1100.01 General
7KH Design Manual SURYLGHV JXLGDQFH IRU WKUHH OHYHOV RI GHVLJQ IRU KLJKZD\
SURMHFWV EDVLF PRGL¿HG DQG IXOO GHVLJQ OHYHOV 7KH GHVLJQ PDWULFHV LQ WKLV FKDSWHU
DUH XVHG WR LGHQWLI\ WKH GHVLJQ OHYHOV IRU D SURMHFW DQG WKH DVVRFLDWHG SURFHVVHV IRU
DOORZLQJ GHVLJQ YDULDQFHV 7KH PDWULFHV DGGUHVV WKH PDMRULW\ RI 3UHVHUYDWLRQ DQG
,PSURYHPHQW SURMHFWV DQG IRFXV RQ WKRVH GHVLJQ HOHPHQWV WKDW DUH RI JUHDWHVW FRQFHUQ
LQ SURMHFW GHYHORSPHQW
7KH GHVLJQ PDWULFHV DUH ¿YH WDEOHV WKDW DUH LGHQWL¿HG E\ URXWH W\SH 7ZR RI WKH
PDWULFHV DSSO\ WR ,QWHUVWDWH KLJKZD\V WKH RWKHU WKUHH DSSO\ WR QRQ,QWHUVWDWH
KLJKZD\V DQG DGGUHVV 3UHVHUYDWLRQ DQG ,PSURYHPHQW SURMHFWV
$ GHVLJQ PDWUL[ LV XVHG WR GHWHUPLQH WKH GHVLJQ OHYHO IRU WKH GHVLJQ HOHPHQWV RI D
SURMHFW $SSO\ WKH DSSURSULDWH GHVLJQ OHYHOV DQG GRFXPHQW WKH GHVLJQ GHFLVLRQV DV
UHTXLUHG E\ WKLV FKDSWHU DQG &KDSWHU
7KH ,QWHUVWDWH 6\VWHP LQFOXGHV LPSRUWDQW URXWHV LQWR WKURXJK DQG DURXQG XUEDQ
DUHDV VHUYHV WKH QDWLRQDO GHIHQVH DQG ZKHUH SRVVLEOH FRQQHFWV ZLWK URXWHV RI
FRQWLQHQWDO LPSRUWDQFH ,W DOVR VHUYHV LQWHUQDWLRQDO DQG LQWHUVWDWH WUDYHO DQG PLOLWDU\
PRYHPHQWV
7KH ,QWHUVWDWH 6\VWHP LV UHSUHVHQWHG RQ WKH OLVW RI 1+6 KLJKZD\V VHH ([KLELW
ZLWK WKH OHWWHU ³,´ EHIRUH WKH URXWH QXPEHU
VXESURJUDP PLJKW SURYLGH VXI¿FLHQW LQIRUPDWLRQ WR LGHQWLI\ WKH 3URMHFW 7\SH 6HH
the Programming Manual IRU GHWDLOV DERXW EXGJHW SURJUDPV DQG VXESURJUDPV
7KH YDULRXV VRXUFHV RI IXQGV IRU WKHVH VXESURJUDPV FDUU\ HOLJLELOLW\ UHTXLUHPHQWV
WKDW WKH GHVLJQHUV DQG SURMHFW GHYHORSHUV PXVW LGHQWLI\ DQG PRQLWRU WKURXJKRXW
SURMHFW GHYHORSPHQW 7KLV LV HVSHFLDOO\ LPSRUWDQW WR HQVXUH DFFXUDF\ ZKHQ ZULWLQJ
DJUHHPHQWV DQG WR DYRLG GHOD\LQJ DGYHUWLVHPHQW IRU ELGV LI WKH 3URMHFW 7\SH FKDQJHV
6RPH SURMHFWV LQYROYH ZRUN IURP VHYHUDO VXESURJUDPV ,Q VXFK FDVHV LGHQWLI\ WKH
YDULRXV OLPLWV RI WKH SURMHFW WKDW DSSO\ WR HDFK VXESURJUDP :KHUH WKH SURMHFW OLPLWV
RYHUODS DSSO\ WKH KLJKHU GHVLJQ OHYHO WR WKH RYHUODSSLQJ SRUWLRQ
Project Types LQ DOSKDEHWLFDO RUGHU DUH
At Grade: 6DIHW\ ,PSURYHPHQW SURMHFWV RQ 1+6 KLJKZD\V PSK RU KLJKHU WR
EXLOG JUDGHVHSDUDWLRQ IDFLOLWLHV WKDW UHSODFH WKH H[LVWLQJ LQWHUVHFWLRQV
Bike Routes (Shldrs): 0DLQ OLQH HFRQRPLF GHYHORSPHQW ,PSURYHPHQW SURMHFWV
WR SURYLGH D VWDWHZLGH QHWZRUN RI UXUDO ELF\FOH WRXULQJ URXWHV ZLWK VKRXOGHUV D
PLQLPXP RI IHHW ZLGH
Bike/Ped Connectivity: ,PSURYHPHQW SURMHFWV WR SURYLGH ELF\FOHSHGHVWULDQ
FRQQHFWLRQV DORQJ RU DFURVV VWDWH KLJKZD\V ZLWKLQ XUEDQ JURZWK DUHDV WR FRPSOHWH
ORFDO QHWZRUNV
Bridge Deck Rehab: 6WUXFWXUHV 3UHVHUYDWLRQ SURMHFWV WKDW UHSDLU GHODPLQDWHG EULGJH
GHFNV DQG DGG SURWHFWLYH RYHUOD\V WR SURYLGH D VRXQG VPRRWK VXUIDFH SUHYHQW IXUWKHU
FRUURVLRQ RI WKH UHLQIRUFLQJ VWHHO DQG SUHVHUYH RSHUDWLRQDO DQG VWUXFWXUDO LQWHJULW\
Bridge Rail Upgrades: 6DIHW\ ,PSURYHPHQW SURMHFWV WR XSGDWH ROGHU EULGJH UDLOV WR
LPSURYH VWUHQJWK DQG UHGLUHFWLRQDO FDSDELOLWLHV
Bridge Repl. (Multilane): 1RQ1+6 PDLQ OLQH VWUXFWXUHV 3UHVHUYDWLRQ SURMHFWV WKDW
UHSODFH EULGJHV RQ PXOWLODQH KLJKZD\V WR LPSURYH RSHUDWLRQDO DQG VWUXFWXUDO FDSDFLW\
Bridge Replacement: 1+6 DQG WZRODQH QRQ1+6 PDLQ OLQH DQG LQWHUFKDQJH
VWUXFWXUHV 3UHVHUYDWLRQ SURMHFWV WKDW UHSODFH EULGJHV WR LPSURYH RSHUDWLRQDO DQG
VWUXFWXUDO FDSDFLW\
Bridge Restrictions: 0DLQ OLQH HFRQRPLF GHYHORSPHQW ,PSURYHPHQW SURMHFWV WKDW
UHPRYH YHUWLFDO RU ORDG FDSDFLW\ UHVWULFWLRQV WR EHQH¿W WKH PRYHPHQW RI FRPPHUFH
BST: 1RQ1+6 URDGZD\ 3UHVHUYDWLRQ SURMHFWV WR GR ELWXPLQRXV VXUIDFH WUHDWPHQW
%67 ZRUN RQO\ WR SURWHFW WKH SXEOLF LQYHVWPHQW
BST Routes/Basic Safety: 1RQ1+6 URDGZD\ 3UHVHUYDWLRQ SURMHFWV WKDW UHVXUIDFH
KLJKZD\V DW UHJXODU LQWHUYDOV DQG UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV WR SURWHFW WKH SXEOLF
LQYHVWPHQW
Collision Analysis Locations (CALs): 6LWHV LGHQWL¿HG WKURXJK D V\VWHPZLGH
DQDO\VLV WKDW KDYH D KLJKVHYHULW\ FROOLVLRQ KLVWRU\ 7KHVH VLWHV DUH FUHDWHG ZLWK WKH
LQWHQW WR PRGLI\ ZKHUH DSSURSULDWH VSHFL¿F KLJKZD\ HOHPHQWV WKDW KDYH D JUHDWHU
SRWHQWLDO WR UHGXFH WKH LGHQWL¿HG KLJKVHYHULW\ FROOLVLRQV
Corridor: 0DLQ OLQH ,PSURYHPHQW SURMHFWV WR UHGXFH DQG SUHYHQW YHKLFXODU
QRQPRWRUL]HG DQG SHGHVWULDQ FROOLVLRQV ZLWKLQ DYDLODEOH UHVRXUFHV
Diamond Grinding: *ULQGLQJ D FRQFUHWH SDYHPHQW XVLQJ JDQJPRXQWHG GLDPRQG
VDZ EODGHV WR UHPRYH VXUIDFH ZHDU RU MRLQW IDXOWLQJ
Dowel Bar Retrofit: 5HHVWDEOLVKLQJ WKH ORDG WUDQVIHU HI¿FLHQFLHV RI WKH H[LVWLQJ
FRQFUHWH MRLQWV DQG WUDQVYHUVH FUDFNV E\ FXWWLQJ VORWV SODFLQJ HSR[\FRDWHG GRZHO
EDUV DQG SODFLQJ KLJKHDUO\ VWUHQJWK QRQVKULQN FRQFUHWH
Four-Lane Trunk System: 1+6 HFRQRPLF GHYHORSPHQW ,PSURYHPHQW SURMHFWV WR
FRPSOHWH FRQWLJXRXV IRXUODQH OLPLWHG DFFHVV IDFLOLWLHV RQ D WUXQN V\VWHP FRQVLVWLQJ
RI DOO )UHLJKW DQG *RRGV 7UDQVSRUWDWLRQ 5RXWHV )*76 ZLWK D FODVVL¿FDWLRQ RI
WRQV\HDU
Freight & Goods (Frost Free): Main line economic development Improvement
SURMHFWV WR UHGXFH GHOD\ IURP ZHDWKHUUHODWHG FORVXUHV RQ KLJKSULRULW\ IUHLJKW DQG
JRRGV KLJKZD\V
Guardrail Upgrades: 6DIHW\ ,PSURYHPHQW SURMHFWV OLPLWHG WR WKH VSHFL¿HG URDGVLGH
GHVLJQ HOHPHQWV 7KHVH SURMHFWV IRFXV RQ :EHDP ZLWK IRRWLQFK VSDFLQJ DQG
RQ JXDUGUDLO V\VWHPV ZLWK FRQFUHWH SRVWV 7KH OHQJWK RI QHHG LV H[DPLQHG DQG PLQRU
DGMXVWPHQWV DUH PDGH 5HPRYDO LV DQ RSWLRQ LI JXDUGUDLO LV QR ORQJHU QHHGHG )RU
,QWHUVWDWH PDLQ OLQH DGGUHVV OHQJWK RI QHHG DV VSHFL¿HG LQ &KDSWHU )RU QRQ
,QWHUVWDWH URXWHV DGGLWLRQDO OHQJWK RI PRUH WKDQ RI WKH H[LVWLQJ OHQJWK LV EH\RQG
WKH LQWHQW RI WKLV SURJUDP ,Q WKHVH LQVWDQFHV FRQVLGHU IXQGLQJ LQ DFFRUGDQFH ZLWK
SULRULW\ SURJUDPPLQJ LQVWUXFWLRQV DQG LI WKH OHQJWK RI QHHG LV QRW PHW GRFXPHQW WR
WKH 'HVLJQ 'RFXPHQWDWLRQ 3DFNDJH ''3 WKDW WKH OHQJWK RI QHHG LV QRW DGGUHVVHG
EHFDXVH LW LV EH\RQG WKH LQWHQW RI WKLV SURJUDP
HMA/PCCP: 1RQ1+6 URDGZD\ 3UHVHUYDWLRQ SURMHFWV WR UHVXUIDFH KLJKZD\V DW
UHJXODU LQWHUYDOV DQG UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV WR SURWHFW WKH SXEOLF LQYHVWPHQW
HMA/PCCP/BST Overlays: 1+6 PDLQ OLQH URDGZD\ 3UHVHUYDWLRQ SURMHFWV WKDW
UHVXUIDFH WKH H[LVWLQJ VXUIDFHV DW UHJXODU LQWHUYDOV WR SURWHFW WKH SXEOLF LQYHVWPHQW
HMA/PCCP/BST Overlays Ramps: 1+6 DQG QRQ1+6 UDPS URDGZD\
3UHVHUYDWLRQ SURMHFWV WKDW UHVXUIDFH WKH H[LVWLQJ VXUIDFHV DW UHJXODU LQWHUYDOV DQG
UHVWRUH H[LVWLQJ VDIHW\ IHDWXUHV WR SURWHFW WKH SXEOLF LQYHVWPHQW
HMA Structural Overlays: +RW PL[ DVSKDOW RYHUOD\V WKDW DUH SODFHG WR LQFUHDVH WKH
ORDGFDUU\LQJ DELOLW\ RI WKH SDYHPHQW VWUXFWXUH 6WUXFWXUDO RYHUOD\ WKLFNQHVV LV JUHDWHU
WKDQ IRRW
HOV: 0DLQ OLQH PRELOLW\ ,PSURYHPHQW SURMHFWV FRPSOHWLQJ WKH IUHHZD\ &RUH +29
ODQH V\VWHP LQ WKH 3XJHW 6RXQG UHJLRQ DQG SURYLGLQJ OHYHO RI VHUYLFH & RQ +29
ODQHV LQFOXGLQJ EXVLQHVV DFFHVV WUDQVLW ODQHV ZLWKLQ FRQJHVWHG KLJKZD\ FRUULGRUV
HOV Bypass: 1+6 DQG QRQ1+6 UDPS PRELOLW\ ,PSURYHPHQW SURMHFWV WR LPSURYH
PRELOLW\ ZLWKLQ FRQJHVWHG KLJKZD\ FRUULGRUV E\ SURYLGLQJ +29 E\SDVV ODQHV RQ
IUHHZD\ UDPSV &RQJHVWHG KLJKZD\ FRUULGRUV KDYH KLJK FRQJHVWLRQ LQGH[ YDOXHV DV
GHVFULEHG LQ WKH +LJKZD\ 6\VWHP 3ODQ IRRWQRWH LQ WH[W IRU ,PSURYHPHQW0RELOLW\
Intersection: 6DIHW\ ,PSURYHPHQW SURMHFWV WR UHGXFH DQG SUHYHQW FROOLVLRQV LQFUHDVH
WKH VDIHW\ RI KLJKZD\V DQG LPSURYH SHGHVWULDQ VDIHW\ ZLWKLQ DYDLODEOH UHVRXUFHV
Median Barrier: /LPLWHG VDIHW\ ,PSURYHPHQW SURMHFWV PDLQO\ QHZ PHGLDQ EDUULHU
ZLWK D IRFXV RQ FDEOH EDUULHU WR UHGXFH PHGLDQ FURVVRYHU DFFLGHQWV
Milling with HMA Inlays: 5HPRYLQJ D VSHFL¿HG WKLFNQHVV RI WKH H[LVWLQJ +0$
SDYHPHQW W\SLFDOO\ IURP WKH WUDYHOHG ODQHV DQG WKHQ RYHUOD\LQJ ZLWK +0$ DW WKH
VDPH VSHFL¿HG WKLFNQHVV
Lane Width: Defined in Chapter 1140 (also see Chapters 1130, 1230, 1240,
and 1360).
Shoulder Width: Defined in Chapter 1140 (also see Chapters 1130, 1230, and 1360).
For shy distance requirements when barrier is present, see Chapter 1610.
Lane Transitions (pavement transitions): The rate and length of transition of
changes in width of lanes (see Chapter 1210).
On/Off Connection: The widened portion of pavement at the end of a ramp
connecting to a main lane of a freeway (see Chapter 1360).
Median Width: The distance between inside edge lines (see Chapters 1140
and 1230).
Cross Slope: Lane: The rate of elevation change across a lane. This element includes
the algebraic difference in cross slope between adjacent lanes (see Chapters 1130
and 1230).
Cross Slope: Shoulder: The rate of elevation change across a shoulder
(see Chapters 1130 and 1230).
Fill/Ditch Slopes: The downward slope from edge of shoulder to bottom of ditch
or catch (see Chapters 1130 and 1230).
Access: The means of entering or leaving a public road, street, or highway with
respect to abutting private property or another public road, street, or highway
(see Chapter 520).
Clear Zone: The total roadside border area, starting at the edge of the traveled
way, available for use by errant vehicles. This area may consist of a shoulder, a
recoverable slope, a nonrecoverable slope, and/or a clear run-out area. The median
is part of a clear zone (see Chapter 1600).
Signing, Delineation, Illumination, ITS: Signs, guideposts, pavement markings,
lighting, and intelligent transportation systems equipment. (See Chapters 720 for
bridge signs and 1020 for signing, Chapter 1030 for delineation, Chapter 1040 for
illumination, and Chapter 1050 for ITS.)
Vertical Clearance: Defined in Chapter 720.
Basic Safety: The list of safety items is in Chapter 1120.
Bicycle and Pedestrian: Defined in Chapter 1510, Pedestrian Design Considerations,
Chapter 1515, Shared-Use Paths, and Chapter 1520, Roadway Bicycle Facilities.
Bridges: Lane Width: The width of a lane on a structure (see Chapters 720, 1130,
1140, 1230, 1240, and 1360).
Bridges: Shoulder Width: The distance between the edge of traveled way and the
face of curb or barrier, whichever is less (see Chapters 720, 1130, 1140, 1230, and
1360; also see Chapter 1610 for shy distance requirements).
Bridges/Roadway: Vertical Clearance: The minimum height between the roadway,
including shoulder, and an overhead obstruction (see Chapter 720).
Bridges: Structural Capacity: The load-bearing ability of a structure (see
Chapter 720).
Intersections/Ramp Terminals: Turn Radii: Defined in Chapter 1310.
(d) DE or EU with /F or /M
'( RU (8 ZLWK ) RU 0 LQ D FHOO PHDQV WKDW WKH GHVLJQ HOHPHQW LV WR EH DQDO\]HG
ZLWK UHVSHFW WR WKH VSHFL¿HG GHVLJQ OHYHO )RU LQVWDQFH D '() LV DQDO\]HG ZLWK
UHVSHFW WR IXOO GHVLJQ OHYHO DQG PLJKW EH UHFRUGHG DV KDYLQJ DQ H[LVWLQJ GHVLJQ
HOHPHQW WKDW GRHV QRW PHHW RU H[FHHG FXUUHQW IXOO GHVLJQ OHYHO $Q (80 LV
DQDO\]HG WR GHFLGH ZKHWKHU RU QRW WR XSJUDGH DQ\ H[LVWLQJ GHVLJQ HOHPHQW WKDW
GRHV QRW PHHW RU H[FHHG WKH FXUUHQW PRGL¿HG GHVLJQ OHYHO
See the following pages for Design Matrices 1–5
[12]
Term. & Trans. Section
Cross Slope Shoulder
Horizontal Alignment
Structural Capacity
[13]
Vertical Alignment
[14] [19]
Cross Slope Lane
[11]
Fill / Ditch Slopes
Shoulder Width
Shoulder Width
Design Elements
Vertical Clear.
[9]
Standard Run
Median Width
Delineation
Lane Width
Lane Width
[10]
Bridge Rail
Clear Zone
Signing
(1-1) Preventative Maintenance
Pavement Restoration
(1-2) Diamond Grinding EU EU F DE F EU F
(1-3) Milling with HMA Inlays EU F EU F DE F EU F
(1-4) Nonstructural Overlay DE EU EU EU F EU F EU F F F
Pavement Rehab. / Resurf.
[17]
(1-5) HMA Structural Overlays EU DE F F F DE F EU F F EU F F F F DE F F F
PCCP Overlays [17]
(1-6) EU DE F F F DE F EU F F EU F F F F DE F F F
Dowel Bar Retrofit [17]
(1-7) EU DE F F F DE DE F F EU F F DE DE F F F
Bridge Rehabilitation
[6] [22]
(1-8) Bridge Deck Rehabilitation F F F DE [11] F F F
Safety
[20] [20]
(1-9) Median Barrier DE F F
[23]
(1-10) Guardrail Upgrades DE F F F
[22]
(1-11) Bridge Rail Upgrades F F F
[27]
(1-12) Collision Analysis Locations Design Elements determined based on a project analysis
[16]
Reconstruction
(1-13) New / Reconstruction F F F F F F F F F F F F F F F F F F F F F
[9] [10]
[10]
[12]
[12]
Sign., Delin., Illum., & ITS
[14] [19]
[14] [19]
Cross Slope Lane
[11]
Fill / Ditch Slopes
Lane Transition
Shoulder Width
Shoulder Width
Limited Access
Limited Access
Vertical Clear.
Vertical Clear.
Standard Run
Standard Run
Lane Width
Lane Width
Bridge Rail
Bridge Rail
Clear Zone
Clear Zone
Turn Radii
Angle
(2-1) Preventative Maintenance
Pavement Restoration
[15] [15]
(2-2) Diamond Grinding EU F F EU F EU F F EU F
[15] [15]
(2-3) Milling With HMA Inlays EU F F F M F F F EU F F M F F F
[15] [15]
(2-4) Nonstructural Overlay EU EU EU F F F M F F F EU F F M F F F
Pavement Rehab. / Resurf.
[17] [15] [15]
(2-5) HMA Structural Overlays EU DE F F F F F EU F F F F F M F F F F F F DE DE DE F F F F M F F F
[17] [15] [15]
(2-6) PCCP Overlays EU DE F F F F F EU F F F F F M F F F F F F DE DE DE F F F F M F F F
[17] [15] [15]
(2-7) Dowel Bar Retrofit DE DE DE F F DE F F F F DE F F F F F F F F F F F
Bridge Rehabilitation
[6] [22] [6] [22]
(2-8) Bridge Deck Rehabilitation F M F F F F M F F F
Safety
(2-9) Intersection F F F F F F F M F F F F F F F F F F F M F F F
[23] [23]
(2-10) Guardrail Upgrades DE F F F F F
[22] [22]
(2-11) Bridge Rail Upgrades F F F F F F
[27]
(2-12) Collision Analysis Locations Design Elements determined based on a Project Analysis
[16]
Reconstruction
(2-13) New / Reconstruction F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
On / Off Connection
Structural Capacity
Vertical Alignment
Vertical Clearance
[14] [19]
Cross Slope Lane
Shoulder Width
[18]
Standard Run
Design Elements
Median Width
Basic Safety
Lane Width
Bridge Rail
Clear Zone
Turn Radii
[3]
Access
Angle
[12]
Preservation
Roadway
(3-1) Non-Interstate Freeway DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F B B DE/F DE/F F F B F
(3-2) HMA/PCCP/BST Overlays DE/M DE/M DE/M DE/M DE/F DE/F DE/M DE/M DE/M DE/M B B M DE/M DE/M F B F B F
(3-3) Replace HMA w/PCCP at I/S DE/M DE/M EU/M EU/M DE/F DE/M EU/M DE/M DE/M B B M DE/M DE/M F B F B F
Structures
(3-4) Bridge Replacement F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F F F[2] F[2] F F F[2] F[2] F F F F
[6] [22]
(3-5) Bridge Deck Rehab. B B M F F F F
[16]
Improvements
Mobility
(3-6) Non-Interstate Freeway F F F F F F F F F F F F F F F F F F F F F F F F
(3-7) Urban F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F[2] F[2] F F F F
(3-8) Rural F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F[2] F[2] F F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(3-9) HOV F F F F F F F F F F F F F F F F F F F F F F F F
(3-10) Bike/Ped. Connectivity [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5] [5] [5] [5] [5] [5] [5] [5]
Safety
(3-11) Non-Interstate Freeway F F F F F F F F F F F F F F F F F F F F F F F
(3-12) Intersection[1] F[2] F[2] F F[2] F F F M F F F F F F
(3-13) Corridor[1][24] M[4] M[4] M[4] M[4] F F[17] M[4] M[4] M[4] M[4] F F F F M[4] M[4] F M[4] M[4] F F F F
[20] [20]
(3-14) Median Barrier DE/F F F
(3-15) Guardrail Upgrades DE/F F F[23]
(3-16) Bridge Rail Upgrades F F[22] F
(3-17) Risk: Roadside F EU/F F F F F F
[21] [21] [
(3-18) Risk: Sight Distance F/M[21] F/M[21] F/M[21] F/M[21] F/M[21] F F F F F[21] F[21] F[21] F/M 21] F/M[21] F[21] F F F
(3-19) Risk: Roadway Width F/M[21] F/M[21] F[21] F[21] F/M[21] F/M[21] F/M[21] F/M[21] F F F F F[21] F[21] F[21] F/M[21] F/M[21] F[21] F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(3-20) Risk: Realignment F F F F F F F F F F F F F F F F F F F F F F F
[27]
(3-21) Collision Analysis Locations Design Elements determined based on a Project Analysis
Economic Development
(3-22) Freight & Goods (Frost Free)[8] F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] EU/F F B EU/F[26] DE/F DE/F F F EU/F EU/F EU/F F F F
(3-23) Four-Lane Trunk System F F F F F F F F F F F F F F F F F F F F F F F F
(3-24) Rest Areas (New) F F F F F F F F F F F F F F F F F F F F F F F
(3-25) Bridge Restrictions F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F[2] F F EU/F[26] F[2] F[2] F F F[2] F[2] F F F F
(3-26) Bike Routes (Shldrs) EU/M [7] EU/F EU/M EU/M B B F EU/M EU/M F B F B EU/F
[12]
[12]
[11]
Horizontal Alignment
On / Off Connection
Vertical Alignment
Vertical Clearance
[14] [19]
[14] [19]
Cross Slope Lane
Shoulder Width
Design Elements
Standard Run
Standard Run
Basic Safety
Basic Safety
Lane Width
Bridge Rail
Bridge Rail
Bike & Ped
Clear Zone
Clear Zone
Turn Radii
[3]
[3]
Access
Access
Angle
Preservation
Roadway
(4-1) Non-Interstate Freeway DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F DE/F B B M DE/F DE/F DE/F F B F DE/F DE/F DE/F B B F M F B F
(4-2) HMA/PCCP/BST Overlay
B B M B F B F B B F M F B F
Ramps
Structures
(4-3) Bridge Replacement F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F F F F F F F[2] F[2] F[2] F F F F F F F F
[6] [22] [6] [22]
(4-4) Bridge Deck Rehab. B B M F F F B B F M F F F
[16]
Improvements
Mobility
(4-5) Non-Interstate Freeway F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
(4-6) Urban F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F F F[2] F[2] F[2] F F F F F F F F
(4-7) Rural F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F F F F[2] F[2] F[2] F F F F F F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(4-8) HOV Bypass F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
(4-9) Bike/Ped. Connectivity [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5]
Safety
(4-10) Non-Interstate Freeway F F F F F F F F F F F F M F F F F F F F F F F F F F M F F F
[1][25] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2] [2]
(4-11) At Grade F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F
(4-12) Intersection[1] F[2] F[2] F F[2] F F F M F F F F F] F F[2] F F F F M F F F
[23] [23]
(4-13) Guardrail Upgrades DE/F F F F F
(4-14) Bridge Rail Upgrades F F[22] F
(4-15) Risk: Roadside F EU/F F F F EU/F F F F F F
[21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
(4-16) Risk: Sight Distance F/M F/M F/M F/M F/M F F F F F/M F/M F F F F F/M F F F F
[21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
(4-17) Risk: Roadway Width F/M F/M F F F/M F/M F/M F F F F F/M F/M F F F F F/M F/M F/M F F F F F F F
(4-18) Risk: Realignment F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F/M[21] F/M[21] F F F F F[2] F[2] F[2] F F F[21] F F F F
[27]
(4-19) Collision Analysis Locations Design Elements determined based on a Project Analysis
Economic Development
(4-20) Four-Lane Trunk System F F F F F F F F F F F F F F F F F F F F F F F F F F F
Structural Capacity
Vertical Alignment
Vertical Clearance
Cross Slope Lane
Shoulder Width
[19]
[18]
Standard Run
Median Width
Design Elements
Basic Safety
Lane Width
[12]
Bridge Rail
Clear Zone
Turn Radii
[3]
Section
Access
Angle
ITS
Preservation
Roadway
(5-1) HMA/PCCP B B M F B F B F
(5-2) BST
(5-3) BST Routes/Basic Safety B B B F B F
(5-4) Replace HMA w/PCCP at I/S EU/M EU/M DE/M EU/M B B M F F B F
Structures
(5-5) Bridge Replacement M F M M F M M M F F F F[2] F[2] F F M M F F F F
[2] [2] [2] [2] [2] [2] [2] [2] [2]
(5-6) Bridge Repl. (Multilane) F F F F F F F F F F F F F F[2] F F F[2] F[2] F F F F
(5-7) Bridge Deck Rehab. B B M F[6] F[22] F
[16]
Improvements
Mobility
(5-8) Urban (Multilane) F[2] F[2] F[2] F[2] F F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F EU/F EU/F F F F F
(5-9) Urban M M M M F M M M F F F F M M F F EU/M EU/M F F F F
(5-10) Rural M M M M F M M M M F F F F M M F F EU/M EU/M F F F F
(5-11) HOV M M M M F M M M M F F F F M M F F EU/M EU/M F F F F
(5-12) Bike/Ped. Connectivity [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] [5] F [5] [5] [5] [5] [5] [5] [5] [5] [5] [5]
Safety
(5-13) Non-Interstate Freeway F[2] F[2] F[2] F[2] F[2] F[2] F[2] F[2] F[2] F F F F F[2] F[2] F F[2] F[2] F F F F
[1] [4] [4] [4] [4] [4]
(5-14) Intersection M M F M F F F M M M F F F F
(5-15) Corridor[1][24] M[4] M[4] M[4] M[4] F M[4] M[4] M[4] M[4] F F F M M[4] M[4] F M[4] M[4] F F F F
(5-16) Median Barrier [20] [20]
DE/F F F
(5-17) Guardrail Upgrades DE/F F F[23]
(5-18) Bridge Rail Upgrades F F[22] F
(5-19) Risk: Roadside [4]
M EU/F F F F F F
(5-20) Risk: Sight Distance [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
F/M F/M F/M F/M F/M F F F F F F F F/M F/M F F F F
(5-21) Risk: Roadway Width [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21] [21]
F/M F/M F F/M F/M F/M F/M F F F F F F F F/M F/M F F F F
(5-22) Risk: Realignment [2] [2] [21] [21] [21] [21] [21] [21]
F/M F/M F/M F/M F F/M F F F/M F F F F F F F F/M F/M F F F F
(5-23) Collision Analysis Locations Design Elements determined based on a Project Analysis[27]
Economic Development
(5-24) Freight & Goods (Frost Free)[8] EU/M EU/M EU/M EU/M EU/M EU/M M M EU/M F B B EU/F[26] DE/M DE/M F EU/M EU/M EU/F F B F
(5-25) Rest Areas (New) F F F F F F F F F F F F F F F F F F F F F
(5-26) Bridge Restrictions M F M M F M M M M F F EU/F[26] M M F F M M F F F F
(5-27) Bike Routes (Shldrs) EU/M [7] EU/F EU/M EU/M B B F EU/M EU/M B F B EU/F
[1] Collision Reduction or Collision Prevention (At-Grade Removal, Signalization & Channelization). Specific deficiencies that created the project must
be upgraded to design level as stated in the matrix.
[2] Modified design level may apply based on a corridor or project analysis (see 1100.03(6)).
[3] If designated as L/A acquired in the Access Control Tracking System, limited access requirements apply. If not, managed access applies (see
1100.03(6)).
[4] Full design level may apply based on a corridor or project analysis (see 1100.03(6)).
[5] For bike/pedestrian design, see Chapters 1510, 1515, and 1520.
[6] Applies only to bridge end terminals and transition sections.
[7] 4-ft minimum shoulders.
[8] If all-weather structure can be achieved with spot digouts and overlay, modified design level applies to NHS highways and basic design level
applies to non-NHS highways.
[9] Continuous shoulder rumble strips required in rural areas (see Chapter 1600).
[10] See Chapter 1020.
[11] See Chapter 720.
[12] Impact attenuators are considered as terminals.
[13] See Chapters 1140 and 1230.
[14] Includes crossroad bridge rail (see Chapter 1610).
[15] EU for signing and illumination.
[16] For design elements not in the matrix headings, apply full design level as found in the applicable chapters and see 1100.03(2).
[17] DE for existing acceleration/deceleration lanes when length meets posted freeway speed and no significant crash history (see Chapter 1360).
[18] On managed access highways within the limits of incorporated cities and towns, city and county design standards apply to areas outside the curb
or outside the paved shoulder where no curb exists.
[19] The funding sources for bridge rail are a function of the length of the bridge. Consult programming personnel.
[20] Applies to median elements only.
[21] Analyses required (see 1100.03(6) for details).
[22] Upgrade barrier, if necessary, within 200 ft of the end of the bridge.
[23] See description of Guardrail Upgrades Project Type, 1100.03(1), regarding length of need.
[24] Apply full design level to projects that realign or reconstruct significant portions of the alignment.
[25] For main line, use the Project Type row for Safety, Non-Interstate Freeway on Matrix 3 for NHS and on Matrix 5 for non-NHS.
[26] Sidewalk ramps must be addressed for ADA compliance (see Chapter 1510).
[27] Collision Analysis Locations (CALs) require a project analysis to document the needs at a location and determine the appropriate design elements
to address.