COURSE STRUCTURE

THIRD YEAR B.TECH PROGRAMME


CIVIL ENGINEEERING

5th SEMESTER 6TH SEMESTER

THEORY CONTACT HOUR CREDIT THEORY CONTACT HOUR CREDIT

1.Advanced Mechanics of Material 3-0-0 3 1.Structural Analysis-II 4-0-0 3

2. Transportation Engineering 4-0- 0 4 2. Irrigation Engineering 3-0- 0 4

3.Design of Concrete Structure 4-0-0 4 3.Design of Steel Structure 4-0-0 4

4. Foundation Engineering 3-0-0 3 4. Transportation Engineering.-II 3-0-0 3

5.PE-1(any one) 5. Environmental Engineering. 3-0-0 3


(a) Surveying-II 3-0-0 3
(b)Remote Sensing & GIS 3-0-0 3 6.FE-1(any one)
6.FE-1(any one) (a) Entrepreneurship
(a) Numerical Methods 3-0-0 3 Development 3-0-0 3
(b)Data Base Management 3-0-0 3 (b)Optimization in Engineering 3-0-0 3
System

TOTAL 20
TOTAL 20
LAB/SESSIONAL LAB/SESSIONAL
7. Concrete & Structural 7. Environmental Engineering Lab 0-0-3 2
Engineering Lab 0-0-3 2
8. Transportation Engineering Lab-I 0-0-3 2
8. Geotech Engineering Lab 0-0-3 2
9.Design and Detailing of 0-0-3 2
9.Design and Detailing of 0-0-3 2 Steel Structure
Concrete Structure TOTAL 6

TOTAL 6 TOTAL 26

TOTAL 26
COURSE STRUCTURE
FOURTH YEAR B.TECH PROGRAMME
CIVIL ENGINEEERING

7th SEMESTER 8TH SEMESTER

THEORY CONTACT HOUR CREDIT THEORY CONTACT HOUR CREDIT

1.Design of Advanced 3-0-0 3 1.PE-VI(any one) 3-0-0 3


Concrete Structure (a) Structural Dynamics &Earthquake
2. PE-II(any one) 3-0- 0 3 Engineering.
(a)Environmental Engineering. (b)Water Power Engineering.
(b)Pollution Measurement and Control (c)Construction Management
(d) Ground Water Hydrology
3.PE-III(any one) 3-0-0 3
(a)Water Resources Engineering. 2. PE-VII(any one) 3-0- 0 3
(b)Water Resources Management (a)Ground Improvement Technique
4. PE-IV (any one) 3-0-0 3 (b)Advanced Foundation Engineering.
(a) Pavement Design (c) Soil Dynamics and Earthquake
(b) Traffic Engineering. & Transportation Engineering.
Planning (d) Soil Structure Interaction

5.PE-V(any one) 3-0-0 3 3. PE-VIII (any one) 3-0-0 3


(a) Estimation, Costing and (a) Prestressed Concrete
Professional Practice (b) Composite material and
(b)Bridge Engineering Structure
(c) Performance & Evaluation of Pavements
6.FE-IV(any one) 3-0-0 3 (d) Town Planning
(a) Disaster Management 4.FE-V(any one) 3-0-0 3
(b) Finite Element Method of Analysis Marketing Management
Production & Operation Management

TOTAL 18

TOTAL 20
LAB/SESSIONAL LAB/SESSIONAL
7.Design of Irrigation Structures 0-0-3 2 7. Major Project 6

8. Design of Water Supply and Sanitary 8. Viva-voce 3


Engineering System 0-0-3 2
9.Seminar 2
9.Minor Project 4
TOTAL 11
8
TOTAL 26 TOTAL 23

5TH SEMESTER SESSIONALS

CONCRETE & STRUCTURAL LAB - 1 (0-0-3)

1. Cube Test for Concrete(Nominal Mix)


2. Cylinder Test for Concrete(Nominal Mix)
3. Split Tensile Strength Test for Concrete Beam
4. Design of Concrete Mix (Indian Standard Method)
5. Failure of Concrete beam in bending(two point loading)
6. Failure of Beam in Shear
7. Prism test

GEOTECH ENGINEERING LAB (0-0-3)

(Relevant I.S codes may be referred)


1. Determination of specific gravity of soil grains
2. Determination of grain size distribution of soil
(a)Sieve test (b) Hydrometer/ pipette test
3. Determination of Atterberg limits of soil
(a) Liquid limit (b) plastic limit (c) shrinkage limit
4. Measurement of soil compaction in the field
(a) Core cutter method (b) Sand replacement method
5. Determination of Density – Water content relationship of soil.
(a) Proctor compaction test (ii) Modified Proctor compaction test (c) Use of Proctor penetration
needle
6. Determination of relative density of granular soil
7. Determination of shear strength parameters of soil
8. (a) Shear Box test (b) Tri-axial compression test (c) Unconfined compression test (d) Vane
shear test
9. Determination of consolidation characteristics of soil using fixed ring Oedometer
10. Determination of California Bearing Ratio (CBR) of soaked and un-soaked soil specimens
11. Determination of coefficient of permeability of soil
(a) Constant head permeameter (b) Falling head permeameter
DESIGN & DETAILING OF CONCRETE STRUCTURE (0-0-3)

(IS 456: 2000 and SP 16 are to be used)


1. Design of rectangular, T- Beam, and L- beam for flexure, shear and torsion
2. Design of double reinforced rectangular beam/T-beam
3. Check for development length and deflection of beams.
4. Design of columns with axial and eccentric loading
5. Design and detailing of one way and two way slabs
6. Design of isolated footings
7. Stair case design, design of combined footing
8. Thorough study of IS-456 2000 and SP-16

6TH SEMESTER SESSIONALS

ENVIRONMENTAL ENGINEERING LAB (0-0-3)

1. Determination of physical characteristics of water


(a) taste
(b) odour
(c) turbidity
(d) colour
(e) pH value
(f) dissolved and suspended solid
2. Determination of hardness characteristics of water-total calcium and magnesium
3. Break point chlorination

TRANSPORTATION ENGINEERING LAB (0-0-3)

1. Quality control tests on highway materials, bitumen, aggregate


2. Roughness measurement of pavements

STEEL STRUCTURE DESIGN LAB (0-0-3)

1. Design and detailing of riveted, bolted and welded connections


2. Detailing of end connections of compression members
3. Design of tension members
4. Design for lacing and battening
5. Detailing of column bases and foundations, detailing of slab base, gusseted base and grillage
foundation.
6. Detailing of structural steel connections, seated and framed connections.
7. Detailing of steel roof trusses/ industrial buildings