7.500 m glass fibre cables for installation in concrete. Temperature range -30
degree C up to 105 degrees Centigrade.
Over a total length of 9.200. and a max. height of 67 m, the 4.364 m long main
section as a rockfill dam with concrete sealing.
a. Moser dam wall, gravity dam Crest length 494 m, crest thickness of 7 m.
b. Drossen DAM wall, arch dam. Height 112 m, crest length 357 m, crest
thickness 7 m.
c. Limberg DAM wall, gravity dam, wall elevation 120m . Crest length 357 m
5. Barrage de St. Croix finished in 1975 in the Central Alpes. Owner EDF
First installation of Glötzl hydraulic total pressure cells in France.
The results have been compared with Telemac vibrating wire transducers.
7. Kölnbrein DAM, Austria, Height 200 m, Concrete double arched gravity dam
10. Ertan dam, people's Republic of China, Height 240 m. Concrete arch
gravity dam.