Documente Academic
Documente Profesional
Documente Cultură
© ABB
27.03.2010 Is-limiter | 1
Is-limiter
Is-limiter
The world's fastest switching device
Reduces substation cost
Solves short-circuit problems in new
substations and substation extensions
Optimum solution for interconnection
of switchgears and substations
In most cases the only technical solution
Reliability and function proofed in
thousands of installations
Worldwide in service
The peak short-circuit current will never
be reached
The short-circuit current is limited at the
very first current rise
© ABB
27.03.2010 Is-limiter | 2
Is-limiter
Technical data
© ABB
27.03.2010 Is-limiter | 3
Is-limiter
Technical data
Utilities
Test-laboratories
© ABB
27.03.2010 Is-limiter | 4
Is-limiter
Comparison: Is-limiter – circuit-breaker
T0 T1 T2 T3
© ABB
27.03.2010 Is-limiter | 5
Is-limiter
Comparison: Is-limiter – circuit-breaker
Total time of
current flow through
Is-limiter: T = 5 - 10 ms
t
T0 T1 T2 T3
© ABB
27.03.2010 Is-limiter | 6
Is-limiter – Function
Breaking of a short-circuit current with Is-limiter
250 kA
i
50 kA u
125 kA
50kA x χ x 2
i1
50 kA t
Current curve at the short-circuit location
© ABB
27.03.2010 Is-limiter | 7
Is-limiter – Function
Breaking of a short-circuit current with Is-limiter
250 kA
i i = i1 + i2
without IS-limiter
50 kA 50 kA u
125 kA
50kA x χ x 2
50 kA i1
50 kA t
Current curve at the short-circuit location
© ABB
27.03.2010 Is-limiter | 8
Is-limiter – Function
Breaking of a short-circuit current with Is-limiter
250 kA
i i = i1 + i2
without IS-limiter
50 kA 50 kA u
125 kA
50kA x χ x 2
50 kA i1
50 kA t
Current curve at the short-circuit location
© ABB
27.03.2010 Is-limiter | 9
Is-limiter – Function
Breaking of a short-circuit current with Is-limiter
250 kA
i i = i1 + i2
without IS-limiter
50 kA 50 kA u
125 kA
50kA x χ x 2 i = i1 + i2
with Is-limiter
50 kA i1
i2
50 kA t
Current curve at the short-circuit location
© ABB
27.03.2010 Is-limiter | 10
Is-limiter – Function
Insert-holder and insert
© ABB
27.03.2010 Is-limiter | 11
Is-limiter – Structure
Typical System Components
3 CT’s
1 Tripping
cabinet
3 Inserts holders
with inserts
© ABB
27.03.2010 Is-limiter | 12
Is-limiter – Structure
Truck mounted panel
Type tested
acc. IEC 62271-200
© ABB
27.03.2010 Is-limiter | 13
Is-limiter – Reliability
Is-limiter as protection device at highest level
Self monitoring
Redundancy
(for each phase one independent system)
Protection against EMI
EMC tested according to IEC 61000
Special current transformers
(low impedance shield between primary and
secondary winding)
Filters for incoming / outgoing wires
Special tripping and measuring wires
(each pair tightly twisted and protected by steel conduit)
Test equipment
(quick, complete and easy test by user)
© ABB
27.03.2010 Is-limiter | 14
Is-limiter – Reliability
Test equipment
© ABB
27.03.2010 Is-limiter | 15
Is-limiter – Function
Detection of the short-circuit current
i
1
1 Short-circuit current
without IS-limiter
© ABB
27.03.2010 Is-limiter | 16
Is-limiter – Function
Detection of the short-circuit current
i
1
1 Short-circuit current
without IS-limiter
ilimit
© ABB
27.03.2010 Is-limiter | 17
Is-limiter – Function
Detection of the short-circuit current
i
1 ilimit ^ (di/dt)
^ = logical „and“
1 Short-circuit current
without IS-limiter
2 Short-circuit current
2 - IS-limiter tripped -
(didt )2
ilimit
© ABB
27.03.2010 Is-limiter | 18
Is-limiter – Function
Detection of the short-circuit current
i
1 ilimit ^ (di/dt)
^ = logical „and“
1 Short-circuit current
without IS-limiter
2 Short-circuit current
2 - IS-limiter tripped -
3
(didt )2 (didt )3 3 Over current
- IS-limiter not tripped -
ilimit 4 Peak value of service
4
current
© ABB
27.03.2010 Is-limiter | 19
Is-limiter – Function
Schedule for tripping
T0
.
T1T2 T3 T4
t
© ABB
27.03.2010 Is-limiter | 20
Is-limiter – Application
Is-limiter mounted in bus section
Advantages:
Improving
„power quality“
Increasing the relia-
bility of the system
Reduction of the
network-impedance
Optimal load flow
Existing busbar
system and
cabling have not
to be changed
© ABB
27.03.2010 Is-limiter | 21
Is-limiter – Application
Is-limiter in generator feeder
Advantages:
Generator can be
connected indepen-
dent on the short-
circuit capability of
the system
Existing busbar and
cable systems have
not to be changed
No need of
expensive
generator breaker
© ABB
27.03.2010 Is-limiter | 22
Is-limiter – Application
Is-limiter in parallel to reactor
Advantages:
Avoid copper
losses of the
reactor
Avoid voltage
drop of the reactor
No electro-
magnetical field
of the reactor
Greenhouse
aspects (CO2
and heating)
© ABB
27.03.2010 Is-limiter | 23
Is-limiter – Application
Connection of a generator to a
network with current-direction comparison
Advantages:
Private / industrial
generator feeder
can be connected
to the fully loaded
grid
Selective tripping
of the IS-limiter
(IS-limiter will
operate only for
short-circuit faults
in the grid 1 ;
will not operate in
the grid 2 )
© ABB
27.03.2010 Is-limiter | 24
Is-limiter – Application
Is-limiter with summation of currents
Advantages:
Only IS-limiters
close to fault
location trip
Existing busbar and
cable systems have
not to be changed
Reduction of the
network-impedance
Optimal load flow
Greenhouse
aspects (CO2
and heating)
© ABB
27.03.2010 Is-limiter | 25