())f, State the advantages and disadvantages of diesel power plant . 8
Calculate the power that can be developed from a hydroelectric power plant having the
/.(c) follon'ing data :
Catchment area 100 km2
Average rainfall i20 cm ,
Run-o{T 80%
Available head 300 m
6' Overall efficiency of the power stationT5o/o. 8
e*&*€
Q4 (a) FIow the reactors are classified? Describe the pressurized water reactor. 8
t- (b) What are the iaf'ety measures for nuclear power plant? 8
v J4
tay
'L
For a power station the yearly duration curve is a straight line from 30,000 to 4000 KW.
To meet the load three turbo generators are installed. The oapacity of two generators is
15,000 KW each and the third is rated at 5000. Determine the following :
(a) I-oad lactor
(b) Capacity factor.
A.-
(-W'
/J-
(Ui irxplain in detail the different elements of cost of electrical energl'
OR
CSVTU Code:M809616
Note: Attempt all five questions. All question carry equal marks. Assume suitable data if any.
Q1 (a) Give the comparison of public supply and private generating plant. 8
(b) Describe the primary and secondary distribution system of a public electric supply
system? 8
Q2 ain with the central system of pulverized coal firing with the help of neat diagram. 8
(b) u/hFhatural water cannot be used for the generation of steam in the boiler? 8
\---'
the auxiliary equipments of diesel power plant . 8
X-9---/Describe
ih--)
'(\-2tbl Derermine the power that can be developed from a hydroelectric power plant having the
following data:
Catchment area 3x108m2
Average rainfall 110cm
t Efficiency of turbine 80%o
, Efficiency of generqlor 85o/o
Mean head 40m
Load factor 45%
Assume that25Vo of the rainfall is lost due to evaporation and4o/ohead iost in penstock. 8
OR
(cL--.-ffifculate the power that can be developed from a hydroelectric power plant having the
' following data :
Catchment area - 100-km2
Average rainfall ,.',. "120 cm
Run-off \ 80%.
':fryO
head
Available in
Overall efficiency of the power stationT5Yo. 8
"94at
Q5 da\-eplain in detail the different elements of cost of electrical energy 8
(b) What is meant by load curve? What is its signific.ance in power generation?
OR
,\--"'(c)-.-FG a power station the yearly duration curve is a straight line from 30,000 to 4000 KW.
To meet the load three turbo generators are installed. The capacity of two generators is
15,000 KW each and the third is rated at 5000. Determine the following :
Note : Attempt allfive questions .all question carry equal marks. Assume suitable dataif any.
Q.1 Describe the primary and secondary <iistribution system of a pubiic eiectric
supply system? 08
6y What factors are to be considered in selection of site for a steam power plant ?
Explain each of them . 08
Q.3 (a) How a surge tank helps in reducing water hammer effect ? 08
g. ./
Calculate the power that can be developed from a hydroelectric power plant
v having the following data :
\oadfactor
,/ \D
Qt) capacity factor
P.T.O.
(iii) use factor
{iv) diversity factor 08
OR
s. ?_ln6@
---__()
3 oJL,r
C) .i8.( $qr$.y + *a
c4.l
Ltf *t
' c t I sKt 1, {rt'
4>_
a$
@
u^-'fo= s,= 321*e l'.\LJ (-^
bln.'{rcI6o
€' -< 7B^ dg xl,
----+\ ^Ur..*
e_
ts, C{
-]
'Qo =
C-',( &
\ _
Note : Attempt alljlve questions .all question carry equal marks. Assume suitable data if any.
a.l 6 Explain with the help of neat diagram the elements of a public electric supply
system. 08
Q.2 (a) Explain the various ways of increasing thermal efficiency of a steam Power
planr. 08
CPY Explain with the help of neat diagram the bin I central system of pulverised
c&l firing 08
Q.3 (a) Enlist the elements of hydroelectric power plant and nrite their functions . 08
-(b)- State the advantages of the hydroetftrie poWer p1'\nt'dnd-Comp-are,fi with steam
power plant. 08
OR
r. .-fu/
,/,\
State the disadvantages of the diesel power plant ? Compare it with steam
power plant. 08
P.T.O.
->D
\
r.,{o:J
-lr ,,
(b) A power station has a maximum demand of 80,000 Kw and daily load curve
is defined as follows:
OR
(q) For a power station the yearly duration curve is a straight line from 30,000
y' to 4000 Kw . To meet the load three turbo generators are installed. The capacity
of two generators is 15,000 Kw each and the third is rated at 5000. Determine
the following :
(A) Load factor
(B) Capacity factor. 08
rtrrr(tr*
*k.-_
blo^-iq Sa,.{
AICTE Code : 088022 S
B. Tech. ( Eight Semester ) Examination
Nov-Dec.2008
Subject z Power Plant Engineering
Branch : Mechanical Engineering
Time : Three Hours Max. Mark: 100
Min. Mark : 35
Note : Attempt allfive questions .all question carry equal marks. Assume suitable data if any.
Q.1 {gy' E*plain with the help of neat diagram the elements of a public electric supply 10
system .
,M it withthe
State advantages-and {i-sadvagrtages of hydrqelectric power plant . Compare
steam power plant. 10
OR
(c) Vhat are the different fields where use of diesel power plant is most suitable ? l0
(b) Describe the fast breeder reactor with the help of neat diagram. 10
(a) What is meant by load curve ? What is its signifi can ce ln power generation ? 10
:,, f
,4 -- sjg 4 2C,lp 1..t 1 .L^-
,'
I
\r: dtx(g
= D'r n
,q
t/P
E, 'Z t,r' x teG k l, G x
16-
tS \ ''t-ralo6x WW-
24s;;'
= lG elr:
tl{,, t,, -- D\ 't_.r xll--\ -S
n
il l- = l6 .=
"ry:
\ a.\- \ 8Y l(>cr{'r
l-t \
OR
Jb{ Explain the different theory of rates. 10
J"fLoadA factor
central power station
60Yo
has annual factors as follows: