Sunteți pe pagina 1din 18

APPENDIX I

(I) BASIC INFORMATION

Name Of The Project Shri Shantinagar Residential


complex
[by Sura na Mutha Bhansali
Developers]
Location/ site alternative under Survey no. 63/A, 63/1/3A, 63/A/4 at
consideration Kondhwa Budurk, near VIT hostel,
Pune, Maaharashtra
Size of the project Total plot area available for
development:40,500 m2
Total area under coverage: 6757.44
m2
And BUA is 46704.24 m2
Expected Cost Of the Project Total cost of project: INR 26 crore
80 lakhs
Screening Category Activity under Item 8(a) of the EIA
Notification of 14th September 2006

(II) Activity

1. Construction, operation or decommissioning of the Project


Involving actions, which will cause physical changes in the locality
(Topography, land use, changes in water bodies, etc.)

S. Information/Checklist Yes/n Details thereof (with


No. confirmation o approximate
quantities/rates, wherever
possible) with source of
information data
1.1 Permanent or temporary Yes The proposal pertains to
change in land use, land building a residential
cover or topography complex. As per
including increase in development plan of Pune
intensity of land use (with Municipal Corporation
respect to loval land use sanctioned by State
plan) Government, the plot under
reference is in Residential
zone. The Conceptual Plan,
Site Plan, Layout Plan and
Parking Plan are enclosed
vide Annexur-I to Annexure
IV respectively with this
application.
1.2 Clearance of existing Land, No No clearance of existing trees
vegetation and building? required. Existing trees shall
be included in green belt of
project area.
1.3 Creation of new land uses? No Poposed development is in
conformity with the approved
development plan if Pune
Municipal Corporation.
1.4 Pre-construction Yes No bore well water usage is
investigation eg. Borehole, proposed during operation
soil testing? phase and as well as
construction phase.
1.5 Construction works The project is categorized as
a whole site development as
per PMC jurisdiction. The
proposal is as follows: all
area in m2

Total plot area =


2
40,500.00m
Less 10% open space =
3778.86m2
Total BUA = 467-
2
4.24m
1.6 Demolition work No At present the land is lying
unutilized, vacant and
therefore demolition work is
not envisaged.
1.7 Temporary sites used foe Yes No housing at site. The
construction works or workers from nearby area of
housing of construction Pune shall be engaged in
workers? construction activity.
1.8 Above ground buildings, Yes Excavation for foundation is
structures or earthworks prominent activity. The
including linear structures, debris, soil and rubble
cut and fill or excavations. removed would be used as
filling material for leveling
and for road construction.
1.9 Underground works No Not applicable as the
including mining or proposal pertains to
tunneling? construction of residential
complex.
1.10 Reclamation works? No Not appliacable.
1.11 Dredging? No Not applicable.
1.12 Offshore structures No Not applicable.
1.13 Production and No Not applicable as the
manufacturing process? proposal pertains to
construction of residential
complex.
1.14 Facilities for storage of No Primary storage Godown will
goods or materials? be provided for storage of
construction materials on
site.
1.15 Facilities for treatment or Yes Sewage Treatment Plant will
disposal of solid waste or be provided.
liquid effluents? Refer annexure VII
The project proponents have
proposed arrangement to
collect solid waste as a part
of waste management.
Organic waste converters
system used for solid waste
management.
1.16 Facilities for long term No Not applicable since this is a
housing of operational construction project.
workers?
1.17 New road, rail or sea traffic Yes There will be some increase
during construction or in road traffic:
operation?
Construction phase: 7-8
trucks/day, JCB Poclain may
ply once or twice a day.

Operation phase: the


development will not have
major impact on traffic
pattern. Internal roads will be
well constructed to manage
traffic. Area is developed
with proper road
infrastructure.
1.18 New road, rail, air Yes Railway: Pune railway
waterborne or other station on Central Railway is
transport infrastructure at a distance of 10 km.
including new or altered Roadway: Pune Satara
routes and stations, ports, Highway is 4-5 km from site.
airports etc? Airway: Lohegaon Airport is
around 30 kms from site.
1.19 New or diverted No No such measure needs to be
transmission lines or undertaken and hence not
pipelines? applicable.
1.20 Impoundments, damming, No There are no naturally
culverting, realignment or occurring aquifers or flowing
other changes to the water course at the given site.
hydrology of watercourses
or aquifers?
1.21 Stream crossing? No Not applicable as there is no
stream crossing.
1.22 Abstraction or transfers of Yes As mentioned earlier, there is
water from ground or no proposal for ground water.
surface waters? The proponents have
proposed for rain water
harvesting system which will
recharge ground water.
1.23 Changes in water bodies or No Not applicable
the land surface affecting
drainage or run-off?
1.24 Transport of personnel or Yes Daily movements of 20
materials for construction, trucks in predicted for
operation or transporting raw material.
decommissioning? The earthwork dug during the
process shall be utilized and
there is no decommissioning
involved in the project.
1.25 Long-term dismantling or No Not applicable since there is
decommissioning or no dismantling or
restoration works? decommissioning involved in
the project.
1.26 Ongoing activity during No Not applicable since there is
decommissioning which no decommissioning.
could have an impact on the
environment?
1.27 Influx of people to an area Yes Proposed project will be
in either temporarily or residential complex and there
permanently? will be permanent population
residing at project place and
the environmental impact
will be directly proportional
to the occupancy.
1.28 Introduction of alien No The proponents have
species? proposed for landscaping /
green belt development of
local and exotic species
around the periphery of the
whole site and in the garden
space in the center of the
proposed buildings. Also
open spaces in the northern
and southern corners of site
shall be developed as green
zone. Open space in the south
western corner shall be used
to build temple. Details of
green belt are provided vide
Annexure-X
1.29 Loss of native species or No No clearance of vegetation
genetic diversity? required and the existing
trees will be added in to
proposed green belt.
1.30 Any other actions? No Not applicable.

2. Use of Natural resources for construction ot operation of the


Project (such as lan, waterm materials or energy, especially any
resources which are non-renewable or in short suppy):

S.no. Information/checklist Yes/No Details thereof (with


confirmation approximate quantities/
rates, wherever possible)
2.1 Land especially undeveloped No Not applicable as land is
or agricultural land (ha) leveled with no major
undulations and lying
vacant.
2.2 Water (expected source & Yes Construction phase: water
competing user) unit: KLD supply required during
construction is about 80
cum/day. The total water
requirement will be met
through PMC water supply
system.
Operation phase: the total
water requirement is 400m2.
The water budget is
enclosed as Annexure-VI.
The total water requirement
will be met through PMC
water supply system.
2.3 Minerals (mt) No Not applicable.
2.4 Construction material- stone, Yes Please refer Annexure-IX
aggregates, sand / soil
(expected)
2.5 Forests and timber (source No Not applicable.
MT)
2.6 Energy including electricity Yes Construction phase: 170-
and fuels (source, competing 190 units/day from MSEB
users) for a tenure of one and a
Unit: fuel (MT), energy half years
(MW) Operation phase:
154KW/building
From MSEB (MSEDCL)
Power back-up: 1000 KVA
power back up will be
provided through DG sets
for lift and common area.
2.7 Any other natural resources No Not applicable.

3. Use, storage, transport, handling or production of substances or


materials which could be harmful to human health ot the
environment or raise concerns about actual or perceived risks to
human health.

S.NO. Information/checklist Yes/No Details thereof (with


confirmation approximate
quantites/rates, wherever
possible) with source of
information data
3.1 Use of substances or No Not applicable
materials, which are
hazardous (as oer MSIHC
rules) to human health or the
environment (flora, fauna
and water supplies)
3.2 Changes in occurrence of No Not applicable
disease or affect disease
vectors (eg. Insects or water
borne diseases)
3.3 Affect the welfare of people No Not applicable
eg. By changing living
conditions?
3.4 Vulnerable groups of people No Not applicable
2ho could be affected by the
project eg. Hospital patient,
children, etc.
3.5 Any other causes No Not applicable

4. Production of solid wastes during construction or operation or


decommissioning (MT/Month)

S.NO. Information/checklist Yes/No Details thereof (with


confirmation approximate
quantites/rates, wherever
possible) with source of
information data.
4.1 Spoil, overburden or mine No Excavation debris will be
wastes ised as filler material.
4.2 Municipal waste (domestic Yes Solid Waste Generation:
and/or commercial wastes)
Construction phase: The
sub-stratum removed will
be used for back filling the
plinth/foundation. A part of
construction waste, which
is suitable for landfill, will
be used for road making
and as fill material. The
proponents will utilize
balance as fill material in
other construction sites in
close vicinity.

Operation phase: The


solid waste, quantity wise it
is 1327kg/day; considering
biodegradable approx. 740
kg/dat shall be directed for
Organic waste converters
(OWS) system. Remaining
442 kg/day rrest qualifies
as Municipal solid waste
hence it is proposed to be
directed to municipal waste
site through collection
dumpers of PMC. Please
refer Annexure-VII
4.3 Hazardous wastes (as per No Not applicable as there
hazardous waste would be no generation of
management rules) hazardous waste.
4.4 Other industrial process No Not applicable.
wastes
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other No Sludge generated will be
sludge from effluent biodegradable and will be
treatment used as manure in garden.
4.7 Construction or demolition Yes construction waste will be
wastes used for roads and as fill
material for leaving and
road, pathway construction.
4.8 Redundant machinery or No Not applicable
equipment
4.9 Contaminated soils or other No Not applicable.
materials
4.10 Agricultural wastes No Not applicable.

5. Release of pollutants or ant hazardous, toxic or noxious


substances to air (kg/hr)

S.N Information/checklist Yes/ Details thereof (with


O. confirmation No approximate
quantities/rates, wherever
possible) with source of
information data
5.1 Emissions from combustion Yes Vehicular movement and
of fossil fuels from stationary energy back up DG sets and
or mobile sources other home appliances like Air
conditioner will be source of
air pollution.
Refer Annexure VIII
5.2 Emissions from production No Not applicable
processes
5.3 Emissions from material No Not applicable as use of ready
handling including storage or mix concrete containing fly
transport ash is envisaged for
construction.
5.4 Emissions from construction No Dust emissions may occur
activities including plant and during excavation and
equipment earthwork. Appropriate
barriers would be provided to
prevent the spread of dust into
the atmosphere. Water
sprinkling shall also be done to
pertain the dust level to
permissible one.
5.5 Dust or odours from handling No Not applicable
of material including
construction materials,
sewage and waste.
5.6 Emissions from burning of No No burning of waste at site
waste in open air (eg. Slash will be carried out. As
materials, construction described earlier, the bio-
debris) degradable waste will be used
for OWC, the sludge from STP
will be used as manure for
gardening and the non-
biodegradable waste will be
disposed off through
municipal waste disposal
facility. There will be
ansolutely no burning of
waste.
5.8 Emissions from incineration No Not applicable
of waste
5.9 Emissions from any other No Not applicable as this project
sources pertains to construction of
residential complex.

6. Generation of noise and vibration and emissions of light and heat:

S.NO. Information/checklist Yes/No Details thereof (with


confirmation approximate
quantities/rates, wherever
possible) with source of
information data
6.1 From operation of Yes
equipment eg engines, Construction phase: The
ventilation plant, crushers main source of noise
pollution will be the
machinery used for
construction and vehicular
movement. The construction
site will be covered from the
sides and hence noise will
not spread to surrounding
Operation phase: During
operation phase the only
source of noise will be
vehicular traffic an DG sets.
It is important that the DG
sets would be utilized only
during failure of electricity
and of course the DG sets
shall be provided with
acoustic enclosure which
will make them quiet
equipment to an acceptable
level.
6.2 From industrial or similar No Not appliacable
process
6.3 From construction or Yes Due to construction
demolition machinery/vehicle
movement. However, site is
vacant and no demolition is
involved.
6.4 From blasting or piling No Not applicable as no blastin
is proposed.
6.5 From construction or Yes During the construction
operational traffic activity, trucks, dumpers
and other vehicles would be
generating the noise.
6.6 From lighting or cooling No Not applicable
systems
6.7 From any other source No Not applicable

7. Risks of contaminating of land or water from releases of


pollutants into the ground or into the sewers, surface waters,
groundwater, coastal waters or the sea:

S.No. Information/checklist Yes/No Details thereof (with


confirmation approximate
quantities/rates, wherever
possible) with source of
information data
7.1 From handling, storage, use No Not applicable as there
or spillage of hazardous would be no storage,
materials transport or handling of
hazardous material
7.2 From discharge of sewage or No A provision of STP to treat
other effluents to water or sewage generated in the
the land (expected mode and complex. The treated
place of discharge) sewage from STP will be
utilized for gardening &
surplus if any would be
disposed off into the sewer
line of the Municipal
Corporation Of Pune. Thus,
there will be no impact on
the surface/ground water
regime due to the sewage
generated in the complex.
7.3 By deposition of pollutants No 1. New trees along with few
emitted to air into the land or indigenous shrubs shall be
into the water planted in the project area to
prevent air & noise
pollution.
2. Sewage treatment plant
will be provided.
3. DG sets will beprovided
with acoustic enclosures.
Refer EMP for further
details
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term No Not applicable
build up of pollutants in the
environment from these
sources?

8. Risk of accidents during construction or operation of the project,


which could affect human health or the environment:
S.No. Information/checklist Yes/No Details thereof (with
confirmation approximate
quantites/rates, wherever
possible) with source of
information data
8.1 From explosions, spillages, No Not applicable
fires etc from storage
handling, use or production
of hazardous substances
8.2 From any other sources No Not applicable
8.3 Could the project be affected No The area is not subject to
by natural disasters causing flooding as per Disaster
environmental damage (Eg. Management Plan prepared
Floods, earthquakes, etc) by PMC

9. Factors which should be considered (such as consequential


development) which could lead to environmental effects or the
potential for cumulative impacts with other existing or planned
activities in the locality:

S.No. Information/checklist Yes/No Details thereof (with


confirmation approximate
quantites/rates, wherever
possible)with source of
information data
9.1 Lead to development of No Not applicable
supporting. Facilities,
ancillary development
stimulated by development The site and nearby areas
stimulated by the project are developed with good
which could have impact on supportive infrastructure.
the environment
Eg: supporting infrastructure
• Housing
development
• Extractive
industries
• Supply
industries
• other
9.2 Lead to after-use of the site , No Not applicable
which could have an impact
on the environment
9.3 Set a precedent for later No Not applicable
developments
9.4 Have cumulative effects due No Not applicable
to proximity to other existing
or planned projects with
similar effects

(II) ENVIRONMENTAL SENSITIVITY

S.NO. AREAS NAME/ Aerial distance (within


IDENTITY 15km)
Proposed project
location boundary
1 areas protected under No such Not applicable. The site is
international conventions, areas located in the developing
national or local area of Pune City
legislation for their
ecological, landscape,
cultural or other related
value
2 Areas which are No such Not applicable. The
important or sensitive for areas project is located in the
ecological reasons- developing area of Pune
wetlands, water courses City.
or other water bodies,
coastal zome, biosphere,
mountains, forests
3 Areas used by protected, No such Not applicable. The
important or sensitive areas project is located in the
species of flora or fauna developing area of Pune
for breeding, nesting, City.
foraging, resting, over
winteringm migration
4 Inland, coastal, marine or No Not applicable
underground waters
5 State/ National No Not applicable
boundaries
6 Routes or facilities used Yes Project site is well
by the public for access to connected to various ways
recreation or other tourist, of Pune
pilgrim area
7 Defence installation No Not applicable
8 Densely populated or Yes Project located is in
built-up area residential and
Commercial zone of Pune
City.
9 Areas occupied by No Not applicable
sensitive man-made land
uses (hospitals, schools,
places of worship, etc)
10 Areas containing No Not applicable
important, high quality or
scarce resources (ground
water resources, surface
resources forestry,
agricultur, fisheries,
tourism, minerals)
11 Areas already subjected None Not applicable
to pollution or
environmental damage.
( Those where existing
legal environmental
standards are exceeded)
12 Areas susceptible to None Not applicable
natural hazard which
could cause the project to
present environmental
problems (earthquakes,
subsidence, landslides,
erosion, flooding or
extreme or adverse
climatic conditions)

S-ar putea să vă placă și