Quotation

Merino Industries
Limited
Date: 5th April ,2011

MR. PAWAN RAI

Big life, Raipur.


Re: Quotation for Titan standard Series Restroom Cubicles

Dear Sir,

Greetings!

Hope you are doing well. This is in reference to the discussion we had regarding the supply & installation
of restroom Cubicles at Big life, Raipur. We are pleased to offer you the best rate.

Please find below the specifications of compact board & accessories along with the details of cost &
commercial terms.

Item Description: Specification of Titan standard Series Restroom Cubicles

Product Type: Restroom Cubicles

Model Type / Series Titan standard

Overall Size (Depth x width) per unit 900 mm X1550mm

Door Width 600mm

Thickness of Merino Compact Laminate Board 12 mm

Color of Merino Compact Board Merino Single Color

Color of Accessories & other hardware Black / white / grey

Accessories (Stainless steel):

a) Top Rail
b) Hinges – Gravity to close
c) Privacy Thumb-turn c/w Occupancy Indicator
d) Coat Hook
e) Door Knob
f) Adjustable Pedestal
g) Aluminium “U” channel (Black anodized)
h) Aluminium Door Stopper channel (Black anodized)
i) Rubber Door Stopper Lining
j) Screws & Wall Plugs
1960 mm (including a gap of 100 to 150 mm from
Overall Height of cubicles
the ground)

Details of cost:

Particulars Cost Per Unit Quantity Total Cost

Basic Rate 27198 4 108792

Add Excise @ 10.30% 2801.3 4 11205.2

Total Material Cost 30000 4 120000

Add : CST @13.5% 4050 4 16200

Grand Total 34050 4 136200

Total Payable Amount: Rs.136200 (Rs. One lakh thirty six thousand two hundred Only)

Terms & Conditions;-

1) Above rates are inclusive of Excise @10.30%, CST @13.5 %.


2) CST @ 2 % shall be charged (Against C Form).
3) Above rate may vary as per final site marking.
4) Payment Terms: - 80% Advance & 20% within 7 days of installation or after 30 days of
material delivery at site, whichever is earlier.
5) Delivery Period: - 25 Days from the date of receipt of advance cheque along with Purchase
Order, final drawing & site marking. All necessary information such as shade confirmation,
tax details etc.
6) Special Note: - If your site gets prolonged or is put on hold for whatever
reason for more than 30 days from the date of delivery of material
at your site, we will be liable for 100% payment against material.
You can not delay our payment on account of unfinished project.
However we will extend all help in installation etc when you are
ready for the same & we will provide you back up for the quality
assurance therefore please do not held back our payment in any
reason in interest of speedy supply to you.
We sincerely hope that the specifications and rates quoted over here will be up to your expectation.

Looking forward for mutually beneficial & longstanding relationship,

Best Regards,

For Merino Industries LTD

Ranjan Bharti

Sales Executive

(M.P & C.G)

+91-9893181217

Standard Terms & Conditions

1. Scope of offer: derived as per drawings. Any


variation above this limit shall be
a. Proposal for the supply & charged for accordingly based
installation of “Ready to Install” upon the final site requirement.
restroom partition systems,
locker systems, urinal partitions c. It should be noted that the
and extruded nylon coated grab shades, series/model,
rails at “Project Name & site accessories color etc shall be
address” as per the terms and clearly mentioned in the
conditions enumerated. purchase order being raised by
customer & the same shall be
2. Specifications & Drawings: based upon the quotation /
Proforma invoice provided by
a. All quotations are submitted Merino Industries Limited. In
based upon on the drawings & cases where the said details are
specifications provided, site not included in the purchase
conditions, mutual interpretation order, the details mentioned in
& understanding thereof. Any the quotation / Proforma invoice
deviations must be pointed out shall be deemed to be
in writing before placing the applicable.
formal order, which shall be 3. Validity of Offer:
incorporated through a revised
offer. a. The quote submitted is valid for
a period of 45 days from date of
b. The permissible variation in the offer and any validity extension
dimensions is restricted up to will be confirmed by Merino
5% from the specifications Industries Limited in writing.
4. Non Acceptance of Work Contract: clear site handing over, free
from all encumbrances must be
a. Merino Industries Limited being made to our Site In charge at
the manufacturer of the least 3 days prior to assembly.
restroom cubicles & locker This will have to be certified by
systems enters into transactions our site in charge after carrying
covered under contract of sale out necessary inspection.
of goods and any charges for
installation are incidental to this
sale hence as per the provisions
of section 194 C of Income Tax 6. Release for Production:
Act the work contract is not is
not applicable even if the PO of a. All the material will be released
the customer uses the words for production only after BOQ,
work contract or contract for specifications, samples & shop
supply & installation or work drawings are endorsed by
order since the substance is customer’s authorized signatory
sale of goods while the form and design consultant / architect
may be works contract. As a as “Final & Accepted”.
matter of policy, the company
b. The material shall be released
does not allow any charging or
for production subject to the
deduction under the work
receipt of advance amount in
contract tax.
total as per the terms and
5. Site Conditions: conditions mutually agreed.

a. Pre-Delivery: The site has to be 7. Delivery Schedules, Shipment,


handed over to us in acceptable Storage & Distribution:
stage for carrying out line
measurements of actual
a. The delivery period on all India
basis, is given as under and
conditions for preparing shop
shall be applicable for all the
drawings for manufacturing.
dispatches pertaining to the
supply of restroom cubicles &
b. Any changes in site conditions
urinal panels. The lead time
from the date of initial inspection
shall be observed from the date
that necessitate a change on
when the final purchase order
BOQ at the time of placing the shall be received along with
final order will result in revision concerned measurement
of offer and price changes shall drawings & final approved
be to customer’s account. shades & measurements.
c. Post Delivery: It shall be noted
that the installation work shall
only be carried on the site when b. Road permits / entry forms, if
the appropriate site clearance in required should be provided by
writing has been provided by the the customer in advance along
with the PO.
person in charge of the site. The
site shall be accepted for c. The material in ready to install
installation only after all the form would be dispatched in
tiling, false ceiling, sanitary mutually agreed lot sizes
fixing, plumbing & electrical directly to site as per terms of
work has been completed. the order and prevailing site
Please note that the installation conditions at such time to
of restrooms cannot be carried facilitate timely assembly. Part
simultaneously along with any shipment / trans shipment to be
other wet work on the site. The permitted.
d. The installation is to be carried service lift shall be accessible at
out concurrently, subject to site all reasonable working hours.
availability.
e. Free delivery on site will be
done in case of site being
located in Delhi NCR. In all 1. Installation:
other cases deliveries will be
a. All the material being supplied
made free up to our nearest
would be in ready to install form,
local godown. The freight for
requiring on site installation, for
delivery from our local godown
which Merino Industries Limited
to the site shall be to customer’s
will depute its own team or shall
account at actual rates.
subcontract it to its authorized
f. All the unloading will be done service provider. Under no
under Company’s supervision / circumstances shall any other
as per guidelines provided and agency or individual carry our
material storage norms are to any kind of fixing activity with
be followed strictly. the material supplied. Any
damages due to such activity
g. Material received must be
will be to customer’s account
acknowledged immediately
and Company shall not bear any
within normal working hours
responsibility for such losses.
after receipt at site and a secure
storage space (preferably with b. Merino Industries Limited shall
lock & key arrangement) free be fully responsible for the
from water seepage, duly conduct & safety of such team/s
insured against fire, flood & theft deputed at site as per the rule of
must be provided for unloading land. However, the customer
the material. Safety of material shall be fully responsible for
at site till handover will have to their easy ingress & egress from
be covered by the customer site within all reasonable
under insurance. Any loss working hours as shall be
occurring at site for such defined in the PO to facilitate
reasons shall be to customer’s installation completion. Further
account. more the teams shall carry the
installation work as per the
h. Floor / Section wise distribution
guidelines provided by us, the
of material shall be
customer or any other agency
responsibility of Merino
shall under no condition exert
Industries Limited, though;
any pressure to work elsewhere
customer will ensure safety of
or for longer hours.
material during course of
installation from theft / c. Customer shall ensure safety of
pilferage / damage by other our team/s deputed on site from
agencies working at the site any kind other risks of site
concurrently. accruing out of circumstances
beyond the control of company.
i. In case of more than 2 floors, a
service lift will have to be d. Customer shall ensure proper
provided by the customer for power/power backup as
faster and convenient conducive for carrying out the
distribution of material to assembly at site at its own cost
different floors / sections. In at all the reasonable working
absence of service lift, labor hours.
charges for material to be lifted
e. Customer shall ensure easy
to various floors shall be to
availability of drinking water,
customer’s account unless
proper ventilation in working
otherwise included through
area, proper lighting in the
written communication. The
working area, and availability of
water for other services, toilet variation / labor charges etc
facility for installers, and first aid shall be to customer’s account.
facility at no extra cost at site.
4. Exclusions:
f. Customer shall assist the
a. The scope of supply
company in arranging / locating
encompasses all the material
suitable boarding and lodging
and hardware used for restroom
facility for its team at site/near
/shower room / change room /
site. In case of remote site the
locker systems /urinal panels
customer shall help the
being offered by the company,
company in arranging for the
and their operation during
transportation of the team.
usage. However, the company
2. LD / Delay Clause: shall not be responsible for the
aesthetic or functional attributes
a. The delays caused due to non
of other items/constructions etc.
availability of basic information
used in conjunction with the
or measurement drawings shall
system supplied by us.
not amount to the delay caused
in the on site delivery of 5. Commercials:
materials by the supplier.
a. Pricing:
Merino Industries Limited will
bear the responsibility of delay i. The offered prices are
caused due to operational based on the careful
bottlenecks on its part except in and in-depth study of
circumstances beyond its customer’s requirement,
control such as floods, state of specifications and site
war, national emergency or conditions, firm till
cyclone etc. delivery at site subject
to fulfillment of other
b. Merino Industries Limited shall
conditions.
not bear any responsibility for
the delay in installation ii. The offered prices
amounting out of the non- include Excise Duty
availability of power or any other &Educational Cess @
problem on site. 10.30% applicable on
c. Merino Industries Limited will the material cost.
execute the order in accordance iii. CST shall be charged
to the norms and policies upon the material cost
mutually agreed in good faith at the rate of 13.5 %. In
and will make all necessary cases where the
endeavors to maintain the customer can provide
essence of time specified in the “C” form for the order,
purchase order. Accordingly, no the CST shall be
LD / Delay clause will be applicable @ 2 %.
acceptable unless agreed upon
in specific and in writing. iv. Service tax shall be
applicable on the
3. Variation in order: installation charges @
a. Under normal circumstances, no 10.30 %.
requests for changes in v. Any commercial forms
specifications would be (Form “C” etc) shall
permissible. have to be provided by
b. If the site conditions / situation customer in advance
so demands, based on its along with PO, failing
discretion the company may which, full tax will be
agree to incorporate certain charged.
changes (to be confirmed in vi. Any changes in the
writing), any delays / cost statutory levies by the
Government of India documents supporting
shall be to customer’s such deductions along
account. with payments.
vii. Octroi / Entry Tax / any c. Pre Delivery Inspection:
other statutory levies
i. PDI during production
shall be to customer’s
stage by customer
account on actuals.
would be permissible if
viii. Any concessional agreed in writing or
rates / exemptions in necessitated for
taxes / duties etc, shall releasing payment
be considered only on against readiness of
submission of all material at factory as
relevant documents as per terms of order.
acceptable by
d. Invoicing:
concerned authorities in
advance. i. The company will raise
a separate invoice/s
b. Ordering:
each for material
i. All purchase orders supplied and installation
should be placed in charges respectively.
favor of “Merino However the total
Industries Limited”, amount shall in this
Hapur unless case not exceed the
specified otherwise in total order value.
writing.
e. Payment Terms:
ii. All purchase orders
should be firm & i. Through cheque or
irrevocable, with all demand draft payable in
BOQ, specifications and the favor of “Merino
shop drawings accepted Industries Limited.” at
for taking into par or via Electronic
production. Payments as per
agreed.
iii. All purchase orders
should be accompanied ii. The payments shall be
by advance payments, made based upon the
commercial forms, rates indicated in the
exemption certificates, Proforma invoice & the
and road permits etc as subsequent purchase
applicable. order placed by the
iv. A separate order for client. Any additional
installation should be supply of material due
released for assembly to variation in general or
of the material at site. dimensional
Kindly note that the specifications of site
assembly is incidental shall be charged extra.
to the supply of material
and hence no works iii. The schedule for
contract tax is payments shall be as
deductable / chargeable under:
on it.
Supply Order
v. Any other statutory
deductions can be 1. 80% Advance
made as per prevailing along with the
laws subject to proper purchase order.
provision of all relevant
2. 20% upon of payments towards assembly
Installation charges subject to terms of
within 7 days payment agreed.
from the date of
c. Any damages in the material or
submission of
to the site out of our installation
final bills.
work shall be indicated before
Installation Order the completion of the installation
and shall be duly informed to
3. 100% against
the concerned site supervisor in
completion of
writing. The company shall not
successful
accept any claims of damages
installation and
after the inspection has been
joint inspection.
completed and site completion
6. Warranty & Retention: certificate signed.
a. Warranty: Warranty letter will 8. Deviations:
be issued after receiving Full a. Any/all changes agreed in the
Payment & Installation scope of offer / order /terms of
Completion Certificate. The execution will only be made
same will be giver for a term of through a written letter signed
5 years on Moisture Related by the authorized representative
Damages (Partitions), 1 year for of the company and /or
Restroom System Workmanship customer and will form a part of
& Accessories excluding normal original offer as a revision with
wear & tear and vandalism date.
b. Merino Industries Limited is a 9. Governing Law:
supplier of repute and the
Purchase order terms and a. The terms of the offer are
warranty are binding documents construed as binding and
towards its responsibility to enforced in accordance with and
ensure supplies in time / render under the rules of the
after sales service. The government of India.
company, as a matter of policy, b. The customer and the company
does not allow cash retention of will endeavor to resolve any
any amount under the defects differences or dispute through
liability period. However, in mutual discussions and
exceptional circumstances, the agreement.
company will consider issuing a
corporate guarantee to secure c. All unresolved disputes are
customer’s advances / subject to the jurisdiction of the
performance of the supplied Hapur (UP) courts.
system depending on the size of
10. Confidentiality: The rates &
order.
other terms of the contract are not to be
7. Completion: disclosed by either party to any third
person or party under any
a. The site completion certificate
circumstances & a breach of this
shall be provided by the client
confidentiality may result in dilution of
upon the final inspection of the
the contract agreement.
site after the completion of the
installation. The client may 11. Application:
indicate the observations /
a. The rates have been offered
dissatisfaction in the quality of
solely for project order
work on the site completion
belonging to or routed through
certificate.
the customer for the particular
b. The installation completion project & shall not be applicable
certificate shall be provided for any third party.
phase wise to facilitate release
***** Thanks & Regards
*****