Sunteți pe pagina 1din 8

AUGUST 2015 - AUGUST 2016

1.1. INFRASTRUCTURI PENTRU O CLADIRE P+1E+Mp

1.1.1. INFRASTRUCTURA FARA SUBSOL T.V.A. 24%


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
CLADIRE INFRASTR.V1 ISCADREV1 556.3 1.0068 560.1
FARA INFRASTR.V2 ISCADREV2 614.8 1.0068 619.0 pag.carte: 14
SUBSOL INFRASTR.V3 ISCADREV3 679.2 1.0068 683.8

1.1.2. INFRASTRUCTURA CU SUBSOL AMENAJAT CA GARAJ SI BOXE DEPOZITARE


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUBSOL CU INFRASTRUCTURA GARAJSUBS 1,354.3 1.0677 1,446.0
GARAJ SI FINISAJ INTERIOR FINGARAJ 405.3 1.0429 422.7 pag.carte: 16
BOXE ELECTRICE FUNCT ELGARAJ 68.0 1.0023 68.2
TOTAL 1,827.5

1.2. INFRASTRUCTURI CU SUBSOLURI CU FUNCTIUNI DE PARCARI SUBTERANE LA CLADIRI PE


CADRE DIN BETON ARMAT CU REGIM DE INALTIME P+5E+Et, P+8E+Et SI P+10E+Et

1.2.1. SUBSOL CU UN NIVEL DE PARCARE


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
INFRASTR. INFRASTRUCTURA ISSUBAUTO 1,360.9 1.0909 1,484.6
BLOC AP. FINISAJ INTERIOR FGARAJSUB 183.7 1.0008 183.8
CU ELECTRICE FUNCT. ELPARCARI 44.1 1.0050 44.3 pag.carte: 18
PARCARI SANITARE SAPARCARI 21.2 1.0042 21.3
AUTO VENTILATII VVPARCARI 32.6 1.0012 32.6

1.2.2. SUBSOL CU 2 NIVELURI DE PARCARE


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUBSOL INFRASTRUCTURA PARC2SUBS 1,217.4 1.0909 1,328.1
BLOC FINISAJ INTERIOR FGARAJSUB 183.7 1.0008 183.8
CU PARCARI ELECTRICE FUNCT. ELPARCARI 44.1 1.0050 44.3 pag.carte: 19
AUTOTURISME SANITARE SAPARCARI 21.2 1.0042 21.3
VENTILATII VVPARCARI 32.6 1.0012 32.6
1.2.3. SUBSOL CU NIVEL DE PARCARE AUTO PREVAZUT CU PLATFORME CU ELEVATOARE
TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUBSOL INFRASTRUCTURA PARCELEVAT 1,836.1 1.0909 2,003.0
BLOC FINISAJ INTERIOR FGARAJSUB 183.7 1.0008 183.8
CU PARCARI ELECTRICE FUNCT. ELPARCARI 44.1 1.0050 44.3 pag.carte: 20
AUTOTURISME SANITARE SAPARCARI 21.2 1.0042 21.3
VENTILATII VVPARCARI 32.6 1.0012 32.6
AUGUST 2015 - AUGUST 2016
1.3. SUPRASTRUCTURA PE CADRE DIN BETON ARMAT

1.3.1. SUPRASTRUCTURA PE CADRE CU REGIM DE INALTIME P+1E


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUPRASTRUCTURA CADRE1386-E1 398.4 1.0066 401.0
STRUCTURA SUPRASTRUCTURA SSCADRE7-E1 412.5 1.0255 423.0 pag.carte: 22
SUPRASTRUCTURA CADRE1386-E1 426.5 1.0443 445.4
SUPRASTRUCTURA SSCADRE9-E1 454.8 1.0519 478.4

1.3.2. SUPRASTRUCTURA PE CADRE CU REGIM DE INALTIME P+1E+MPARTIALA


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUPRASTRUCTURA SSCLPEM6 289.1 1.0015 289.5
STRUCTURA SUPRASTRUCTURA SSCLPEM7 359.0 1.0115 363.1 pag.carte: 23
SUPRASTRUCTURA SSCLPEM8 373.1 1.0211 381.0
SUPRASTRUCTURA SSCLPEM9 387.2 1.0332 400.1

1.4. SUPRASTRUCTURI PE CADRE DIN BETON ARMAT CU 5, 8, 10ETAJE SI ETAJ TEHNIC

1.4.1. SUPRASTRUCTURA CU P+5E+ETEHNIC

1.4.1.1. SUPRASTRUCTURA P+5E+ETEHNIC, CU 2 DESCHIDERI SI 4 TRAVEI


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUPRASTRUCTURA SUPRAP5E6 424.8 1.0073 427.9
STRUCTURA SUPRASTRUCTURA SUPRAP5E7 483.2 1.0073 486.7 pag.carte: 24
SUPRASTRUCTURA SUPRAP5E8 556.1 1.0073 560.2
SUPRASTRUCTURA SUPRAP5E9 693.5 1.0073 698.6

1.4.1.2. SUPRASTRUCTURA PE CADRE P+5E+ETEHNIC, CU 3 DESCHIDERI SI 5 TRAVEI


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUPRASTRUCTURA SUPRAP5E6 445.9 1.0071 449.1
STRUCTURA SUPRASTRUCTURA SUPRAP5E7 522.9 1.0071 526.6 pag.carte: 25
SUPRASTRUCTURA SUPRAP5E8 492.2 1.0802 531.7
SUPRASTRUCTURA SUPRAP5E9 538.6 1.0071 542.4
1.4.2. SUPRASTRUCTURI P+8/10E+ET CU 3 DESCHIDERI SI 5 TRAVEI, CU PUT DE LIFT SI O
SINGURA SCARA PRINCIPALA

1.4.2.1. SUPRASTRUCTURA CU REGIM DE INALTIME P+8E+ETEHNIC, CU 3 DESCHIDERI SI


5 TRAVEI, CU UN PUT DE LIFT SI O SCARA
TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUPRASTRUCTURA CADRE8E3D5T6 506.2 1.0069 509.7
STRUCTURA SUPRASTRUCTURA CADRE8E3D5T7 539.1 1.0069 542.8 pag.carte: 26
SUPRASTRUCTURA CADRE8E3D5T8 571.6 1.0069 575.5
SUPRASTRUCTURA CADRE8E3D5T9 637.8 1.0069 642.2

1.4.2.2. SUPRASTRUCTURA CU REGIM DE INALTIME P+10E+ETEHNIC, CU 3 DESCHIDERI SI


5 TRAVEI, CU UN PUT DE LIFT SI O SCARA
TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
SUPRASTRUCTURA CADRE10E6 503.8 1.0007 504.2
STRUCTURA SUPRASTRUCTURA CADRE10E7 522.7 1.0007 523.1 pag.carte: 26
SUPRASTRUCTURA CADRE10E8 553.8 1.0007 554.2
SUPRASTRUCTURA CADRE10E9 585.6 1.0007 586.0

1.4.2.3. PUT DE LIFT SI SCARA SECUNDARA, LA SUPRASTRUCTURA PE CADRE


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
PUT LIFT PT.1ETAJ PUTLIFT 5,322.25 0.9971 5,306.8
SUPRASTR. P+8E+ETJ.TEHNIC 47,900.24 0.9971 47,761.3 pag.carte: 27
P+10E+ETJ.TEHNIC 58,544.74 0.9971 58,375.0
SC.SECUND.1ETAJ SCARAMON 2,971.50 0.9935 2,952.2
SUPRASTR. P+8E+ETJ.TEHNIC 26,743.50 0.9935 26,569.7
P+10E+ETJ.TEHNIC 32,686.50 0.9935 32,474.0

1.4.2.4. INSTALATIE ELECTRICA DE FORTA PENTRU ALIMENTARE LIFTURI SI CAMERA DE TROLIU


TIP SISTEM TIP SUBSISTEM Simbol pret indice cost curent
carte 2015 - 2016 2015 - 2016
1 STATIE+COTA AFERENTA CAM.TROLIU EL380-1E 228.50 0.9874 225.6
LIFT+ CAMERA ELECTR.LIFT PERS. EL380V-8E 2,056.90 0.9874 2,031.0 pag.carte: 27
TROLIU ELECTR.LIFT PERS. EL380V-10E 1,949.50 0.9874 1,924.9
9
AUGUST 2015 - AUGUST 2016
1.5. INCHIDERI PERIMETRALE SI COMPARTIMENTARI INTERIOARE
LA STRUCTURILE PE CADRE DIN BETON ARMAT

1.5.1. INCHIDERI PERIMETRALE


TIP SISTEM GROSIME Simbol pret indice cost curent
INCHIDERE ZID INCHIDERE carte 2015 - 2016 2015 - 2016
BCA 24 CM ZBCA2467 127.0 0.9547 121.2
BCA BCA 30 CM ZBCA3067 154.8 1.0031 155.3 pag.carte: 28
BCA 24 CM ZBCA2489 135.2 0.9382 126.8
BCA 30 CM ZBCA3089 163.7 1.0170 166.5
POROTERM 24 CM ZPOR2467 163.3 1.0582 172.8
POROTERM POROTERM 30 CM ZPOR3067 202.1 1.0054 203.2
POROTERM 24 CM ZPOR2489 195.1 1.0100 197.1
POROTERM 30 CM ZPOR3089 243.0 1.0054 244.3

1.5.2. COMPARTIMENTARI INTERIOARE


TIP SISTEM TIP Simbol pret indice cost curent
COMPARTIM. SUBSISTEM carte 2015 - 2016 2015 - 2016
BCA 20 cm si 10 cm COMPBCA 39.9 0.9789 39.1
BCA+ZID CAR 20 cm si 12,5 cm COMPBCAZ 54.0 1.0267 55.4 pag.carte: 29
POROTERM 20 cm si 10 cm COMPORO 58.5 1.0045 58.8
alb/alb+alb/verde COMPRIGI 29.2 1.0073 29.4
RIGIPS 1 placa roz-rez.la foc RIGFOC 31.2 1.0193 31.8
2 placi alb/alb+verde 2COMPRIGI 42.4 1.0223 43.3
2 placi roz la foc 2RIGFOC 42.9 1.0193 43.7
AUGUST 2015 - AUGUST 2016
1.6.CLADIRI PARTER PE CADRE DIN BETON ARMAT PENTRU
BAZINE DE INOT OLIMPICE SI SEMIOLIMPICE

1.6.1. CLADIRE CU DESCHIDEREA DE 12 M AFERENTA BAZINULUI


DE INOT SEMIOLIMPIC
TIP TIP Simbol pret indice cost curent
SISTEM SUBSISTEM carte 2015 - 2016 2015 - 2016
CLADIRE D=12M STRUCTURA INCHIDERI, STRD12H66 1,771.7 1.0567 1,872.2
PLANSEU ACOPERIS
STRUCTURA STRUCTURA INCHIDERI, STRD12H67 1,844.7 1.0567 1,949.3
PLANSEU ACOPERIS
INCHIDERI SI STRUCTURA INCHIDERI, STRD12H68 1,927.0 1.0567 2,036.3
PLANSEU ACOPERIS pag.carte: 31
PLANSEU ACOPERIS STRUCTURA INCHIDERI, STRD12H69 2,093.2 1.0567 2,211.9
PLANSEU ACOPERIS
TERASA NECIRC. TERASA NECIRC. TERNECIRC 450.6 1.0036 452.2
COMPARTIM. COMPART.DEPEND. COMPBCA 39.9 0.9789 39.1
FINISAJ FIN.ZONA CL.BAZIN FINBAZSEO 297.4 1.0040 298.6
INCLUSIV FATADA FIN.ZONA DEPEND. FINDEPSEO 834.4 1.0050 834.4
INSTAL. ELECTRICE ELECTRICE CL.BAZIN ELCLSEOL 68.6 1.0064 69.0
ELEC.ZONA DEP. ELDEPBSEO 169.7 1.0030 170.2
SANITARE SANITARE CL.BAZIN SABASEOL 124.7 1.0067 125.5
SANIT.ZONA DEP. SADEPBSEO 178.7 1.0049 179.6
INCALZIRE INCALZIRE CL.BAZIN IBAZSEO 159.6 1.0105 161.3
INCALZ.ZONA DEP. IDEPSEO 165.6 1.0088 167.1
STRUCTURA SI FINISAJ BAZIN SEMIOLIMPIC
TIP TIP Simbol pret indice cost curent
CONSTRUCTIE SUBSISTEM carte 2015 - 2016 2015 - 2016
STRUCTURA BAZIN PISCIN300 929.4 1.0621 987.1
BAZIN SEMIOLIMPIC FINISAJ GRES.VITRIF. FINSEMIOL 866.9 1.0076 873.5
FINISAJ CU LINER LINERSEMIOL 644.5 1.0077 649.5

1.6.2. CLADIRE CU DESCHIDEREA DE 26 M AFERENTA BAZINULUI


DE INOT OLIMPIC
TIP TIP Simbol pret indice cost curent
SISTEM SUBSISTEM carte 2015 - 2016 2015 - 2016
CLADIRE D=24M STRUCTURA INCHIDERI, STR26GR6 2,063.2 1.0567 2,180.2
PLANSEU ACOPERIS
STRUCTURA CU STRUCTURA INCHIDERI, STR26GR7 2,148.1 1.0567 2,269.9
PLANSEU ACOPERIS
INCHIDERI SI STRUCTURA INCHIDERI, STR26GR8 2,243.9 1.0567 2,371.1
PLANSEU ACOPERIS pag.carte: 32
PLANSEU ACOPERIS STRUCTURA INCHIDERI, STR26GR9 2,437.3 1.0567 2,575.5
PLANSEU ACOPERIS
TERASA NECIRC. TERASA NECIRC. TERNECIRC 450.6 1.0036 452.2
COMPARTIM. COMPART.DEPEND. COMPBCA 39.9 0.9789 39.1
FINISAJ FIN.ZONA CL.BAZIN FINBAZSEO 297.4 1.0040 298.6
INCLUSIV FATADA FIN.ZONA DEPEND. FINDEPSEO 834.4 1.0050 838.6
INSTAL. ELECTRICE ELECTRICE CL.BAZIN ELCLSEOL 68.6 1.0064 69.0
ELEC.ZONA DEP. ELDEPBSEO 169.7 1.0030 170.2
SANITARE SANITARE CL.BAZIN SABASEOL 124.7 1.0067 125.5
SANIT.ZONA DEP. SADEPBSEO 178.7 1.0049 179.6
INCALZIRE INCALZIRE CL.BAZIN IBAZSEO 159.6 1.0105 161.3
INCALZ.ZONA DEP. IDEPSEO 165.6 1.0088 167.1
STRUCTURA SI FINISAJ BAZIN OLIMPIC
TIP TIP Simbol pret indice cost curent
CONSTRUCTIE SUBSISTEM carte 2015 - 2016 2015 - 2016
STRUCTURA BAZIN PISCIN1000 841.6 1.0621 893.9
BAZIN OLIMPIC FINISAJ GRES.VITRIF. LINERSEMIOL 524.9 1.0076 528.9
FINISAJ CU LINER FINOLIMP 706.3 1.0077 711.7

S-ar putea să vă placă și