Documente Academic
Documente Profesional
Documente Cultură
NOTES:
TRUE
°5
NORTH 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
22.
OTHERWISE NOTED.
°
T00-A-DD-013675.001.
2
5
NORTH
PREVAILING
3. FOR ARROWS AND CROSS WALK MARKINGS SHALL BE
WIND
AS PER STD. DWG. AD-036512.
OF
MAKKAH
4. ALL ROAD MARKING AND TRAFFIC SIGNS SHALL BE
CONSENT
PAINTED USING THERMOPLASTIC REFLECTIVE
TRAFFIC PAINT OR EQUIVALENT.
DRAWING LIMIT
TTEN
WRI
THE
THOUT
WIS
THI
FROMNG
DRAWI
KEYPLAN
NED
TRUE
5°
OBTAI
NORTH
22.
PLANT
°
2
5
NORTH
STOP
PREVAILING
WIND
MAKKAH
NG
STOP
STI
BE
BUS LAY BAY
EXI
PART,SHALL
003
ON
DWG.NO.DD-816906.
EXPANSI
STOP
STOP
SHADED PARKING (12 SLOTS)
NEW
MI
LI T
STOP
N
STOP
I
NG
FULL,OR
DRAWI
8M TWO WAY ROAD SHADED PARKING (44 SLOTS) SHADED PARKING (35 SLOTS)
N
I
STOP
STOP
SEE
THIS DRAWING
ON
REPRODUCTI
SLOTS)
SLOTS)
SLOTS)
REFERENCE DRAWINGS
ON
SLOTS)
OVERALL ROAD LAYOUT T00-S-DD-816901.001
ROAD
NUATI
ROAD MARKING & SIGNAGE DETAILS T00-A-DD-816911-001
18
18
18
ROAD MARKING & SIGNAGE DETAILS T00-A-DD-816911-002
ROAD
(
(
PATROL
22
NG
NG
NG
CONTI
(
ROAD LAYOUT PLAN T00-S-DD-816902.002
PARKI
PARKI
PARKI
SAUDIARAMCO.NO
WAY
NG
PARKI
1M
TWO
6.
SHADED
SHADED
SHADED
FOR
SHADED
8M
NE
|
MATCHLI
STOP
STOP
OF
PROPERTY
SHADED PARKING (35 SLOTS) SHADED PARKING (35 SLOTS)
8M TWO WAY ROAD
SOLE
6.1M PATROL ROAD
S1 08/27/20 RAJ RHS KMA
THE
O1 06/18/20 RAJ RHS KMA
AFW DATE BY CH'D PIP PRJ PRO HSE CIV ELE INST COMS
ARE N
HEREI
0 10.0 20.0 30.0 40.0 50.0 60.0 70.0
METERS
NED
SCALE: 1 :750M
CONTAI
DRAWING LIMIT
REVISION VALIDATION
ON
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
I
00 08/27/20 ISSUED FOR CONSTRUCTION (S1)
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-09003-0014 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
SAPMT CAMP FACILITIES
DRAWI
TCF EXPANSION
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
S DD-816906 002 00
AFW CONTRACT: 5781 CLASS: 1 REV: S1 DSN: 28660 Saudi Aramco 2615 ENG. (05/05)