Systtem Descrip
ption
MA FIRST B
ERM Ballast Watter Treatm
ment system
m is comprrised of the
e below sttages durin
ng Ballast Water
W
Trea
atment process:
Filtratio
on. A self cleaning ba
asket filterr with pore
e size of 20
00 microns is used forr the removal of
particle
es with size larger of 200
2 micronss, in order to
t ensure a high hydroc
cyclone perrformance.
Physica
al Separatio
on. It is efffected thrrough a mu
ulti-hydrocy
yclone sep
parator, ha
aving a hyd
draulic
load of 100 m3/hr each, sepa
arating partticles largerr than 20 microns.
m
Electro
olysis. By using an ele
ectrolytic cell,
c having
g low volta
age direct current
c electrodes ma
ade of
titanium
m and speccial coatings, sodium hypochlorit
h te is producced for the
e disinfectio
on of the ballast
b
water.
Neutrallization. Used
U only during
d de-b
ballasting, a dosing pump
p is providing a sodium
s bisulfate
solution
n to the ballast water for neutra
alizing the remaining
r free
f chlorin
ne (down to
o 0.1ppm) within
w
the trea
ated ballastt.
1
200 μm
m self clean
ning filter Cyc
clonic Sepa
arator Ellectrolysis Cell
The
e Treatmen
nt Process
2
e Advantage
The es:
High se
ediment rem
moval efficciency with stable operration.
No need
d for back-fflushing tim
me due to th
he special type
t of filtrration used..
Stable p
pressure/Sttable Flow even in extreme sedim
ment uptak
ke, without clogging risks.
No movving parts in
n any stage of the syste
em’s process.
Compac
ct Installattion with low
l footprint (i.e. 4.5
4 m2 for a
500m3/
/hr system)
Very lo
ow chlorine concentration prod
duced by an
a advance
ed
electro
olysis cell unit.
Low po
ower consu
umption due to the efffective ele
ectrolysis ce
ell
(i.e. appx 15 kW fo
or a 500 m3
3/hr unit)
High En
nergy Efficiency and stable operation even
n in very lo
ow
No need
d for chemiical storage
e and handliing.
Very sim
mple and Fu
ully Automated Opera
ation – idea
al for crew use.
No sparre parts, du
ue to prolon
nged lifetim
me of system
m compone
ents.
3
The
e Approval Status
duriing MEPC 63
3.
Insttallation Fe
eatures
4
The skid-moun
nted unit comprises of the tre
eatment sttage modu
ules (i.e. filter,
f cyclonic separrators,
ctrolysis cellls) as well as the neu
elec utralization unit, flow sensors, ch
hlorine senssors, tempe
erature swittches,
sodiium bisulfatte tank and
d can be pro
ovided pre-piped for easy
e installa
ation on boa
ard.
To reach
r the required Ba
allast Pump
p capacitie
es, sufficien
nt number of treatme
ent stage modules
m mu
ust be
installed, with each modu
ule (comprised of one
e cyclonic sseparator and one elec ell) being able to
ctrolysis ce
trea
at 100 m3/h
hr ballast water.
w
E
ERMA FIRST
T 500 m3/hr Ballast Water
W Treatm
ment unit – Typical Arrangemen
A nt
ERM
MA FIRST Ba
allast Water Treatmen
nt system can be supplied as such
h to serve capacities
c r
ranging from
m 100
500 m3/h, with
m3//hr up to 25 w higherr capacity configuratio
c ons also posssible.
ERM
MA FIRST, is a compacct and enerrgy efficien
nt system, having
h a re
elatively sm
mall footprin
nt, i.e. for a 500
m3/
/hr unit, the 5 m2 and e-cconsumptio
e footprint is appx 4.5 on at appx 15
1 kW.
5