 4 0.00 0.00 12.13 12.13
I-405 I-5 to I-5 0.00 0.00 30.32 30.30
SR 432 SR 4 to I-5 0.00 0.00 10.33 10.32
SR 433 Oregon State Line to SR 432 0.00 0.00 0.94 0.94
SR 500 I-5 to SR 503 0.00 0.00 5.96 5.96
SR 501 I-5 to Port of Vancouver 0.00 0.00 3.83 3.42
SR 502 I-5 to SR 503 0.00B 0.00 7.56 7.58
SR 503 SR 500 to SR 502 0.00 0.00 8.09 8.09
SR 509 12th Place S to SR 99 24.35B 26.13 29.83 33.11
SR 509 Pacific Ave to Marine View Drive 0.22 1.44 3.20 4.42
SR 512 I-5 to SR 167 0.00 0.00 12.06 12.06
SR 513 Sandpoint Naval Air Station 0.00 0.00 3.35 3.35
SR 516 I-5 to SR 167 2.03 2.02 4.72 4.99
SR 518 I-5 to SR 509 0.00 0.00 3.81 3.42
SR 519 I-90 to Seattle Ferry Terminal 0.00 0.00 1.14 1.14
SR 520 I-5 to SR 202 0.00 0.00 12.83 12.82
SR 522 I-5 to US 2 0.00 0.00 24.68 24.68
SR 524 Cedar Way Spur to I-5 4.64 4.76 5.32 5.44
SR 524 Spur Cedar Way Spur – Lynnwood Park & 4.64 0.00 5.14 0.50
Ride to SR 524
SR 525 I-5 to SR 20 0.00 0.00 30.49 30.72
SR 526 SR 525 to I-5 0.00 0.00 4.52 4.52
SR 529 I-5 to Everett Homeport 0.00 0.00 2.72 2.72
SR 539 I-5 to Canadian Border 0.00 0.00 15.16 15.16
SR 543 I-5 to Canadian Border 0.00 0.00 1.09 1.09
SR 546 SR 539 to SR 9 0.00 0.00 8.02 8.02
I-705 I-5 to Schuster Parkway 0.00 0.00 1.50 1.50
SR 970 I-90 to US 97 0.00 0.00 10.31 10.31

NHS Highways in Washington


Exhibit 1100-3 (continued)

WSDOT Design Manual M 22-01.05 Page 1100-13


June 2009
Design Matrix Procedures Chapter 1100


See the following pages for Design Matrices 1–5

Page 1100-14 WSDOT Design Manual M 22-01.06


December 2009
Design Matrix Procedures Chapter 1100

 Project Type Main Line Bridges Barriers

[12]
Term. & Trans. Section
Cross Slope Shoulder
Horizontal Alignment

Bike and Pedestrian


On / Off Connection

Structural Capacity
[13]
Vertical Alignment

[14] [19]
Cross Slope Lane

Illumination & ITS

[11]
Fill / Ditch Slopes
Shoulder Width

Shoulder Width
Design Elements 

Vertical Clear.
[9]

Standard Run
Median Width

Delineation
Lane Width

Lane Width
[10]

Bridge Rail
Clear Zone

Signing
(1-1) Preventative Maintenance
Pavement Restoration
(1-2) Diamond Grinding EU EU F DE F EU F
(1-3) Milling with HMA Inlays EU F EU F DE F EU F
(1-4) Nonstructural Overlay DE EU EU EU F EU F EU F F F
Pavement Rehab. / Resurf.
[17]
(1-5) HMA Structural Overlays EU DE F F F DE F EU F F EU F F F F DE F F F
PCCP Overlays [17]
(1-6) EU DE F F F DE F EU F F EU F F F F DE F F F
Dowel Bar Retrofit [17]
(1-7) EU DE F F F DE DE F F EU F F DE DE F F F
Bridge Rehabilitation
[6] [22]
(1-8) Bridge Deck Rehabilitation F F F DE [11] F F F
Safety
[20] [20]
(1-9) Median Barrier DE F F
[23]
(1-10) Guardrail Upgrades DE F F F
[22]
(1-11) Bridge Rail Upgrades F F F
[27]
(1-12) Collision Analysis Locations Design Elements determined based on a project analysis
[16]
Reconstruction
(1-13) New / Reconstruction F F F F F F F F F F F F F F F F F F F F F

Design Matrix 1: Interstate Routes (Main Line)


Exhibit 1100-4

WSDOT Design Manual M 22-01.07 Page 1100-15


July 2010
Design Matrix Procedures Chapter 1100

Ramps and Collector Distributors Crossroad


 Project Type
Ramp Terminals Barriers Barriers

[9] [10]

[10]
[12]

[12]
Sign., Delin., Illum., & ITS

Sign., Delin., Illum., & ITS


Term. & Trans. Section

Term. & Trans. Section


Cross Slope Shoulder
Horizontal Alignment

Bike and Pedestrian

Bike and Pedestrian


On / Off Connection
Vertical Alignment

[14] [19]

[14] [19]
Cross Slope Lane

I/S Sight Distance


[11]

[11]
Fill / Ditch Slopes

Fill / Ditch Slopes


Design Elements 

Lane Transition
Shoulder Width

Shoulder Width
Limited Access

Limited Access
Vertical Clear.

Vertical Clear.
Standard Run

Standard Run
Lane Width

Lane Width
Bridge Rail

Bridge Rail
Clear Zone

Clear Zone
Turn Radii

Angle
(2-1) Preventative Maintenance
Pavement Restoration
[15] [15]
(2-2) Diamond Grinding EU F F EU F EU F F EU F
[15] [15]
(2-3) Milling With HMA Inlays EU F F F M F F F EU F F M F F F
[15] [15]
(2-4) Nonstructural Overlay EU EU EU F F F M F F F EU F F M F F F
Pavement Rehab. / Resurf.
[17] [15] [15]
(2-5) HMA Structural Overlays EU DE F F F F F EU F F F F F M F F F F F F DE DE DE F F F F M F F F
[17] [15] [15]
(2-6) PCCP Overlays EU DE F F F F F EU F F F F F M F F F F F F DE DE DE F F F F M F F F
[17] [15] [15]
(2-7) Dowel Bar Retrofit DE DE DE F F DE F F F F DE F F F F F F F F F F F
Bridge Rehabilitation
[6] [22] [6] [22]
(2-8) Bridge Deck Rehabilitation F M F F F F M F F F
Safety
(2-9) Intersection F F F F F F F M F F F F F F F F F F F M F F F
[23] [23]
(2-10) Guardrail Upgrades DE F F F F F
[22] [22]
(2-11) Bridge Rail Upgrades F F F F F F
[27]
(2-12) Collision Analysis Locations Design Elements determined based on a Project Analysis
[16]
Reconstruction
(2-13) New / Reconstruction F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F

Design Matrix 2: Interstate Interchange Areas


Exhibit 1100-5

Page 1100-16 WSDOT Design Manual M 22-01.07


July 2010
Design Matrix Procedures Chapter 1100

 Project Type Main Line Bridges[11] Intersections Barriers

Term. & Trans. Section


Sign., Del., Illum., & ITS
Cross Slope Shoulder
Horizontal Alignment

On / Off Connection

Structural Capacity
Vertical Alignment

Vertical Clearance

[14] [19]
Cross Slope Lane

I/S Sight Distance


Fill / Ditch Slopes
Lane Transition
Shoulder Width

Shoulder Width
[18]

Standard Run
Design Elements 

Median Width

Basic Safety

Bike & Ped.


Lane Width

Lane Width

Bridge Rail
Clear Zone

Turn Radii
[3]
Access

Angle

[12]
Preservation
Roadway
(3-1) Non-Interstate Freeway DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F B B DE/F DE/F F F B F
(3-2) HMA/PCCP/BST Overlays DE/M DE/M DE/M DE/M DE/F DE/F DE/M DE/M DE/M DE/M B B M DE/M DE/M F B F B F
(3-3) Replace HMA w/PCCP at I/S DE/M DE/M EU/M EU/M DE/F DE/M EU/M DE/M DE/M B B M DE/M DE/M F B F B F
Structures
(3-4) Bridge Replacement F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F F F[2] F[2] F F F[2] F[2] F F F F
[6] [22]
(3-5) Bridge Deck Rehab. B B M F F F F
[16]
Improvements
Mobility
(3-6) Non-Interstate Freeway F F F F F F F F F F F F F F F F F F F F F F F F
(3-7) Urban F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F[2] F[2] F F F F
(3-8) Rural F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F[2] F[2] F F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(3-9) HOV F F F F F F F F F F F F F F F F F F F F F F F F
(3-10) Bike/Ped. Connectivity [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5] [5] [5] [5] [5] [5] [5] [5]
Safety
(3-11) Non-Interstate Freeway F F F F F F F F F F F F F F F F F F F F F F F
(3-12) Intersection[1] F[2] F[2] F F[2] F F F M F F F F F F
(3-13) Corridor[1][24] M[4] M[4] M[4] M[4] F F[17] M[4] M[4] M[4] M[4] F F F F M[4] M[4] F M[4] M[4] F F F F
[20] [20]
(3-14) Median Barrier DE/F F F
(3-15) Guardrail Upgrades DE/F F F[23]
(3-16) Bridge Rail Upgrades F F[22] F
(3-17) Risk: Roadside F EU/F F F F F F
[21] [21] [
(3-18) Risk: Sight Distance F/M[21] F/M[21] F/M[21] F/M[21] F/M[21] F F F F F[21] F[21] F[21] F/M 21] F/M[21] F[21] F F F
(3-19) Risk: Roadway Width F/M[21] F/M[21] F[21] F[21] F/M[21] F/M[21] F/M[21] F/M[21] F F F F F[21] F[21] F[21] F/M[21] F/M[21] F[21] F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(3-20) Risk: Realignment F F F F F F F F F F F F F F F F F F F F F F F
[27]
(3-21) Collision Analysis Locations Design Elements determined based on a Project Analysis
Economic Development
(3-22) Freight & Goods (Frost Free)[8] F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] EU/F F B EU/F[26] DE/F DE/F F F EU/F EU/F EU/F F F F
(3-23) Four-Lane Trunk System F F F F F F F F F F F F F F F F F F F F F F F F
(3-24) Rest Areas (New) F F F F F F F F F F F F F F F F F F F F F F F
(3-25) Bridge Restrictions F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F EU/F[26] F[2] F[2] F F F[2] F[2] F F F F
(3-26) Bike Routes (Shldrs) EU/M [7] EU/F EU/M EU/M B B F EU/M EU/M F B F B EU/F

Design Matrix 3: Main Line NHS Routes (Except Interstate)


Exhibit 1100-6

WSDOT Design Manual M 22-01.07 Page 1100-17


July 2010
Design Matrix Procedures Chapter 1100

Ramps and Collector-Distributors Crossroad


 Project Type Ramp Terminals Barriers Barriers

[12]
[12]

Term. & Trans. Section


Sign., Del., Illum., & ITS

Sign., Del., Illum., & ITS


Term. & Trans. Section
Cross Slope Shoulder

[11]
Horizontal Alignment

On / Off Connection
Vertical Alignment

Vertical Clearance
[14] [19]

[14] [19]
Cross Slope Lane

I/S Sight Distance


Fill / Ditch Slopes

Fill / Ditch Slopes


Lane Transition
Shoulder Width

Shoulder Width
Design Elements 

Standard Run

Standard Run
Basic Safety

Basic Safety

Ped. & Bike


Lane Width

Lane Width
Bridge Rail

Bridge Rail
Bike & Ped
Clear Zone

Clear Zone
Turn Radii
[3]

[3]
Access

Access
Angle
Preservation
Roadway
(4-1) Non-Interstate Freeway DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F B B M DE/F DE/F DE/F F B F DE/F DE/F DE/F B B F M F B F
(4-2) HMA/PCCP/BST Overlay
B B M B F B F B B F M F B F
Ramps
Structures
(4-3) Bridge Replacement F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F F F F F F F[2] F[2] F[2] F F F F F F F F
[6] [22] [6] [22]
(4-4) Bridge Deck Rehab. B B M F F F B B F M F F F
[16]
Improvements
Mobility
(4-5) Non-Interstate Freeway F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
(4-6) Urban F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F F F[2] F[2] F[2] F F F F F F F F
(4-7) Rural F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F F F[2] F[2] F[2] F F F F F F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(4-8) HOV Bypass F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
(4-9) Bike/Ped. Connectivity [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5]
Safety
(4-10) Non-Interstate Freeway F F F F F F F F F F F F M F F F F F F F F F F F F F M F F F
[1][25] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(4-11) At Grade F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
(4-12) Intersection[1] F[2] F[2] F F[2] F F F M F F F F F] F F[2] F F F F M F F F
[23] [23]
(4-13) Guardrail Upgrades DE/F F F F F
(4-14) Bridge Rail Upgrades F F[22] F
(4-15) Risk: Roadside F EU/F F F F EU/F F F F F F
[21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
(4-16) Risk: Sight Distance F/M F/M F/M F/M F/M F F F F F/M F/M F F F F F/M F F F F
[21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
(4-17) Risk: Roadway Width F/M F/M F F F/M F/M F/M F F F F F/M F/M F F F F F/M F/M F/M F F F F F F F
(4-18) Risk: Realignment F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F/M[21] F/M[21] F F F F F[2] F[2] F[2] F F F[21] F F F F
[27]
(4-19) Collision Analysis Locations Design Elements determined based on a Project Analysis
Economic Development
(4-20) Four-Lane Trunk System F F F F F F F F F F F F F F F F F F F F F F F F F F F

Design Matrix 4: Interchange Areas, NHS (Except Interstate), and Non-NHS


Exhibit 1100-7

Page 1100-18 WSDOT Design Manual M 22-01.07


July 2010
Design Matrix Procedures Chapter 1100

 Project Type Main Line Bridges[11] Intersections Barriers

Cross Slope Shoulder


Horizontal Alignment

Sign., Del., Illum., &

Structural Capacity
Vertical Alignment

Vertical Clearance
Cross Slope Lane

I/S Sight Distance


Fill / Ditch Slopes
Lane Transition
Shoulder Width

Shoulder Width

Term. & Trans.

[19]
[18]

Standard Run
Median Width
Design Elements 

Basic Safety

Bike & Ped.


Lane Width

Lane Width

[12]

Bridge Rail
Clear Zone

Turn Radii
[3]

Section
Access

Angle
ITS
Preservation
Roadway
(5-1) HMA/PCCP B B M F B F B F
(5-2) BST
(5-3) BST Routes/Basic Safety B B B F B F
(5-4) Replace HMA w/PCCP at I/S EU/M EU/M DE/M EU/M B B M F F B F
Structures
(5-5) Bridge Replacement M F M M F M M M F F F F[2] F[2] F F M M F F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2]
(5-6) Bridge Repl. (Multilane) F F F F F F F F F F F F F F[2] F F F[2] F[2] F F F F
(5-7) Bridge Deck Rehab. B B M F[6] F[22] F
[16]
Improvements
Mobility
(5-8) Urban (Multilane) F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F EU/F EU/F F F F F
(5-9) Urban M M M M F M M M F F F F M M F F EU/M EU/M F F F F
(5-10) Rural M M M M F M M M M F F F F M M F F EU/M EU/M F F F F
(5-11) HOV M M M M F M M M M F F F F M M F F EU/M EU/M F F F F
(5-12) Bike/Ped. Connectivity [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5] [5] [5] [5] [5] [5] [5] [5]
Safety
(5-13) Non-Interstate Freeway F[2] F[2] F[2] F[2] F[2] F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F[2] F[2] F F F F
[1] [4] [4] [4] [4] [4]
(5-14) Intersection M M F M F F F M M M F F F F
(5-15) Corridor[1][24] M[4] M[4] M[4] M[4] F M[4] M[4] M[4] M[4] F F F M M[4] M[4] F M[4] M[4] F F F F
(5-16) Median Barrier [20] [20]
DE/F F F
(5-17) Guardrail Upgrades DE/F F F[23]
(5-18) Bridge Rail Upgrades F F[22] F
(5-19) Risk: Roadside [4]
M EU/F F F F F F
(5-20) Risk: Sight Distance [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
F/M F/M F/M F/M F/M F F F F F F F F/M F/M F F F F
(5-21) Risk: Roadway Width [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
F/M F/M F F/M F/M F/M F/M F F F F F F F F/M F/M F F F F
(5-22) Risk: Realignment [2] [2] [21] [21] [21] [21] [21] [21]
F/M F/M F/M F/M F F/M F F F/M F F F F F F F F/M F/M F F F F
(5-23) Collision Analysis Locations Design Elements determined based on a Project Analysis[27]
Economic Development
(5-24) Freight & Goods (Frost Free)[8] EU/M EU/M EU/M EU/M EU/M EU/M M M EU/M F B B EU/F[26] DE/M DE/M F EU/M EU/M EU/F F B F
(5-25) Rest Areas (New) F F F F F F F F F F F F F F F F F F F F F
(5-26) Bridge Restrictions M F M M F M M M M F F EU/F[26] M M F F M M F F F F
(5-27) Bike Routes (Shldrs) EU/M [7] EU/F EU/M EU/M B B F EU/M EU/M B F B EU/F

Design Matrix 5: Main Line Non-NHS Routes


Exhibit 1100-8

WSDOT Design Manual M 22-01.07 Page 1100-19


July 2010
Design Matrix Procedures Chapter 1100

Design Matrix Notes:


 A blank cell indicates that the element is not applicable.
F Full design level (see Chapter 1140).
M Modified design level (see Chapter 1130).
DE Design Exception to full design level.
EU Evaluate Upgrade to full design level.

[1] Collision Reduction or Collision Prevention (At-Grade Removal, Signalization & Channelization). Specific deficiencies that created the project must
be upgraded to design level as stated in the matrix.
[2] Modified design level may apply based on a corridor or project analysis (see 1100.03(6)).
[3] If designated as L/A acquired in the Access Control Tracking System, limited access requirements apply. If not, managed access applies (see
1100.03(6)).
[4] Full design level may apply based on a corridor or project analysis (see 1100.03(6)).
[5] For bike/pedestrian design, see Chapters 1510, 1515, and 1520.
[6] Applies only to bridge end terminals and transition sections.
[7] 4-ft minimum shoulders.
[8] If all-weather structure can be achieved with spot digouts and overlay, modified design level applies to NHS highways and basic design level
applies to non-NHS highways.
[9] Continuous shoulder rumble strips required in rural areas (see Chapter 1600).
[10] See Chapter 1020.
[11] See Chapter 720.
[12] Impact attenuators are considered as terminals.
[13] See Chapters 1140 and 1230.
[14] Includes crossroad bridge rail (see Chapter 1610).
[15] EU for signing and illumination.
[16] For design elements not in the matrix headings, apply full design level as found in the applicable chapters and see 1100.03(2).
[17] DE for existing acceleration/deceleration lanes when length meets posted freeway speed and no significant crash history (see Chapter 1360).
[18] On managed access highways within the limits of incorporated cities and towns, city and county design standards apply to areas outside the curb
or outside the paved shoulder where no curb exists.
[19] The funding sources for bridge rail are a function of the length of the bridge. Consult programming personnel.
[20] Applies to median elements only.
[21] Analyses required (see 1100.03(6) for details).
[22] Upgrade barrier, if necessary, within 200 ft of the end of the bridge.
[23] See description of Guardrail Upgrades Project Type, 1100.03(1), regarding length of need.
[24] Apply full design level to projects that realign or reconstruct significant portions of the alignment.
[25] For main line, use the Project Type row for Safety, Non-Interstate Freeway on Matrix 3 for NHS and on Matrix 5 for non-NHS.
[26] Sidewalk ramps must be addressed for ADA compliance (see Chapter 1510).
[27] Collision Analysis Locations (CALs) require a project analysis to document the needs at a location and determine the appropriate design elements
to address.

Design Matrix Notes


Exhibit 1100-9

Page 1100-20 WSDOT Design Manual M 22-01.07


July 2010

S-ar putea să vă placă și