Date 27-Apr-11 28-Apr-11 29-Apr-11

Shift A B C A B C A
Trip
UOM Safe value
Value
Min 0.61 0.61 0.62 0.61 0.61 0.62 0.61

Stage 1 Vibration Mils 1.2 Max 0.7 Max 0.67 0.67 0.65 0.67 0.66 0.65 0.67

Avg 0.63 0.63 0.62 0.65 0.62 0.62 0.62

Min 0.37 0.37 0.37 0.38 0.38 0.38 0.38

Stage 2 Vibration Mils 1.3 Max 0.7 Max 0.39 0.39 0.39 0.41 0.40 0.40 0.40

Avg 0.38 0.39 0.38 0.39 0.40 0.39 0.39

Min 0.44 0.44 0.44 0.44 0.45 0.44 0.43

Stage 3 Vibration Mils 1.5 Max 0.7 Max 0.46 0.46 0.45 0.47 0.48 0.45 0.56

Avg 0.45 0.46 0.44 0.46 0.47 0.45 0.46


Compressor 1

Oil pressure PSI 16 20-26 Avg 25.60 25.70 25.82 25.64 25.68 25.75 25.58
Max - 125
Oil Temperature Deg F 110-120 Avg 116.10 114.70 113.20 113.76 114.72 114.08 115.98
Min - 90
Stage 2 Temperature Deg F 125 Max 100 Avg 100.85 99.55 97.37 98.20 100.37 98.92 101.80

Dryer Inlet temperature Deg C NA Max 40 Avg 34.62 33.52 32.78 32.68 33.87 33.43 34.80

Start Date/Time of Comp Start @ 12:56 AM 20.04.11 Running Running Running Running Running Running Running

Stop Date/time Stop @ 11:11 PM 12.03.2011 NA NA NA NA NA NA NA

Trip Date/time TRIP @ 08:12 PM 19.04.11 NA NA NA NA NA NA NA

Primary filter Running hrs Hours NA Max 50 28 36 44 4 12 20 28

Secondary filter Running hrs Hours NA Max 2000 1024 1032 1040 1048 1056 1064 1072

Cooling water flow m3/hr 1250 Min 1300 Avg 1570 1570 1568 1573 1571.00 1573 1577

Cooling water Pressure Kg/cm2 2 Min 2.25 Avg 2.642 2.643 2.65 2.655 2.63 2.66 2.645

Due to power
Remarks
outage at CPP2

V ib r a tio n
Do not change compressor settings in CMC panel or ASC with out Utilities Incharge's permission .

Do not change Secondary filters in running condition .

- n - 1 - 1 0 1 1 1- 2 J1- 3 J1- u4 J1- u5 J1l- u-6 Jl- u-7 Jl- u- Jl- u- Jl u- l u- l - l -


0 .7 0
0 .5 5
0 .4 0
0 .2 5

1 11111111111111 1
0 .1 0

A B AC B C A B C A B C A B C A B C A B C A BC A BC A BC
-9 ulJ - 1ulJ - u1lJ - 1ulJ - 1lu - u1l - 1l - 1l - 1 1 1 1
V
0 .1 0
0 .2 5
0 .4 0
0 .5 5

2 2 7 2 8 3- 9 A-1 0 A-2 - p A-3 M- p A4r M- p 5-r M- pa 6 -r M- a 7-ry M- a 8-y M- a 9 y M- a1 y M- a1 y 0M-a1 y 1 -a1 y 2 -a 1 y 3 - 1 y 4 - 1 5 - 1 6 -1 7 -1 8 2- 9 2- 0 2- 1 2- 2 2- 3 2- 4 2- 5 2- 6 2- 7 2- 8 3- 9 3- 0 -1 1 -2 - -3 J- 4 J- u5 J- u6 nJ- u7 nJ- u8- nJ- u9- nJ- 1u- nJ- 1u- 0nJ 1u- 1n 1-u 2n J1- 3n J1- u4 J1- u5 J1n- u6 J1n- u-7 J1n- u-8 J2n- u-9 J2n- u-0 Jn-2 u-1 Jn-2 u-2 Jn-2 u-3 Jn2- u-4 nJ2- u-5 nJ2- -u6 nJ2- -u7 J2n- -u8 J3n- u-9 Jn- u-0 Jn- u- Jn- u- Jn u- n u- n - n - 1 - 1 0 1 1 1- 2 J1- 3 J1- u4 J1- u5 J1l- u-6 Jl- u-7 Jl- u-
1 2 -3 -4 J -5 J -6uJ -7uJ -8 luJ -9ulJ - 1ulJ - u1lJ - 1ulJ - u1l - u1l - 1l - 1l - 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 M 1 M Ma Ma y Ma y M-a y M1-a y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y 1-a 1y 1-a 1y 1- 1y 1- 1 1- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11111111111111 1
A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A CB A CB A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A CB A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A BC A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A BC A BC A BC A B C A B C A B C A B AC B C A B AC B C A B AC B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A BC
29-Apr-11 30-Apr-11 1-May-11 2-May-11 3-May-11 4-May-11

B C A B C A B C A B C A B C A

0.61 0.62 0.62

0.66 0.65 0.67

0.62 0.62

0.38 0.38 0.38

0.40 0.40 0.40

0.39 0.39

0.45 0.44 0.44

0.47 0.45 0.47

0.46 0.45

25.58 25.57

115.48 114.52

101.38 99.44

34.42 33.49

Running Running Running

NA NA NA

NA NA NA

36 44 4

1080 1088 1096

1576 1575 1575

2.647 2.660 2.65


V ib r a tio n

- n - 1 - 1 0 1 1 1- 2 J1- 3 J1- u4 J1- u5 J1l- u-6 Jl- u-7 Jl- u- Jl- u- Jl u- l u- l - l -

S g
a
t e 1 S a
t e
g 2 S a
t e
g 3

0 .7 0
0 .5 5
0 .4 0
0 .2 5
1 11111111111111 1

0 .1 0
A B AC B C A B C A B C A B C A B C A B C A BC A BC A BC
-9 ulJ - 1ulJ - u1lJ - 1ulJ - 1lu - u1l - 1l - 1l - 1 1 1 1
V
0 .1 0
0 .2 5
0 .4 0
0 .5 5

2 2 7 2 8 3- 9 A-1 0 A-2 - p A-3 M- p A4r M- p 5-r M- pa 6 -r M- a 7-ry M- a 8-y M- a 9 y M- a1 y M- a1 y 0M-a1 y 1 -a1 y 2 -a 1 y 3 - 1 y 4 - 1 5 - 1 6 -1 7 -1 8 2- 9 2- 0 2- 1 2- 2 2- 3 2- 4 2- 5 2- 6 2- 7 2- 8 3- 9 3- 0 -1 1 -2 - -3 J- 4 J- u5 J- u6 nJ- u7 nJ- u8- nJ- u9- nJ- 1u- nJ- 1u- 0nJ 1u- 1n 1-u 2n J1- 3n J1- u4 J1- u5 J1n- u6 J1n- u-7 J1n- u-8 J2n- u-9 J2n- u-0 Jn-2 u-1 Jn-2 u-2 Jn-2 u-3 Jn2- u-4 nJ2- u-5 nJ2- -u6 nJ2- -u7 J2n- -u8 J3n- u-9 Jn- u-0 Jn- u- Jn- u- Jn u- n u- n - n - 1 - 1 0 1 1 1- 2 J1- 3 J1- u4 J1- u5 J1l- u-6 Jl- u-7 Jl- u-
1 2 -3 -4 J -5 J -6uJ -7uJ -8 luJ -9ulJ - 1ulJ - u1lJ - 1ulJ - u1l - u1l - 1l - 1l - 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 M 1 M Ma Ma y Ma y M-a y M1-a y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y M1-a 1y 1-a 1y 1-a 1y 1- 1y 1- 1 1- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11111111111111 1
A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A CB A CB A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A CB A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A BC A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A BC A BC A BC A B C A B C A B C A B AC B C A B AC B C A B AC B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A BC
4-May-11 5-May-11 6-May-11 7-May-11 8-May-11 9-May-11

B C A B C A B C A B C A B C A

Com p 1 Vib ra tio n Tr e nd

Date
Date
9-May-11 10-May-11 11-May-11 12-May-11 13-May-11 14-May-11

B C A B C A B C A B C A B C A
14-May-11 15-May-11 16-May-11 17-May-11 18-May-11

B C A B C A B C A B C A B C
19-May-11 20-May-11 21-May-11 22-May-11 23-May-11

A B C A B C A B C A B C A B C
24-May-11 25-May-11 26-May-11 27-May-11 28-May-11

A B C A B C A B C A B C A B C
29-May-11 30-May-11 31-May-11 1-Jun-11 2-Jun-11

A B C A B C A B C A B C A B
2-Jun-11 3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11

C A B C A B C A B C A B C A B
7-Jun-11 8-Jun-11 9-Jun-11 10-Jun-11 11-Jun-11 12-Jun-11

C A B C A B C A B C A B C A B
12-Jun-11 13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11

C A B C A B C A B C A B C A B
216
227
17-Jun-11 18-Jun-11 19-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11

C A B C A B C A B C A B C A B
22-Jun-11 23-Jun-11 24-Jun-11 25-Jun-11 26-Jun-11 27-Jun-11

C A B C A B C A B C A B C A
27-Jun-11 28-Jun-11 29-Jun-11 30-Jun-11 1-Jul-11 2-Jul-11

B C A B C A B C A B C A B C A
2-Jul-11 3-Jul-11 4-Jul-11 5-Jul-11 6-Jul-11 7-Jul-11

B C A B C A B C A B C A B C A
7-Jul-11 8-Jul-11 9-Jul-11 10-Jul-11 11-Jul-11

B C A B C A B C A B C A B C
12-Jul-11 13-Jul-11 14-Jul-11 15-Jul-11 16-Jul-11

A B C A B C A B C A B C A B C
17-Jul-11 18-Jul-11

A B C A B C A

Running

NA

NA

28

1024
Date 27-Apr-11 28-Apr-11 29-Apr-11

Shift A B C A B C A
Safe
UOM Trip Value
value
Min 0.28 0.28 0.29 0.28 0.28 0.28 0.28

Stage 1 Vibration Mils 1.2 Max 0.7 Max 0.29 0.29 0.29 0.29 0.29 0.29 0.29

Avg 0.29 0.29 0.29 0.29 0.29 0.29 0.29

Min 0.25 0.25 0.27 0.25 0.28 0.28 0.29

Stage 2 Vibration Mils 1.3 Max 0.7 Max 0.28 0.28 0.29 0.28 0.30 0.30 0.32

Avg 0.27 0.27 0.27 0.27 0.29 0.29 0.29

Min 0.65 0.65 0.66 0.65 0.65 0.66 0.65

Stage 3 Vibration Mils 1.5 Max 0.7 Max 0.68 0.67 0.68 0.67 0.67 0.68 0.67

Avg 0.66 0.66 0.67 0.68 0.66 0.67 0.66


Compressor 2

Oil pressure PSI 16 20-26 Avg 22.40 22.33 22.67 22.34 22.30 22.48 22.08
Max - 125
Oil Temperature Deg F 110-120 Avg 114.90 113.78 112.90 113.28 114.12 113.30 114.80
Min - 90
Stage 2 Temperature Deg F 125 Max 100 Avg Not Visible Not Visible Not Visible Not Visible Not Visible Not Visible Not Visible

Dryer Inlet temperature Deg C NA Max 40 Avg 31.57 30.65 29.85 29.76 30.60 30.52 31.85

Start Date/Time of Comp Start @ 11:05 PM 19.04.11 Running Running Running Running Running Running Running

Stop Date/time Stop @ 02:19 PM 09.12.10 NA NA NA NA NA NA NA

Trip Date/time TRIP @ 08:12 PM 19.04.11 NA NA NA NA NA NA NA

Primary filter Running hrs Hours NA Max 50 4 12 20 28 36 44 4

Secondary filter Running hrs Hours NA Max 2000 530 538 546 554 562 570 578

Cooling water flow m3/hr 1250 Min 1300 Avg 1570 1570 1568 1573 1571.00 1573 1577

Cooling water Pressure Kg/cm2 2 Min 2.25 Avg 2.642 2.643 2.65 2.655 2.63 2.66 2.645

Due to power
Remarks outage at
CPP2

Do not change compressor settings in CMC panel or ASC with out Utilities Incharge's permission .
Do not change Secondary filters in running condition .

uC1-A8BnJuC1-A9BnJuC1-A BnJC1l-uA BnJC1l-AuBnJC01lAu-BJC1lAu-BC12lAu-B-C13lAu-B1C-4lAJB1C-5lAJB1C-6lA-JB1-Cu7 -J 1-u8 J 1-u J 1l-u J 1lu- J 1lu- J1lu- 1lu- 1lu- 1 l - 1l - 1 l- 1 - 1 1 1 1 1
0 . 0 0
0 .
0 0

2 2ABC2AB C73ABC8A1 BC92AB-C03AB-CA4 B-C5ABM-C6ABMC-A7 BMpC-8ABMpC-9ABMpaC-1ArBMpaC-1A rBMaC-1ArByMa0C1-A rByMa1C-A yBa12C-ABya-13CA By1a-4C AMyB1a-5C AMBy1-6CAM1By-7C2AM1yB-8C2AMa1B-9C2AMa1B-0C2AMa1B-C2AyMa1B-2C AyMa1B-3C2AyMa1B-4C2AyMa1B-5C2AyM1aB-6C2AyM1aB-7C3AyM1aB-8C31AyMaB-9C 1AyMaB-0C1Ay2MaB-1C A3y1MaB-C 1Ay4MaB-C1Ay5MaB-JC1yA6MaB-JC 1Ay7MaB-JC1uAy8aB-JC1uyA9aB-JC1uAyaB-JCn1uAyaB-JCn1uyAB-JC0n1uyAB-JC1nuAyB-C2n1uAB-C3n1uAB-C4n1AJB-C5n1AJB-C6n1AJBu-C721AJB-uC821AJB-uC92A1JBnu-C02A1JBn-uC12AJBn-uC2A1J-BnuC32A1JB-nCu421AJB-nuC521AJ-BnuC621AJB-nuC713AJB-nuC81AJB-nuC91A2JB-nuC01A3JB-nuC1-A4JBn-uC1A5J-BnuC1-A6JBnuC1-A7JBnuC1-A8BnJuC1-A9BnuJC1-ABnJC1l-AuBnJC1l-AuBnJC01lAu-BJC1lAu-BC12lAu-B-C13lAu-B1C-4lAJB1C-5lAJB1C-6lA-JB1-Cu7 -J 1-u8 J 1-u J 1l-u J 1lu- J 1lu-
29-Apr-11 30-Apr-11 1-May-11 2-May-11 3-May-11 4-May-11

B C A B C A B C A B C A B C A

0.28 0.28 0.28

0.29 0.29 0.29

0.29 0.29

0.29 0.30 0.29

0.32 0.32 0.34

0.29 0.31

0.65 0.66 0.65

0.68 0.68 0.67

0.66 0.67

22.20 22.50

114.35 113.50

Not Visible Not Visible

31.22 30.80

Running Running Running

NA NA NA

NA NA NA

12 20 28

586 594 602

1576 1575 1575

2.647 2.660 2.65


4-May-11 5-May-11 6-May-11 7-May-11 8-May-11 9-May-11

B C A B C A B C A B C A B C A

.
9-May-11 10-May-11 11-May-11 12-May-11 13-May-11 14-May-11

B C A B C A B C A B C A B C A

Com p# 2 V ibr a ti on Tr end


a
t
S g e 1 S a
t g 2
e S g
a
t e 3
Com p# 2 V ibr a ti on Tr end
a
t
S g e 1 S a
t g 2
e S g
a
t e 3
14-May-11 15-May-11 16-May-11 17-May-11 18-May-11 19-May-11

B C A B C A B C A B C A B C A

rati on Tr e nd
S a
t g 2
e a
t
S g e 3
rati on Tr e nd
S a
t g 2
e a
t
S g e 3
19-May-11 20-May-11 21-May-11 22-May-11 23-May-11 24-May-1

B C A B C A B C A B C A B C A
24-May-11 25-May-11 26-May-11 27-May-11 28-May-11 29-May-11

B C A B C A B C A B C A B C A
29-May-11 30-May-11 31-May-11 1-Jun-11 2-Jun-11 3-Jun-11

B C A B C A B C A B C A B C A
3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11 8-Jun-11

B C A B C A B C A B C A B C A
8-Jun-11 9-Jun-11 10-Jun-11 11-Jun-11 12-Jun-11 13-Jun-11

B C A B C A B C A B C A B C A
13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11 18-Jun-11

B C A B C A B C A B C A B C A
18-Jun-11 19-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11 23-Jun-11

B C A B C A B C A B C A B C A
23-Jun-11 24-Jun-11 25-Jun-11 26-Jun-11 27-Jun-11 28-Jun-11

B C A B C A B C A B C A B C A
28-Jun-11 29-Jun-11 30-Jun-11 1-Jul-11 2-Jul-11 3-Jul-11

B C A B C A B C A B C A B C A
3-Jul-11 4-Jul-11 5-Jul-11 6-Jul-11 7-Jul-11 8-Jul-11

B C A B C A B C A B C A B C A
8-Jul-11 9-Jul-11 10-Jul-11 11-Jul-11 12-Jul-11 13-Jul-11

B C A B C A B C A B C A B C A
13-Jul-11 14-Jul-11 15-Jul-11 16-Jul-11 17-Jul-11 18-Jul-11

B C A B C A B C A B C A B C A
18-Jul-11

B C
Date 27-Apr-11 28-Apr-11 29-Apr-11

Shift A B C A B C A
Safe
UOM Trip Value
value
Min 0.14 0.14 0.13 0.16 0.14 0.14 0.14

Stage 1 Vibration Mils 1.2 Max 0.7 Max 0.17 0.17 0.16 0.17 0.17 0.16 0.17

Avg 0.16 0.16 0.15 0.17 0.15 0.14 0.15

Min 0.13 0.13 0.13 0.13 0.13 0.13 0.13

Stage 2 Vibration Mils 1.3 Max 0.7 Max 0.14 0.14 0.13 0.14 0.14 0.14 0.14

Avg 0.13 0.13 0.13 0.13 0.14 0.13 0.14

Min 0.50 0.50 0.52 0.50 0.50 0.51 0.50

Stage 3 Vibration Mils 1.5 Max 0.7 Max 0.54 0.56 0.55 0.55 0.55 0.55 0.55

Avg 0.51 0.52 0.53 0.52 0.52 0.54 0.52


Compressor 3

Oil pressure PSI 16.00 20-26 Avg 30.60 30.80 31.10 30.76 30.67 30.85 30.53

Max - 125 Min


Oil Temperature Deg F 110-120 Avg 113.80 112.77 112.40 112.88 113.13 112.83 113.65
- 90

Stage 2 Temperature Deg F 125 Max 100 Avg 95.60 93.73 91.78 92.48 94.73 93.22 96.15

Dryer Inlet temperature Deg C NA Max 40 Avg 29.40 28.48 27.35 27.42 28.40 28.18 29.53

Start Date/Time of Comp Start @ 11:19 PM 19.04.11 Running Running Running Running Running Running Running

Stop Date/time Stop @ 03:40 PM 04.12.10 NA NA NA NA NA NA NA

Trip Date/time TRIP @ 08:12 PM 19.04.11 NA NA NA NA NA NA NA

Primary filter Running hrs Hours NA Max 50 4 12 20 28 36 44 4

Secondary filter Running hrs Hours NA Max 2000 484 492 500 508 516 524 532

Cooling water flow m3/hr 1250 Min 1300 Avg 1570 1570 1568 1573 1571.00 1573 1577

Cooling water Pressure Kg/cm2 2 Min 2.25 Avg 2.642 2.643 2.65 2.655 2.63 2.66 2.645

Due to
power
Remarks
outage at
CPP2

Do not change compressor settings in CMC panel or ASC with out Utilities Incharge's permission .

Do not change Secondary filters in running condition .


A vg . V ib ratio
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60

A
2 7 - A p r - 1B1
C
A
2 8 - A p r - 1B1
C
A
2 9 - A p r - 1B1
C
A
3 0 - A p r - 1B1
C
A
1 - M a y - 1B1
C
A
2 - M a y - 1B1
C
Sta g e 1 Vib ra tio n

A
3 - M a y - 1B1
C
A
4 - M a y - 1B1
C
A
5 - M a y - 1B1
C
A
S ta g e 2 Vib ra tion

6 - M a y - 1B1
C
A
7 - M a y - 1B1
C
A
8 - M a y - 1B1
C
A
Sta g e 3 V ibra tio n

9 - M a y - 1B1
29-Apr-11 30-Apr-11 1-May-11 2-May-11 3-May-11 4-May-11

B C A B C A B C A B C A B C A

0.14 0.14 0.14

0.17 0.17 0.17

0.15 0.15

0.13 0.13 0.13

0.14 0.14 0.14

0.14 0.14

0.51 0.52 0.51

0.56 0.56 0.57

0.53 0.53

30.75 31.04

113.18 112.72

96.15 94.08

29.13 28.42

Running Running Running

NA NA NA

NA NA NA

12 20 28

540 548 556

1576 1575 1575

2.647 2.660 2.65


C
A

S ta g e 2 Vib ra tion
6 - M a y - 1B1
C
A
7 - M a y - 1B1
C
A
8 - M a y - 1B1
C
A

Sta g e 3 V ibra tio n


9 - M a y - 1B1
C
A
1 0 - M a y - 1B1
C
A
1 1 - M a y - 1B1
C
A
1 2 - M a y - 1B1
C
A
1 3 - M a y - 1B1
C
A
1 4 - M a y - 1B1
C
A
1 5 - M a y - 1B1
C
A
1 6 - M a y - 1B1
C
A
1 7 - M a y - 1B1
C
A
1 8 - M a y - 1B1
C
A
1 9 - M a y - 1B1
C
A
2 0 - M a y - 1B1
C
A
2 1 - M a y - 1B1
C
A
2 2 - M a y - 1B1
C
A
2 3 - M a y - 1B1
C
A
2 4 - M a y - 1B1
C
A
2 5 - M a y - 1B1
C
A
2 6 - M a y - 1B1
C
A
2 7 - M a y - 1B1
C
A
2 8 - M a y - 1B1
C
A
2 9 - M a y - 1B1
C
A
3 0 - M a y - 1B1
C
A
3 1 - M a y - 1B1
C
A
1 - J u n - 1B1
C
A
2 - J u n - 1B1
C
A
3 - J u n - 1B1
C
A
4 - J u n - 1B1
C
A
5 - J u n - 1B1
C
Comp 3 Vibr

T
4-May-11 5-May-11 6-May-11 7-May-11 8-May-11 9-May-11

B C A B C A B C A B C A B C A
A
3 - J u n - 1B1
C
A
4 - J u n - 1B1
C
A
5 - J u n - 1B1
C
A
6 - J u n - 1B1
C
A
7 - J u n - 1B1

Time
C
A
8 - J u n - 1B1
C
A
9 - J u n - 1B1
C
mp 3 Vibration trend

A
1 0 - J u n - 1B1
C
A
1 1 - J u n - 1B1
C
A
1 2 -J u n -1B1
C
A
1 3 -J u n -1B1
C
A
1 4 -J u n -1B1
C
A
1 5 - J u n - 1B1
C
A
1 6 - J u n - 1B1
C
A
1 7 - J u n - 1B1
C
A
1 8 - J u n - 1B1
C
A
1 9 - J u n - 1B1
C
A
2 0 - J u n -1B1
C
A
2 1 - J u n -1B1
C
A
2 2 - J u n -1B1
C
A
2 3 - J u n - 1B1
C
A
2 4 - J u n - 1B1
C
A
2 5 - J u n - 1B1
C
A
2 6 - J u n - 1B1
C
A
2 7 - J u n - 1B1
C
A
2 8 - J u n - 1B1
C
A
2 9 - J u n - 1B1
C
A
3 0 - J u n - 1B1
C
A
1 - J u l- 1B1
C
A
2 - J u l- 1B1
C
A
3 - J u l- 1B1
C
A
9-May-11 10-May-11 11-May-11 12-May-11 13-May-11 14-May-1

B C A B C A B C A B C A B C A
1 - J u l- 1B1
C
A
2 - J u l- 1B1
C
A
3 - J u l- 1B1
C
A
4 - J u l- 1B1
C
A
5 - J u l- 1B1
C
A
6 - J u l- 1B1
C
A
7 - J u l- 1B1
C
A
8 - J u l- 1B1
C
A
9 - J u l- 1B1
C
A
1 0 -J u l- 1B1
C
A
1 1 - J u l- 1B1
C
A
1 2 - J u l- 1B1
C
A
1 3 - J u l- 1B1
C
A
1 4 - J u l- 1B1
C
A
1 5 - J u l- 1B1
C
A
1 6 - J u l- 1B1
C
A
1 7 -J u l- 1B1
C
14-May-11 15-May-11 16-May-11 17-May-11 18-May-11 19-May-1

B C A B C A B C A B C A B C A
19-May-11 20-May-11 21-May-11 22-May-11 23-May-11 24-May-1

B C A B C A B C A B C A B C A
24-May-11 25-May-11 26-May-11 27-May-11 28-May-11 29-May-1

B C A B C A B C A B C A B C A
29-May-11 30-May-11 31-May-11 1-Jun-11 2-Jun-11 3-Jun-1

B C A B C A B C A B C A B C A
3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11 8-Jun-11

B C A B C A B C A B C A B C A
8-Jun-11 9-Jun-11 10-Jun-11 11-Jun-11 12-Jun-11 13-Jun-11

B C A B C A B C A B C A B C A
13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11 18-Jun-11

B C A B C A B C A B C A B C A
18-Jun-11 19-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11 23-Jun-11

B C A B C A B C A B C A B C A
23-Jun-11 24-Jun-11 25-Jun-11 26-Jun-11 27-Jun-11 28-Jun-11

B C A B C A B C A B C A B C A
28-Jun-11 29-Jun-11 30-Jun-11 1-Jul-11 2-Jul-11 3-Jul-11

B C A B C A B C A B C A B C A
3-Jul-11 4-Jul-11 5-Jul-11 6-Jul-11 7-Jul-11 8-Jul-11

B C A B C A B C A B C A B C A
8-Jul-11 9-Jul-11 10-Jul-11 11-Jul-11 12-Jul-11

B C A B C A B C A B C A B C
13-Jul-11 14-Jul-11 15-Jul-11 16-Jul-11 17-Jul-11

A B C A B C A B C A B C A B C
18-Jul-11

A B C
Date 27-Apr-11 28-Apr-11 29-Apr-11

Shift A B C A B C A

UOM Trip Value Safe value

Min 0.38 0.38 0.38 0.38 0.39 0.38 0.38

Stage 1 Vibration Mils 1.2 Max 0.7 Max 0.41 0.41 0.41 0.41 0.41 0.41 0.41

Avg 0.39 0.40 0.40 0.39 0.40 0.40 0.390

Min 0.15 0.15 0.15 0.14 0.14 0.16 0.15

Stage 2 Vibration Mils 1.3 Max 0.7 Max 0.17 0.18 0.17 0.16 0.18 0.18 0.18

Avg 0.15 0.16 0.16 0.150 0.16 0.18 0.170

Min 0.27 0.27 0.27 0.27 0.26 0.26 0.27

Stage 3 Vibration Mils 1.5 Max 0.7 Max 0.28 0.28 0.29 0.29 0.29 0.28 0.29

Avg 0.28 0.28 0.28 0.28 0.28 0.27 0.270


Compressor 4

Oil pressure PSI 16 20-26 Avg 28.70 28.96 29.08 29 28.92 28.82 28.78

Max - 125
Oil Temperature Deg F 110-120 Avg 115.50 114.43 113.50 114.06 114.68 114.23 115.55
Min - 90

Stage 2 Temperature Deg F 125 Max 100 Avg 104.20 104.97 100.62 104.18 108.60 103.48 108.53

Dryer Inlet temperature Deg C NA Max 40 Avg 33.50 32.57 31.25 31.74 32.73 32.15 33.75

Start Date/Time of Comp Start @ 11:46 PM 19.04.11 Running Running Running Running Running Running Running

Stop Date/time Stopped @ 08:07 PM on 07.04.2011 NA NA NA NA NA NA NA

Trip Date/time TRIP @ 08:12 PM 19.04.11 NA NA NA NA NA NA NA

Primary filter Running hrs Hours NA Max 50 4 12 20 28 36 44 4

Secondary filter Running hrs Hours NA Max 2000 1240 1248 1256 1264 1272 1280 1288

Cooling water flow m3/hr 1250 Min 1300 Avg 1570 1570 1568 1573 1571.00 1573 1577

Cooling water Pressure Kg/cm2 2 Min 2.25 Avg 2.642 2.643 2.65 2.655 2.63 2.66 2.645

Remarks

Do not change compressor settings in CMC panel or ASC with out Utilities Incharge's permission .

Do not change Secondary filters in running condition .


A vg. V ibration
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80

A
27-Apr-11 B
C
A
28-Apr- 11B
C
Sta ge 1 Vib ra tio n

A
29 -Apr-11B
C
A
30-Apr- 11B
C
Sta ge 2 Vib ra tion

A
1-M ay -11B
C
A
2-M ay -11B
C
S ta g e 3 Vib ra tio n

A
3-M ay -11B
C
A
4-M ay -11B
1575

C
A
5-M ay -11B
C
A
2.6 6 0

6 -M ay -11B
C
A
29-Apr-11 30-Apr-11 1-May-11 2-May-11 3-May-11 4-May-11

B C A B C A B C A B C A B C A

0.38 0.39 0.38

0.41 0.41 0.40

0.400 0.40

0.15 0.15 0.15

0.18 0.18 0.18

0.170 0.17

0.27 0.27 0.28

0.31 0.29 0.29

0.280 0.28

28.82 29.04

115.20 114.24

110.15 105.66

33.40 32.64

Running Running Running

NA NA NA

NA NA NA

12 20 28

1296 1304 1312

1576 1575 1575

2.647 2.660 2.65


A
4-M ay -11B

15 7 5
C
A
5-M ay -11B
C
A 2 .6 60

6 -M ay -11B
C
A
7-M ay -11B
C
A
8 -M ay -11B
C
A
9-M ay -11B
C
A
1 0-M ay -11
B
C
A
11-M ay -11B
C
A
12-M ay -11B
C
A
13-M ay -11B
C
A
14-M ay -11B
C
A
15-M ay -11B
C
A
16-M ay -1B1
C
A
17-M ay -11B
C
A
18-M ay - 11
B
C
A
19-M ay -11B
C
A
20-M ay - 11
B
C
A
21-M ay -11B
C
A
22-M ay -11B
C
A
23-M ay -11B
C
A
24-M ay -11B
C
A
25-M ay -11B
C
A
26 -M ay -11
B
C
A
27-M ay -11B
C
A
28 -M ay -11
B
C
A
29-M ay -11B
C
A
30 -M ay -11
B
C
A
31-M ay -11B
C
A
1-J un-11B
C
A
2-J un-11B
C
Com
4-May-11 5-May-11 6-May-11 7-May-11 8-May-11

B C A B C A B C A B C A B C
31-M ay -11B
C
A
1-J un-11B
C
A
2-J un-11B
C
A
3-J un-11B
C
A
4-J un -11B
C
A
5-J un-11B
C
A
6-J un-11B
C
A
7-J un-11B

Time
C
A
8-J un-11B
C
A
Comp 4 Vibration trend

9-J un-11B
C
A
10-J un-11 B
C
A
11-J un-11 B
C
A
12-J un-11 B
C
A
13-J un-11 B
C
A
14-J un-11 B
C
A
15-J un-11 B
C
A
16-J un-11 B
C
A
17-J un-11 B
C
A
18-J un-11 B
C
A
19-J un-11 B
C
A
2 0-J un -11
B
C
A
21-J un-11 B
C
A
2 2-J u n-11
B
C
A
23-J un-11 B
C
A
24-J un-11 B
C
A
25-J un-11 B
C
A
26-J un-11 B
C
A
27-J un-1 B1
C
A
28-J un-11 B
C
A
29-J un-1 B1
C
A
9-May-11 10-May-11 11-May-11 12-May-11 13-May-11

A B C A B C A B C A B C A B C
A
26-J un-11 B
C
A
27-J un-1 B 1
C
A
28-J un-11 B
C
A
29-J un-1 B 1
C
A
30-J un-11 B
C
A
1-J ul-11B
C
A
2-J ul-11B
C
A
3-J ul-11B
C
A
4-J ul-11B
C
A
5-J ul-11B
C
A
6-J ul-11B
C
A
7-J ul-11B
C
A
8-J ul-11B
C
A
9-J ul-11B
C
A
10 -J ul- 11B
C
A
11-J ul-11B
C
A
12 -J ul- 11B
C
A
13-J ul-11B
C
A
14-J ul-11B
C
A
15-J ul-11B
C
A
16-J ul-11B
C
A
1 7-J u l-11B
C
14-May-11 15-May-11 16-May-11 17-May-11 18-May-11

A B C A B C A B C A B C A B C
19-May-11 20-May-11 21-May-11 22-May-11 23-May-11

A B C A B C A B C A B C A B C
24-May-11 25-May-11 26-May-11 27-May-11 28-May-11

A B C A B C A B C A B C A B C
29-May-11 30-May-11 31-May-11 1-Jun-11 2-Jun-11

A B C A B C A B C A B C A B C
3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11

A B C A B C A B C A B C A B C
8-Jun-11 9-Jun-11 10-Jun-11 11-Jun-11 12-Jun-11

A B C A B C A B C A B C A B C
192
216
231.5
120
351.5
13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11

A B C A B C A B C A B C A B C
18-Jun-11 19-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11

A B C A B C A B C A B C A B C
23-Jun-11 24-Jun-11 25-Jun-11 26-Jun-11 27-Jun-11

A B C A B C A B C A B C A B C
28-Jun-11 29-Jun-11 30-Jun-11 1-Jul-11 2-Jul-11

A B C A B C A B C A B C A B C
3-Jul-11 4-Jul-11 5-Jul-11 6-Jul-11 7-Jul-11

A B C A B C A B C A B C A B C
8-Jul-11 9-Jul-11 10-Jul-11 11-Jul-11 12-Jul-11

A B C A B C A B C A B C A B C
13-Jul-11 14-Jul-11 15-Jul-11 16-Jul-11 17-Jul-11

A B C A B C A B C A B C A B C
18-Jul-11

A B C
Date 27-Apr-11 28-Apr-11 29-Apr-11

Shift A B C A B C A

Trip
UOM Safe value
Value
Min 0.68 0.68 0.68 0.68 0.68 0.68 0.68

Stage 1 Vibration Mils 1.2 Max 0.7 Max 0.70 0.69 0.69 0.69 0.69 0.69 0.69

Avg 0.69 0.69 0.69 0.69 0.68 0.68 0.68

Min 0.57 0.58 0.58 0.57 0.57 0.57 0.57

Stage 2 Vibration Mils 1.3 Max 0.7 Max 0.59 0.60 0.60 0.59 0.59 0.58 0.58

Avg 0.58 0.58 0.59 0.58 0.58 0.57 0.57

Min 0.20 0.20 0.20 0.19 0.19 0.18 0.19

Stage 3 Vibration Mils 1.5 Max 0.7 Max 0.21 0.21 0.21 0.21 0.22 0.21 0.21

Avg 0.21 0.21 0.20 0.20 0.21 0.20 0.21


Compressor 5

Oil pressure PSI 16 20-26 Avg 25.10 25.23 25.27 25.30 25.15 25.20 25.12

Max - 125
Oil Temperature Deg F 110-120 Avg 116.80 115.08 114.28 114.86 115.48 114.78 116.35
Min - 90

Stage 2 Temperature Deg F 125 Max 100 Avg 102.40 100.45 96.27 99.90 99.08 98.58 104.07

Dryer Inlet temperature Deg C NA Max 40 Avg 32.70 31.60 30.58 30.96 31.60 31.23 32.77

Start Date/Time of Comp Started @ 08:05 pm on dated 06.02.2011 Running Running Running Running Running Running Running

Stop Date/time Stopped @ 10:30 pm on dated 03.02.2011 NA NA NA NA NA NA NA

Trip Date/time TRIP @ 08:12 PM 19.04.11 NA NA NA NA NA NA NA

Primary filter Running hrs Hours NA Max 50 28 36 44 4 12 20 28

Secondary filter Running hrs Hours NA Max 2000 509 517 525 533 541 549 557

Cooling water flow m3/hr 1250 Min 1300 Avg 1570 1570 1568 1573 1571.00 1573 1577

Cooling water Pressure Kg/cm2 2 Min 2.25 Avg 2.642 2.643 2.65 2.655 2.63 2.66 2.645

Due to power
Remarks
outage at CPP2

Do not change compressor settings in CMC panel or ASC with out Utilities Incharge's permission .

Do not change Secondary filters in running condition .


29-Apr-11 30-Apr-11 1-May-11 2-May-11 3-May-11 4-May-

B C A B C A B C A B C A B C A

0.68 0.68 0.68

0.69 0.69 0.69

0.68 0.68

0.57 0.57 0.57

0.59 0.59 0.59

0.58 0.58

0.20 0.20 0.21

0.22 0.22 0.22

0.21 0.21

25.15 25.02

115.93 114.94

105.62 101.30

32.43 31.78

Running Running Running

NA NA NA

NA NA NA

36 44 4

565 573 581

1576 1575 1575

2.647 2.660 2.65


Avg. Vibration
0.75
0.70
0.65
0.60
0.55
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A
4/27/11 4/28/11 4/29/11 4/30/11 5/1/11 5/2/11 5/3/11 5/4/11 5/5/11 5/6/11 5/7/11 5/8/11 5/9/11 5/1
4-May-11 5-May-11 6-May-11 7-May-11 8-May-11 9-May-

B C A B C A B C A B C A B C A
C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B
11 5/8/11 5/9/11 5/10/11 5/11/11 5/12/11 5/13/11 5/14/11 5/15/11 5/16/11 5/17/11 5/18/11 5/19/11 5/20/11 5/21/11 5/22/11 5/23/11 5/24/11 5/25/11 5/26/11 5/27/11 5/28/11 5/29/11 5/30/11 5/31/11 6/1/11 6/2/11 6/3/11 6/4/1
9-May-11 10-May-11 11-May-11 12-May-11 13-May-11 14-May-

B C A B C A B C A B C A B C A
A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C
Time
6/2/11 6/3/11 6/4/11 6/5/11 6/6/11 6/7/11 6/8/11 6/9/11 6/10/11 6/11/11 6/12/11 6/13/11 6/14/11 6/15/11 6/16/11 6/17/11 6/18/11 6/19/11 6/20/11 6/21/11 6/22/11 6/23/11 6/24/11 6/25/11 6/26/11 6/27/11 6/28/11 6/29/11
14-May-11 15-May-11 16-May-11 17-May-11 18-May-11 19-May-

B C A B C A B C A B C A B C A
Sta ge 1 V ib ra tio n Sta g e 2 Vib ra tio n Sta g e 3 Vib ra tio n

Comp # 5 Vibration Trend

B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C
27/11 6/28/11 6/29/11 6/30/11 7/1/11 7/2/11 7/3/11 7/4/11 7/5/11 7/6/11 7/7/11 7/8/11 7/9/11 7/10/11 7/11/11 7/12/11 7/13/11 7/14/11 7/15/11 7/16/11 7/17/11 7/18/11
19-May-11 20-May-11 21-May-11 22-May-11 23-May-11

B C A B C A B C A B C A B C
24-May-11 25-May-11 26-May-11 27-May-11 28-May-11

A B C A B C A B C A B C A B C
29-May-11 30-May-11 31-May-11 1-Jun-11 2-Jun-11

A B C A B C A B C A B C A B C
3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11

A B C A B C A B C A B C A B C
8-Jun-11 9-Jun-11 10-Jun-11 11-Jun-11 12-Jun-11

A B C A B C A B C A B C A B C
13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11

A B C A B C A B C A B C A B C
18-Jun-11 19-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11

A B C A B C A B C A B C A B C
23-Jun-11 24-Jun-11 25-Jun-11 26-Jun-11 27-Jun-11

A B C A B C A B C A B C A B C
28-Jun-11 29-Jun-11 30-Jun-11 1-Jul-11 2-Jul-11

A B C A B C A B C A B C A B C
3-Jul-11 4-Jul-11 5-Jul-11 6-Jul-11 7-Jul-11

A B C A B C A B C A B C A B C
8-Jul-11 9-Jul-11 10-Jul-11 11-Jul-11 12-Jul-11

A B C A B C A B C A B C A B
12-Jul-11 13-Jul-11 14-Jul-11 15-Jul-11 16-Jul-11 17-Jul-11

C A B C A B C A B C A B C A
17-Jul-11 18-Jul-11

B C A B C
Date 27-Apr-11 28-Apr-11 29-Apr-11

Shift A B C A B C A
Safe
UOM Trip Value
value
Min 0.45 0.46 0.48 0.46 0.47 0.47 0.45

Stage 1 Vibration Mils 1.2 Max 0.7 Max 0.49 0.49 0.49 0.48 0.48 0.49 0.48

Avg 0.48 0.48 0.48 0.47 0.47 0.48 0.47

Min 0.42 0.43 0.43 0.42 0.42 0.43 0.42

Stage 2 Vibration Mils 1.3 Max 0.7 Max 0.44 0.45 0.46 0.44 0.45 0.45 0.45

Avg 0.44 0.44 0.44 0.43 0.43 0.43 0.43

Min 0.33 0.33 0.33 0.33 0.34 0.33 0.33

Stage 3 Vibration Mils 1.5 Max 0.7 Max 0.37 0.36 0.36 0.36 0.37 0.36 0.37
Compressor 6

Avg 0.34 0.35 0.34 0.35 0.35 0.34 0.35

Oil pressure PSI 16 20-26 Avg 26.20 26.40 26.67 26.52 26.15 26.37 26.18

Max - 125
Oil Temperature Deg F 110-120 Avg 114.80 113.65 112.97 113.38 113.73 113.63 114.65
Min - 90

Stage 2 Temperature Deg F 125 Max 100 Avg 95.90 94.83 92.03 93.74 96.07 94.57 97.23

Dryer Inlet temperature Deg C NA Max 40 Avg 30.80 29.30 28.48 28.50 29.45 29.22 30.52

Start Date/Time of Comp Start @ 11:11 PM 19.04.11 Running Running Running Running Running Running Running

Stop Date/time Stop @ 7:20 PM 11.12.10 NA NA NA NA NA NA NA

Trip Date/time TRIP @ 08:12 PM 19.04.11 NA NA NA NA NA NA NA

Primary filter Running hrs Hours NA Max 50 28 36 44 4 12 20 28

Secondary filter Running hrs Hours NA Max 2000 218 226 234 242 250 258 266

Cooling water flow m3/hr 1250 Min 1300 Avg 1570 1570 1568 1573 1571.00 1573 1577

Cooling water Pressure Kg/cm2 2 Min 2.25 Avg 2.642 2.643 2.65 2.655 2.63 2.66 2.645

Due to power
Remarks outage at
CPP2

Do not change compressor settings in CMC panel or ASC with out Utilities Incharge's permission .

Do not change Secondary filters in running condition .


29-Apr-11 30-Apr-11 1-May-11 2-May-11 3-May-11 4-May-1
B C A B C A B C A B C A B C A

0.46 0.46 0.46

0.48 0.48 0.48

0.47 0.47

0.41 0.42 0.42

0.45 0.45 0.44

0.43 0.43

0.34 0.34 0.34

0.47 0.36 0.36

0.35 0.35

26.03 26.34

114.23 113.60

97.60 95.06

30.32 29.44

Running Running Running

NA NA NA

NA NA NA

36 44 4

274 282 290

1576 1575 1575

2.647 2.660 2.65


A v g . v ib r a t io
0.60

Comp 6 Vibration trend


0.55

0.50

0.45

0.40

0.35

0.30

0.25

0.20

0.15

0.10

0.05

0.00
A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B
28-Apr-11 30-Apr-11 2-May-11 4-May-11 6-May-11 8-May-11 10-May-11 12-May-11 14-May-11 16-May-11 18-Ma
4-May-11 5-May-11 6-May-11 7-May-11 8-May-11 9-May-11
B C A B C A B C A B C A B C A
Time
A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A
6-May-11 18-May-11 20-May-11 22-May-11 24-May-11 26-May-11 28-May-11 30-May-11 1-Jun-11 3-Jun-11 5-Jun-11 7-Jun-11 9-Jun-11
9-May-11 10-May-11 11-May-11 12-May-11 13-May-11 14-May-11
B C A B C A B C A B C A B C A
me
B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B
n-11 9-Jun-11 11-Jun-11 13-Jun-11 15-Jun-11 17-Jun-11 19-Jun-11 21-Jun-11 23-Jun-11 25-Jun-11 27-Jun-11 29-Jun-11 1-Jul-11
14-May-11 15-May-11 16-May-11 17-May-11 18-May-11
B C A B C A B C A B C A B C
Sta ge 1 V ib ra tio n S ta g e 2 Vib ra tio n Sta ge 3 V ib ra tio n

A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C A B C
1 1-Jul-11 3-Jul-11 5-Jul-11 7-Jul-11 9-Jul-11 11-Jul-11 13-Jul-11 15-Jul-11 17-Jul-11
19-May-11 20-May-11 21-May-11 22-May-11 23-May-11
A B C A B C A B C A B C A B C
24-May-11 25-May-11 26-May-11 27-May-11 28-May-11
A B C A B C A B C A B C A B C
29-May-11 30-May-11 31-May-11 1-Jun-11 2-Jun-11
A B C A B C A B C A B C A B C
3-Jun-11 4-Jun-11 5-Jun-11 6-Jun-11 7-Jun-11
A B C A B C A B C A B C A B C
8-Jun-11 9-Jun-11 10-Jun-11 11-Jun-11 12-Jun-11
A B C A B C A B C A B C A B C
13-Jun-11 14-Jun-11 15-Jun-11 16-Jun-11 17-Jun-11
A B C A B C A B C A B C A B C
18-Jun-11 19-Jun-11 20-Jun-11 21-Jun-11 22-Jun-11
A B C A B C A B C A B C A B C
23-Jun-11 24-Jun-11 25-Jun-11 26-Jun-11 27-Jun-11
A B C A B C A B C A B C A B C
28-Jun-11 29-Jun-11 30-Jun-11 1-Jul-11 2-Jul-11
A B C A B C A B C A B C A B C
3-Jul-11 4-Jul-11 5-Jul-11 6-Jul-11 7-Jul-11
A B C A B C A B C A B C A B C
8-Jul-11 9-Jul-11 10-Jul-11 11-Jul-11 12-Jul-11
A B C A B C A B C A B C A B C
13-Jul-11 14-Jul-11 15-Jul-11 16-Jul-11 17-Jul-11
A B C A B C A B C A B C A B C
18-Jul-11
A B C
Compressor # 1 Maintenance Sheet
Freqency of
Maintenance or 2nd 3rd 7th 8th
S. No. Replacement Last Change 1st Change Change Change 4th Change 5th Change 6th Change Change Change

1 Secondary filters 3 Months 22/06/10 14/11/08 10/10/09 07/12/10 27/03/10 22/06/10 25/09/2010 22/10/10 4/11/2010

2 Inlet Valve 3 Months 07/12/10 17/11/09 07/12/10 13/03/11

3 Bypass Valve 3 Months 27/03/10 03/07/09 17/11/09 01/12/09 25/12/09 13/01/10 19/01/10 2/3/2010 27/3/10

4 Motor Coupling Alignment 3 Months 24/06/10 04/09/08 22/02/09 01/05/09 19/10/09 31/03/10 24/06/10 5/8/2010 24/12/10

5 MOP, Spider Alignment 3 Months 23/06/10 04/09/08 22/02/09 01/05/09 19/10/09 31/03/10 23/06/10 24/12/10
Vibration Probe, Transmitter & Cable
6 #1 3 Months 23/6/2010 18/11/09 07/01/10 02/03/10 01/04/10 23/6/2010 5/8/2010 23/12/10 14/03/11
Vibration Probe, Transmitter & Cable
7 #2 3 Months 23/6/2010 18/11/09 07/01/10 04/03/10 01/04/10 23/6/2010 5/8/2010 23/12/10 14/03/11
Vibration Probe, Transmitter & Cable
8 #3 3 Months 23/6/2010 16/10/09 18/11/09 07/01/10 02/03/10 01/04/10 23/6/2010 23/12/10 14/03/11
9 FRL & INSTRUMENT LINE 3 Months 26/3/10 08/01/10 19/1/2010 02/03/10 26/3/10 22/06/10 29/7/10 22.10.10 23/12/10

10 Thermostate valve checking 3 Months

11 Oil Top up 3 Months 14/03/2011

12 Motor Bearing Greasing 3 Months

13 Clean/Replace Mist Arrestor Element 3 Months

14 Intercooler # 1 6 Months 6/8/2010

15 Intercooler # 2 6 Months 6/8/2010

16 Aftercooler 6 Months 6/8/2010

17 Stage # 1 Impeller and diffuser 6 Months 26/06/09 26/06/09 6/8/2010

18 Stage # 2 Impeller and diffuser 6 Months

19 Stage # 3 Impeller and diffuser 6 Months 26/06/09 26/06/09


20 Oil Cooler 6 Months 23/06/10 26/06/09 18/11/09 23/06/10

21 Motor Insulation checking 6 Months

22 Oil NRV cleaning 6 Months


Change over Duplex Filter
23 6 Months 15/03/2011

24 Motor end cover cleaning 6 Months 14/03/2011

25 Servo Oil 32 1 Year 03/05/10 16/10/08 02/04/09 18/11/09 03/05/10 28/07/10

26 Sump filters 1 Year 18/11/09 16/10/08 18/11/09 28/07/10

27 Duplex filters 1 Year 18/11/09 16/10/08 18/11/09 28/07/10

28 FRL FILTER ELEMENT CHANGE 1 Year

29 Dryer Back Flushing 3 Months 23/12/10 13/03/11


Dryer spare change +
30 Maintenance NA
Compressor # 2 Maintenance Sheet
Freqency of
Maintenance or
S. No. Replacement Last Change 1st Change 2nd Change 3rd Change 4th Change 5th Change 6th Change 7th Change

1 Secondary filters 3 Months 20/04/10 11/11/08 03/03/09 14/11/09 13/01/10 20/04/10 9/7/2010 27/09/2010

2 Inlet Valve 3 Months 22/01/10 02/11/09 22/01/10 10/5/2010

3 Bypass Valve 3 Months 01/11/09 01/11/09 9/5/2010

4 Motor Coupling Alignment 3 Months 27/01/10 06/06/08 03/06/09 02/11/09 27/01/10 1/10/2010 10/12/2010

5 MOP, Spider Alignment 3 Months 02/11/09 06/06/08 03/06/09 02/11/09 1/10/2010 10/12/2010
Vibration Probe, Transmitter & Cable
6 #1 3 Months 11/05/10 01/06/09 11/11/09 02/02/10 11/05/10 1/10/2010
Vibration Probe, Transmitter & Cable
7 #2 3 Months 11/05/10 01/06/09 11/11/09 02/02/10 11/05/10 1/10/2010
Vibration Probe, Transmitter & Cable
8 #3 3 Months 11/05/10 01/06/09 11/11/09 02/02/10 11/05/10 1/10/2010

9 FRL & INSTRUMENT LINE 3 Months 22/01/10 13/01/10 22/01/10 10/05/10 9/7/2010 28/09/10 10/12/2010

10 Thermostate valve checking 3 Months

11 Oil Top up 3 Months

12 Motor Bearing Greasing 3 Months

13 Clean/Replace Mist Arrestor Element 3 Months

14 Intercooler # 1 6 Months 05/02/10 04/03/08 02/02/10 05/02/10 01/10/10

15 Intercooler # 2 6 Months 10/05/10 04/03/08 22/01/10 05/02/10 10/05/10 30/09/10

16 Aftercooler 6 Months 31/3/10 04/03/08 23/01/10 31/3/10 30/09/10

17 Stage # 1 Impeller and diffuser 6 Months

18 Stage # 2 Impeller and diffuser 6 Months

19 Stage # 3 Impeller and diffuser 6 Months 30/09/10

20 Oil Cooler 6 Months 04/11/09 16/09/08 04/11/09 29/09/2010

21 Motor Insulation checking 6 Months


22 Oil NRV cleaning 6 Months

23 Change over Duplex Filter 6 Months

24 Motor end cover cleaning 6 Months

25 Servo Oil 32 1 Year 14/11/09 04/12/08 30/05/09 14/11/09 28/09/10

26 Sump filters 1 Year 04/11/09 04/12/08 04/11/09 28/09/10

27 Duplex filters 1 Year 04/11/09 04/12/08 04/11/09 28/09/10

28 FRL FILTER ELEMENT CHANGE 1 Year

29 Dryer Back Flushing 3 Months 10/12/2010


Dryer spare change +
30 Maintenance NA 9/12/2010 14.01.11
Compressor # 3 Maintenance Sheet
Freqency of
Maintenance or 2nd 3rd 7th
S. No. Replacement Last Change 1st Change Change Change 4th Change 5th Change 6th Change Change

1 Secondary filters 3 Months 13/03/10 29/12/09 13/3/10 25/05/10 25/08/2010 4/12/2010 25/01/11

2 Inlet Valve 3 Months 12/05/10 12/05/10 8/12/2010 25/01/11

3 Bypass Valve 3 Months 12/05/10 13/4/10 12/05/10 8/12/2010 25/01/11

4 Motor Coupling Alignment 3 Months 14/05/10 15/10/09 15/04/10 13/5/10 14/05/10 30/08/10 6/12/2010

5 MOP, Spider Alignment 3 Months 14/05/10 15/10/09 22/10/09 14/03/10 14/05/10 30/08/10 6/12/2010
Vibration Probe, Transmitter & Cable
6 #1 3 Months 19/7/10 05/02/10 15/2/10 13/3/10 12/05/10 26/05/10 19-Jul-10 31/08/10
Vibration Probe, Transmitter & Cable
7 #2 3 Months 19/7/10 05/02/10 15/2/10 13/3/10 12/05/10 26/05/10 19-Jul-10 31/08/10
Vibration Probe, Transmitter & Cable
8 #3 3 Months 19/7/10 05/02/10 15/2/10 13/3/10 12/05/10 26/05/10 19-Jul-10 4/12/2010

9 FRL & INSTRUMENT LINE 3 Months 19/7/10 5/2/2010 13/03/10 21/4/10 12/5/10 26/05/10 19-Jul-10 26-Aug-10

10 Thermostate valve checking 3 Months

11 Oil Top up 3 Months

12 Motor Bearing Greasing 3 Months

13 Clean/Replace Mist Arrestor Element 3 Months

14 Intercooler # 1 6 Months 15/2/10 01/10/09 04/02/10 15/02/10 12/05/10 7/12/2010

15 Intercooler # 2 6 Months 16/02/10 10/10/09 30/12/09 16/02/10 27/05/10 27/08/10

16 Aftercooler 6 Months 31/12/09 31/12/09

17 Stage # 1 Impeller and diffuser 6 Months 02/10/09 16/12/08 02/10/09

18 Stage # 2 Impeller and diffuser 6 Months 06/10/09 15/12/08 01/10/09 06/10/09

19 Stage # 3 Impeller and diffuser 6 Months 05/10/09 11/12/08 05/10/09

20 Oil Cooler 6 Months

21 Motor Insulation checking 6 Months


22 Oil NRV cleaning 6 Months
Change over Duplex Filter
23 6 Months

24 Motor end cover cleaning 6 Months


Compressor # 4 Maintenance Sheet
Freqency of
Maintenance or 2nd 3rd 9th
S. No. Replacement Last Change 1st Change Change Change 4th Change 5th Change 6th Change 7th Change 8th Change Change

1 Secondary filters 3 Months 06/06/10 05/03/10 6/6/2010 21/09/2010 20/10/10 30/11/10 21/01/11 28/02/11

2 Inlet Valve 3 Months 09/05/10 05/03/10 22/03/10 9/5/2010 21/01/11 28/02/11 8/4/2011

3 Bypass Valve 3 Months 22/03/10 05/03/10 22/03/10 22-Oct-10 30/11/10 21/01/11 28/02/11 8/4/2011

4 Motor Coupling Alignment 3 Months 11/07/10 15/10/09 5/3/2010 1/7/2010 11/7/2010 12/7/2010 4/12/2010 24/01/11 1/3/2011

5 MOP, Spider Alignment 3 Months 11/07/10 15/10/09 05/03/10 11/06/10 12/06/10 1/7/2010 11/7/2010 12/7/2010 4/12/2010
Vibration Probe, Transmitter & Cable
6 #1 3 Months 10/06/10 05/03/10 23/3/10 03/06/10 10/06/10 2/7/2010 19-Oct-10 30/11/10
Vibration Probe, Transmitter & Cable
7 #2 3 Months 10/06/10 05/03/10 23/3/10 03/06/10 10/06/10 2/7/2010 19-Oct-10 30/11/10
Vibration Probe, Transmitter & Cable
8 #3 3 Months 10/06/10 05/03/10 23/3/10 03/06/10 10/06/10 2/7/2010 11/7/2010 19-Oct-10

9 FRL & INSTRUMENT LINE 3 Months 10/06/10 02/03/10 09/05/10 29/05/10 10/06/10 2/7/2010 18-Oct-10 22/10/2010

10 Thermostate valve checking 3 Months

11 Oil Top up 3 Months 28/02/11 27/03/11

12 Motor Bearing Greasing 3 Months

13 Clean/Replace Mist Arrestor Element 3 Months

14 Intercooler # 1 6 Months 03/03/10 03/10/09 03/03/10 2/7/2010 27/03/11

15 Intercooler # 2 6 Months 01/07/10 02/03/10 02/06/10 1/7/2010 7-Oct-10 27/03/11 8/4/2011

16 Aftercooler 6 Months 02/03/10 02/03/10 8-Oct-10 24/01/11

17 Stage # 1 Impeller and diffuser 6 Months 03/03/10 27/10/09 03/03/10 11-Oct-10

18 Stage # 2 Impeller and diffuser 6 Months 23/03/10 27/10/09 27/10/09 03/03/10 23/3/10 27/03/11

19 Stage # 3 Impeller and diffuser 6 Months 03/03/10 14/10/09 03/03/10 10-Apr-10 13/10/10

20 Oil Cooler 6 Months

21 Motor Insulation checking 6 Months


22 Oil NRV cleaning 6 Months 8/4/2011
Change over Duplex Filter
23 6 Months 1/3/2011

24 Motor end cover cleaning 6 Months 27/03/11

25 Servo Oil 32 1 Year 29/05/10 13/10/09 04/03/10 09/05/10 29/05/10 1/7/2010 21/10/2010

26 Sump filters 1 Year 03/03/10 03/03/10 21/10/2010

27 Duplex filters 1 Year 03/03/10 03/03/10 11/06/10 24/01/11 21/10/2010

28 FRL FILTER ELEMENT CHANGE 1 Year

29 Dryer Back Flushing 3 Months 20/11/10 22/01/11 28/02/11 27/03/11


Dryer spare change +
30 Maintenance NA 18/12/10 20/01/11 22/01/11
12th 13th 14th
10th Change 11th Change Change Change Change

27/03/11

24/01/11 1/3/2011 27/03/11 8/4/2011

28/02/11 27/03/11 8/4/2011

28/02/11 27/03/11 8/4/2011

30/11/10 28/02/11 27/03/11 8/4/2011 9/4/2011

30./11/10 21/01/11 28/02/11 27/03/11


Compressor # 5 Maintenance Sheet
Freqency of
Maintenance or 2nd 3rd
S. No. Replacement Last Change 1st Change Change Change 4th Change 5th Change 6th Change 7th Change

1 Secondary filters 3 Months 15/05/10 25/10/09 17/02/10 15/05/10 24/08/10 24/10/10 26/11/10 12.01.2011

2 Inlet Valve 3 Months 05/12/09 16/11/09 05/12/09 12/08/10 24/10/10

3 Bypass Valve 3 Months 19/02/10 16/11/09, 05/12/09 27/12/09 19/02/10 12/08/10 13/11/10 5/2/2011

4 Motor Coupling Alignment 3 Months 08/05/10 25/10/09 20/02/10 08/05/10 07/08/10 08/08/10 20/09/10 22/9/2010

5 MOP, Spider Alignment 3 Months 08/05/10 25/10/09 19/02/10 08/05/10 07/08/10 08/08/10 20/09/10 22/09/10

6 Vibration Probe, Transmitter & Cable # 1 3 Months 08/05/10 27/10/09 16/11/09 07/12/09 19/02/10 05/05/10 8/5/2010 09/08/10

7 Vibration Probe, Transmitter & Cable # 2 3 Months 05/05/10 27/10/09 16/11/09 07/12/09 19/02/10 05/05/10 09/08/10

8 Vibration Probe, Transmitter & Cable # 3 3 Months 05/05/10 27/10/09 16/11/09 07/12/09 19/02/10 05/05/10 09/08/10

9 FRL & INSTRUMENT LINE 3 Months 05/05/10 07/12/09 18/01/2010 19/02/2010 08/04/10 05/05/10 7/8/2010 30/10/10

10 Thermostate valve checking 3 Months

11 Oil Top up 3 Months 5/2/2011


12 Motor Bearing Greasing 3 Months

13 Clean/Replace Mist Arrestor Element 3 Months

14 Intercooler # 1 6 Months 07/05/10 25/12/09 18/02/10 07/05/10 10/08/10 24/11/10 20/04/11

15 Intercooler # 2 6 Months 07/05/10 24/12/09 18/02/10 07/05/10 09/08/10 23/09/10 25/10/10 26/10/10

16 Aftercooler 6 Months 06/04/10 24/12/09 06/04/10 21/08/2010 24/09/10

17 Stage # 1 Impeller and diffuser 6 Months 19/09/10

18 Stage # 2 Impeller and diffuser 6 Months 22/09/10 04/02/11

19 Stage # 3 Impeller and diffuser 6 Months 25/12/09 25/12/09 19/09/10 27/10/2010 30/10/10 02/11/10 25.11.10

20 Oil Cooler 6 Months 07/08/10


21 Motor Insulation checking 6 Months

22 Oil NRV cleaning 6 Months

23 Change over Duplex Filter 6 Months 5/2/2011

24 Motor end cover cleaning 6 Months 5/2/2011

25 Servo Oil 32 1 Year 07/08/10

26 Sump filters 1 Year 07/08/10

27 Duplex filters 1 Year 07/08/10

28 FRL FILTER ELEMENT CHANGE 1 Year

29 Dryer Back Flushing 1 Year 11/8/2010 30/10/10 13.01.10 5/2/2011


30 Dryer spare change + Maintenance 1 Year 13/11/10 9/12/2010 20/01/11 2/2/2011 23/02/11 24/02/11
8th Change

5/4/2011

25.11.10

25.11.11

20/09/10

20/09/10

20/09/10

26/11/10

2/11/2010
25/02/11
Compressor # 6 Maintenance Sheet
Freqency of
Maintenance or 2nd 3rd
S. No. Replacement Last Change 1st Change Change Change 4th Change 5th Change 6th Change
1 Secondary filters 3 Months 14/06/10 12/12/08 19/10/10 22/03/10 14/06/10 13/09/10 12/12/2010
2 Inlet Valve 3 Months 27/04/10 27/04/09 10/4/2010 27/04/10 14/06/10
3 Bypass Valve 3 Months 10/04/10 26/3/10 10/4/2010 14/06/10
4 Motor Coupling Alignment 3 Months 21/06/10 18/10/08 18/09/09 22/03/10 21/06/10 13/12/10
5 MOP, Spider Alignment 3 Months 21/06/10 22/03/10 14/06/10 21/06/10 13/12/10
Vibration Probe, Transmitter & Cable
6 #1 3 Months 10/04/10 16/02/09 23/03/10 10/4/2010 14/06/10
Vibration Probe, Transmitter & Cable
7 #2 3 Months 10/04/10 16/02/09 23/03/10 10/4/2010 14/06/10
Vibration Probe, Transmitter & Cable
8 #3 3 Months 10/04/10 16/02/09 23/03/10 10/4/2010 14/06/10

9 FRL & INSTRUMENT LINE 3 Months 22/03/10 22/3/10 15/6/10 14/09/10

10 Thermostate valve checking 3 Months

11 Oil Top up 3 Months

12 Motor Bearing Greasing 3 Months

13 Clean/Replace Mist Arrestor Element 3 Months

14 Intercooler # 1 6 Months 24/03/10 21/10/09 24/03/10

15 Intercooler # 2 6 Months 24/03/10 21/10/09 24/03/10 22/10/10

16 Aftercooler 6 Months 25/03/10 10/2/2009 21/10/09 25/03/10 22/10/10

17 Stage # 1 Impeller and diffuser 6 Months

18 Stage # 2 Impeller and diffuser 6 Months


19 Stage # 3 Impeller and diffuser 6 Months

20 Oil Cooler 1 Year 21/09/10 14/06/10

21 Motor Insulation checking 6 Months

22 Oil NRV cleaning 6 Months


Change over Duplex Filter
23 6 Months

24 Motor end cover cleaning 6 Months

25 Servo Oil 32 1 Year 21/09/10


26 Sump filters 1 Year 21/09/10

27 Duplex filters 1 Year 21/09/10

28 FRL FILTER ELEMENT CHANGE 1 Year

29 Dryer Back Flushing 3 Months 14/09/10 12/12/2010


Dryer spare change +
30 Maintenance NA 25/10/10 26/10/10 9/12/2010
Diesel Compressor Maintenance Sheet
15.12.10 07.02.11 07.03.11
Diesel Engine oil changed 2.5 lts

Belt alignment done


Overall cleaning done
Air filter cleaning done
Oil filter cleaning done
Base bolt tightening done
Sheet
18.04.11
Secondary Compressor Maintenance Sheet

Oil Change 12/02/09, 2.5 ltrs oil changed 18/01/10 2.5 ltrs oil changed

Motor Pulley
Checked,compressor pulley
Motor Pulley and Comp pulley Alignment damaged
V Belt Checked
Motor Pulley Checked
Belt wheel 9/10/09, Pulley Key damaged Wheel damaged
Limit switch 7/03/09, Pressure switch changed
Valve

MONTHLY MAINTENANCE DONE FOR SECONDARY COMPRESSOR MOTOR DRIVEN AND DIESEL COMPRESSOR AS
tenance Sheet
24.04.10 10.06.10
30.03.10, Oil level checked 24..04.10, Oil level checked- ok Checked ok

Alignment done on 22/01/10 Alignment done on 24/04/2010 Done


Checked Checked-ok
Checked Checked-ok
New wheel fitted on 22/01/10 Checked Checked-ok

Overall cleaning Suction filter cleaning done


Base bolt tightening done

ESEL COMPRESSOR AS PER MM CHECK(15.01.11)


07.07.10 25.11.10 7/2/2011
Checked servo 220 - 2.5 lts

checked Done
Checked Checked-ok
Checked-ok
Checked-ok
Overall cleaning Overall cleaning

Suction filter cleaning done Suction filter cleaning done


Base bolt tightening done New crank assembly and crank pin installed
7/3/2011 25/04/11
COMPRESSOR PREVENTIVE MAINTENANCE PLAN 2010

Sr No. Activity
Frequency Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

ACTUAL DATE
1 Oil Change Comp 1 1
Comp 2 2
2 Sump Filter Comp 3 3
1 Year
Comp 4 4
3 Duplex Filter Comp 5 5
Comp 6 6

ACTUAL DATE
4 Intercooler # 01 Cleaning Comp 1 1 1
5 Intercooler # 02 Cleaning Comp 2 2 2
6 Aftercooler Cleaning Comp 3 3 3
6 Month
7 Motor Insulation checking Comp 4 4 4
Comp 5 5 5
Comp 6 6 6

ACTUAL DATE
8 Oil Cooler Cleaning Comp 1 1 1 1 1
9 Secondary Filter Comp 2 2 2 2 2 2
1st Stage Probe Cleaning / Gap
10
Voltage Setting Comp 3 3 3 3 3
2nd Stage Probe Cleaning / Gap
11
Voltage Setting Comp 4 4 4 4 4
3rd Stage Probe Cleaning / Gap
12
Voltage Setting 3 Month Comp 5 5 5 5 5
13 FRL Filter Comp 6 6 6 6 6
14 Motor Alignment
15 MOP Alignment
Bypass valve and inlet valve
16
actuator cleaning
17
18 Oil NRV cleaning
COMPRESSOR PREVENTIVE MAINTENANCE PLAN 2011

Sr No. Activity
Frequency Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

ACTUAL DATE
1 Oil Change Comp 1 1
Comp 2 2
2 Sump Filter Comp 3 3
1 Year Comp 4 4
3 Duplex Filter Comp 5 5
Comp 6
4 FRL Filter 6

ACTUAL DATE

Intercooler # 01 Cleaning/Tube
5
leakage inspection
Comp 1 1 1 2

Intercooler # 02 Cleaning/Tube
6
leakage inspection
Comp 2 2
Aftercooler Cleaning/Tube 6 Month
7
leakage inspection Comp 3 3 3
8 Motor Insulation checking Comp 4 4 4
9 Oil NRV cleaning Comp 5 5 5
10 Change over Duplex Filter Comp 6 6 6
11 Oil Cooler Cleaning
12 Motor end cover cleaning

ACTUAL DATE
13 Secondary Filter Comp 1 1 1 1 1
1st Stage Probe Cleaning / Gap
14
Voltage Setting
2nd Stage Probe Cleaning / Gap
15
Voltage Setting Comp 2 2 2 2 2
3rd Stage Probe Cleaning / Gap
16
Voltage Setting
FRL Filter Cleaning/ Instrument
17
line flushing Comp 3 3 3 3 3
18 Motor Alignment 3 Month
19 MOP Alignment Comp 4 4 4 4 4
Bypass valve and inlet valve
20
actuator cleaning
21 Thermostate valve checking Comp 5 5 5 5 5
22 Oil Top up
23 Motor Bearing Greasing Comp 6 6 6 6 6
Clean/Replace Mist Arrestor
24
Element
DRYER PREVENTIVE MAINTENANCE PLAN 2011

Sr No. Activity
Frequency Jan Feb Mar

ACTUAL DATE
1 Water strainer cleaning Dryer 1 1 1 1
Dryer 2 2 2 2
2 Cleaning of Dryer Dryer 3 3 3 3
1 Month Dryer 4 4 4 4
3 Checking of ADVs & its maintenance needed Dryer 5 5 5 5
Dryer 6 6 6 6

ACTUAL DATE
4 Dryer back flushing Dryer 1 1
5 Water strainer cleaning Dryer 2 2
6 Cleaning of Dryer ( Internal + External ) Dryer 3 3
7 Maintenance of ADVs 3 Month Dryer 4 4
8 Checking of HOT Gas Bypas valve & NRV Dryer 5 5
9 Compressor outlet temperatures. Dryer 6 6
LAN 2011

Apr May Jun Jul Aug Sep Oct Nov Dec

1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3
4 4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5 5
6 6 6 6 6 6 6 6 6

1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
LOG BOO
Date Shift Shift Incharge Location Equipment No
1/10/2009 A Prashant Comp # 03
Comp # 03

Comp # 06
Filter

1/10/2009 B Subhashish Comp # 02


Filter
Comp # 03

1/10/2009 C Vendan Comp # 03

2/10/2009 A Prashant Comp # 05


Filter
Comp # 03

2/10/2009 B Subhashish Comp # 01


Filter
Comp # 03

2/10/2009 C Vendan Comp # 03

3/10/2009 A Amit Comp # 06


Filter
Comp # 03
3/10/2009 B Pratick Comp # 02
Filter
Comp # 03

3/10/2009 C Vendan Comp # 01

4/10/2009 A Subhashish Comp # 05


Filter
Comp # 01

4/10/2009 B Pratick Comp # 01


Filter

4/10/2009 C Prashant NA

5/10/2009 A Pratick Comp # 06


Filter

5/10/2009 B Amit Comp # 02


Filter

5/10/2009 C Prashant Comp # 03

6/10/2009 A Pratick Comp # 05


Filter
Comp # 03

6/10/2009 B Amit Comp # 01


Filter
Comp # 03

6/10/2009 C Prashant NA
7/10/2009 A Pratick Comp # 06
Filter
CWP # 04

7/10/2009 B Amit Comp # 02


Filter

7/10/2009 C Vendan NA

8/10/2009 A Nagesh Comp # 05


Filter
Comp # 03

8/10/2009 B Amit Comp # 01


Filter
Comp # 01

8/10/2009 C Vendan Secondary Comp

9/10/2009 A Prashant Comp # 06


Filter
Secondary Comp
C.T. # 03

9/10/2009 B Pratick Comp # 02


Filter

9/10/2009 C Vendan NA

10/10/2009 A Nagesh Comp # 05


Filter
Comp # 05
10/10/2009 B Pratick Comp # 01
Filter
Comp # 01
Comp # 01

10/10/2009 C Vendan Comp # 01

11/10/2009 A Vendan NA

11/10/2009 B Prashant Comp # 02


Filter

11/10/2009 C Pratick Comp # 01

12/10/2009 A Prashant Comp # 05


Filter

12/10/2009 B Subhashish Comp # 01


Filter
Comp # 03

12/10/2009 C Pratick Comp # 03

13/10/2009 A Prashant Comp # 06


Filter
Comp # 03

13/10/2009 B Subhashish Comp # 02


Filter
Comp # 03
13/10/2009 C Pratick Filter
Comp # 01

14/10/2009 A Prashant Comp # 05


Filter
Comp # 03

14/10/2009 B Amit Comp # 01


Filter
Comp # 03

14/10/2009 C Pratick Comp # 03

15/10/2009 A Amit Comp # 06


Comp # 03

15/10/2009 B Prashant Comp # 02


Filter
Comp # 03

Comp # 03

15/10/2009 C Subhashish Filter


Comp # 03
16/10/2009 A Pratick Comp # 05
Filter
Comp # 03

16/10/2009 B Prashant Comp # 01


Filter
Secondary Comp
Comp # 01
Comp # 03
Comp # 03
Comp # 03

16/10/2009 C Subhashish NA

17/10/2009 A Venugopal Comp # 06


Filter

17/10/2009 B Vendan Comp # 02


Filter

17/10/2009 C Subhashish NA

18/10/2009 A Prashant Comp # 05


Filter

18/10/2009 B Pratick Comp # 03


Filter

18/10/2009 C Subhashish NA

19/10/2009 A Pratick Comp # 06


Filter
19/10/2009 B Prashant Comp # 02
Filter
Comp # 01

Comp # 01
Comp # 06
Comp # 06

19/10/2009 C Amit NA

20/10/2009 A Pratick Comp # 05


Filter

20/10/2009 B Prashant Comp # 03


Filter
Comp # 06

20/10/2009 C Amit NA

21/10/2009 A Prashant Comp # 02


Filter
HWP#01
HWP#03
Comp # 06

21/10/2009 B Nagesh Comp # 06

21/10/2009 C Amit NA

22/10/2009 A Amit Comp # 05


Filter

22/10/2009 B Nagesh Comp # 03


Filter

22/10/2009 C Prashant NA

23/10/2009 A Vendan Comp # 01


Filter
Comp # 03

23/10/2009 B Nagesh Comp # 02


Filter

23/10/2009 C Prashant NA

24/10/2009 A Nagesh Comp # 05


Comp # 06
Filter

24/10/2009 B Vendan Comp # 05

24/10/2009 C Pratick Filter

25/10/2009 A Pratick Comp # 05

25/10/2009 B Vendan Comp # 01


Comp # 02
Comp # 05

25/10/2009 C Prashant Filter


26/10/2009 A Pratick Comp # 06
Filter
Comp # 05

26/10/2009 B Nagesh Comp # 03


Filter

26/10/2009 C Prashant NA

27/10/2009 A Pratick Comp # 05


Comp # 04

27/10/2009 B Subhashish Comp # 01


Comp # 02
Filter
Comp # 04

27/10/2009 C Amit Filter

28/10/2009 A Prashant Comp # 06


Filter
WMI Crane

28/10/2009 B Amit Comp # 03


Filter
Comp # 06

28/10/2009 C Pratick NA

29/10/2009 A Subhashish Comp # 02


Filter
29/10/2009 B Prashant Comp # 01
Filter
HWP#04

29/10/2009 C Amit NA

30/10/2009 A Subhashish NA

30/10/2009 B Pratick Comp # 03


Comp # 06
Filter

30/10/2009 C Amit NA

31/10/2009 A Subhashish Comp # 01


Comp # 02
Filter
C.T. # 02

31/10/2009 B Pratick Filter

31/10/2009 C Amit Comp # 02


Comp # 02
Comp # 05
Comp # 02

1/11/2009 A Subhashish Cooling Tower


Comp # 06
Filter

1/11/2009 B Pratick Cooling Tower


Comp # 03
Filter

1/11/2009 C Prashant NA

2/11/2009 A Nagesh NA

2/11/2009 B Amit Comp # 05


Filter
Comp # 02

2/11/2009 C Prashant C.T. # 01

3/11/2009 A Pratick Comp # 06


Filter
Actuator

3/11/2009 B Subhashish Comp # 03


Filter
Chemical

3/11/2009 C Prashant Comp # 02

4/11/2009 A Amit Comp # 01


Filter
Dryer # 02
Comp # 06

4/11/2009 B Subhashish Comp # 05


Filter
Comp # 02
Comp # 02
Comp # 03

4/11/2009 C Prashant NA

5/11/2009 A Amit Comp # 06


Filter

5/11/2009 B Subhashish Comp # 03


Filter
Comp # 06
Comp # 05

5/11/2009 C Prashant NA

6/11/2009 A Pratick Comp # 01


Filter

6/11/2009 B Pratick Comp # 05


Filter
Dryer # 04

6/11/2009 C Prashant NA

7/11/2009 A Amit Comp # 06


Filter
Comp # 02

7/11/2009 B Subhashish Comp # 03


Filter
Dryer # 04
Comp # 02
Chemical
7/11/2009 C Amit NA

8/11/2009 A Subhashish Comp # 01


Filter

8/11/2009 B Prashant Comp # 05


Filter

8/11/2009 C Pratick NA

9/11/2009 A Amit Comp # 06


Filter
Comp # 02
Comp # 01

9/11/2009 B Prashant Comp # 03


Filter
Chemical
WMI Crane

9/11/2009 C Pratick NA

10/11/2009 A Pratick Dryer # 6


Filter
Comp # 05

10/11/2009 B Prashant Comp # 01 & 05


Filter
Dryer # 6
Chemical

10/11/2009 C Amit Dryer # 6


11/11/2009 A Pratick Dryer # 6
CWP # 02

11/11/2009 B Subhashish Comp # 03


Filter
Dryer # 6

11/11/2009 C Amit NA

12/11/2009 A Prashant Comp # 01


Filter
Dryer # 6
WMI Crane

12/11/2009 B Subhashish Comp # 05


Filter
Dryer # 6

12/11/2009 C Amit NA

13/11/2009 A Amit Comp # 06


Filter
Dryer # 6

13/11/2009 B Prashant Comp # 03


Filter
AVGF
Dryer # 6

13/11/2009 C Pratick NA

14/11/2009 A Amit Comp # 01


Filter
Comp # 06

14/11/2009 B Subhashish Comp # 05


Filter
WMI Crane

Comp # 03
Chemical

14/11/2009 C Pratick NA

15/11/2009 A Subhashish Comp # 06


Filter

15/11/2009 B Prashant Comp # 03


Filter
Comp # 01
Comp # 05

15/11/2009 C Pratick Comp # 05

16/11/2009 A Vendan Comp # 05


Filter
Comp # 05
Comp # 01

16/11/2009 B Amit Comp # 01


Filter
Comp # 02
Comp # 02
Comp # 05
Comp # 05

16/11/2009 C Pratick NA

17/11/2009 A Pratick Comp # 06


Filter
Instrument Air Line
Spare B/V Actuator

17/11/2009 B Amit Comp # 03


Filter
CWP # 02
Comp # 05
Comp # 01
Comp # 01
Chemical
Flowmeter

17/11/2009 C Subhashish Comp # 02

18/11/2009 A Vendan Comp # 05


Filter
Comp # 01
CWP # 03
CWP # 02

18/11/2009 B Amit CWP # 02


CWP # 03
Comp # 01

18/11/2009 C Subhashish Comp # 02


19/11/2009 A Nagesh Comp # 05 & 06
Filter
Comp # 01
Dryer # 01

19/10/2009 B Vendan Comp # 01


Dryer # 01
Comp # 06
AVGF

19/11/2009 C Subhashish Comp # 02


Comp # 03

20/11/2009 A Vendan Comp # 03


Filter
AVGF
Comp # 04

20/11/2009 B Pratick Comp # 02


Filter
Comp # 04

20/11/2009 C Subhashish NA

21/11/2009 A Vendan Comp # 06


Filter
Comp # 02

21/11/2009 B Pratick Comp # 05


Filter
Fabrication
21/11/2009 C Subhashish NA

22/11/2009 A Prashant Comp # 03


Filter
Comp # 01

22/11/2009 B Pratick Comp # 02


Filter
Comp # 01

22/11/2009 C Subhashish NA

23/11/2009 A Prashant Comp # 06


Filter
HWP # 01 & 04
Dryer # 02

23/11/2009 B Pratick Comp # 05


Filter
HWP # 01 & 04
Dryer # 02
I/P

23/11/2009 C Vendan Comp # 03

24/11/2009 A Prashant Comp # 03


Filter
Al Un Flow

24/11/2009 B Subhashish Comp # 02


Filter
Comp # 01
Dryer # 06
24/11/2009 C Vendan NA

25/11/2009 A Prashant Comp # 06


Filter

25/11/2009 B Pratick Comp # 02


Filter
Comp # 01

25/11/2009 C Pratick NA

26/11/2009 A Subhashish Comp # 03


Filter
HWP # 02 & 03

26/11/2009 B Vendan Comp # 02


Filter
Intercooler

26/11/2009 C Vendan NA

27/11/2009 A Subhashish Comp # 06


Filter
Comp # 01

27/11/2009 B Pratick Comp # 03


Filter
Comp # 01

27/11/2009 C Prashant NA

28/11/2009 A Subhashish Comp # 03


Filter
Comp # 01
Comp # 01
Comp # 01
Comp # 02
Comp # 02

28/11/2009 B Pratick Comp # 02


Filter

28/11/2009 C Vendan NA

29/11/2009 A Pratick Comp # 01


Filter

29/11/2009 B Prashant Comp # 05


Filter
Comp # 03
Comp # 03
Comp # 01
Comp # 03

29/11/2009 C Pratick NA

30/11/2009 A Vendan Comp # 03


Filter

30/11/2009 B Prashant Comp # 02


Filter
Chemical

30/11/2009 C Pratick NA
1-Dec-09 A Prashant Comp # 01
Comp # 06
Filter
Steam line
Comp # 01

1-Dec-09 B Vendan Comp # 01


Comp # 05
Filter

1-Dec-09 C Pratick Filter

2-Dec-09 A Pratick Comp # 03


Comp # 05
Filter

2-Dec-09 B Prashant Comp # 02


Filter

2-Dec-09 C Vendan

3-Dec-09 A Nagesh Comp # 02

3-Dec-09 B Prashant Comp # 05


Filter
HWP# 04
Comp # 05
Comp # 05
Comp # 05
Comp # 01
3-Dec-09 C Vendan Spare

4-Dec-09 A Prashant Comp # 03


Filter
CWP # 02
Intercooler cleaning tank

4-Dec-09 B Pratick Comp # 02


Filter
Intercooler cleaning tank

4-Dec-09 C Vendan Air Audit

5-Dec-09 A Nagesh Comp # 06


Filter
Comp # 04

5-Dec-09 B Pratick Comp # 01


Filter
Comp # 04
Chemical

5-Dec-09 C Vendan Air Audit

6-Dec-09 A Prashant Comp # 03


Filter
Air Audit

6-Dec-09 B Pratick Comp # 02


Filter

6-Dec-09 C Vendan Air Audit


7-Dec-09 A Nagesh Comp # 06
Filter
Comp # 05
ASC Scada

7-Dec-09 B Pratick Comp # 01


Filter
Comp # 04

7-Dec-09 C Prashant Air Audit

8-Dec-09 A Vendan Comp # 03


Filter
Comp # 05

8-Dec-09 B Pratick Comp # 02


Filter
Comp # 04
Chemical
Spare

8-Dec-09 C Prashant Air Audit


All comp.

9-Dec-09 A Pratick Comp # 06


Filter
Air Audit

9-Dec-09 B Vendan Comp # 01


Filter
Spare

9-Dec-09 C Prashant Air Audit


All comp.

10-Dec-09 A Nagesh Comp # 03


Filter

10-Dec-09 B Vendan Comp # 02


Filter
Air Line fabrication

10-Dec-09 C Prashant Air Audit


All comp.

11-Dec-09 A Pratick Comp # 06


Filter
Air Line fabrication

11-Dec-09 B Vendan CWP # 04


Comp # 01
Filter

11-Dec-09 C Prashant Air Audit


All comp.

12-Dec-09 A Nagesh Comp # 03


Filter

12-Dec-09 B Vendan Comp # 02


Filter
Air Line fabrication

12-Dec-09 C Pratick Air Audit

13-Dec-09 A Prashant Comp # 06


Filter
Air Audit

13-Dec-09 B Vendan Comp # 01


Filter

13-Dec-09 C Pratick Air Audit

14-Dec-09 A Nagesh Comp # 03


Filter

14-Dec-09 B Prashant Comp # 02


Filter

14-Dec-09 C Pratick Air Audit

15-Dec-09 A Subhashish Comp # 06


Filter
Air Audit
Comp # 05

15-Dec-09 B Nagesh Comp # 01


Filter
Comp # 05

15-Dec-09 C Pratick Air Audit

16-Dec-09 A Pratick Comp # 03


Filter
Comp # 05

16-Dec-09 B Prashant Comp # 02


Filter
Comp # 05
ASC Scada

16-Dec-09 C Vendan Air Audit

17-Dec-09 A Nagesh Comp # 02


Filter
Comp # 05

17-Dec-09 B Prashant Comp # 01


Filter
Comp # 05

17-Dec-09 C Vendan Air Audit

18-Dec-09 A Subhashish Comp # 03


Filter
Instrument line
Air Audit

18-Dec-09 B Prashant Comp # 02


Filter
Instrument line
Instrument line
Comp # 06
Comp # 06
Comp # 06
Comp # 06

18-Dec-09 C Vendan Air Audit

19-Dec-09 A Subhashish Comp # 06


Filter
Dryer # 02
Air Audit

19-Dec-09 B Pratick Comp # 01


Filter
Spare
Intercooler cleaning tank

19-Dec-09 C Vendan Air Audit

20-Dec-09 A Subhashish Air Audit

20-Dec-09 B Prashant Comp # 02


Comp # 03
Filter

20-Dec-09 C Pratick Filter

21-Dec-09 A Pratick Comp # 06


Filter
Comp # 05

Comp # 05

21-Dec-09 B Nagesh Comp # 02


Filter
Filter

21-Dec-09 C Prashant

22-Dec-09 A Subhashish Comp # 03


Filter
Comp # 05
Air Audit

22-Dec-09 B Pratick Comp # 02


Filter

22-Dec-09 C Prashant

23-Dec-09 A Subhashish Comp # 06


Filter
Comp # 01
Air Audit

23-Dec-09 B Pratick Comp # 01


Filter

23-Dec-09 C Prashant

24-Dec-09 A Subhashish Comp # 03


Filter
Comp # 04
Air Audit

24-Dec-09 B Vendan Comp # 02


Filter
Comp # 04
Comp # 05

24-Dec-09 C Prashant Comp # 05


Comp # 01
Comp # 01
Comp # 05
25-Dec-09 A Pratick Comp # 06
Filter
Comp # 05

25-Dec-09 B Vendan Comp # 01


Filter
Comp # 05

25-Dec-09 C Venugopal Comp # 05

26-Dec-09 A Prashant Spare


Comp # 03
Filter
Comp # 05
Comp # 01

26-Dec-09 B Vendan Spare


Comp # 02
Filter

26-Dec-09 C Pratick Comp # 01

27-Dec-09 A Prashant Spare


Comp # 06
Filter
Comp # 01 & 05
27-Dec-09 B Vendan Comp # 01
Filter
Comp # 05

Comp # 01 & 03
Comp # 05
Comp # 01
Comp # 01
Comp # 05

27-Dec-09 C Pratick Filter

28-Dec-09 A Prashant Comp # 03


Filter
Other

28-Dec-09 B Amit Comp # 02


Filter
Spare
MRV

28-Dec-09 C Pratick Air Audit

29-Dec-09 A Prashant Comp # 06


Filter
CWP # 04

29-Dec-09 B Vendan Comp # 01 & 03


Filter
Comp # 05
Comp # 03
Comp # 03
Comp # 05

29-Dec-09 C Pratick Filter

30-Dec-09 A Prashant Comp # 05 & 06


Filter
Comp # 03
CWP # 04

30-Dec-09 B Amit Comp # 02


Filter
Comp # 03

30-Dec-09 C Pratick

31-Dec-09 A Amit Comp # 03

31-Dec-09 B Vendan Comp # 01


Filter
Comp # 03

31-Dec-09 C Pratick

1/1/2010 A Pratick Comp # 05


Spare
Comp # 03
1/1/2010 B Vendan Comp # 06

1/1/2010 C Amit Comp # 02


Filter

2/1/2010 A Amit Comp # 03

2/1/2010 B Vendan Comp # 03


Comp # 05
Comp # 06
Comp # 03

2/1/2010 C Prashant

3/1/2010 A Amit Comp # 03

3/1/2010 B Pratick Comp # 02 & 06


Filter

3/1/2010 C Prashant

4/1/2010 A Vendan Comp # 01


C.T. # 02
C.T. # 03

4/1/2010 B Pratick Comp # 05


Filter
C.T. # 03
4/1/2010 C Prashant

5/1/2010 A Vendan Comp # 03

5/1/2010 B Pratick Comp # 02 & 06


Spare
Pressurizing pumps
Hot water level indicator

5/1/2010 C Amit Filter

6/1/2010 A Prashant Comp # 01


Filter
Dryer#05

6/1/2010 B Pratick Comp # 05


Filter
Comp # 06
Comp # 06
Table

6/1/2010 C Amit Filter


Comp # 01
Comp # 06
Comp # 01

7/1/2010 A Vendan Comp # 03


Comp # 01
Comp # 02
CWP # 03

7/1/2010 B Pratick Comp # 02


Comp # 01
Comp # 06
Comp # 01

Filter

7/1/2010 C Amit Filter

8/1/2010 A Vendan Comp # 05


Filter
Dryer#05
Dryer#01
Comp # 01

8/1/2010 B Pratick Comp # 06


Filter
Comp # 02

8/1/2010 C Amit Comp # 02


Comp # 02

9/1/2010 A Amit Comp # 03


Filter
Comp # 02

9/1/2010 B Subhashish Comp # 02


Filter
Comp # 04
Dryer#02

9/1/2010 C Prashant

10/1/2010 A Pratick Comp # 05


Filter

10/1/2010 B Subhashish Comp # 06


Filter
Comp # 02

10/1/2010 C Amit

11/1/2010 A Pratick Comp # 03


Filter
Spare

11/1/2010 B Subhashish Comp # 02


Filter
Comp # 04

11/1/2010 C Prashant Comp # 02

12/1/2010 A Pratick Comp # 05


Filter
Comp # 03 & 06

12/1/2010 B Amit Comp # 06


Filter
Comp # 01

12/1/2010 C Prashant Comp # 01


Comp # 01
Comp # 01
Comp # 05

13/01/10 A Subhashish Comp # 02


Filter
Comp # 02
Comp # 01
Comp # 02

13/01/10 B Amit Comp # 03

Comp # 01
Spare
Filter

13/01/10 C Prashant

14/01/10 A Subhashish Comp # 05


Filter
Comp # 03
Comp # 02

14/01/10 B Amit Comp # 01 & 06

Spare
Siren
Filter

14/01/10 C Prashant Filter

15/01/10 A Subhashish Comp # 02


Filter
Comp # 01
Spare

15/01/10 B Amit Comp # 03


Filter
Diesel Compressor
MS pipe

15/01/10 C Prashant Air Audit

16/01/10 A Subhashish Comp # 05


Filter

Cooling Tower
Chemical

16/01/10 B Amit Comp # 01 & 06


Filter

Hypo (Chemical)
CWP # 03
CWP # 01
CWP # 03
CWP # 01
CWP # 03
CWP # 01

16/01/10 C Prashant CWP # 03


Filter
Comp # 03

17/01/10 A Subhashish Comp # 02


Filter

17/01/10 B Amit Comp # 03


Filter
Comp # 03
Comp # 05
Comp # 01

17/01/10 C Pratick Comp # 01


Comp # 05

18/01/10 A Subhashish Comp # 05


Filter
Secondary Compressor
CWP # 01
HWP#03
Comp # 05
Comp # 01
Dryer # 06
C.T. # 01
HWP # 02

18/01/10 B Prashant Comp # 01


Comp # 06
Filter
C.T. # 01
Air Audit
Comp # 05
Comp # 01
Comp # 03
Comp # 05

18/01/10 C Pratick Comp # 05


Comp # 01
Comp # 05
Comp # 01
Comp # 01

19/01/10 A Amit Comp # 02


Filter

19/01/10 B Prashant Comp # 03


Filter
Chemical
Comp # 02

19/01/10 C Pratick Comp # 02


Filter

20/01/10 A Amit Comp # 04


Comp # 04
20/01/10 B Prashant Comp # 02
Comp # 01
Comp # 05
Comp # 06
Filter
Comp # 04
Comp # 04

20/01/10 C Pratick Comp # 02


HWP# 02 of RPH
HWP# 01 of RPH
HWP# 02 of RPH
Filter
Comp # 04

21/01/10 A Amit Comp # 02


Filter
Comp # 04
21/01/10 B Prashant Comp # 02
Comp # 03
Filter
Comp # 04

Comp # 02

21/01/10 C Pratick Filter


Comp # 01

22/01/10 A Amit Comp # 01


Comp # 05
Filter
Comp # 02

PPH

22/01/10 B Prashant Comp # 01


Comp # 06
Filter
Secondary Compressor
Comp # 02

22-Jan-10 C Pratick Comp # 01


Filter

23/01/10 A Prashant Comp # 02


Spare CWP Motor

23/01/10 B Vendan Comp # 02


Blower
Comp # 03
Filter
Chemical

23/01/10 C Subhashish Comp # 01

24/01/10 A Vendan Comp # 01 & 05


Filter
Comp # 01

24/01/10 B Pratick Comp # 06


Comp # 01

24/01/10 C Subhashish Comp # 01

25/01/10 A Vendan Comp # 02


CWP spare motor

25/01/10 B Pratick Comp # 03


CWP # 03
Comp # 01
CWP # 03
Blower

25/01/10 C Subhashish NA

26/01/10 A Vendan Comp # 01 & 05


Primary filter
Chemical

26/01/10 B Pratick Comp # 06


Filter
Chemical

26/01/10 C Amit Filter

27/01/10 A Prashant Comp # 02


Blower
Dryer#02

27/01/10 B Pratick Comp # 02


Dryer#02
Others
Comp # 03
Filter
Blower

28/01/10 A Vendan Dryer # 1


Comp # 01 & 05
DWP

28/01/10 B Amit Comp # 06


Filter

28/01/10 C Amit Filter

29/01/10 A Vendan Spare Aftercooler Bundle


Dryer # 4
29/01/10 B Prashant Spare Aftercooler Bundle
Comp # 03
Filter
Dryer # 6

C Amit NA

30/01/10 A Vendan Comp # 01 & 05


Air network

30/01/10 B Pratick Comp # 06


Filter
Spare Intercooler
Spare Intercooler
Carbon air Audit
Spare Aftercooler Bundle
Chemical

30/01/10 C Amit Filter


Spare Aftercooler Bundle

31/01/10 A Pratick Comp # 04


Comp # 04

31/01/10 B Subhashish Comp # 03


Filter

31/01/10 C Amit NA

1-Feb-10 A Pratick Comp # 01 & 05


Filter
Comp # 04
1-Feb-10 B Subhashish Comp # 06
Filter
Comp # 04
Dryer # 01
Cooling Tower
Chemical

1-Feb-10 C Vendan Comp # 04


Filter

2-Feb-10 A Pratick Comp # 02


Dryer # 01

2-Feb-10 B Amit Comp # 03


Filter
Comp # 02

Dryer # 01
Dryer # 01
Dryer # 01
Dryer # 01

2-Feb-10 C Vendan

3-Feb-10 A Pratick Comp # 04


Comp # 01 & 05
Filter

3-Feb-10 B Amit Comp # 06


Filter
Comp # 04
3-Feb-10 C Vendan Filter

4-Feb-10 A Pratick Comp # 04


Comp # 02
Comp # 04
Comp # 04

4-Feb-10 B Amit Comp # 03


Comp # 03

4-Feb-10 C Vendan Waterline pipe fitting

5-Feb-10 A Pratick Comp # 02


Comp # 03

Comp # 03
Comp # 03
Comp # 03
Comp # 02

5-Feb-10 B Amit Comp # 02


Comp # 02
Comp # 02
Comp # 02
Comp # 02
Comp # 02
Comp # 02
Comp # 02
Comp # 01 & 05

5-Feb-10 C Vendan Comp # 02


Comp # 02
Comp # 03 & 06

6-Feb-10 A Subhashish Filter


Dryer # 4
Cooling Tower

6-Feb-10 B Amit Filter


Cooling Tower

6-Feb-10 C Vendan

7-Feb-10 A Subhashish Comp # 01


Filter

Comp # 03

7-Feb-10 B Amit Comp # 05


Filter

7-Feb-10 C Vendan

8-Feb-10 A Subhashish Comp # 03


Filter
RPH,PPH,CPH
Comp House

8-Feb-10 B Prashant Comp # 06


Filter
Cooling Tower
Chemical

8-Feb-10 C Amit NA

9-Feb-10 A Prashant Comp # 01

9-Feb-10 B Vendan Comp # 05

9-Feb-10 C Pratick Filter

10-Feb-10 A Amit Comp # 03


Filter
Comp # 02

10-Feb-10 B Vendan Comp # 06


Filter
Comp # 04

10-Feb-10 C Pratick Air Audit

11-Feb-10 A Amit Comp # 01


Filter
Comp # 02
Comp # 04

11-Feb-10 B Vendan Comp # 05


Filter
Comp # 02
CWP # 01

11-Feb-10 C Pratick CWP # 01

12-Feb-10 A Subhashish Comp # 03


Comp # 02
Comp House

12-Feb-10 B Vendan Comp # 06


Comp # 02
Cooling Tower
Canteen

12-Feb-10 C Pratick Filter

13-Feb-10 A Prashant Comp # 01


Comp # 02
Filter
Comp # 02
CWP # 01
CWP # 02
Comp # 02

13-Feb-10 B Vendan Comp # 05


Comp # 02

13-Feb-10 C Subhashish

14-Feb-10 A Amit Comp # 03


Filter

14-Feb-10 B Pratick Comp # 06


Filter
Comp # 03

14-Feb-10 C Subhashish Comp # 03


Comp # 03
Comp # 02

15-Feb-10 A Vendan Comp # 01 & 02


Comp # 03

15-Feb-10 B Pratick Comp # 03


Comp # 03

HWP# 04

15-Feb-10 C Subhashish Filter

16-Feb-10 A Vendan Comp # 03


Comp # 02
HWP# 04

16-Feb-10 B Pratick Comp # 03


Comp # 02
Comp # 06
Filter

16-Feb-10 C Pratick

17-Feb-10 A Vendan Comp # 01 & 02


Filter
Comp # 03
Spare motor

17-Feb-10 B Prashant Comp # 05


Comp # 05
Filter
Spare CWP Motor
Cooling Tower
Comp # 03
Comp # 05

17-Feb-10 C Amit Filter

18-Feb-10 A Pratick Comp # 05

18-Feb-10 B Vendan Comp # 03


Comp # 06

18-Feb-10 C Amit

19-Feb-10 A Vendan Comp # 02 & 03

Comp # 05

19-Feb-10 B Pratick Comp # 05


Comp # 05
Comp # 05
Comp # 01
Filter

19-Feb-10 C Amit Filter

20-Feb-10 A Subhashish Comp # 05


Dryer#05
CWP
Comp House
Comp House
Comp House

20-Feb-10 B Vendan Dryer#05


CWP Spare Motor
Comp # 06
Filter
C.T. # 01

20-Feb-10 C Amit

21-Feb-10 A Pratick Comp # 02 & 03


Filter
Comp House

21-Feb-10 B Prashant Comp # 01


Filter
Comp House
Air Audit

21-Feb-10 C Amit

22-Feb-10 A Pratick Secondary Compressor


CWP # 04
HWP # 03

22-Feb-10 B Prashant Comp # 06


Filter
HWP # 03
HWP # 04
22-Feb-10 C Vendan

23-Feb-10 A Pratick Comp # 04


Comp # 02 & 03
Filter
PPH

23-Feb-10 B Amit Comp # 01


Filter
PPH
HWP# 03
HWP# 02
Fabrication Work

23-Feb-10 C Vendan Filter

24-Feb-10 A Pratick HWP # 02

24-Feb-10 B Amit HWP # 01


Comp # 01
Filter
Blower

24-Feb-10 C Vendan

25-Feb-10 A Pratick Comp # 02 & 03


Filter
C.T. # 02

25-Feb-10 B Amit Comp # 01


Filter
25-Feb-10 C Vendan RPH Cold well
PPH

26-Feb-10 A Pratick C.T. # 01


Blower
Instrument panal
Dryer# 03

26-Feb-10 B Amit Comp # 06


Filter
CWP # 04

26-Feb-10 C Vendan Running equipments @ CPH


PPH

27-Feb-10 A Amit Comp # 02 & 03


Filter
C.T. # 03

27-Feb-10 B Subhashish C.T. # 03


Comp # 01
Filter
Comp House

27-Feb-10 C Vendan Filter


PPH
Comp # 05

28-Feb-10 A Amit Comp # 01

28-Feb-10 B Subhashish Comp # 06


Filter
28-Feb-10 C Pratick CWP # 01
Comp # 01
PPH

1-Mar-10 A Subhashish Comp # 02 & 03


Filter

1-Mar-10 B Vendan Comp # 05


Filter
PPH

1-Mar-10 C Pratick Filter


PPH
Instrument panal

2-Mar-10 A Prashant Plant Water Line


Comp # 01

Comp # 04
Air Audit

2-Mar-10 B Vendan Comp # 01

Comp # 04

Comp # 06
Filter
PPH

2-Mar-10 C Pratick Comp # 04


PPH
3-Mar-10 A Prashant Comp # 02 & 03
Filter
Comp # 04

3-Mar-10 B Vendan Comp # 04

Comp # 05
Filter

3-Mar-10 C Pratick Comp # 04


PPH

4-Mar-10 A Prashant Comp # 04

Comp # 01

4-Mar-10 B Vendan Comp # 04

Comp # 06
Filter

4-Mar-10 C Pratick Comp # 04

PPH

5-Mar-10 A Prashant Comp # 04


Comp # 02 & 03

5-Mar-10 B Vendan Comp # 04

Comp # 02

5-Mar-10 C Pratick Comp # 02


Comp # 02
Air Audit
Comp # 01 & 05
Filter
PPH

6-Mar-10 A Prashant Filter


Comp # 03
Comp # 04

6-Mar-10 B Vendan Comp # 04

Comp # 04
Comp # 06
Filter

6-Mar-10 C Subhashish Comp # 01, 02 & 03


Comp House
PPH
Filter
7-Mar-10 A Prashant Filter
Comp # 02

7-Mar-10 B Pratick Comp # 01 & 05


PPH
Filter
CWP # 04
Comp # 04
Dryer # 06

7-Mar-10 C Subhashish Comp # 04, 05 & 06


Comp House
Filter
PPH
Comp # 05

8-Mar-10 A Vendan Comp # 04


Comp # 03
Filter

8-Mar-10 B Pratick Comp # 04


Comp # 06
Filter
PPH
Comp # 04
CWP # 04

8-Mar-10 C Subhashish Comp # 01, 02 & 03


Comp House
PPH
Comp # 04
CWP # 04
HWP # 01
9-Mar-10 A Vendan Comp # 04
Comp # 02
Filter
Scrap
Hydrant line
Dryer # 4

9-Mar-10 B Pratick Comp # 01 & 05


Filter
Comp # 04
PPH
Dryer # 4
Fire hydrant

9-Mar-10 C Subhashish Comp # 04, 05 & 06


Comp House
Filter
PPH

10-Mar-10 A Vendan Comp # 04


Comp # 03
Filter
HWP 3 @ RPH

10-Mar-10 B Pratick Comp # 06


Filter
Comp # 04
Filter Feed Pump 1 & 2 @
RPH

10-Mar-10 C Prashant PPH


Comp House
Secondary Compressor

11-Mar-10 A Vendan Dryer # 1


HWP # 2 @ RPH
Steel structures
Comp # 02

11-Mar-10 B Pratick Comp # 01 & 05


Filter
CWP # 04
HWP # 02 @ CPH
Spare Auto drain valve
PPH

11-Mar-10 C Prashant PPH


Comp House
Comp # 06
Filter
Air Audit

12-Mar-10 A Vendan CWP # 04


HWP # 04 @ CPH
Comp # 03
Filter

12-Mar-10 B Pratick Comp # 06


Filter
HWP # 02 @ CPH
HWP # 03 @ CPH
HWP # 03 @ CPH
Fabrication work
PPH
12-Mar-10 C Prashant PPH
Comp House
CPH

13-Mar-10 A Vendan Comp # 03


Comp # 03
HWP # 01 @ CPH
Comp # 02,03 & 05
Filter
Comp # 03

13-Mar-10 B Subhashish Comp # 01


Filter
Comp # 03

HWP # 01 @ CPH & RPH


Air Audit

13-Mar-10 C Amit Air Audit


Filter

14-Mar-10 A Pratick Comp # 03


Air Audit
Filter

14-Mar-10 B Subhashish Comp # 06


Filter

14-Mar-10 C Amit MOP (Comp#03)


PPH

15-Mar-10 A Pratick Comp # 04


Comp # 02 & 05
Filter
Air Audit

15-Mar-10 B Subhashish Comp # 01


Filter
Comp # 04
Comp # 04
Blower

15-Mar-10 C Vendan Air Audit


Filter
Comp # 03
PPH

16-Mar-10 A Pratick Diesel Secondary Comp.


Fabrication Work

16-Mar-10 B Amit Comp # 06


Filter
Fabrication Work
Diesel Secondary Comp.

16-Mar-10 C Vendan Dewatering pump


PPH

17-Mar-10 A Pratick Comp # 04


Comp # 04
Diesel Secondary Comp.
Fabrication Work
Comp # 02 & 05
Filter
17-Mar-10 B Amit Comp # 01
Filter
Diesel Secondary Comp.
Comp # 04

17-Mar-10 C Vendan Intercooler


PPH
Filter

18-Mar-10 A Pratick PPH


Comp # 03
Diesel Secondary Comp.

18-Mar-10 B Amit Comp # 06


Filter

Diesel Secondary Comp.

18-Mar-10 C Vendan CPH AVGF


PPH

19-Mar-10 A Pratick Diesel Secondary Comp.


Comp # 02 & 05
Filter
FFPH

19-Mar-10 B Amit Comp # 01


Filter
Diesel Secondary Comp.

19-Mar-10 C Vendan PPH


Filter

20-Mar-10 A Subhashish Comp # 03


Filter
Diesel Secondary Comp.
Intercooler Discharge
Fabrication (Comp # 01)

20-Mar-10 B Amit Comp # 06


Filter
Diesel Secondary Comp.
Fabrication (Comp # 04)

20-Mar-10 C Vendan PPH


Pumps
Comp House

21-Mar-10 A Subhashish Comp # 02 & 05


Filter

21-Mar-10 B Amit Comp # 01


Filter

21-Mar-10 C Pratick PPH


Filter

22-Mar-10 A Subhashish Comp # 03


Filter
HWP # 03 @ RPH
Diesel Secondary Comp.
Comp # 04
Comp # 04
Comp # 03 & 06
22-Mar-10 B Vendan Comp # 06
Filter
Diesel Secondary Comp.
Fabrication (Comp # 04)
Comp # 06
Comp # 06
Comp # 06
Comp # 06
Comp # 06

22-Mar-10 C Pratick Air Audit


PPH

23-Mar-10 A Amit Comp # 02 & 05


Filter

23-Mar-10 B Vendan Comp # 01


Filter
Comp # 04
Comp # 04

23-Mar-10 C Pratick Air Audit


Filter
PPH

24-Mar-10 A Amit Comp # 03


Filter
Comp # 06

24-Mar-10 B Prashant Comp # 06

Comp # 04
Filter

24-Mar-10 C Pratick Comp # 06


Dryer # 6
PPH

25-Mar-10 A AMIT Comp # 02 & 05


Filter
Comp # 06
Comp # 06
Comp # 01

25-Mar-10 B Vendan / Venkat Comp # 06


Comp # 01
Filter

25-Mar-10 C Pratick Comp # 01


Dryer # 01
Air Audit
PPH

26-Mar-10 A Prashant Comp # 01 & 03


Filter
Comp # 06
Comp # 01

26-Mar-10 B Vendan / Venkat Comp # 01


Comp # 04
Comp # 06
Comp # 06
Dryer # 6
26-Mar-10 C Pratick Filter
Gasket
PPH

27-Mar-10 A Amit Comp # 02 & 05


Comp # 01
Secondary Compressor

27-Mar-10 B Subhashish / Venkat Diesel Compressor


Comp # 01
Cooling Fan
Potroom

27-Mar-10 C Vendan Filter


PPH

28-Mar-10 A Vendan / Saket Comp # 03

28-Mar-10 B Pratick Comp # 04


PPH

28-Mar-10 C Subhashish Filter


PPH

29-Mar-10 A Vendan Comp # 02 & 05


Comp # 03 & 04
Dryer 1
Diesel Compressor
Auto drain valve

29-Mar-10 B Pratick Secondary Compressor


Auto drain valve
Comp # 02
Potroom

29-Mar-10 C Subhashish Filter

Dryer # 04
Comp # 06
PPH
Alumina Massflowmeter

30-Mar-10 A Saket / Venkat Comp # 03


Secondary Compressor
Comp # 02
Comp # 06
Comp # 02

30-Mar-10 B Pratick Comp # 02


Potroom
PPH
Comp # 04
Comp # 01

30-Mar-10 C Subhashish Comp # 04


Filter
Comp House
PPH

31-Mar-10 A Saket / Venkat Comp # 02


Comp # 02
Potroom

31-Mar-10 B Pratick Comp # 02


Comp # 02
Comp # 01

Comp # 05
Potroom
PPH
Comp # 02

31-Mar-10 C AMIT Filter


PPH

1-Apr-10 A Saket / Venkat Comp # 03 & 06


Comp # 01
C.T. # 02
Plant Water Line

1-Apr-10 B Pratick Comp # 02


Comp House
C.T. # 01
PPH
HWP# 02 @ CPH
HWP# 03 @ CPH

1-Apr-10 C AMIT HWP# 02 @ CPH


Filter
Comp # 04

2-Apr-10 A Venkat CWP # 02

2-Apr-10 B Pratick Comp # 05


C.T. # 03
Ventilation Blower
Comp House
Secondary Compressor

2-Apr-10 C Pratick Filter


PPH

3-Apr-10 A Venkat comp # 03


softener @ RPH
ventilation blower

Secondary Compressor

3-Apr-10 B Subhashish Comp # 02 & 06


Filter
PPH

3-Apr-10 C AMIT Filter

4-Apr-10 A Pratick Comp # 04


Filter

4-Apr-10 B Subhashish Comp # 05


Filter

4-Apr-10 C AMIT Filter

5-Apr-10 A Pratick / Venkat ACH Comp # 03 & 02


Dryer #1
CWP # 02
Filter
Potroom
5-Apr-10 B Subhashish Comp # 06
Filter
Dryer #1
Dryer #1
Pedestal Fan
PPH

5-Apr-10 C Vendan ACH Comp # 05


CPH CWP # 02
CPH CWP # 03
ACH Filter
CPH AVGF
PPH Filters

6-Apr-10 A Pratick ACH Comp # 04


ACH Filter
CPH CWP # 03

6-Apr-10 B AMIT ACH Comp # 05

6-Apr-10 C Vendan ACH Comp # 05


ACH Comp # 05

7-Apr-10 A Pratick / Venkat PPH Filters


ACH Comp # 05
ACH Comp # 03 & 02

7-Apr-10 B Subhashish ACH Filter


ACH Comp # 06
ACH Filter
CPH HWP # 01 & HWP # 02
RPH Cooling Tower
7-Apr-10 C Vendan PPH Filters
ACH Filter

8-Apr-10 A Pratick PPH Filters


ACH Comp # 05
PPH Pump # 01
PPH Pump # 02
ACH Comp # 06
ACH Comp # 04
ACH Filter

8-Apr-10 B Venkat ACH Comp # 01


PPH Pump # 03
PPH Pump # 04

8-Apr-10 C Vendan RPH Pedastal fan


PPH Filters

9-Apr-10 A Pratick ACH Comp # 03 & 02


ACH Filter
CPH CWP # 04
ACH Comp # 06
ACH Comp # 01
Pot Room Hose pipe
ACH Comp # 06
ACH Cooling Tower

9-Apr-10 B Venkat ACH VFD wall


CPH CPH
ACH

9-Apr-10 C Vendan Pot Room Hose pipe


PPH Filters

10-Apr-10 A Subhashish CPH Cooling Tower


ACH Comp # 04 & 06
ACH Filter
Pot Room Air Audit
ACH Comp # 06

RPH HWP # 03 & AVGF -02


RPH HWP # 02

10-Apr-10 B Venkat CPH HOIST


CPH sump pump
Pot Room Drinking water line
ACH COMP # 05

10-Apr-10 C Vendan ACH Filter


PPH Filters

11-Apr-10 A Subhashish ACH Comp # 01 & 02


ACH Filter

11-Apr-10 B Venkat ACH comp # 03


11-Apr-10 C Pratick ACH Filter
PPH Filters

12-Apr-10 A Subhashish CPH Cooling Tower


CPH HWP # 03
ACH Comp # 01
ACH Comp # 04
ACH Filter
ACH Comp # 01
ACH Comp # 01
ACH Comp # 06

12-Apr-10 B E Vendan ACH comp # 05


CPH HWP # 04
ACH Filter

12-Apr-10 C Pratick PPH Filters

ACH Comp # 01

13-Apr-10 A Venkat / Amit ACH Comp # 01


comp # 03
Comp # 02

13-Apr-10 B E Vendan ACH Comp # 01


ACH comp # 03

ACH Filter
CPH CWP # 03
CPH CWP # 03
CPH CWP # 04
CPH CWP # 03

13-Apr-10 C Pratick PPH Filters


Pot Room Hose pipe

14-Apr-10 A Venkat / Amit ACH Comp # 04

Pot Room Air Audit

14-Apr-10 B E Vendan ACH comp # 05


ACH comp # 06
ACH comp # 03

14-Apr-10 C Pratick PPH Filters


Pot Room Hose pipe
ACH Filter

15-Apr-10 A Venkat / Amit ACH comp # 03


Comp # 02
filter

15-Apr-10 B E Vendan ACH Comp # 01


ACH Filter
ACH comp # 03
ACH comp # 03
Pot Room Drinking waterline

15-Apr-10 C Pratick ACH comp # 03


Pot Room Hose pipe
PPH Filters

16-Apr-10 A Venkat / Amit CPH CWP # 03


RPH FFP#1
ACH Comp # 04

16-Apr-10 B E Vendan ACH Comp # 05


ACH Comp # 06
ACH Filter
RPH HWP 2
CPH Hoist

16-Apr-10 C Pratick ACH Filter


Pot Room Hose pipe
PPH Filters

17-Apr-10 A Venkat / Amit ACH Comp # 02


CPH HWP #3, 4
Pot Room hose pipe

17-Apr-10 B E Vendan ACH Comp # 01


ACH DW line
ACH Filter
Utilties

17-Apr-10 C Subhashish ACH Dewatering Pump


PPH Filters

18-Apr-10 A Venkat / Amit ACH Comp # 04


ACH filter
Pot Room hose pipe
All comp.

18-Apr-10 B Pratick ACH Comp # 05


ACH Comp # 06
ACH Filter
Pot Room hose pipe
Pot Room hose pipe

18-Apr-10 C Subhashish ACH Filter


Pot Room Air Audit
PPH Filters

19-Apr-10 A E Vendan ACH Comp # 02


CPH HWP 4
PPH/RPH Pumps

19-Apr-10 B Pratick CPH HWP 4


ACH Comp # 01
ACH Filter
ACH Blower
ACH Comp # 02

19-Apr-10 C Subhashish ACH Comp # 03


Pot Room Air Audit
PPH Filters

20-Apr-10 A E Vendan ACH Comp # 03 & 04


Sec. 3 Hydrant line
RPH Pumps

20-Apr-10 B Pratick Sec. 3 Hydrant line


ACH Comp # 05
ACH Comp # 06
ACH Filter
ACH Comp # 02
ACH Comp # 02
ACH Comp # 03
ACH Comp # 03
ACH Comp # 02

20-Apr-10 C Venkat / Amit ACH Comp # 03


ACH filters

21-Apr-10 A E Vendan Sec. 8 Blower


ACH Comp # 03
ACH Sec. compessor

21-Apr-10 B Pratick ACH Comp # 01


ACH Comp # 02
ACH Filter
ACH Blower

21-Apr-10 C Venkat / Amit ACH Filter


PPH DWP

22-Apr-10 A E Vendan ACH Comp # 04


ACH Water dispensar
Sec. 8 Blower

22-Apr-10 B Pratick ACH Comp # 05


ACH Comp # 06
ACH Filter
Sec. 8 Blower
CPH CWP # 02

22-Apr-10 C Venkat / Amit ACH filter


23-Apr-10 A E Vendan Pot Room Drinking waterline
CPH CWP # 01
CPH CWP # 03
CPH CWP # 01

23-Apr-10 B Pratick ACH Comp # 01


ACH Comp # 02
ACH Filter
Pot Room Drinking waterline
CPH CWP # 01
CPH CWP # 01
CPH CWP # 03

23-Apr-10 C Venkat / Amit ACH Filter


PPH DWP

24-Apr-10 A Subhashish ACH Comp # 04


ACH Filter
ACH Secondary Comp

Plant 2 Hydrant valve

24-Apr-10 B E Vendan ACH comp # 05


ACH comp # 06
ACH Filter
Plant 2 Hydrant line
ACH Secondary Comp
Pot Room Air Audit
24-Apr-10 C Venkat / Amit ACH Filter
PPH DWP
Pot Room hose pipe

25-Apr-10 A Pratick Pot Room Air Audit

25-Apr-10 B Venkat / Amit ACH Comp # 01


Comp # 02
PPH DWP
Filter

25-Apr-10 C Amit ACH Filter

26-Apr-10 A Prashant ACH Filter


Comp # 04
Secondary Comp
Pot Room hose pipe
DWP Monthly Maint
FFPH Monthly Maint

26-Apr-10 B Pratick ACH Comp # 05


ACH Comp # 06
ACH Filter
FFPH Monthly Maint
Monthly Maint
DWP Monthly Maint
ACH FAN
Pot Room hose pipe
26-Apr-10 C E Vendan ACH Filter
PPH DWP
ACH Fans

27-Apr-10 A Pratick ACH Fans


Pot Room hose pipe
ACH Comp # 03
ACH Comp # 06
ACH Comp # 06
Sec. 8 Blower

27-Apr-10 B Amit ACH Comp # 06


ACH Comp # 01
Comp # 02
ACH Filter

27-Apr-10 C E Vendan ACH Filter


PPH DWP
Pot Room hose pipe

28-Apr_10 A Venkat ACH Comp # 04


ACH filter
ACH Dryer #6
FFPH Diesel pump
ACH

28-Apr_10 B Amit ACH Comp # 03


ACH Comp # 05
ACH filter

28-Apr_10 C E Vendan ACH Filter


PPH DWP
Pot Room hose pipe
29-Apr_10 A Pratick ACH Fans
ACH Comp # 06
Plant 2 Water line
Pot Room Water line

29-Apr-10 B Venkat / Amit ACH Comp # 01


ACH Comp # 02
ACH Filter

29-Apr-10 C E Vendan PPH DWP


CPH Pumps

30-Apr-10 A Pratick ACH Comp # 04


ACH Fans
Pot Room hose pipe
Pot Room Water line
Plant 2 Water meter

30-Apr-10 B Venkat / Amit ACH Comp # 03


ACH Comp # 05
ACH filter
Pot Room hosepipe
ACH fan

30-Apr-10 C E Vendan PPH DWP


ACH Filter

1-May-10 A Subhashish / Venkat ACH Split ac


Pot Room hose pipe
ACH blower
ACH VFD
ACH fan
ACH blower

1-May-10 B Amit ACH Comp # 01


ACH Comp # 02
ACH Filter
ACH blower
ACH fan
CPH CWP # 03
CPH CWP # 04

1-May-10 C E Vendan PPH DWP


ACH Filter
Pot Room hose pipe

2-May-10 A Subhashish ACH Comp # 04


ACH Filter
Pot Room hosepipe

2-May-10 B Amit ACH Comp # 03


ACH Comp # 05
ACH filter

2-May-10 C Pratick ACH Filter


Pot Room hose pipe
PPH DWP

3-May-10 A Subhashish Pot Room hosepipe


ACH Dewatering Pump
ACH Comp # 01
ACH fan

3-May-10 B E Vendan ACH Comp # 01


ACH Comp # 02
ACH Filter
ACH fan

3-May-10 C Pratick ACH Filter


Pot Room hose pipe
PPH DWP

4-May-10 A Amit ACH Comp # 04


ACH Filter
Pot Room hosepipe
ACH fan
New Garage Water meter
ACH Comp # 06

4-May-10 B E Vendan ACH Comp # 03


ACH Comp # 05
ACH filter
ACH Comp # 06
ACH fan
CPH Hoist & sump pump

4-May-10 C Pratick CPH CWP # 04


CPH CWP # 03
ACH Comp # 06
ACH Comp # 06
ACH Comp # 06
ACH Comp # 05
ACH Filter
PPH DWP

5-May-10 A Amit ACH Comp # 05


ACH Fan
ACH Comp # 05
ACH Comp # 05

5-May-10 B Subhashish Pot Room hosepipe


ACH Comp # 01
ACH Comp # 02
ACH Filter
ACH Fan

5-May-10 C Pratick ACH Filter


PPH DWP
ACH Dryer # 05

6-May-10 A Amit ACH comp # 06


ACH Comp # 04
ACH Filter
ACH Fan
ACH Blower

6-May-10 B Subhashish ACH comp # 03


ACH Filter
ACH Fan
ACH Blower
ACH Pedestal Fan
RPH Cooling Tower

6-May-10 C Pratick ACH Filter


PPH DWP

7-May-10 A Amit ACH Blower


ACH Comp # 05
ACH Comp # 05
ACH Comp # 05
RPH Cooling Tower

7-May-10 B Subhashish ACH Comp # 01


ACH Comp # 02
ACH Filter
ACH Comp # 05

ACH Comp # 05
ACH Comp # 05

7-May-10 C Pratick ACH Comp # 05


ACH Filter
PPH DWP

8-May-10 A Amit ACH comp # 06


ACH Comp # 04
ACH Filter
ACH Comp # 05
RPH Cooling Tower

8-May-10 B E Vendan ACH Comp # 03


ACH Comp # 05
RPH Cooling Tower

8-May-10 C Subhashish Pot Room Air Audit


ACH Filter
PPH Dozing Pump
PPH DWP

9-May-10 A Amit ACH Fan


ACH Comp # 05
ACH Comp # 04
ACH Comp # 04

9-May-10 B Pratick ACH Comp # 04


ACH Comp # 04
ACH Comp # 04
ACH Comp # 02
ACH Comp # 02
ACH Fan
ACH Comp # 01
ACH Comp # 02
ACH Filter
ACH Comp # 04

9-May-10 C Subhashish Pot Room Air Audit


ACH Comp # 02
ACH Comp # 02
PPH DWP

10-May-10 A E Vendan ACH comp # 06


ACH Comp # 02
ACH Comp # 02

10-May-10 B Pratick ACH Comp # 02


ACH Comp # 02
ACH Comp # 02
ACH Fan
ACH Diesel Compressor
ACH comp # 03
ACH comp # 04
ACH Filter

10-May-10 C Subhashish Pot Room Air Audit


ACH comp # 05
ACH Filter
ACH Fan
PPH DWP

11-May-10 A E Vendan ACH Diesel Compressor


CPH C.T. # 02
LAB DW line

11-May-10 B Pratick ACH Comp # 01


ACH Comp # 02
ACH Filter
ACH Diesel Compressor

ACH Comp # 02
ACH Fan

11-May-10 C Amit Pot Room Air Audit


PPH DWP
ACH Filter

12-May-10 A Subhashish ACH comp # 06


ACH Filter
CPH C.T. # 03
ACH Diesel Compressor
Pot Room Watermeter
ACH Comp # 02
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03

12-May-10 B Pratick ACH Comp # 03


ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 03
ACH Comp # 04

12-May-10 C Amit ACH comp # 05


ACH Filter
Pot Room Air Audit
PPH DWP

13-May-10 A Venkat ACH comp # 03


ACH comp # 03
Pot Room Air Audit
Plant 2 steam line
Sec. 8 Water meter

13-May-10 B Pratick ACH comp # 03


ACH Comp # 01
RPH HWP # 01
RPH HWP # 03

13-May-10 C Amit ACH comp # 03


Pot Room Air Audit
PPH DWP

14-May-10 A Venkat RPH HWP # 02


ACH Comp # 02
ACH filter
ACH comp # 03

14-May-10 B Pratick ACH comp # 03


ACH Comp # 04
ACH Comp # 06
ACH filter
CPH Make-Up line
Pot Room Air Audit
ACH CWP # 02
ACH Comp # 03

14-May-10 C Amit Pot Room Air Audit


ACH comp # 05
ACH Filter
PPH DWP

15-May-10 A Venkat CPH CWP # 01


CPH filter
ACH Diesel Compressor
ACH Comp # 03
ACH Comp # 05

15-May-10 B Subhashish ACH Comp # 01 & 03


ACH filter
ACH Comp # 05
ACH Diesel Compressor

15-May-10 C Amit Pot Room Air Audit


ACH Filter
PPH DWP
ACH Fan

16-May-10 A Pratick ACH Comp # 02


ACH filter

16-May-10 B Subhashish ACH Comp # 04& 05


ACH filter
ACH Diesel Compressor
ACH Comp # 06

16-May-10 C Amit ACH Filter


PPH DWP
ACH Fan
CPH CWP # 04
CPH CWP # 01 & 03

17-May-10 A Pratick / Sahoo Plant 2 Drinking line


RPH Filter feed pump 1
RPH Filter feed pump 2
Pot Room Process water line

17-May-10 B Subhashish ACH Comp # 01 & 03


ACH filter
Pot Room Process water line
PPH TP # 01 & 02
CBM

17-May-10 C Venkat / Sahoo Pot Room Process water line


Pot Room hose pipe
ACH filter

18-May-10 A Pratick PPH TP # 03 & 04


RPH/ PPH/ FFPH Running equipment
Bake Oven & Cast House steam Line
CPH Railing
ACH Comp # 02
ACH filter

18-May-10 B Amit ACH Comp # 04


ACH Comp # 06
ACH filter
CPH Railing
ACH Dewatering pump

18-May-10 C Venkat / Sahoo ACH Fan


ACH Filter

19-May-10 A Pratick CPH Railing


CPH CWP # 02
CPH CWP # 03

19-May-10 B Amit ACH Comp # 01


ACH comp # 03
ACH filter
CPH CWP # 04
CPH CWP # 03
CPH CWP # 04
CPH CWP # 04
CPH AVGF
CPH Chemical
CPH CWP # 01

19-May-10 C Venkat / Sahoo Pot Room Hose pipe


ACH filter

20-May-10 A Pratick CPH HWP # 04


CPH Railing
ACH Comp # 02
ACH filter
20-May-10 B Amit ACH Comp # 04
ACH Comp # 06
ACH filter
CPH HWP # 03
CPH Chemical
CPH AVGF

21-May-10 C Venkat / Sahoo ACH filter

21-May-10 A Pratick CPH HWP # 01


CPH Railing
CPH HWP # 02
CPH HWP # 03
CPH HWP # 04
CPH HWP # 01
CPH HWP # 02

21-May-10 B Amit ACH Comp # 01


ACH comp # 03
ACH filter
CPH Railing

21-May-10 C Venkat / Sahoo ACH Cooling Fan


ACH filter

22-May-10 A Subhashish CPH Railing


Pot Room Hosepipe

22-May-10 B Amit ACH Comp # 02


ACH Comp # 04
ACH Comp # 06
ACH filter
CPH Railing
ACH Exhaust fan

22-May-10 C Venkat / Sahoo ACH filter


Pot Room Hosepipe
ACH Cooling Fan

23-May-10 A Subhashish Pot Room Hosepipe


ACH Cooling Fan

23-May-10 B Amit ACH Comp # 01


ACH comp # 03
ACH filter
CPH AVGF
CPH Chemical

23-May-10 C Venkat CPH filter

24-May-10 A Subhashish Pot Room Hosepipe


ACH Cooling Fan
ACH filter
ACH Comp # 04
CPH Railing
DWP Flushing

24-May-10 B Venkat / Sahoo ACH FILTER

24-May-10 C Pratick ACH filter


PPH DWP
ACH Comp # 05
25-May-10 A Amit ACH Comp # 05
ACH Comp # 03
Bake Oven & Cast House Steamline
Pot Room Air Audit

25-May-10 B Venkat / Sahoo ACH primary filter


ACH comp # 03
Pot Room Air Audit
ACH filter
ACH comp # 03
CPH Chemical

25-May-10 C Pratick ACH filter


PPH DWP
Pot Room Air Audit

26-May-10 A Amit ACH Comp # 04


ACH filter
Bake Oven & Cast House Steamline
Pot Room Air Audit
ACH comp # 03
ACH Railing
ACH Condensate Moisture

26-May-10 B Venkat / Sahoo ACH Thermo static valve


ACH Comp # 02
ACH comp # 06
ACH gate
Pot Room hose pipe

26-May-10 C Pratick ACH filter


PPH DWP
ACH comp # 05

27-May-10 A Amit ACH Comp # 01


ACH Comp # 03
ACH filter
Bake Oven & Cast House Steamline
Pot Room hosepipe

27-May-10 B Venkat / Sahoo Pot Room Air audit


ACH filter wall
ACH VFD
ACH thermo static valve

27-May-10 C Pratick ACH Comp # 03


PPH DWP
Pot Room Air Audit

28-May-10 A Amit ACH Comp # 04


ACH Comp # 03
ACH filter
Bake Oven & Cast House Steamline
Pot Room hosepipe
FFPH FFP
FFPH FFP
FFPH FFP

28-May-10 B Venkat / Sahoo ACH Comp # 02


ACH Comp # 06
Pot Room Air audit
ACH filter wall
ACH filter

28-May-10 C Pratick ACH filter


ACH comp # 05
Pot Room Air Audit
ACH Comp # 04
ACH Comp # 03

29-May-10 A Prashant ACH filter


ACH Comp # 01
Bake Oven & Cast House Steamline
FFPH FFP
FFPH FFP
Pot Room hose pipe
Cast House DWL
ACH Comp # 04

29-May-10 B Venkat / Sahoo FFPH FFP


ACH condensate header
ACH VFD
Pot Room hose pipe
ACH primary filter

29-May-10 C Subhashish Pot Room hose pipe


PPH DWP

30-May-10 A Pratick ACH Cooling Fan


Pot Room hose pipe

30-May-10 B Venkat ACH Comp # 02


ACH comp # 06
Pot Room hose pipe

30-May-10 C Subhashish Pot Room hose pipe


ACH filter
ACH comp # 05
ACH Comp # 04
ACH Cooling Fan
PPH DWP

31-May-10 A Pratick / Sahoo Pot Room hose pipe


ACH Comp # 01
ACH filter
ACH Comp # 04
Plant 2 Drinking line
ACH Dryer # 06

31-May-10 B Pratick ACH Comp # 04


Pot Room hose pipe
Plant 2 Drinking line
ACH Dryer # 06
ACH comp # 03
ACH filter

31-May-10 C Subhashish Pot Room hose pipe


ACH filter
PPH DWP

1-Jun-10 A Venkat / Sahoo ACH Dryer ! &6,5


Pot Room air audit
Plant 2 water meter

1-Jun-10 B Pratick ACH Dryer # 06


Plant 2 water meter
ACH Comp # 04
ACH Comp # 02
ACH comp # 06
ACH filter
1-Jun-10 C Amit Pot Room hose pipe
ACH filter
ACH comp # 05
PPH DWP

2-Jun-10 A Venkat / Sahoo Pot Room hose pipe


ACH Comp # 01
Plant 2 steam line flushing
ACH Intercooler#2
ACH filter
ACH filter wall fabrication

2-Jun-10 B Pratick Pot Room hose pipe


ACH comp # 03
ACH filter
ACH comp # 04

2-Jun-10 C Amit Pot Room hose pipe


ACH filter
PPH DWP

3-Jun-10 A Venkat / Sahoo Pot Room hose pipe


Plant 2 steam line
ACH filter wall
Bake Oven valve replacement

3-Jun-10 B Pratick ACH comp # 04


ACH Comp # 02
ACH comp # 06
ACH filter

3-Jun-10 C Amit Pot Room hose pipe


ACH comp # 05
ACH filter
PPH DWP

4-Jun-10 A Pratick / Sahoo Pot Room hose pipe


ACH Comp # 01
ACH filter

4-Jun-10 B Venkat ACH Comp # 03


ACH Comp # 04
Pot Room hose pipe
ACH primary filter

4-Jun-10 C Amit Pot Room hose pipe


ACH filter
PPH DWP
ACH Comp # 04

5-Jun-10 A Venkat / Sahoo ACH Comp # 04


Cast House Welding work
GAP Drinking line
Pot Room hose pipe

5-Jun-10 B Subhashish ACH Comp # 02


ACH Comp # 06
Pot Room hose pipe
ACH filter
CPH CWP # 02

5-Jun-10 C Amit Pot Room hose pipe


ACH comp # 05
ACH filter
PPH DWP
6-Jun-10 A E Vendan ACH Comp # 01
ACH Dewatering pump
ACH Dryer 1

6-Jun-10 B Subhashish ACH Comp # 03


ACH Filter
ACH Comp # 04

ACH Dryer # 01

6-Jun-10 C Venkat / Sahoo Pot Room hose pipe


ACH primary filter

7-Jun-10 A Subhashish ACH Dryer


DWP Flushing

Pot Room Air Audit


RPH Maintenance
Bake Oven Air leakege

7-Jun-10 B E Vendan ACH Comp # 04


ACH Dryer 6
RPH Cooling Tower
ACH Comp # 02 & 06

7-Jun-10 C Venkat / Sahoo Pot Room hose pipe


ACH Primary filter
ACH Comp # 05
PPH DWP

8-Jun-10 A Prashant ACH Primary filter


ACH Comp # 01
DW Section # 01
ACH Comp # 04
CPH AVGF

8-Jun-10 B Amit ACH Comp # 03


ACH Filter
RPH Cooling tower
CARBON PLANT DWP

8-Jun-10 C Venkat / Sahoo ACH primary filter


POT ROOM Air audit

9-Jun-10 A Subhashish Potroom Section 1


RPH CT

Air Audit Potroom

Air Audit Potroom

9-Jun-10 B Amit ACH Comp # 02


ACH Comp # 06
ACH Filter
ACH Dryer

Pot Room Air Audit

9-Jun-10 C Venkat / Sahoo Pot Room Air Audit


ACH Comp # 05
ACH Filter

10-Jun-10 A Subhashish ACH Comp # 01


ACH Filter
CPH CT
ACH Secondary Comp
Air Audit Potroom
ACH Comp # 04

10-Jun-10 B Amit ACH Comp # 03


ACH Filter
ACH Comp # 04
CPH ACGF
ACH Comp # 04
ACH Comp # 04
ACH Comp # 04
ACH Comp # 04
ACH Comp # 04

10-Jun-10 C Venkat / Sahoo ACH primary filter


Pot room Air audit
PPH DWP

11-Jun-10 A Subhashish CPH CT


ACH Comp # 04

ACH Comp # 04

11-Jun-10 B Amit ACH Comp # 02


ACH Comp # 06
ACH Filter
CPH AVGF
ACH Comp # 04
ACH Comp # 04
ACH Comp # 04
ACH Comp # 04

11-Jun-10 C DD Sahoo/ Venkatesh ACH Comp # 05


ACH Filter
Pot room Air audit

12-Jun-10 A Subhashish ACH Comp # 06


ACH Filter
CPH CT
ACH Comp # 04

12-Jun-10 B Amit ACH Comp # 04


ACH Comp # 03
ACH Filter
ACH Comp # 04
ACH Comp # 06

12-Jun-10 C DD Sahoo/ Venkatesh Pot room Air audit


ACH Filter

13-Jun-10 A Subhashish Laboratory Rerouting


Pot room Air audit

13-Jun-10 B Amit ACH Comp # 02


ACH Filter
Pot room Air audit

13-Jun-10 C Pratick ACH Comp # 05


ACH Filter
PPH DWP
Pot room Air audit

14-Jun-10 A Subhashish Laboratory Rerouting


ACH Comp # 01
ACH Filter
ACH Comp # 06

14-Jun-10 B DD Sahoo/ Venkatesh ACH Comp # 06


ACH Comp # 06
ACH Comp # 06
ACH Comp # 06
ACH Comp # 06
ACH Comp # 06
ACH Comp # 03
ACH Comp # 04
ACH filter

14-Jun-10 C Pratick ACH Filter


PPH DWP
Pot room Air audit

15-Jun-10 A Amit ACH Comp # 06


ACH Comp # 06
ACH Comp # 06
ACH Comp # 06
Pot room Air audit
15-Jun-10 B DD Sahoo/ Venkatesh ACH Comp # 06
ACH Comp # 06
ACH Comp # 06
ACH Comp# 02
ACH Filter
RPH HWP #2
ACH Comp # 06

15-Jun-10 C Pratick ACH Comp # 05


ACH Filter
PPH DWP
Pot room Air audit

16-Jun-10 A Amit ACH Comp # 06


Pot room Air audit
PPH Pump#03
PPH Pump#04
ACH Filter

16-Jun-10 B DD Sahoo/ Venkatesh PPH Pump #1


PPH Pump #2
ACH comp # 3, 4
ACH [rimary filter
ACH Comp # 06

16-Jun-10 C Pratick ACH Filter


PPH DWP

17-Jun-10 A Amit ACH Filter


Pot Room Drinking water line
Pot room Air audit
17-Jun-10 B DD Sahoo/ Venkatesh ACH Comp# 2
CPH HWP # 1
CPH HWP # 2
ACH filter
Potroom Air audit

17-Jun-10 C Pratick ACH Comp # 05


ACH Filter
PPH DWP

18-Jun-10 A Amit ACH Comp # 01


ACH filter
ACH Dryer # 06
CPH AVGF
ACH/CPH CWP
Potroom Air audit

18-Jun-10 B DD Sahoo/ Venkatesh ACH Comp # 3 & 4


CPH HWP # 3
ACH comp #6
ACH diesel comp
Pot room Air audit
ACH

18-Jun-10 C Pratick ACH Filter


PPH DWP
Pot room Air audit

19-Jun-10 A Amit CPH HWP # 4


ACH Cast house gate
CPH AVGF
Pot room Air audit
CPH CWP # 1
19-Jun-10 B DD Sahoo/ Venkatesh Pot room Air audit
ACH filter wall
CPH CWP # 2
ACH gate fabrication
ACH Comp # 02
ACH filter

19-Jun-10 C Subhashish ACH Comp # 5


ACH filter
Pot room Air audit

20-Jun-10 A Amit ACH Comp # 01


ACH filter
CPH AVGF
Pot room Air audit

20-Jun-10 B Pratick ACH Comp # 03


ACH Comp # 04
ACH filter

20-Jun-10 C E Vendan ACH PPH


ACH filter

21-Jun-10 A DD SAHOO/VENKATESH ACH Comp # 6


CPH CWP # 3
RPH Drain cleaning
Q &A Lab Drinking water line
ACH filter wall and height work
ACH Painting
ACH Air audit

21-Jun-10 B Pratick ACH Comp # 02


ACH filter
ACH Comp # 06
GAP Process Water
Bake Oven Fire hydrant

21-Jun-10 C E Vendan ACH PPH


ACH filter
ACH Comp # 05

22-Jun-10 A DD SAHOO/VENKATESH RPH Drain cleaning


ACH Painting
ACH Comp # 01
BAKE OVEN Hydrant line
CPH CWP # 4
POT ROOM & CARBON AREADrinking water line
Pot room
ACH filter

22-Jun-10 B Pratick ACH Comp # 03


ACH Comp # 04
ACH filter
ACH Dryer # 04
ACH Comp # 06
ACH Comp # 01
ACH Comp # 01
ACH Comp # 01

22-Jun-10 C Amit ACH filter


ACH PPH
Pot room Air audit

23-Jun-10 A DD SAHOO/VENKATESH ACH comp #1


24-Jun-10
23-Jun-10 B Pratick ACH comp # 01
ACH comp # 01
ACH comp # 01
ACH Comp # 02
ACH filter
RPH CWP # 03

23-Jun-10 C Amit ACH PPH


ACH filter
ACH Comp # 05
Pot room Air audit

24-Jun-10 A DD SAHOO/VENKATESH Pot room Air audit


ACH Comp #1
ACH Comp #1
ACH Comp # 3
ACH Filter
CENTRAL STORE Water line
Rodding fabrication

24-Jun-10 B Pratick ACH Comp #1


ACH Dryer # 01
ACH Comp # 04
ACH Comp # 06
ACH Filter
Rodding fabrication
RPH Water line

24-Jun-10 C Pratick ACH PPH


ACH filter
25-Jun-10 A DD SAHOO/VENKATESH Pot room Air audit
ACH Painting
ACH
Store-ACH chemical shifting
RPH CWP # 2

25-Jun-10 B Prashant ACH Painting


ACH
ACH Comp # 02
ACH Filter
ACH
Pot room Air audit

25-Jun-10 C Amit ACH PPH


ACH filter
ACH Comp # 05
Pot room Air audit

26-Jun-10 A V.Venkat/D.D SAHOO ACH Comp # 03


ACH ACH
ACH ACH
FFPH main pump # 2
FFPH main pump # 3
PPH dozing pump
Pot room Air audit

26-Jun-10 B Prashant ACH Comp # 04


ACH Comp # 06
ACH Filter

26-Jun-10 C Amit ACH PPH


ACH filter
Pot room Air audit

27-Jun-10 A Pratick
Pot room Air audit

27-Jun-10 B Subhashish ACH Comp # 02


ACH Filter

Pot room Air Audit

27-Jun-10 C Amit ACH PPH


ACH filter
ACH Comp # 05
Pot room Air audit

28-Jun-10 A Pratick ACH Comp # 03


ACH Filter
ACH Spare Header
Carbon Air Audit
Pot Room Drinking line
Pot Room+ Cast
house+ LPG Yard Fire hydrant

28-Jun-10 B Subhashish ACH Comp # 06 & 04


ACH Header

Pot room Air Audit

28-Jun-10 C DD SAHOO/VENKATESH ACH filter


POT ROOM Airaudit

29-Jun-10 A Pratick ACH Spare Header


ACH Dryer # 05
CPH Barrication
29-Jun-10 B Amit ACH Comp # 02
ACH Filter
Pot room Air Audit
CPH Barrication

29-Jun-10 C DD SAHOO/VENKATESH Pot room Air Audit


ACH Comp # 05
ACH filter

30-Jun-10 A Pratick ACH Comp # 03


ACH Filter
ACH Comp # 01
ACH Comp # 01
ACH Comp # 01

30-Jun-10 B Amit ACH Comp # 06 & 04


ACH Filter
Pot room Air Audit

30-Jun-10 C DD SAHOO/VENKATESH Pot room Air Audit


ACH Comp # 4
ACH Comp # 4
ACH Filter

1-Jul-10 A Pratick ACH Comp # 04


ACH Comp # 04
ACH Comp # 04
ACH Comp # 04

1-Jul-10 B Amit ACH Comp # 02


Pot room Air Audit
ACH Comp # 04
ACH Comp # 04

1-Jul-10 C DD SAHOO/VENKATESH Pot room Air Audit


ACH Comp # 05
POT ROOM Fire hydrant
ACH primary filter

2-Jul-10 A Prashant ACH Comp # 01


ACH Comp # 03
ACH primary filter
Pot room Air Audit
ACH Comp # 04
ACH Comp # 04

2-Jul-10 B Amit ACH Comp # 04


ACH Comp # 04
ACH Comp # 06
ACH primary filter
Pot room Air Audit

2-Jul-10 C DD SAHOO/VENKATESH Pot room Air Audit


ACH Comp # 04

3-Jul-10 A Subhashish Pot room Air Audit


ACH Comp # 04
ACH Comp # 04
ACH Dryer # 04
ACH Dryer # 04
ACH Dryer # 04
ACH Comp # 01

3-Jul-10 B Amit ACH Comp # 02


Pot room Air Audit
ACH Comp # 04
ACH primary filter

3-Jul-10 C DD SAHOO/VENKATESH ACH Comp # 05


Pot room Air Audit
ACH primary filter

4-Jul-10 A Prashant ACH Comp # 01


ACH Comp # 03
ACH primary filter
Pot room Air Audit
CPH AVGF
ACH Dryer 5

4-Jul-10 B Amit ACH Dryer 5


ACH Comp # 06
ACH primary filter
Pot room Air Audit

4-Jul-10 C Pratick ACH Filter


PPH DWP

5-Jul-10 A Prashant ACH Dryer 5


CPH AVGF
CPH HWP 01
CPH HWP 02
Plant 2 DWL
ACH Comp #06
Pot room Air Audit

5-Jul-10 B DD SAHOO / V.Venkatesh Pot room Air Audit


ACH Comp # 02
ACH Material shifting
ACH Stainer fabrication
ACH Water draining
ACH primary filter cleaning

5-Jul-10 C Pratick ACH Comp # 05


Pot room Air Audit
ACH primary filter
ACH Dryer 6
PPH DWP

6-Jul-10 A Amit ACH Comp # 01


ACH Comp # 03
ACH primary filter
CPH AVGF
Pot room Air Audit
CPH HWP#01 & 02
CPH HWP#03 & 04
CPH HWP# 03
CPH HWP# 04
ACH Airconditioner

6-Jul-10 B V Venkatesh ACH Comp#6


ACH All compn
ACH steam line
ACH primary filter
ACH hose pipe
ACH sec comp

6-Jul-10 C Pratick ACH Filter


PPH DWP

7-Jul-10 A Amit ACH hose pipe


CPH CWP#01
CPH AVGF
ACH Comp#6

7-Jul-10 B V Venkatesh ACH comp #2


CPH CWP#2
ACH comp #6
ACH CWP #2
Pot room Air audit
ACH primary filter

7-Jul-10 C Pratick ACH Comp # 05


Pot room Air Audit
ACH primary filter
PPH DWP

8-Jul-10 A Amit ACH Comp # 01


ACH Comp # 03
ACH primary filter
CPH AVGF
Pot room Air Audit
CPH CWP#02
CPH CWP#04
CPH CWP#04
ACH Cooling Tower#01
ACH Comp#06
ACH comp #6
ACH Dryer#06
CPH CWP#04
CPH CWP#03

8-Jul-10 B V Venkatesh ACH CWP # 3


ACH Dryer#6
ACH comp#6
ACH comp#5
Pot room Air audit
CPH AVGF filter
ACH primary filter

8-Jul-10 C Pratick ACH Filter


PPH DWP

9-Jul-10 A Amit CPH AVGF


Pot room Air audit
Casthouse/Bakeoven Steamline
ACH Dryer#06
CPH CWP#03
ACH Comp#04
ACH Comp#02
ACH Comp#02
CPH CWP#03
PPH Pump#01 & 03
PPH Pump#01 & 03

9-Jul-10 B V Venkatesh CPH cooling tower #1


ACH dryer #6
CPH AVGF
ACH primary filter cleaning
Pot room hose pipe
Pot room steam line
ACH COMP # 02

9-Jul-10 C Pratick ACH Comp # 05


Pot room Air Audit
ACH primary filter
PPH DWP
10-Jul-10 A Amit ACH Comp # 01
ACH Comp # 03
ACH primary filter
CPH AVGF
ACH Dryer#06
Pot room Air audit
ACH Comp#02
CPH HWP#03 & 04
CPH HWP#01 & 02
ACH CT#01
ACH CT#01
ACH CT#02
ACH CT#02
ACH CT#03
ACH CT#03
CPH HWP#01 & 02
CPH HWP#03& 04
ACH CT#01
ACH CT#01
ACH CT#02
ACH CT#02
ACH CT#03
ACH CT#03
RPH hot well #3

10-Jul-10 B V Venkatesh ACH comp #6


Pot room hose pipe
ACH primary filter
ACH dryer #6
ACH Comp # 02

10-Jul-10 C Prashant ACH primary filter


Pot room hose pipe
ACH Comp # 02
PPH DWP

11-Jul-10 A Amit CPH AVGF


Pot room Air audit
ACH Comp#02
ACH Comp#04
CPH CWP#03
CPH CWP#03
ACH Comp#04
ACH Dryer#01

11-Jul-10 B Pratick ACH Comp#04


ACH Comp # 04
ACH primary filter
Pot room Air audit

11-Jul-10 C Prashant ACH primary filter


ACH Comp # 5
Pot room hose pipe
ACH Comp # 4
PPH DWP

12-Jul-10 A V Venkatesh ACH COMP # 1,3


POT ROOM AIR AUDIT
ACH FILTER WALL
RPH HOT WELL #1

12-Jul-10 B Pratick ACH Comp#04


RPH hot well #2
ACH comp #6
ACH primary filter
12-Jul-10 C Prashant ACH primary filter
Pot room hose pipe
PPH DWP

13-Jul-10 A V Venkatesh ACH Comp # 02


ACH comp # 4
Plant -II steam line
potroom hose pipe
ACH filter wall
ACH primary filter

13-Jul-10 B Pratick ACH Comp#04


Bake open Fire hydrant

13-Jul-10 C Amit ACH primary filter


ACH Comp # 5
Pot room hose pipe
PPH DWP

14-Jul-10 A V Venkatesh ACH filter wall


ACH Air Conditoner
RPH filter feed pump
Pot room hose pipe
ACH comp #1
ACH strainer
ACH comp # 4
ACH primary filter

14-Jul-10 B Pratick RPH filter feed pump # 02


ACH comp # 06
ACH comp # 03
ACH comp # 04
14-Jul-10 C Amit Pot room hose pipe
PPH DWP
ACH primary filter

15-Jul-10 A V Venkatesh ACH comp # 02


ACH comp #04
GAP flow meter
FTP flow meter
Pot room hose pipe
ACH primary filter

15-Jul-10 B Subhashish ACH comp #04


CPH Flowmeter

Pot room Air Audit

15-Jul-10 C Amit ACH primary filter


ACH Comp # 5
Pot room hose pipe
PPH DWP

16-Jul-10 A V Venkatesh ACH comp # 4


RPH
Pot room hose pipe
ACH
plant-ii steam line
ACH Comp # 01
ACH primary filter

16-Jul-10 B Pratick ACH comp # 06


ACH comp # 03
CPH Flow meter chamber
PPH TP# 02
PPH TP# 024

16-Jul-10 C Amit Pot room hose pipe


PPH DWP
ACH primary filter

17-Jul-10 A DDSahoo / V venkatesh ACH Comp # 02


RPH Draini cleaning work
ACH Comp # 4
ACH Primary filter
Pot room flow meter
GAP flow meter
ACH Fabrication
Pot room Airaudit

17-Jul-10 B E Vendan ACH Comp # 4


ACH Comp # 3
ACH CWP 3
FFPH JP

17-Jul-10 C E Vendan ACH Comp # 5


ACH primary filter
CPH CT # 01
PPH DWP

18-Jul-10 A Subhashish ACH Comp # 01


ACH Primary filter

Pot room Airaudit


ACH Dewatering
ACH Comp # 03

18-Jul-10 B Pratick ACH comp # 06


ACH primary filter

ACH Comp # 03
PPH DWP

18-Jul-10 C Amit Pot room hose pipe


PPH DWP

19-Jul-10 A Pratick ACH comp # 02


ACH primary filter
GAP Flow Meter
ACH Comp # 03

ACH Comp # 03
ACH Comp # 03
Plant 2 Drinking line

19-Jul-10 B Subhashish ACH comp # 04


ACH comp # 05
ACH primary filter
GAP Flow Meter
ACH Comp # 03
Plant 2 Drinking line
ACH Dewatering

19-Jul-10 C DDSahoo / V venkatesh ACH primary filter


ACH Dewatering
ACH Comp # 03
ACH Trench plate

20-Jul-10 A Prashant ACH Comp # 01


ACH Primary filter
ACH Dewatering
ACH Comp # 03
PPH DWP
Pot room Airaudit

20-Jul-10 B E Vendan ACH Comp # 06


ACH Primary filter
ACH Comp # 03
PPH DWP
ACH Comp # 02
Rodding PW line

20-Jul-10 C DDSahoo / V venkatesh Pot room Airaudit


ACH Dewatering

21-Jul-10 A Pratick ACH comp # 02


ACH primary filter
ACH Comp # 03

21-Jul-10 B Amit CPH CWP#02&04;HWP#01&02


ACH Comp#01,02,04,05&06
ACH comp # 04
ACH comp # 05
ACH primary filter

21-Jul-10 C DDSahoo / V venkatesh Pot room Airaudit


ACH primary filter

22-Jul-10 A Pratick ACH Comp # 01


ACH Primary filter
CPH CT # 01
Carbon Airaudit
ACH Comp#03
ACH Comp#01
22-Jul-10 B E Vendan ACH comp # 06
ACH primary filter
Pot room Airaudit
ACH ACH

22-Jul-10 C DDSahoo / V venkatesh ACH comp # 01


POT Room hose pipe

23-Jul-10 A Pratick ACH comp # 02


ACH primary filter
ACH comp # 03
CPH CT # 02
ACH Dewatering line
ACH comp # 01
POT Room hose pipe

23-Jul-10 B Amit ACH comp # 04


ACH comp # 05
ACH primary filter
ACH comp # 01
CPH Railing

23-Jul-10 C DDSahoo / V venkatesh ACH comp #1


ACH primary filter
Pot room Air audit

24-Jul-10 A E Vendan ACH Sec. Compressor


ACH Comp 1
ACH Comp 4
Pump Hosues Drainline

24-Jul-10 B Subhashish ACH comp # 06


ACH primary filter
Pot room Air audit
ACH Comp 1
ACH Sec. Compressor
ACH Dewatering

24-Jul-10 C DDSahoo / V venkatesh Pot room hose pipe


ACH Secondary compressor

25-Jul-10 A Subhashish ACH comp # 02


ACH comp # 03
ACH primary filter
Pot room Air audit

25-Jul-10 B Amit ACH comp # 04


ACH comp # 05
ACH primary filter
Pot room Air audit

25-Jul-10 C Pratick ACH Dewatering


ACH primary filter
PPH DWP

26-Jul-10 A Subhashish CPH CT# 03


DWP Flushing
Comp # 01 Header

Pot room Air audit


ACH primary filter

26-Jul-10 B DDSahoo / V venkatesh Comp # 01 Header


ACH Dryer #1,2,3,4,5,6
ACH Water sample
ACH Comp # 6
ACH Primary filter
ACH Dewatering
DWP Flushing
ACH secondary comp

26-Jul-10 C Pratick ACH Dewatering


PPH DWP
Pot room Air audit

27-Jul-10 A Amit ACH comp # 02


ACH comp # 03
ACH primary filter
Pot room Air audit
Comp # 01 Header

27-Jul-10 B DDSahoo ACH comp # 4


ACH comp # 5
ACH Condensate sample
ACH Filter
ACH Dewatering
ACH Fabrication
FFPH Main pump # 2 & 3
CPH

27-Jul-10 C Pratick PPH DWP


ACH primary filter
CPH HWP # 01
CPH HWP # 03 & 04

28-Jul-10 A Amit Comp # 01 Header

Pot room Air audit


ACH primary filter
CPH AVGF
CPH CWP#03
CPH CWP#01
ACH Comp # 01

28-Jul-10 B DDSahoo / V venkatesh ACH Comp # 6


ACH Comp #1
ACH Comp # 01
ACH Comp #1
Potroom Airaudit
ACH Filter
ACH Dewatering
CPH Railing

28-Jul-10 C Pratick ACH Dewatering


PPH DWP

29-Jul-10 A E Vendan ACH Comp # 01


Alumina Station Air line
Potroom Air line
ACH Intercoler Headers

29-Jul-10 B DD Sahoo/ Venkatesh ACH Comp # 5


ACH Filter
CPH Fabrication
CPH Flow meter
ACH Filetrwall
ACH Comp # 4
Potroom Airaudit

29-Jul-10 C Pratick PPH DWP


ACH primary filter
30-Jul-10 A DD Sahoo/ Venkatesh Potroom Airaudit
Plant-II Water meter reading
CPH Fabrication and Railing
CPH HWP # 2
ACH Comp#1
Q & A Lab Air line
ACH primary filter

30-Jul-10 B Subhashish ACH Comp # 6


ACH Filter
CPH Fabrication and Railing

ACH Dryer # 05

Potroom Airaudit
ACH Intercoolers

30-Jul-10 C Pratick PPH DWP


ACH Comp#1

31-Jul-10 A E Vendan ACH Comp # 01


ACH Comp # 02
ACH Comp # 3

31-Jul-10 B DD Sahoo/ Venkatesh ACH Comp # 4


ACH Comp # 5
ACH DRYER # 1
ACH OIL Barrel
Potroom Airaudit
ACH primary filter

31-Jul-10 C Pratick PPH DWP


ACH primary filter
1-Aug-10 A Amit Pot room Air audit
ACH primary filter
CPH AVGF
CPH CWP#01

1-Aug-10 B Subhashish ACH Comp # 6


ACH Filter
Bake Oven Flowmeter

1-Aug-10 C DD Sahoo/ Venkatesh ACH Dewatering


Pot room Air audit

2-Aug-10 A Subhashish ACH Comp # 02


ACH Comp # 3
ACH Filter
Plant II Flushing

Potroom Airaudit
ACH Airline
ACH Comp # 01

2-Aug-10 B E vendan ACH Comp # 4


ACH Comp # 5
CPH Flowmeter chamber
ACH ADV

2-Aug-10 C DD Sahoo/ Venkatesh POT ROOM hose pipe


ACH primary filter

3-Aug-10 A Subhashish ACH Comp # 01

ACH Comp # 02
Potroom Airaudit

ACH Airline
ACH Filter

ACH Dewatering

3-Aug-10 B Amit ACH Comp # 6


ACH primary filter

ACH Airline

ACH Dewatering

Potroom Airaudit
CPH CWP#01
CPH CWP#03
CPH CWP#03
CPH CWP#01
ACH Comp # 01

3-Aug-10 C DD Sahoo/ Venkatesh POT ROOM hose pipe


ACH Dewatering

4-Aug-10 A Subhashish ACH Comp # 02


ACH Comp # 3
ACH Filter

Potroom Airaudit

ACH Airline
ACH Dewatering pump
ACH Comp # 01
ACH Comp # 01
ACH Trench Plates
CPH CWP # 01

4-Aug-10 B E Vendan ACH Comp # 4


ACH Comp # 5

ACH Airline
ACH Comp 1
ACH Comp 1
CPH CWP 1
CPH CWP 1

4-Aug-10 C Amit ACH Comp # 01

Potroom Airaudit
ACH Filter
CPH CWP 1

5-Aug-10 A E.Vendan Potroom Airaudit


ACH Comp #1
ACH Comp #2
RPH CWP #1

Potroom Water line Fabrication

5-Aug-10 B DDSahoo / Venkatesh ACH comp#6


ACH Comp # 01
RPH CWP #1
pot room zero level pipe line
Poroom Airaudit
Potroom Section -1 garage
ACH PRIMARY FILTER
5-Aug-10 C Amit Poroom Airaudit
ACH Comp # 01

6-Aug-10 A Pratick Potroom Airaudit


ACH Comp # 02
ACH Comp # 3
ACH Filter
ACH Plate
ACH Comp # 01

6-Aug-10 B DDSahoo ACH Comp #5


ACH ComP# 4
ACH Dewatering pump

ACH Comp # 01
ACH secondary filter
RPH & FFPH Fabrication
ACH Comp # 01
ACH Dewatering pump
ACH Comp # 01
ACH Filter

6-Aug-10 C Amit Poroom Airaudit


ACH Primary filter
ACH Comp # 5

7-Aug-10 A Pratick ACH Comp # 05


ACH Comp # 05
ACH Comp # 05
ACH Comp # 05
ACH Primary filter
CPH CWP # 01
7-Aug-10 B DDSahoo ACH Comp # 05
ACH Comp # 05
ACH Comp # 05
ACH comp # 6
FFPH Fabrication
ACH Water line
ACH Fabrication
ACH Filter

7-Aug-10 C Amit Poroom Airaudit

8-Aug-10 A Pratick ACH Comp # 05


ACH Fabrication
ACH Filter
ACH Comp # 02
ACH Comp # 3

8-Aug-10 B DDSahoo ACH Comp # 4


ACH Comp # 01
POTROOM Airaudit
ACH Filter

8-Aug-10 C Amit Poroom Airaudit


ACH Filter

9-Aug-10 A Pratick ACH Comp # 05


ACH Comp # 05
Plant 2 Drinking Line
Poroom Airaudit

9-Aug-10 B DDSahoo ACH Comp # 05


Poroom Airaudit
ACH Comp # 6
Plant 2 Drinking Line
ACH Filter

Section-8,potroom fire fighting line


ACH Dewatering pump

9-Aug-10 C Subhashish Poroom Airaudit


ACH Comp # 02
ACH Dewatering

10-Aug-10 A Amit ACH Comp # 02


ACH Comp # 3
ACH Filter
ACH Comp # 05
Poroom Airaudit

10-Aug-10 B DDSahoo ACH Comp # 4


ACH Comp # 01
ACH Filter
ACH Dewatering pump
lab Process water line
plant -II water meter
ACH COMP#5
ACH Potroom

10-Aug-10 C Subhashish Poroom Airaudit


ACH Aftercooler
ACH Dewatering
ACH Filter

11-Aug-10 A Amit ACH Trench cover


Poroom Airaudit
RPH HWP#02
ACH Filter
Carbon Water meter

11-Aug-10 B Subhashish ACH Comp # 6


ACH Filter
Carbon Water meter
ACH Dryer # 05
Poroom Airaudit
Pot overhaul Water line

11-Aug-10 C Pratick Poroom Airaudit


ACH Dewatering
PPH DWP
ACH Aftercooler

12-Aug-10 A DDSAHOO ACH Comp # 02


ACH Comp # 3
ACH Filter
Poroom Airaudit
ACH dryer#5
ACH ComP #5
Rodding Flow meter

12-Aug-10 B E vendan ACH Comp # 01


ACH Comp # 4
ACH Filter
ACH dryer#5
Poroom Airaudit

12-Aug-10 C Pratick Poroom Airaudit


ACH Dewatering
PPH DWP

13-Aug-10 A DDSAHOO RPH filter feed pump-1


RPH filter feed pump-2
ACH Dryer-1
ACH filter
RPH Railing and fabrication
ACH Dryer# 5
ACH Comp # 01
POT ROOM hose pipe

13-Aug-10 B E vendan ACH Comp # 6


ACH Filter
PPH TP 2,3
ACH Dryer 1
FFPH Railing
CPH CWP 4

13-Aug-10 C Pratick Poroom Airaudit


ACH Dewatering
PPH DWP
ACH Comp # 05
ACH Interercooler 2

14-Aug-10 A Amit ACH Comp # 02


ACH Comp # 3
ACH Filter

ACH Secondary Filter of comp#05


ACH Dryer-1
RPH Cooling tower#01
RPH HWP#01
14-Aug-10 B DDSAHOO ACH Comp # 01
ACH Comp # 4
ACH Filter
ACH Dryer-1

ACH Dewatering pump


Potroom Airaudit

14-Aug-10 C Pratick ACH Dewatering


PPH DWP
ACH filter

15-Aug-10 A Amit ACH filter


CPH AVGF
ACH Dryer-1
Potroom Airaudit

15-Aug-10 B DDSAHOO ACH Comp # 6


ACH Filter
ACH Dewatering pump
Potroom Airaudit

15-Aug-10 C Pratick ACH Dewatering


PPH DWP

16-Aug-10 A DDSAHOO ACH Comp # 02


ACH Comp # 3
ACH Filter
Potroom Airaudit

Plant - II Drinking water line


RPH PM of CT-2
ACH Comp # 5

16-Aug-10 B E vendan ACH Comp # 01


ACH Comp # 4
ACH Filter
Plant 2 DW line
ACH Comp 5
RPH CT 2
CPH CWP 1
CPH CWP 3
CPH CWP 4

16-Aug-10 C Pratick RPH CT 2


ACH Dewatering
PPH DWP
ACH Filter

17-Aug-10 A Amit ACH Filter


CPH AVGF
Carbon Airaudit
Potroom Airaudit
PPH Leakage arresting

17-Aug-10 B DDSAHOO ACH Comp # 6


ACH Filter
Plant 2 DW line
RPH CT # 2
carbon area
ACH Dewatering pump

RPH motor of CT #2

17-Aug-10 C E vendan ACH Dewatering


PPH DWP

18-Aug-10 A Amit ACH Comp # 02


ACH Comp # 3
ACH Filter
CPH AVGF
Potroom Airaudit
ACH ADV
RPH CT#02

18-Aug-10 B Pratick ACH Comp # 01


ACH Comp # 4
ACH Filter
ACH ADV
Potroom Airaudit

RPH Spare motor of cooling tower

18-Aug-10 C E vendan ACH Dewatering


PPH DWP
ACH Filter

19-Aug-10 A Pratick ACH Filter


CPH AVGF
Potroom Airaudit
RPH CT # 03
CPH CWP # 04

19-Aug-10 B DDSAHOO ACH Comp # 6


ACH Filter
CPH CWP # 01
Potroom Airaudit

CPH CT #1
RPH CT #1
ACH diesel compressor

19-Aug-10 C E vendan ACH Dewatering


PPH DWP
Potroom Airaudit

20-Aug-10 A E vendan ACH Comp # 02


ACH Comp # 3
ACH filter
ACH Comp # 5
CPH CWP # 02

20-Aug-10 B Pratick ACH Comp # 01


ACH Comp # 4
ACH Filter
ACH Comp # 5
CPH CWP # 02

20-Aug-10 C DDSAHOO ACH Filter


Potroom Airaudit

21-Aug-10 A Subhashish ACH Filter

Potroom Airaudit

ACH Comp # 5
RPH CT#02
ACH Temp Transmitter

21-Aug-10 B Pratick ACH Comp # 6


ACH Filter

ACH Comp # 5
CPH CWP # 02

21-Aug-10 C DDSAHOO Potroom Airaudit


ACH Dewatering pump

22-Aug-10 A Amit ACH Comp # 02


ACH Comp # 3
ACH Filter
CPH AVGF
Potroom Airaudit

Potroom (Section 7) Water line

22-Aug-10 B Pratick ACH Comp # 01


ACH Comp # 4
ACH Filter
Potroom Airaudit

22-Aug-10 C DDSAHOO/venkat ACH Filter


Potroom Air audit
ACH Dewatering pump

23-Aug-10 A E vendan ACH Comp # 6


ACH Filter
CPH AVGF
Potroom Airaudit
PPH DWP
Plant 2 DW line
Plant 2 DW line
CPH CWP # 3

23-Aug-10 B Subhashish ACH Comp # 3


ACH Filter
Potroom Airaudit

23-Aug-10 C DDSAHOO ACH Filter


Potroom Airaudit
ACH Comp # 4 & 5
ACH Dewatering

24-Aug-10 A E vendan ACH Comp # 02


ACH Filter
CPH AVGF
PPH DWP
Pump Houses Sump Pump
Pump Houses Hoists

24-Aug-10 B Subhashish ACH Comp # 01


ACH Comp # 4
ACH Filter
Potroom Airaudit
ACH Comp # 5
RPH Sump Pump
RPH Hoists
FFPH Railing

24-Aug-10 C DDSAHOO ACH Filter


Potroom Airaudit
ACH Dewatering

25-Aug-10 A Subhashish ACH Comp # 6


ACH Filter
Potroom Airaudit
CPH HWP # 02
ACH Comp # 5
Plant II Fire Hydrant
25-Aug-10 B Pratick CPH HWP # 03
ACH Comp # 3
ACH Comp # 3
ACH Filter
Plant II Fire Hydrant
ACH Comp # 3

25-Aug-10 C E vendan PPH DWP


Potroom Airaudit
ACH Dewatering

26-Aug-10 A Pratick ACH Comp # 02


ACH Filter
ACH Comp # 03
CPH HWP # 04
FFPH Main pump # 01
FFPH Jockey pump # 04
ACH Dryer # 03
Potroom Airaudit

26-Aug-10 B DDSAHOO ACH Comp # 01


ACH Comp # 4
ACH Dryer # 03
FFPH main pump # 2
FFPH jockey # 5
ACH Gasket cutting
ACH Filter
Potroom Airaudit
ACH dewatering pump

26-Aug-10 C E vendan PPH DWP


Potroom Airaudit
ACH Dewatering Pump
ACH Filter

27-Aug-10 A Pratick ACH Comp # 6


ACH Filter
Potroom Airaudit
ACH Comp # 03
ACH 40 mm FRL
ACH CT spare shaft

27-Aug-10 B DDSAHOO ACH Filter


Potroom Airaudit
ACH Comp # 03
ACH CT spare shaft
ACH Zero loss drain valve
ACH Dewatering pump

27-Aug-10 C E vendan PPH DWP


Potroom Airaudit

28-Aug-10 A Pratick ACH Comp # 02


Potroom Airaudit
ACH Filter
ACH Comp # 05
Carbon AirAudit
ACH CT spare shaft
Potroom Airaudit

28-Aug-10 B DDSAHOO ACH Comp # 01


ACH Comp # 4
CPH HWP# 1
POT ROOM hose pipe
Carbon Area Air audit
ACH primary filter
HFO LINE HFO VALVE
ACH comp # 3
ACH VFD
ACH dewatering pump
ACH Flange work

28-Aug-10 C E vendan PPH DWP


Potroom Airaudit
ACH Filter

29-Aug-10 A Pratick ACH Comp # 6


ACH Filter
Potroom Airaudit

29-Aug-10 B DDSAHOO CAST House HFO Line


POTROOM Fire Hydrant line
Potroom Airaudit
BAKE OVEN HFO Line
ACH dewatering pump

29-Aug-10 C DDSAHOO/venkat Potroom Airaudit

30-Aug-10 A Pratick Potroom Airaudit


CPH Hoist
ACH Comp # 03
ACH Comp # 02
ACH Filter

30-Aug-10 B E vendan Potroom Airaudit


CPH Hoist
ACH Comp # 03
ACH Comp # 01
ACH Comp # 4
ACH Filter
Stores Materials

30-Aug-10 C Subhashish ACH Filter


ACH Comp # 03
Potroom Airaudit

31-Aug-10 A E vendan Potroom Airaudit


ACH EOT Crane
ACH Comp # 03
ACH Al Flowmeter
Plant 2 DW line

31-Aug-10 B DDSAHOO Plant 2 DW line


ACH Comp # 03
ACH Comp # 6
ACH Dewatering pump
Potroom Airaudit
CPH Fabrication
VFD ROOM @ ACH A/C
CARBON AREA Arir audit
ACH ,CPH,CT CBM report
ACH Filter
Potroom Second time Airaudit

31-Aug-10 C Subhashish Potroom Airaudit

1-Sep-10 A Pratick ACH Comp # 02


ACH Filter
Potroom Airaudit
RPH ,CPH CBM report
CPH Fabrication
Bake Oven & Cast
house Steam line
Plant 2 DW line

1-Sep-10 B DDSAHOO Potroom Airaudit


Cooling Tower &
PPH CBM Report
CPH Fabrication
ACH Comp # 01
ACH Comp # 4

FFPH Water pipe


ACH FILTER
ACH Dewatering pump
Potroom Second time Airaudit
ACH Local store audit

1-Sep-10 C Subhashish Potroom Airaudit


ACH Dewatering pump
ACH FILTER

2-Sep-10 A E Vendan ACH Carbon line


ACH Carbon line
ACH Carbon line
ACH Carbon line
Potroom Airaudit
CPH Fabrication
Bake Oven & Cast
house Steam line
Plant 2 Hydrant line
PPH DWP
ACH Alumina line

2-Sep-10 B Subhashish ACH Comp # 6


ACH Filter
Potroom Airaudit
CPH Fabrication
Bake Oven Hydrant line
ACH Alumina line
RPH CT

2-Sep-10 C Pratick ACH Gasket cutting


Potroom Airaudit

3-Sep-10 A DDSAHOO ACH Fabrication


ACH Comp # 02
ACH CPH cooling tower

RPH Scrap shifting


Potroom Airaudit
FFPH Cleaning
ACH Filter

3-Sep-10 B E Vendan ACH Comp # 1,4


ACH Filter
Potroom Airaudit
ACH Header
ACH Header
Ramp 1 Hydrant line
RPH CT
FFPH JP 3 & MP 3
ACH Comp 3

3-Sep-10 C Pratick ACH Gasket cutting


Potroom Airaudit
ACH Filter
PPH DWP
PPH DWP

4-Sep-10 A Subhashish Potroom Airaudit


FFPH Diesel Engine
FFPH Diesel Engine
Potroom Process waterline

4-Sep-10 B DDSAHOO/Praveen Potroom Airaudit


ACH Comp # 6
ACH Filter
FFPH Diesel Engine
FFPH Diesel Engine
ACH Fabrication
Plant- II Watermeter Reading
Potroom Water line

4-Sep-10 C E Vendan Potroom Airaudit


PPH DWP

5-Sep-10 A DDSAHOO ACH Comp # 02


ACH Filter
Potroom Airaudit
Canteen Water line
ACH Dewatering pump
ACH CWP #1

5-Sep-10 B Pratick/Praveen ACH Comp # 01


ACH Comp # 4
ACH Filter
PPH DWP
Potroom Airaudit

5-Sep-10 C E Vendan Potroom Airaudit


PPH DWP
ACH Intercooler 2
ACH Filter

6-Sep-10 A DDSAHOO BAKE OVEN HFO LINE


GARAGE AIR LINE
POTROOM AIRAUDIT
ACH DRYER # 1 & 6
RPH CT # 2 & 3
ACH Fabrication
PLANT - II DRINKING WATR LINE

6-Sep-10 B Subhashish/Praveen ACH Comp # 6


ACH Filter
ACH Dryer # 01

Pr Trans & Annubar Alumina Hand


ACH Diesel
ACH Fabrication
POTROOM AIRAUDIT
PLANT - II DRINKING WATR LINE

6-Sep-10 C Pratick PPH DWP


Potroom Airaudit

7-Sep-10 A DDSAHOO ACH & CPH Parameters

7-Sep-10 B Subhashish ACH & CPH Parameters

7-Sep-10 C Pratick ACH & CPH Parameters


ACH Comp # 05

8-Sep-10 A DDSAHOO ACH Comp# 3


ACH Comp #1
ACH Comp #2
ACH Comp #4
ACH Filter
ACH Comp # 5,3rd stage
ACH Dryer # 6
ACH Fabrication
ACH Airaudit

ACH Comp # 3

8-Sep-10 B Vendan/Praveen ACH Air Audit


ACH Comp # 6
ACH Fabrication
ACH Fabrication
ACH ACH
ACH Comp#5

8-Sep-10 C Pratick PPH DWP


ACH Filter

9-Sep-10 A E Vendan CAST HOUSE Steamline


POTROOM AIRAUDIT
PPH Fabrication
ACH Comp # 05
CPH CT1

9-Sep-10 B Praveen / Subhashish ACH Air Audit


MI Garage Water Meter
ACH Comp # 05
ACH Comp # 01
ACH Fabrication
Carbon Bake Oven
9-Sep-10 C Pratick PPH DWP
Potroom Airaudit
ACH Comp # 05

10-Sep-10 A Pratick ACH Comp # 01


ACH Comp # 02
ACH Comp # 03
ACH Comp # 04
ACH Comp # 05
RPH HWP # 02

10-Sep-10 B E Vendan Potroom Airaudit


RPH HWP# 1
ACH Comp # 06
ACH Fabrication
Al Handling airline

10-Sep-10 C DDSAHOO Potroom Airaudit


ACH Dewatering
ACH Watermeter reading
ACH Filter

11-Sep-10 A Subhashish ACH Comp # 03


ACH Comp # 04
ACH Filter
FFPH Diesel Pump
RPH HWP # 03
Comp # 05 Intercooler
Potroom Airaudit

11-Sep-10 B E Vendan Potroom Airaudit


ACH Filter
GAP Water Meter
Comp # 05 Intercooler

11-Sep-10 C DDSAHOO Potroom Airaudit


ACH Watermeter reading
ACH Filter

12-Sep-10 A Pratick ACH Comp # 01


ACH Comp # 02
ACH Filter

12-Sep-10 B E Vendan Potroom Airaudit


ACH Filter
ACH Comp # 06

12-Sep-10 C DDSAHOO Potroom Airaudit


ACH Filter
ACH Watermeter reading

13-Sep-10 A Pratick ACH Comp # 03


ACH Comp # 04
ACH Filter
PLANT 2 Drinking line
Bake oven Water flow meter
Utilities Hoist & Sump pump

13-Sep-10 B E Vendan Potroom Airaudit


ACH Filter
ACH Comp # 06
PLANT 2 Drinking line
Bake oven Water flow meter
ACH Comp# 6
Pump Houses Hoist

13-Sep-10 C DDSAHOO Potroom Airaudit


ACH Watermeter reading

14-Sep-10 A Pratick ACH Comp # 01


ACH Comp # 02
ACH Filter
ACH Comp # 06

RPH FFP # 01

14-Sep-10 B Subhashish ACH Comp # 06


ACH Dryer # 06
RPH FFP # 02
Potroom Airaudit
ACH Filter

14-Sep-10 C DDSAHOO Potroom Airaudit


ACH Comp # 4
ACH Comp # 6
potroom Watermeter reading

15-Sep-10 A Praveen Potroom Airaudit


ACH Comp # 03 & 4
ACH Filter
ACH Comp # 06
BO&CH Steam line flushing
Plant-2 Water meter reading

RPH Pooja Pandal

15-Sep-10 B Amit ACH Motor/pump


RPH Pooja Pandal
Potroom Airaudit
ACH Diesel Compressor
Plant-2 Water meter reading
ACH Comp#06

15-Sep-10 C DDSAHOO Potroom Airaudit


potroom Watermeter reading

16-Sep-10 A Pratick ACH Comp # 01


ACH Comp # 02
ACH Filter
PPH Pump # 02
PPH Pump # 04
Potroom Airaudit

16-Sep-10 B Praveen ACH Filter


CPH HWP#1&4
ACH Comp#3&4
ACH Diesel compressor

16-Sep-10 C Subhashish Potroom Airaudit

17-Sep-10 A Amit ACH Comp # 03 & 4


ACH Filter
Potroom Airaudit

17-Sep-10 B DDSAHOO Potroom Airaudit


ACH Filter

17-Sep-10 C Subhashish Potroom Airaudit


CPH HWP # 01
CPH HWP # 04
18-Sep-10 A E Vendan ACH Comp # 1 & 2
ACH Filter
Potroom Airaudit
ACH Comp # 05

18-Sep-10 B Subhashish ACH Filter

ACH Comp # 05
Potroom Airaudit
ACH comp # 03 & 04

18-Sep-10 C DDSAHOO Potroom Airaudit


potroom Watermeter reading

19-Sep-10 A Amit Potroom Airaudit

ACH Comp # 05
ACH Comp # 03 & 4
ACH Filter

19-Sep-10 B DDSAHOO Potroom Airaudit

ACH Comp # 05

19-Sep-10 C Pratick Potroom Airaudit


PPH DWP

20-Sep-10 A Subhashish ACH Comp # 01


ACH Filter
Potroom Airaudit

ACH Comp # 05
Plant II DWP
RPH CT # 01

20-Sep-10 B DDSAHOO ACH Comp # 5


ACH Comp # 5
ACH Comp # 5

ACH Comp # 5
ACH Airaudit

ACH All compressor


Utility Crane Hoist
ACH Filetr
ACH Comp # 6
ACH Comp # 4
ACH Comp # 4
ACH Comp # 3
ACH Comp # 4
CPH CT # 1

20-Sep-10 C Pratick Potroom Airaudit


PPH DWP
ACH Comp # 4

21-Sep-10 A Amit Potroom Airaudit


ACH Comp # 03
ACH Comp # 5
ACH Filter
ACH CT#01
RPH CT#02

21-Sep-10 B DDSAHOO ACH Comp # 5


ACH Comp # 5
ACH Comp # 5
ACH Comp # 6
ACH Comp # 5
ACH Fabrication
ACH Dryer # 5

21-Sep-10 C Pratick Potroom Airaudit


PPH DWP

22-Sep-10 A Amit Potroom Airaudit


RPH CT#03
ACH Diesel compressor

22-Sep-10 B DDSAHOO Potroom Airaudit

ACH Comp # 1 , 2 & 6


ACH Filter

22-Sep-10 C Pratick ACH Filter


PPH DWP
potroom Watermeter reading

23-Sep-10 A DDSAHOO ACH Comp # 3


ACH Filter
ACH Comp # 4

ACH Comp # 5
ACH CWP # 1
ACH CWP # 2
ACH Comp # 5

23-Sep-10 B E Vendan Potroom Airaudit

ACH Comp # 5
ACH Filter
23-Sep-10 C Pratick Potroom Airaudit
PPH DWP
potroom Watermeter reading

24-Sep-10 A Praveen Potroom Airaudit

ACH Civil job+Water Leakage


ACH Comp#5
ACH Comp#5
PPH Pump#3,4
ACH Condensate
ACH Comp#1

24-Sep-10 B Amit ACH Comp#5


ACH Comp # 2 & 6
Potroom Airaudit
ACH Filter
ACH Comp # 01

24-Sep-10 C Pratick Potroom Airaudit


PPH DWP
potroom Watermeter reading
ACH Comp#5
ACH Comp # 01

25-Sep-10 A Subhashish ACH Comp # 04


Potroom Airaudit
ACH Filter
CPH HWP # 01
ACH Comp#5
ACH & CPH Pipeline
ACH Filter
25-Sep-10 B Amit ACH Comp#5
Potroom Airaudit
ACH Comp # 3
ACH Filter
ACH & CPH Pipeline

ACH Comp#01
ACH Diesel Compressor

25-Sep-10 C Praveen Potroom Airaudit


PPH DWP
ACH Dewatering Pump

26-Sep-10 A Amit Potroom Airaudit


CPH AVGF
CPH Civil job

26-Sep-10 B Pratick ACH Comp # 02


ACH Comp # 06
ACH Filter
Potroom Airaudit

26-Sep-10 C Praveen Potroom Airaudit


ACH Comp#1
ACH Filter
PPH DWP
RPH HWP#2
PPH Tank level

27-Sep-10 A E Vendan Potroom Airaudit


CPH AVGF
CPH Civil job
CPH HWP # 03
Plant II DWP
PPH & DWP Pipeline
ACH Dryer # 01
ACH Comp # 05

27-Sep-10 B Pratick ACH Comp # 3


ACH Comp # 5
ACH Filter
ACH Comp # 02
ACH Comp # 02
CPH HWP # 04
Plant II DWP
ACH Dryer # 06
RPH & FFPH Pipeline

27-Sep-10 C Praveen ACH Dryer#6


ACH Comp#4
ACH Dryer#2
PPH DWP
Potroom Airaudit

28-Sep-10 A DDSAHOO ACH Filter


ACH Airaudit
ACH Comp # 02
CPH HWP# 2
CPH HWP# 2
CPH AVGF # 1 & 2

28-Sep-10 B Pratick ACH Comp # 02


ACH Comp # 02
CPH CWP# 1
ACH Comp # 6
ACH Filter
CBM
ACH Comp # 04
ACH Comp # 01

28-Sep-10 C Praveen CPH HWP#2


ACH Comp#5
RPH Chemical 1800+
ACH Comp#5
Potroom AIRAUDIT

29-Sep-10 A DDSAHOO Potroom AIRAUDIT


ACH Comp #2
ACH Comp # 5
CPH CWP # 2
CPH CWP # 1
ACH Comp # 4
ACH Comp # 5
ACH Filter
ACH Comp # 6
CPH CWP

29-Sep-10 B Pratick CPH CWP# 3


ACH Comp # 6
ACH Comp # 3
ACH Filter

29-Sep-10 C Praveen Potroom AIRAUDIT


PPH DWP
ACH Filter

30-Sep-10 A Pratick ACH Comp # 02


ACH Comp # 02
ACH CWP # 04
ACH Comp # 5
ACH Filter
FFPH JP # 04
FFPH Main pump # 01
Pot room Fire line
CPH CWP # 03
CPH CWP # 04

30-Sep-10 B Amit ACH Comp # 02

ACH Comp # 02
FFPH JP # 05
FFPH Main pump # 02
ACH Comp # 02
Potroom AIRAUDIT

30-Sep-10 C Praveen Potroom AIRAUDIT


ACH Comp # 01
ACH Filter
CPH HWP#4
PPH DWP

1-Oct-10 A Subhashish ACH Comp # 4


ACH Filter
Potroom AIRAUDIT
ACH Comp # 02
ACH Comp # 02
FFPH Diesel Engine

1-Oct-10 B Pratick ACH Comp # 02


ACH Comp # 02
FFPH Diesel Engine
ACH Comp # 3
ACH Comp # 02
Rodding Process water line

1-Oct-10 C DDSAHOO ACH Filter


Potroom AIRAUDIT
Potroom Water meter
ACH Comp # 02
CARBON Process Water line
FFPH JP #1

2-Oct-10 A Amit ACH Comp # 5


ACH Filter
CPH AVGF
ACH Comp#02
ACH Comp#04
Potroom Air Audit

2-Oct-10 B Praveen PPH DWP


ACH Comp#4
Potroom Process Water Line
RPH CT#3
RPH CT#3
PPH CPH & RPH

2-Oct-10 C DDSAHOO ACH Comp # 01


ACH Filter
Potroom AIRAUDIT
Potroom Water meter

3-Oct-10 A Amit CPH AVGF


Potroom Air Audit
3-Oct-10 B Praveen Bake Oven HFO line
RPH CT#3
ACH Comp#3
Potroom AIRAUDIT
PPH DWP

3-Oct-10 C DDSAHOO Potroom AIRAUDIT


Potroom Water meter

4-Oct-10 A Pratick Potroom AIRAUDIT


RPH HWP # 02
ACH Comp#4
ACH Comp#2,5
ACH Filter
RPH HWP # 01

4-Oct-10 B Praveen ACH Comp#4


RPH HWP # 01
ACH Comp#1
ACH Filter
RPH HWP # 01,02
PPH DWP

4-Oct-10 C DDSAHOO Potroom AIRAUDIT


Potroom Water meter
ACH Filter
ACH Impeller & Diffuser

5-Oct-10 A Subhashish/Vinod RPH HWP#3


DWP Drinking waterline
ACH ADV
Potroom AIRAUDIT
5-Oct-10 B Praveen ACH Comp#3
RPH HWP#3
Plant-2 DWL
ACH ADV
ACH Comp#1
Potroom AIRAUDIT
PPH DWP

5-Oct-10 C DDSAHOO Potroom AIRAUDIT


Potroom Water meter
ACH Dewatering Pump

6-Oct-10 A Amit CPH AVGF


Potroom Air Audit
ACH Comp#2,5
ACH Filter

6-Oct-10 B Praveen ACH Comp#1


ACH Filter
Potroom Air Audit
PPH DWP
CPH/RPH Well

ACH Gasket Cutting


6-Oct-10 C DDSAHOO

ACH Filter
ACH Dewatering Pump

7-Oct-10 A Amit CPH AVGF


Potroom Air Audit
ACH Comp#04
ACH Comp#06
7-Oct-10 B Praveen Alumina
CPH AVGF
PPH DWL
Potroom Air Audit
ACH Comp#04
ACH Comp#06
ACH Comp#3
ACH Filter

7-Oct-10 C Vendan/vinod ACH Dewatering Pump


Potroom AIRAUDIT
ACH AVGF
Potroom Water meter
ACH Gasket Cutting

8-Oct-10 A Amit CPH AVGF


Potroom Air Audit
ACH Comp#2 & 5
ACH Filter
ACH Comp#04
ACH Comp#06

8-Oct-10 B DDSAHOO ACH Comp# 1


Work shop Drinking Water line
HOT Header pressure meter
RPH
ACH Comp#04
ACH Comp#06
Cast House HFO line
ACH Filter
ACH Dewatering Pump
Cast House Process water line
Cold water Level Indicator
ACH

8-Oct-10 C Vendan/vinod Potroom AIRAUDIT


ACH AVGF
Potroom Water meter
ACH Cold well
ACH Filter

9-Oct-10 A Praveen Potroom AIRAUDIT


ACH AVGF
ACH Panel View
ACH Training
ACH After Cooler
ACH CPH

9-Oct-10 B DDSAHOO Potroom Airaudit


ACH Comp # 4
ACH Comp # 3
ACH CPH
ACH Gasket cutting
ACH Filter
ACH Comp #6
ACH AVGF # 1 & 2

9-Oct-10 C E Vendan/Vinod Potroom Airaudit


Potroom Water meter
ACH Dewatering Pump
ACH CT#1,2,3
FFPH DIESEL ENGINE # 2
ACH Cold well

10-Oct-10 A Praveen Potroom Airaudit


CPH AVGF
ACH Comp # 2,5
ACH Filter
Carbon Air line
FTPAH V/V

10-Oct-10 B DDSAHOO ACH Comp # 4

Potroom Airaudit
ACH Comp # 01
ACH Filter
CPH AVGF # 1 & 2

10-Oct-10 C E Vendan/Vinod Potroom Airaudit


ACH Dewatering Pump
ACH Comp # 4
ACH Filter
Potroom Water meter

11-Oct-10 A Praveen Cast House HFO line


FFPH Water Meter
ACH AVGF # 1 & 2
Potroom Airaudit
ACH Comp # 4

11-Oct-10 B DDSAHOO Potroom Airaudit


ACH Comp # 3
ACH Filter
ACH Comp # 4

CPH AVGF # 1 & 2

11-Oct-10 C vinod/pratik Potroom Airaudit


Potroom Water meter
ACH Dewatering Pump

12-Oct-10 A Praveen Potroom Airaudit


ACH Comp # 6
CPH AVGF # 1 & 2
ACH Comp # 2&5
ACH Filter

12-Oct-10 B DDSAHOO Potroom Airaudit


ACH Comp # 01
ACH Filter
ACH Comp # 6
ACH Comp # 4
CPH AVGF # 1 & 2
ACH Dewatering pump

12-Oct-10 C vinod/pratik Potroom Airaudit


Potroom Water meter
ACH Filter
ACH Condensate Moisture

13-Oct-10 A Praveen Potroom Airaudit


ACH Condensate Moisture
CPH AVGF # 1 & 2
ACH Comp#4
Plant 2 Drinking Line
Workshop/SYD Water leakage
FFPH&RPH CBM of equipments
Cast House HFO v/v
FFPH Pump

13-Oct-10 B DDSAHOO Potroom Airaudit


ACH Comp # 01
ACH Filter
ACH Comp # 4
CPH AVGF # 1 & 2
ACH switchyard
Plant 2 Drinking Line
FFPH&RPH CBM of equipments
ACH Comp # 4
PLANT-2 Process water line
ACH Comp # 4
ACH Comp # 4
PLANT-2 Process water line

13-Oct-10 C Pratick Potroom Airaudit


Potroom Water meter

14-Oct-10 A Praveen ACH Foundation


CPH Floor
Carbon/ Pot Room Air Leakage
ACH Sec.Compressor
ACH process water line
ACH Comp # 2&5
ACH Filter
Bake Oven Steam line

14-Oct-10 B vinod Potroom Airaudit


ACH Filter
ACH Filter
Carbon/ Pot Room Air Leakage
Bake Oven Steam line
ACH Foundation
FFPH PIPE LINE
CPH AVGF # 1 & 2
14-Oct-10 C Pratick Potroom Airaudit
Potroom Water meter
ACH Filter

15-Oct-10 A DDSAHOO ACH Diesel compressor


POTROOM Audit of Air
PLANT - II Steamline
CPH AVGF # 1 & 2
CPH Civil job
Potroom Airaudit
ACH Local store

15-Oct-10 B vinod PLANT - II Steamline


CPH Civil job
Potroom Airaudit
ACH Filter
ACH Filter
CPH AVGF # 1 & 2
POTROOM Audit of Air
FFPH PIPE LNE
ACH diesel comp.

15-Oct-10 C Pratick Potroom Airaudit


Potroom Water meter
ACH Filter

16-Oct-10 A DDSAHOO ACH Comp # 2&5


ACH Filter
CPH AVGF # 1 & 2
ACH Parking area
FFPH Diesel pump # 1
FFPH Diesel pump # 2
PPH TP # 2
PPH TP # 3
RPH & FFPH Store & shop floor
ACH CPH
CPH Civil job

16-Oct-10 B ESHANT / VINOD Potroom Airaudit


CPH AVGF # 1 & 2
PPH pump#2,3
PPH pump#1
PPH pump#4
PPH pump#1
ACH Filter
ACH Comp # 01
CPH Civil job
PLANT-2 Drinking water line
CPH CT#1
ACH Parking area
ACH Filter

16-Oct-10 C Praveen ACH Filter


CPH&RPH Cold Well
PPH TP#1
Potroom Airaudit
Potroom Water meter

17-Oct-10 A DDSAHOO Potroom Airaudit


CPH AVGF # 1 & 2
Comp # 6
Comp # 4 Stopped

17-Oct-10 B ESHANT/ VINOD Potroom Airaudit


CPH AVGF # 1 & 2
ACH Comp # 3,4
ACH Filter
ACH Comp # 4
ACH Comp # 4

17-Oct-10 C Praveen Bake Oven HFO


Potroom Airaudit
PPH DW line
ACH Filter
Potroom Water meter
ACH Dewater pump

18-Oct-10 A DDSAHOO Potroom Airaudit


RPH CT # 1
ACH Comp # 2&5
CPH AVGF # 1 & 2
ACH Dewatering pump
ACH Comp#4
ACH Parking Area
CPH HWP # 1
ACH Comp#4
ACH Filter
RPH CT

18-Oct-10 B ESHANT/ VINOD Potroom Airaudit


CPH HWP # 1
CPH AVGF # 1 & 2
ACH Comp#1
ACH Filter
ACH Comp#4
ACH Parking Area
RPH CT # 1
RPH CT # 1
ACH Parking Area

18-Oct-10 C Praveen Potroom Airaudit


ACH Filter
PPH DW line

19-Oct-10 A DDSAHOO Potroom Air Audit


MAYANK ACH Comp#3
CPH AVGF #1,2
ACH Comp # 4
Plant - II water meter

RPH Cooling Tower#2


RPH Cooling Tower# 1
FFPH water line valve
ACH dewatering pump

19-Oct-10 B ESHANT/ VINOD Potroom Airaudit


CPH AVGF #1,2
ACH Comp#3
ACH Filter
FFPH water line valve
RPH Cooling Tower# 1
RPH Cooling Tower

19-Oct-10 C Praveen CPH CWP motor2&3


Potroom Airaudit
PPH DW line

20-Oct-10 A DDSAHOO ACH Comp # 2&5


CPH AVGF # 1 & 2
ACH Dewatering pump
ACH Filter
RPH CT # 3
Potroom water line
ACH Comp #4
ACH,CPH,PPH,RPH All Running Equipment
ACH Servo prime 32 oil
ACH Secondary filter

20-Oct-10 B Pratick/ Mayank ACH Comp #4


ACH Comp#1
ACH Filter
POT ROOM water line
RPH, FFPH All Running Equipment
Potroom Airaudit

20-Oct-10 C Praveen Potroom Airaudit


PPH DW line
ACH Comp#1
ACH Comp#1

21-Oct-10 A ESHANT/ VINOD CPH AVGF # 1 & 2


Potroom Airaudit
ACH Comp#4
ACH Comp#4
ACH Comp#4
PPH PPH
CPH CT#1
ACH Comp#2,3,5

Scrap Yard Filter

21-Oct-10 B PRATICK/MAYANK Potroom Airaudit


ACH Comp#4
ACH Comp#4
ACH Comp#4
Scrap Yard Filter
ACH SAFETY BOARD
ACH Comp#3
ACH Filter

21-Oct-10 C Praveen Potroom Airaudit


ACH Comp#5
PPH DW line
PPH Sump pump

22-Oct-10 A PRATICK / ESHANT CPH AVGF # 1 & 2


CPH CT#2
ACH Comp# 02
ACH Comp# 05
ACH Filter
ACH Comp#4
ACH Comp#6
ACH Comp#4

22-Oct-10 B VINOD/Mayank CPH AVGF # 1 & 2


ACH Comp# 01
ACH Filter
ACH Comp#4
ACH Comp#4
ACH Comp#6
ACH Comp#6
ACH Comp #1
ACH Comp # 6
ACH Comp#6
ACH Comp#1
ACH Comp#6
22-Oct-10 C DDSAHOO ACH Comp # 01
ACH Trench Plate
Potroom Water Meter
Potroom Airaudit
ACH Filter

23-Oct-10 A ESHANT/ VINOD CPH AVGF # 1 & 2


Potroom Airaudit
CPH CT#3
ACH header, drum
CPH Comp#1
ACH civil job
FFPH PUMP

23-Oct-10 B Praveen ACH Comp# 03


ACH Filter
ACH Filter
Potroom Airaudit
ACH/CPH Road to W/B
FFPH PUMP
CPH AVGF # 1 & 2

23-Oct-10 C DDSAHOO Potroom Water Meter


Potroom Airaudit

24-Oct-10 A ESHANT/ VINOD CPH AVGF # 1 & 2


Potroom Airaudit
CPH civil job
ACH Comp# 02,05
ACH Comp# 02,05

24-Oct-10 B PRAVEEN/MAYANK ACH Comp#1


ACH Comp#1
ACH comp#5
ACH comp#04,06
PPH DW line

24-Oct-10 C DDSAHOO Potroom Water Meter


Potroom Airaudit
ACH Comp # 5
ACH Dewatering Pump
ACH Filter

25-Oct-10 A ESHANT/ VINOD CPH AVGF # 1 & 2


Potroom Airaudit
ACH Comp # 6
ACH Comp#5
ACH Comp#5
ACH Filter
ACH Comp#3

25-Oct-10 B PRAVEEN/MAYANK ACH Comp#3


CPH AVGF # 1 & 2
PPH DW Line
ACH Dryer # 6
ACH Comp#5
ACH filter

25-Oct-10 C DDSAHOO ACH Dewatering Pump


ACH Filter
ACH Comp # 5
ACH Comp # 3

26-Oct-10 A ESHANT/ VINOD CPH AVGF # 1 & 2


Potroom Airaudit
ACH Comp # 5
ACH Filter(Comp#2,3)
ACH Filter
Plant 2 weater pipe line

26-Oct-10 B PRAVEEN/MAYANK ACH comp #1,#6


Plant 2 weater pipe line
ACH Comp # 5
Plant 2 steam line
ACH Dryer # 6
ACH Filter
PPH DW line

26-Oct-10 C DDSAHOO ACH Comp # 5


ACH Filter
ACH Dryer # 6
BAKE OVEN HFO line
Potroom Water meter
ACH Dewatering pump

27-Oct-10 A VINOD CPH AVGF # 1 & 2


ACH Comp # 5
ACH Comp # 3
Potroom Airaudit
ACH Filter
ACH Comp#3
ACH Comp#4
ACH Comp#3
ACH comp

27-Oct-10 B PRAVEEN/MAYANK ACH Comp # 5


Potroom Airaudit
CPH/RPH Chemical Shifting
ACH Comp # 5
ACH Filter
ACH Comp #3
PPH DW line
CPH AVGF # 1 & 2

27-Oct-10 C DDSAHOO Potroom Water Meter


Potroom Airaudit
ACH Dewatering Pump
Potroom Fire Hydrant Line

28-Oct-10 A PRAVEEN ACH Comp # 5


ACH Process water line
ACH Comp #2,4
ACH Filter
ACH Comp
Work Shop Bullets
PPH TP

28-Oct-10 B SUBHASHISH/MAYANK ACH Comp #1,#6


ACH Filter
Potroom Airaudit
ACH Comp #1
ACH comp #5
PPH DW line
ACH Dryer #6
ACH Process water line

28-Oct-10 C VINOD/ESHANT Potroom Water Meter


Potroom Airaudit
ACH Dewatering Pump
ACH Filter

29-Oct-10 A Amit ACH comp #5


Potroom Airaudit
ACH Process water line
CPH AVGF # 1 & 2

29-Oct-10 B DDSAHOO / Mayank ACH Comp # 5


ACH Comp # 5
Potroom Airaudit
ACH Com # 3
ACH Filter
CPH AVGF # 1 & 2

29-Oct-10 C VINOD/ESHANT ACH Comp # 5

ACH Comp # 5
Potroom Airaudit
ACH Dewatering Pump
Potroom Water Meter

30-Oct-10 A DDSAHOO ACH Dryer # 5


ACH Comp # 2 & 4
CAST HOUSE HFO line
ACH AVGF # 1 & 2
ACH Dewatering pump
ACH Zero loss Drain Valve
Potroom Complete Air audit
ACH Filter

30-Oct-10 B PRAVEEN Potroom Complete Air audit


ACH Comp # 1 & 6
ACH Filter
ACH Filter
ACH Comp # 5
CPH AVGF
ACH Dewatering pump

30-Oct-10 C VINOD/ESHANT Potroom Airaudit


Potroom Water Meter
ACH Filter

31-Oct-10 A PRAVEEN ACH AVGF # 1 & 2


Potroom Airaudit
ACH Filter

31-Oct-10 B DDSAHOO ACH AVGF # 1 & 2


ACH Filter
ACH Comp # 3

31-Oct-10 C VINOD/ESHANT Potroom Airaudit


Potroom Water Meter
ACH Dewatering pump

1-Nov-10 A PRAVEEN Potroom Water Meter


ACH AVGF # 1 & 2
ACH Srike

1-Nov-10 B PRATICK / ESHANT Cast House HFO v/v

Bakeoven hydrant line


ACH Comp # 2 & 4
ACH Filter

1-Nov-10 C VINOD/MAYANK Potroom Airaudit


Potroom Water Meter
ACH Comp #1 & 6
2-Nov-10 A PRAVEEN Potroom Airaudit
Potroom Water Meter
ACH Comp#5
GAP Water Leakage
ACH Filter

2-Nov-10 B PRATICK / ESHANT ACH Comp # 3


ACH Filter
ACH Comp#5
ACH Dewatering pump

2-Nov-10 C VINOD/MAYANK Potroom Airaudit


Potroom Water Meter
ACH Filter

3-Nov-10 A PRAVEEN ACH Dryer#6


RPH HWP#1
ACH Comp#5
ACH Comp # 2,4
ACH Sec. Filter
Cast House HFO
Bake Oven HFO

3-Nov-10 B PRATICK ACH Dryer#6


RPH HWP # 02
ACH Comp # 01
ACH Comp # 06
ACH Filter

3-Nov-10 C Amit ACH Filter


Potroom Airaudit

4-Nov-10 A PRAVEEN RPH HWP-3


RPH FFP-1
RPH FFP-2
ACH Comp # 1,3
ACH Comp # 4
CPH Cooling Tower#1
ACH Comp # 02

4-Nov-10 B VINOD/MAYANK ACH


ACH Store
ACH Comp#1
ACH Comp#1
ACH Comp # 02
RPH HWP#3,FFP#1,2
CPH CT FAN#1
ACH Comp#1
RPH FFP#1
Potroom Airaudit

4-Nov-10 C PRATICK ACH Filter


Potroom Airaudit

5-Nov-10 A VINOD/MAYANK Potroom Airaudit


ACH Filter
ACH Comp#4

5-Nov-10 B DDSAHOO / ESHANT Potroom Airaudit


ACH Filter
ACH Comp # 6
CAST HOUSE HFO line

5-Nov-10 C PRATICK Potroom Airaudit


Potroom Water Meter
6-Nov-10 A PRATICK / ESHANT ACH Comp # 02
ACH Filter
ACH Comp # 03
ACH CT#1
ACH Comp # 01

6-Nov-10 B DDSAHOO / VINOD ACH CT#1


ACH Filter
Potroom Airaudit
CPH HWP # 1
BAKE OVEN process water line

6-Nov-10 C PRAVEEN BAKE OVEN HFO


CPH CT#1
BAKE OVEN Process Water line
PPH Drinking water line
ACH Filter

7-Nov-10 A PRATICK / ESHANT ACH Comp # 04


ACH Filter

7-Nov-10 B DDSAHOO / VINOD ACH Comp # 06


ACH Filter
ACH Dewatering pump

7-Nov-10 C PRAVEEN/MAYANK CPH/RPH Chemicals


ACH Filter
ACH Comp#4
Pot Room Flowmeter reading

8-Nov-10 A PRATICK / ESHANT ACH Comp # 02


ACH Comp # 03
ACH Filter
RPH CT# 2
CPH CT# 2,
ACH Comp # 01
ACH AVGF # 1 & 2

8-Nov-10 B DDSAHOO RPH CT# 1


CPH CT# 3
PPH Area of PPH
ACH Comp # 01
ACH primary Filter

8-Nov-10 C PRAVEEN/MAYANK ACH Filter


Pot Room Flowmeter reading
ACH Comp#4
CPH/RPH Chemicals

9-Nov-10 A PRATICK / ESHANT ACH Comp # 04


ACH Comp # 06
ACH primary Filter
ACH Dewatering pump 1, 2

9-Nov-10 B DDSAHOO / Mayank ACH Dewatering pump 2


ACH Comp#5
ACH Dewatering pump 1
ACH Dewatering pump

9-Nov-10 C PRAVEEN ACH Primary Filter


ACH Comp#4
Potroom Air Audit
Water Line Water meter

10-Nov-10 A DDSAHOO PPH Backwash


ACH Comp # 2 & 3
RPH CT # 3
PLANT - II Drinking water line
ACH Filter
ACH Pipe fitting
ACH CBM
ACH Comp # 01

10-Nov-10 B PRATICK PLANT - II Drinking water line


Utilities CBM
Potroom Airaudit
ACH Diesel compressor
ACH Dryer # 01

10-Nov-10 C PRAVEEN Potroom Airaudit


ACH Filter
Water Line Water meter
ACH Comp#4
PPH DWL

11-Nov-10 A VINOD/MAYANK CPH HWP#2


ACH ADV
ACH COMP#4
RPH CWP#1
ACH COMP#4,6
ACH Filter
BO/CH Steamline
CPH HWP#2
CPH HWP#2
Potroom Airaudit
ACH Dewatering pump

11-Nov-10 B PRATICK CPH HWP# 03


ACH ADV
Potroom Airaudit
CPH CT # 01

12-Nov-10 A VINOD/MAYANK ACH dryer#5 adv


RPH CWP#1
ACH COMP#1,2,3
ACH Filter
Potroom Airaudit

12-Nov-10 B Subhashish ACH Filter


RPH CWP#1
Potroom Flushing
Potroom Airaudit

12-Nov-10 C DDSAHOO RPH CWP#1


POTROOM Airaudit
POTROOM Watermeter reading
ACH Filter

12-Nov-10 A VINOD/MAYANK ACH Comp#4,6


ACH Dryer#5
ACH Comp#1,2,3,4
ACH Comp#5
ACH Filter
Rectifier Rectiformer pipe lines
FFPH Flowmeter

13-Nov-10 B PRAVEEN CPH HWP-4


ACH Comp#5
POTROOM Airaudit
ACH Filter

13-Nov-10 C DDSAHOO POTROOM Airaudit


POTROOM Watermeter reading
ACH Dewatering pump

14-Nov-10 A PRATICK/MAYANK ACH COMP#1


ACH COMP#2
ACH COMP#3
ACH Filter

14-Nov-10 B PRAVEEN POTROOM Airaudit


Cast House HFO
Comp-2&4 Winding Temp

14-Nov-10 C DDSAHOO POTROOM Airaudit


POTROOM Watermeter reading

15-Nov-10 A PRATICK/MAYANK ACH COMP#4


ACH COMP#6
ACH Filter
CPH HWP#1
Plant 2 DW line
FFPH Flowmeter
CPH Hoist

15-Nov-10 B PRAVEEN BO HFO


CPH HWP#1
Plant 2 DW line
FFPH Flowmeter
Scrap Yard Used Oil
POTROOM Airaudit

15-Nov-10 C DDSAHOO POTROOM Airaudit


POTROOM Watermeter reading
16-Nov-10 A VINOD/MAYANK ACH Comp#1,2,3
PPH TP #2,3
ACH EOT Crane
Plant II Steam Line
POTROOM Cooling Hoses
ACH Comp#5
CH HFO
Dryer#6 Dryer#6
CPH 5S

16-Nov-10 B PRAVEEN PPH TP #2,3


POTROOM Cooling Hoses
ACH Filter
Dryer#6 Dryer#6

16-Nov-10 C DDSAHOO POTROOM Airaudit


POTROOM Watermeter reading
ACH Filter
ACH Dewatering pump

17-Nov-10 A PRATICK ACH COMP#4


ACH COMP#6
ACH Filter

ACH Comp # 03

17-Nov-10 B PRAVEEN POTROOM Airaudit


ACH Filter

17-Nov-10 C DDSAHOO POTROOM Airaudit


POTROOM Watermeter reading

18-Nov-10 A Subhashish ACH Comp#1,2,3


ACH Filter
POTROOM Airaudit
RPH Dewatering Pump
ACH MOP
ACH Manometer
Workshop CS Pipe
CH & Bake Oven Staemline
PPH Valves

18-Nov-10 B PRAVEEN Cast House HFO


ACH Filter
POTROOM Air audit

18-Nov-10 C MAYANK/ESHANT POTROOM Airaudit


POTROOM Watermeter reading
ACH Dewatering pump

19-Nov-10 A DDSAHOO ACH Comp # 4 & 6


ACH Filter
ACH Railing cutting
GAP Watermeter

Utility CBM

ACH Proces Water line

Potroom Air Line,section- 1


ACH Secondary filter

19-Nov-10 B PRATICK ACH Comp # 05

Utility CBM
ACH Comp # 05
ACH Filter
ACH Proces Water line

19-Nov-10 C MAYANK/ESHANT POTROOM Airaudit


POTROOM Watermeter reading

20-Nov-10 A Praveen POTROOM Airaudit


POTROOM Watermeter reading
Bake Oven HFO
ACH DWP+Cutting
Carbon Airaudit
CPH CWP#4
ACH Comp # 1.2.3

20-Nov-10 B DDSAHOO Carbon Airaudit


CPH CWP#2
ACH CWP # 4
ACH Intercooler

ACH Process waterline

20-Nov-10 C MAYANK/ESHANT ACH Filter


ACH Dewatering pump
POTROOM Airaudit
POTROOM Watermeter reading

21-Nov-10 A Praveen ACH Filter


POTROOM Airaudit
RPH PW
CPH Excavation
ACH Water Line 12"
ACH Intercooler

21-Nov-10 B DDSAHOO ACH Comp # 4


RPH AVGF # 1 & 2
ACH Process water
Potroom Airaudit
ACH Filter

21-Nov-10 C MAYANK/ESHANT ACH Filter


Potroom Airaudit
POTROOM Watermeter reading
ACH Dewatering pump

22-Nov-10 A Praveen Cast House HFO


CPH CT#1
Potroom Airaudit
ACH Comp#1,2,3
Bake Oven HFO
ACH Comp # 5

22-Nov-10 B DDSAHOO Potroom Airaudit


ACH Filter
ACH Comp # 5
ACH Comp # 5
ACH Dryer # 6

22-Nov-10 C MAYANK/ESHANT ACH Filter


Potroom Airaudit
POTROOM Watermeter reading
ACH Dewatering pump

23-Nov-10 A Praveen Potroom Airaudit


ACH Filter
ACH Comp#4,6
ACH Comp#5
23-Nov-10 B DDSAHOO Potroom Airaudit
ACH Filter
ACH Comp#5
ACH Comp#6
ACH Comp # 5
ACH Comp # 5
ACH Filter

23-Nov-10 C MAYANK/ESHANT Potroom Airaudit


POTROOM Watermeter reading
ACH Comp # 5
ACH Dewatering pump

24-Nov-10 A Praveen Potroom Airaudit


ACH Filter
ACH Comp#5
CPH CT#1,3
Plant 2 DWL
ACH Comp # 1,2&3

24-Nov-10 B DDSAHOO ACH Filter


Plant 2 DWL
Potroom Airaudit
ACH Comp#5
ACH Comp#5
ACH NEW FILTER

ACH Comp#5

24-Nov-10 C PRATICK Potroom Airaudit


POTROOM Watermeter reading
ACH Filter
25-Nov-10 A Praveen Potroom Airaudit
ACH Filter
POTROOM Watermeter reading
ACH Comp#5
ACH Comp#4&6
ACH Sec Comp

25-Nov-10 B MAYANK/ESHANT ACH Comp#5


ACH Sec Comp
ACH Comp#5
ACH Comp#5
Potroom Airaudit
ACH Filter

25-Nov-10 C PRATICK Potroom Airaudit


POTROOM Watermeter reading

26-Nov-10 A DDSAHOO ACH Comp # 1,2 & 3


ACH Comp # 5
ACH Filter
CPH CWP # 3

CPH CWP # 2
ACH CT # 3
ACH & CPH Chemical

26-Nov-10 B MAYANK/ESHANT ACH Filter


CPH CT Fan#03
Potroom Airaudit
CPH CWP#03
PPH TP#01
CPH CWP # 3
ACH Comp#05
ACH Shutter
ACH cold water header
ACH Secondary filter

26-Nov-10 C PRATICK Potroom Airaudit


POTROOM Watermeter reading
ACH Filter

27-Nov-10 A DDSAHOO ACH Comp # 4 & 6


FFPH Main Pump # 2
POTROOM Airaudit
FFPH Jockey Pump # 2
ACH secondary filter

27-Nov-10 B MAYANK/ESHANT FFPH Main Pump # 1


FFPH Jockey Pump # 1
RPH AVGF #1,2
ACH Comp#5
Potroom Airaudit
CPH CWP#3

27-Nov-10 C PRATICK ACH wooden box


POTROOM Watermeter reading
ACH Filter

28-Nov-10 A DDSAHOO ACH Comp # 1,2 & 3


ACH Filter
Potroom Airaudit

28-Nov-10 B MAYANK/ESHANT ACH Filter


Potroom Airaudit
Plant 2 HFO line
28-Nov-10 C PRATICK Potroom Airaudit
POTROOM Watermeter reading
ACH Filter
Rodding Drinking Water Line

29-Nov-10 A DDSAHOO ACH Comp # 4 & 6


FFPH MP # 3 & JP # 3
FFPH MP #3
ACH Dryer # 6
ACH Diesel compressor
ACH Filter
POTROOM AIRAUDIT
ACH Comp # 5

29-Nov-10 B MAYANK/ESHANT ACH Filter


POTROOM AIRAUDIT
ACH Dryer # 6
ACH Diesel compressor
Plant 2 DW line

29-Nov-10 C E Vendan Potroom Airaudit


POTROOM Watermeter reading
PPH Filter

30-Nov-10 A DDSAHOO Potroom Airaudit


ACH Dryer # 6
ACH Comp # 1,2 & 3
FFPH MP # 3
ACH Dryer # 1
ACH Filter
ACH Comp # 4
Utility Running Equipment
ACH Comp # 4
ACH All Dryer
ACH Comp # 4

30-Nov-10 B MAYANK/ESHANT Utility Running Equipment


ACH All Dryer
Potroom Airaudit
ACH Dryer # 6

FFPH MP # 3
ACH Filter
ACH Comp # 4
Cast House HFO

30-Nov-10 C E Vendan ACH Filter


POTROOM Watermeter reading
PPH Filter

1-Dec-10 A Subhashish Potroom Airaudit

1-Dec-10 B E Vendan PPH Filter


ACH Dryer 1

1-Dec-10 C DDSAHOO ACH Comp # 5 & 6


ACH Filter
POTROOM Watermeter reading

2-Dec-10 A MAYANK/ESHANT ACH Comp # 1,2 & 3


ACH Filter
FFPH MP # 3
ACH Comp # 4

2-Dec-10 B Vinod ACH/CPH


2-Dec-10 C DDSAHOO POTROOM Watermeter reading
BAKE OVEN HFO line
ACH Filter

3-Dec-10 A MAYANK/ESHANT ACH Comp # 4


ACH Comp # 3, 5, 6
ACH Filter
FFPH JP#2

3-Dec-10 B E Vendan ACH Comp # 4


ACH Dryer 4
ACH Filter

3-Dec-10 C Subhashish POTROOM Watermeter reading


ACH Filter

ACH Dryer # 01

4-Dec-10 A MAYANK/ESHANT ACH Comp # 1,2


ACH Filter
Plant 2 DW Line
ACH 5S
ACH(outside) Pipeline
ACH Comp#04

4-Dec-10 B PRAVEEN ACH Comp#4


ACH Comp#3
CPH CWP#2
ACH Comp#3
ACH Comp#3
ACH Comp#3
Plant-2 DWL
FFPH Fire Line
ACH Filter

4-Dec-10 C Subhashish POTROOM Watermeter reading


ACH Filter

ACH Dryer #01

5-Dec-10 A MAYANK/ESHANT ACH Comp # 5, 6


ACH Filter
BAKE OVEN HFO line

5-Dec-10 B PRAVEEN ACH/RPH Well


ACH Comp#4
RPH AVGF
PPH DW
ACH Filter

5-Dec-10 C PRATICK POTROOM Watermeter reading


ACH Filter

6-Dec-10 A ESHANT/ PRATICK ACH Comp #1, 2


ACH Filter
ACH Comp # 3

6-Dec-10 B PRAVEEN ACH Filter


ACH Comp # 3
ACH Comp # 3
PPH DW
ACH/RPH Well
RPH AVGF
6-Dec-10 C DDSAHOO POTROOM Watermeter reading

7-Dec-10 A MAYANK/ESHANT ACH Comp # 5, 6


ACH Filter
ACH Comp # 3
ACH Dryer#3
FFPH Chmber 13

7-Dec-10 B PRAVEEN ACH Comp # 4


ACH Filter
ACH Dryer#3
ACH Comp # 3
FFPH Chmber 13

7-Dec-10 C DDSAHOO POTROOM Watermeter reading


ACH Filter
GAP Fire hydrant line valve
ACH Dewatering

8-Dec-10 A PRAVEEN Plant#2 Watermeter reading


ACH Comp#1,2
ACH Fabrication
ACH Comp#3
BO Steam Line

8-Dec-10 B Vinod ACH Filter


ACH Dryer#5
ACH Comp # 3
ACH Comp #3
ACH ACH
BO Steam Line
PPH AVGF
8-Dec-10 C DDSAHOO POTROOM Watermeter reading
ACH Filter
ACH Dewatering

9-Dec-10 A PRAVEEN POTROOM Watermeter reading


ACH Comp# 4,5,6
ACH Fabrication
ACH Dryer#1
ACH Dryer#2,5,6
ACH Dryer#4
FFPH MP#3
ACH Comp#3

9-Dec-10 B Vinod ACH Filter


FFPH MP#3
ACH Comp # 1,4
FTP FTP
ACH Comp # 1
ACH COMP#2

9-Dec-10 C MAYANK/ESHANT POTROOM Watermeter reading

10-Dec-10 A Vinod ACH comp#2


ACH comp#2
RPH Fabrication work
POTROOM Airaudit
ACH Comp# 1,2
ACH Comp# 2
ACH Comp# 3

ACH comp#2
10-Dec-10 B DDSAHOO
ACH Dryer # 2
ACH Comp # 3
ACH Filter
ACH Parking area
ACH Crane
RPH Water sample
RPH Diesel

ACH Comp # 3

10-Dec-10 C MAYANK/ESHANT ACH Comp # 2

11-Dec-10 A Praveen POTROOM Watermeter reading


PPH DWL

11-Dec-10 B DDSAHOO FFPH Main Pump # 3


ACH Comp # 3
CAST HOUSE HFO line
ACH Comp # 3
ACH CWP # 2
ACH Comp # 6
ACH Comp #6
ACH Comp #6
ACH Filter
ACH CWP # 2

11-Dec-10 C Eshant ACH Filter


ACH Comp #6
ACH Dewatering pump
POTROOM Watermeter reading
BAKE OVEN HFO line

12-Dec-10 A Praveen ACH Comp #1 & 2


ACH Filter
ACH Water line

12-Dec-10 B DDSAHOO ACH Comp # 6


ACH Dryer # 6
ACH Filter

12-Dec-10 C Eshant/Mayank ACH Filter


POTROOM Watermeter reading

13-Dec-10 A Praveen Plant - II Watermeter reading


ACH Comp # 6
ACH Comp # 3,4 & 5
ACH Comp # 1
FFPH MP # 3

13-Dec-10 B DDSAHOO ACH Comp # 6


FFPH MP # 3
ACH Filter
ACH Comp # 6
ACH Comp # 6
CAST HOUSE HFO Line

13-Dec-10 C MAYANK/ESHANT ACH Filter


POTROOM Watermeter reading

14-Dec-10 A Vinod ACH Fabrication work


RPH Comp # 6
ACH Comp # 1,2
ACH Filter
14-Dec-10 B DDSAHOO ACH Filter
FTP Work
RPH CWP # 3
FFPH DP # 2
FFPH Diesel Pump # 2

14-Dec-10 C MAYANK/ESHANT FFPH Diesel Pump # 2


ACH Diesel comp
POTROOM Watermeter reading

15-Dec-10 A Vinod ACH Diesel Comp.


RPH HWP#3
ACH Comp # 4,5
ACH Filter

15-Dec-10 B Praveen ACH Oil Filter#3


ACH Comp#6
FTP ID motor
ACH Filter
RPH/Workshop Shaft

15-Dec-10 C DDSAHOO ACH Filter

POTROOM Watermeter reading

16-Dec-10 A Praveen POTROOM Watermeter reading


ACH Comp # 1,2,3
RPH HWP#2
RPH Deisel Pump
Pot 236 Process line
ACH Ladder
PPH DWL
16-Dec-10 B MAYANK/ESHANT Utility Running Equipment
ACH Ladder
ACH(Back side) Shade
FTP ID Fan#3
RPH CT Fan#02
GAP DW line
FFPH Diesel Pump # 2
PPH DWL

16-Dec-10 C VINOD ACH Filter

POTROOM Watermeter reading

17-Dec-10 A DDSAHOO ACH Comp # 4 & 5


ACH Filter
RPH CT # 3
ACH Dryer # 6
ACH Fabrication
ACH Filter wall
FFPH JP # 2
FTP ID fan

17-Dec-10 B MAYANK/ESHANT ACH Fabrication


ACH Filter wall
RPH CT # 3
GAP PW line
POT no. 236 PW line
ACH Filter
Bake Oven HFO
cph &rph

17-Dec-10 C VINOD POTROOM Watermeter reading


ACH Dewatering pump

18-Dec-10 A DDSAHOO ACH Comp # 1,2& 3


ACH Filter
ACH Fabrication
ACH Comp # 4
RPH CT # 1
ACH FILTER WALL
ACH 5S

18-Dec-10 B MAYANK/ESHANT ACH Filter


ACH Fabrication
ACH FILTER WALL
ACH store room
RPH store room
PPH DWL
FFPH Diesel Pump # 2

18-Dec-10 C Praveen Rodding Process water line


ACH Filter
Potroom Watermeter reading
CPH Cooling Tower#3

19-Dec-10 A DDSAHOO ACH Comp # 4 & 5


ACH Filter
ACH Dewatering pump
ACH CT # 3
CAST HOUSE HFO Line

19-Dec-10 B MAYANK/ESHANT ACH Filter


PPH DWL

19-Dec-10 C Praveen Potroom Watermeter reading


ACH Filter

20-Dec-10 A DDSAHOO ACH Comp # 1,2& 3


ACH Filter
ACH Comp # 6
ACH Painting
FFPH MP # 3
ACH Trench Plate

20-Dec-10 B MAYANK/ESHANT ACH Trench Plate


FFPH MP # 3
ACH Comp # 6
PPH DWL
ACH Filter
ACH FILTER WALL
ACH Painting

20-Dec-10 C Praveen Potroom Watermeter


ACH Filter
ACH CT # 3

21-Dec-10 A DDSAHOO ACH Comp # 4 & 5


ACH Filter
ACH Comp # 6
ACH Painting
RPH CWP #1
ACH Filterwall
RPH CWP
RPH CWP # 3
CPH CT # 1

21-Dec-10 B MAYANK/ESHANT ACH Filter


ACH Filterwall
ACH Painting
RPH CWP #1
PPH DWL

21-Dec-10 C Praveen Potroom Watermeter


ACH Filter
ACH CT # 3
RPH CWP#1

22-Dec-10 A DDSAHOO ACH Comp #2& 3


ACH Filter
ACH Painting
ACH Secondary dryer
ACH 3/4th line fabrication
ACH Comp # 6
ACH Comp # 6

22-Dec-10 B VINOD ACH Comp # 1


ACH Filter
ACH Painting
ACH Comp # 6
CPH CWP#2
FFPH MP#3
ACH Comp # 6
ACH Comp # 1
ACH CWP#2

22-Dec-10 C Praveen Potroom Watermeter


ACH Filter
ACH CT # 3
Bake Oven HFO
23-Dec-10 A MAYANK/ESHANT ACH Comp # 4, 5
ACH Filter
ACH comp# 1
ACH Dryer # 1
ACH Water pipeline
CPH CWP#2

23-Dec-10 B VINOD
ACH Filter
ACH Painting
ACH Com#01
CPH CWP#2
CPH diesel comp.
CPH Secondary comp.

23-Dec-10 C Praveen Potroom Watermeter


ACH Filter

24-Dec-10 A MAYANK/ESHANT FFPH MP#3


ACH Filter
ACH Painting
ACH Comp # 2,3,6
ACH Com#01
ACH Filterwall

FFPH MP#2

24-Dec-10 B VINOD
ACH Filter
ACH Painting
ACH Com#01
CPH CWP#2
CPH CWP#4
CPH CWP#1
ACH Filterwall
FFPH MP#3

24-Dec-10 C DDSAHOO ACH Filter


Potroom Watermeter

25-Dec-10 A MAYANK/ESHANT ACH Comp # 4,5


ACH Filter
RPH Bearing

25-Dec-10 B Praveen ACH Filter


CPH Process water
PPH DWL
RPH Bearing
CPH/RPH Chemical

25-Dec-10 C DDSAHOO Potroom Watermeter

26-Dec-10 A MAYANK/ESHANT ACH Comp # 2,3,6


ACH Filter
PPH DWL

26-Dec-10 B VINOD ACH Filter


ACH ADV

26-Dec-10 C DDSAHOO ACH Filter


Potroom Watermeter

27-Dec-10 A MAYANK/ESHANT ACH Comp # 4,5


ACH Filter
ACH Dryer #1,6
CPH HWP#1,2
RPH Spare motor
ACH Structure
ACH secondary compressor

27-Dec-10 B Pratick ACH Dryer #1,6


ACH Filter
RPH Spare motor
FFPH MP#3
RPH CWP # 01

27-Dec-10 C DDSAHOO Potroom Watermeter

28-Dec-10 A MAYANK/ESHANT ACH Comp # 2,3,6


ACH Filter
ACH Comp#1
ACH Structure
RPH Spare motor
ACH Filterwall

28-Dec-10 B Praveen ACH Filter


ACH Comp#1
RPH Spare motor
ACH Filterwall

28-Dec-10 C DDSAHOO ACH Filter


Potroom Watermeter

29-Dec-10 A Vinod/Mayank ACH Comp # 4,5


ACH Filter
ACH Comp#1
ACH Structure
CPH Spare motor
ACH Filterwall
CPH Puller

29-Dec-10 B Praveen ACH Filter


ACH Comp#1
ACH Structure
ACH Filter wall
CPH/RPH Dosing
CPH Spare motor
ACH Sec Filter

29-Dec-10 C DDSAHOO Potroom Watermeter


ACH Filter

30-Dec-10 A Vinod ACH Comp # 2,3,6


ACH Filter
PPH/RPH AVGF
ACH Structure
CPH Spare motor
ACH Filterwall
ACH Surrounding

30-Dec-10 B Praveen ACH Filter


ACH Structure
CPH Spare motor
ACH Filterwall
PPH DWL
CPH/RPH Dozing

30-Dec-10 C Mayank ACH Filter


Potroom Watermeter
Bakeoven HFO

31-Dec-10 A Vinod ACH Comp # 4,5


ACH Filter
RPH VALVE no. 13
ACH Structure
CPH CWP#1
ACH Filterwall
ACH Surrounding
CPH HWP#2
CPH/ACH Comp./PUMPS/Motor

31-Dec-10 B DDSAHOO ACH Filter


ACH Filterwall
ACH Structure
CPH HWP#2
CPH CWP#1
FFPH MP # 3
Utility Running Equipment
CAST HOUSE HFO Line
ACH

31-Dec-10 C MAYANK/ESHANT Potroom Watermeter

1-Jan-11 A Praveen ACH Filterwall


ACH Structure
ACH Comp # 2,3,6
ACH Filter
Potroom Watermeter

1-Jan-11 B DDSAHOO ACH Filter


ACH+CPH 5S
RPH +FFPH 5S
PPH 5S
ACH Painting
ACH filterwall fabrication
1-Jan-11 C MAYANK/ESHANT Potroom Watermeter
ACH Filter

2-Jan-11 A Praveen Plant2 Watermeter


ACH Comp # 4,5
ACH Filter
RPH/CPH Chemical

2-Jan-11 B DDSAHOO ACH Filter


Potroom Air audit
CAST House HFO line
BAKE OVEN HFO line

2-Jan-11 C MAYANK/ESHANT Potroom Watermeter


Potroom Air audit

3-Jan-11 A Praveen Plant2 Watermeter


ACH Comp # 2.3.6
ACH Filter
ACH Filterwall
ACH Structure
CPH HWP#2
ACH to Scrapyard Filters
CPH CT

3-Jan-11 B DDSAHOO ACH Filter


Potroom Air audit
CPH HWP #2
FFPH Water leakage
CAST HOUSE HFO Line
ACH Dryer box up
3-Jan-11 C MAYANK/ESHANT CPH CT
ACH Filter
Potroom Watermeter
Potroom Air audit

4-Jan-11 A Praveen Plant2 Watermeter


ACH Comp # 4,5
ACH Filter
RPH HWP#1
ACH Structure
CPH CT
Potroom Air audit
Room-1 and CH DWL

CAST HOUSE + Drinking line


4-Jan-11 B DDSAHOO Section-4
ACH Painting
RPH HWP # 1
POTROOM Air audit
CPH HWP # 2
ACH Training
Hot well level Indicator
RPH
ACH Filter

4-Jan-11 C MAYANK/ESHANT CPH CT


Potroom Watermeter
Potroom Air audit
CAST HOUSE HFO Line

5-Jan-11 A Praveen ACH Comp # 2,3,6


ACH Filter
RPH HWP#3
ACH Structure
CPH CT

5-Jan-11 B DDSAHOO ACH Filter


Potroom Air audit
ACH Structure
RPH HWP # 3
ACH Fabrication
ACH Secondary Dryer
BAKE OVEN Steam Line
ACH Alarm

5-Jan-11 C Vinod CPH CT


ACH Filter
Potroom Watermeter
Potroom Air audit

6-Jan-11 A Praveen ACH Comp # 4,5


ACH Filter
CPH CT#3
ACH Structure
CPH CT
Potroom Air audit

6-Jan-11 B MAYANK/ESHANT Potroom Air audit


ACH Filter
ACH Structure
CPH CT

6-Jan-11 C Vinod CPH CT


Potroom Watermeter
Potroom Air audit

7-Jan-11 A DDSAHOO CAST HOUSE HFO Line


ACH CT # 1
RPH Filter Feed Pump#1,2
ACH Comp # 2,3,6
ACH Filter
ACH Fabrication
ACH Structure
Potroom Air audit

7-Jan-11 B MAYANK/ESHANT Potroom Air audit


ACH Filter
ACH Structure
Garage Watermeter
BAKE OVEN HFO Line
ACH Fabrication
PPH DW Unit2
central store water flow meter

7-Jan-11 C Vinod CPH CT


Potroom Watermeter
Potroom Air audit

8-Jan-11 A DDSAHOO ACH Comp # 4,5


ACH Filter
ACH Structure
ACH HWP # 4
Potroom Air audit
CPH CT # 2
CPH HWP # 2
CPH HWP # 4
RPH Watermeter
ACH Comp # 4
ACH Comp # 5
8-Jan-11 B ESHANT Potroom Air audit
ACH Filter
ACH Structure
RPH Watermeter
ACH HWP # 4
PPH DW Unit2

8-Jan-11 C Praveen Potroom Air audit


ACH Filter
ACH HWP # 4
CPH CT
Potroom Watermeter

9-Jan-11 A DDSAHOO ACH Comp # 2,3,6


ACH Filter
Potroom Air audit
CPH CT # 1

9-Jan-11 B ESHANT Potroom Air audit


ACH Filter
PPH DW Unit2

9-Jan-11 C Praveen Potroom Air audit


ACH Filter
CPH CT
Potroom Watermeter

10-Jan-11 A DDSAHOO ACH Comp # 4,5


ACH Filter
ACH Structure
Potroom Air audit
CPH CT # 2
CPH CWP # 1
CPH CWP # 4
CPH CWP # 4
ACH Fabrication
CPH HWP # 4
CPH HWP # 3
CPH HWP # 4
CPH HWP # 3
CPH HWP # 4

10-Jan-11 B ESHANT Potroom Air audit


ACH Filter
PPH DW Unit2
ACH Structure
CPH HWP # 4
ACH Fabrication
PPH pump#2
CPH cwp-hwp

BAKE OVEN HFO Line


CPH CT#3
CPH HWP # 4

10-Jan-11 C Praveen Potroom Air audit


ACH Filter
CPH CT
Potroom Watermeter

11-Jan-11 A DDSAHOO ACH Comp # 2,3,6


ACH Filter
Potroom Air audit
CPH CT # 1
ACH HWP # 4
ACH Fabrication
RPH CT # 3

11-Jan-11 B ESHANT Potroom Air audit


ACH Filter
PPH DW Unit2
ACH Structure
CPH HWP # 4
ACH Fabrication
RPH CT # 3
cast house HFO Line
RPH CT # 3

11-Jan-11 C Praveen ACH Filter


CPH CT
Potroom Watermeter

12-Jan-11 A DDSAHOO ACH Comp # 4,5


ACH Filter
ACH Structure
CPH CT # 1
ACH Comp #1
CPH CWP # 4
RPH CWP # 2
BAKEOVEN Steam line
ACH Comp #1

12-Jan-11 B Vinod ACH Dryer # 1


ACH Filter
ACH comp#5
BAKEOVEN Steam line
CPH CWP#3
CPH COMP#5
ACH Structure
RPH CWP # 2

12-Jan-11 C Praveen ACH Filter


Potroom Watermeter
Potroom Air audit

13-Jan-11 A ESHANT Potroom Air audit


ACH Comp # 2,3,6
ACH Filter
PPH DW Unit1
ACH Structure
CPH CWP # 3
cast house HFO Line
ACH comp#5
ACH POP
ACH POP
ACH comp#5

ACH Diesel Engine Compressor

13-Jan-11 B Vinod/Mayank Potroom Air audit


ACH Filter
PPH DW Unit1
BAKE OVEN HFO Line
ACH Structure
ACH comp#5
CPH CWP # 3
ACH Sec Compressor
ACH comp#1

13-Jan-11 C Praveen ACH Filter


Potroom Watermeter
Potroom Air audit

14-Jan-11 A Mayank/Eshant Potroom Air audit


ACH Filter
PPH DW Unit1
ACH Comp # 1,4
ACH Structure
CPH CT
CPH CT Fan#1
Utilities All equipments
ACH Dryer # 6
CPH HWP
PPH TP

14-Jan-11 B Vinod ACH Structure


ACH Dryer # 6
ACH Sec Compressor
ACH All equipments
Potroom Air audit
ACH Filter
PPH DW Unit1
RPH CT#2
RPH CT#1

14-Jan-11 C DDSAHOO Potroom Air audit


POTROOM Watermeter Reading
RPH Dewatering Pump

15-Jan-11 A Mayank/Eshant Potroom Cooling Hoses


ACH Filter
PPH DW Unit1
ACH Comp # 2,3,6
CPH CT#2
ACH Structure
ACH COMP#1
ACH Diesel compressor

ACH Secondary compressor


CPH CT Fan

15-Jan-11 B Praveen PPH DW


CPH CT#2
ACH Diesel compressor

ACH Secondary compressor


ACH Structure
ACH COMP#1
Potroom Cooling Hoses
HFO CH

15-Jan-11 C DDSAHOO Potroom Air audit


POTROOM Watermeter Reading
BAKEOVEN HFO Line
ACH Filter

16-Jan-11 A Mayank/Eshant Potroom Cooling Hoses


ACH Filter
PPH DW Unit1
ACH Comp # 1, 4

16-Jan-11 B Praveen Potroom Cooling Hoses


ACH Filter
GARAGE Water Line

16-Jan-11 C DDSAHOO Potroom Air audit


POTROOM Watermeter Reading
CPH CT #1
17-Jan-11 A Mayank/Eshant Potroom Cooling Hoses
ACH Comp # 2,3,6
ACH Filter
PPH DW Unit1
cast house HFO Line
CPH CT#1

PLANT2 DRINKING WATER LINE


ACH Structure
ACH ADV

17-Jan-11 B Praveen ACH Filter


ACH Structure
PLANT2 DRINKING WATER LINE
Potroom Cooling Hoses
ACH ADV

17-Jan-11 C DDSAHOO Potroom Air audit


POTROOM Watermeter Reading
ACH Filter

18-Jan-11 A Mayank/Eshant Potroom Cooling Hoses


ACH Comp # 1,4
ACH Filter
PPH DW Unit1
BAKEOVEN HFO Line
ACH,CPH,PPH Structure
Bake Oven,Pot
Room Flow meter
ACH 5-S
ACH Electric Hoist
18-Jan-11 B Praveen Potroom Cooling Hoses
ACH Filter
PPH DW Unit2
BAKEOVEN HFO Line
ACH,CPH,PPH Structure
Bake Oven,Pot
Room Flow meter
ACH 5-S
FTP-4 Ball v/v

18-Jan-11 C DDSAHOO Potroom Air audit


POTROOM Watermeter Reading
ACH Comp # 5
ACH Comp # 5
CPH CWP# 3

19-Jan-11 A Subhashish ACH Comp # 2,3,6


ACH Filter

19-Jan-11 B Praveen ACH+PPH+CPH 5S


CPH+RPH Chemical
Potroom Air audit
ACH Filter

19-Jan-11 C DDSAHOO Potroom Air audit


POTROOM Watermeter Reading
ACH Filter

20-Jan-11 A Praveen ACH Comp # 1,4,5


ACH Filter
PPH Pipes
ACH Comp/Dryer#4,5,6
RPH Chem.Barrel+Sec.filter
Potroom Air audit
ACH Fabrication
PPH DW Unit1

20-Jan-11 B Praveen ACH Filter


PPH Pipes
ACH Comp/Dryer#1,2,3
PPH DW Unit2
CPH+RPH Chemical
ACH Dryer#4

20-Jan-11 C Mayank/Eshant Potroom Air audit


POTROOM Watermeter Reading
ACH Filter

21-Jan-11 A Pratick Potroom Air audit


ACH Comp # 04
ACH Comp # 04
ACH Comp # 04
ACH Comp # 04
ACH Comp # 2,3,6
ACH Filter
CPH CWP # 02
FFPH Jockey Pump # 01

21-Jan-11 B DDSAHOO Potroom Air audit


ACH Filter
ACH Comp #4
ACH Comp #4
ACH Comp #4
ACH Comp #4
ACH Comp #4
BAKEOVEN HFO Line
21-Jan-11 C ESHANT ACH comp#4, dryer #4
Potroom Air audit
POTROOM Watermeter Reading
ACH Filter
ACH CT# 1

22-Jan-11 A Praveen Potroom Air audit


ACH Comp # 1,5
ACH Filter
CPH/RPH Make up
ACH Dryer#4
ACH CT# 1
PPH DW Unit1
PPH Pipe

22-Jan-11 B DDSAHOO Potroom Air audit


ACH Filter
PPH Pipe
PPH DWP
PPH
PPH
PPH
ACH Comp #4

ACH Dryer # 5

22-Jan-11 C ESHANT Potroom Air audit


POTROOM Watermeter Reading
ACH Dryer#4
ACH Dryer # 5
ACH Diesel engine comp
23-Jan-11 A Praveen Potroom Air audit
ACH Comp # 2,3,6
ACH Comp#2
CPH/RPH Make up
PPH DW Unit1
ACH Dryer#5

23-Jan-11 B DDSAHOO Potroom Air audit


ACH Filter

23-Jan-11 C ESHANT Potroom Air audit


POTROOM Watermeter Reading
CAST HOUSE HFO Line

24-Jan-11 A Praveen Potroom Air audit


ACH Comp # 1,5
ACH Filter
ACH Comp#4
PPH Unit # 1
ACH Comp#4
CPH/RPH Make up

24-Jan-11 B Vinod Potroom Air audit


ACH Filter
ACH Comp#4
PPH Unit # 1
ACH Comp#4
ACH Comp#4
ACH dryer

24-Jan-11 C Mayank/Eshant Potroom Cooling Hoses


ACH Comp#4
POTROOM Watermeter Reading
ACH Comp#3
ACH Filter

25-Jan-11 A Praveen ACH Comp#3


ACH Comp#4
Plant Fire Line
PPH Pump

ACH Comp#3

25-Jan-11 B DDSAHOO Potroom Air audit


ACH Comp # 2,3,6
ACH Filter
potroom Complete air audit
ACH Comp #4
ACH Comp #4

25-Jan-11 C Mayank/Eshant Potroom Air audit


POTROOM Watermeter Reading
FFPH Fire Hydrant Line
ACH Primary Filter

26-Jan-11 A Praveen Cast House HFO


PPH DW

26-Jan-11 B DDSAHOO Potroom Air audit


ACH Comp # 1,5
ACH Filter

ACH Fire hydrant line


BAKEOVEN FIRE Hydrant Valve
ACH Fire hydrant line

26-Jan-11 C VINOD Potroom Air audit


ACH Filter
ACH Fire hydrant line
BAKEOVEN FIRE Hydrant Valve
POTROOM Watermeter Reading

27-Jan-11 A Praveen Bake Oven HFO


PPH DW
ACH Comp # 2,3,6
ACH Filter

27-Jan-11 B Mayank/Eshant ACH Comp#4


ACH Filter
ACH stores 5S
PPH DW
CARBON AREA FIRE HYDRANT LINE
Potroom Cooling Hoses

27-Jan-11 C VINOD ACH Filter


Potroom Cooling Hoses
POTROOM Watermeter Reading

28-Jan-11 A DDSAHOO ACH Comp # 1,5 & 6


Potroom Cooling Hoses

FFPH JP #1
ACH Filter
FFPH Automation
CARBON Air Audit
ACH Dryer # 5

28-Jan-11 B Mayank/Eshant ACH Filter


Potroom Cooling Hoses
PPH DW
Cast House HFO
CARBON Air Audit
ACH Dryer # 5
ACH Pipeline, structure

28-Jan-11 C VINOD ACH Filter


Potroom Cooling Hoses
POTROOM Watermeter Reading

29-Jan-11 A DDSAHOO ACH Comp # 2,3 & 4


Potroom Cooling Hoses
ACH Filter
FFPH Diesel Engine #2
FFPH Automation
ACH Fabrication
ACH Painting
ACH & CPH CBM

29-Jan-11 B Mayank/Eshant ACH Filter


Potroom Cooling Hoses
PPH DW
ACH Painting
ACH 5S
ACH RAILING

29-Jan-11 C Mayank/Eshant ACH Filter


Potroom Cooling Hoses
POTROOM Watermeter Reading
Bake Oven HFO

30-Jan-11 A DDSAHOO ACH Comp # 1,5 & 6


Potroom Cooling Hoses
ACH Filter
CPH CT # 1

30-Jan-11 B Mayank/Eshant ACH Filter


Potroom Cooling Hoses
PPH DW

30-Jan-11 C DDSAHOO ACH Filter


Potroom Cooling Hoses
POTROOM Watermeter Reading

31-Jan-11 A VINOD ACH Comp # 2,3,4


Potroom Cooling Hoses
ACH Filter
CPH fabrication
CPH cable celler
ACH Painting

31-Jan-11 B Mayank/Eshant ACH Filter


Potroom Cooling Hoses
PPH DW
Bakeovan HFO
ACH Painting
CPH fabrication
CPH cable celler

31-Jan-11 C Praveen ACH Filter


Potroom Cooling Hoses
POTROOM Watermeter Reading
1-Feb-11 A DDSAHOO ACH Comp # 1,5 & 6
ACH Filter
ACH Fabrication
ACH Dryer # 5
ACH Painting
FFPH Watermeter
FFPH MP # 1
ACH Dryer # 5
FFPH MP # 3

1-Feb-11 B Eshant ACH Filter


Potroom Cooling Hoses
PPH DW
ACH Fabrication
ACH Dryer # 5
ACH Painting
ACH G I Sheet Cutting
FFPH MP # 3

1-Feb-11 C Praveen ACH Filter


POTROOM Watermeter Reading

2-Feb-11 A DDSAHOO ACH Comp # 2,3 & 4


ACH Fabrication
ACH Dryer # 5
ACH Structure
ACH Filter
RODDING Valve Chamber
ACH Door & repair
ACH White washing

2-Feb-11 B MAYANK ACH Fabrication


ACH Dryer # 5
ACH Structure
ACH Filter
RODDING Valve Chamber
ACH White washing
PPH DW
Potroom Cooling Hoses
FFPH MP#1

2-Feb-11 C Praveen ACH Filter


Potroom Cooling Hoses
POTROOM Watermeter Reading
Bake Oven HFO

3-Feb-11 A Eshant ACH Comp # 1,5 & 6


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH Fabrication
ACH White washing
RPH HWP#2
RPH Cooling Tower
PPH/ CPH Fire Extinguisher

3-Feb-11 B MAYANK ACH Fabrication


ACH Filter
PPH/ CPH Fire Extinguisher
Potroom Cooling Hoses
ACH White washing
RPH HWP#2
ACH Charger box
Cast House HFO
PPH DW Unit#1
RPH HWP#2
RPH HWP#3

3-Feb-11 C DDSAHOO ACH Filter


Potroom Cooling Hoses
POTROOM Watermeter Reading
ACH Comp # 5

4-Feb-11 A Eshant ACH Comp # 2,3 & 4


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH Comp#5
Near GAP CHAMBER # 6
GAP Fire line
ACH Painting
ACH CWP#3

4-Feb-11 B MAYANK ACH Comp#5


Near GAP CHAMBER # 6
GAP Fire line
ACH Painting
ACH Filter
PPH DW Unit#1
Potroom Cooling Hoses

4-Feb-11 C Praveen GAP Fire line


ACH Filter
Potroom Cooling Hoses
POTROOM Watermeter Reading

5-Feb-11 A Eshant ACH Comp # 1, 6


ACH Filter
Potroom Cooling Hoses
PPH DW
Bakeovan HFO
ACH Comp#5
ACH Comp#5
FFPH MP# 2

5-Feb-11 B MAYANK ACH Comp#5


ACH Comp#5
ACH Comp#5
ACH Comp#5
Cast House HFO
PPH DW Unit#1
Potroom Cooling Hoses
ACH Comp#5
ACH Dryer#5
FFPH MP#2
RPH Notice board
Rodding,GAP Fire line

5-Feb-11 C Praveen Potroom Cooling Hoses


POTROOM Watermeter Reading

6-Feb-11 A D D Sahoo/ Eshant ACH Comp # 2,3 & 4


ACH Filter
Potroom Cooling Hoses
PPH DW

6-Feb-11 B MAYANK ACH Filter


PPH DW Unit #1
ACH Comp#05
ACH Comp#05
CPH CWP#3
BakeOven HFO

6-Feb-11 C Praveen Potroom Cooling Hoses


POTROOM Watermeter Reading
ACH Filter
ACH Comp#05

7-Feb-11 A Eshant ACH Comp # 1,5 & 6


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH Stand/ stairs
Cast House Water flow meter
Cast House HFO line
ACH Door/ Window
ACH comp # 6
ACH Diesel engine comp.

7-Feb-11 B MAYANK ACH Sec. motor comp


ACH Dryer # 1
ACH Dryer # 2
ACH Dryer # 3
ACH Dryer # 4
ACH Dryer # 6
ACH EOT CRANE
PPH Dosing pump
ACH Filter
PPH DW Unit #1
Potroom Cooling Hoses

7-Feb-11 C Praveen Potroom Cooling Hoses


POTROOM Watermeter Reading
ACH Filter
Plant2 Fire Hydrant Line

Plant2 FFPH

8-Feb-11 A Eshant ACH Comp # 2,3 & 4


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH Stand/ stairs
Plant 2 Drinking water line
FFPH/ rectifier VALVES

8-Feb-11 B DD SAHOO ACH Filter


POTRROM Compressed Air audit
PLANT-II Drinking water line
FFPH Valves
POTROOM Air audit

8-Feb-11 C Praveen Potroom Cooling Hoses


POTROOM Watermeter Reading
ACH Filter

9-Feb-11 A MAYANK ACH Comp # 1,5 & 6


ACH Filter
Potroom Cooling Hoses
PPH DW Unit #2
ACH Stand/ stairs
PPH TP#1
Plant 2 Process waterline

9-Feb-11 B DD SAHOO ACH Filter


POTROOM Air audit
ACH Stand/ stairs Fabrication.
Plant 2 Process waterline
BAKEOVEN HFO line

9-Feb-11 C Praveen Potroom Cooling Hoses


POTROOM Watermeter Reading
ACH Filter

10-Feb-11 A MAYANK ACH Comp # 2,3 & 4


Central stores Fire Hydrant
Canteen Pipe fittings
Cast House HFO line
ACH Filter
Potroom Cooling Hoses
PPH DW Unit #2
ACH Stand/ stairs

10-Feb-11 B DD SAHOO ACH Filter


POTROOM Air audit
ACH Stand/ stairs Fabrication.
ACH & RPH Material
Canteen Pipe fittings
FTP Allignment

10-Feb-11 C Eshant BAKEOVEN HFO line


Potroom Cooling Hoses
ACH Filter

11-Feb-11 A MAYANK ACH Comp # 1,5 & 6


ACH Filter
Potroom Cooling Hoses
PPH DW Unit #2
ACH Stand/ stairs
CPH CWP#2
CPH CWP#1
RPH pipe fittings
GAP Fire Water Line

11-Feb-11 B Praveen ACH Filter


Potroom Cooling Hoses
GAP Fire Water Line
Cast House HFO line
PPH DW Unit #2
ACH Stand/ stairs Fabrication.
CPH CWP#2

11-Feb-11 C Eshant ACH Filter


Potroom Cooling Hoses

12-Feb-11 A MAYANK ACH Comp # 2,3 & 4


Potroom Cooling Hoses
PPH DW Unit #2
ACH Stand/ stairs
ACH Air Pipeline
ACH Filter

12-Feb-11 B DD SAHOO ACH Filter


POTROOM Air audit
ACH Stand/ stairs Fabrication.

ACH Air Pipeline


ACH Diesel compressor
BAKEOVEN HFO Line

12-Feb-11 C Eshant ACH Filter


Potroom Cooling Hoses
PPH TP # 4

13-Feb-11 A VINOD ACH Comp # 1,5,6


Potroom Cooling Hoses
PPH DW Unit #2
Pot room Sec#1
ACH Filter
ACH Dewatering pump
ACH comp#3

13-Feb-11 B DD SAHOO ACH Filter


POTROOM Air audit

ACH Comp # 3
ACH Exhaust Fan

13-Feb-11 C Eshant ACH Filter


Potroom Cooling Hoses
ACH Comp # 3

14-Feb-11 A MAYANK ACH Comp # 2, & 4


Potroom Cooling Hoses
PPH DW Unit #2
ACH Comp#3
ACH Comp#3
Canteen Pipe Line
PPH TP#3,4
ACH Filter

14-Feb-11 B DD SAHOO ACH Filter


POTROOM Air audit
ACH Dryer#1
CARBON Air line
RPH CT#2
ACH COMP#3
CANTEEN Water line

14-Feb-11 C Eshant ACH Comp # 3


ACH Comp # 3
ACH CT#1
Potroom Cooling Hoses
CAST HOUSE HFO Line

15-Feb-11 A Subhashish ACH Comp # 1,5, 6


ACH Filter
Potroom Cooling Hoses
ACH Intercooler
ACH TP # 01
ACH Instrument line
RPH HWP # 01
RPH HWP # 03
CPH CT#01

15-Feb-11 B DD SAHOO ACH Filter


POTROOM Air audit
RPH HWP # 1

ACH Intercooler
FFPH Fire Water line
PPH Su mp Pump

15-Feb-11 C Eshant ACH Filter


POTROOM Air audit

16-Feb-11 A Subhashish ACH Comp # 02, 03 & 04


ACH Filter
Potroom Cooling Hoses
Utilities Pumps/Compressors
ACH Intercooler

ACH TP # 01

ACH Comp/Dryer
Carbon Leakages

16-Feb-11 B DD SAHOO ACH Filter


POTROOM Air audit
Carbon Leakages
ACH Intercooler

ACH TP # 01
ACH Fabrication
Utilities Pumps/Compressors

16-Feb-11 C MAYANK ACH Filter


POTROOM Air audit
POTROOM Watermeter Reading

17-Feb-11 A DD SAHOO ACH Comp # 1,5, 6


ACH Filter
POTROOM Air audit
GAP Fire water line
RPH CT # 1
CAST HOUSE HFO Line
BAKEOVEN HFO line

17-Feb-11 B Eshant ACH instrument line


ACH Dryer# 1
Gap Fire water line
GAP, Canteen, Fire water line,water monitor-
Bakeovan 1,2,3,4,5,6
ACH Filter
POTROOM Air audit
PPH DW Unit #1

17-Feb-11 C MAYANK ACH Filter


POTROOM Air audit
POTROOM Watermeter Reading
ACH Shopfloor

18-Feb-11 A Vinod ACH Comp # 2,3,4


ACH Filter
POTROOM Air audit
PPH TP#2
Plant#2 Drinking line
PPH TP#3
PPH TP#2

18-Feb-11 B Eshant ACH instrument line


ACH 5S
POTROOM-FTP 3 process water line
&4
Plant# 2 Drinking water line
ACH Filter
POTROOM Air audit
PPH DW Unit #1

18-Feb-11 C MAYANK ACH Filter


POTROOM Air audit
POTROOM Watermeter Reading
ACH Shopfloor
19-Feb-11 A DD SAHOO ACH Comp # 1,5, 6
ACH Filter
POTROOM Air audit
BAKEOVEN HFO Line up
Plant-II Fire line leakage arresting
PPH TP# 3
RPH CT#3
CPH CT#2

19-Feb-11 B Eshant ACH instrument line


ACH Dryer # 3,4,5,
PLANT#2 Fire line valve

RODDING near
AUTOGENOUS
MILL Fire line
ACH Filter
POTROOM Air audit
PPH DW Unit #1

19-Feb-11 C MAYANK ACH Filter


POTROOM Air audit
POTROOM Watermeter Reading

20-Feb-11 A DD SAHOO ACH Comp # 2,3 & 4


ACH Filter
POTROOM Air audit
Canteen Water lline

20-Feb-11 B Praveen ACH Filter


POTROOM Air audit

20-Feb-11 C MAYANK ACH Filter


POTROOM Air audit
POTROOM Watermeter Reading

21-Feb-11 A DD SAHOO ACH Comp # 1,5 & 6


ACH Filter
POTROOM Air audit
ACH New Instrumrntation line
PPH TP# 3 & 4
WORKSHOP Ball valve
PPH TP# 4

21-Feb-11 B Eshant ACH instrument line


ACH Dummy plate
ACH Chamber cover
ACH Filter
POTROOM Air audit
PPH DW Unit #1

21-Feb-11 C MAYANK ACH Filter


POTROOM Air audit
POTROOM Watermeter Reading

22-Feb-11 A VINOD ACH Comp # 2,3,4


ACH CT#2
PPH TP#1
POTROOM Air audit
ACH DRYER#1,5
ACH DRYER#1
PPH TP#2,3

22-Feb-11 B Praveen ACH CT#2


POTROOM Air audit
ACH Dryer#1
CPH/RPH Chemical Dosing
22-Feb-11 C Eshant ACH Filter
POTROOM Air audit

23-Feb-11 A Praveen ACH Filter

ACH Comp # 1,5,6


ACH Dryer#5
ACH Fabrication
BO HFO

23-Feb-11 B Subhashish ACH Filter


BO HFO
POTROOM Air audit
ACH Dryer#5
CPH/RPH Chemical Dosing

23-Feb-11 C Vinod ACH Filter


POTROOM Air audit

24-Feb-11 A Eshant ACH Comp # 2,3 & 4


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH Dryer#5
Cast House HFO
Plant 2 fire line
ACH Filter House
Potroom-SEC-1 fire hydrant line
PPH Transfer Pump # 1
ACH Structure/ Pipe line
CPH HWP#1
CPH HWP#4
24-Feb-11 B Subhashish ACH Filter
Potroom Cooling Hoses

ACH Dryer#5
ACH Filter House
PPH Transfer Pump # 1
ACH Structure/ Pipe line

24-Feb-11 C Vinod ACH Filter


POTROOM Air audit
ACH tullu pump

25-Feb-11 A Eshant ACH Comp # 1,5 & 6


ACH Filter
Potroom Cooling Hoses
PPH DW
PPH Transfer Pump # 1
ACH Structure/ Pipe line
CPH HWP#1
CPH HWP#3
CPH HWP#3
ACH Filter House
Potroom-SEC-1 fire hydrant line
ACH Dryer#5

25-Feb-11 B Subhashish ACH Filter


Potroom Cooling Hoses
Cast House HFO
ACH Structure/ Pipe line
ACH Filter House
ACH Dryer#5
CPH/RPH Chemical Dosing
25-Feb-11 C Praveen ACH Filter
Potroom Cooling Hoses
Bake Oven HFO
Pot Room Watermeter

26-Feb-11 A Eshant ACH Comp # 2,3,4


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH New Instrumrntation line
FFPH JP# 1
RPH All Equipments
ACH Dryer#5
Potroom-SEC-1 fire hydrant line

26-Feb-11 B Vinod ACH Filter


Potroom Cooling Hoses
PPH DW
ACH New Instrumrntation line
FFPH JP# 1
ACH Dryer#5
Potroom-SEC-1 fire hydrant line

26-Feb-11 C Praveen ACH Filter


Potroom Cooling Hoses
Pot Room Watermeter

27-Feb-11 A Eshant ACH Comp # 1,5,6


ACH Filter
Potroom Cooling Hoses
PPH DW
CPH/RPH Chemical Dosing
FFPH MP#1
Cast House HFO

27-Feb-11 B vinod ACH Filter


Potroom Cooling Hoses
PPH DW
ACH Diesel comp.
FFPH MP#1
fire line sec.1 (pot room)

27-Feb-11 C Praveen ACH Filter


Potroom Cooling Hoses
Pot Room Watermeter

28-Feb-11 A Eshant ACH Comp # 2,3,4


Bake Oven HFO
ACH Filter
Potroom Cooling Hoses
PPH DW
FFPH JP# 2
ACH Dryer#5
ACH comp# 4
ACH comp# 4
CPH CWP#1
ACH comp# 4
ACH comp# 4
ACH comp# 4

28-Feb-11 B Vinod ACH Comp # 4


ACH Comp # 4
ACH Filter
Potroom Cooling Hoses
PPH D/W
Plant2 Fire hydrants
Canteen drinking pipeline
RPH HWP#2
RPH HWP#1
ACH comp# 4
ACH comp# 4
ACH intercooler
ACH comp# 4
ACH comp# 4
ACH comp# 4

28-Feb-11 C Praveen ACH Filter


Potroom Cooling Hoses
Pot Room Watermeter
Plant2 Fire Line

1-Mar-11 A Eshant ACH Comp # 1,5,6


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH Dryer#4
ACH comp# 4
ACH comp# 4
Cast House HFO
CPH HWP#4
CPH HWP#3
CPH HWP#4
ACH Dryer#5

1-Mar-11 B Vinod ACH Filter


Potroom Cooling Hoses
PPH DW
ACH comp# 4
ACH comp# 4
ACH Dryer#5
Store inspection of Sec. filter
Canteen pipe line
ACH comp# 4

1-Mar-11 C Praveen ACH Filter


Potroom Cooling Hoses
Pot Room Watermeter
ACH Comp#4

2-Mar-11 A Eshant ACH Comp # 2,3


ACH Filter
Potroom Cooling Hoses
PPH DW
ACH Dryer#5
CPH CT# 1
CPH CWP # 1
ACH comp# 4

2-Mar-11 B DD SAHOO ACH Filter


Potroom Air audit
ACH Dryer#5
FFPH Flow Meter
Potroom, Section#4
Fire Water Chamber
CastHouse HFO line

2-Mar-11 C Praveen ACH Filter


Potroom Cooling Hoses
Pot Room Watermeter

3-Mar-11 A Vinod ACH Comp # 1,5,6


ACH Filter
Potroom Cooling Hoses
FFPH JP#3
Plant 2 Fire line
Comp#1.5 ADV
Store pipe fitting
fire line chamber

3-Mar-11 B DD SAHOO ACH Filter


Potroom Air audit
Section # 4 Fire chamber # 4 & 5
Section# 7 Process Water
ACH Fabrication

3-Mar-11 C Eshant ACH Filter


Potroom Cooling Hoses
Bakeoven HFO line

4-Mar-11 A Vinod ACH Comp # 2,3,4


ACH Filter
Potroom Cooling Hoses
Plant 2 drinking line
Plant 2 steam line
Comp#1.5. ADV
Dryer# 1 Dryer# 1

4-Mar-11 B Praveen ACH Filter


Central store Fire Line
Plant 2 drinking line
ACH Dryer # 6
4-Mar-11 C Eshant ACH Filter
Potroom Cooling Hoses
Plant 2 Fire Line

5-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit

ACH Comp # 1,5 & 6


CAST HOUSE HFO Line
POTROOM Air line leakage audit
ACH Instrument line
ACH Zero loss Drain valve

5-Mar-11 B Praveen ACH Filter


FFPH Jockey#3
CPH/RPH Well
ACH Zero loss Drain valve

5-Mar-11 C Eshant ACH Filter


Potroom Cooling Hoses
Bakeoven HFO line

6-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit

ACH Comp # 2, 3 & 4


ACH Zeroloss drain valve

6-Mar-11 B Praveen ACH Filter


Potroom Air audit
PPH DWL

6-Mar-11 C Eshant ACH Filter


Potroom Cooling Hoses

7-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit
ACH Comp # 1,5 & 6
ACH Water Meter
CAST HOUSE HFO Line
RPH HWP #2
ACH Diesel Compressor

7-Mar-11 B Praveen ACH Filter


Potroom Air audit
PPH DWL
LPG Yard Fire line
RPH HWP #2
ACH Roof Cover

7-Mar-11 C Eshant FFPH MP # 1


RPH HWP# 2
ACH Filter
Potroom Cooling Hoses

8-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit

ACH Comp # 2, 3 & 4


BAKEOVEN HFO Line
RPH HWP # 2

FFPH Flow meter

8-Mar-11 B Praveen ACH Filter


Potroom Air audit
RPH HWP # 2
FFPH Flow meter

ACH Dryer

8-Mar-11 C Eshant ACH Filter


Potroom Cooling Hoses

9-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit

ACH Comp # 1,5 & 6


CAST HOUSE HFO Line

CANTEEN Drinking water


CPH CWP #2
POTROOM Fire Hydrant

9-Mar-11 B Praveen ACH Filter


Potroom Air audit
CPH CWP#2
CPH Flow meter
PPH DWL

9-Mar-11 C Praveen ACH Filter


Potroom Cooling Hoses
HFO Bake Oven

10-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit
ACH Comp # 2, 3 & 4
Secondary Compressor &
ACH Dryer
ACH Store Audit
BAKE OVEN Fire Hydrant

10-Mar-11 B Vinod ACH Filter


Potroom Air audit
plant 2 Carbon Area
RPH,CPH Cooling Tower
RPH 6" gate valve
CPH CWP#2
CPH CWP#4

10-Mar-11 C Praveen ACH Filter


Potroom Cooling Hoses
Potroom H2O meter

11-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit
ACH Comp # 1,5 & 6
CPH CWP #4
CARBON AREA Air Line
Rodding Water Line

11-Mar-11 B Eshant ACH Filter


POTROOM Air audit
ACH New Instrumrntation line
ACH Store
CPH CWP #4

11-Mar-11 C Vinod ACH Filter


Potroom Cooling Hoses
ACH DRYER#1

12-Mar-11 A DD SAHOO ACH Filter


Potroom Air audit
ACH Comp # 2, 3 & 4
CAST HOUSE HFO Line
BAKE OVEN HFO Line
FFPH Water meter

12-Mar-11 B Eshant ACH Filter


POTROOM Air audit
FFPH Water meter
ACH Store
CPH/RPH Chemical Dosing
PPH DW

12-Mar-11 C MAYANK ACH Filter


Potroom Cooling Hoses
Potroom H2O meter
ACH Comp#1

13-Mar-11 A Praveen ACH Filter


Potroom Cooling Hoses
Plant H2O meter

ACH Comp#1
ACH Comp#5,6

13-Mar-11 B Eshant ACH Filter


POTROOM Air audit
PPH DW
ACH Comp#1
ACH Dryer#1
ACH Comp#1
ACH Comp#1
ACH Comp# 1
13-Mar-11 C MAYANK ACH Filter
Potroom Cooling Hoses
Potroom H2O meter
ACH Comp# 1

14-Mar-11 A Praveen ACH Filter


Potroom Cooling Hoses
Plant H2O meter
ACH Comp#2,3,4

ACH Comp#1

14-Mar-11 B DD SAHOO ACH Filter


Potroom Air audit
ACH Comp#1
ACH Comp#1
ACH Comp#1
ACH Comp#1
FFPH JP #1
ACH Comp#1

14-Mar-11 C MAYANK ACH Filter


Potroom Cooling Hoses
Potroom H2O meter
ACH Comp# 1
FFPH JP#1

15-Mar-11 A Praveen ACH Filter


Potroom Cooling Hoses
Plant H2O meter
ACH Comp#5,6
CPH/RPH AVGF
Canteen Water Meter

15-Mar-11 B Eshant ACH Filter


POTROOM Air audit
Cast house HFO Line
RPH Water flow meter
ACH Water flow meter
ACH New Instrumrntation line
ACH Comp# 1

ACH Comp# 1

15-Mar-11 C DD SAHOO Rodding Fire Hydrant line

Potroom Watermeter
ACH & RPH AVGF

16-Mar-11 A Praveen ACH Filter


Potroom Cooling Hoses
Plant H2O meter
ACH Comp#2,3,4
ACH New Instrumrntation line
RPH HWP#2

16-Mar-11 B MAYANK ACH Filter


Potroom Cooling Hoses
ACH New Instrumrntation line
RPH HWP#2
CPH CWP#3
CPH CWP#4
CPH CWP#3

16-Mar-11 C DD SAHOO Potroom Watermeter


ACH Filter
Potroom Cooling Hoses

17-Mar-11 A Eshant ACH Comp # 1,5 & 6


ACH Primary Filter
Potroom Cooling Hoses
PPH DW
FFPH MP# 3
RPH(canteen ) WATER LINE
RPH all mech equipment
ACH New Instrumrntation line
Cast house HFO Line
ACH Primary Filter
RPH HWP#2
RPH HWP#3
ACH smoke detector

17-Mar-11 B MAYANK ACH Filter


Potroom Cooling Hoses
ACH New Instrumrntation line
PPH DW
(canteen ) WATER LINE
ACH Comp#1
FFPH MP# 3

17-Mar-11 C DD SAHOO Potroom Watermeter


ACH Filter
Potroom Cooling Hoses

18-Mar-11 A Eshant ACH Comp # 2,3 & 4


ACH Primary Filter
Potroom Cooling Hoses
PPH DW
FFPH Main pump # 3
RPH Cooling Tower # 2
RPH Cooling Tower # 2
Bakeoven HFO Line
ACH New Instrumrntation line
RPH Cooling Tower # 2

18-Mar-11 B MAYANK ACH Filter


Potroom Cooling Hoses
FFPH MP# 3
ACH,CPH,PPH All Running Equipments
PPH DW
ACH Primary Filter

18-Mar-11 C Praveen Potroom Watermeter


ACH Filter
Potroom Cooling Hoses
PPH TP#1
FFPH JP#2

19-Mar-11 A Eshant ACH Comp # 1,5 & 6


ACH Primary Filter
Potroom Cooling Hoses
PPH DW
ACH New Instrumrntation line
FFPH MP#2
FFPH JP# 2 & 3
RPH AVGF#1
RPH AVGF#2
19-Mar-11 B MAYANK ACH Filter
Potroom Cooling Hoses
FFPH MP# 3
RPH AVGF#1
RPH AVGF#2
Plant 2 Fire Line,MP#2
PPH DW
FFPH JP#3
FFPH JP#2
ACH Dryer#1,3
PPH TP#3

19-Mar-11 C Praveen Potroom Watermeter


ACH Filter
Potroom Cooling Hoses
CPH/RPH AVGF
Cast House HFO

20-Mar-11 A DD SAHOO ACH Comp # 2,3 & 4


ACH Primary Filter
Potroom Cooling Hoses

20-Mar-11 B MAYANK ACH Filter


Potroom Cooling Hoses
PPH DW
Bakeoven HFO Line

20-Mar-11 C Praveen Potroom Watermeter


ACH Filter
Potroom Cooling Hoses

21-Mar-11 A DD SAHOO ACH Comp # 1,5 & 6


ACH Primary Filter
Potroom Cooling Hoses
ACH Instrument line
PLANT-II Drinking Water line
ACH Diesel compressor

21-Mar-11 B MAYANK ACH Filter


Potroom Cooling Hoses
PPH DW
ACH Instrument line
FFPH DEP#2

21-Mar-11 C Praveen Potroom Watermeter


ACH Filter
Potroom Cooling Hoses

22-Mar-11 A DD SAHOO ACH Comp # 2,3 & 4


ACH Primary Filter
Potroom Cooling Hoses
CAST HOUSE HFO Line
PLANT-II Drinking Water Line
ACH Instrument line
Switchyard
ACH & RPH AVGF # 1 & 2
ACH Fabrication
Switchyard Fire Line

22-Mar-11 B VINOD ACH Primary Filter


Potroom Cooling Hoses
ACH Instrument line
Switchyard
RPH AVGF # 1 & 2
ACH Fabrication
22-Mar-11 C Praveen Potroom Watermeter
ACH Filter
Potroom Cooling Hoses
CPH CT#3

23-Mar-11 A MAYANK ACH Comp # 1,5&6


ACH Primary Filter
Potroom Cooling Hoses
CPH CT#3
PPH DW Unit #1
CPH CT#3
ACH Filter Platform
ACH Pipe Stand
Comprehensive
building water line

23-Mar-11 B DD SAHOO ACH Primary Filter


Potroom Cooling Hoses
RPH AVGF # 2
ACH Fabrication
SWITCHYARD Fire Line
FFPH JP# 3

FTP # 3 & 4 Process water line

23-Mar-11 C Praveen Potroom Watermeter


ACH Filter
Potroom Cooling Hoses

24-Mar-11 A MAYANK ACH Comp # 2,3&4


ACH Primary Filter
Potroom Cooling Hoses

FTP # 3 & 4 Process water line


PPH DW Unit #1
FFPH JP# 3
ACH,RPH Scrap
ACH Filter Platform

24-Mar-11 B DD SAHOO ACH Primary Filter


Potroom Cooling Hoses
FFPH JP# 3
FTP # 3 & 4 Process water line
ACH,RPH Scrap
ACH Filter Platform
CAST HOUSE HFO Line

24-Mar-11 C ESHANT ACH Filter


Potroom Cooling Hoses
RPH AVGF
CPH AVGF
Bakeoven HFO Line

25-Mar-11 A MAYANK ACH Comp # 1,5 & 6


ACH Primary Filter
Potroom Cooling Hoses
PPH DW Unit #1
ACH Filter Platform
Pot Room Fire Hydrant
RPH AVGF #1
CPH HWP#2
CPH HWP#4

25-Mar-11 B Praveen ACH Primary Filter


Potroom Cooling Hoses
CPH HWP#2
ACH Fabrication
Pot Room Fire Hydrant Line

25-Mar-11 C ESHANT ACH Filter


Potroom Cooling Hoses

26-Mar-11 A MAYANK ACH Comp # 2,3&4


ACH Primary Filter
Potroom Cooling Hoses
PPH DW Unit #1
ACH Filter Platform
Pot Room Fire Hydrant
ACH Comp#4
ACH Comp#4
CAST HOUSE HFO Line

26-Mar-11 B DD SAHOO ACH Primary Filter


Potroom Cooling Hoses
Rodding Fire Line
ACH Comp#4

Rodding Fire Line


CPH CWP

26-Mar-11 C ESHANT ACH GASKET


ACH Filter
Bakeoven HFO Line

27-Mar-11 A MAYANK ACH Comp # 1,5&6


Potroom Cooling Hoses
PPH DW Unit #1
ACH Comp#4

PPH TP#3
PPH TP#4

27-Mar-11 B DD SAHOO ACH Primary Filter


Potroom Cooling Hoses
ACH Comp#4
ACH Comp#4
ACH Comp#4
ACH Comp#4
ACH Comp#4

ACH Comp#4

ACH Comp#4

27-Mar-11 C ESHANT ACH Comp#4


ACH Primary Filter

28-Mar-11 A MAYANK ACH Comp # 2,3


Potroom Cooling Hoses
PPH DW Unit #1
ACH Primary Filter
Cast House HFO line
ACH Comp#4

28-Mar-11 B Vinod / Praveen ACH Primary Filter


Potroom Cooling Hoses
ACH Comp # 4
ACH Comp # 4
ACH Comp # 4

28-Mar-11 C ESHANT ACH Primary Filter


Potroom Cooling Hoses
ACH Dryer # 4
CPH AVGF

29-Mar-11 A DD SAHOO ACH Primary Filter


ACH Comp# 1,5 & 6

ACH Filter House

PLANT-II Drinking Water line


BAKE OVEN HFO Line

29-Mar-11 B Praveen ACH Primary Filter

ACH Filter House

PLANT-II Drinking Water line


Potroom Cooling Hoses
FFPH JP#3
CPH/RPH Chemical Dosing

29-Mar-11 C ESHANT ACH Primary Filter


Potroom Cooling Hoses

30-Mar-11 A DD SAHOO ACH Primary Filter


ACH Comp# 2,3 & 4
Potroom Cooling Hoses
ACH Filter House

PPH TP # 2
UTILITY CBM
ACH Diesel Compressor
FFPH MP # 3
ACH New Intercooler# 2

30-Mar-11 B Praveen ACH Primary Filter


ACH Comp#4
Potroom Cooling Hoses
Cast House HFO
CPH/RPH Chemical Dosing
PPH TP # 2

30-Mar-11 C MAYANK ACH Primary Filter


Potroom Cooling Hoses
Potroom Watermeter

31-Mar-11 A DD SAHOO ACH Primary Filter


ACH Comp# 1,5 & 6
Potroom Air audit
CAST HOUSE HFO Line
ACH Filter House
ACH New Intercooler # 1
Workshop Fire hydrantvalve

31-Mar-11 B ESHANT ACH Primary Filter


Potroom Cooling Hoses
ACH Filter House
Potroom hydrant valve
PPH DW Unit #2
ACH Dewatering Pump
ACH ACH Area
Switchyard Fire Line

31-Mar-11 C MAYANK ACH Primary Filter


Potroom Cooling Hoses
Potroom Watermeter
BAKE OVEN HFO Line

1-Apr-11 A Praveen ACH Primary Filter


ACH Comp# 2,3,4
Potroom Air audit
ACH Filter House
Potroom DW line & Fire Hydrant line
PPH DWL

1-Apr-11 B ESHANT ACH Primary Filter


Potroom Cooling Hoses
ACH Filter House
PPH DW Unit #2
Canteen Drinking line
Workshop hydrant valve
CAST HOUSE HFO Line

1-Apr-11 C MAYANK ACH Primary Filter


Potroom Cooling Hoses
Potroom Watermeter

2-Apr-11 A Praveen ACH Primary Filter


ACH Comp# 1,5,6
Potroom Air audit
ACH Filter House
ACH Diesel ompressor
Canteen Drinking water line
2-Apr-11 B DD SAHOO ACH Filter

Potroom Section# 5, Water line

2-Apr-11 C MAYANK ACH Primary Filter


Potroom Watermeter
BAKE OVEN HFO Line

3-Apr-11 A Praveen ACH Primary Filter


ACH Comp# 2,3,4
ACH Pipe Line
Pot Repair shop drinking water line

3-Apr-11 B DD SAHOO ACH Filter


ACH Pipe Line

3-Apr-11 C MAYANK ACH Primary Filter


Potroom Watermeter

4-Apr-11 A Vinod ACH Comp# 1,5,6


ACH Filter House
Potroom Air audit
ACH Pipe Line

4-Apr-11 B ESHANT ACH Primary Filter


Potroom Cooling Hoses
ACH Filter House
Canteen Drinking water line
Carbon Area Air line
PPH DW Unit #2
CAST HOUSE HFO Line
4-Apr-11 C MAYANK ACH Primary Filter
Potroom Watermeter
Potroom Cooling Hoses

5-Apr-11 A Praveen ACH Comp# 2,3,4


ACH Comp#2,5
Potroom Air audit
FFPH JP#2
ACH AVGF#1,2
PPH DWL
Bake Oven HFO

5-Apr-11 B ESHANT ACH Primary Filter


Potroom Cooling Hoses
ACH Filter House

CAST HOUSE/ Fire hydrant valve


ACH
ACH Surrounding Area
FFPH JP#3
FFPH JP#3
FFPH MP#1 & JP#1
FFPH MP#1 & JP#1

5-Apr-11 C DD SAHOO ACH Filter


POTROOM Air Audit
POTROOM Watermeter

6-Apr-11 A Praveen ACH Comp# 1,5,6


Potroom Air audit
FFPH MP#1
FFPH Diesel Pump#1
PPH DWL
6-Apr-11 B MAYANK ACH Primary Filter
Potroom Cooling Hoses
ACH Filter House
PPH DW Unit #2
CAST HOUSE Fire hydrant valve

6-Apr-11 C DD SAHOO ACH Filter


POTROOM Air Audit
POTROOM Watermeter
BAKEOVEN HFO Line

7-Apr-11 A ESHANT ACH Primary Filter


ACH Filter House
PPH DWL
ACH Comp# 2,3,4
ACH Comp# 3
Potroom Fire Hydrant v/v
FFPH JP#2, MP#1

7-Apr-11 B MAYANK ACH Primary Filter


Potroom Cooling Hoses
ACH Filter House
PPH DW Unit #2

Fire hydrant valve,gate v/v


Potroom,GAP
FFPH DEP#1
CAST HOUSE HFO Line
ACH Comp#4
Plant 2 Fire water line

7-Apr-11 C DD SAHOO ACH Filter


POTROOM Air Audit
POTROOM Watermeter
ACH Comp # 4
ACH Comp # 4
ACH Dewatering

8-Apr-11 A ESHANT ACH Primary Filter


PPH DWL
ACH Comp# 1,5&6
ACH Comp# 4
PPH TP#4
FFPH DEP#1
POTROOM Air Audit

8-Apr-11 B MAYANK ACH Primary Filter


PPH DW Unit #2
FFPH DEP#1
FFPH tp#1
ACH Water cooler
ACH roof light frame
ACH

Comp#4

ACH Shop floor

8-Apr-11 C Praveen ACH Comp#4


ACH Comp#4
ACH Filter
POTROOM Watermeter

9-Apr-11 A ESHANT BAKEOVEN HFO Line


PPH DWL
ACH Dewatering pump
ACH Dewatering pump
POTROOM Air Audit
ACH Comp# 2,3&4
ACH Primary Filter
RPH Cooling tower #3
ACH Filter house Platform
CPH Chamber
ACH/CPH 5-S
ACH WALLS and Floor

9-Apr-11 B MAYANK ACH Primary Filter


PPH DW Unit #2
RPH Cooling tower #3
CPH Chamber
ACH WALLS and Floor
ACH Filter house Platform
FFPH Condition based maintenance
ACH Comp#4
ACH Comp#4

9-Apr-11 C Praveen ACH Filter


POTROOM Watermeter
POTROOM Air Audit

10-Apr-11 A Vinod ACH Filter


ACH Filter
POTROOM Air Audit
CPH flowmeter

10-Apr-11 B DD SAHOO ACH Filter


POTROOM Air Audit
CPH Fabrication
CAST HOUSE HFO Line
10-Apr-11 C Praveen ACH Filter
POTROOM Watermeter
POTROOM Air Audit
CPH AVGF#1,2

11-Apr-11 A Vinod ACH Filter


ACH Filter
POTROOM Air Audit
ACH/PPH Chemical Barrel
PPH TP#3
ACH Wall & Floor
ACH Fabrication

11-Apr-11 B DD SAHOO ACH Filter


POTROOM Air Audit
CANTEEN Drinking Water Line
ACH Fabrication
PPH Flow meter

11-Apr-11 C Praveen ACH Filter


POTROOM Watermeter
POTROOM Air Audit
CPH CT#2

12-Apr-11 A ESHANT PPH DWL


ACH Comp# 1,5 & 6
ACH Primary Filter
CPH Cooling tower #3
ACH Filter house Platform
ACH WALLS and Floor
RPH Surrounding area
Canteen drinking water line
POTROOM Air Audit
12-Apr-11 B DD SAHOO ACH Filter
POTROOM Air Audit
ACH Filter house Platform
RPH Surrounding area
Canteen drinking water line
RPH CWP # 2 & 3

12-Apr-11 C Praveen ACH Filter


POTROOM Watermeter
POTROOM Air Audit
CPH CT#1
Bake Oven HFO

13-Apr-11 A Mayank ACH Filter


ACH Filter
POTROOM Air Audit
CPH CT#1
RPH Area
PPH DWL
RPH CWP#3
ACH Filter house Platform
ACH WALLS and Floor
ACH LIGHT FRAME

13-Apr-11 B DD SAHOO ACH Filter


POTROOM Air Audit
ACH Filter house Platform
ACH White Washing

RPH CWP # 3

13-Apr-11 C Praveen ACH Filter


POTROOM Watermeter
POTROOM Air Audit

14-Apr-11 A Mayank ACH Filter


ACH comp#1,5,6
POTROOM Air Audit
PPH DWL
CAST HOUSE HFO Line

14-Apr-11 B DD SAHOO ACH Filter


POTROOM Air Audit

14-Apr-11 C ESHANT ACH Filter


POTROOM Air Audit
RPH CT#2

15-Apr-11 A Mayank ACH Filter


ACH comp#2,3,4
POTROOM Air Audit
PPH DWL
RPH CT#2
FFPH MP#2
CPH Filter house Platform
RPH,FFPH All Running Equipments
ACH WALLS and Floor
Bake Oven HFO
ACH Steam valve

15-Apr-11 B Praveen ACH Filter


POTROOM Air Audit
ACH Filter house Platform
FFPH MP#2
PPH DWL
ACH Steam valve
CPH HWP#2

15-Apr-11 C ESHANT CPH HWP#2


ACH Filter
POTROOM Air Audit
RPH CT#1

16-Apr-11 A Mayank ACH Filter


ACH comp#1,5,6
POTROOM Air Audit
PPH DWL
RPH CT#1
CPH Filter house Platform
ACH WALLS and Floor
ACH Dryer#6
CPH HWP#2

16-Apr-11 B Praveen ACH Filter


POTROOM Air Audit
ACH Filter house Platform
PPH DWL
ACH White washing
CPH HWP#2
RPH HWP#3

16-Apr-11 C ESHANT RPH HWP#3


ACH Filter
POTROOM Air Audit
RPH AVGF# 1

17-Apr-11 A Praveen ACH Filter


POT ROOM Air Audit
PPH DWL
Cast House HFO
ACH comp#2,3,4

17-Apr-11 B DD SAHOO ACH Filter


POTROOM Air Audit

FFPH JP # 1 & 2

17-Apr-11 C ESHANT Bakeoven HFO


ACH Filter
POTROOM Air Audit
RPH CT# 3

18-Apr-11 A DD SAHOO CPH HWP # 2 & 3


ACH Comp # 1,5 & 6
ACH Filter
CPH HWP # 3
ACH Ladder
ACH White Washing
POTROOM Air audit

RPH CT # 3
RPH CT # 3

ACH Comp # 6

18-Apr-11 B Praveen ACH Filter


POTROOM Air Audit
ACH Dryer#4
ACH Diesel Compressor
ACH Ladder
ACH White Washing

18-Apr-11 C ESHANT ACH Filter


POTROOM Air Audit

19-Apr-11 A DD SAHOO ACH Comp # 2,3 & 4


ACH Filter
ACH Ladder
ACH White Washing
POTROOM Air audit
GAP Drinking water Line
RPH Chemical Room
BAKEOVEN HFO Line
ACH Dryer # 1,2 & 3
RPH AVGF # 1

19-Apr-11 B Praveen ACH Filter


POTROOM Air Audit
ACH Dryer#4
ACH Diesel Compressor
ACH Ladder
ACH White Washing

19-Apr-11 C ESHANT ACH COMP#1,2,3,4,6


Comp#5 Intercooler#1
RPH CWP & HWP& CT
CPH CWP & HWP& CT
PPH TP#1&4
FFPH JP# 2&3 MP#1
ACH Comp# 2
ACH Comp# 6
ACH Comp# 3
ACH Comp# 4
ACH Comp# 1
ACH Filter

20-Apr-11 A DD SAHOO ACH Comp # 1 & 6


ACH Filter
ACH White Washing

RPH CT # 3
CPH CT # 2 & 3
ACH White Washing
CPH CT # 3
ACH VFD
RPH HWP # 1 & 2
RPH HWP # 1

ACH Comp # 5
ACH Comp # 5
ACH Ladder
CPH CT # 3
RPH & HFO Line Store & HFO Line
POTROOM Air audit

20-Apr-11 B Praveen ACH Filter


ACH Comp# 5
CPH CWP#1
ACH Comp#5
RPH & HFO Line Store & HFO Line
PPH DWL
POTROOM Air Audit

20-Apr-11 C Mayank ACH Filter


POTROOM Air Audit
Bakeoven HFO
21-Apr-11 A DD SAHOO ACH Comp # 2,3 & 4
ACH Filter
ACH White Washing
POTROOM Air audit
CPH HWP # 1 & 3
CPH HWP # 1
RPH Chemical room
RPH CT # 1
ACH Ladder

21-Apr-11 B ESHANT ACH Filter


POTROOM Air audit
ACH White Washing
RPH Chemical room
ACH Ladder
FTP# 3 & 4 Process water line
PPH DWL
PPH Transfer Pump
FFPH DEP # 1,2

21-Apr-11 C Mayank ACH Filter


POTROOM Air Audit

22-Apr-11 A Praveen ACH Comp # 1,5,6


ACH Filter
CPH/RPH AVGF#1,2
PPH DWL

22-Apr-11 B ESHANT ACH Filter


POTROOM Air audit
Casthouse HFO
PPH DWL
CPH/ RPH Chemical Dosing

22-Apr-11 C MAYANK ACH Filter


POTROOM Air Audit
Bake Oven HFO

23-Apr-11 A Praveen ACH Comp # 2,3,4


ACH Filter
CPH/RPH AVGF#1,2
PPH DWL

23-Apr-11 B ESHANT ACH Filter


POTROOM Air audit
ACH White Washing
ACH Filter house/ Ladder
RPH/ FFPH 5S
Bakeoven Chamber v/v
PPH DWL
CPH/ RPH Chemical Dosing

23-Apr-11 C MAYANK ACH Filter


POTROOM Air Audit

24-Apr-11 A Vinod ACH Comp # 1,5,6


ACH Filter
PPH DWL

24-Apr-11 B DD SAHOO ACH Filter


POTROOM Air audit
FFPH DP # 2

24-Apr-11 C MAYANK ACH Filter


POTROOM Air Audit
Bake Oven HFO

25-Apr-11 A VINOD ACH Comp # 2,3 & 4


ACH Filter
ACH White Washing
POTROOM Air audit
ACH Ladder
ACH diesel comp
ACH,RPH Water sample
ACH Surrounding
FFPH Wall

25-Apr-11 B DD SAHOO ACH Filter


POTROOM Air audit
ACH White Washing
ACH Ladder
ACH,RPH Water sample
CPH Surrounding
Secondary & Diesel
ACH Compressor
CAST HOUSE HFO Line

25-Apr-11 C MAYANK ACH Filter


POTROOM Air Audit

26-Apr-11 A Praveen ACH Comp # 1,5,6


ACH Filter
PPH DWL
CPH HWP#4
CPH HWP#1
POTROOM Air audit
ACH White Washing
ACH Ladder
ACH Diesel comp
PPH/FFPH Surrounding

26-Apr-11 B ESHANT ACH Filter


POTROOM Air audit
PPH DWL
CPH/ RPH Chemical Dosing
CPH HWP#4
ACH White Washing
ACH Diesel comp
ACH Ladder
PPH Fire extinguisher
ACH/PPH/CPH/
RPH/FFPH SURROUNDING area
Bakeoven Chamber#9
FFPH JP#2, MP#1
FFPH JP#2, MP#1
RPH AVGF

26-Apr-11 B DD SAHOO ACH Filter


POTROOM Air audit
POTROOM Watermeter
CPH HWP # 4
CPH CT # 1
BAKEOVEN Chamber# 9
BAKEOVEN HFO Line

27-Apr-11 A Praveen ACH Comp # 2,3,4


ACH Filter
PPH DWL
CPH CT#1
POTROOM Air audit
ACH Ladder
ACH Diesel comp
CPH CT#1,Surrounding
Carbon Drinking water line Flushing

27-Apr-11 B MAYANK ACH Filter


POTROOM Air audit
PPH DWL
CPH/ RPH Chemical Dosing
ACH Ladder
ACH Diesel comp
CPH CT#1,Surrounding
Cast House HFO

27-Apr-11 C DD SAHOO ACH Filter


POTROOM Air audit
POTROOM Watermeter

28-Apr-11 A ESHANT ACH Filter


POTROOM Air audit
PPH DWL
RPH CT # 3
RPH CT # 3
RPH CT # 3
RPH CT # 2
RPH CT # 2
RPH CT # 2
FFPH JP # 3
FFPH JP # 3
FFPH JP # 3
FFPH DEP # 1
ACH Comp # 1,5 & 6
ACH Ladder
CPH WATER FLOW METER
ACH White Washing
FTP# 3 Paint box & Brush
ACH sling & lifting tools
ACH SCRAP

28-Apr-11 B MAYANK ACH Filter


POTROOM Air audit
PPH DWL
CPH/ RPH Chemical Dosing
ACH Ladder
CPH WATER FLOW METER
ACH White Washing
FTP# 3 Paint box & Brush
Plant 2 Fire line

28-Apr-11 C DD SAHOO ACH Filter


POTROOM Air audit
POTROOM Watermeter
CPH CT # 3
BAKEOVEN HFO Line

29-Apr-11 A ESHANT ACH Filter


POTROOM Air audit
PPH DWL
ACH Comp # 2,3 & 4
ACH 5-S
ACH White Washing
CPH Water flow meter
CPH CT # 3
RPH HWP#1
RPH HWP#2
RPH HWP#2
RPH Chemical Room
FFPH MP#1, JP# 2

29-Apr-11 B MAYANK ACH Filter


POTROOM Air audit
PPH DWL
CPH/ RPH Chemical Dosing
ACH Ladder
ACH White Washing
RPH HWP#2
ACH 5-S
FFPH MP#1, JP# 3
FFPH JP#1
FFPH MP#1
Cast House HFO

29-Apr-11 C Praveen ACH Filter


POTROOM Air audit
POTROOM Watermeter

30-Apr-11 A DD SAHOO ACH Filter


POTROOM Air audit
ACH Comp # 1,5 & 6
CPH CT # 3
CPH CT # 3
ACH Wahite washing
ACH Ladder
CPH CT # 3
POTROOM Complete air line audit
PPH & RPH Sorrounding
LOG BOOK
Type Of Job Job Done
Stop Comp#03 stopped at 06:00 AM as no further requirement from AH&FTP
PM Comp#03 Half yearly maintenance going on.
intercooler#01 dismentling, cleaning done.
PL Primary filter change for comp.# 06.
PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning
PM Comp#03 Half yearly maintenance going on.
Second stage dismentling, cleaning done & boxup done.
intercooler#01 box up work in progress.
New FRL installed

PM Intercooler#01 gasket cutting, box up work done.

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
PM Stage #01 dismentling done.

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
PM Stage #01 cleaning done, fitted back.
Intercooler#02 dismentling, cleaning & fitted back.

Start Trial start given at 10:45 pm but tripped due to Stage#02 & Stage#03 high
vibration

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
PM Stage #03 dismentling done.
Shaft coupling dismentled.
PL Primary filter change for comp.# 02.
PL 8 Nos. primary filter cleaning
UBD Stage #01, 02 dismentling done.

Observation Stage #03 vibration raised to 0.36 mils

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
Observation Stage #03 vibration fluctuates between 0.19 to 0.38 mils

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning

UBD Thrust brg cover plate fitted.


Air end covering done for stage #02 & 03.

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
UBD Dismentling of stage#2 done.

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
UBD Rotor assembly for Stage#02 & Stage#03 packed & sent to Ahmedabad for
balancing

NA NA
PL Primary filter change for comp.# 06.
PL 8 Nos. primary filter cleaning
PM Monthly maintenance done.

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
UBD Motor DE brg checked & found OK

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
Observation Stage #03 vibration reached 0.41 mils

BD Belt pully came out from the shaft

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
BD Belt pully sent to w/shop for machining work
PL Oil top up done. (1 Lts)

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
PL Auto drain valve fitted.
PL Primary filter change for comp.# 01.
PL 8 Nos. primary filter cleaning
PL Secondary filter changed.
Observation Stage #03 vibration reached 0.64 mils after secondary filter change

Observation Stage #03 vibration reached 0.74 mils, spike of 0.96 mils came.

NA NA

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning

Observation Stage #03 vibration decreased to 0.46 mils

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
UBD Intercooler#01 & 02 opened for cleaning & inspection
Motor end cover dismentled & cleaned.

UBD Maintenance work going on.

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
PL Secondary filter changed.

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning
UBD 450 Lts of fresh oil filled
Oil Seal of Stage#03 cleaned with diesel
PL 8 Nos. primary filter cleaning
Observation Stage#03 voltage gap value is 5.372 vdc

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
UBD Maintenance work going on.

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
UBD Stage#02 assembly is in progress
Intercooler assembly is in progress

UBD Maintenance work going on.


Stage#01 diffuser fitted, Stage#02 in progress

PL Primary filter change for comp.# 06.


UBD Stage#02 diffuser fitted.
y, z clearance checked.
Intercooler fitted,
Air end fitted

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning
UBD pipe duct fitting done
Alignment done.
Pop & MOP fitting done
Start Started at 09:30 PM normal observation
Stop Stopped at 09:45 PM as problem found in Breaker

PL 8 Nos. primary filter cleaning


UBD Breaker from comp#04 shifted to comp#03
PL Primary filter change for comp.# 05.
PL 8 Nos. primary filter cleaning
Start Started at 12:30 PM normal observation

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
PL 1/2" Ball vale fitted in drain line
Stop Stopped at 15:40 PM
Trip Comp#03 tripped at 16:15 PM due to low sal air pressure as FRL top plug
blown away
UBD FRL unit changed.
Start Started at 05:15 PM normal observation

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
PL Primary filter change for comp.# 02.
PL 8 Nos. primary filter cleaning
UBD Alignment done
regreasing done in coupling
Probe setting done.
Start Started at 05:15 PM normal observation
Stop Stopped at 06:15 PM
PL Secondary filter change for comp.# 06.

NA NA

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PM Oil changed 420 lts

NA NA

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning
PL Monthly Maintenance Done
PL Monthly Maintenance Done
PM Auto drain Valve installation going on.

PM Sump filter changed- Qty 2


Duplex filter changed- Qty 3
Auto drain Valve installation done.

NA NA

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
Start Started at 09:00 AM as 5th compressor is required

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 05.


PL Primary filter change for comp.# 06.
PL 8 Nos. primary filter cleaning

Stop Stopped at 08:00 PM

PL 8 Nos. primary filter cleaning

PM Primary filter change for comp.# 05.


Secondary filter change for comp.# 05.
Motor alignment going on.

PL Primary filter change for comp.# 01.


PL Primary filter change for comp.# 02.
PM Motor alignment done.

PL 8 Nos. primary filter cleaning


PL Primary filter change for comp.# 06.
PL 8 Nos. primary filter cleaning
PM Auto drain valve work in progress

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning

NA NA

PM Probe setting done. S-1 6.711vdc, S-2 6.205 vdc, S-3 6.255 vdc
UBD Stage#01 & 02 dismentling in progress

PL Primary filter change for comp.# 01.


PL Primary filter change for comp.# 02.
PL 8 Nos. primary filter cleaning
UBD Stage#01 & 02 dismentling done.

PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
PL Hand Railing welding work done.

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
Observation Vibration of stage#02 varry from 0.21 to .041 mils

NA NA

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning
PL Primary filter change for comp.# 01.
PL 8 Nos. primary filter cleaning
PL Monthly Maintenance done

NA NA

NA NA

PL Primary filter change for comp.# 03.


PL Primary filter change for comp.# 06.
PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 01.


PL Primary filter change for comp.# 02.
PL 8 Nos. primary filter cleaning
PL Algee removal work in progress

PL 8 Nos. primary filter cleaning

Observation Bypass valve is not working properly


Stop Stopped at 11:33 PM
Start Started at 11:17 PM
PL Bypass valve maintenance done.
New spider installed.
New FRL installed.
Cell Cleaning Cooling Tower cell # 02 cleaning work in progress
PL Primary filter change for comp.# 06.
PL 8 Nos. primary filter cleaning

Cell Cleaning Cooling Tower cell # 02 cleaning done


PL Primary filter change for comp.# 03.
PL 8 Nos. primary filter cleaning

NA NA

NA NA

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
PM I/V of comp # 02 was not working so from spare B/V of comp # 02, I/P
convertor fitted
Maintenance of spare B/V done.
4 nos I/P convertor is ready from damaged I/P
Motor Alignment done.

Stopped CT Fan Motor # 01 stopped at 1.00AM

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
Maint I/P Actuator Maintenance

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
Chemical
Addition 100 lts (NAOCL) addition done in CPH Cold well tank

Observation Water outlet pipe 6" is having puncture just before the valve

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
Maint Maintenance of Dryer # 02
Observation Stage #02 vibration at 2.30 AM 0.63 mils,Stage # 03 vibration at 5.10AM 0.5
mils,

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
Observation Seal Air pressure Gauge Not working
Welding Work Welding done in main valve of intercooler - leakage arrested
Pr Gauge New Seal Air pressure gauge fitted.

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PM Intercooler moisture drain pipe was modified
PM Instalation of auto drain Valve in dryer # 6

NA NA

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
Shifting Auto drain valve from comp # 04 shifted to comp # 06 after cleaning.

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
PM The Gap Voltage in allstages was standardised, StageI-6.217, StageII- 6.294,
StageIII- 6.204

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PM Flushing
PM FRL Cleaning
Chemical
Addition 100 lts (NAOCL) addition done in CPH Cold well tank
NA NA

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
PM Vibration Probe cleaning for all three stages and gap voltage setting S-1
6.173,S-2 6.293,S-3 6.211
Observation Motor draws more current 73A so Dryer valve closed by 5%

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
Chemical
Addition 100 lts (NAOCL) addition done in CPH Cold well tank
Observation CT not working

NA NA

BD Maintenance work in progress


PL 8 Nos. primary filter cleaning
PL Auto drain valve fitted.

PL Primary filter change for comp.# 01 & 05.


PL 8 Nos. primary filter cleaning
BD Maintenance work in progress
Chemical
Addition 100 lts (NAOCL) addition done in CPH Cold well tank

BD Red Oxide coating in inlet and discharge pipe done


BD Maintenance work in progress
PM Quarterly Maintenance done

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
BD Maintenance work in progress

NA NA

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
BD Maintenance work in progress
BD CT limit switch plate welding done

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
BD Maintenance work in progress

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
BD Maintenance work in progress

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PL AVGF # 01 & 02 Backwashed
BD Maintenance work in progress / started at 16 hrs

NA NA

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
Observation .55 mils vibration spike stage 2 at 11.39 AM

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
UBD New Hooter installed
Limit switch for CT (02nos) has been taken out for cleaning
Arrangement for fixing counter weight limit switch has been done .

AM Annual Maintenance, Oil Replacement, Oil filters replacement, Oil cooler


Chemical Cleaning, Secondary filter Replacement, motor end cover Cleaning, MOP
Addition 100 lts (NAOCL) addition done in CPH Cold well tank
Alignment

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
Observation I/V Stuck at 100% opening
Observation FRL unit not working properly

Observation FRL unit not working properly

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
Observation FRL unit not working properly
Observation Stage 2 vibration reaches to .9 from .6

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning
PM I/V Actuator replaced with spare one
Start Started at 15:38 hrs
Stop Stopped at 17:02 hrs
BD Bypass Valve Mallfunctioning -FRL Cleaned, bypass Valve & inlet valve
Cleaned

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
Project FRL fitting for instrument air line fabrication work in progress
Maint Maintenance work in progress

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PM Maintenance done
Start Started at 16:00 hrs
Stop Stopped at 17:38 hrs
PM Inlet Valve, bypass Valve Cleaning, FRL cleaning
Chemical
Addition 100 lts (NAOCL) addition done in CPH Cold well tank
BD Flowmeter of Alumina Unloading is showing wrong reading in Bridge
software

Observation Stage 2 vibration has reached to .40 from .32

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
AM Annual Maintenance, Oil Replacement, Oil filters replacement, Oil cooler
Cleaning, Secondary filter Replacement, motor end cover Cleaning, MOP
Start Started at 2.35 PM
Alignment work in progress
Stop Stopped at 2.40 PM due to high motor temperature

Start Started at 8.30 AM


Stop Stopped at 8.45 AM
AM Annual Maintenance, Oil Replacement, Oil filters replacement, Oil cooler
Cleaning, Secondary filter Replacement, motor end cover Cleaning, MOP
Alignment,oil top up 150 lts-Done
Observation Stage 2 vibration fluctuating
PL Primary filter change for comp.# 05 & 06.
PL 8 Nos. primary filter cleaning
AM Motor coupling alignment work in progress
PM Backflushing, Strainer Claening, Auto Drain Valve cleaning, checking of
Compressors work in progress

AM Motor coupling alignment work in progress


PM Backflushing, Strainer Claening, Auto Drain Valve cleaning, checking of
Compressors work in progress
PM Intercooler # 02 Tube bundle dismantled
PL AVGF # 01 & 02 Backwashed

Observation Stage 2 vibration fluctuating


Observation Stage 3 Vibration is gradually increasing

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PL AVGF # 01 & 02 Backwashed
BD Aftercooler tube bundle release work in progress

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
BD Intercooler # 02 and Aftercooler maintenance work in progress

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
Observation Stage 2 Vibration has spike of 1.14mils at 1 PM

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
Steam line fabrication work in progress for intercooler cleaning
FRL line for instrument air line work in progress
NA NA

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
Observation Inlet valve Malfunctioning

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning
BD FRL Cleaned, bypass Valve & inlet valve Cleaned

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
MM Monthly maintenance work in progress
Observation Suction gas temperature is quiet high 17-18 deg c

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
MM Monthly maintenance done
BD Auto drain valve maintenance work in progress
Maint I/P checking and maintenance done

Observation Stage 3 vibration reached 1.19 mils at 3.42 am

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
Observation At 1.30 PM Alumina Unloading header flow raised to 1650 NM3/HR while
only one wagon was running, valve closed to 20% opening pressure 2.3 bar
flow 811 NM3/HR
PL Primary filter change for comp.# 02.
PL 8 Nos. primary filter cleaning
PM Sump Filter change
BD Brass connector change from Auto Drain Valve of Dryer # 04
NA NA

PL Primary filter change for comp.# 06


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 02


PL 8 Nos. primary filter cleaning
PM Duplex Filter change

NA NA

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
MM Monthly Maintenance done

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PM Spare Intercooler & Aftercooler tube bundle cleaned in NAOH and steam

NA NA

PL Primary filter change for comp.# 06.


PL 8 Nos. primary filter cleaning
PM Intercooler and Aftercooler dismantling work in progress

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
PM Intercoolers and Aftercooler boxed up in Comp # 01

NA NA

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning
Start Started at 8.36 AM
Trip Tripped at stage 2 temperature high
Start Restarted at 8.50 AM
Stop Stopped at 9.15 AM for B/V Maintenance
Start Strated at 11.50 AM after installing spare B/V

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning

NA NA

PL Primary filter change for comp.# 01.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 05.


PL 8 Nos. primary filter cleaning
Stop Stopped at 4.45 Pm
Start Started at 6PM with new I/P convertor
BD New I/P fitted in B/V
BD New I/P fitted in I/V

NA NA

PL Primary filter change for comp.# 03.


PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 02.


PL 8 Nos. primary filter cleaning
Chemical
Addition 100 lts (NAOCL) addition done in CPH Cold well tank

NA NA
PL Primary filter change for comp.# 01 .
PL Primary filter change for comp.# 06 .
PL 8 Nos. primary filter cleaning
PL Steam line re-routing/ fabrication work in progress
Stop Stop @ 12:40 PM due to b/valve replacement

BD FRL cleaning & B/Valve replacement


PL Primary filter change for comp.# 05 .
PL 8 Nos. primary filter cleaning

PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 03


PL Condensate drain line fabrication work in progress
PL 8 Nos. primary filter cleaning

PL Primary filter change for comp.# 02


PL 8 Nos. primary filter cleaning

NA

PL Primary filter change for comp.# 06

PL Primary filter change for comp.# 05 .


PL 8 Nos. primary filter cleaning
MM Monthly maintenance done
Observation B/V stuck @ 20% opening
Stop Comp# 05 stop @ 6:45 due to B/V stuck @ 20% opening
BD B/V replaced for comp# 05
Start Start @6:30 PM due to B/V stuck @ 20% opening of comp #05.
PL Bypass valve assembly cleaned

PL Primary filter change for comp.# 03


PL 8 Nos. primary filter cleaning
MM Monthly maintenance done
PL Painting work in progress

PL Primary filter change of Comp#02


PL 8 Nos. Primary filter cleaning done.
PL Painting work done

PL Pot Room Air Audit done- 21 Nos of hoses open

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL One Intercooler Cleaning done

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.
PL One Intercooler Cleaning done
PL Hypo dosing 100 kg done

PL Pot Room Air Audit done- 23 Nos of hoses open

PL Primary filter change of comp#03


PL 8 Nos. Primary filter cleaning done.
PL Pot Room Air Audit done- 21 Nos of hoses open

PL Primary filter change of Comp#02


PL 8 Nos. Primary filter cleaning done.

PL Pot Room Air Audit done- 22 Nos of hoses open


PL Primary filter change of Comp#06
PL 8 Nos. Primary filter cleaning done.
PL FRL cleaned & 3rd stage vib. Probe cleaned
Observation Asc scada not working

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.
PL Y- gasket fixed in one intercooler

PL Pot Room Air Audit done- 18 Nos of hoses open

PL Primary filter change of comp#03


PL 8 Nos. Primary filter cleaning done.
PL Suction side strainer painting

PL Primary filter change of Comp#02


PL 8 Nos. Primary filter cleaning done.
PL Suction side strainer painting
PL Hypo dosing 100 kg done
PL B/V o-ring gasket change

PL Pot Room Air Audit done- 18 Nos of hoses open


Observation Manometer reading above 4 for all comp.

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL Pot Room Air Audit done

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.
PL Spare b/v cleaned & tested

PL Pot Room Air Audit done- 14 Nos of hoses open


Observation Manometer reading above 4 for all comp.

PL Primary filter change of comp#03


PL 8 Nos. Primary filter cleaning done.

PL Primary filter change of Comp#02


PL 8 Nos. Primary filter cleaning done.
PL Air line fabrication

PL Pot Room Air Audit done- 14 Nos of hoses open


Observation Manometer reading above 4 for all comp.

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL Air line fabrication

MM Monthly maint. Done


PL Primary filter change of comp#01
PL 8 Nos. Primary filter cleaning done.

PL Pot Room Air Audit done- 21 Nos of hoses open


Observation Manometer reading above 4 for all comp.

PL Primary filter change of comp#03


PL 8 Nos. Primary filter cleaning done.

PL Primary filter change of Comp#02


PL 8 Nos. Primary filter cleaning done.
PL Air line fabrication done

PL Pot Room Air Audit done- 21 Nos of hoses open

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL Pot Room Air Audit done- 27 Nos of hoses open

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.

PL Pot Room Air Audit done- 24 Nos of hoses open

PL Primary filter change of comp#03


PL 8 Nos. Primary filter cleaning done.

PL Primary filter change of Comp#02


PL 8 Nos. Primary filter cleaning done.

PL Pot Room Air Audit done- 21 Nos of hoses open

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL Pot Room Air Audit done- 15 Nos of hoses open
PL Condensate drain line fabrication work going on

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.
PL Condensate drain line fabrication work going on

PL Pot Room Air Audit done

PL Primary filter change of comp#03


PL 8 Nos. Primary filter cleaning done.
PL Condensate drain line fabrication work going on

PL Primary filter change of Comp#02


PL 8 Nos. Primary filter cleaning done.
PL Condensate drain line fabrication done
PL Asc scada started @ 6:00 pm

PL Pot Room Air Audit done

PL Primary filter changed for comp.# 02 .


PL 8 Nos. Primary filter cleaning done.
PL Intercooler# 02 is under maintenance

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.
PL Intercooler# 02 work done

PL Pot Room Air Audit done-15 Nos of hoses open

PL Primary filter change of comp#03


PL 8 Nos. Primary filter cleaning done.
PL Arrangement done for shutdown work to fix FRL in instrument main header
line
PL Pot Room Air Audit done-16 Nos of hoses open

PL Primary filter changed for comp.# 02 .


PL 8 Nos. Primary filter cleaning done.
Instrument air line FRL unit mounted
Shut down maintenance
1/2 " ball valve changed in comp# 06 instrument line
Shut down maintenance
FRL unit changed
Shut down maintenance
Temp. gauge fitting in intercooler# 01
Shut down maintenance
Stop stop @ 4:10 pm due to instrument line header work
Start Start @ 5:40 pm after shutdown maintenance

PL Pot Room Air Audit done-16 Nos of hoses open

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL Auto drain valve fixing in dryer # 02
PL Pot Room Air Audit done-13 Nos of hoses open

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.
PL Auto drain valve repaired
PL Cleaning done

PL Pot Room Air Audit done-21 Nos of hoses open

PL Pot Room Air Audit done-14 Nos of hoses open

PL Primary filter changed for comp.# 02.


PL Primary filter changed for comp.# 03 .
PL 8 Nos. Primary filter cleaning done.

PL 8 Nos. Primary filter cleaning done.

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL Vibration probe setting done:
1st stage: 6.693
2nd stage: 6.213
3rd stage: 6.244
PL intercooler# 02 cleaning done

PL Primary filter changed for comp.# 02.


PL 8 Nos. Primary filter cleaning done.
PL 8 Nos. Primary filter cleaning done.

NA

PL Primary filter changed for comp.# 03 .


PL 8 Nos. Primary filter cleaning done.
PL DP transmitter installed in comp# 05
PL Pot Room Air Audit done-9 Nos of hoses open

PL Primary filter changed for comp.# 02.


PL 8 Nos. Primary filter cleaning done.

NA

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
PL Water sample sent to lab for analysis
PL Pot Room Air Audit done-12 Nos of hoses open

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.

NA

PL Primary filter changed for comp.# 03 .


PL 8 Nos. Primary filter cleaning done.
PL Y gasket fixing in intercooler-02 & aftercooler in progress.
PL Pot Room Air Audit done-16 Nos of hoses open

PL Primary filter changed for comp.# 02.


PL 8 Nos. Primary filter cleaning done.
PL Y gasket fixed in intercooler-02 & aftercooler
Start Start @ 7:30 pm due to alumina requirement

stop Stop @ 10:40 pm due to Heavy moisture found in stage 3


stop Stopped @ 11:30 pm due to B/V stuck @ 50% open
BD B/V replaced from comp# 05
BD Intercooler # 01 & intercooler # 02 dismentling done & cleaning done
PL Primary filter change of Comp#06
PL 8 Nos. Primary filter cleaning done.
BD Air end dismentling of stage 3 & stage 3 checking
Inter cooler # 01 & 02 , after cooler shell cleaning
Intercooler # 01 cleaning

PL Primary filter change of comp#01


PL 8 Nos. Primary filter cleaning done.
BD spare tube bundle fixed in Intercooler# 02 , aftercooler
tube bundle fixed in Intercooler # 01
Air end assembleed of stage # 03

Start Start @ 11:37 pm due to alumina requirement

PL Intercooler cleaning done


PL Primary filter changed for comp.# 03 .
PL 8 Nos. Primary filter cleaning done.
PL Water sample sent to lab
Observation B/V stuck @ 50%

PL Aftercooler cleaning done


PL Primary filter changed for comp.# 02.
PL 8 Nos. Primary filter cleaning done.

Observation B/V stuck @ 50% open

PL New I/P unit fitted in spare B/V


PL Primary filter change of Comp#06
PL 8 Nos. Primary filter cleaning done.
Observation B/V stuck @ 50% open
PL Primary filter change of comp#01
PL 8 Nos. Primary filter cleaning done.
Observation > Motor not stop even after pressing stop button & emergency stop button
> On diagnosis it was found that feeder of motor# 05 has some problem for
which to be attend Comp# 01 & comp# 03 also to be stopped
Stop Stopped @ 4:15 pm
Observation electrical department found breaker problem
BD B/V maintenance done
Start Comp# 01 started @ 5:58 pm after b/v maintenance
BD B/v repaired & breaker problem solved

PL 8 Nos. Primary filter cleaning done.

PL Primary filter changed for comp.# 03 .


PL 8 Nos. Primary filter cleaning done.
PL C-clamp & One plate of intercooler sent to W/shop for making slot as per
drawing

PL Primary filter changed for comp.# 02.


PL 8 Nos. Primary filter cleaning done.
PL Y- gasket fitted at aftercooler tube bundle
PL MRV made & material sent to store :
> BCM
> thrust bearing - 2 nos
> plain bearing
> temp scanner

PL Pot Room Air Audit done-13 Nos of hoses open

PL Primary filter change of Comp#06


PL 8 Nos. Primary filter cleaning done.
MM Monthly maint. Done

PL Primary filter change of comp#01 & 03


PL 8 Nos. Primary filter cleaning done.
Start Started @ 4:50 pm for comp# 03 shutdown
Stop Stopped @ 5:05 pm for secondary filter change & PM
PL Secondary filter change @ 5:10 pm
PL Manometer replaced with DP but DP was not suitable then manometer fitted
again

PL 8 Nos. Primary filter cleaning done.

PL Primary filter change of Comp#05 & 06


PL 8 Nos. Primary filter cleaning done.
PL Intercooler # 02 tubebundle removed
Change over CWP # 04 started at 8:00 am & CWP# 01 stopped @ 8:00 am

PL Primary filter changed for comp.# 02.


PL 8 Nos. Primary filter cleaning done.
PL assmbly of Intercooler # 02 tubebundle done

NA

PL Maintenance of comp# 03:


> aftercooler Tube bundle disassemble
> Shell cleaning
> Back flushing of air line

PL Primary filter changed for comp.# 01.


PL 8 Nos. Primary filter cleaning done.
PL assmbly of aftercooler tubebundle done

NA

PL Primary filter change for comp.# 05 .


PL Intercooler cleaning
PL DP fixing in progress
PL Primary filter change for comp.# 06 .

PL Primary filter change for comp.# 02 .


PL 8 Nos. primary filter cleaning

Start Start @ 13:10 PM

Stop Stop @ 4:35 PM


PL Primary filter change for comp.# 05 .
Observation Stage # 3 vibration Spike came at 02:28 PM
PL Flushing of intercooler DPT line.

NA

Start Start @ 08:33 AM

PL Primary filter change of comp#02 & 06.


PL 16 Nos. primary filter cleaning

NA

PL Primary filter change of comp#01.


Change over CT#02 Start @ 9:50 AM
PL Bi-monthly maintenance

PL Primary filter change of Comp#05


PL 8 Nos. Primary filter cleaning done.
Start Start @ 9:50 PM.
NA

PL Primary filter change of Comp#03

PL Primary filter change of comp#02 & 06.


PL Intercooler bundle cleaning done.
PL Monthly maintenance of Pump #01,02,03 & 04.
Observation Not working properly

PL 16 Nos. primary filter cleaning

PL Primary filter change of comp#01.


PL 8 Nos. Primary filter cleaning done.
Observation Suction gas temp. for dryer#5 is 23-25 C

PL Primary filter change of comp#05.


PL 8 Nos. Primary filter cleaning done.
Stop Stop @ 7:55 PM
PL Secondary filter change (IR make)
PL Table fabrication for I/V & B/V maintenance

PL 8 Nos. primary filter cleaning


Observation I/V of comp#01 Struck @ 10 % opening.
Start Start @ 3 AM.
Stop Stop @ 4:24 AM.

PL Primary filter change of Comp#03


PL Secondary filter change (IR make)
PL I/V maintenance
PL Quaterly maintenance- (RPH)

PL Primary filter change of comp#02.


PL I/V actuator change & assembled
PL Flow meter fixed
PL Vibration probe cleaning & gap voltage setting done.
Stage#1: 6.553, Stage#2: 6.179,Stage#3: 6.206
PL 8 Nos. primary filter cleaning

PL 8 Nos. primary filter cleaning

PL Primary filter change of comp#05.


PL 8 Nos. Primary filter cleaning done.
Observation Suction gas temp. for dryer#5 is high
PL Strainer cleaning done.
PL FRl cleaning

PL Primary filter change for comp.# 06 .


PL 8 Nos. Primary filter cleaning done.
Observation Manometer reading is 16 @ 10 PM.

Inspection At 11: PM : Secondary filters get choked as there is a lagre gap betn filter
paper
Observation Manometer reading is 13.7 @ 11 PM.

PL Primary filter change of Comp#03


PL 8 Nos. Primary filter cleaning done.
Observation Manometer reading is 21

PL Primary filter change of comp#02.


PL 8 Nos. Primary filter cleaning done.
PL Y gasket fitted in intercooler & boxup.
PL Temperature Sensor replaced with dryer #04.

NA

PL Primary filter change of comp#05.


PL 8 Nos. Primary filter cleaning done.

PL Primary filter change for comp.# 06 .


PL 8 Nos. Primary filter cleaning done.
Observation Manometer reading is above 16

NA

PL Primary filter change of Comp#03


PL 8 Nos. Primary filter cleaning done.
PL Y gasket fitted in intercooler

PL Primary filter change of comp#02.


PL 8 Nos. Primary filter cleaning done.
PL Aftercooler is ready

Observation Manometer reading is above 17.5

PL Primary filter change of comp#05.


PL 8 Nos. Primary filter cleaning done.
PL Intercooler water sample taken

PL Primary filter change for comp.# 06 .


PL 8 Nos. Primary filter cleaning done.
Start Start @ 4:28 PM

Observation Oil leakage found from POP Pressure regulating valve


PL POP bypass MCB switchoff @ 11 PM.
Observation B/V Struck @ 50% @ about 00:40 AM.
Observation Avg. winding temp. of motor#05 is high i.e 100.2 C ,Fan is placed.

PL Primary filter change for comp.# 02 .


PL 8 Nos. Primary filter cleaning done.
PL New Secondary filter change in comp # 02
PL Comp # 01 stopped at 9.42 AM as bypass valve was stucked up in 60-
70%,spare bypass valve installed and compressor restarted at 10.35 AM.
PL Comp # 02 stopped at 11.50 AM to change the secondary filters and FRL
unit with new one after doing so compressor restarted at 1.00 PM.

PL Primary filter change of Comp#03


BD Leakage arrested of FRL unit of instrument air line by M seal
PL B/V : I/P Convertor maintenance of Comp#01
PL B/V : I/P Convertor maintenance of Spare
PL 8 Nos. Primary filter cleaning done.

NA

PL Primary filter change of comp#05.


PL 8 Nos. Primary filter cleaning done.
PL Duplex Filter changeover done as reading was 1.02 kg/cm2
Observation Stage # 3 vibration peak of 1.03 mils came at 08:46 am

PL Primary filter change of comp#01 & 06.


PL Cleaning of FRL (Instrument air line) Completed & Change over done.
PL New Actuator assembled in Spare B/V,Checked & found OK
PL Siren mounting completed ( 2Nos.) at Compressor house
PL 8 Nos. primary filter cleaning Done

PL 8 Nos. primary filter cleaning Done

PL Primary filter changed for comp.# 02 .


PL 8 Nos. Primary filter cleaning done.
PL B/V : I/P Convertor maintenance of Comp#01checked again Today- working
ok (installed with new Actuator)
PL B/V : I/P Convertor maintenance of Spare checked again Today- working ok

PL Primary filter changed for comp.# 03 .


PL 8 Nos. Primary filter cleaning done.
PL Shifting of diesel compressor to right position
PL MS pipe cutting (24",20",16",14") total 4 nos.

PL Pot Room Air Audit done- 27 Nos of hoses open


Note C.T.#01 Panel display now working fine

PL Primary filter change of comp#05.


PL 8 Nos. Primary filter cleaning done.
Plain & Thrust Bearings with pipe fittings for DP Installation information
mentioned in G shift Logbook of Hofincons.
Angle fabrication work in progress for cooling tower barrication
Chemical shifting done 750 kg (NAOCL),1800 plus 55 kg in Compressor
House.

PL Primary filter change of comp#01 & 06.


PL 8 Nos. primary filter cleaning Done
PL Angle fabrication work for cooling tower barrication
PL Chemical addition done in CPH & RPH (120 litres) Hypo
Observation Noise coming from motor side of CWP#03.
Start CWP#01 Start @ 21:10 PM
Stop CWP#03 Stop @ 21:12 PM
Observation CWP#01 draws less current i.e 50 A,Discharge valve is in 70 % open
condition ( Total Flow 1110m3/hr.)
Start CWP#03 Restart @ 21:20 PM
Stop CWP#01 Stop @ 21:22 PM

BD Motor DE+NDE greesing done. Sound reduced but Brg & spider needs to be
changed.
PL 8 Nos. primary filter cleaning Done
Observation Bypass valve struck at 20 % opening from 10:30 pm.

PL Primary filter changed for comp.# 02 .


PL 8 Nos. Primary filter cleaning done.

PL Primary filter changed for comp.# 03 .


PL 8 Nos. Primary filter cleaning done.
Observation Bypass valve struck at 10 % opening .
Observation Inlet valve struck at 30% opening,while on BCM it shows 100% (Min. Load)
when system Pressure is 6 bar.
Observation B/V of comp#01 struck at 50 %.

Observation B/V of comp#01 struck at 80 %.


Observation Inlet valve struck at 30% opening,while on BCM it shows 100% (Min. Load)
when system Pressure is 6.2 bar.

PL Primary filter change of comp#05.


PL 8 Nos. Primary filter cleaning done.
MM Maintenance of secondary compressor done along with oil change 2 litres -
Testing done working ok.
MM CWP#01 Monthly maintenance done
MM HWP#03 Monthly maintenance done
Observation Inlet valve struck at 30% opening,while on BCM it shows 100% (Min. Load)
when system Pressure is 6 bar.
Observation B/V of comp#01 struck at 50 %.
Observation Dew point temperature 23 at 1.45 pm
Observation CT fan motor # 01,Oil leval low top up to be done
Observation water leakage from NDE pump side HWP # 02

PL Primary filter change of comp#01.


PL Primary filter change of comp#06.
PL 8 Nos. Primary filter cleaning done.
PL Oil topup done by 0.5 lts in G-box
PL Pot Room Air Audit done- 23 Nos of hoses open
BD stopped at 07:03 pm as heavy fumes & rubbing sound coming out from Stage
#01
Observation Bypass valve of comp#01 struck at 80 %.
Observation Bypass valve struck at 10 % opening .
Observation Inlet valve struck at 30% opening,while on BCM it shows 100% (Min.
Load), stopped at 07:03 pm as heavy fumes & rubbing sound coming out
fron Stage #01
BD Breakdown maintenance of comp#05.( FRL cleaned)
BD B/V maintenance of comp#01.
Start Comp#05 Start @ 11:20 PM.
Stop Comp#01 Stop @ 1:10 PM.
Start Comp#01 Start @ 6:00 AM.

PL Primary filter changed for comp.# 02 .


PL 8 Nos. Primary filter cleaning done.

PL Primary filter changed for comp.# 03 .


PL 8 Nos. Primary filter cleaning done.
PL Hypo dosing 100 kg done.
Obesrvation Inlet valve of comp#03 struck at 40 % opening at 9 pm.

Obesrvation Inlet valve of comp#02 stuck at 40 % opening.


PL 8 Nos. Primary filter cleaning done.

PL Intercooler bundle cleaning with steam & shell cleaning.


PL B/V maintenance of Comp#04
Observation Inlet valve of comp#02 stuck at 40 % opening.
PL Primary filter changed for comp.# 01.
PL Primary filter changed for comp.# 05.
PL Primary filter changed for comp.# 06 .
PL 8 Nos. Primary filter cleaning done.
PL Intercooler#1,2 & aftercooler shell cleaning, Oil tank flushing, Sump Filter
cleaning
PL Y gasket fitting in intercooler#01, tank cleaning

Observation Inlet valve of comp#02 stuck at 40 % opening.


Observation Heavy Noise coming between NRV & valve
Start HWP# 01 start @ 10:50 pm due to Heavy Noise coming between NRV &
valve of HWP# 02
Stop HWP# 02 stop @ 10:55 pm due to Heavy Noise coming between NRV &
valve.
PL 8 Nos. Primary filter cleaning done.
PL Duplex Filter cleaning

PL Primary filter changed for comp.# 02 .


PL 8 Nos. Primary filter cleaning done.
BD Motor fan cover dismanling,cleaning & assembled
Oil line flushing done.
MOP dismantling done
Observation Inlet valve of comp#02 stuck at 40 % opening.
PL Primary filter changed for comp.# 03.
PL 8 Nos. Primary filter cleaning done.
BD Plain brg, Air seal removed from Stage#01 & Stage#02 for inspection
420 Lts of oil issued from store (Servo prime 32)
Oil line flushing & pipe fitting
Thermostatic valve removed, cleaned & fitted back
Stopped Comp#02 stopped at 19:45 hrs as no further requirement from FTP&AH
deptt.

PL 8 Nos. Primary filter cleaning done.


Observation After dryer temp. transmitter is not working

PL Primary filter changed for comp.# 01.


PL Primary filter changed for comp.# 05.
PL 8 Nos. Primary filter cleaning done.
Dismantling of Intercooler#02
Shut down maintenance
I/V inspection & maintenance
FRL cleaning & flushing.
PL Hypo dosing 90 liters

Observation After dryer temp. transmitter is not working


PL Primary filter changed for comp.# 06.
PL 8 Nos. Primary filter cleaning done.
New belt wheel fitted
Shut down maintenance
Intercooler#02 Shell cleaning
Shut down maintenance
I/valve fitting done
Intercooler#02 tube bundle fitting done

PL After dryer temp. transmitter repaired


PL 8 Nos. Primary filter cleaning done.

Dismantling of Aftercooler tube bundle


Shut down maintenance
Aftercooler Shell cleaning
PL DE+NDE housing dismentled.
New bearging DE 6317 fitting going on
NDE bearing 6314 is new one.

Aftercooler tube bundle fitted back after cleaning


Shut down maintenance
Fabrication GI plates & angles cut & welding is going on
PL Primary filter changed for comp.# 03.
PL 8 Nos. Primary filter cleaning done.
PL Hypo addition

PL After dryer temp. transmitter repaired

PL Primary filter changed


PL 8 Nos. Primary filter cleaning done.
Observation After dryer temp. transmitter is not working

PL Primary filter changed for comp.# 06.


PL After dryer temp. transmitter repaired

PL After dryer temp. transmitter repaired

PL FRL & Bypass valve maintenance in progress


PL Bearing DE side replaced-6314C3

PL Primary filter changed for comp.# 03.( replaced by new primary filter)
PL Spare motor fitting. Alignment & motor connection done
PL After dryer temp. side RTD change & now is working please keep monitor
Change over CWP# 03 start @ 4:40 pm & CWP# 02 stop @ 4:50 pm for testing of CWP#
03
PL Blower fabrication work in progress

NA NA

PL Primary filter change (In # 5, new set of filters fixed)


Observation 1 new primary filter was not adaptable ( different measurement )
PL Chemical dozing done; Hypo dozing to be done @ 7 pm

PL Primary filter changed for comp.# 06.


PL 8 Nos. Primary filter cleaning done.
PL Hypo dozing done @ 7 pm

PL 8 Nos. Primary filter cleaning done.

PL Motor coupling removed, Motor alignment going on


PL Blower fabrication work in progress
PL Maintenance going on
Y-strainer mesh found damaged.

PL Motor alignment done.


PL Y-strainer mesh replaced.
PL Rodding side fire hydrant leakage arrested.
PL Primary filter changed for comp.# 03.
PL 8 Nos. Primary filter cleaning done.
PL Blower fabrication done

PL Auto drain valve - maintenance


PL Primary filter change
Pipeline & valve maintenance

PL Primary filter changed for comp.# 06.


PL 8 Nos. Primary filter cleaning done.

PL 8 Nos. Primary filter cleaning done.

PL Cleaning & Maintenance


PL Strainer maintenance
PL Cleaning Done
PL Primary filter changed for comp.# 03.
PL 8 Nos. Primary filter cleaning done.
Sensor of Suction Gas temp found faulty, replaced with new sensor
Shut Down Maintenance

NA NA

PL Primary filter change


Audit at section 8 & carbon area

PL Primary filter changed for comp.# 06.


PL 8 Nos. Primary filter cleaning done.
PL Cleaning done.
PL Y- gasket fitting done
PL Carbon air audit done
PL Y- gasket fitting work in progress
PL Hypo addition

PL 8 Nos. Primary filter cleaning done.


PL Y- gasket fitting Done.

PL Aftercooler shell (inside) painting with primer.


PL Intercooler# 02 shell (inside) painting with primer.( Work in progress)

PL Primary filter changed for comp.# 03


PL 8 Nos. Primary filter cleaning done.

NA NA

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Diffuser cleaning work in progress
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Diffuser for Stage 1 Cleaned, Stage 2 & 3 cleaning work under progress
PL 01 No Auto Drain Valve replaced - as it was not working in auto mode
Project Wire Mesh fixing work under progress near Cooling Tower (CPH)
PL 60 lts Hypo added in cold well tank

PL Shell painting for aftercooler & intercooler 2


PL 8 Nos. primary filter cleaning

PL Intercooler dismentling done & cleaning process under progress


PL Auto drain valve maintenance-as it was not working in auto mode

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Intercooler#01 dismantling done & cleaning done with air,as there is no
suppy of steam.
Gap voltage set: 1st: 6.122,2nd: 6.146,3rd:6.148 mVDC
Shaft rotation done. Vibration : 1st: 0.17, 2nd: 0.10,3rd: 0.25 mils.
Y-gasket fitted.Assembly done.
PL Auto drain valve maintenance completed
Observation Dryer not started,power supply is coming from the feeder,but 1 A glass Fuse
damaged
PL 1 A glass Fuse change from Dryer #04
Start Start @ 5:00 PM

NA

PL Intercooler & aftercooler boxup (work in progress)


PL Primary filter change
PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Intercooler#01 & aftercooler boxup & assembly completed
PL 8 Nos. primary filter cleaning

PL Intercooler & aftercooler boxup (work in progress)


Start Start @ 11:00 Am for changeover
PL motor. & comp. cleaning done
PL Seal air pressure regulator cleaning done

Stop Stop @ 2:00 PM


Shut down Intercooler#01 dismantle
Intercooler#01 Cleaning done
Intercooler#01 Y-gasket fitted
Intercooler#01 Assembly In progress

PL De rusting

Observation Stage 2 temp. Draw high ( Max. Temp: 129.3 F)


PL Probe cleaning & setting done
Before setting:1st stage: 6.294; 2nd stage: 6.268; 3rd stage: 6.224
After setting:1st stage: 6.285; 2nd stage: 6.273; 3rd stage: 6.254
PL FRL cleaning done
PL Duplex filter changing
Start Start @ 12:40 Pm for changeover
Stop Comp#02 Stop @ 12:50 PM.

Shut down Intercooler#02 dismantle


Observation After dismantle Y- gasket found damage
Shut down Intercooler#01 dismantle
Observation After dismantle Y- gasket found damage
Shut down Intercooler#02 Y-gasket fitted
Shut down Intercooler#01 Y-gasket fitted
Shut down Intercooler#02 Assembly Done
Shut down Intercooler#01 Assembly Done
PL Primary filter change

Shut down Intercooler#02 Assembly Done


Shut down Intercooler#01 Assembly Done
PL Primary filter change

PL 8 Nos. primary filter cleaning


PL Strainer cleaning done
Project Wire Mesh fixing work in progress

PL 8 Nos. primary filter cleaning


Project Wire Mesh fixing work

NA

PL Primary filter change


PL 8 Nos. primary filter cleaning
stage 3 vibration went to .77mils at 12:13 PM,Moisture drain valve checked
Observation and opened to 100 %

PL Primary filter change


PL 8 Nos. primary filter cleaning

NA

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Chemical shifting done in PPH,RPH and CPH.
PL Water removal from trench

PL Primary filter change


PL 8 Nos. primary filter cleaning
Project Wire Mesh fixing work done
PL 60 lts Hypo added in cold well tank

NA NA

PL Primary filter change

PL Primary filter change

PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
Shut down Y- gasket fitting & assembly in intercooler#02 completed.

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Aftercooler dismentle & old Y- gasket removed

PL Pot Room Air Audit done- 31 Nos of hoses open

PL Primary filter change


PL 8 Nos. primary filter cleaning
Shut down B/V maintenance done
PL Aftercooler : Y- gasket fitted

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Header fabrication in progress
Shut down Plastic bag removed from suction side

Start Start @ 10:30 Pm after shutdown maint.

PL Primary filter change


PL Header fabrication in progress
PL Water removal from trench

PL Primary filter change


PL Header fabrication in progress
Project Wire Mesh fixing work
PL Water meter fixing

PL 8 Nos. primary filter cleaning

PL Primary filter change


PL Primary filter change
PL 8 Nos. primary filter cleaning
Start Start @ 10:30 AM
PM Monthly PM
Start Start @ 10:15 AM
PL Header fabrication in progress

PL Primary filter change (new filters - 8 no)


PL Header fabrication in progress

NA

PL Primary filter change


PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
Stop stopped at 20:55 hrs as no further requirement from FTP&AH deptt.

PL Motor + Compressor cleaning done


PL Gap Voltage Checked
stage 1 - 6.368 , stage 2 - 6.374 , stage 3 - 6.270
Observation Motor DE bearing temeperature found little bit higher 75 degc fan placed.

PL Primary filter change


PL Inter cooler 1 tube bundle dismantled & Y gasket replaced

PL Inter cooler 1 tube bundle new Y gasket fixed & intercooler 1 box-up done
PL All stage Vibration probe cleaning done after cleaning gap voltage set:
stage 1 - 6.200 , stage 2 - 6.202 , stage 3 - 6.210
PL Hot well connection has been shifted to old MCC panel from G.E. panal

PL 8 Nos. primary filter cleaning


Main Pump # 02 started at FFPH on requirement from Bakeoven at 4.30 AM.

PL Inter cooler 2 tube bundle checkingdone.


PL Pipe Header fabrication
PL Panel maintenance

PL Inter cooler 2 tube bundle tube cleaning by water & air. After cleaning
intercooler box-up
PL Pipe Header fabrication
PL Primary filter change
PL 8 Nos. primary filter cleaning

NA

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL O rings changed in all heat exchangers
PL Bearing replacement in progress

PL Primary filter change


PL New Secondary Filter Changed Make-IR, 8 Nos.
PL 8 Nos. primary filter cleaning
PL Bearing changed for NDE
Project Wire Mesh fixing work
Start Start @ 16:55 PM
Stop Stopped @ 17:00 PM

PL 8 Nos. primary filter cleaning

PL Intercooler-2 dismentled & box- up work going on

PL Intercooler-1 Tube bundle removed & inspection done


PL Primary filter change

NA

PL Primary filter change


PL FRL cleaning done
PL Gap voltage checking: 1st: 6.58/ 2nd: 6.12/ 3rd: 6.15
PL Probe cleaning done
PL Voltage gap set after probe cleaning 1st: 6.48/ 2nd: 6.23/ 3rd: 6.18
PL Motor cover cleaning
PL MoP spider checking found ok
PL Secondary compressor gasket fitting
PL NDE labrynth seal checked found ok

PL MOP replaced by comp # 04 MOP due to MOP side oil leakage


PL Motor coupling dismentle & alignment checking found ok then coupling
greasing & assembled
PL Bypass valve cleaning
PL Primary filter change
PL 8 Nos. primary filter cleaning

PL 8 Nos. primary filter cleaning

PL Maintenance of MOP done


PL Dryer # 05 maintenance in progress
PL Bearing fixing of DE for spare motor in progress at CPH,.
PL Channel fabrication work in progress
PL Dewatering from trenches.
PL All Compressor;s intercooler and aftercooler cleaned

PL Dryer # 05 maintenance - Flushing & strainer cleaning done.


PL DE side bearing fixed.
PL Primary filter change
PL 8 Nos. primary filter cleaning
Condition based Oil top up - 1 litre

NA

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Channel fabrication work in progress

PL Primary filter change


PL 16 Nos. primary filter cleaning
PL Channel fabrication work in progress
PL Pot Room Air Audit done- 28 Nos of hoses open

NA

PL Secondary comp. monthly maint . Done


PL Monthly maintenance done
PL Monthly maintenance in progress

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Monthly maintenance done
PL Monthly maintenance done
NA

PL Inter cooler 2 tube bundle new Y gasket fixing work going on


PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Monthly maint. Of Pump no# 01 & 02 done

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Monthly maint. Of Pump no# 03 & 04 done
Start Start @ 4:20 PM
Stop Stop @ 4:25 PM
PL Fabrication of Blower

PL 8 Nos. primary filter cleaning

PL Monthly maintenance done

PL Monthly maintenance done


PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Testing Done.

NA

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Monthly maintanance done

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Net fixed over the railing
PL Back wash of Filter unit # 2

PL Monthly maintanance done


PL Blower shifting near pot 828
Observation cooling tower # 01 indication not display in Instrument control panel & also
Auto mode not working of CT# 01
PL Auto drain drain valve repaired

PL Primary filter change


PL 8 Nos. primary filter cleaning
Trip Trip at 3 PM

CBM Bearing temperature monitoring


PL Back wash of Filter unit

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Monthly maintanance in progress

PL Monthly maintanance done.


PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Dewatering from trenches.

PL 8 Nos. primary filter cleaning


PL Back wash of Filter unit
Start m/c started at 10:57 pm

Stop Stop @ 9:50 AM

PL Primary filter change


PL 8 Nos. primary filter cleaning
Shutdown Plastic bag removed from suction side- @ RPH
PL Comp# 01 cleaning done
PL Back wash of Filter unit

PL Primary filter change


PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Back wash of Filter unit

PL 8 Nos. primary filter cleaning


PL Back wash of Filter unit
PL Cooling Tower 1 Indication Problem rectified by switchyard

PL Water meter reading taken


PL Line flushing done
Bypass Valve Maintenance Done
PL Aftercooler, Intercooler#02 Tube Bundle Fitted
PL Pot Room Air Audit done- 20 Nos of hoses open

PL Probe cleaning & volt set at 6.485; 6.249; 6.245


PL New FRL fixed
PL IV & BV were reassembled
PL Inter/After Coolers assembly
PL New FRL fixed
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Back wash of Filter unit

PL 9 nos. of Gasket cutting for comp# 04


PL Back wash of Filter unit
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Intercooler#01 New Y gasket fitted, Boxup done
PL Oil line flushing, Diffuser cleaning

PL MOP assembly mounted


PL Sump & duplex filters (new) fixed
PL OUI display fixed
PL Rotating assembly & bearings of all stages fixed
PL Primary filter change
PL 8 Nos. primary filter cleaning

PL Gasket cutting for comp# 04


PL Back wash of Filter unit

PL Oil Servo 32 filled in tank 420 Lts


Dryer inlet valve mounted
Diffuser assembly done for Stage #1 & Stage#2
Start Compressor started at 11:30 AM

PL Air-ends & ducts assembled


PL Shaft float set
PL Primary filter change
PL 8 Nos. primary filter cleaning

PL Tightning of nuts & bolts of 3rd stage inlet & outlet pipe
PL Moisture drain line header & valve of intercooler fixed
PL Back wash of Filter unit

PL MOP maintenance done & fitted


Inlet Valve repaired
Bypass valve maintenace done & mounted
Motor alignment going on
PL Primary filter change

PL New set of Primary & Secondary filter fixed


PL Main & MOP coupling alignment
PL Inlet valve fixed
Started @ 7:15 pm but tripped; Again started @ 7:36 pm & again tripped
Start
Trip Tripped @ 9:40 pm due to 2nd stage temp. high

Shutdown RTD replaced by comp# 04


Start Started @ 11:50 pm
PL Pot Room Air Audit done- 35 Nos of hoses open
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Back wash of Filter unit

PL 16 Nos. primary filter cleaning


PL Primary Filter change
PL New Vibration probe+ cable fitted in stage -2.
Start/Stop Started @ 12:30 pm but stage 2 vibration still high so again stopped

PL Vibration signal interchange - stg 2 in stg 3 slot & vice versa


PL Auto drain valve repaired
Start Started @ 04:15 pm
PL Primary filter change
PL 8 Nos. primary filter cleaning

PL cleaning done for piping and intercoolers


PL Dewatering done from trench.
PL Back wash of Filter unit
PL 8 Nos. primary filter cleaning
PL 11 Nos. primary filter cleaning
PL Primary Filter change

PL Primary filter change


PL Back wash of Filter unit
PL 10 Nos. primary filter cleaning
Trip Trip at 3:05 PM
Stop Stop @ 3:20 PM
Observation Dew point temperature 22 ° C

PL cleaning done for piping and intercoolers


PL Dewatering done from trench.
PL 10 Nos. primary filter cleaning
PL Back wash of Filter unit
Observation Winding temperature found high - Fan placed

PL Stg 2 air end disassembled


PL Primary filter change
PL 8 Nos. primary filter cleaning

PL Stg 2 y clearance , z clearance set & air end assembled


PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Back wash of Filter unit
Start Started @ 06:15 pm
Start Started @ 05:40 pm

PL cleaning done for piping and intercoolers


PL Dewatering done from trench.
PL Back wash of Filter unit
Stop Stop @ 10:40 PM
Stop Stop at 10:45 PM
Stop Stop at 10:46 PM
PL Stg 2 air end disassembled; rotor assembly packed
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Disposed to scrapyard
PL Valve maintenance
PL Auto drain valve fixing - in progress

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL 2 nd stage sent for balancing
PL Back wash of Filter unit
PL Auto drain valve fixing
PL 6 no. fire hydrant leakage arrasted

PL cleaning done for piping and intercoolers


PL Dewatering done from trench.
PL 08 Nos. primary filter cleaning
PL Back wash of Filter unit

PL Intercooler tube bundle dismantled, inspected & fitted back


PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Quaterly maintenance

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Intercooler box up
Quaterly maintenance
PL

PL Back wash of Filter unit


PL Dewatering done from trench.
PL Compressor body + Suction Filter cleaned

PL Auto drain valve repairing


PL Quaterly Maintenance
PL Shifting
PL Primary filter change

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Quaterly Maintenance- @ CPH
PL Quaterly Maintenance
PL Auto drain valve repairing
PL Back wash of Filter unit

PL Back wash of Filter unit


PL Dewatering done from trench.
PL Compressor motor body + Intercoolers cleaned
PL 8 Nos. primary filter cleaning
PL Pot Room Air Audit done- 39 Nos of hoses open

Observation Motor/Drive trial run & monitored


PL Quaterly Maintenance
PL Primary filter change
PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
Start Start @ 2:40 pm for HWP # 03 maintenance
STOP Stop @ 2:45 pm due to quarterly maintenance
PL Quaterly Maintenance
PL trench cover
PL Back wash of Filter unit
PL Back wash of Filter unit
PL Dewatering done from trench.
PL Dewatering done from Pump house thro' sump pump.

STOP Stopped @ 11:10 am


PL New sec. & Pri. Filters fixed
PL Quaterly Maintenance - In progress
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Pr. Guage fitting at control valves & reading values - In progress

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Gasket fixed in secondary filters
PL New FRL installed
PL Compressor cleaning + gap voltage setting
PL Quarterly Maintenance done
PL Air Audit done for Potroom - 32 hoes pipe found open

PL Air Audit done for Potroom - 23 hose pipe found open


PL 8 Nos. primary filter cleaning

PL Motor cover end open , Cleaning of motor & motor cover assembled
PL Air Audit done for Potroom - 25 hose pipe found open
PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning

PL Oil leakage arrested of MOP


PL Back wash of Filter unit

PL Stg 2 y clearance , z clearance set & air end assembly in progress


PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Air Audit done for Potroom - 25 hose pipe found open

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Complete assembly of Stage II done after balancing
Start Started at 6.30 pm tripped in 2nd stage high vibration
PL Blower shifting from FTP - 01 to Compressor House

PL Air Audit done for Potroom - 21 hoses pipe found open


PL 8 Nos. primary filter cleaning
Start Started @ 3:10 am
PL Back wash of Filter unit

PL Installation Work in Progress


PL Intercooler outlet header Cup cover fabrication

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Intercooler outlet header Cup cover fabrication
PL Installation Work in Progress

PL Cleaning done
PL Back wash of Filter unit

PL Stg 2 air end disassembled; rotor assembly packed


PL 2 nd stage sent for balancing
PL Installation Work in Progress
PL Intercooler outlet header Cup cover fabrication
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Installation Work in Progress
PL I/V maintenance done

PL Fabricated plates - Grinding done


PL Back wash of Filter unit
PL 8 Nos. primary filter cleaning

PL Quarterly maintenance of Pump #1,2,3,4 (Work in progress in B-shift)


PL Primary filter change
PL Installation Work in Progress
PL Auto Drain Valve Maintenance

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Auto Drain Valve Maintenance
PL Installation Work in Progress

PL Manual backwash
PL Back wash of Filter unit

PL Installation Work in Progress


PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Quarterly maintenance of Main Pump #1 & 2 & Jockey pump # 04

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Installation Work in Progress
PL Auto Drain Valve Maintenance

PL Back wash of Filter unit


PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
Project Alignment + Structure fixing done
PL discharge flow line covered with plates in all compressors to avoid water
spillage
PL Trench cover plates replaced + repaired

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Installation Work in Progress
PL Trench cover plates replaced + repaired

PL Back wash of Filter unit


PL Temp. readings taken
PL Dewatering done from trench.

PL Primary filter change


PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning

PL Back wash of Filter unit


PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
QM Quarterly maintenance done at RPH
PL Installation Work in Progress
PL Inlet valve repaired and installed
PL Bypass Valve repaired
PL Auto drain Valve maintenance in progress
PL Primary filter change
PL 8 Nos. primary filter cleaning
PL Installation Work in Progress
PL Trench cover plates replaced + repaired
Stop Stopped @ 3:05 pm
PL Secondary filter change (IR)
PL Gap voltage checking : 1st- 6.46; 2nd- 6.28 , 3rd- 6.09
PL MOP & main coupling alignment done & MOP spider changed
PL motor cover dismelting & cleaning of motor

PL Air Audit done for Potroom - 27 hose pipe found open


PL Back wash of Filter unit

PL Primary filter change


PL 8 Nos. primary filter cleaning

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Assembly done & made ready
start Started @ 3:05 pm

PL Air Audit done for Potroom - 27 hose pipe found open


PL 8 Nos. primary filter cleaning
PL Back wash of Filter unit

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Intercooler disassembly done for cleaning

PL Intercooler #1 tube bundle cleaning done & boxup


PL Intercooler #2 tube bundle cleaning done & y gasket fitting going on
PL Primary filter change
PL 8 Nos. primary filter cleaning

PL Intercooler #2 y gasket fitting & box up going on


PL Cleaning of dryer
PL Back wash of Filter unit

PL Primary filter change


PL 8 Nos. primary filter cleaning
PL Intercooler #02 Y gasket fitted & assembly done.
PL Aftercooler disasassembly done & cleaning in progress.
Stop Stop @ 12:30 PM

PL AFTERCOOLER CLEANINGAND GASKET FITTING


PL RTD CHECKING AND OTHER ELECTRICAL WORKS
PL 8 Nos. primary filter cleaning

PL Cleaning of comp.
PL Cleaning of dryer
PL Air Audit done for Potroom - 22 hose pipe found open
PL Back wash of Filter unit

Primary filter change


PL
PL 8 Nos. primary filter cleaning
PL Bypass Valve Maintenance------ going on
PL FRL Cleaning+ Motor End Cover Cleaning

PL motor end cover box up & Mop alignment done


PL Primary filter change
PL Bypass Valve Maintenance
PL Frl cleaning
PL Over all Cleaning of dryer
PL 16 Nos. primary filter cleaning
PL Gasket cutting for switchyard fire line
PL Back wash of Filter unit

PL Primary filter change


PL Secondary filter change
PL Pipeline Fabrication------ going on
Gasket cutting for pipeline

Pipeline fabrication/installation work in progress


PL
PL Bypass valve repairing/cleaning done
PL wire mesh changed - 01 no
PL Air audit done - 21 hose pipe found open

PL 16 Nos. primary filter cleaning


PL Back wash of Filter unit

PL Primary filter change

PL Primary filter change


PL Back wash of Filter unit

PL 16 Nos. primary filter cleaning


PL Back wash of Filter unit

PL Primary filter change


PL Secondary filter checking
PL Maintenance
PL Pipeline fixing
PL Maintenance

PL Pipeline fixing
PL Maintenance
PL New fabricated Pipe Header shifted near comp# 02 & assembled
PL Air audit done - 30 hose pipe found open

PL 16 Nos. primary filter cleaning


Connection for Auto Drain valve rectified which was wrongly done due
PL which the fuse were getting bursted , new fuse installed and dyer started
running ok
PL scanner malfunctioning rectified
PL Back wash of Filter unit
PL Calibration done

PL Primary filter change


PL Preventive Maintenance
PL Pipe Fabrication Work
PL Compressor started at 11.10 am
PL Compressor stopped at 11.20 am

Shutdown Cold Water supply pipe line replaced


PL Air audit done - 30 hose pipe found open
PL Back wash of Filter unit
start Comp# 04 start @ 9:36 pm
Stop Compressor stopped at 09.50 pm due to NDE bearing temp high

PL Primary filter change


PL 16 Nos. primary filter cleaning
PL Dewatering done from trenches
PL Back wash of Filter unit

PL Pipeline Fabrication for Intercooler 2


PL Aftercooler cleaning, Y gasket fitting(to be continued in B shift)
PL Air audit done - 24 hose pipe found open

PL Pipeline Fabrication for Intercooler


PL Aftercooler cleaning, Y gasket fitting & box up done
PL Alignment checking R +0.27 & labyrinth seal checked found ok
Mop alignment done
PL Primary filter change
PL Air audit done - 31 hose pipe found open
PL Back wash of Filter unit
start Comp# 02 start @ 8:30 pm

PL 8 Nos. primary filter cleaning


PL Back wash of Filter unit

PL Primary filter change


PL Probe cleaning & probe setting done
PL Quaterly mainteanance done-@ RPH
PL Water meter reading taken

PL Primary filter change


PL Measurement of Pipe for painting
PL Quaterly mainteanance done- RPH
PL Back wash of Filter unit
Tripped Tripped @ 8:55 pm
start Start @ 9:10 pm due to HWP # 02 trip

Testing Feeder repaired & testing done


PL 24 Nos. primary filter cleaning
PL Primary filter change

Testing cold well pump change over done from 2 to 4-@ CPH
wire mess fitting done for pedestal fan
dryer Y strainer cleaning done for all dryer
rectifier cooling tower 3 under maintanance

PL Primary filter change


PL Quaterly mainteanance done-@ RPH
PL Ventilation blower to HT room filter modification
PL Measurement of Pipe for painting
PL Secondary comp. installation

PL 8 Nos. primary filter cleaning


PL Back wash of Filter unit

PL primary filter change


PL filter change for softener in RPH
PL filter cleaning
HT ventilation blower taken to line at 12 noon
diesel driven compressor trail under progress

PL primary filter change


PL 08 Nos. primary filter cleaning
PL Back wash of Filter unit

PL 08 Nos. primary filter cleaning

PL Primary filter change


PL 08 Nos. primary filter cleaning

PL Primary filter change


PL 08 Nos. primary filter cleaning

PL 08 Nos. primary filter cleaning

PL primary filter change


PL Dryer # 1 maintance and back flushing in progress
PL CWP#2 quarterly maintance done
PL 08 Nos. primary filter cleaning
PL Air audit done - total 36 nos. hose found open ,frl leakages 11 found(valve
passing union leakage socket 14 nos
PL Primary filter change
PL 08 Nos. primary filter cleaning
PL Dryer # 1 maintance and back flushing
PL Dryer valve mainteance done
PL Wire mesh fixed - 01 no
PL Back wash of Filter unit

Stop Stopped as there is no requirement for Al. unloading


start Started after PM
Stop Stopped & made ready for PM & VFD work
PL 08 Nos. primary filter cleaning
PL Manual backwash & put in service mode
PL Back wash of Filter unit

PL Primary filter change


PL 08 Nos. primary filter cleaning
PL CWP#3 quarterly maintance done

PL Aftercooler dismentle & Y- gasket found damage ; Y-gasket changing & box
up work in progress

PL Aftercooler dismentle & Y- gasket found damage ; Y-gasket changing & box
up work in progress
PL Aftercooler dismentle & box up

PL Back wash of Filter unit


PL Motor cover end dismentling & cover cleaning , mop alignment work done
PL primary filter change

PL 08 Nos. primary filter cleaning


PL primary filter change
PL 08 Nos. primary filter cleaning
QM Quarterly Maintenance done
PL Cell # 02 Cleaning done
PL Back wash of Filter unit
PL 08 Nos. primary filter cleaning

PL Back wash of Filter unit


PL New FRL changed
PL Monthly maintenance done
PL Monthly maintenance done
PL Fabrication of mop coupling guard
PL Primary filter change
PL 08 Nos. primary filter cleaning

PL LCD display replaced by New display of cmc panel


PL monthly maintance done
PL monthly maintance done
Air audit done at pot room and 36 hosses found open
Air audit done at pot room and 32 hpsses found open
hot well pump #2 decoupling done and no load current cheched

BD Fan found not operating; Informed to the concerned & rectified


PL Back wash of Filter unit

PL primary filter change


PL 08 Nos. primary filter cleaning
Tripped CWP# 04 tripped @ 9:25 am
Stop Comp# 06 stop @ 9:45 am due Cwp # 04
Start Comp # 01 start @ 10:15 am after CWP# 03 start
PL Air audit done at pot room and 32 hpsses found open
PL mop coupling guard fixed
PL Cell # 02 Cleaning done

painting of VFD wall done


pipe line measurement done
Foundation for air filter room done by hydra
comp #5 started at 8.15PM
8n nos primary filter cleaning done

PL Air audit done at pot room and 40 hoses found open


PL Back wash of Filter unit

PL cell # 01 cleaned and restarted


PL Primary filter change
PL 08 Nos. primary filter cleaning
PL Air Audit done 27 hose pipe found open
PL Inlet and bypass valve checked found ok
compessor cleaning done
secondary filter checked found ok
probe cleaning And gap voltage setting done
previuos reading (6.1 , 6.1 , 6.1) current reading (6.2, 6.2, 6.2)
MM monthly maintenance done
MM monthly maintenance done

MM monthly maintanance of hoist


MM monthly maintanance of sump pump
Drinking water pipe line flushing done
PL 8 nos primary filter changed
8 no primary filter cleaned

PL 08 Nos. primary filter cleaning


PL Back wash of Filter unit

PL Primary filter change


PL 08 Nos. primary filter cleaning

PL 8 nosPrimary filter changed


8 nos primary filter cleaned

PL 08 Nos. primary filter cleaning


PL Back wash of Filter unit

PL Cooling Tower cell # 03 Algae and mud cleaning done


MM Monthly maintenance done
BM Motor DE bearing dismantled checked slight misalignment found , cleaned
and reinstalled
PL Primary filter change
PL 08 Nos. primary filter cleaning
PL BTD Check
Stop Comp# 01 stopped @ 10:30 am due for Motor DE bearing checking
Start Comp # 06 start @ 10:20 for changeover with comp # 01

PL Primary filters changed


MM Monthly maintenance done
PL 08 Nos. primary filter cleaning

PL Back wash of Filter unit


Motor bearing temp (NDE) reading showing "open" at scanner &
PL all RTD & BTD resistance check &
tightness done by abhishek sir

Start comp #1 started at 10.10 am for change over with comp # 3


PL maintanance of bypass valve ,gap voltage setting and boxup
PL primary filter changed

PL Primary filters changed


PL maintanance
Motor DE brg checking
Motor NDE brg checking done.
Motor End cover plate cleaning done.
PL 08 Nos. primary filter cleaning
trip Tripped - because of voltage dip
Start Started after resetting in drive bypass mode
Start VFD changeover; Started in remote mode
Stop VFD changeover; Stopped & put in Auto mode

PL Back wash of Filter unit


PL Air audit done at pot room and 41 hoses found open

PL Primary filter changed 8 nos


8 nos primary filter cleaned
Air audit Air audit done in pot room and 44 cooling hoses found open

PL Primary filters changed


PL Primary filters changed
PL Motor RTD checking

PL Back wash of Filter unit


PL Air audit done at pot room and 32 hoses found open
PL 08 Nos. primary filter cleaning

PL motor and comp shaft alaignmentdone and radial reading +0.25


PL 8 nos primary filter changed
PL 8 nos primary filter cleaning
chemical dosing done

PL Primary filters changed


PL 08 Nos. primary filter cleaning
PL Main coupling alignment
Ob No reading in stg 3 during manual rotation; Cable, probe inspection in
progress
PM DW line flushing

No reading in stg 3 during manual rotation; Cable, probe inspection done,


PL now reading show of stg 3 during manual rotation
PL Air audit done at pot room and 32 hoses found open
PL Back wash of Filter unit

MM monthly maintanance done NRV maintanance done


MM monthly maintanance done
PL primary filter changed
8 nos primary filter cleaned

PL Primary filters changed


PL Primary filters changed
PL 08 Nos. primary filter cleaning
PM Periodic Maintenance
Compliance Lock plates welded in the block assembly

PL 08 Nos. primary filter cleaning


PL Air audit done at pot room and 32 hoses found open
PL Back wash of Filter unit

PL primary filter changed 8 nos


NRV maintanance done
air audit done in pot room 41 hosses found open
air audit done in pot room 33 hosses found open

PL Primary filters changed


PL Pipeline fixed with anchor bolts
PL 08 Nos. primary filter cleaning
PL Water sampling at all pump houses

PL Dewatering done from trench


PL Back wash of Filter unit

PL primary filter changed


PL primary filter cleaning done
PL air audit done in pot room and 34 hosses found open
three stsages gap voltage checked

PL Primary filters changed


PL Primary filters changed
PL 08 Nos. primary filter cleaning
PL air audit done in pot room and 20 hosses found open
PL air audit done in pot room and 17 hosses found open

PL 08 Nos. primary filter cleaning


PL air audit done in pot room , 36 hoses found open
PL Back wash of Filter unit

PL primary filter changed


PL NRV maintanance
PL Vibration readings

PL NRV maintanance
PL Primary filters changed
PL 08 Nos. primary filter cleaning
PL Blower Testing
Stop Comp# 02 stop @ 7:00 pm

Start Compressor # 03 Started at 11.48 PM ( Due huge pressure drop and


equirement from A/U side)
PL air audit done in pot room , 28 hoses found open
PL Back wash of Filter unit

PL primary filter changed


Complaint Arresting leakage - In progress
PL Vibration readings

Complaint Arresting leakage


PL Primary filters changed
PL Primary filters changed
PL 16 Nos. primary filter cleaning
PL Secondary filter changed (IR)
Start Started @ 5:15 pm for changeover (due to comp# 03 2nd stage temp
showing - ve)
Stop Stop @ 5:30 pm due to 2nd stage temp showing -ve
PL 2 nd stage temp transmitter cheking (due to temp. showing -ve) by
switchyard person
PL Compressor cleaning

PL compressor # 3 cleaning done


PL 8 nos primary filter cleaning done

PL Shifting - In progress
PL FRL cleaning
PL Direction of rotation - Inspection

PL Primary filters changed


PL Primary filters changed
PL 08 Nos. primary filter cleaning
PL Shifting & testing done

PL Eight nos primary filter cleaning done


PL unit #1 back wash

PL Primary filters changed


Dispensar shifted & electric connection given
PL Shifting - In progress

PL Primary filters changed


PL Primary filters changed
PL 08 Nos. primary filter cleaning
PL duct Shifting
PL NRV maintanance

PL primary filter cleaning done 8 nos


PL Line flushing
PL NRV maintanance
Start Started in remote mode
Stop Stopped for Pump & NRV maintenance

PL Primary filters changed


PL Primary filters changed
PL 08 Nos. primary filter cleaning
PL Line flushing
PL NRV maintanance & monthly mainteanance
Start Started after Pump & NRV maintenance
Start Started in PLC mode

PL primary filter cleaning done 8 nos


PL unit #1 back wash and running unit #2 stop

PL Primary filters changed


PL 08 Nos. primary filter cleaning
PL Oil level checkING done
Motor Pulley and Comp pulley Alignment - in process
V Belt checking - Done
Motor Pulley checking - Done
Belt wheel checking - Done
PL Hydrant valve Checking in progress

PL Primary filters changed


PL Primary filters changed
PL 08 Nos. primary filter cleaning
PL Hydrant line inspection
PL Maintenance
PL air audit done in pot room , 41 hoses found open
PL primary filter cleaning done 8 nos
PL unit #1 back wash done
air audit done in pot room and 46 hosses found open

PL air audit done in pot room , 42 hoses found open

PL primary filter changed 8 nos


PL primary filter changed 8 nos
PL unit #2 back wash done and running
PL primary filter cleaning done 8 Nos

PL primary filter cleaning done 8 nos

PL primary filter cleaning done 8 nos


PL primary filter changed 8 nos
PL Maintenance - crankshaft assembly found damaged
PL air audit done in pot room and 38 hosses found open
PL MGF 1 &2 , ACF 1 & 2 Valve maintenance, Dosing pump checking done
PL Main Pump #1 Monthly Maint
PL Jockey Pump # 4 Monthly Maint
PL Jockey Pump # 5 Monthly Maint

PL Primary filters changed


PL Primary filters changed
PL 08 Nos. primary filter cleaning
PL Main Pump #2Monthly Maint
PL Main Pump #3Monthly Maint
PL MGF 1 &2 , ACF 1 & 2 Valve maintenance
PL Fan shifting from pot overhauling shop to ACH
PL air audit done in pot room and 33 hosses found open
PL primary filter cleaning done 8 nos
PL unit #1 back wash done
PL Cleaning with emery Paper & air

PL Cleaning with emery Paper & air


PL air audit done in pot room and 31 hosses found open
Start Started @ 8:27 am for changeover (due to comp# 06 inlet valve stuck)
Stop Stop @ 8:38 am due to inlet valve stuck @ 50%
PL Mainteanace in progress( FRL cleaning & flushing; inlet valve maint., Mop
alignment
PL duct Shifting & blower testing

PL Mainteanace completed: FRL cleaning & flushing; inlet valve maint., Mop
alignment
PL primary filter changed 8 nos
PL primary filter changed 8 nos
PL primary filter cleaning done 8 nos

PL primary filter cleaning done 8 nos


PL back wash done
PL air audit done in pot room and 44 hosses found open

PL primary filter changed


PL 8 nos primary filter cleaning done
PL Dryer maintenance done and back flushing done
PL diesel pump maintenance done
blower dismantling done

PL Primary filters changed


PL Primary filters changed
PL 8 nos primary filter cleaning done

PL primary filter cleaning done 8 nos


PL back wash done
PL air audit done in pot room and 45 hosses found open
PL Cleaning with emery Paper & air
PL Mist arrestor cleaning
PL water line audit
PL water line fabrication near sec-1 & sec-2 ramp

PL Pfrimary filter changed 8 nos


PL Pfrimary filter changed 8 nos
PL 8 nos primary filter cleaning done

PL back wash done


CBM Equipment temp monitoring

PL primary filter changed 8 nos


PL Cleaning with emery Paper & air
PL air audit done in pot room and 44 hoses found open
PL Water line leakage arrested- near sec-4
PL Water meter reading

PL Primary filters changed


PL Primary filters changed
PL 8 nos primary filter cleaning done
Air audit done in pot room and33 hose pipes found open
fans are cleaned with emery paper and air

PL back wash done


PL primary filter cleaning done 8 nos

PL split afc maintanance done in ACH control room


PL air audit done in pot room and 53 hosses found open
PL blower motor dismantling under progress
wiring wiring job for vfd under progress
PL fan cleaning under progress
PL welding and cutting job under progress

PL Pfrimary filter changed 8 nos


PL Pfrimary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL blower motor dismantling under progress
PL fan cleaning under progress
Start Start @ 3:55 PM
Stop Stop @ 4:00 PM

PL back wash done


PL primary filter cleaning done 8 nos
air audit done in pot room and 51 hosses found open

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL Air audit done in pot room 34 hose pipes found open

PL Primary filters changed


PL Primary filters changed
PL 8 nos primary filter cleaning done

PL primary filter cleaning done 8 nos


PL air audit done in pot room and 44 hosses found open
PL back wash done

PL Air audit done in pot room 34 hose pipes found open


Repairing Damaged line repairing in progress
PL 110 litre oil topup done
PL Fan cleaning under progress

PL primary filter changed 8 nos


PL primary filter changed 8 nos
PL primary filter cleaning done 8 nos
PL Fan cleaning under progress

PL primary filter cleaning done 8 nos


PL air audit done in pot room and 49 hosses found open
PL back wash done

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL Air audit done in pot room 36 hose pipes found open
PL Fan cleaning under progress
PL Installation of water meter @ Ne garage(Near Section-1)
PL Fabrication of Condensate header

PL Primary filters changed


PL Primary filters changed
PL 8 nos primary filter cleaning done
PL Fabrication of Condensate header
PL Fan cleaning under progress
PL Monthly mainteanace done

Start Start @ 10:35 PM in remote mode


Stop Stop @ 10:40 PM & put in Auto mode
PL Fabrication of Condensate header
Trip Comp # 06 started @ 12:25 but tripped due to modulate mode enable
Start again Started @ 1:55 AM for changeover
Stop Stopped @ 2:10 am due to 1 st stage vib. Increased ( 0.67 to .81 mils)
PL primary filter cleaning done 8 nos
PL back wash done

PL Maintenance
PL Fan Cleaning
Gap voltage: Before: ST#01: 6.6 VDC;ST#02: 6.2 VDC;ST#03: 5.83 VDC;
PL After :ST#01: 6.25 VDC;ST#02: 6.19 VDC;ST#03: 6.20 VDC
Inspection Secondary filter chescked & found ok

PL Air audit done in pot room 34 hose pipes found open


PL Pfrimary filter changed 8 nos
PL Pfrimary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL Fan cleaning under progress

PL primary filter cleaning done 8 nos


PL back wash done
PL Dryer # 05 cleaning

PL Primary filter changed 8 nos


PL primary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL Fan Cleaning
PL Blower flange fabrication.

PL Primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL Fan Cleaning Done
PL Blower flange fabrication. Done
PL 02 nos Pedestal fan assembly done with wire mesh fixing one fitted at comp
# 03 and one at CWP # 02
MM Monthly Maintenance done for cooling tower # 02

PL primary filter cleaning done 8 nos


PL back wash done

PL Dismantling of impellar from blower


START Start @ 10:50 AM
STOP Stop @ 11:10 AM due to high vibrations of all stages.
PL Maintenance of intercooler#01 & 02(In Progress)
MM Monthly Maintenance done for cooling tower # 03

PL Pfrimary filter changed 8 nos


PL Pfrimary filter changed 8 nos
PL 8 nos primary filter cleaning done
PM Maintenance of intercooler#01 & 02(In Progress)
New Y gasket fixed in intercooler 2 as grey gasket (Neoprene) was found
PM damaged, replaced with new silicon gasket.
PM Intercooler 1 & 2 dismantled , cleaned in chemical , box up work in progress

PM New Y gasket fixed intercooler 2 & box up done


PL primary filter cleaning done 8 nos
PL back wash done

PL Primary filter changed 8 nos


PL primary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL Motor alignment in progress
MM Monthly Maintenance done for cooling tower # 01 completed

PL Primary filter changed 8 nos


PL Motor alignment; Stg 1 vib. Probe replaced.
MM Flushing done in sec. 4, 5, 8 & ABB office

PL Air audit done in pot room 55 hose pipes found open, line 01 - 37 nos, line
02 - 18nos, services - nil
PL 8 nos primary filter cleaning done
PL 100 lts Hypo addition done
PL back wash done

PL Fan fabrication/installation
START Start @ 10:50 AM
STOP Stop @ 11:35 AM
PL Maintenance: New actuator & new FRL installed,I2P cleaning done

PL Wire Tigthing done in CMC panel due to pop not running,


PL Inlet valve i2p cleaning done
Start Comp# 04 start @ 6:35 pm for changeover
STOP Stop @ 06:55 PM due to Inlet valve maimtenance
PL Inlet valve maintenance - i2p cleaning, Actuator maintenance done
PL Fan fabrication/installation
PL Pfrimary filter changed 8 nos
PL Pfrimary filter changed 8 nos
PL 9 nos primary filter cleaning done
PL 32 lts oil top- up done

PL Air audit done in pot room 73 hose pipes found open, line 01 - 45 nos, line
02 - 28nos, services - 02 NOS
PL Inlet valve maintenance done
PL Bypass valve maintenance done, new I/P convertor installed
PL back wash done

PL Pfrimary filter changed 8 nos


PL Intercooler 2 dismantled; Inspected
PL Inlet valve actuator issued; assembled

PL Inlet valve actuator issued & new i2p installed; assembled


PL FRL change
PL Intercooler 2 cleaning; Y-gasket change & box up done
PL Fan fabrication/installation
PL New pully installed
PL Primary filter changed 8 nos
PL Primary filter changed 8 nos
PL 8 nos primary filter cleaning done

PL Air audit done in pot room 65 hose pipes found open, line 01 - 34 nos, line
02 - 28 nos, services - 03 NOS
PL Primary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL 02 no Fan fabrication/installation done
PL back wash done

PL Commissioning in progress
PL Monthly Maintenance
PL 20 mm pipe shifting

PL Pfrimary filter changed 8 nos


PL Pfrimary filter changed 8 nos
PL 16 nos primary filter cleaning done
PL Commissioning
Gap voltage: Before: ST#01: 6.19 VDC;ST#02: 6.28 VDC;ST#03: 6.29
PL VDC; After :ST#01: 6.20 VDC;ST#02: 6.20 VDC;ST#03: 6.20 VDC
PL Fan shifting done

PL Air audit done in pot room 66 hose pipes found open, line 01 - 41nos, line 02
- 25 nos, services - nil
PL back wash done
PL 8 nos primary filter cleaning done

PL Pfrimary filter changed 8 nos


PL 08 nos primary filter cleaning done
MM Monthly Maintenance Done
PL Diesel engine trial taken for one hour running ok
PL Water meter maintenane in progress at section 8
Start Compressor started at 11.100 AM
Stop Compressor stopped at 11.15 AM for PM
PM Secondary filter checking in progress
PM Intercooler # 01 dismantling, Y gasket changing + Tube bundle cleaning in
progress
PM Gap voltage before : stage 1 - 6.15vdc, stage - 02 - 6.06 vdc, stage - 03- 6.13
vdc,
PM probe cleaning in progress
PM instrument air line flushing + FRL cleaning Done
PM Inlet valve maintenance in progress
PM Bypass valve maintenance in progress

PM Secondary filter checking done


PM Intercooler # 01 dismantling, Y gasket changing + Tube bundle cleaning &
box -up done
PM Gap voltage before : stage 1 - 6.15vdc, stage - 02 - 6.06 vdc, stage - 03- 6.13
vdc,
PM probe cleaning & gap setting done; ST#01: 6.20 VDC;ST#02: 6.20
VDC;ST#03: 6.20 VDC
PM Inlet valve maintenance done
PM Bypass valve maintenance done
PL Pfrimary filter changed 8 nos

PL Primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL air audit done in pot room and 70 hose pipe found open
PL back wash done

PL shaft alaignment done


PL box up and non driving end cleaning under progress
PL air audit done in pot room and 52 hosses found open
PL steam line flushinhg under progress
PL Water meter mainteanace near sec-8

PL Motor coupling alignment & mop coupling alignment, Motor cover fixing in
progress
PL Primary filter changed 8 nos
PL Monthely maintenance done
PL Monthely maintenance done

PL Motor coupling alignment completed radial set at 0.20 & mop coupling
alignment completed,coupling assembly completed
PL air audit done in pot room and 73 hos pipe found open
PL back wash done

ML monthly maintanance o f hot well pump #2


PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL motor alaignment under progress

PL motor alaignment under progress


PL primary filter changed done 8 nos
PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL Strainer wire mesh replaced by new fabricated wire mesh
PL air audit done in pot room and 74 hos pipe found open
Start started at 03:45 PM
Stop stopped at 350 pm

PL Air audit done in pot room and 68 hos pipe found open
PL Primary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL back wash done

PL cold well pump dismantling


PL primary filter cleaning done 8 nos
PL Silencer pipe extension work in progress
Start Compressor started at 1..200 PM
Stop Compressor stopped at 2.10 PM

PL primary filter changed done 8 nos


PL 8 nos primary filter cleaning done
PL 08 nos new secondary filters changed
PL Silencer pipe extension work done

PL Air audit done in pot room and 72 hos pipe found open
PL 8 nos primary filter cleaning done
PL back wash done
PL Primer on stands of fan

PL primary filter changed done 8 nos


PL 8 nos primary filter cleaning done

PL primary filter changed done 8 nos


PL 8 nos primary filter cleaning done
PL Rope wrapping done in silencer pipe
PL Fan shifting done from comp # 01 to comp 06 sa winding temeperature was
high.

PL 8 nos primary filter cleaning done


PL back wash done
PL Primer on stands of fan
Trip Trip @ 12:50 AM & All Pumps goes to bypass mode
Stop & Start Stop & Start simultaneously @ 1: 15 AM

PL Flushing of drinking water line


PL Monthly maintenance done
PL Monthly maintenance done
PL Water leakage arresting in progress near sec-3

PL primary filter changed done 8 nos


PL 8 nos primary filter cleaning done
PL Water leakage arresting done near sec-3
MM Monthly maintenance done for transfer pump # 01 and 02.
PL CBM done in compressor house and compressor pump house.

PL leakage arresting done eith m seal


PL Air audit done in pot room and 73 hosses found open
PL primary filter cleaning done 8 nos

PL Monthly maintenance done for transfer pump # 03 and 04.


PL CBM of vibration
PL Steam line flushing
PL Fabrication of railing (measurement work)
PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL Fabrication of railing (measurement work)
Start Start @ 4:30 PM to 6:00 PM

PL fan painting done in ach


PL Primary filter cleaning done

PL Fabrication of railing (measurement work)


PL Monthly maintenance done
PL Monthly maintenance done

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL Monthly maintenance done
Start Start @ 3:05 PM
Stop Stop @ 3:10 PM for monthly maintenance
Start Start @ 5:40 PM after monthly maintenance
PL Back wash done
PL Chemical dosing : Hypo - 40 Kg
Stop Stop @ 5:45 PM

PL air audit done in pot room and 62 hose pipes found open
PL 8 no. primary filter cleaning done

PL Monthly maintenance done


PL Fabrication of railing
PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL primary filter changed done 8 nos
PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL Monthly maintenance done
PL Chemical dosing : Hypo - 40 Kg
PL Back wash done

PL 8 nos primary filter cleaning done

PL Monthly maintenance done


PL Fabrication of railing
PL Monthly maintenance done
Start Start @ 6:30 AM
Start Start @ 6:32 AM
Stop Stop @ 6:35 AM for monthly maintenance
Stop Stop @ 6:40 AM for monthly maintenance

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL Fabrication of railing

PL painting of primer in cooling fan


PL 8 nos primary filter cleaning done

PL Fabrication of railing
PL Air audit done in pot room and 45 hoses found open

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL Fabrication of railing
PL 4 nos. exhaust fan installled @ ACH

PL 8 nos primary filter cleaning done


PL air audit done in pot room and 49 hosses found open
PL painting of primer in cooling fan

PL Air audit done in pot room and 45 hoses found open, line oi- 29 nos, line 02-
15 nos
PL 03 nos cooling fan painted

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL 8 nos primary filter cleaning done
PL Back wash done
PL Chemical dosing: Hypo 40 kg

PL primary filter cleaning done 8 nos

PL Air audit done in pot room and 51 hoses found open, line oi- 30 nos, line 02-
21 nos
PL 03 nos cooling fan painted
PL 8 nos primary filter cleaning done
PL primary filter changed done 8 nos
PL Fabrication of railing is under progress
PL Drinking waterline flushing + Hydrant valve checking under progress

PL Comp no # 2,6 primary filter changing done


PL comp no #3 secondary filter checking done
PL air audit done in pot room and 45 hosses found open

PL 8 nos primary filter cleaning done


PL back wash done
PL Compressor side cleaning done
Start Start @ 10:50 AM
Stop Stop @ 11:15 AM
PL Steam line flushing
PL air audit done in pot room and 52 hosses found open

PL Primary filter change done


PL New secondary filter replacing done
PL air audit done in pot room and 61 hosses found open
PL primary filter cleaning done 8 nos
PL primary filter change done
PL chemical dosing done in cold well 40 liters hypo

PL 8 nos primary filter cleaning done


PL back wash done
PL air audit done in pot room and 47 hosses found open

PL primary filter changed done 8 nos


PL 8 nos primary filter cleaning done
PL Steam line flushing
PL air audit done in pot room
UPM FRL cleaning and Gap Voltage setting of all Stages to 6.20 V
PL Fabrication work in Process
PL Sent to Lab

PL thermostatic valve maintanance done


PL primary filter change done
PL primary filter change done
PL cast house gate fabrication
PL air audit done in pot room and 57 hosses found open

PL 8 nos primary filter cleaning done


PL back wash done
PL primary filter change

PL primary filter changed done 8 nos


PL Intercooler #02 : Dismantling,cleaning
PL 8 nos primary filter cleaning done
PL Steam line flushing
PL air audit done in pot room and 58 hosses found open

PL air audit done in pot room and 51 hosses found open


PL fabrication of filter wall welding job
PL vfd test run done in air comp house
PL thermo static valve maintanance done

PL 15 lts. Oil top up done


PL back wash done
PL air audit done in pot room and 65 hosses found open

PL Primary filter changed done 8 nos


PL Condensate header fabrication
PL 8 nos primary filter cleaning done
PL Steam line flushing
PL air audit done in pot room and 64 hosses found open
PL FFP #01 : MonthlyMaintenance
PL FFP #02 : MonthlyMaintenance
PL FFP #03: MonthlyMaintenance (In progress)

PL primary filter changed


PL primary filter changed
PL air audit done in pot rooom and 55 hosses found open
PL filter wall welding work done
PL 8 nos primary filter cleaning done

PL 8 nos primary filter cleaning done


PL primary filter change
PL air audit done in pot room and 65 hosses found open
Trip Tripped @ 4:13 am due to 2 nd stage temp. high
Start Start @ 4:58 am due to comp# 04 trip

PL 8 nos primary filter cleaning done


PL primary filter change
PL Steam line flushing
PL JP #03 : MonthlyMaintenance
PL JP #04 : MonthlyMaintenance
PL air audit done in pot room and 50 hosses found open
BD Drinking water line leakage arresting
PL Sec Filter Checking, FRL cleaning, Thermostatic valve replacement,oil topup
15 lts

PL JP #05 : MonthlyMaintenance
PL condensate fabrication work done
PL VFD test running done for 1,3
PL air audit done in pot room and 50 hosses found open
PL 8 nos primary filter cleaning done

PL Air audit done in pot room and 62 hoses found open


PL back wash done

PL 01 nos cooling fan painted


PL Air audit done in pot room and 62 hoses found open

PL primary filter change done 8 nos


PL primary filter change done 8 nos
PL Air audit done in pot room and 59 hoses found open

PL Air audit done in pot room and 67 hoses found open


PL 8 nos primary filter cleaning done
PL primary filter changed
PL Cleaning done with cotton waste
PL 01 no cooling fan painting done
PL back wash done

PL Air audit done in pot room and 76 hoses found open


PL primary filter changed
PL 8 nos primary filter cleaning done
PL Oil cooler cleaning work in progress
PL Flushing in progress
PL Dryer maintenance in progress

PL Oil cooler cleaning work done


PL Air audit done in pot room and 73 hoses found open
PL Flushing done
PL Dryer maintenance done
PL primary filter changed
PL 8 nos primary filter cleaning done

PL Air audit done in pot room and 57 hoses found open


PL 8 nos primary filter cleaning done
PL back wash done

PL dryer maintanance under progress


PL air audit done in pot room and 48 cooling hosses found open
PL water meter reading taken in plant -ii under progress

PL Dryer maintenance done


PL water meter reading taken in plant -ii
PL Pressure regulator change of seal air
PL primary filter change done 8 nos
PL primary filter change done 8 nos
PL 8 nos primary filter cleaning done
PL Air audit done in pot room and 58 hoses found open
PL 8 nos primary filter cleaning done
PL primary filter changed
PL back wash done

PL Air audit done in pot room and 50 hoses found open


PL primary filter changed 8 nos.
PL steam line flushing done in plant-II
PL Intercooler-2 of Compressor#4 maintenance under progress.
PL 8 nos. of primary filter cleaning done.
PL filter wall fabrication under progress

PL Air audit done in pot room and 48 hoses found open


PL primary filter changed
PL 8 nos primary filter cleaning done
PL Intercooler 2 cleaning with steam & water ; New y-gasket installed ; box- up
done

PL Air audit done in pot room and 62 hoses found open


PL 8 nos primary filter cleaning done
PL back wash done

PL Air audit done in pot room and 58 hoses found open


PL Steam line maintenance done
PL filter wall fabrication work under progress
PL compressed air line valve replacement done in Bake oven area

PL Vibration Probe cleaning & setting done


PL primary filter change done 8 nos
PL primary filter change done 8 nos
PL 8 nos primary filter cleaning done

PL Air audit done in pot room and 66 hoses found open


PL primary filter changed
PL 8 nos primary filter cleaning done
PL back wash done

PL Air audit done in pot room and 62 hoses found open


PL primary filter changed 8 nos.
PL 8 nos primary filter cleaning done

PL primary filter changed 8 nos


PL pop coupling alaignment done
PL Air audit done in pot room and 52 hoses found open
PL primary filter cleaning done 8 nos

PL Air audit done in pot room and 58 hoses found open


PL 8 nos primary filter cleaning done
PL back wash done
PL Cleaning of comp#04 done

PL POP maintenance under progress


PL Cast House shed cuting
PL drinking water line leakage arrested
PL air audit done in pot room and 61 hosses found open

PL primary filter changed 8 nos


PL primary filter changed 8 nos
PL Air audit done in pot room and 52 hoses found open
PL 8 nos primary filter cleaning done
PL Taken in closed loop with VFD

PL Air audit done in pot room and 78 hoses found open


PL primary filter changed
PL 8 nos primary filter cleaning done
PL back wash done
PL Primary filter changed
PL Dewatering done
Observation FH & F1 fault occurred; Strainer cleaned, Condensate drained & alarm reset

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL 8 nos new secondary filter installed in comp # 04
01 no compressor bypassed , 2 compressors will be in operation continously
PL as compressor # 02 & 03 are not working manual mode

PL air auidit done in pot room and 62 hosses found open


PL primary filter cleaning done 08 nos

PL Strainer cleaning done for all dryers


PL Drinking waterline flushing in progress
Air Audit done in potroom 62 hose pipes found open, line 01 - 40nos, line 02
PL - 22nos, services - nil
PL Host + Sump Pump maintenance done
PL Air leakage arresting in progress

PL POP oil seal reaplaced with new one


Observation H1 alarm. 2 no. Compressors were run manually & alarm reset.
PL Quaterly Maintenance done for cooling tower # 03
PL Primary filters changed

PL Air audit deone in pot room and 57(including services-3 hoses) hosses found
open
PL Primary filter cleaning done 8 nos
PL primary filter change done 8 nos
PL back wash done of unit-1

PL Primary filter cleaning done 8 nos


PL Primary filter change done 8 nos
BD Drinking water line maintenance- Lounge Room # 01…..contd
PL Stage # 1 vib probe inspection.
PL Manual backwash done in AVGF# 1 & 2

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL Quaterly maintenance of CT#01
PL Drinking waterline & hydrant flushing & inspection

PL primary filter cleaning done 4 nos


PL air audit done in pot room and 73 hoses found open

PL Damaged drinking waterline replacement done in potroom sectio 1.


QM quarterly maintenance done for ct # 02
Air Audit done in potroom 58 nos hose pipe found open , line 01-34nos,
PL line02-24nos , services - nil
Air Audit done in potroom 54 nos hose pipe found open , line 01-31nos,
PL line02-23nos , services - nil

PL primary filter changed 8 nos


PL primary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL Quaterly maintenance of Dryer#02
Air Audit done in potroom 50 hose pipes found open, line 01 - 25nos, line 02
PL - 25nos, services - nil

Air Audit done in potroom 55 hose pipes found open, line 01 - 23nos, line 02
PL - 32nos, services - 3
PL primary filter changed 8 nos
PL 8 nos primary filter cleaning done

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
QM quarterly maintenance done for ct # 02
QM Quarterly maintenance done for secondary compressor motor driven
Air Audit done in potroom 54 nos hose pipe found open , line 01-31nos,
PL line02-23nos , services - nil
Start Comp # 04 started at 1.30pm
Comp # 04 tripped in 2nd stage high vibration at 1.35PM

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
BD Maintenance: Gap voltage set
PL AVGF Backwash
Start Start @ 5:25 PM
Trip Trip @ 5:28 PM due to 2nd stage vibration
Start Start @ 7 PM
Trip Trip @ 7:15 PM due to low oil pressure
PL comp no 4 maintanance , oil seal replacement in POP

PL primary filter cleaning done 8 nos


PL air audit done in pot room and 51 hose pipe found open
PL back washing done in pressurising pump house

QM quarterly maintenance done for ct # 03


Start Comp # 04 started at 1.0.46AM
Trip Comp # 04 tripped in low oil pressure at 10.53AM , as soon as pop bypass is
switched off
BDM Breakdown maintenance in progress for oil loop
New NRV installed in oil resrvoir for MOP
MOP Dismantled for inspection

PL primary filter changed 8 nos


PL primary filter changed 8 nos
PL 8 nos primary filter cleaning done
PL Backwash done
BDM Breakdown maintenance for oil network
BDM New duplex oil filter install(1 no.) / thermostatic valve inspection done &
found ok
Start Start @ 7 :20 PM
Stop Stop @8:05 PM, due fume observed at mop.

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL air audit done in pot room and 48 hose pipe found open

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
QM quarterly maintenance done for ct # 01
BDM Breakdown maintenance in progress for oil loop
POP NRV dismantled checked found ok
MOP dismantled, inspected found ok, boxup work under progress.
Oil resrvoir emptied ( oil line flushing and cleaning to be done)
Nipple fitted in inlet and discharge of mop to check the oil flow.

BDM Breakdown maintenance: MOP repaired and install


PL primary filter changed 8 nos
PL 8 nos primary filter cleaning done
Start Start @ 6 :25 PM
Stop Stop @ 9:35 PM

PL air audit done in pot room and 61 hose pipe found open
PL 8 nos primary filter cleaning done

PL Drinking water line rerouting in progress


PL Air audit done in pot room 63 hose pipe found open

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL Air audit done in pot room 59 hose pipe found open

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL back wash done
PL Air audit done in pot room 59 hose pipe found open

PL Drinking water line rerouting work in progress


PL primary filter changed 8 nos
PL 8 nos primary filter cleaning done
QM Comp # 06 quarterly maintenance in progresds
New secondary filter installed (Mahle)
New primary filter installed (IR)
Gap volltage settind done : Before (1)6.22vdc, (2) 6.21vdc, (3 6.26vdc After
setting (1) 6.2vdc, (2) 6.2 cdc, 6.2vdc
Vibration probe cleaning done

QM Inlet and Bypass valve checked and found -ok


QM FRL cleaning done
QM Instrumentation air line flushung done.
QM Ball valve fitted on Suction line of MOP.
QM Motor end cover cleaning done.
QM MOP allignment done.
PL Primary filter changed 8 nos
PL Primary filter changed 8 nos
PL Primary filter cleaning done 8 nos.

PL 8 nos primary filter cleaning done


PL back wash done
PL Air audit done in pot room 62 hoses pipe found open

QM Oil cooler cleaning


QM NRV maintenance of MOP & POP
QM Condensate header fabrication
QM New 1 micron FRL fitted in Comp#06
PL Air audit done in pot room 59 hoses pipe found open
QM FRL changed & new one installed.
QM NRV checked and found ok
QM POP spider changed & allignment done.
PL Primary filter changed in 8 nos.
PL Primary filter cleaning done in 8 nos.
ML hot well pump monthly maintanance done.
QM Condenser header fabrication done of intercooler-1 & Aftercooler

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL back wash done
PL Air audit done in pot room 61 hose pipe found open

QM Condensate header fabrication


PL Air audit done in pot room 59 hoses pipe found open
PL Monthly maintenance
PL Monthly maintenance
PL 8 nos primary filter cleaning done

PL pressurising pump# 1, monthly maintanance


pressurising pump#2 monthly maintanance
PL primary filter changed 16 nos
PL primary filter cleaning done
QM Condensate header fabrication done

PL 8 nos primary filter cleaning done


PL back wash done

PL 8 nos primary filter cleaning done


PL Drinking water pipe line flushing done
PL Air audit done for cooling hoses in pot-room, 59 hoses found
PL Primary filter changed
ML monthly maintenance of HWP # 1 done.
ML monthly maintenance of HWP 2 done.
PL Primary filter cleaning done- 8 nos.
PL Air audit done for cooling hoses in pot-room,67 hoses found

PL primary filter changed 8 nos


PL 8 nos primary filter cleaning done
PL back wash done

PL Primary filter changed 8 nos


PL Primary filter cleaning done- 8 nos.
PL Backflushing & cleaning
PL Backwash done
PL CWP#03 & CWP#04 are running & CWP#01 stop @11:00 AM & CWP#02
in Auto mode
PL Air audit done for cooling hoses in pot-room, 61 hoses found

PL Primary filter changed .


ML HWP monthly maintenance done
PL sheet fabrication work completed
PL diesel compressor maintanance done
PL air audit done in pot room and 52 hosses found open
PL gate fabrication work

PL 8 nos primary filter cleaning done


PL back wash done
PL Air audit done in pot room 66 hose pipe found open

ML HWP monthly maintenance done


PL gate fabrication work
PL Backwash done
PL air audit done in pot room and 47 hosses found open
ML CWP monthly maintenance done
PL air audit done in pot room and 55 hosses found open
PL Filterwall fabrication work done.
ML CWP # 2 monthly maintenance done.
PL gate fabrication for cast house done.
PL Primary filter changed in Comp # 2
PL Primary filter cleaning done-8 nos.

PL Primary filter changed in Comp # 5


PL Primary filter cleaning done-8 nos.
PL Air audit done in pot room and 53 hosses found open

PL Primary filter changed 8 nos


PL Primary filter cleaning done- 8 nos.
PL Backwash done
PL air audit done in pot room and 50 hosses found open

PL Primary filter changed 8 nos


PL Primary filter changed 8 nos
PL Primary filter cleaning done- 8 nos.

PL Filter backwash
PL Primary filter cleaning done-8 nos.

PM Motor shaft allignment in Conmp # 6 in progress


ML CWP # 3 monthly maintenance done
PL Drain cleaning work done at RPH progress.
PL Drinking water line work done( 2 nipples,1-union,)
PL Filterwall work under complete
PL Painting work of AVGF at CPH
PL Air audit done ,55 hoses found open.

PL Primary filter changed 8 nos


PL Primary filter cleaning done- 8 nos.
PL Motor alignment & mop alignment done
PL Water meter side leakage arrested
PL Chamber 10 gland leakage arrested

PL Filter backwash
PL Primary filter cleaning done-8 nos.
PL Primary filter changed 8 nos

PL Drain cleaning work done at RPH progress.


PL painting work in progress
PL primary filter change done
PL Fire hydrant line # 10 blind (gland leakage ,so new gland fitted)
ML CWP # 4 monthly maintenance work done.
PL Drinking water line monthly maintenance under progress.
PL Air audit done in pot room and 54 hosses found open
PL Primary filter cleaning done.-8 nos.

PL Primary filter changed 8 nos


PL Primary filter changed 8 nos
PL Primary filter cleaning done- 8 nos.
PL Dryer # 04 maintenance done
Start Start @ 4 :25 PM
Stop Stop @ 4:40 PM
PL New secondary filter installed (Mahle)
PL FRL cleaning & line flushing done

PL Primary filter cleaning done-8 nos.


PL Unit #01 Filter backwash
PL Air audit done in pot room and 69 hosses found open

PL gap voltage setting done 6.2,6.2,6.2


PL oil cooler cleaning under progress
PL mop NRV cleaning
PL Air audit done in pot room and 70 hosses found open

PL ball valve fitting in suction line of mop


PL mop NRV cleaning done
Pl oil cooler cleaning & box-up done
PL Primary filter changed 8 nos
PL Primary filter cleaning done- 8 nos.
BD Impeller dismentled & plastic removed , impeller assembled

PL Filter backwash
PL Primary filter cleaning done-8 nos.
PL Primary filter changed 8 nos
PL Air audit done in pot room and 57 hosses found open

PL Air audit done in pot room and 58 hosses found open


PM Comp # 1 , motor shaft allignment done.
PM Comp # 1 , motor end cover cleaning done.
PL Primary filter changed in comp # 3
PL Primary filter cleaning done -8 nos.
PL Central store water line leakage arrested.
PL fabrication of plate for fire hydrant chamber 6 done.

PM Comp # 1 , motor shaft allignment checking , greasing & box-up done


PM Dryer backflushing done
PL Primary filter changed 8 nos
PL Primary filter changed 8 nos
PL Primary filter cleaning done -8 nos.
PL fabrication of plate for fire hydrant chamber 6 & shifting done
PL Blower water supply replaced by new line

PL Filter backwash
PL Primary filter cleaning done-8 nos.
PL Air audit done in pot room and 68 hosses found open
PL painting work in progress
PL scrap shifting under progress
PL chemical shifted from store to ACH done.
PL CWP # 2 monthly maintenance. Done

PL painting work in progress


PL scrap material shifting done
PL Primary filter changed 8 nos
PL Primary filter cleaning done -8 nos.
Dewatering pump fitted near Dryer # 6
PL Air audit done in pot room and 78 hosses found open

PL Filter backwash
PL Primary filter cleaning done-8 nos.
PL Primary filter changed 8 nos
PL Air audit done in pot room and 77 hosses found open.

PL Primary filter change done


PL Cutting and fabrication work on progress.
PL Primary filter cleaning done-8 nos.
ML Monthly maintenance of Main pump # 2 done.
ML Monthly maintenance of Main pump # 3 done.
ML Dozing pump maintenance done.
PL Air audit done in pot room and 73 hosses found open

PL Primary filter changed 8 nos


PL Primary filter changed 8 nos
PL Primary filter cleaning done -8 nos.

PL Filter backwash
PL Primary filter cleaning done-8 nos.
PL Air audit done in pot room and 71 hosses found open

PL Air audit done in pot room and 68 hosses found open

PL Primary filter changed 8 nos


PL Primary filter cleaning done -8 nos.
Air audit done in pot room and 66 hosses found open, line 01- 36nos , Line
PL 02-30 nos , services- nil

PL Filter backwash
PL Primary filter cleaning done-8 nos.
PL Primary filter changed 8 nos
PL Air audit done in pot room and 72 hosses found open

PL Primary filter change done


PL Primary filter cleaning done -8 nos.
PL Spare Header fabrication for intercooler
PL Air Audit of carbon - in progress
PL Drinking line Flushing done
Fire hydrant maintenance done
PL

PL Primary filter changed 16 nos


PL Header fabrication work under progress
Air audit done in pot room and 61 hoses found open, line 01- 31nos , Line
PL 02-27 nos , services- 01

PL Primary filter cleaning done-8 nos.


PL Airaudit done in pot room -68 hoses found open including services-3 nos.

PL Header fabrication work under progress


PL Quaterly maintenance done
PL Barication work in progress
PL Primary filter changed 8 nos
PL Primary filter cleaning done -8 nos.

PL Air audit done in pot room and 62 hosses found open

PL Barication work in progress

PL Air audit done in pot room and 64 hosses found open.


PL Primary filter change done.
PL Primary filter cleaning done- 8 nos.

PL Primary filter change done


PL Primary filter cleaning done -8 nos.
Trip Started @ 8:50 am but tripped due to starter failure (breaker problem)
BD Breaker maintenance by switch yard person
Start Comp # 01 started @ 11:20 am

PL Primary filter changed 16 nos


PL Primary filter cleaning done- 8 nos.
PL Air audit done in pot room 64 hoses found open.

PL Air audit done in pot room 67 hoses found open.


Stop Comp # 4 stopped at 11:17 pm . And rack out at 11:50 pm for maintenance.
Alarm Low oil temperature alarm at 2:21 am at stand by mode.
PL Primary filter cleaning done- 8 nos.

PL Oil top up 50 ltr. Done


PL POP NRV replaced by spare NRV
PL Motor shaft Alignment & Mop alignment work in progress
PL Intercooler # 02 dismentlled & cleaning with steam & water

PL Primary filter changed 8 nos


PL Air audit done in pot room
PL Motor shaft Alignment & Mop alignment work completed
PL Intercooler # 02 dismentlled & cleaning with steam & water completed Y
gasket fitted.

PL Air audit done in 57 pot room


PL Primary filter change done 8 nos
PL Near SECTION- 1 , Fire hydrant line water line valve closed due to water
leakage.
PL Primary filter cleaning done 8 nos

PL Primary filter change done 8 nos


PL Primary filter change done 8 nos
PL Primary filter cleaning done 16 nos
PL Air audit done in pot room - 48 Hoses open
PL Intercooler # 01 dismentlled & cleaning with steam & water- in progress
PL Intercooler Header fabrication going on

PL Intercooler Header fabrication


PL Intercooler # 01 dismentlled & cleaning with steam & water;Y gasket install
& assembly done.
PL Primary filter change done 8 nos
PL Primary filter cleaning done 24 nos
PL Air audit done in pot room & 60 hose pipes were open

PL Air audit done in pot room & 64 hose pipes were open
PL Comp @#4 cleaning done.

PL Air audit done in pot room - 44 Hoses open


PL Water leakage in intercooler arresting done
PL Intercooler Header fabrication work in progress
PL Dryer back flushing done
PL Stainer cleaning done
PL Dryer cleaning done
PL Zero loss ADV checked not working in high pressure

PL Primary filter changed 8 nos


PL Air audit done in pot room : 63 nos. hose pipes were open.
PL Intercooler Header fabrication work completed.
PL Primary filter cleaning done 8 nos

PL Primary filter changed 8 nos


PL Air audit done in pot room : 56 nos. hose pipes were open.
PL Primary filter cleaning done 8 nos

PL Primary filter change done 8 nos


PL Primary filter change done 8 nos
PL Primary filter cleaning done 8 nos
PL Air audit done in pot room - 61 Hoses open
PL Manual backwash done in unit 1 & 2
BD No supply to dryer, contactor problem….contd

BD No supply to dryer, contactor problem;Solved by vineet(SWYD);now ok


PL Primary filter change done 8 nos
PL Primary filter cleaning done 8 nos
PL Air audit done in pot room : 61 nos. hose pipes were open.

PL 8 nos primary filter cleaning done


PL back wash done

BD No supply to dryer, contactor over heated.


PL Manual backwash done in unit 1 & 2
PL Monthly Maintenance
PL Monthly Maintenance
PL Drinking water line flushing
PL Zero loss drain valve fitting in intercooler 2
PL Air audit done in pot room : 53 nos. hose pipes were open.

PL Air audit done in pot room : 61 nos. hose pipes were open.
PL Primary filter change done 8 nos
PL Material(pipe and plate) shifting work done.
PL stainer fabrication work done
PL Water drain work done
PL primary filter cleaning done 8 nos

PL Primary filter changed 8 nos


PL Air audit done in pot room : 67 nos. hose pipes were open.
PL Primary filter cleaning done 8 nos
BD One connector found damage inside dryer replaced by new connector
PL back wash done

PL Primary filter change done 8 nos


PL Primary filter change done 8 nos
PL Primary filter cleaning done 8 nos
PL Manual backwash done in unit 1 & 2
PL Air audit done in pot room : 66 nos. hose pipes were open.
Start Start @ 10:20 AM
Stop Stop @ 10:25 AM
PL Monthly Maintenance done
PL Monthly Maintenance done
PL Welding job

PL primary filter changed


PL moisture checking
PL Steam line maintenance
PL primary filter cleaning
PL air audfit done in pot room and 63 hose pipe found open
PL secondary compressor maintenance

PL 8 nos primary filter cleaning done


PL back wash done

PL Air audfit done in pot room and 74 hose pipe found open
PL Quaterly Maintenance done
PL Manual backwash done in unit 1 & 2
PL Header fabrication work

PL Primary filter change done -8 nos


PL quarterly maintenance of cold well pump # 2
PL compressor header fabrication
PL Rack out of cwp #2 done in CPH
PL Air audit done in pot room and 66 hosses found open
PL primary filter cleaning done 8nos

PL Primary filter changed 8 nos


PL Air audit done in pot room : 67 nos. hose pipes were open.
PL Primary filter cleaning done 8 nos
PL back wash done

PL Primary filter change done 8 nos


PL Primary filter change done 8 nos
PL Primary filter cleaning done 8 nos
PL Manual backwash done in unit 1 & 2
PL Air audit done in pot room : 63 nos. hose pipes were open.
Start Start @ 10:30 AM
Stop Stop @ 10:35 AM
PL Quaterly Maintenance done
PL Oil Top up 1 Litre.(SAE 100)
PL Auto drain valve install
PL compressor header fabrication
PL Checkup & Maintenance
Start Start @ 12:50 PM
Stop Stop @ 12:55 PM

PL quarterly maintenance
PL Dryer no 6 maintenance
PL primary filter change done 8 nos
PL auto drain valve instalation
PL air audit done in pot room and 65 hosses pipes found open
PL back wash done in compressor pump house
PL primary filter cleaning done 8 nos

PL 8 nos primary filter cleaning done


PL back wash done

PL Manual backwash done in unit 1 & 2


PL Air audit done in pot room and 63 hosses pipes found open
PL Maintenance
PL Maintenance by Global engg.
Start Start @ 9:45 AM
Start Start @ 9:55 AM
Stop Stop @ 11:55 AM
PL Maintenance : FRL cleaning;Secondary filter change 8 nos.
Stop Stop @ 12:10 PM
Trip Trip @12:30 PM due to power failure from power plant
Restart Restart @ 12:35 PM

PL cooling tower oil top up done


PL dryer maintenance
PL back wash done at compressor pump house
PL primary filter cleaning done 8 nos
PL air audit done in pot room and 62 hosses found open
PL steam line maintenance done
PL headear fabrication

PL Primary filter changed 8 nos


PL Air audit done in pot room : 67 nos. hose pipes were open.
PL Primary filter cleaning done 8 nos
PL back wash done
PL Primary filter change done 8 nos
PL Primary filter change done 8 nos
PL Primary filter cleaning done 8 nos
PL Manual backwash done in unit 1 & 2
PL Maintenance by Global engg.
PL Air audit done in pot room and 58 hosses pipes found open
PL Header fabrication
Start Start @ 10:20 AM
Stop Stop @ 10:25 AM
Stop Stop @ 11:15 AM
Start Start @ 11:25 AM
Stop Stop @ 11:25AM
Start Start @ 11:35 AM
Stop Stop @ 11:35 AM
Start Start @ 11:45 AM
Start Start @ 12:40 PM
Stop Stop @ 12:45 PM
Stop Stop @ 12:50 PM
Start Start @ 1:00 PM
Stop Stop @ 1:00 PM
Start Start @ 1:10 PM
Stop Stop @ 1:10 PM
Start Start @ 1:20 PM
MM monthly maintenance

PL primary filter change done 8 nos


PL air audit done in pot room and 59 hosses found open
PL primary filter cleaning done 8 nos
PL dryer maintenance done in air compressor house
PL headear fabrication under progress

PL primary filter cleaning done 8 nos


PL air audit done in pot room and 64 hosses found open
PL Compressor cleaning done
PL back wash done

PL Manual backwash done in unit 1 & 2


PL Air audit done in pot room and 67 hosses pipes found open
Start Start @ 9:50 AM
Stop Stop @ 9:55 AM
Start Start @ 9:30 AM
Stop Stop @ 10:14 AM
PL Maintenance: Motor alignment
PL Dryer #01 repaired

PL Maintenance: Motor alignment done


PL Primary filter change done 8 nos
PL Primary filter cleaning done 8 nos
PL Air audit done in pot room and 64 hosses pipes found open

PL primary filter cleaning done 8 nos


PL primary filter changed.
PL air audit done in pot room and 74 hosses found open
PL Compressor cleaning done
PL back wash done

PL primary filter changed.


PL air audit done in pot room and 59 hosses found open
PL FILTER WALL FABRICATION UNDER PROGRESS
PL Monthly maintenance of hot well pump

PL Maintenance: Motor alignment done


MM monthly maintenance
PL primary filter change done 8 nos
PL Primary filter cleaning done 8 nos
PL primary filter cleaning done 8 nos
PL air audit done in pot room and 61 hosses found open
PL back wash done

PL primary filter change done eight nos


PL motor coupling alaignment under progress
PL steam line flushing
PL air audit done in pot room and 58 hosses found open
PL filter wall fabrication
PL filter cleaning done

PL Maintenance: Motor alignment cheking


PL Chember 10 line shutdown taken & valve removed & blind fixed

PL primary filter cleaning done 8 nos


PL primary filter changed.
PL Air audit done in pot room and 70 hosses found open
PL back wash done

PL filter wall fabrication under progress


PL Ac maintenance done
PL filter feed pump quarterly maintenance
PL air audit done in pot room and 57 hosses found open
PL primary filter change done 8 nos
PL strainer fabrication
PL gap voltage setting / instrument air line maintenance
PL primary filter cleaning done 8 nos

PL Annual maintenance done


PL primary filter change done 8 nos
PL primary filter change done 8 nos
PL Header fabrication work in progress
PL Air audit done in pot room and 70 hosses found open
PL back wash done
PL primary filter cleaning done 8 nos

PL primary filter change 8 nos


PL headear fabrication and auto drain valve fixing
PL flow meter replacement in gap
PL flo2w meter replacement in ftp
PL air audit done in pot room and 56 hosses found open
PL primary filter cleaning done 8 nos

PL headear fabrication and auto drain valve fixing work under progress
PL water drained out form the chamber and covered , flowmeter working ok.
Air Audit done in potroom 62 hose pipes found open, line 01 - 38 nos, line
PL 02 - 24 nos, services - nil

PL primary filter cleaning done 8 nos


PL primary filter changed.
PL Air audit done in pot room and 65 hosses found open
PL back wash done

PL motor coupling alaignment checking


PL drain cleaning
PL air audit done in pot room and 66 hosses found open
PL welding and cutting job under progress
PL steam line flushing
PL primary filter change done 8 nos
PL primary filter cleaning done 8 nos

PL primary filter change done 8 nos


PL primary filter change done 8 nos
PL Flow meter chamber cover fabrication done & shifted
PL Monthly maintenance done
PL Monthly maintenance done

PL Air audit done in pot room and 74 hosses found open


PL back wash done
PL primary filter cleaning done 8 nos

PL Primary filter chang done-8 nos.


PL Water drain cleaning work under progress.
PL Header fabrication work done.
PL primary filter cleaning done-8 nos.
PL Flow meter installation work completed at section-8 of potroom.
PL Flow meter installation under progress
PL Bag filter house fabrication under progress.
PL Airaudit in potroom done 49 hoses found open.

Start started at 3:38 pm


stop Stopped @ 6 pm
Start & stop Started @ 4:15 pm; Stopped @ 6:45 pm
Start & stop Stopped @ 5 pm; Started @ 6: 30 pm

PL Primary filter chang done-8 nos.


PL primary filter cleaning done 8 nos
PL Oil topup - 2 litres
PL back wash done

PL Primary filter chang done-8 nos.


PL primary filter cleaning done-8 nos.
Airaudit in potroom done 69 hoses found open., line 01-45 nos, line 02- 21
PL nos, services- 03 nos
PL Dewaytering done in compressor house
PL Secondary filter checked, paper found damaged in 5 nos of filter , need to be
replaced

PL primary filter change done 8 nos


PL primary filter cleaning done 8 nos
Secondary filter checked, paper found damaged in 5 nos of filter , replaced
PL by spare goof secondary filter
PL back wash done

PL Air audit done in pot room and 71 hosses found open


PL back wash done

PL primary filter change done 8 nos


PL primary filter cleaning done 8 nos
PL New Flow meter installation in GAP WORK IN PROGRESS
PL All stage Vibration probe cleaning done after cleaning gap voltage set:
stage 1 - 6.20 , stage 2 - 6.20 , stage 3 - 6.20
PL Frl cleaning & FRL line flushing Done
PL Oil cooler cleaning Work in progress
PL Drinking line flushing in progress

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL primary filter cleaning done 8 nos
PL New Flow meter installation done in GAP
PL Oil cooler cleaning done
PL Drinking line flushing done
PL Dewaytering done in compressor house

PL primary filter cleaning done 8 nos


PL Dewaytering done in compressor house
PL Comp#3 and dryer #3 cleaning done.
PL Trench plate removed from comp #6

PL primary filter changed done 8 nos


PL primary filter cleaning done 8 nos
PL Dewaytering done in compressor house
PL Header fabrication going on
PL Monthly maintenance going on
PL Air Audit in potroom done 60 hoses found open.

PL primary filter changed done 8 nos


PL primary filter cleaning done 8 nos
PL Header fabrication
PL Valves fixing
PL Primer Coating for water pipeline in the trench.
PL Flowmeter replaced - 3"

PL Air Audit in potroom done 72 hoses found open.


PL Dewatering done in compressor house at near comp #1

PL primary filter changed done 8 nos


PL primary filter cleaning done 8 nos
PL Header fabrication

Restore CWP#02&04;HWP#01&02 restore @ 3:10 PM


Restore Comp#01,02,04,05&06 restore @ 3:35 PM
PL primary filter changed done 8 nos
PL primary filter changed done 8 nos
PL primary filter cleaning done 8 nos

PL Air Audit in potroom done 31 hoses found open.


PL primary filter cleaning done 8 nos

PL primary filter changed done 8 nos


PL primary filter cleaning done 8 nos
PL Half yearly maintenance done & oil changed
PL Air audit in progress
Start Start @ 12:45 PM
Stop Stop @ 12:55 PM
PL primary filter changed done 8 nos
PL primary filter cleaning done 8 nos
PL Air Audit in potroom done 60 hoses found open.
BD Oil cooler tube leakage arresting - In progress

PL oil cooler maintenance (end cover fitting with new gasket).


PL air audit done in pot room and 59 hosses found open

PL primary filter changed done 8 nos


PL primary filter cleaning done 8 nos
PL primary filter changed done 8 nos
PL Half yearly maintenance done & oil changed
PL Damage Dewatering line maintenance
PL Oil cooler maintenance in progress
PL air audit done in pot room and 60 hosses found open

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL primary filter cleaning done 16 nos
PL Oil cooler maintenance(M seal & MS rod of taper sze inserted)
PL Railing fabrication

PL oil cooler maintenance - leakage arrested


PL primary filter cleaning done 16 nos
PL Air audit done in pot room and 56 hosses found open

BD Disassembly of Unit, Rotor assembly. Found Unloader damaged.


BD Oil cooler Maintenance In Progress
PL Welding of support plate near Aftercooler Outlet air Pipe
PL Cleaning

PL primary filter changed done 8 nos


PL primary filter cleaning done 8 nos
PL Air audit done in pot room and 45 hosses found open
BD oil cooler leakage arrested, oil cooler box up done,
BD Secondary compressor from Switchyard connected to receiver tank
PL Dewatering done in ACH from 5.30 Pm to 10..00pm

PL Air audit done in pot room and 63 hosses found open


PL Secondary compressor run to maintain Receiver tank pressure-7.5 bar

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL primary filter cleaning done 16 nos
PL Air audit done in pot room and 41 hose pipes found open

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL primary filter cleaning done 8 nos
PL Air audit done in pot room and 55 hose pipes found open

PL Dewatering done in compressor house at near comp #1


PL primary filter cleaning done 8 nos
PL back wash done

HM Cooling Tower # 03 half yearly maintenance done, oil changed 14 lts


PL Drinking waterline flushing in progress for plant II
PL Comp # 01 Header fabrication work in progress
Air audit done in pot room and 63 hose pipes found open , line 01-39, Line
PL 02- 18, services - 06
PL primary filter cleaning done 08 nos

PL Comp # 01 Header fabrication work completed partly.


PL Stainer maintenance of all dryers done.
PL Water sample condensate collection from all compressors.
PL Primary filter changed done-8 nos.
PL Primary filter cleaning done-8 nos.
Pl Dewatering pump run for dewatering of water from drain near Comp# 2.
PL Drinking waterline flushing in done for plant II
PL secondary compressor was started to maintain 7.5 pressure.

PL Dewatering done in compressor house at near comp #1


PL back wash done
PL Air audit done in pot room and 64 hose pipes found open

PL primary filter changed done 8 nos


PL primary filter changed done 8 nos
PL primary filter cleaning done 8 nos
PL Air audit done in pot room and 67 hose pipes found open
PL Comp # 01 Header fabrication work

PL primary filter change done


PL primary filter change done 8 nos
PL inter cooler sample sent for all except comp #1
PL Primary filter cleaning done-8 nos.
PL Dewatering pump run to drain water near comp # 2
PL Comp # 1 Header fabrication work done (Partly left)
QM Main pump # 2 & 3 ,quaterly maintenance done at FFPH.
PL Backwash of AVGF # 1 & 2.

PL back wash done


PL primary filter cleaning done 8 nos
Trip Tripped @ 1:25 am due to Y-phase burnt
Start Start @ 1:35 am

PL Comp # 01 Header fabrication work completed


Air audit done in pot room and 63 hose pipes found open , line 01-39, Line
PL 02- 18, services - 06
PL primary filter cleaning done 08 nos
PL Backwash of AVGF # 1 & 2.
PL Put in close loop @ 8:30 AM
PL Stop @ 8:30 AM
PL Maintenance: Oil drain & top up

PL Comp # 6 ,primary filter changed-8 nos.


PL Vibration probe GAP voltage set up done and value set at 6.2 volt
PL Oil cooler oil leakage checked and found ok.
PL Oil top up in comp #1 oil reservoir
PL Airaudit done in pot room and 63 nos. hoses found open.
PL Primary filter cleaning done-8 nos.
PL Dewatering pump run to remove drain water from drain near comp #2
PL Railing installation work done at CPH

PL Dewatering done in compressor house at near comp #1


PL back wash done

PL FRL changed
PL Line tapping
PL Audit: Hoses nos. Line 1 -31, Line 2 - 22
PL Pipe fittings Maintenance - In progress

PL Primary filter changed-8 nos.


PL Primary filter cleaning done-8 nos.
PL Railing work at CPH on progress.
PL Water flow meter installation at Project side done.
PL Filterwall fabrication work done.
PL Primary filter changed-8 nos.
PL Airaudit done in pot room and 59 nos. hoses found open.

PL back wash done


PL primary filter cleaning done 8 nos
PL Airaudit done in pot room and 60 nos. hoses found open.
PL Water meter reading taken in plant-II
PL Railing work under progress at CPH
PL HWP # 2 started at 11:50 AM.
PL Oil cooler maintenance(for checking of leakage) done for Comp #1 and
found OK.
PL Instrument air line checking at LAB.
PL primary filter cleaning 8 nos

PL Primary filter changed-8 nos.


PL Primary filter cleaning done-8 nos.
PL Railing work under progress at CPH
01 no auto drain valve replacement done from comp 01 to comp 05 asw H1
PL alarm was coming at dryer 05
Airaudit done in pot room and 57 nos. hoses found open. Line 01 - 39nos,
PL line 02 - 19 nos , services -m nil
PL Condensate leakage arresting in progress

PL back wash done


PL Compressor cleaning

UP Stg 2 vibn. Fluctuating in standby mode. Switchyard team is working on it.


PL Primary filter changed
PL Primary filter changed

PL Primary filter changed


PL Primary filter changed
PL One new Auto drain valve installed in dryer #1
PL Oil barrel shifted and place at Compressor house.
PL Airaudit done in pot room and 58 nos. hoses found open.
PL primary filter cleaning done 8 nos

PL back wash done


PL primary filter cleaning done 8 nos
Air audit done in pot room and 72 hose pipes found open .
PL
PL primary filter cleaning done 08 nos
PL Backwash of AVGF # 1 & 2.
PL Stop @ 6:50 AM

PL Primary filter changed-8 nos.


PL Primary filter cleaning done-8 nos.
PL 1" Flowmeter installation done at Bake Oven

PL Dewatering pump run to remove drain water from drain near comp #2
PL Air audit done in pot room and 65 hose pipes found open .

PL Primary filter changed


PL Primary filter changed
PL Primary filter cleaning done-8 nos.
PL Drinking waterline flushing under progress
Airaudit done in pot room and 63 nos. hoses found open. Line 01 - 42nos,
PL line 02 - 21 nos , services -m nil
PL Airline fabrication work under progress for compressor intercooler ADV
UP Stg 2 vibn. Fluctuating in standby mode. Switchyard team is working on it.

PL Primary filter changed-8 nos.


PL Primary filter changed-8 nos.
BD Dewatering done out of chamber
PL Header pipeline fabrication

PL air audit done in pot room and 66 hosses found open


PL primary iflter cleaning done 8 nos

Stg 2 & 3 vibn. Fluctuating in standby mode. Switchyard team is working on


UP it..
Dismantling each transmitters for cleaning then reinstallation done for each
UP transmitters with tightness checking under observation now
Airaudit done in pot room and 65 nos. hoses found open. Line 01 - 39 nos,
PL line 02 - 26 nos , services - nil
Airline fabrication work under progress for compressor intercooler ADV
PL connection
PL Primary filter cleaning done-8 nos.
Dewatering pump dismnatling work under progress as water has entered
inside the motor need to dried by blower and rechecking to be done by
BD switchyard

PL Primary filter changed-8 nos.


PL primary flter cleaning done 8 nos
Airline fabrication work done for compressor intercooler ADV connection
PL
Dewatering pump dismnatling done, as water has entered inside the motor

BD need to dried by blower and rechecking to be done by switchyard


Airaudit done in pot room and 65 nos. hoses found open. Line 01 - 39 nos,
PL line 02 - 26 nos , services - nil
PL Start @ 3:15 PM (Closed loop)
PL Stop @ 3:16 PM
PL Start @ 5:15 PM (Closed loop)
PL Stop @ 5:16 PM
PL Vibration Probe & transmitter change of Stage#02

PL air audit done in pot room and 66 hosses found open


PL Dewatering from drain inside compressor house under progress

PL Primary filter changed


PL Primary filter changed
PL Primary filter cleaning done-8 nos.
Airaudit done in pot room and 65 nos. hoses found open. Line 01 - 34nos,
PL line 02 - 18 nos , services - nil
Airline fabrication work under progress for compressor intercooler ADV
PL connection
BD Dewatering pump repaired now working ok
PL Vibration problem resolved for all stages
PL MOP suction line oil leakage arrested
PL Damaged trench plates removal in progress
PM Electrical side maintenance done

PL Primary filter changed-8 nos.


PL Primary filter changed-8 nos.
Airline fabrication work done for compressor intercooler ADV connection
PL
Start started @ 3:30 pm
Stop Stopped @ 6:30 pm
Start started @ 3:10 pm
Stop Stopped @ 9:30 pm

Gap voltage setting done (All stage to 6.20 VDC) & after shaft rotation its
PL vibration is: 0.28,0.23 &0.18 mils of st#01,st#02 & st#03 respectively.
Airaudit done in pot room and 61 nos. hoses found open.
PL
PL Primary filter cleaning done-8 nos.
Start started @ 1:05 AM

PL Airaudit done in pot room and 58 hoses found open.


PL Comp # 1 started at 11:45 am
PL Comp # 1 stopped at 12:50 pm due to stage #1 high vibration.
PL Spare part assembly for CWP # 1 work under progress.
Potroom , Waterline leakage arrested near section # 7 at Zero level work
PL under progress

PL primary filter change done


PL Comp # 1 ,Shaft motor allignment work done.
PL Spare parts assembly work for CWP # 1 done at RPH
PL welding and cutting job
PL Airaudit done in pot room and 62 hoses found open.
PL Water supply problem checked and found ok.
PL primary filter 8 nos cleaning done.
PL Airaudit done in pot room and 53 hoses found open.
PL BCM checking done & found ok.

PL Airaudit done in pot room and 56 hoses found open.


PL Primary filter changed
PL Primary filter changed
PL Primary filter cleaning done-8 nos.
PL Plate fabrication of intercooler trench
PL Stage 1 dismentled & checking & setting of Gap voltage of vibration probe

PL Comp #5 , primary filter changed and new 8 nos. primary filter fitted.
PL Comp#4 , Primary filter changed.
PL Dewatering pump started for draining. And its damaged suction pipe
removed near comp # 2
Impeller and diffuser of Stage #1 of comp #1 dismanteled ,checked, cleaned
PL and assembly done.
PL Secondary filter of both comp# 4 & 5 manually checked .
PL Welding and fabrication work at RPH for railing done.
PL Comp # 1 started at 6:15 pm
PL Dewatering pump started for draining near comp # 5
PL Comp #1 ,intercooler header dismanteled completely.
PL Primary filter cleaning done-8 nos.

PL Airaudit done in pot room and 69 hoses found open.


PL primary filter 8 nos cleaning done.
Stop Comp # 5 stop at 10:43 PM

BD Feeder problem & feeder replaced by spare feeder


PL Oil , duplex filter & sump filter change of compressor in progress
PL Oil cooler cleaning in progress
PL Motor end cover cleaning done & mop alignment in progress
PL primary filter 8 nos cleaning done.
Stop CWP# 01 stop @ 12:20 pm
PL Oil , duplex filter & sump filter change of compressor # 5 done.
PL Oil cooler cleaning done and oil replaced by new oil 450 liters.
PL Motor end cover cleaning done & mop alignment done.
PL Primary filter changed -8 nos.
PL Welding and fabrication work at FFPH done.
PL Water supply line checking in compressor house.
PL Trench plate shifting,welding and header fabrication.
PL Primary Filter cleaning done.

PL Airaudit done in pot room and 63 hoses found open.

PL Motor alignment set @ +0.24 & Mop alignment done


PL Header fabrication for compressor in progress
PL Primary Filter cleaning done.
PL Primary filter changed
PL Primary filter changed

PL Primary filter changed


PL Primary filter changed
PL Airaudit done in potroom and total 62 nos. of hoses found open.
PL Primary filter cleaned - 8 nos.

PL Airaudit done in pot room and 65 hoses found open.


PL Primary Filter cleaning done.

PL Intercooler 2 dismentling done & cleaning


PL Vibration probe cleaning & all stage Gap voltage set @ 6.20 vdc
PL Drinking line flushing in progress
PL Airaudit done in pot room and hoses found open.

PL Intercooler 2 dismentling done & cleaning


PL Airaudit done in pot room and 50 hoses found open.
PL Primary filter changed.
PL Drinking line flushing in progress
PL Primary Filter cleaning done.
Below section-8,isolation valve has been closed for maintenance work near
PL rodding
PL Impeller of dewatering pump near comp# 5 checked and cleaned as jammed
by dust .

PL Airaudit done in pot room and 56 hoses found open.


PL Pipe leakages checked found no leakage
PL Dewatering done in compressor house

PL Primary filter changed


PL Primary filter changed
PL Primary Filter cleaning done.
PL Intercooler #01 dismentling done & cleaning
PL Airaudit done in pot room 56 hosses found open

PL Primary filter changed


PL Primary filter changed
PL Primary Filter cleaning done - 8 nos.
PL Two dewatering pump run for draining near comp # 2 & 5
PL 1 inch plug fixed and leakage arrested
PL water meter reading
PL inter cooler-1 cleaning done and new Y-gasket fitted.
PL Airaudit done in pot room and total 60 nos. hoses found open

PL Airaudit done in pot room and 52 hoses found open.


PL 03 nos gasket prepared for aftercooler
PL Dewatering done in compressor house
PL Primary Filter cleaning done - 8 nos.

PL Placing of trench cover


PL Airaudit done in pot room and 53 hoses found open.
PL Monthly maintenance
PL Primary Filter cleaning done - 8 nos.
PL Water meter installation bake oven

PL Primary filter changed


PL Primary Filter cleaning done - 8 nos.
PL Water meter installation at GAP done
PM Dryer back flushing done
PL Airaudit done in pot room and 44 hoses found open.
PL pipeline leakage arrested at pot overhaul shop

PL Airaudit done in pot room and 52 hoses found open.


PL Dewatering done in compressor house
PL back wash done
PL 03 nos gasket finishing work for aftercooler

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Airaudit done in pot room and 57 hoses found open.
PL dryer#5 Auto drain valve maintenance and cleaning of dryer under progress.
PL comp#5 inlet valve I to P maintenance in progress.
PL Flow meter installation at Rodding area done.

PL Primary filter changed


PL Primary filter changed
PL Primary Filter cleaning done - 8 nos.
PL dryer#5 Autop drain valve maintenance
PL Airaudit done in pot room and 54 hoses found open.

PL Airaudit done in pot room and 52 hoses found open.


PL Dewatering done in compressor house
PL back wash done

PL Filterfeed pump-1 quaterly maintenance at RPH done.


PL Filterfeed pump-2 quaterly maintenance at RPH
BD Dryer-1 maintenance by servicing people under breakdown in progress.
PL Primary filter cleaned-8 nos.
PL Railing and fabrication work at RPH under progress.
PL Cleaning of dryer# 5
PL oil top up 25 liters in comp#1 oil tank.
PL air audit done in pot room and 51 nos. hosses found open

PL Primary filter changed


PL Primary Filter cleaning done - 8 nos.
PL Monthly Maintenance
PL Nitrogen charged & tested in refrigerant line; Found pr. Dropping to 140 psi
PL Railing fixing in the pathway
PL Pr. Guage replaced

PL Airaudit done in pot room and 56 hoses found open.


PL Dewatering done in compressor house
PL back wash done
PL Secondary filter checked found bad condition of filter paper
PL 01 nos gasket prepared for intercooler 2

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
Spare secondary filter 3 nos. change in comp#05
PL
BD Dryer-1 maintenance by servicing people under breakdown in progress.
PL Half yearly maintenace
PL Monthly maintenace
PL Primary filter changed.
PL Primary filter changed.
PL Primary filter cleaned-8 nos.
BD Dryer-1 maintenance by servicing people under breakdown in progress and
nitrogen gas charged and a new water regulating valve installed and heat
exchanger-2 found leakge. And it is bypassed for checking other exchangers.
PL Dewatering pump near comp#2 run for draining.
PL Airaudit done in potroom and total 51 hoses found open.

PL Dewatering done in compressor house


PL back wash done
PL Primary filter cleaned-8 nos.

PL Primary filter cleaned-8 nos.


PL AVGF # 01 & 02 Backwashed
BD Maintenance by global engg.
PL Airaudit done in potroom and total 51 hoses found open.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Dewatering pump near comp# 2 run for draining.
PL Airaudit done in potroom and total 50 nos. of hoses found open.

PL Dewatering done in compressor house


PL back wash done

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 51 nos. hoses found open.
Drinking water line flushing in plant - II (only done in GAP,BAKE OVEN,
PL POT ROOM) done excep t garrage and rodding.
PL PM of CT-2 at RPH Work In Progress.
compressor maintenance work under progress( oil leakage from MOP pump
PL inlet pipe).

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Flushing
MOP oil line leakage arrested; Valve fixed in suction side
BD Motor replaced; Oil replaced
START Started as less pressure found; Kept @ 64 A
START Started for changeover (121 A)
STOP Stopped for changeover

BD Motor replaced; electrical connection done of new motor & trail taken ;
PL Dewatering done in compressor house
PL back wash done
PL Primary filter cleaned-8 nos.

PL Primary filter cleaned-8 nos.


PL AVGF # 01 & 02 Backwashed
PL Airaudit in progress.
PL Airaudit done in potroom and total 43 hoses found open.
BD Leakage arresting in progress

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Flushing of drinking water line done.
PL making of flange for CT# 2 of RPH at Workshop under progress
PL carbon air audit
PL main dewatering pump near comp #2 sparking problem solved
Drive end bearing of motor of CT #2 changed and spare part of motor
PL maintenance work is under progress.

PL Dewatering done in compressor house


PL back wash done

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL AVGF # 01 & 02 Backwashed
PL Airaudit done in potroom and total 47 hoses found open.
PL Connector fabrication of Auto drain valve
Start Start @ 10:00 AM

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Connector fabrication of Auto drain valve
PL Airaudit done in potroom and total 47 hoses found open.
Drive end bearing changed of spare motor of cooling tower
PL

PL Dewatering done in compressor house


PL back wash done
PL Primary filter cleaned-8 nos.

PL Primary filter cleaned-8 nos.


PL AVGF # 01 & 02 Backwashed
PL Air audit done in potroom (All leakages cheking)
PL Half yearly maintenance & Oil changed
PL Monthly maintenance done

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Monthly maintenance done CWP #1 at CPH
PL Air audit done in potroom done and total 42 nos. of hoses found open.
cooling tower #1 stopped for inspection by service people from wet point
PL aqua equipments LTD
cooling tower #1 stopped for inspection by service people from wet point
PL aqua equipments LTD
PL Diesel compressor silencer fabrication done.

PL Dewatering done in compressor house


PL back wash done
PL Air audit done in potroom done and total 48 nos. of hoses found open.

PL Primary filter changed.


PL Primary filter changed.
PL Filter cleaning
PL Aftercooler Maintenance
PL Monthly maintenance done

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Aftercooler Maintenance
PL Monthly maintenance done

PL Primary filter cleaned-8 nos.


PL Air audit done in potroom done and total 53 nos. of hoses found open.

PL Primary filter cleaned-8 nos.


Air audit done in potroom done and total 53 nos. of hoses found open. Line
PL 01 -31nos, line 02-21 nos, services nil
Aftercooler Maintenance - cleaning with steam and chemical, new y gasket
PL fixing- in progress
BD Propeller Shaft fixing
BD Comp # 1 after dryer temperature transmitter repaired

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
Aftercooler Maintenance - cleaning with steam and chemical, new y gasket
PL fixing done.
PL Monthly maintenance done

PL Air audit done in potroom done and total 54 nos. of hoses found open.
PL Dewatering done in compressor house by main dewatering pump near comp
#2

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL AVGF # 01 & 02 Backwashed
PL Airaudit done in potroom and total 47 hoses found open.
Leakage arrested by placing M-Seal
BD

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 47 hoses found open.

PL Primary filter cleaned-8 nos.


PL Airaudit done in potroom and total 55 hoses found open.
PL dewatering pump started

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL AVGF # 01 & 02 Backwashed
PL Airaudit done in potroom and total 38 hoses found open.
PL Unit 01Backwashed
PL Flushing
PL Water meter reading
PL Monthly maintenance

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 52 hoses found open.

PL Primary filter cleaned-8 nos.


PL Airaudit done in potroom and total 55 nos. hoses found open.
PL Cleaning of Comp # 4 & 5 and its dryer done.
PL Dewatering pump started for draining near comp # 2 .

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL AVGF # 01 & 02 Backwashed
PL Unit 01Backwashed
PL Monthly maintenance
PL Monthly maintenance

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 49 hoses found open.
PL 08 nos new secondary filter installesd
PL Monthly maintenance done
PL Monthly maintenance done
PL Railing fabrication work

PL Primary filter cleaned-8 nos.


PL Airaudit done in potroom and total 46 nos. hoses found open.
PL Dewatering pump started for draining near comp # 2 .

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 44 hoses found open.
MM Monthly maintenance done ( spider changed 02 nos SW276)
PL New LCD Display installed
PL Fire Hydrant checking in progress
MM Monthly maintenance done
PL 08 nos new secondary filter installesd
PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Fire Hydrant checking done
Stop Stop @ 4:57 pm

PL Unit Backwashed
PL Airaudit done in potroom and total 46 nos. hoses found open.
PL Dewatering pump started

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL FRL filter cleaning & instrument air line flushing
MM Monthly maintenance done
MM Monthly maintenance done
MM Monthly maintenance done
PL Dryer cleaning & auto drain valve checkng in progress
PL Airaudit done in potroom and total 37 nos. hoses found open.

PL Primary filter changed.


PL Primary filter changed.
PL Dryer cleaning & auto drain valve checkng done.
PL monthly maintenance
PL monthly maintenance
PL Gasket cutting for intercooler # 2 done.
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 34 nos. hoses found open.
PL dewatering pump started near compressor #2

PL Unit Backwashed
PL Airaudit done in potroom and total 43 nos. hoses found open.
PL Dewatering pump started for draining
PL Primary filter cleaned-8 nos.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 36 nos. hoses found open.
PL Intercooler 2 dismentle done & intercooler 2 cleaning work in progress
PL Main header FRL change over & FRL filter cleaning done
PL CT spare shaft fabrication in progress

PL Primary filter cleaned-7 nos.


PL Airaudit done in potroom and total 41 nos. hoses found open.
PL Intercooler 2 dismentle done & intercooler 2 cleaning done and new Y-
gasket fitted.
PL CT spare for shaft(fplate cutting and marking for flange) fabrication work
done.
PL Shifting of Zero loss drain valve from comp# 5 to comp # 4 second stage.
PL Dewatering pump started for draining near Comp # 2

PL Unit Backwashed
PL Airaudit done in potroom and total 46 nos. hoses found open.

PL Primary filter changed.


PL Airaudit done in potroom and total 42 nos. hoses found open.
PL Primary filter cleaned-8 nos.
UPM Gasket replaced of 2nd stage
PL Air audit in progress
PL CT spare shaft fabrication in progress
PL Airaudit done in potroom and total 42 nos. hoses found open.

PL Primary filter changed.


PL Primary filter changed.
PL Hot well pump motor # 1 assembling done.
PL Airaudit done in potroom and total 54 nos. hoses found open.
PL Air audit in carbon area ( except rodding, garriage, stone crusher ) done.
PL Primary filter cleaning done-8 nos.
PL Cast house HFO line up done.
PL meggering done by switchyard .
PL VFD panel base fabrication done.
PL Dewatering pump started near comp # 2
PL Flange plate send to workshop.

PL Unit Backwashed
PL Airaudit done in potroom and total 51 nos. hoses found open.
PL Primary filter cleaned-8 nos.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 34 nos. hoses found open.

PL HFO line off done on request by Mr. Satish Kasyap,Cast


house(9993018970).
PL Fire Hydrant line no.-4 valve closed near section-4.
PL Airaudit done in potroom and total 45 nos. hoses found open.
PL HFO line off done on request by Mr. Harsh (2201),shift incharge(2102)
PL Dewatering pump started near comp # 2

PL Airaudit done in potroom and total 35 nos. hoses found open.

PL Airaudit done in potroom and total 36 nos. hoses found open.


BD Hoist maintenance done
PL Motor alignment & motor end cover cleaning in progress
PL Primary filter changed.
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom and total 45 nos. hoses found open.


BD Wirerope adjusted; Oil replaced in gearbox(0.5 l)
PL Motor alignment done; OKS grease(1 kg approx) applied in coupling
PL Primary filter changed.
PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Filters, Oil, Grease issued from Stores

PL Primary filter cleaned-8 nos.


PM oil top up done 20 lts
PL Airaudit done in potroom and total 40 nos. hoses found open.

PL Airaudit done in potroom and total 39 nos. hoses found open.


BD Crane electrical maintenance done - fuse replaced
PL Probe setting for 1 stage
BD Instrumentation Maintenance in progress
PL Flushing & Water Meter Reading in Progress

Flushing & Water Meter Reading taken (except GAP,Bake oven,


PL rodding,Dummy point near work shop) .
PL Probe setting for 2nd & 3rd stage done and set @ 6.2 volt
PL Primary filter changed.
PL Dewatering pump started near comp # 2
PL Airaudit done in potroom and total 27 nos. hoses found open.
PL Railing fabrication work at CPH done.
PL VFD room air conditioner maintenance done.
PL Air audit in carbon area( Garage, Stone crusher area only) done.
PL Vibration of all running equipments ( Compressor ,Pump , Motor)taken .
PL Primary filter cleaning done.
PL Airaudit done in potroom for second time and total 24 nos. hoses found
open.

PL Airaudit done in potroom and total 401 nos. hoses found open.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 47 nos. hoses found open.
PL Vibration of all running equipments (Pump , Motor)taken .
PL Railing fabrication work at CPH .
Steam line flushing
PL
PL Flushing & Water Meter Reading taken .

PL Airaudit done in potroom and total 26 nos. hoses found open.


CBM report of running equipments at cooling tower & PPH taken.
PL
PL Railing fabrication work done at CPH
PL Primary filter changed.
PL Primary filter changed.
Valve maintenance of water line at FFPH(Jockey pump # 4 & 5,main pump #
PL 1 & Diesel pump # 2) done.
PL Primary filter cleaned.
PL Dewatering pump started for draining near comp#2
PL Airaudit done in potroom for second time and total 31 nos. hoses found
open.
PL ACH local store audit for Pipe fitting materials stock done.

PL Airaudit done in potroom and total 37 nos. hoses found open.


PL Dewatering done in compressor house
PL Primary filter cleaned.

Stop Pipeline was shutdown for tapping to GAP-2


Start Pipeline was shutdown for tapping to GAP-3
Stop Pipeline was shutdown for tapping to AUTOGENOUS MILL
Start Pipeline was shutdown for tapping to AUTOGENOUS MILL
PL Airaudit done in potroom and total 38 nos. hoses found open.
PL Railing fabrication work at CPH .
Steam line flushing
PL
PL Flushing & Inspection
PL Maintenance
BD Flow meter Instrumentation Maintenance

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 36 nos. hoses found open.
PL Railing fabrication work at CPH .Completed
PL Inspection done
BD Pressure Transmitter flushing done
PL Flange welded with cooling tower shaft

PL Gasket cutting for intercooler # 1 .


PL Airaudit done in potroom and total 37 nos. hoses found open.

PL 8 inch pipe line fabrication for intercooler line under progress.


PL primary filter changed.-8 nos.
PL Nozzle chacking in Cooling tower @ CPH done.CT # 1,6 nos.,CT # 2,8
nos.,Ct # 3,5 nos. nozzles found blocked by dust and rectified.
PL scrap shifting from compressor house.
PL Airaudit done in pot room and total 41 nos. of hoses found open.
PL Stainer cleaning for suction and discharge line at FFPH done.
PL Primary filter cleaned-8 nos.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 39 nos. hoses found open.
PL 8" pipeline fabricated
PL Loctite fixing agents applied over pipeline;
BD Isolation valve opened
PL Nozzles checked in Cell No 1
PL Gland leakage arrested
PL Arrangements made for Intercooler hydrotesting

PL Gasket cutting for intercooler # 1 .done


PL Airaudit done in potroom and total 38 nos. hoses found open.
PL Primary filter cleaned-8 nos.
PL back wash done
PL 105 lts hypo dosing in dosing pump tank & start dosing pump

PL Airaudit done in potroom and total 37 nos. hoses found open.


PL Diesel Engine # 01 maintenance under progress
PL Diesel Engine # 02 maintenance under progress
PL Process water line valve replacement under progress

PL Airaudit done in potroom and total 35 nos. hoses found open.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Diesel Engine # 01 maintenance under progress
PL Diesel Engine # 02 maintenance under progress
PL Dummy plate fabrication for Intercooler inlet & outlet. (4 pieces) pipe done.
PL Watermeter reading in plant-II taken.
PL Process waterline valve replacement work done.

PL Airaudit done in potroom and total 38 nos. hoses found open.


PL back wash done

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 46 nos. of hoses found opened.
PL Water line valve damaged and leakage arrested by fitting of a new Half inch
ball valve in canteen.
PL Dewatering done in compressor house
because of decrease in flow below 1300 CWP #1 started in closed loop.

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL back wash done
PL Airaudit done in potroom and total 37 nos. of hoses found opened.

PL Airaudit done in potroom and total 49 nos. hoses found open.


PL back wash done
PL Gasket cutting done
PL Primary filter cleaned-8 nos.

PL HFO line up done on request by Bake oven shift incharge.


PL A new 3/4 th ball valve fitted in garage.
PL Airaudit done in pot room & total 41 nos. of hoses found open.
PL Autodrain valve maintenance done.
PL CT # 2 & 3 ,nozzle checking work done.
PL Dummy plate fabrication for Intercooler inlet & outlet. (4 pieces) pipe done.
PL Drinking water line flushing under progress.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Auto drain valve changed 01 no. due to malfunctioning
Alumina handling shutdown taken from 3.00PM to 5.15PM for Pressure
SD Transmitter flushing and Annubar cleaning
PL 44 lts Diesel shifted to compressor house store
PL Dummy plate fabrication for Intercooler inlet & outlet. pipe done.
PL Air audit done in pot room & total 31 nos. of hoses found open.
PL Drinking water line flushing Done

PL back wash done


PL Airaudit done in potroom & total 41 nos. of hoses found open

PL critical parameters monitored

PL critical parameters monitored

PL critical parameters monitored


Start Comp # 05 start @ 1:30 am but tripped due to 3rd stage vibration

PL Comp # 3 started @ 7:40 am


PL Primary filter changed.-8 nos.
PL Primary filter changed.-8 nos.
PL Primary filter changed.-8 nos.
PL Primary filter cleaned-8 nos.
BD Comp # 5 , 3rd stage dismantelled for checking work under progress.
PL One new Auto drain valve installed(Right side).
PL Dummy plate fabrication for intercooler & Aftercooler done.
PL Airaudit done in potroom and total 46 nos. of hoses found open.
During starting ,blind hot end side bolt from intercooler-1 exhausted due to
PL loosen tight of bolt and it is soon fittrd at that time.

BD Comp # 5 , 3rd stage upto difuser dismantelled and Inter Cooler#2 bundle
removed.
PL Primary filter of Comp#6 changed-8 nos.
PL Dummy plate fabrication matching for intercooler & Aftercooler done
PL Gasket cutting done
PL 16 Primary filter cleaned
BD POP stopped

PL back wash done


PL Primary filter cleaned-8 nos.

PL Flushing
PL Airaudit done in pot room & total 31 nos. of hoses found open.
PL Dummy plate measurement done to be fabricated
PL Stage I dismantling
PL Gear reducer oil top up 2.5 lts - ct1

Not done as there was strike


PL
PL Water meter installed at MI garage.
BD Stage I & III dismantling done
Sec. filters found damaged(Both of CH side,each of PP side and Comp side)
PL Dummy plate measurement done and fabricated
PL Steam line flushing
PL back wash done
PL Airaudit done in potroom & total 41 nos. of hoses found open
BD Diffuser cleaning of stage 1 & stage 3

PL Primary filter changed.-8 nos.


PL Primary filter changed.-8 nos.
PL Primary filter changed.-8 nos.
PL Primary filter changed.-8 nos.
BD Diffuser cleaning of stage 3
PL Quaterly maintenance done

PL Airaudit done in potroom & total 37 nos. of hoses found open


PL Quaterly Maintenance
Primary filter changed
PL Dummy plate measurement done and fabricated
PL shutdown taken & Annubar maintenance done

PL Airaudit done in potroom & total 36 nos. of hoses found open


PL Dewatering pump started for draining near Comp # 2
PL Watermeter reading taken in potroom.
PL Primary filter cleaned-8 nos.

PL Primary filter changed.-8 nos.


PL Primary filter changed.-8 nos.
PL Primary filter cleaned-8 nos.
PL Maintenance in progress by service personnel
PL Quaterly maintenance done
BD Intercooler # 02 re boxup done
PL Airaudit done in potroom & total 32 nos. of hoses found open

PL Airaudit done in potroom & total 26 nos. of hoses found open


PL Primary filter cleaned-8 nos.
BD Damaged meter replaced.
BD Intercooler # 02 re boxup done

PL Airaudit done in potroom & total 41 nos. of hoses found open


PL Watermeter reading taken in potroom.
PL Primary filter cleaned-8 nos.

PL Primary filter changed.-8 nos.


PL Primary filter changed.-8 nos.
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom & total 35 nos. of hoses found open


PL Primary filter cleaned-8 nos.
PL Primary filter changed

PL Airaudit done in potroom & total 32 nos. of hoses found open


PL Primary filter cleaned-8 nos.
PL Watermeter reading taken in potroom.

PL Primary filter changed.-8 nos.


PL Primary filter changed.-8 nos.
PL Primary filter cleaned-8 nos.
PL Drinking line flushing in progress
PL Water flow meter maintenance
PL Hoist & Sump pump monthly maintenance in progress

PL Airaudit done in potroom & total 39 nos. of hoses found open


PL Primary filter cleaned-8 nos.
PL Secondary filters changed - 8 no. (TentoSix)
PL Drinking line flushing done
PL Water flow meter maintenance
Stop Stopped & Sec. Filters changed (New 8 No.)
PL Maintenance

PL Airaudit done in potroom & total 47 nos. of hoses found open


PL Watermeter reading taken in potroom.

PL Primary filter changed.-8 nos.


PL Primary filter changed.-8 nos.
PL Primary filter cleaned-8 nos.
PL Oil change in progress & sump filter & duplex filter replaced
PL FRL filter cleaning & instrument air line flushing done
PL Filter feed pump quarterly maintenance done

PL Oil change done 450 lts, new sump filter & duplex filter fitted
PL Dryer back flushing done
PL Filter feed pump quarterly maintenance done
PL Airaudit done in potroom & total 38 nos. of hoses found open
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom & total 40 nos. of hoses found open.


PL Secondary filter checked.
PL Cleaning of comp # 6 done.
PL Watermeter reading taken near pot controller and sectrion-1

PL Airaudit done in potroom & total 34 nos. of hoses found open.


PL Primary filter changed.-8 nos. each
PL Primary filter cleaned-8 nos.
PL PM by Switchyard going on.
PL Flushing going on
PL Dewatering pump running at FFPH
PL Dewatering pump running at ACH.
PL Fabrication not completed

PL CBM completed
PL Fabrication work
PL Airaudit done in potroom & total 37 nos. of hoses found open.
PL Maintenance: Battery cable found damage.
PL Completed
PL Gap Voltage checking done: ST#01: 6.17; ST#02: 6.23; ST#03: 6.19

PL Airaudit done in potroom & total 39 nos. of hoses found open.


PL Watermeter reading taken near pot controller and sectrion-1

PL Primary filter changed.-8 nos.


PL Primary filter changed.-8 nos.
PL Primary filter cleaned-8 nos.
PL Quaterly maintenance done
PL Quaterly maintenance done
PL Airaudit done in potroom

PL Primary filter cleaned-8 nos.


PL HWP#1 Stopped and HWP#4 Started
PL Sec filter checked, filter chocked of Comp#4 and of Comp#3 is OK
PL Engine wirings checked; Found starter problem; To be sent for servicing

PL Airaudit done in potroom 29 hose pipes found open.

PL Primary filter changed.-8 nos. each


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom & total 28 nos. of hoses found open.

PL Airaudit done in potroom 32 hose pipes found open.


PL Primary filter cleaned-16 nos.

PL Airaudit done in potroom 28 hose pipes found open.


PL Stopped at 11.40 pm as NDE bearing temp erature found high for pump side
PL Started ar 11.45 PM
PL Primary filter changed.-8 nos. each
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom & total 28 nos. of hoses found open.
BD Stage 01 & 03 assembly under progress

PL Primary filter cleaned-8 nos.


Stage 01 & 03 assembly under progress, Rotor assembly installation done for
BD stage 01 & 03
PL Airaudit done in potroom 34 hose pipes found open.
PL ADV removed

PL Airaudit done in potroom 41 hose pipes found open.


PL Watermeter reading taken near pot controller and sectrion-1

PL Airaudit done in potroom 39 hose pipes found open.


Stage 01 & 03 assembly under progress, Rotor assembly installation done for
BD stage 01 & 03
PL Primary filter changed.-8 nos. each
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom 45 nos. hose pipes found open.


Stage 01 & 03 assembly under progress, Rotor assembly installation done for
BD stage 01 & 03.

PL Airaudit done in potroom 41 hose pipes found open.


PL back wash done

PL Primary filter changed.-8 nos.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom & total 36 nos. of hoses found open.
Motor coupling alignment, Mop alignment, Gap voltage setting at 6.2 vdc,
BD inlet valve connection
PL Drinking waterline flushing under progress
PL Monthly maintenance done

PL Comp # 5 Started @ 2:35 pm


PL Comp # 5 stopped @ 3:25 pm due to High vibration of second stage.
PL Motor shaft allignment done in comp # 5 under progress.
GAP voltage checking done and stage # 3 GAP voltage set @ 6.20 volt.
PL
PL Airaudit done in potroom & total 35 nos. of hoses found open.
All compressor safety valves,intercooler,oil cooler,vent holes of
intercooler,pressure gauges and thinkness of intercooler and Oil cooler
PL checking done.
PL Checking of Hoist By Safety department.
PL Shifting of Secondary Filter to ACH done.
PL Comp # 6 started @
PL Comp # 4 stopped @ 6:20 pm for planned maintenance.
PL Primary filter changed.-8 nos.
PL Moisture header removed .
PL Primary filter cleaned.-8 nos.
PL Cooling Tower # 1 Stopped @ 9:10 pm

PL Airaudit done in potroom 41 hose pipes found open.


PL back wash done
PL Sec. Filters changed (New 8 No.)

PL Airaudit done in potroom 39 hose pipes found open.


PL Primary filter changed.-8 nos. each
PL Air end disaasembly done of ST#02; Impeller & diffuser cleaning
PL Primary filter cleaned-8 nos.
Start Start @ 10:15 AM
PL Monthly maintenance

PL Air end disaasembly done of ST#02; Impeller & diffuser cleaning


PL GAP voltage set @6.20 volt.
PL motor shaft allignment done.
PL Zero loss drain valve removed from Intercooler # 1.
PL Comp # 5 Started @ 6:30 pm
PL Plate Fabrication work done.
PL Dryer # 5 , contactor rectified by Switchyard

PL Airaudit done in potroom 41 hose pipes found open.


PL back wash done

PL Airaudit done in potroom & total 42 nos. of hoses found open.


PL Monthly maintenance
PL Maintenance: Diesel top up,Engine oil change

PL Airaudit done in potroom & total 37 nos. of hoses found open. Line-1 , 22
hoses & Line-2 , 15 hoses.
PL Primary filter changed.
PL Primary filter cleaned-8 nos.

PL Primary filter cleaned-8 nos.


PL back wash done
PL Watermeter reading taken near pot controller and sectrion-1, section 3

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Comp # 4 started at 9:30 am
Intercooler # 1 & 2 miantenance in comp # 5 under progress .On checking
PL Y-Gasket found totally damaged.
PL CWP # 1 started at 9:40 am
PL CWP # 1 started at 12:26 pm
PL Comp # 5 stopped at 9:55 am

PL Airaudit done in potroom & total 31 nos. of hoses found open. Line-1 , 17
hoses & Line-2 , 14 hoses.
PL Intercooler 2 cleaned & fixed
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom 41 hose pipes found open.
PL back wash done
PL Watermeter reading taken near pot controller and sectrion-1, section 3

PL Airaudit done in potroom 33 hose pipes found open.


Job going on
PL
BD Dismantling of 3rd stage and cleaning with compressed air done.
BD Dismantling of After Cooler and cleaning with compressed air done.
PL Pump#4 Started and Pump#3 Stopped
PL Condensate sample of Comp#6 intercooler-2 taken
PL Primary filter cleaned-8 nos and replaced.

BD Dismantling of After Cooler and cleaning with compressed air done.


PL Primary filter changed.
PL Airaudit done in potroom 35 hose pipes found open.
PL Primary filter cleaned-8 nos.
PL Stop @ 4:20 PM

PL Airaudit done in potroom 41 hose pipes found open.


PL back wash done
PL Watermeter reading taken near pot controller and sectrion-1, section 3
BD Aftercooler box -up done but found water leakage in front of aftercooler
PL Sec. Filters changed (New 8 No.)

PL Primary filter changed.


PL Airaudit done in potroom 31 hose pipes found open.
PL Primary filter cleaned-8 nos.
MM Monthly maintemnance done
BD Aftercooler water leakage arresting in progress
PL Ultrasonic thickness measurement under progress by party
PL 02 nos damaged primary filter replaced
BD Aftercooler water leakage arrested
PL Airaudit done in potroom 28 hose pipes found open.
PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Ultrasonic thickness measurement under progress by party
FRL cleaning,Instrument air line flushing,Gap voltage checking done: Before
:ST#01: 6.26 VDC,ST#02:6.18 VDC,ST#003: 6.19 VDC After : ST#01:
PL 6.20 VDC,ST#02:6.18 VDC,ST#03: 6.19 VDC
PL Alignment checking

PL Airaudit done in potroom 37 hoses found open.


PL back wash done
PL Water from the trench removed now the pump has been stopped.

PL Airaudit done in potroom 34 hoses found open.


PL Backwash unit #01 &02
PL Civil work for pipe line

PL Primary filter changed.-8 nos. each


PL Primary filter changed.-8 nos. each
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom 39 hoses found open.

PL Airaudit done in potroom 41 hoses found open.


Passing in Inlet v/v to dryer to be arrested soon.
PL Primary filters cleaned-8 nos.
PL back wash done
Abnormal noise coming to be arrested.
Indicator of the tank level not working.

PL Airaudit done in potroom 34 hoses found open.


PL Backwash unit #01 &02
PL Civil work for pipe line
PL Monthly maintenance done
PL Drinking waterline flushing under progress
PL Ultrasonic thickness measurement done by party
PL Dryer inlet valve replaced & back flushing done
Start Started @ 10:30 am for changeover

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
Stop Stopped @ 3:27 pm
PL Sec. Filters changed (New 8 No.) & also Primary filter change
PL Monthly maintenance done
PL Drinking waterline flushing under progress
PL Zero loss drain valve shifted from air to air side to refrigerent to air side
PL Ultrasonic thickness measurement done by party

PL Both ADV's operated manually temp maintained around 4 deg C.


PL Main drain header v/v opened for condensate removal.
Inlet v/v found open,now closed.
PL Drinking waterline flushing done and back wash done
PL Airaudit done in potroom 34 hoses found open.

PL Primary filter cleaned-8 nos.


PL Airaudit done in potroom 26 hoses found open.
PL Motor end cover clening & Oil change under progress.
PL HWP # 2 stopped @ 10:22 AM for monthly maintenance.(racked out @
10:35 am)
PL HWP # 2 monthly maintenance done.
PL AVGF # 1 & 2 back wash done.

PL Motor end cover clening & MOP alignment done.


PL Oil changed & duplex & sump filter replaced
PL CWP # 1 monthly maintenance done.
PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL CBM done in compressor house and compressor pump house.
PL Intercooler moisture drain header removed
Start Started @ 9:12 pm

Start Started @22:55 hrs


PL 1) MOP alignment, 2) Gasket cutting done for IC#1 discharge(2 Nos). Motor
Raked-out
Stock zero, fresh stock to be brought.
BD Stopped @ 22:05 hrs
PL Air audit done 45 hoses found open

PL Air audit done 25 hoses found open


PL Oil cooler maintenance under progress.
PL Gasket change in intercooler# 1 outlet flange of Comp # 5 done.
PL CWP # 2 stopped for monthly maintenance @ 10:10 am
PL CWP # 1 put in AUTO mode @ 10:00 am
PL Primary filter changed.
PL Comp # 5 started @ 11:35 am
PL Primary filter cleaned-8 nos.
PL Comp # 6 stopped @ 12:25 pm
CWP CWP # 2 started @ 12:25 pm & CWP # 3 stopped for maintenance. @ 12: 35
pm

PL CWP # 3 monthly maintenance done.


BD MOP alignment done
PL Primary filter changed.
PL Primary filter cleaned-8 nos.

PL Air audit done 37 hoses found open


PL Drinking waterline flushing done and back wash done
PL Primary filter cleaned-8 nos.

PL Intercooler 2 dismentleing done & intercooler cleaning, y-gasket change in


progress
Stage 3 air end & diffuser dismentle & cleaning of impeller,impeller nut &
PL diffuser with CRC in progress
PL Monthly maintenance done
PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Monthly maintenance done
PL Monthly maintenance done
PL Fire hydrant valve maintenance near sec 7 done by pot maintenance
start CWP # 03 started @ 8:25 am
Stop CWP # 04 stopped @ 8:30 am

PL Intercooler#02 intercooler cleaning, y-gasket change & box up completed


Stage 3 air end & diffuser dismentle & cleaning of impeller,impeller nut &
PL diffuser with CRC & assembly completed.
PL Monthly maintenance done
PL Monthly maintenance done
PL Aftercooler flushing done.
PL Air audit done 40 hoses found open

PL Air audit done 34 hoses found open


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
CBM Abnormal sound coming
PL Drinking waterline back wash done

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Air audit done 39 hoses found open
PL Intercooler 1 dismentleing & cleaning, done, y-gasket change in progress
PL Main motor alignment and MOP alignment in progress
PL Diesel Engine valve maint in progress

PL y-gasket change done & box up done of intercooler # 01


PL Main motor alignment and MOP alignment done
PL Diesel Engine valve maint done
PL Primary filter changed.
PL Auto drain valve fixing in intercooler moister drain line
PL Maintenance work near the autogenous mill approach road site.

PL Primary filter cleaned-8 nos.


PL Air audit done and 38 nos. of hoses found open.
PL Watermeter reading taken of potroom .
PL comp # 2 shaft manually rotated and vibration readings taken. Vibrations-
0.16,0.10,0.20
BD Process water line restored for Carbon @ 11:30 pm
PL Jockey Pump # 1 started at 4:00 am

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Unit #01 & 02 backwash done
Start Start @ 9:07 AM
Stop Stop @ 11:26 AM
PL Air audit done and 32 nos. of hoses found open.

PL Unit#2 backwashed and running


Inlet v/v to dryer passing to be arrested.
BD Hole in the Process water line near Pot 718.WIP. M-seal applied
Start Started as per requirement of the SYD(talked with Piyush)
Stop Stopped and reassigned to Auto Mode.
PL Chemical dosing done

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Air audit done and 43 nos. of hoses found open.
PL Watermeter reading taken of potroom .

PL Unit #01 & 02 backwash done


PL Air audit done and 46 nos. of hoses found open.
PL Line opened
Start Started as per requirement of the SYD(talked with Piyush)
PL Primary filter changed
PL Air audit done and 47 nos. of hoses found open.
PL Back wash done of unit#2 and running

PL Air audit done and 50 nos. of hoses found open.


PL Watermeter reading taken of potroom .

PL Air audit done and 46 nos. of hoses found open.


PL Monthly maintenance done
PL Dryer inlet valve change
PL Primary filter changed 8 no..
PL Primary filter cleaned-8 nos.
PL Monthly maintenance in progress

PL St-3 air chamber and diffuser dismantling.


PL Monthly maintenance done
PL Primary filter changed 8 no.
PL Primary filter cleaned-8 nos.
Rake-IN Done
PL Back wash done of unit#2 and running

PL Air audit done in potroom and 29 nos. of hoses found open.


PL Water meter reading taken of potroom .
PL Primary filter cleaned-8 nos.
PL Impeller cleaning done by CRC of comp # 4,3rd stage.

PL Monthly maintenance done


PL Drinking waterline Flushing under progress
PL Auto drain valve modification work under progress for comp # 06
PL Air audit done in potroom and 29 nos. of hoses found open.
PL Primary filter changed
PL Rake-In done
PL Flushing done of Pot Room
PL Auto drain valve modification work under progress for comp # 06
PL Primary filter cleaned-8 nos
PL Air audit done in potroom and 39 nos. of hoses found open.
PL Back wash done of unit#2 and running

PL Air audit done in potroom and 46 nos. of hoses found open.


PL Water meter reading taken of potroom .
PL Dewatering pump started for draining.

PL Unit #01 & 02 backwash done


PL Air audit done and 35 nos. of hoses found open.
PL Primary filter changed 8 no..
PL Primary filter cleaned-8 nos.

PL Primary filter changed 8 no..


PL Primary filter cleaned-8 nos.
PL Air audit done and nos. of hoses found open.
PL Back wash done of unit#2 and running
PL Chemical dosing done

Gasket( 2 nos.) cutting done for intercooler-2 and 1 no for Intercooler-1 of


PL
Comp # 4
Primary filter cleaning done.-8 nos.
PL
PL Dewatering Pump started for Draining.

PL Unit #01 & 02 backwash done


PL Air audit done and 34 nos. of hoses found open.
PL Intercooler#02 box up in progress
PL Fabrication of water line
Valve closed due to high pressure drop.Opened at 8:30 pm
PL Both AVGF's back washed
PL Unit 2 back washed and running
PL Air audit done and 42 nos. of hoses found open.
PL Intercooler#02 box up done
PL Fabrication of water line, not started.
PL Primary filter changed
PL Primary filter cleaned-8 nos.

PL Dewatering Pump started for Draining.


PL Air audit done in potroom and 49 nos. of hoses found open.
PL Back wash done
PL Water meter reading taken of potroom .
PL Gasket( 1 nos.) cutting done for intercooler

PL Unit #01 & 02 backwash done


PL Air audit done and 35 nos. of hoses found open.
PL Primary filter changed 8 no..
PL Primary filter cleaned-8 nos.
PL Intercooler#01 dismantling done,cleaning is in progress
PL Fabrication of water line

PL Primary filter changed-- 8 no..


PL Drinking Water line leakage at Work shop ( Plant- II ).
Hot header pressure meter not working & rectified by switchyard.
PL
PL Intercooler#01 dismantling done,cleaning ,new Y-gasket fitting and box up
done.
PL Fabrication of water line under progress.
PL HFO line opened for Cast House on request by Cast house( Mr. Ashish)
PL Primary filter cleaned-8 nos.
PL Dewatering pump started for draining.
PL Chamber -2 mainvalve was opened and Water supply restored.
Cold water level Indicator rectified by Switchyard.
PL

PL Air audit done in potroom and 50 nos. of hoses found open.


PL Back wash done
PL Water meter reading taken of potroom .
Pl chemical dosing
PL Primary filter cleaned-8 nos.

PL Air audit done in potroom and 33 nos. of hoses found open.


PL Back wash done
PL Feeding command problem for PV rectified
UPL Training given on FTPAH process
PL Maint job in Progress
PL Civil job WIP

PL Airaudit done in potroom and total 37 nos. of hoses found open.


PL Aftercooler maintenance work under progress and tube bundle is out.

PL Primary filter changed-8 nos.


PL Civil job at CPH back side done.
PL After coller gasket cutting work for comp # 4.
PL Primary filter cleaned-8 nos.
PL Manual shaft rotation of Comp # 6 and vibrations are 0.30, 0.13 ,0.12 mils.
PL Back wash of AVGF # 1 & 2 done at CPH.

PL Airaudit done in potroom and total 37 nos. of hoses found open.


PL Water meter reading taken of potroom .
PL Dewatering pump started for draining.
PL OIL TOPUP OF COOLING TOWER 1,2,3 (05 lit.)
PL INSPECTION AND CHECKING IN TIME OF RUNNING THEN STOP
(PUMP No 2)
PL chemical dosing

PL Airaudit done in potroom and total 32 nos. of hoses found open.


PL Unit #01 & 02 backwash done
PL Primary filter changed-8 nos.
PL Primary filter cleaned-8 nos.
Checking of air tapping given to Stone crusher and Projects
V/v closed as pressure drop was there

PL Aftercooler shell cleaning done by shift technician of Comp # 4 and tube


bundle out.
PL Airaudit done in potroom and total 41 nos. of hoses found open.
PL Primary filter changed-8 nos.
PL Primary filter cleaned-8 nos.
PL Back wash of AVGF # 1 & 2 done at CPH.

PL Airaudit done in potroom and total 40 nos. of hoses found open.


PL Dewatering pump started for draining.
PL Aftercooler shell cleaning done by shift technician of Comp # 4.
PL Primary filter cleaned-8 nos.
PL Water meter reading taken of potroom .

PL HFO line opened for CH


Water meter is not working.(1-1/2)
PL Back wash of AVGF # 1 & 2 done at CPH.
PL Airaudit done in potroom and total 23 nos. of hoses found open.
PL Aftercooler maintenance work under progress and tube bundle is out.

PL Airaudit done in potroom and total 29 nos. of hoses found open.


PL Primary filter changed-8 nos.
PL Primary filter cleaned-8 nos.

PL Aftercooler maintenance work done & cleaning done by chemical and new
Y-gasket fitted.
PL Back wash of AVGF # 1 & 2 done at CPH.

PL Airaudit done in potroom and total 29 nos. of hoses found open.


PL Water meter reading taken of potroom .
PL Dewatering pump started for draining.

PL Airaudit done in potroom and total 28 nos. of hoses found open.


PL Fabrication work of water line.
PL Back wash of AVGF # 1 & 2 done at CPH.
PL Primary filter changed-8 nos.
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom and total 31 nos. of hoses found open.


PL Primary filter changed-8 nos.
PL Primary filter cleaned-8 nos.
PL Fabrication work of water line.
PL Comp # 4, 3rd stage impeller assembly done only.
PL Back wash of AVGF # 1 & 2 done at CPH.
PL dewatering pump started.

PL Airaudit done in potroom and total 29 nos. of hoses found open.


PL Water meter reading taken of potroom .
PL Primary filter cleaned-8 nos.
PL moisture sample taken of intercooler

PL Airaudit done in potroom and total 40 nos. of hoses found open.


PL Sample deposited to QA Lab.
PL Back wash of AVGF # 1 & 2 done.
BD 3rd stage diffuser assembly and Y,Z clearance setting done
PL Flushing of drinking water line.
BD Work in progress.
PL CBM of FFPH done,in RPH to be continued.
HFO line v/v opened.
BD Fire fighting water line pump has been stopped@13:05 hrs

PL Airaudit done in potroom and total 35 nos. of hoses found open.


PL Primary filter changed-8 nos.
PL Primary filter cleaned-8 nos.
PL Comp # 4, 3rd stage piping assembly work done.
PL Back wash of AVGF # 1 & 2 done at CPH.
PL Process water line leakage arresting work in progress
PL Flushing of drinking water line.
PL CBM of RPH done.
PL Shaft allignment done
PL Process water line shut down taken @ 6:45 pm for 2 hours
PL Comp # 4 started @7:52 pm
PL Comp # 4, GAP voltage set at 6.20 ,6.19 ,6.20 volt.
PL Process water line restored @ 8:40 pm

PL Airaudit done in potroom and total 37 nos. of hoses found open.


PL Water meter reading taken of potroom .

PL Civil job going on


PL Flooring going on
PL Work going on
PL V-belt changed
PL Process water line has been closed for the above job written.
PL Primary filter changed-8 nos.
PL Primary filter cleaned-8 nos.
Closed as per requested by Vinay Gupta(BO)

PL Airaudit done in potroom and total 30 nos. of hoses found open. Line 1- 17
line 2-13
PL Primary filter changed-8 nos. of comp#1
PL Primary filter cleaned-8 nos.
PL work compleated before 5:30 pm
Open as per requested
PL Civil work in progress for tommorow
PL work in progress for tommorow
PL Back wash of AVGF # 1 & 2 done at CPH.
PL Airaudit done in potroom and total 37 nos. of hoses found open.
PL Water meter reading taken of potroom .
PL Primary filter cleaned-8 nos.

PL Cleaning and checking of diesel Compressor done.


PL Complete air audit of all air line and pneumatic instruments under progress.
PL steamline flushing work in progress.
PL Backwash of AVGF # 1 & 2
PL Civil work(PCC work) under progress.
PL Airaudit done in potroom and total 27 nos. of hoses found open.
PL Locar store audit for pipe fitting materials done.

PL steamline flushing work done.


PL Civil work(PCC work) under progress.
PL air audit done, 29 hoses found open
PL Primary filter changed-16 nos. of comp#3,4
PL Primary filter cleaned-8 nos.
PL Back wash of AVGF # 1 & 2 done at CPH.
PL Complete air audit of all air line and pneumatic instruments work is done..
PL welding work on water pipe line for closing leakage under progress.
PL 04 lit. diiesel topup in diesel comp. and collect 10Lit. from RPH

PL Airaudit done in potroom and total 44 nos. of hoses found open.


PL Water meter reading taken of potroom .
PL Primary filter cleaned-8 nos.

PL Primary filter changed-16 nos.


PL Primary filter cleaned-8 nos.
PL Backwash of AVGF # 1 & 2
PL water leakage arresting work in progrss ( will be started in B -shift).
PL monthly maintenance of Diesel pump # 1.
PL monthly maintenance of Diesel pump # 2.
PL Monthly maintenance of Transfer pump # 2
PL Monthly maintenance of Transfer pump # 3
PL 5S audit of RPH store and shop floor .
PL 5S audit of CPH store and shop floor .
PL Civil work(PCC work) under progress.

PL Air audit done in potroom and total 39 nos. of hoses found open.
PL Back wash of AVGF # 1 & 2 done at CPH.
PL pump change over TP# 1,4 to TP#2,3
PL monthly maintanance of pp# 1 not done
PL monthly maintanance of pp#4 done
PL pump rotate anticlockwise due to discharge/suction valve is not working
properly(back press.)
PL Primary filter cleaned-8 nos.
PL Primary filter changed-8 nos.
PL Civil work(PCC work) under progress.
PL Drinking water line Flushing done
PL OIL TOP UP in CT#1 done 1.5 lit.
PL water leakage arresting work in progress ( postponed for tommorow).
pending primary filter cleaned-8 nos.

primary filter cleaned-8 nos.


PL Chemical Dosing done
NRV to be changed on priority.also unit#2 back wash done
PL Air audit done in potroom and total 41 nos. of hoses found open.
PL Water meter reading taken of potroom .

PL Airaudit done in potroom and total 35 nos. of hoses found open.


PL Backwash of AVGF # 1 & 2
PL Air release from COMP # 6 NRV.
PL Comp # 4 stopped @ 1:35 pm as Bypass valve gasket damaged

PL Airaudit done in potroom and total 37 nos. of hoses found open.


PL Backwash of AVGF # 1 & 2
PL Primary filter changed-16 nos.
PL Primary filter cleaned- nos.
PL (By pass v/v) gasket change due to air leakage.
PL rack out

PL V/V for HFO feed has been opened.


PL Airaudit done in potroom and total 36 nos. of hoses found open.
PL Unit#2 back wash done
PL Primary filter cleaned-8 nos.
PL Water meter reading taken of potroom .
PL To be stopped

PL Airaudit done in potroom and total 35 nos. of hoses found open.


PL Cooling Tower # 1 Monthly maintenance and Nozzle checking.
PL Primary filter changed.
PL AVGF backwash of #1,#2 .
PL Dewatering pump stopped after draining at 7:30 am
UPM POP line NRV maintenance of comp#4 .
PL Civil job for water leakage arresting under progress.
PL Rack in of HWP # 1
UPM FRL cleaning of Comp#4 done.
PL Primary filter cleaned-8 nos.
PL CT#1&3 are running & CT#2 in auto.

PL Airaudit done in potroom and total 37 nos. of hoses found open.


PL Rack in of HWP # 1
PL AVGF backwash of #1,#2 .
PL Primary filter change-8 nos.
PL Primary filter cleaned-8 nos.
PL secondary filter checking
PL Civil job for water leakage arresting under progress.
PL Cooling Tower # 1 Monthly maintenance done and Nozzle checking. (5 no.
nozle jam
PL 5 no. nozle found jam and cleaning process done.
PL dewatering pump conection/ start and water out from leackage of parking
area of ACH

PL Airaudit done in potroom and total 33 nos. of hoses found open.


PL Primary filter cleaned-8 nos.
PL Unit#2 back wash done

PL Air audit done in pot room and 20 no. of hoses found open.
UPM Secondary filter check of comp #3 and found ok.
PL AVGF backwash of #1 ,2 .
PL Gap voltage checking and setting to 6.20 volt done.
water meter checking of FFPH,Central store,GAP CT and Rodding CT
PL
maintenance under progress.
PL Monthly maintenance of cooling tower #2 and nozzle checking done.
PL Motor NDE cover and fan out and maintenance work under progress.
UPL Water line valve at FFPH,smelter side damaged & workin progress
PL Dewatering pump started for draining

PL Airaudit done in potroom and total 41 nos. of hoses found open.


PL AVGF backwash of #1 ,2 .
PL Primary filter change-8 nos.
PL Primary filter cleaned-8 nos.
PL Water line valve at FFPH,smelter side damaged & work completed
PL Motor NDE cover and fan out and maintenance work done.
CT # 1, 3 running, CT # 2 on AUTO mode

PL DE temp found 65 degree celcius.


PL Airaudit done in potroom and total 41 nos. of hoses found open.
PL Unit#2 back wash done

PL Primary filter changed.


PL AVGF backwash of # 1 & 2 .
PL Dewatering pump stopped after draining at 7:00 am
PL Primary filter cleaned-8 nos.
PL monthly maintenance and nozzle checking done.
PL water line leakage arresting work in progress
PL Secondary & Primary filter changed work will be in progress in B-shift.
PL CBM reading under progress.
PL 3 barrel servo prime oil shifted to ACH
PL 8 secondary filter bought to ACH

PL Secondary & Primary filter changed ( new 8 nos. ten to six filter installed)
PL Primary filter change-8 nos.
PL Primary filter cleaned-8 nos.
PL water line leakage arresting done
PL CBM reading done
PL Airaudit done in potroom and total 28 nos. of hoses found open.

PL Airaudit done in potroom and total 39 nos. of hoses found open.


PL Unit#2 back wash done
PL Primary filter change-16 nos.
PL Sec. filter checked

PL AVGF backwash of # 1 & 2 .


PL Airaudit done in potroom and total 30 nos. of hoses found open.
PL Drain Oil Change in progress & should be completed in B-shift
PL oil cooler cleaning in PROGRESS for B-shift
PL oil filter change in PROGRESS for B-shift
PL Drinking line flushing :- DONE
PL Monthly Maint COMPLETED
PL Check Second. Filter :- CHECKED
Scrap shifting from ACH to Scrap Yard(Filter&Oil drum) in PROGRESS for
PL B-shift

PL Airaudit done in potroom and total 23 nos. of hoses found open.


PL OIL changed (450 lts oil used)
PL oil filter change DONE. & Mop Nrv cleaning
PL oil cooler cleaning DONE.
PL Scrap shifting from ACH to Scrap Yard(Filter) DONE.
UPM Safety board fixing UNDER PROGRESS(welding and drilling done)
PL Primary filter change-8 nos.
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom and total 31 nos. of hoses found open.


PL Sec filters checked found damaged
PL Unit#2 back wash done
BD Sump Pump not working

PL AVGF backwash of # 1 & 2 .


PL Monthly Maintenance COMPLETED & 7 nos. nozzle cleaning done
PL Primary filter change- 8 nos.
PL Primary filter change- 8 nos.
PL Primary filter cleaned- 8 nos.
PL manual rotation , oil NRV release
PL intercooler#2 dismentled, shell cleaning & intercooler 2 cleaning done
PL Bypass valve I to P replaced & bypass valve cleaning done & FRL filter
replaced

PL AVGF backwash of # 1 & 2 .


PL Primary filter change- 8 nos.
PL Primary filter cleaned- 8 nos.
PL Air release of NRV of MOP
PL Comp #4 Rack in done. Start 4:06pm
PL Comp #6 Intercooler #2 cleaning
PL Comp #6 Aftercooler flushing done.
PL Secondary filter changed ( new 8 nos. ten to six filter installed)
PL Gap voltage checking and 6.14, 6.21, 6.2 volt done.
PL Air release of NRV of MOP.,manual rotation
PL Comp #1 stopped at 6:17 PM
PL Comp #6 Rack in done. Start at 8:00 pm
PL Comp # 1 rack out done By Mr.Murgan from Switchyard.
PL Trench Plate covered on drain areas near Comp # 6
PL Watermeter reading taken in Potroom
PL Airaudit done in potroom and total 36 nos. of hoses found open.
PL Primary filter cleaned-8 nos.

PL AVGF backwash of # 1 & 2 . Done


PL Airaudit done in potroom and total 35 nos. of hoses found open.
PL Monthly Maintenance COMPLETED
PL Spare shifting and dissmantelling(intercooler header,oil drum) in progress
PL FRL cleaning, Instrument line flushing, GAP voltage Checking done
PL Civil work in progress
PL FFPH PUMP STOPED AND FIRE WATER LINE CLOSED DUE TO
MAINT. OF CAST HOUSE.

PL Primary filter change- 8 nos.


PL New sec. filters(8 nos) and new pri. Filters(7 nos) has been kept at
Compressor store(out side)
PL Old sec filter(24 nos) + New sec filters(8 nos) shifted to RPH stores
PL Airaudit done in potroom and total 35 nos. of hoses found open.
5S MS scrap shifted from the road and cleared.
PL FFPH PUMP started.
PL AVGF backwash of # 1 & 2 . Done

PL Watermeter reading taken in Potroom


PL Airaudit done in potroom and total 36 nos. of hoses found open.

PL AVGF backwash of # 1 & 2 . Done


PL Airaudit done in potroom and total 35 nos. of hoses found open.
PL Civil work is completed
PL Primary filter change- 16 nos.
PL Primary filter clean- 8 nos.

UPL Manual rotation,air-release from NRV done


UPL Comp #1 started @ 8:20 PM
UPL Comp #5 stopped at 8:40 PM,motor racked out due to high 3rd stage
vibration 0.6 mils
PL primary filter changed and cleaned-8 no.s.
PL backwash done in unit #1& 2

PL Watermeter reading taken in Potroom


PL Airaudit done in potroom and total 32 nos. of hoses found open.
PL Com # 5 ,Secondary filter changed-8 nos.
PL Dewatering pump started.
PL Primary filter cleaned.-8 nos.

PL AVGF backwash of # 1 & 2 . Done


PL Airaudit done in potroom and total 35 nos. of hoses found open.
PL vibration checking CBM
PL Comp #5 Intercooler #2 cleaning
PL Comp #5 Intercooler #2 Y gasket change
PL Primary filter cleaned.-8 nos.
PL stopped at 01:06pm

PL Motor racked out


PL AVGF backwash of # 1 & 2 . Done
PL Unit #1 backwash done.
PL Installation of new auto drain valve of dryer #6 done.
PL Comp #5 Intercooler #2 cleaning and Y gasket change completed.
PL primary filter cleaned-8 no.s.

PL Dewatering pump started.


PL Primary filter cleaned.-8 nos.
PL Intercooler # 2 dome opened both side.
PL LT panel supply checked and rectified & POP STARTED.

PL AVGF backwash of # 1 & 2 . Done


PL Airaudit done in potroom and total 18 nos. of hoses found open.
PL Comp #5 Intercooler #2 leackage check/close and boxup.
PL Primary filter change-16 nos.
PL Primary filter cleaned.-8 nos.
Water leakage checking in plant level

PL Primary filter change-16 nos.


BD Process water line leakage arresting near lounge 2.
PL Comp #5 Intercooler #2 leackage check/close and boxup.
PL Steam line v/v to bake oven closed,now opened
PL Installation of new auto drain valve of dryer #6 done.
PL Primary filter cleaned.-8 nos.
PL backwas done in unit#1

PL Intercooler # 2 box up done.


PL Primary filter cleaned.-8 nos.
PL 10 mm connecter fitted and dryer brought to in line.
PL HFO line opened on request by Mr.Harse Mital.
PL Water meter reading taken in potroom.
PL Dewatering pump started for draining.

PL AVGF backwash of # 1 & 2 . Done


PL 3rd stage dismenteling/checkingwater leackage o
PL Oil change /sump & duplex filter change.
PL Airaudit done in potroom and total 26 nos. of hoses found open.
PL Primary filter cleaned.-8 nos.
UPL GAP volt. Setting stage 3rd from 6.15 to 6.2
UPL Air release from comp#3
UPL Started at 1:47 pm
PL sump & duplex filter change.

PL 3rd stage dismenteling/checking water leakage ,One O-ring for Air end used
PL Airaudit done in potroom and total 28 nos. of hoses found open.
PL Total 3000 Kgs of chemical shifted to CPH/RPH
PL intercooler#1 checking water leakage;box-up DONE.
PL Primary filter cleaned.-8 nos.
PL Primary filter change-08 nos.
PL backwas done in unit#1
PL AVGF backwash of # 1 & 2 . Done

PL Water meter reading taken in Potroom


PL Airaudit done in potroom and total 34 nos. of hoses found open.
PL Dewatering pump started.
PL Fire Hydrant line closed near Section-1&8(Sec 8 v/v was closed already)

PL Inter Cooler-2 leakage arresting and box up


PL Excavation work in front of ACH in Process water line
PL Primary filter change-16 nos.
PL Primary filter cleaned.-8 nos.
PL CBM completed
PL Notification made for 30 nos.(i.e. 15 pairs) of bullets for IC-2 of Comp#5
PL TP#1 started at 1:45 pm,TP#2 stopped at 1:50 pm,TP#3 stopped at 11:30 pm

PL Primary filter change-16 nos.


PL Primary filter cleaned.-16 nos.
PL Airaudit done in potroom and total 36 nos. of hoses found open.
PL secondary filter checked and paper found damaged at ends in most cases.
PL Inter Cooler-2 leakage arresting,8 tubes plugged and box up
PL Backwash done in unit #1.
PL ADV maintenance and stainer cleaning done.
PL Excavation work in front of ACH in Process water line

PL Water meter reading taken in Potroom


PL Airaudit done in potroom and total 40 nos. of hoses found open.
PL Dewatering pump started.
PL Primary filter cleaned.-8 nos.

PL ST#03 Dismantling/FRL cleaning/Dryer Flushing


PL Airaudit done in potroom and total 36 nos. of hoses found open.
PL Waterline maintenace
PL AVGF backwash of # 1 & 2 . Done

PL Intercooler # 2 , leakage arresting ,5 points plugged and work in progress.


PL Stage # 3 ,dismantelling & impeller gap checked & stage assembly work in
progress.
PL Airaudit done in potroom and total 37 nos. of hoses found open.
PL Primary filter changed.
PL Primary filter cleaned.-8 nos
PL AVGF # 1 & 2 , backwash done at CPH.

Intercooler # 2 , leakage arresting ,total 14 points plugged and Boxup


PL workdone.
Stage # 3 stage assembly workdone.
PL
PL Airaudit done in potroom and total 32 nos. of hoses found open.
PL Dewatering pump started.
PL Water meter reading taken in Potroom

PL Dryer flushing,FRL cleaning & MOP allignment. Done.


PL Primary filter changed.
PL HFO LINE opening for cast house as requested by Mr.Nobal Singh done.
PL AVGF # 1& 2 Backwash done at CPH
PL Dewatering pump started for draining.
PL Zeroloss drain valve maintenance done.
PL Complete airaudit of Air line in potroom() WIP.
PL Primary filter cleaned-8 nos.

PL Complete airaudit of Air line in potroom done,also 35 hoses found open


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL 16 nos. sec filters shifted to ACH from stores.
PL Comp. started but tripped at 4.12 mils vibration 3rd stage.
PL AVGF # 1& 2 Backwash done at CPH
PL Dewatering pump not working.

PL Airaudit done in potroom and total 32 nos. of hoses found open.(L1-22, L2-
10)
PL Water meter reading taken in Potroom
PL Primary filter cleaned-8 nos.

PL AVGF # 1& 2 Backwash done at CPH


PL Airaudit done in potroom and total 36 nos. of hoses found open.
PL Primary filter cleaned-8 nos.

PL AVGF # 1 & 2 Backwash done at CPH


PL Primary filter cleaned-8 nos.
PL Primary filter changed.

PL Airaudit done in potroom and total 47 nos. of hoses found open.(L1-30 L2-
17)
PL Water meter reading taken in Potroom
PL Dewatering pump started for draining.

PL Water meter reading taken in Potroom


PL AVGF # 1 & 2 Backwash done at CPH
Strike Technician left the site at 9:30 am

HFO line up
hydrant line:- main pump at RPH started for 30 min (main pump to be close
in c - shift when bakeoven call ,informed to c-shift incharge)
PL Primary filter changed.
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom and total 45 nos. of hoses found open.(L1-30 L2-
17)
PL Water meter reading taken in Potroom
PL Primary filter changed 16 no.& Primary filter cleaned-08 nos.
PL Airaudit done in potroom and total 23 nos. of hoses found open.
PL Water meter reading taken in Potroom
BD InterCooler#2 maint. And 3rd stg dismantling.
PL Shown to GAP people.
PL Pri. Filter cleaning not done

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
BD InterCooler#2 maint. boxup done & diffuser cleaning done
PL Dewatering pump started for draining.

PL Airaudit done in potroom and total 39 nos. of hoses found open.(L1-24 L2-
15)
PL Water meter reading taken in Potroom
PL Primary filter cleaned-8 nos.

PL ADV repairing and installation


PL Monthly Maintenance
PL Condensate Bypass v/v fabrication of I/C-1 n 2 and After Cooler
PL Primary filter changed 16 nos
PL Sec. filter shifted
PL V/V opened,now closed
PL V/V opened

PL ADV maintenance
PL Monthly Maintenance done
PL Primary filter changed 08 no.
PL Primary filter changed 08 no.
PL Primary filter cleaned-8 nos.

PL Primary filter cleaned-8 nos.


PL Airaudit done in potroom and total 39 nos. of hoses found open.(L1-24 L2-
15)

PL Monthly Maint. WIP


PL Monthly Maint. WIP
PL Monthly Maint. WIP
PL Primary filter changed 16 nos
PL ACH comp #4 Manometer installation (not done )
PL CPH,Cooling Tower#1 leakage arrest and oil top up
PL comp#2 ADV dismantling done

PL Store house keeping.


PL ACH house keeping
PL Comp#1 stopped at 4 PM,
PL 8 No.Secondary filter changed of comp#1
PL primary filter change 8no. Of comp#2
PL HWP#3,FFP # 1,2 rack -in.
PL CT Fan #1 rack-in.
PL Comp#1 rack-out done.
PL FFP #1 started.
PL Airaudit done in potroom and total 37 nos. of hoses found open.(L1-27 L2-
10)

PL Primary filter cleaned-8 nos.


PL Airaudit done in potroom and total 39 nos. of hoses found open.(L1-24 L2-
15)

PL Airaudit done in potroom and total 38 nos. of hoses found open.(L1-27 L2-
11)
PL Primary filter cleaned-8 nos.
PL primary filter change 8no. Of comp#2

PL Airaudit done in potroom and total 36 nos. of hoses found open.


PL Primary filter cleaned-8 nos.
PL primary filter change 8no. Of comp# 6
PL Cast house HFO line opened on request.

PL Airaudit done in potroom and total 39 nos. of hoses found open.(L1-25 L2-
19)
PL Water meter reading taken in Potroom
PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL Primary filter changed.
PL oil leakage arresting and Quaterly maintenance
PL By pass condensate line installtion

PL oil leakage arresting and Quaterly maintenance


PL Primary filter cleaned-8 nos.
PL Airaudit done in POT ROOM and total 38 nos. of hoses found open.
PL Monthly maintenance of HWP # 1 at CPH.
PL Process water line shut down for Stone crusher area done water leakage
arresting.

PL HFO v/v opened,as per Shift I/C Diptesh


PL Turned in Auto mode.
PL V/V opened at PPH and near Rodding area.
PL Backwash done unit#2 running
PL Primary filter cleaned-8 nos.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Dewatering pump started for draining.

PL Chemicals 1800+ and BDNF to be shifted from RPH to CPH and vice-versa.
PL Primary filter cleaned-8 nos.
Observation Bypass v/v gasket damaged, continuous air leakage is there,keep observation.
PL Flowmeter reading of pot controller,sec 1& 3 lounge room

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL quat. Maint done
PL quat. Maint done
PL CLEANING
PL AVGF # 1 & 2 Backwash done at CPH

PL Quaterly maintenance of CT # 1 at RPH


PL Quaterly maintenance of CT # 3 at CPH
PL 5S audit of PPH and its Surrounding area.
PL Cleaning of comp # 1 & Dryer # 1.
PL Primary filter cleaned-8 nos.

PL Primary filter cleaned-8 nos.


PL Flowmeter reading of pot controller,sec 1& 3 lounge room
Observation Bypass v/v gasket damaged, continuous air leakage is there,keep observation.
PL Chemicals 1800+ and BDNF to be shifted from RPH to CPH and vice-versa.

PL Primary filter changed.


PL Primary filter changed.
PL Primary filter cleaned-8 nos.
PL dewatering pump #1,2 maintenance ;I1 done ;2 under progress

PL Dewatering pump #2 maintenance-impeller found broken and removed.


PL Impeller dismantling of comp #5 & impeller sent for balancing.
PL Dewatering pump near comp # 2, union leakage arresting done (minor
leakage from union)
PL Dewatering pump started for draining.

PL Primary filter cleaned-8 nos.


Observation Bypass v/v gasket damaged, continuous air leakage is there,keep observation.
PL 41 hoses found open(L1-26,L2-15)
PL Readings of CPH,MI garage,FTP,Sec-3 taken

PL Baxkwash done Unit # 1 and running.


PL Primary filter changed.
PL Quaterly maintenance of CT # 3 at RPH done.
PL Drinking water flushing in plant - II in progress.
PL Primary filter cleaned-16 nos.
PL Pipe fitting measurement of Manometer done in progress.
PL CBM of all equipments in progress.
PL Comp # 1 started @ 11:43 am

PL Drinking water flushing in plant - II done


PL CBM of all equipments done
PL Airaudit done in potroom and total 48 nos. of hoses found open.(L1-30 L2-
18)
PL Diesel compressor base bolt tightning & oil change & filter cleaning done
PL Auto drain valve shifted from dryer # 05 to dryer # 01

PL Airaudit done in potroom and total 46 nos. of hoses found open.(L1-27 L2-
17)
PL Primary filter cleaned-8 nos.
PL Readings of CPH,MI garage,FTP,Sec-3 taken
Observation Bypass v/v gasket damaged, continuous air leakage is there,keep observation.
PL Unit#1 back washed and running.

PL Quarterly maint. of HWP#2


PL Maint. Of Spare of ADV
PL New Manometer Installed.
PL cooling hosess replacement/Impeller assemby
PL Primary filter change
PL Primary filter cleaned-16 nos.
PL Steam line flushing
PL HWP #2 stopped at 9:30 am
PL HWP #2 started at 1:00 pm
PL Airaudit done in potroom and total 41 nos. of hoses found open.(L1-27 L2-
17)
PL Dewatering pump started for draining.

PL Quarterly maint. of HWP# 3


PL Maint. Of Spare of ADV
PL Airaudit done in potroom and total 49nos. of hoses found open.(L1-33 L2-
16)
PL Coupling guard installation

PL Installation of Auto drain valve of comp#05


PL CWP#01 :To ready new impeller assembly & installation of new impeller
PL Primary filter change
PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 50 nos. of hoses found open.(L1-32 L2-
18)

PL Primary filter cleaned-8 nos.


PL New rotating assembly installation under progress
PL Drinking water line flushing done in smelter area
PL Airaudit done in potroom and total 42 nos. of hoses found open.

PL New rotating assembly installation under progress


PL Airaudit done in potroom and total 60 nos. of hoses found open.
PL Watermeter reading taken in Potroom.
PL Primary filter cleaned-8 nos.

PL Primary filter change of comp #4,6


PL New ADV installation in Dryer#5
PL Correction of MOP horizontal vibration of comp #1,2,3,4
PL Dismantling of intercooler #2 of Comp # 5
PL Primary filter cleaned-8 nos.
PL Pipe thickness measurement of rectiformer pipe lines.
PL Welding/cutting job of flowmeter.

PL Quaterly Maint. Of Pump,Completed


PL Bypass v/v maint.
PL Airaudit done in potroom and total 48 nos. of hoses found open.
PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom and total 53 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL Dewatering pump started for draining.

PL Primary filter change of comp #1


PL Primary filter change of comp #2
PL Primary filter change of comp #3
PL Primary filter cleaned-24 nos.

PL Airaudit done in potroom and total 46 nos. of hoses found open.


PL V/V opened for Cast House.
Observation Winding Temp is varying between 95 to 99 degree C.

PL Airaudit done in potroom and total 61 nos. of hoses found open.


PL Watermeter reading taken in Potroom.

PL Primary filter change of comp #4


PL Primary filter change of comp #6
PL Primary filter cleaned-8 nos.
UPL HWP#1 maintenance under progress
PL Drinking water line flushing under progress.
PL Flowmeter installation at FFPH under progress.
PL Hoist connection done at CPH

PL V/V opened for BO


UPL HWP#1 maintenance done
PL Drinking water line flushing done
PL Flowmeter installation at FFPH under progress.
PL Oil drum Shifted to Scrap Yard
PL Airaudit done in potroom and total 50 nos. of hoses found open.

PL Airaudit done in potroom and total 63 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL Primary filter change of comp #1,2,3 and cleaning-8 no.s.
PL Transfer pump #2,3 quarterly maintenance under progress.
PL EOT crane maintenance.
PL Steam line flushing in plant II
PL Airaudit done in potroom and total 55 nos. of hoses found open.
PL Digital manometer installation in comp#5 under progress.
PL V/V opened for Cast House.
PL running at H3 mode
UPM 5S work in CPH surroundings.

PL Transfer pump #2,3 quarterly maintenance done.


PL Airaudit done in potroom and total 49 nos. of hoses found open.
PL Pri. Filter cleaned 8 nos
PL running at H3 mode.

PL Airaudit done in potroom and total 54 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL Primary filter cleaned-8 nos.
PL Dewatering pump started for draining.

PL Primary filter change of comp #4


PL Primary filter change of comp #6
PL Primary filter cleaned-8 nos.
Comp # 03 secondary filter checked found gap between paper & aluminum
PL fin.

PL Airaudit done in potroom and total 52 nos. of hoses found open.


PL Primary filter cleaned-8 nos.

PL Airaudit done in potroom and total 47 nos. of hoses found open.


PL Watermeter reading taken in Potroom.

PL Primary filter change of comp #1,2,3 and cleaning-8 no.s.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 479 nos. of hoses found open.
PL hose installation at suction and discharge done
PL Flexible pipe installation in progress
PL Digital manometer installation at comp # 05 job not done
PL Cast steel pipe cutting at workshop for installation at MOP
PL Steam line flushing in progress
PL Greasing of valves done

PL Valve opened of Cast House side.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total nos. of hoses found open.

PL Airaudit done in potroom and total 52 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL Dewatering pump started for draining.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Railing cutting done.
PL Watermeter & stainer cleaning work done at GAP cooling tower.
CBM of all running Equipments at Utility in progress.(ACH,CPH,CPH
PL Cooling Tower done).
Process water line (for ACH area leakage line only) shut down taken.
PL
Air pressure line checked and found 6.2 bar.(Wrong complain given by Shift
PL Incharge inchargeof POT services Mr. V . Narshima )
PL Secondary filter checked-12 nos.

PL MOP Flexible pipe installation done


CBM of all running Equipments at Utility in progress.(ACH,CPH,CPH
PL Cooling Tower done).
PL Intercooler # 02 shell cleaning with water & wire mesh
PL Primary filter cleaned-8 nos.
PL Process water line restored.

PL Airaudit done in potroom and total 37 nos. of hoses found open.


PL Watermeter reading taken in Potroom.

PL Airaudit done in potroom and total 59 nos. of hoses found open.


PL Watermeter reading taken.
PL Valve opened.
PL Dewatering+Fabrication for Valve chambers
PL Carbon area air audi0t
PL PM done of CWP#4, of CWP#2 to be done in B-shift
PL Primary filter changed.

PL Carbon area air audit done.


PL PM of CWP # 2 at CPH. I(stopped at 3:05 pm and rack out done)
PL Rack in done and CWP # 4 started at 2: 50 pm.
PL New Intercooler # 2 work done by patel engineering.
Leakaged Process water line tapping pipe (1/2 inch) dissconnected and
PL made dummy.

PL Primary filter cleaned-08 nos.


PL Outside Dewatering pump maintenance done.
PL Airaudit done in potroom and total 44 nos. of hoses found open.
PL Watermeter reading taken in Potroom.

PL Primary filter cleaned-08 nos.


PL Airaudit done in potroom and total nos. of hoses found open.
PL 100 kL water top up done
PL Excavation Job going on.
UPL Piping job completed,Process water line taken online.
PL Inter cooler grinding job done by Patel Engg.

PL Secondary filter checking done and 3 filters found damaged.


PL Backwash done for both filter.
PL Process wate line chamber valve near LPG yard opened. And water line
restored.
PL Airaudit done in potroom and total 60 nos. of hoses found open.
PL Primary filter cleaned - 8 nos.

PL Primary filter cleaned - 8 nos.


PL Airaudit done in potroom and total 60 nos. of hoses found open.
PL Watermeter reading taken in Potroom.
PL Dewatering pump started for draining.

PL Valve for HFO line to Cast House opened


PL Stopped due to low CW and HW temperature.In Auto mode now.
PL Airaudit done in potroom and total 60 nos. of hoses found open.
PL Pri.Filter changed
PL Valve for HFO line to Bake Oven opened.
PL New intercooler # 2 box up under progress.

PL Airaudit done in potroom and total 60 nos. of hoses found open.


PL Primary filter cleaned - 8 nos.
PL New intercooler # 2 box up under progress.
PL New intercooler # 1 box up under progress.
PL Dryer cover plate(back side) opened.

PL Primary filter cleaned - 8 nos.


PL Airaudit done in potroom and total 60 nos. of hoses found open.
PL Watermeter reading taken in Potroom.
PL Dewatering pump started for draining.

PL Airaudit done in potroom and total 38 nos. of hoses found open.


PL Primary filter cleaned - 8 nos.
PL Pri.Filter changed and New Filters installed in Comp#6
BD Inter Cooler#1,2 job going on
PL Airaudit done in potroom and total 52 nos. of hoses found open.
PL Primary filter cleaned - 8 nos.
BD Inter Cooler#1,2 job ,grinding done.
PL Manometer installation done.
PL New intercooler # 2 box up under progress.
PL Y-gasket fitted in old Intercooler # 1
PL New filter brought to ACH, 16 packet secondary and 4 packet Primary filter.

PL Airaudit done in potroom and total 41 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL New intercooler # 2 box up under progress.
PL Dewatering pump started for draining.

PL Airaudit done in potroom and total 37 nos. of hoses found open.


PL Primary filter cleaned - 8 nos.
BD Inter Cooler#1,2 job going on
PL CT-3 Stopped and CT-1 is started.
PL Drinking water line flushing going on( Carbon area completed).
PL Primary filter changed.

PL Primary filter cleaned - 8 nos.


PL Drinking water line flushing in POTROOM done.
PL Airaudit done in potroom and total 50 nos. of hoses found open.
BD Inter Cooler# 2 box up job completed.
BD Inter Cooler# 1 box up job completed.
PL New Secondary filter checked- 8 nos. and found ok.
Third stage assembly done,Z-clearance checkesd and is found 0.32 and Y-
BD clearance set at 0.64

PL Airaudit done in potroom and total 56 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL Primary filter cleaned - 8 nos.
PL Airaudit done in potroom and total 39 nos. of hoses found open.
PL Primary filter cleaned - 8 nos.
PL Watermeter reading taken in Potroom.
BD Piping job done,Motor Allignment job WIP
PL Primary Filter Changed
PL Sec. Comp WIP

BD Motor alignment job, WIP


PL Maintenance of Sec. Comp WIP
BD POP leakage arresting NOT DONE.
BD intercooler#1 endcover dismantling
PL Airaudit done in potroom and total 39 nos. of hoses found open.
PL Primary filter cleaned - 8 nos.

PL Airaudit done in potroom and total 60 nos. of hoses found open.


PL Watermeter reading taken in Potroom.

PL Primary filter changed.


PL Secondary filter checked-8 nos.
PL Primary filter cleaned-8 nos.
PL Annual maintenance of CWP # 3 in progress.
CWP # 2 started at and CWP # 3 stopped at for maintenance work.
PL
PL Electrical PM of CT # 3 at CPH done
PL Chemical shifting done.

PL Primary filter cleaned-8 nos.


PL CT Fan#03 started at 2:55 pm
PL Airaudit done in potroom and total 50 nos. of hoses found open.
PL Welding job & Cast cover fitting on CWP#03
PL TP#01 discharge valve gearbox maintenance( d/v to be changed NOT
DONE)
PL CWP #03 racked in @ 3:30 pm
PL FRL cleaning,instrument line flushing,GAP voltage setting
PL Shutter near comp#01 greasing done.
PL cold water header tapping to be blinded
PL New Secondary filters checked-8 no.s

PL Airaudit done in potroom and total 60 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL Primary filter cleaned-8 nos.

PL Primary filter changed.


PL Monthly maintenance of MP # 2 at FFPH.
PL Potroom airaudit done and total 44 nos. of hoses found open.
PL Monthly maintenamce of Jockey pump # 2 at FFPH.
PL Secondary filter checked-24 nos. and 2 nos. found damaged.

PL Monthly maintenance of MP # 1 at FFPH.


PL Monthly maintenamce of Jockey pump # 1 at FFPH.
PL Backwash of AVGF #1,2 at RPH
PL Maintenance of intercooler#1 of comp#5
PL Airaudit done in potroom and total 58 nos. of hoses found open.
UP CWP#3 started at 5:30 pm

shifting of 16 nos. of empty wooden boxes of secondary filter from


PL compressor house to Outside (near shutter)
PL Watermeter reading taken in Potroom.
PL Primary filter cleaned-8 nos.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Airaudit done in potroom and total 54 nos. of hoses found open.

PL Primary filter cleaned-8 nos.


PL Airaudit done in potroom and total 62 nos. of hoses found open.
PL HFO lined up for cast house
PL Airaudit done in potroom and total 58 nos. of hoses found open.
PL Watermeter reading taken in Potroom.
PL Primary filter cleaned-8 nos.
PL Water leakage arrested

PL Primary filter change of Comp# 4 & 6


PL MP # 3 monthly maintenance at FFPH
BD MP # 3 , motor burned during start .
PL Dryer # 6 ,maintenance work under progress. By service engg.
PL Diesel compressor gasket fitting.
PL Primary filter cleaned - 8 nos.
PL Airaudit done in potroom and total 39 nos. of hoses found open.
PL Compressor # 5 started @ 11:20 am

PL Primary filter cleaned - 8 nos.


PL Airaudit done in potroom and total 56 nos. of hoses found open.
PL Dryer # 6 ,maintenance work under progress.
PL Diesel compressor gasket fitting.
PL Drinking water line flushing done.

PL Airaudit done in potroom and total 50 nos. of hoses found open.


PL Watermeter reading taken in Potroom.
PL Backwash of unit

PL Airaudit done in potroom and total 39 nos. of hoses found open.


PL Dryer # 6 ,maintenance work under progress.
PL Primary filter changed.
PL Breakdown maintenance work at FFPH for MP # 3 under perogress.
PL Dryer # 1 ,stainer cleaning done.
PL Primary filter cleaned-8 nos.
PL Secondary filter changed and 8 nos. of new filter changed.
PL CBM under progress.
PL GAP voltage setting done.
PL Dryer cover opening done.
PL Comp # 4 stopped at 7:21 am and rack out done.

PL CBM under progress.


PL Dryer cover Fixing done.
PL Airaudit done in potroom and total 39 nos. of hoses found open.
PL Dryer # 6 ,maintenance work under progress.
Breakdown maintenance work at FFPH for MP # 3 under perogress-(motor
PL dismantled & pump side coupling done)
PL Primary filter cleaned-8 nos.
PL FRL cleaning and new I2P converter installation in bypass v/v.
PL HFO lined up for Cast House.

PL Primary filter cleaned-8 nos.


PL Watermeter reading taken in Potroom.
PL Backwash of unit

PL Airaudit done in potroom and total 47 nos. of hoses found open.

PL Backwash of unit
BD FH alarm: Strainer cleaned & fitted; Water regulating valve adjusted

PL Primary filter change of Comp# 5 & 6


PL Primary filter cleaned-16 nos.
PL Watermeter reading taken in Potroom.

PL Primary filter changed.


PL Primary filter cleaned-16 nos.
PL MP#03 breakdown maintenance.
PL Comp#04 maintenance(motor & MOP alignment) under progress(not done).

PL ALL EQUIPMENTS ARE RUNNING OK.


PL Watermeter reading taken in Potroom.
PL HFO line opened for Bake oven on request by shift engineer.
PL Primary filter cleaned- 8 nos.

Comp#04 maintenance(motor & MOP alignment) under progress(Motor


PL alignment done).
PL Primary filter changed.
PL Primary filter cleaned-16 nos.
PL Smelter side fire pump JP#2 stopped(as per Nagesh sir's instructions).

PL Comp#04 maintenance(motor & MOP alignment)


PL Dryer backflushing
PL Primary filter cleaned-8 nos.

PL Watermeter reading taken in Potroom.


PL Primary filter cleaned- 8 nos.
Supply checked for compressors and pressure switch found ok, water
BD drained out from Auto rain Valve line but FH alarm is niot getting reset

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Drinking water line flushing -WIP
PL 5S work at ACH ( WIP)
PL pipeline fabrication outside ACH. ( NOT STARTED IN ' A' SHIFT)
PL Manual shaft rotation and air release from NRV.

PL Started at 15:30 hrs


PL Stopped at 15:45 hrs motor racked out,I/V and O/V closed of Dryer#3
PL Started at 15:00 hrs and stopped at 16:15 hrs
PL Primary and Sec filter changed.Also Filter piece of FRL changed.
PL Dryer back flushing not done since passing is there in Bypass V/V
PL Gap voltage cheked 1st-6.18,2nd-6.19,3rd-6.05 V
PL Flushing of DWL done.
PL Jockey Pump 2 running as per Vendan Sir.
PL Primary filter cleaning done-8 Nos.

PL Watermeter reading taken in Potroom.


PL Primary filter cleaned- 8 nos.
Pressure switch bypassed by electrical; side (SWD) even afetr that FH alarm
BD is not getting reset

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL HFO line opened for Bake oven on request by shift engineer.

PL Chemical dosing done


PL Primary Filter Changed
PL Backwashed as per Vendan Sir.
PL Unit#2 Backwashed and running
PL Primary Filter Cleaned

PL Watermeter reading taken in Potroom.


PL Primary filter cleaned- 8 nos.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Comp#03 maintenance(motor & MOP alignment) under progress

PL Primary filter cleaned-8 nos.


PL Comp#03 maintenance(motor & MOP alignment) DONE.
PL Comp#03 oil cooler cleaning done.
PL Unit#2 Backwashed and running
PL Chemical dosing done
PL Backwashed as per Vendan Sir.
PL Watermeter reading taken in Potroom.

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL intercooler 1 cleaning WIP
PL Strainer cleaning WIP
PL Valve maintenance WIP

PL Primary filter changed.


PL Primary filter cleaned-8 nos.
PL Strainer cleaning COMPLETED
PL intercooler 1 cleaning , & Boxup COMPLETED
PL Valve maintenance WIP

PL Watermeter reading taken in Potroom.


PL Primary filter cleaned-8 nos.
PL Fire Hydrant line valve checked in GAP area.
PL Dewatering pump started for draining.

PL Watermeter reading taken in Potroom.


PL Pri. Filter changed.
PL V/V Chambers Plates fabrication done.
PL B/V maint job going on.
PL Closed

PL Primary filter cleaned-8 nos. done


PL ADV no. 1 dismentaling and maint. (Running ok)
PL B/V maint and test ok ob done.
PL inlet valve actuater maint. And check Job done.
PL House keeping done
PL opened
PL AVGF backwash done
PL Watermeter reading taken in Potroom.
PL Primary filter cleaned-8 nos.
PL Dewatering pump started for draining.

PL Watermeter reading taken in Potroom.


PL Pri. Filter changed.
PL Pipeline Fabrication WIP
PL Started and Running at DPT-3 deg C.
PL Strainer cleaning done.
PL Strainer cleaning not done as B/F v/v is passing.
PL Maintenance WIP
PL POP new LED installed.

PL Primary filter cleaned-8 nos. done


PL Break down maint.
PL condenset pipeline maint.
PL three person going to FTP
PL auto drain valve conection
PL stoped at 2:19 pm

PL Watermeter reading taken in Potroom.

PL main motor/MOP allinement WIP


PL 8 no. secondary filter change has been done
PL puller fabricate and MP# Maint WIP
Air audit done from pot room
PL 16 no.Pri. Filter changed. (In comp#1 new P. filter install)
PL FRL cleaning done
PL instrument line flushing done

Comp # 2, Main motor( radial +0.26 and axial +0.05 set)/MOP allinement
PL done.
PL Drayer Back-flushing done.
PL Fabrication work done inttercooler moisture discharge line.
PL Primary filter cleaned - 8 nos.
PL Sand filling near water tapping before ACH.
PL Crane problem rectified by switchyard engineer( Mr.Bibhashis).
PL Water sample sent to LAB.
PL Diesel shifting done from Garage to RPH.
Comp # 3 started @ 8:55 pm after GAP voltage settting done for 3rd
PL stage & got tripped at 9:14 pm.

Comp # 2 started @ 10:36 pm ( normal )


PL

PL Watermeter reading taken in Potroom.


PL Unit#1 Backwashed and running

PL Main Pump # 3 maintenance done.


PL Gasket fiited at MOP NRV.
PL Cast house HFO line up done on request by Mr. Bala.
PL Started @ 5:39 pm
PL CWP # 2 started at 5:30 pm
PL Stooped for PM at 7:20 pm
PL Rack out done by switchyard team by Mr.Krishna .
PL Differential oil pressure lever change over done.
PL Primary filter cleaned - 8 nos.
PL CWP # 2 stopped at 9:42 pm

PL Primary filter cleaned - 8 nos.


PL Copmpressor cleaning with cotton
PL Dewatering pump started
PL Watermeter reading taken in Potroom.
PL HFO line opened for Bake oven on request by shift engineer.

PL Primary filter changed - 8 nos each


PL Primary filter cleaned - 8 nos.and Sec filter of Comp#3 checked found OK
PL Water line maintenance work done.

PL Secondary filter changed of Comp # 6


PL Back flushing done and FRL cleaning done.
PL Primary filter cleaned.- 8 nos.

PL Primary filter cleaned - 8 nos.


PL Watermeter reading taken in Potroom , CPH, PPH, GARAGE

PL Watereter reading taken.


PL Motor shaft & MOP allignment under progress.
PL Primary filter changed.
PL Secondary filter checked. And found chocked
BD Maintenance going on.

PL Motor shaft & MOP allignment under progress.


BD Maintenance done.
PL Primary filter cleaned.- 8 nos.
PL Inlet valve maintenance done.
PL Bypass valve maintenance done.
PL HFO line up done on request.

PL Primary filter cleaned - 8 nos.


PL Watermeter reading taken in Potroom , CPH, PPH, GARAGE

PL ladder making process cont.


PL CWP#3 maint. Process Cont.
PL Primary filter changed.
PL 8 no. Primary filter cleaning done
PL Primary filter cleaned.- 8 nos.
PL Technician( 3 nos.) sent to FTP.
PL CWP#3 annual maintenance done.
PL Diesel pump # 1 run for 1 hour for check up.
PL Diesel pump # 2 runned and valve damaged. Valve maintenance work under
going.

PL Diesel pump # 1 runned and valve damaged. Valve maintenance work under
going.
PL Cleaning with cotton
PL Watermeter reading taken in Potroom , CPH, PPH, GARAGE

PL maint. work done.


PL HWP#3 maint. work done.
PL Primary filter changed.
PL 8 no. Primary filter cleaning done

PL Oil Filter of Comp#3 change over taken.Left side filter running.


PL Temp. transmitter changed and digital manometer calibrated to "inWC"
PL Technician( 5 nos.) sent to FTP.
PL Primary filter cleaned.- 8 nos.
PL Shaft shifted from Stores to WorkShop.

PL Primary filter cleaned.- 8 nos.


Watermeter reading taken in Potroom , CPH, RPH, GARAGE,SECTION-
PL 3,POT CONTROLLER

PL Watermeter reading taken in Potroom


PL Primary filter changed.
PL HWP#2 PM completed,motor racked in .
PL Trial run for the pump of SYD side taken
PL Leakage arrested, no leakage found.
PL Ladder Fabrication Job Going on.
PL Unit#1 backwashed
PL CBM Done.
PL Ladder Fabrication Job Going on.
PL Welding/cutting job of shade behind ACH in progress
PL FTP work(2 technicians sent for FTP work).
PL Annual Maintenance done and CT Fanracked in.
UPM Unused water line closed.
UPL DEP # 3 Started as per swicthyard @ 07:58 PM
PL Unit#1 backwashed

PL Primary filter cleaned.- 8 nos.


Watermeter reading taken in Potroom , CPH, RPH, GARAGE,SECTION-
PL 3,POT CONTROLLER

PL Primary filter changed.


PL Primary filter cleaned.- 8 nos.
PL Annual maintenance of CT # 3 at RPH under progress.
PL Dryer Cleaning outside & Inside done.
PL Ladder fabrication for maintenance in comp house under progress.
By Contractor Filter wall fabrication work under progress.
On Request Jockey pump started at 11:20 am
PL FTP work(2 technicians sent for FTP work).

PL Ladder fabrication for maintenance in comp house under progress.


By Contractor Filter wall fabrication work under progress.
PL Annual maintenance of CT # 3 at RPH done.
PL Water leakage arresting done
PL Water leakage arresting done
PL Primary filter cleaned.- 8 nos.
PL HFO lined up for bake oven (as per shift i/c diptesh)
new chemical barrel shift to 100 no. in cph and 71 no. in rph

Watermeter reading taken in Potroom , CPH, RPH, GARAGE,SECTION-


PL 3,POT CONTROLLER
PL Dewatering pump started

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Ladder fabrication for maintenance in comp house
PL Auto drain valve (both) maintenance of Dryer#04
PL Annual Maintenance done.
PL Filterwall fabrication work under progress.
PL 5S of ACH area done.

PL Primary filter cleaned- 8 nos.


PL Ladder fabrication for maintenance in comp house
PL Filterwall fabrication work under progress.
PL 5-s work done
PL 5-s work done
PL Unit#1 backwashed
UPL DEP # 3 Started as per swicthyard @ 05:35 PM

UPL Water leakage in Process water line arrested.Welding done.


PL Pri. Filter cleaning done. 8 nos.
PL Watermeter reading taken.
PL CT#3 STOPPED as Hot Water temp. goes below 23 deg Celcius.

PL Primary filter changed.


PL Primary filter cleaned.-8 nos.
PL Dewatering pump started for draining.
PL CT # 3 ,started @ 10.16 am at CPH.
PL HFO Line up done.

PL Primary filter cleaned- 8 nos.


PL Unit#1 backwashed

PL Watermeter reading taken.


PL Pri. Filter cleaning done. 8 nos.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Condensate header water leakage arresting work under progress.
PL Painting work under progress.
PL MP #3, shaft assembly work under progress.
PL Trench plate removed for painting work

PL Trench plate removal for painting work


PL MP #3, shaft assembly work under progress.
PL Condensate header water leakage arresting work under progress.
PL Unit#1 backwashed
PL Primary filter cleaned- 8 nos.
PL Filterwall fabrication work under progress.
PL Painting work under progress.

PL Watermeter reading taken.


PL Pri. Filter cleaning done. 8 nos.
PL CT # 1 ,stopped @ 11 pm at CPH as CW temp was touching 21 deg C.

PL Primary filter changed.


PL Primary filter cleaned.-8 nos.
PL Condensate header water leakage arresting work done.
PL Painting work under progress.
PL Maintenance work under progress.
PL Filterwall fabrication work under progress.
PL CWP # 3 started @ 12:25 pm & CWP# 1 stopped @ 12:35 pm
PL New Discharge valve gear box replaced.
PL CT # 1 started @ 7:00 AM.

PL Primary filter cleaned.-8 nos.


PL Filterwall fabrication work under progress.
PL Painting work under progress.
PL Maintenance work under progress.
PL Unit#1 backwashed

PL Watermeter reading taken.


PL Pri. Filter cleaning done. 8 nos.
PL CT # 1 stopped @ 10 pm at CPH as CW temp was touching 21 deg C.
PL Maintenance job completed, new motor installed.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL Cleaning & Maintenance done.
PL Fabrication work under progress.
PL Air release from NRV & MOP line.
PL Comp # 6 started @ 12:23 pm & tripped at 12:38 pm

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL Air release from NRV & MOP line.
PL Maint. Work
PL Maint. Work
PL Comp # 6 started @ 6:15pm
PL Comp # 1 stoped @ 7:48pm
PL stopped @ 9:00pm

PL Watermeter reading taken.


PL Pri. Filter cleaning done. 8 nos.
PL CT # 1 stopped @ 12 am at CPH as CW temp was touching 21 deg C.
PL HFO line v/v opened as requested by Kuldip Chandraker
PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL FRL cleaning ,, Secondary filter change
PL Dryer backflushing
PL Painting Job in progress.
PL Motor change and maintenance of CWP#2.(WIP)

PL Primary filter cleaned- 8 nos.


PL Painting work under progress.
PL GAP valtage checking St1 =6.2,St2=6.2.St3=6.17
PL maintenance work done of CWP#2.. Running satisfactorily.
PL New Pressure gauge install
PL New pipe line fabrication work in progress.

PL Watermeter reading taken.


PL Pri. Filter cleaning done. 8 nos.

PL MP#3 assemby under progress.


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL Primary filter changed.
PL MOP & Motor alignment under progress.
PL Filterwall fabrication work under progress.
MP#1 started at 10:40 am but it fails due to over current relay, THUS main
PL pump# 2 STARTED

PL Primary filter cleaned- 8 nos.


PL Painting work under progress.
PL Motor/Mop allignment,
PL Start at 7:00pm
PL Auto mode
PL Stop at 7:10pm
PL Filterwall fabrication work under progress.
PL MP#3 assemby under progress.

PL Primary filter cleaned- 8 nos.


PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Bearing cover sent to work shop for machining

PL Primary filter cleaned- 8 nos.


PL Make up 125 kL
PL Backwash done
PL Bearing cover made.
PL Dosing done

PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL unit # 1 Backwash done

PL Primary filter cleaned- 8 nos.


PL Change ADV of Dryer no. 6 with dryer no. 01

PL Primary filter cleaned- 8 nos.


PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Temperature sensor changed from dryer#1 to dryer #6.
PL HWP #1 started at 11:50 AM & HWP# 2 stopped at 11:55 AM
PL Bearing Mounting
PL Painting work under progress.
PL Pipeline fabrication for sec. compressor.

PL Auto drain valve cleaning reinstallation, Temp sensor changing for ADV
PL Primary filter cleaned- 8 nos.
PL NDE side bearing removed
PL MP#3 bearing cover fabrication done & fixed to pump.
Trial Trail taken of CWP # 01 found ok

PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Stage #1 cleaning & trench cover placing in progress.
PL Painting work under progress.
PL Bearing installation.
PL Filterwall fabrication work under progress.

PL Primary filter cleaned- 8 nos.


PL Stage #1 cleaning & trench cover placing in progress.
PL Bearing installation done
PL Filterwall fabrication work todays job done.

PL Primary filter cleaned- 8 nos.


PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Stage #1 Diffuser assembly.
PL Painting work under progress.
PL Bearing installation.
PL Filterwall fabrication work under progress.
PL Rectification of puller

PL Primary filter cleaned- 8 nos.


PL Stage #1 Box up done.
PL Painting work for today done
PL Filter wall fabrication work under progress.
PL Chemical dosing done
PL Bearing installation pending.
PL Sec filter shifted to ACH 8 nos.

PL Watermeter reading taken.


PL Secondary filter checked - 8 nos. & 3 filter found not ok(loose foil).

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Valve replacement
PL Painting work under progress.
PL Bearing installation.
PL Filterwall fabrication work under progress.
PL housekeeping done

PL Primary filter cleaned- 8 nos.


PL Painting work under progress.
PL Bearing installation.
PL Filterwall fabrication work under progress.
PL Backwash done
PL Chemical dosing done

PL Primary filter cleaned- 8 nos.


PL Watermeter reading taken.
PL HFO lined up for bake oven on request byMr. Subroto.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Valve Maint. And installed
PL Painting work under progress.
PL Quartarly Maint. of CWP#1
PL Filterwall fabrication work under progress.
PL housekeeping done
PL Quartarly Maint. of HWP#2
PL CBM done

PL Primary filter cleaned- 8 nos.


PL Filterwall fabrication work done.
PL Painting of pipe line done.
PL Quartarly Maint. of HWP#2 not done.
PL Quartarly Maint. of CWP#1
PL Maintenance work done.
PL CBM for for all running equipments.
PL HFO line up done.
PL CWP # 1 & HWP # 2 Rack in done

PL Watermeter reading taken.

PL Filterwall fabrication work under progress.


PL Painting work under progress.
PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Watermeter reading taken.

PL Primary filter cleaned- 8 nos.


PL 5S done on these areas.
PL 5S done on these areas.
PL 5S done on these areas.
PL Work done
PL work done.
PL Watermeter reading taken.
PL Primary filter cleaned- 8 nos.

PL Watermeter reading taken.


PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Dosing done

PL Primary filter cleaned- 8 nos.


PL Airaudit done in potroom & total 64 nos. of hoses found open.
PL HFO line up done on request by Mr. Harse Mittal.
PL Cast house closed(Mr. Ashis) & Bake oven opened(Mr.Hars Mittal).

PL Watermeter reading taken.


PL Airaudit done in potroom & total 64 nos. of hoses found open.

PL Watermeter reading taken.


PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Filterwall fabrication work under progress.
PL Painting work under progress.
PL PM going on
PL Shifting of Pri. And Sec. filter
PL CT#1 started at 9:30 am

PL Primary filter cleaned- 8 nos.


PL Airaudit done in potroom & total nos. of hoses found open.
PL Monthly Maintenance work done,
PL Water leakage arresting done.
PL HFO Line up done.
PL Dryer box up done & Trench plate covered.
PL CT#1 stopped @ 10 PM
PL Primary filter cleaned- 8 nos.
PL Watermeter reading taken.
PL Airaudit done in potroom & total 61 nos. of hoses found open.

PL Watermeter reading taken.


PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL PM going on
PL Painting work under progress.
PL CT#1 started at 12:30 pm
PL Airaudit done in potroom & total 60 nos. of hoses found open.
PSD Water supply restored and 2" ball v/v installed.

PL Drinking Water line Flushing done.

PL Painting work done.


PL Annual maintenance of HWP # 1 done.
PL Air audit done & 53 nos. found open.
PL Rack in done.
PL Training to New technician given by B-shift Engineer.
Rectified ,the Hot well level indicator.
PL
PL Primary filter cleaned- 8 nos.

PL CT#1 stopped @ 10 PM
PL Watermeter reading taken.
PL Airaudit done in potroom & total 68 nos. of hoses found open.
PL HFO Line up done as per shift incharge of bakeoven

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL PM going on
PL Painting work under progress.
PL CT#1 started at 8:30 am

PL Primary filter cleaned- 8 nos.


PL Airaudit done in potroom & total 55 nos. of hoses found open.
PL Painting work under .
PL Monthly maintenance done.
PL Platform fabrication work completed.
PL Secondary Dryer Cooling fan rectified.
UPL Isolation of Steam line & its restoration.
PL Water parameter alarm rectified.

PL CT#3 stopped @ 2:20 AM


PL Primary filter cleaned- 8 nos.
PL Watermeter reading taken.
PL Airaudit done in potroom & total 60 nos. of hoses found open.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL PM done
PL Painting work under progress.
PL CT#3 stopped at 9:10 am and CT#2 Started at 9:15 am
PL Airaudit done in potroom & total 53 nos. of hoses found open.

PL Airaudit done in potroom & total 54 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL CT#3 RACK IN DONE

PL CT#1 stopped @ 1.00 AM


PL Watermeter reading taken.
PL Airaudit done in potroom & total 60 nos. of hoses found open.

PL HFO Line up done on request by Mr. Ashish.


PL CT Fan # 1 started.
PL Monthly Maintenance done.of FFP#1 done
PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Fabrication of pipe line.
PL Painting work under progress.
PL Airaudit done potroom.

PL Airaudit done in potroom & total 49 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL watermeter removed mechanically at MI Garage.
PL HFO Line up done for Bakeoven on request by Mr. Harsh Mittal.
PL Fabrication of pipe line under progress.
PL Unit #2 Backwash done.
PL Watermeter installation at central stores.

PL CT#2 stopped @ 1.00 AM


PL Watermeter reading taken.
PL Airaudit done in potroom & total 60 nos. of hoses found open.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL Monthly Maintenance done in HWP # 4.
PL Air audit done in potrom & total 57 nos. of hoses found open.
PL CT # 2 started at 7:10 am.
PL HWP # 2 started at 8:00 am.
PL HWP # 4 stopped at 8:05 am.
PL Watermeter installation work for Central store.
PL Secondary filter checked & found foils gap increased.
PL Secondary filter checked & found foils become loose & can slide
tangentially.
PL Airaudit done in potroom & total 56 nos. of hoses found open.
PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL Watermeter installation work for Central store.
PL Monthly Maintenance done in HWP # 4.
PL Unit #2 Backwash done.

PL Airaudit done in potroom & total 56 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Monthly Maintenance done in HWP # 4 done.
PL CT#1 stopped @ 11.35 PM
PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Air audit done in potrom & total 56 nos. of hoses found open.
PL CT # 1 started at 7:10 am.

PL Airaudit done in potroom & total 62 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Unit #2 Backwash done.

PL Airaudit done in potroom & total 63 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL CT#2 stopped @ 10:15 PM
PL Watermeter reading taken.

PL Primary filter changed(New 5 primary filter fitted).


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL Air audit done in potrom & total 59 nos. of hoses found open.
PL CT # 2 started at 7:10 am.
PL Put in AUTO mode @ 8:00 am.
PL Stooped @ 8:05 am.
PL Bi-Monthly Maintenance under progress.
PL Fabrication of water pipe line work under progress at ACH.
PL Started at 11:00 am.
PL Stopped at 11:05 am.
PL Pressure gause fitted taking from HWP # 3.
PL Started at 1:40 pm.
PL Stopped at 1:45 pm.

PL Airaudit done in potroom & total 61 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Unit #2 Backwash done.
PL Painting work under progress.
PL allignment checking
PL Fabrication of water pipe line work under progress at ACH.
PL Backflushing of pipe
PL cwp#4 rack in and hwp#4 rack out @3:05 pm
HFO Line up done for Bakeoven on request by Mr. jitendra@ 3:50pm
PL
PL Oil top up done
PL Rack in done

PL Airaudit done in potroom & total 56 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL CT#2 stopped @ 10:15 PM
PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Air audit done in potrom & total 52 nos. of hoses found open.
PL CT # 2 started at 7:10 am.
PL HWP # 4 , NRV Maintenance work under progress.
PL Fabrication work structure for PPH under progress.
PL Maintenance & shaft allignment of CT # 3 under progress.

PL Airaudit done in potroom & total 48 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Unit #2 Backwash done.
PL Painting work under progress.
PL HWP # 4 , NRV Maintenance work under progress.
PL Fabrication work structure for PPH under progress.
PL Maintenance & shaft allignment of CT # 3 under progress.
PL HFO Line up done for cast house on as per Mr. BALA@ 2:45 PM
PL ct# 3 rack in at 7:39 PM now in auto mode

PL Primary filter cleaned- 8 nos.


PL CT#1 stopped @ 10:30 PM
PL Watermeter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Painting work under progress.
PL CT # 1 started at 8:35 am.
PL Air release from NRV ,MOP line & manual shaft rotation.
PL Started @ 9:35 am.
PL Maintenance work under progress.
PL Steam line Isolation done as per request.
PL Started @ 11:40 am

PL ADV installed which is remove from dryer#5


PL primari filter clean 8 no.
PL Secondary filter installed
PL Steam line restore
PL stoped
PL stoped
PL Painting work under progress.
PL Maintenance work under progress.

PL Primary filter cleaned- 8 nos.


PL Watermeter reading taken.
PL Airaudit done in potroom & total 65 nos. of hoses found open.

PL Airaudit done in potroom & total 55 nos. of hoses found open.


PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Unit #1 Backwash done.
PL Painting work under progress.
PL CWP # 3 , allignment checking,NRV Maintenance work under progress.
PL HFO Line up done for cast house on as per Mr. Satish@ 9 AM
PL FRL cleaning, FRL DIRECTION CHANGING
PL POP stop at12 pm
PL POP started at 1:30 PM
PL Dryer back flushing
Discharge line v/v changing

PL

PL Airaudit done in potroom & total 58 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Unit #2 Backwash done.
PL HFO Line up done for Bakeoven on request by S/I @3 pm
PL Painting work .
PL FRL cleaning, Strainer cleaning & Dryer backflushing.
PL CWP # 3 , allignment checking,NRV Maintenance work done.
PL Pipeline fitting of sec compressor.
PL Manometer pipeline flushing and cleaning done.

PL Primary filter cleaned- 8 nos.


PL Watermeter reading taken.
PL Airaudit done in potroom & total 74 nos. of hoses found open.

PL Airaudit done in potroom & total 49 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Unit #1 Backwash done.
PL Primary filter changed.
PL Painting work under progress.
PL CT Fan#1 stopped at 9:15 AM and CT Fan#3 started at 9:15 AM
PL PM of CT Fan#1 at CPH
PL CBM of all running equipments under progress.
PL ADV installation
PL HWP#3 started at 11:18 AM & HWP#4 stopped at 11:23 AM
PL TP#3 started & TP# 4 stopped at 10 AM

PL Painting of structure
PL Zero loss drain valve installtion dryer 02
PL Pipe fittings installation secondary compressor line
PL CBM Comp House
PL Airaudit done in potroom & total 67 nos. of hoses found open.
PL Primary filter cleaned- 8 nos.
PL Unit #2 Backwash done.
PL Maint. Work done.
PL Started at 2:pm

PL Air audit done in potrom & total 64 nos. of hoses found open.
PL Watermeter reading of potrom taken.
Dewatering pump given to Switchyard.

PL Airaudit done in potroom & total 58 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Unit #1 Backwash done.
PL Primary filter changed.
PL Annual Maintenance
PL Painting of structure under progress
PL New manometer installation.
PL Monthly maintenance under progress.

PL Monthly maintenance under progress.


PL CT Fan#1 started at 9 am & CT fan #2 stopped at 9:05 am

PL Unit #2 Backwash done.


PL Annual Maintenance done,Motor Rack in done
PL Monthly maintenance done

PL Monthly maintenance done


PL Painting of structure under progress
PL New manometer installation.
PL Airaudit done in potroom & total 58 nos. of hoses found open.
PL Valve opened for Cast House.

PL Air audit done in potrom & total 77 nos. of hoses found open.
PL Watermeter reading of potrom taken.
PL HFO line up done for Bake oven.
PL Primary filter cleaned- 8 nos.

PL Airaudit done in potroom & total 58 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Unit #1 Backwash done.
PL Primary filter changed.

PL Airaudit done in potroom & total 68 nos. of hoses found open.


PL Primary filter cleaned- 8 nos.
PL Leakage arresting work done.

PL Air audit done in potrom & total 75 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL CT # 1 stopped at 4:10 am as cold water temp. was low.
PL Airaudit done in potroom & total 34 nos. of hoses found open.
PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Unit #1 Backwash done.
PL HFO Line up done for cast house on as per Mr. BALA@ 12 PM
PL Started at 7:45 AM
DRINKING WATER LINE FLUSHING UNDER PROGRESS.
PL
PL Painting of structure under progress
PL ADV repairing for installation

PL Primary filter cleaned- 8 nos.


PL Painting of structure done.
PL DRINKING WATER LINE FLUSHING DONE.
PL Airaudit done in potroom & total 60 nos. of hoses found open.
PL ADV maintenance done.

PL Air audit done in potrom & total 68 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos.

PL Airaudit done in potroom & total 61 nos. of hoses found open.


PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Unit #1 Backwash done.
PL HFO line up done for Bake oven.
PL Painting of structure under progress

PL Flowmeter installation under progress.


PL 5-S of AREA
PL Maintenance.
PL Airaudit done in potroom & total 61 nos. of hoses found open.
PL Primary filter cleaned- 8 nos.
PL Unit #2 Backwash done.
PL HFO line up done for Bake oven.
PL Painting of structure under done

PL Flowmeter installation under done


PL 5-S of AREA
USD Ball v/v replaced 1"

PL Air audit done in potrom & total 67 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL Air release & manual shaft rotation done before starting.
PL Started @ 12:15 am.
PL Started @ 12:10 am.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.

PL 5S done.
PL Chemical dozing done
PL Air audit done in potrom & total 60 nos. of hoses found open.
PL primary filter cleaned-8 nos.

PL Air audit done in potrom & total 73 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos.
PL Painting going on
PL Cleaning of Equipment
PL Shifting of Chem. Barrel+Sec. filter done to ScrapYard
PL Air audit done in potrom & total 65 nos. of hoses found open.
PL Fabrication job going on.
PL Unit #1 Backwash done.

PL Primary filter cleaned- 8 nos.


PL Painting done
PL Cleaning of Equipment
PL Unit #2 Backwash done.
PL Chemical dozing done
PL ADV installation in R to A side

PL Air audit done in potrom & total 58 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos.

PL Air audit done in potrom & total 62 nos. of hoses found open.
Stop Stopped @ 7:05 am
PL FRL filter change
PL By-pass valve maintenance in progress
PL 5 nos secondary filter shifted to filter house for changing
PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
Stop Stopped @ 11:40 am
PL Semi-annual maintenance done

PL Air audit done in potrom & total 72 nos. of hoses found open.
PL Primary filter cleaned- 8 nos.
PM Maintenance work done of Bypass valve.
PM Inlet Valve maintenance done.
PM POP-NRV maintenance done.
PM FRL filter changed & instrumentation line flushing done.
PM Secondary Filter changed-5 nos.only.
PL HFO line up done on request by Mr. Diptesh(Shift-In-charge).
PL Cleaning done
PL Air audit done in potrom & total 60 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos.
PL CT# 1 stopped at 3:45 am as cold water temp down to 20.1

PL Air audit done in potrom & total nos. of hoses found open.
PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Make up ran 125 kL
PL Back Flushing and Strainer cleaning,Y gasket found
PL CT# 1 started at 13:15 hrs
PL Unit #1 Backwash done.
PL Painting going on

PL Air audit done in potrom & total 71 nos. of hoses found open.
PL Primary filter cleaned- 8 nos.
PL Painting work done.
PL Main drinking line water line leakage arrested
PL MGF # 02 main hole flange gasket change
PL All filter unit passing valve replaced by ball valve
PL All filter unit pipe line leakage arrested
PL Secondary filter changed-3 nos.
Dryer FH-alarm rectified (resetting of relay switch done after that it is ok ) &
PL an ADV fitted.

PL Air audit done in potrom & total 71 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL cover fixing done
PL ADV REMOVED(which was not working)
PL Cleaning done
PL Air audit done in potrom & total 78 nos. of hoses found open.
PL Primary filter changed.
PL Sec filter changed 8 nos.
PL Make up ran 125 kL
PL Unit #1 Backwash done.
USD Reset and then started ran for an hour again alarm FH came

PL Air audit done in potrom & total 67 nos. of hoses found open.
PL Primary filter cleaned- 8 nos.

PL Air audit done in potrom & total 72 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL HFO line up done on request by Mr. BALA(Shift-In-charge).

PL Air audit done in potrom & total 53 nos. of hoses found open.
PL Primary filter changed.
PL Primary filter cleaned- 8 nos.
PL Maint. Of After Cooler
PL Pipe line fabrication work in Carbon filter of Unit # 1 under progress.
PL Duplex filter checked in Comp # 4.
PL Make up ran 125 kL

PL Air audit done in potrom & total 68 nos. of hoses found open.
PL Primary filter cleaned- 8 nos. done.
PL Maint. Of After Cooler on process.
PL Pipe line fabrication work in Carbon filter of Unit # 1.
PL Motor allignment done with radial 0.26mm
PL gap transmeter fixing
PL scroll comp shifted from store

Airaudit done in potroom & total 22 nos. of hoses found open (incomplete
PL report due to power outtage).
PL After Cooler end cover box up done.
PL Watermeter reading of potroom taken.
PL Secondary filter changed.
PL Primary filter cleaned- 8 nos. done.

PL Comp#3 started @ 11:15 am


PL After Cooler Tightened
USD Job in progress
PL Pump change over taken.
Secondary Filter Changing, FRL cleaning, Insrument line flushing, Inlet
Valve Actuator cleaning, Bypass Valve Actuator cleaning, Gap Voltage
PL setting stage III

PL Air audit done in potrom & total 53 nos. of hoses found open.
PL Primary filter changed & secondary filter checked & found ok.
PL Primary filter cleaned- 8 nos. done.
PL Complete air audit for air line completed.
PL Air release from NRV,MOP line & manual shaft rotation.
PL Started @ 9:05 PM.

PL Air audit done in potrom & total 57 nos. of hoses found open.
PL Watermeter reading of potroom and ftp taken.
PL Fire Hydrant Line for BAKEOVEN has been charged
PL Primary filter cleaned- 8 nos. done.

PL Valve opened for CH


PL Unit#2 Back Washed and running.

PL Air audit done in potrom & total 51 nos. of hoses found open.
PL Primary filter changed & secondary filter checked & found ok.
PL Primary filter cleaned- 8 nos. done.
Fire hydrant line valve near ACH damaged & line made dummy before ACH
PL parking
1 no. Fire Hydrant valve given to Bake oven(Mr.Surya , Shift-Engg.) as per
PL instruction by Mr. E.Vendan Sir. From RPH store.
PL Fire hydrant line valve near LPG yard closed.

PL Air audit done in potrom & total 59 nos. of hoses found open.
PL Primary filter cleaned- 8 nos. done.
PL Fire hydrant line valve near LPG and Sec. 01 are opened.
PL Near furnace no. 01 fire hydrant line valve are passing.(leakage found)
PL Watermeter reading of potroom and ftp taken.

PL Valve opened for BO


PL Unit#2 Back Washed and running.
PL Primary filter changed & secondary filter of 6 found choked rest are ok.
PL Primary filter cleaned- 8 nos. done.

PL Primary filter changed


PL Primary filter cleaned- 8 nos. done.
PL 5S work done.
PL Unit#1 Back Washed and running.
PL FIRE HYDRANT LINE - LEAKAGE AUDIT DONE
PL Airaudit done in potroom & total nos. of hoses found open

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 72 nos. of hoses found open
PL Watermeter reading of potroom and ftp taken.

PL Primary filter changed.


PL Airaudit done in potroom & total 68 nos. of hoses found open
NRV maintenance under progress & electrical cable found damaged &
PL informed to switchyard.
PL Primary filter cleaned- 8 nos. done.
PL Automation of FFPH maintenance work under progress.
PL Complete air audit of air line in carbon area under progress.
PL Zero loss drain valve installation in dryer # 5( right side) under progress..

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 64 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL HFO Valve opened as per Mr. BALA
PL Complete air audit of air line in carbon area under progress.
PL Zero loss drain valve installation in dryer # 5( right side) .
PL Painting work

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 69 nos. of hoses found open
PL Watermeter reading of potroom and ftp taken.

PL Primary filter changed.


PL Airaudit done in potroom & total 71 nos. of hoses found open
PL Primary filter cleaned- 8 nos. done.
PL Bi-Monthly maintenance under progress.
PL Automation checking of FFPH under progress.
PL Railing fabrication for barricading ACH from Alumina
PL Painting of pipe line under progress.
PL CBM done of all running equipments.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 65 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL Painting of pipe line /Structure
PL 5S work done.
PL RAILING fabrication for boundry of ACH backyard

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 65 nos. of hoses found open
PL Watermeter reading of potroom and ftp taken.
PL Valve opened for BO

PL Primary filter changed.


PL Airaudit done in potroom & total 74 nos. of hoses found open
PL Primary filter cleaned- 8 nos. done.
PL CT # 1 started at 1:25 pm.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 75 nos. of hoses found open
PL Unit#1 Back Washed and running.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 85 nos. of hoses found open
PL Watermeter reading of potroom taken.

PL Primary filter changed.


PL Airaudit done in potroom & total 67 nos. of hoses found open
PL Primary filter cleaned- 8 nos. done.
PL Ralling fabrication work on process
PL 5S and scrape segregation/spare arrangement on process.
PL Painting of pipe line under progress.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 68 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL HFO Valve opened as per Mr. BALA
PL Painting of pipe/ structure
PL Ralling fabrication work
PL 5S and scrape segregation/spare arrangement done

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 72 nos. of hoses found open
PL Watermeter reading of potroom taken.
PL Primary filter changed.
PL Primary filter cleaned- 8 nos. done.
PL Railing fabrication for barricating ACH from Alumina under progress.
PL Dryer maintenance: By service engg under progress.
PL Painting of structure under progress.
PL Watermeter Maintenance done.
PL Bi-Monthly Maintenance done.
PL Dryer Bypassed for maintenance work.
PL Bi-Monthly Maintenance done.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 62 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL Railing fabrication for barricating ACH from Alumina
PL Dryer maintenance: By service engg on progress.
PL Painting of structure under progress.
PL G I Sheet Cutting for plug point
PL leakage arresting

PL Primary filter cleaned- 8 nos. done.


PL Watermeter reading of potroom taken.

PL Primary filter change comp 02, 03 & 04


PL Railing fabrication for barricating ACH from Alumina under progress.
PL Dryer maintenance: By service engg under progress.
PL Painting of structure under progress.
PL Primary filter cleaned.- 8 nos.
PL Valve chamber-6 maintenance work under progress.
PL Door reparing work under progress.
PL White washing of ACH under progress.

PL Railing fabrication for barricating ACH from Alumina


PL Dryer maintenance: By service engg
PL Painting of structure
PL Primary filter cleaned.- 8 nos.
PL Valve chamber-6 maintenance work
PL White washing of ACH
PL Unit#1 Back Washed and running.
PL Airaudit done in potroom & total 62 nos. of hoses found open
PL Main Pump#1 started at 7:40 PM

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 73 nos. of hoses found open
PL Watermeter reading of potroom taken.
PL Line for BO opened.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 65 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Railing fabrication for barricating ACH from Alumina - in progress
PL White washing of ACH under progress.
PL HWP#2 stopped at 12:30 PM for maintenance
PL structure maintenance/ repair- in progress
PL Fire Extinguisher hangigng to wall- in progress

PL Railing fabrication for barricading ACH from Alumina done.


PL Primary filter cleaned.- 8 nos.
PL Fire Extinguisher hanging to wall Done.
PL Airaudit done in potroom & total 60 nos. of hoses found open
PL White washing of ACH under progress.
PL HWP#2 bi-monthly maintenance Done and Racked in at 7:15 PM.
PL GI sheet cutting for charger box done.
PL HFO lined up for Cast House on request by Mr. Bala.
PL Unit#1 Back Washed and running.
PL HWP#2 started at 7:12 PM
PL HWP#3 stopped at 7:17 PM

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 68 nos. of hoses found open
PL Watermeter reading of potroom taken.
PL Comp # 5 stopped @ 10:30 pm.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 65 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL stage 2 cleaning
PL Chamber cover fabrication
PL fire line leakage arresting
PL Painting of structure under progress.
PL CWP#3 stopped at 12:15 pm

PL stage 2 cleaning and box-up done.


PL Chamber cover fabrication
PL fire line leakage arresting under progress.
PL Painting of structure under progress.
PL Primary filter cleaned- 8 nos. done.
PL Unit#1 Back Washed and running.
PL Airaudit done in potroom & total 63 nos. of hoses found open

PL fire line leakage arresting


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 62 nos. of hoses found open
PL Watermeter reading of potroom taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 63 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL HFO Valve opened as per Mr. jitendra
PL MOTOR Alignment,
PL FRL & Instrument line Flushing
PL Bi-monthly maintenance

PL Motor end cover cleaning


PL Oil top up 50 liters.
PL Bypass Valve maintenance
PL MOP Allignment,
PL HFO lined up for Cast House on request by Mr. Bala.
PL Unit#1 Back Washed and running.
PL Airaudit done in potroom & total 74 nos. of hoses found open
PL Gap voltage setting.
PL Dryer back flushing.
PL Main Pump #2 rack-in done @FFPH.
PL Large notice board shifted from ACH to RPH.
PL Cover plate fixing and fireline maintenance.

PL Airaudit done in potroom & total 69 nos. of hoses found open


PL Watermeter reading of potroom taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 72 nos. of hoses found open
PL Unit#2 Back Washed and running.

PL Primary filter cleaned- 8 nos. done.


PL Unit#1 Back Washed and running.
PL Manual shaft rotation & air release from NRV done.
PL Comp#05 started at 08:05 PM
PL CWP#3 started at 7:30 PM
PL HFO lined up for bake oven

PL Airaudit done in potroom & total 81 nos. of hoses found open


PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos. done.
PL POP MCB bypass turned off

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 55 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Fabrication of stand for maintenance
PL Water flow meter replacement- DONE
UPL HFO line up done for Cast house
PL Door/ Window repair work .
PL Secondary filter changed- 8 nos
PL Monthly maintenance- DONE.

PL Monthly maintenance work


PL Dryer Strainer cleaning work
PL Dryer Strainer cleaning work
PL Dryer Strainer cleaning work
PL Dryer Strainer cleaning work
PL Dryer Strainer cleaning work
PL Monthly maintenance work
PL Fixing of dosing pump.
PL Primary filter cleaned- 8 nos. done.
PL Unit#1 Back Washed and running.
PL Airaudit done in potroom & total 68 nos. of hoses found open

PL Airaudit done in potroom & total 85 nos. of hoses found open


PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos. done.
PL Fire Hydrant line is charged now.
MP-1 tripped at 4:00 am thus MP-2 started to charge Fire hydrant line as
PL clearance given by Vendan Sir.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 63 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Fabrication of stand for maintenance
PL Flushing
PL Gland leakage arresting

PL Primay filter cleaned- 8 nos.


PL Complete air audit for leakages done.
PL Drinking water line flushing done.
PL Gland leakage arresting done.
PL Airaudit done in potroom & total 52 nos. of hoses found open.

PL Airaudit done in potroom & total 50 nos. of hoses found open


PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos. done.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 61 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Fabrication of stand for maintenance
PL Bi-monthly maintenance under progress.
PL Chambers identification display in progress.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 78 nos. of hoses found open.
PL Fabrication of stand for maintenance.
PL Chambers identification display done.
PL HFO line up done for bake oven on requested by Mr.Kuldip.

PL Airaudit done in potroom & total 78 nos. of hoses found open


PL Watermeter reading of potroom taken.
PL Primary filter cleaned- 8 nos. done.

PL Primary filter changed.


PL Leakage arresting.
PL Material shifting and pipe fitting at canteen.
UPL HFO line up done for Cast house
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 61 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Fabrication of stand for maintenance under progress.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 65 nos. of hoses found open.
PL Fabrication of stand for maintenance.
PL Pipe fitting material arrangement for reuse.
PL Material shifting and pipe fitting at canteen.
PL One Technician sent to FTP work on requested by Switchyard Team.

PL HFO line up done for bake oven


PL Airaudit done in potroom & total 59 nos. of hoses found open
PL Primay filter cleaned- 8 nos.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 77 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Fabrication of stand for maintenance under progress.
CWP#2 tripped at 9:15 AM
CWP #1 started at 9:17 AM
PL Material shifting and pipe fitting at RPH UNDER PROGRESS.
PL Leakage arresting under progress.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 80 nos. of hoses found open
PL water monotor1,2,3,4-Leakage arresting done
PL HFO line up done for cast house
PL Unit#1 Back Washed and running.
PL Fabrication of stand for maintenance.
PL CWP #2 started at 07:35 PM

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 75 nos. of hoses found open

PL Primary filter changed.Comp_2 Sec Fltr found OK by Praveen


PL Airaudit done in potroom & total 71 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Fabrication of stand for maintenance under progress.
PL Air pipe line fabrication under progress.
PL 09 no.s new primary filters installed .(08 in comp#3)

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 82 nos. of hoses found open.
PL Fabrication of stand for maintenance.
Air pipe line fabrication, material arrangement work done& filter shifting
PL from central Store to ACH done.
PL Distle water top up in battery done & 5S of ACH done.
PL HFO Line up done on requested by Mr. Kuldip

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 77 nos. of hoses found open
PL TP # 4 changeover done, TP # 3 Running

PL Primary filter changed. Sec Fltr found OK


PL Airaudit done in potroom & total 71 nos. of hoses found open
PL Unit#2 Back Washed and running ok.
PL no water supply problem solve
PL Primay filter cleaned- 8 nos.
PL satarted
PL stopped at 11:39am

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 68 nos. of hoses found open.
Rack out done by Mr. Abhinav(Switchyard). & its POP rectified & now
PL running.
PL Exhaust fan started.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 68 nos. of hoses found open
PL Compressor cleaning (external surface ) done

PL Primary filter changed.Comp_2 Sec Fltr found OK by Praveen


PL Airaudit done in potroom & total 67 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Dryer backflushing.
PL FRL cleaning & instrument airline flushing.
PL Canteen pipeline work under progress.
PL TP#3 tripped at 7:05 AM,TP#4 started at 7:10 AM.
PL Primary filter cleaned- 8 nos. done.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 59 nos. of hoses found open.
PL Cleaning of dryer, Sensor interchange, & current checking done.
PL Air line leakage audit only BAKEOVEN & GARAGE completed.
PL CT#2 started @ 4:30 pm.
PL Relay changed by switchyard team (Mr. Akhil sir & Roshan Sir).
PL New water line work done.

UPL Manual shaft rotation and air released from NRV of POP & MOP
UPL Started At 12:42 AM
PL CT#1 stopped @ 1 AM.
PL Airaudit done in potroom & total 65 nos. of hoses found open
PL HFO Line up done on requested by Mr. Kashyap

PL Primary filter changed.for comp # 01, 05 & 06


PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 81 nos. of hoses found open
PL plate fabrication for intercooler at workshop IN PROGRESS
PL Dummy plate fabrication for transfer pump # 01 PPH
PL 2" instrument line work - IN PROGRESS
PL Stopped at 10.30 AM for PM
PL Started at 10.20 AM
PL Started at 6.45 AM

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 68 nos. of hoses found open.
PL Maintenance work done.
plate fabrication for intercooler at workshop under progress & 2i nch
PL instrument line arrangement for material.
PL Fire water line leakage checking done.
PL Sump pump checked, running ok.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 86 nos. of hoses found open.

PL Primary filter changed.for comp # 02, 03 & 04


PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 75 nos. of hoses found open
PL CBM of running equipments in progress
PL plate fabrication for intercooler at workshop IN PROGRESS
Dummy plate fabrication for transfer pump # 01 PPH at workshop in
PL progress
Vibration transmitter - 01 no, Vibration Cable - 01 no, Scroll Compressor -
PL 02 nos reurned at store
PL Complete Air Audit for carbon area in progress

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 70 nos. of hoses found open.
PL Complete Air Audit for carbon area in progress
PL plate fabrication for intercooler at workshop IN PROGRESS
Dummy plate fabrication for transfer pump # 01 PPH at workshop in
PL progress
PL 2inch instrumentation line fabrication work done.
PL CBM of running equipments done.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 80 nos. of hoses found open.
PL Watermeter reading of potroom taken.

PL Primary filter changed.for comp # 01, 05 & 06


PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 72 nos. of hoses found open.
PL Fire water leakage arresting work at Petcoke area done.
PL Monthly Maintenance work PROGRESS.
PL Line up done . Requested by Mr. Bala.
PL Line up done.requested by Mr.Kuldip.

PL 2" fabrication work done,


PL Sensor change work done
PL Leakage arresting of fire water line
gland packing change, leakage arresting
PL
PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 65 nos. of hoses found open.
PL Unit#2 Back Washed and running.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 88 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL 5S done(bellow in red tag,racks arranged,dryer cover kept behind dryer#1)

PL Primary filter changed.for comp # 02,3.4


PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 78 nos. of hoses found open.
PL Monthly Maintenance work done.
PL Flushing on process
PL start @ 6:30am
PL Stoped @ 6:40am

PL 2" fabrication work done,


PL 5S of surrounding area
checking of leakage in process water line
PL
PL drinking water flushing
PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 77 nos. of hoses found open.
PL Unit#2 Back Washed and running.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 68 nos. of hoses found open.
PL Watermeter reading of potroom taken.
PL 5S done(racks shifted near comp#1).
PL Primary filter changed.
PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 65 nos. of hoses found open.
PL HFO line up done on requested by Mr.Diptesh.
PL Fire line leakage arreswting work under progress.
PL Maintenance work done.
PL Electrical PM done by Switchyard team.
PL Strarted @ 8:30 am at CPH

PL 2" fabrication work done,


PL Extension of ADV drain line to main drain line
PL leakage checking and arresting
leakage arresting done

PL
PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 78 nos. of hoses found open.
PL Unit#2 Back Washed and running.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 96 nos. of hoses found open.
PL Watermeter reading of potroom taken.

PL Primary filter changed.


PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 81 nos. of hoses found open.
PL Water line work at Canteen DONE.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 75 nos. of hoses found open.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 84 nos. of hoses found open.
PL Watermeter reading of potroom taken.

PL Primary filter changed & Secondary filters found OK.


PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 81 nos. of hoses found open.
PL New 2inch Instrumrntation line fabrication work under progress.
PL TP # 3started @ 9:25 am & TP # 4 stopped @ 9:30 am
PL 1 inch ball valve issued to Workshop.
PL Monthly Maintenance done.

PL 2" fabrication work done,


PL Dummy plate grinding
PL chamber cover fabrication
PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 58 nos. of hoses found open.
PL Unit#2 Back Washed and running.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 67 nos. of hoses found open.
PL Watermeter reading of potroom taken.

PL Primary filter changed & Secondary filters found OK.


PL Monthly Maint. Done.
PL VALVE CHANGING WORK DONE.(SUCTION AND DISCHARGE)
PL Airaudit done in potroom & total 64 nos. of hoses found open.
PL DRYER COVER FITTING
PL STARTED@11:00AM
PL Start @ 12:55pm(line charge)

PL Motor Racked in and Started at 15:20 hrs


PL Airaudit done in potroom & total 65 nos. of hoses found open.
PL Sensor position interchanged
PL Dosing Done
PL Primay filter cleaned- 8 nos.
PL Airaudit done in potroom & total 81 nos. of hoses found open.

PL Primay filter cleaned- 8 nos.


Primary filter changed & Secondary filters found OK.except Comp1 found
PL choked
PL Maint. By service personnel going on
PL Plate fabrication and 2" instrument line going on
PL HFO v/v opened for BO

PL Primay filter cleaned- 8 nos.


PL HFO v/v Closed for BO
PL Airaudit done in potroom & total 66 nos. of hoses found open.
PL Nitrogen gas charged under observation for 12 hrs
PL Dosing Done

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 73 nos. of hoses found open.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 66 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Nitrogen gas charged under observation - work in progress
PL HFO v/v opened for Cast House as per MR.Kashyap
PL Pipe line/ valve checking
PL Net fitting/ shade covering to filter house work in progress
PL Fire Hydrant line leakage checking - work in progress
PL Pump Assembly - work in progress
PL Painting of pipelines and Structure- work in progress
PL STOPED AT 10:45AM
PL STARTED AT 11AM
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 66 nos. of hoses found open
Nitrogen gas charged under observation, Condensor descaling done by
PL chemical
PL Net fitting/ shade covering to filter house work
PL Pump Assembly completed
PL Painting of pipelines and Structure

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total 68 nos. of hoses found open.
PL stoped at 11:30pm

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 62 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Maintenance work - Completed ( rack in done)
PL Painting of pipelines and Structure- work in progress
PL STARTED AT 9:20 AM
PL STOPED AT 9:25 AM
PL BI-monthly maintenance- Completed ( rack in done)
PL Net fitting/ shade covering to filter house work in progress
PL Fire Hydrant line leakage checking - work in progress
PL Nitrogen gas charged under observation, Condensor descaling done by
chemical

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 62 nos. of hoses found open
PL HFO v/v opened for Cast House
PL Painting of exhaust fans ACH Completed
PL GI sheet fitting/ shade covering to filter house
PL Heat Exchanger leakage checking
PL Dosing Done
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 76 nos. of hoses found open
PL HFO v/v opened for BO
PL H2O meter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 79 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL New 2inch Instrumrntation line fabrication work under progress.
PL Maintenance work in progress
PL Condition based monitoring
PL Heat Exchanger leakage checking
PL Fire Hydrant line leakage checking - work in progress

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 73 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL New 2inch Instrumrntation line fabrication work done
PL Maintenance work done.
PL Heat Exchanger leakage checking
PL Fire Hydrant line leakage checking - work in progress

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 81 nos. of hoses found open
PL H2O meter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 76 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Dosing Done
PL stopped at 12:30 PM
PL HFO v/v opened for Cast House

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 81 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL diesel topup 5lt. Done
PL statrted at 6:30 PM
PL leakage arresting work done

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 79 nos. of hoses found open
PL H2O meter reading taken.

PL Primary filter changed.


PL HFO v/v opened for BO
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 71 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Maintenance work done
PL Heat Exchanger leakage checking
PL stopped at 10:08 AM
PL POP stopped at 11:17 AM
PL stopped at 11:25 AM
PL FRL cleaning
PL Check valve replacement done pop
PL POP started at 12:30 PM

PL Primary filter changed.


PL Secondary filter changed
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 74 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL Maintenance/leakage work done
PL Fabrication of new pipe line
PL stopped at 3:30pm
PL started at 3:20pm
PL Oil top up 50 lit.
PL inlet bypass valve maint.
PL gasket fixing, plate grinding done.
PL GAP voltage setting
PL Vibration probe cleaning with petrol
PL 2nd stage vibration transmitter and extension cable changing

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 75 nos. of hoses found open
PL H2O meter reading taken.
PL Line charged

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 76 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Dryer backflushing- completed
PL Motor end cover cleaning
PL Motor allignment
PL HFO v/v opened for Cast House
PL STOPPED AT 07:20 AM
PL STARTED AT 07:25 AM
PL BI-monthly maintenance- completed
PL Heat Exchanger leakage checking-work in progress

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 74 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL Oil top.up/GAP voltage setting on process
PL Motor allignment done
PL Heat Exchanger leakage checking-work done
PL Secondary filter inspection ok and material issue from store.
PL fabrication and pipe line extention on process
PL MOP allignment done

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 63 nos. of hoses found open
PL H2O meter reading taken.
PL Gap Voltage set At 6.20 for all the stages./Oil top up not required.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 75 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Heat Exchanger leakage checking-work in progress
PL Maintenance completed & started @ 12:30 PM
PL STARTED AT 10:30 AM
PL STARTED AT 12:14 PM

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 66 nos. of hoses found open
BD Dryer # 5 maintenance work done.
PL Flow mwter maintenance work done.
Fire water chamber work done.
PL
PL HFO line up done on requested by Mr. Ashish.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 85 nos. of hoses found open
PL H2O meter reading taken.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 72 nos. of hoses found open
PL Monthly maint.
PL shut down at 10:30am
PL Zero ADV fixing
PL material issue from store
PL chamber cleaning near sec 4

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 70 nos. of hoses found open
PL Fire line water leakage arresting work done.
PL Process water line leakage arresting work done.
PL Plate fabrication for Fire Chamber done.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 61 nos. of hoses found open
PL HFO line up done on requested by Mr. Diptesh

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 51 nos. of hoses found open
PL flushing on process
PL flushing on process
PL Zero loss ADV fixing
PL Zero loss ADV fixing

PL Primary filter cleaned- 8 nos. done.


PL Leakage arrested
PL Flushing done
PL ADV installed
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 83 nos. of hoses found open
PL Leakage arresting

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 75 nos. of hoses found open
Primary Filter changed & two secondary filter foils found bent( ACH side
PL lower one & CPH side lower one).
PL HFO line up done on requested by Mr. Sandeep.
PL Complete air line leakage audit done.
PL New 2 inch Instrumentation line fabrication done.
PL Zero loss drain valve fixing in after cooler of Comp # 1,4 & 5

PL Primary filter cleaned- 8 nos. done.


PL Pump started
PL Chemical Dosing Done.
PL Zero loss drain valve fixing in after cooler of Comp # 1,2,4 & 5

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 82 nos. of hoses found open
PL HFO line up done on requested by Mr. Jitendra

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 67 nos. of hoses found open
Primary Filter changed & two secondary filter foils found bent( ACH side
PL lower one & CPH side lower one).
PL Zero loss drain valve interchange from Comp # 1 to 4.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 77 nos. of hoses found open
PL Backwash done

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 73 nos. of hoses found open

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 59 nos. of hoses found open
PL Primary Filter changed & two secondary filter foils found bent( ACH side
lower one & CPH side lower one).
PL Water meter Maintenance under progress(Blade found damaged).
PL HFO line up done on requested by Mr. Aswin.
PL HWP # 2, Quaterly maintenance under progress.
PL Maonthly Maintenance done.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 68 nos. of hoses found open
PL Backwash done of unit#2
PL Job completed of leakage arresting done.
PL HWP # 2, Quaterly maintenance under progress.
PL Roofing and side covering job done.

PL started at 10:15 PM
PL Rack In done at 11:25 PM
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 77 nos. of hoses found open

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 74 nos. of hoses found open
Primary Filter changed & two secondary filter foils found bent( ACH side
PL lower one & CPH side lower one).
PL HFO line up done on requested by Mr. Kuldip.
UPL Maintenance work( NRV work & allignment) under progress.
Flow meter maintenance work under progress(3 inch Water meter
PL Installation).

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 85 nos. of hoses found open
UPL Maintenance work( NRV work & allignment) done.
PL Flowmeter installation not completed.
Strainer cleaning of Dryer-1,2,3,4,5,6 done.
PL

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 89 nos. of hoses found open

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 90 nos. of hoses found open
Primary Filter changed & two secondary filter foils found bent( ACH side
PL lower one & CPH side lower one).
PL HFO Line up done on requested by Mr. Ashis.
Drinking water supply checked & found ok (false complain given by
PL Canteen).
PL Bi-Monthly Maintenance work under progress.
PL Fire hydrant Maintenance work under progress.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 80 nos. of hoses found open
PL Bi-monthly maintenance done motor racked in & running in Auto.
PL Flowmeter installation job completed.
PL Unit#2 backwashed done.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 93 nos. of hoses found open
PL Valve opened for Bake Oven

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 80 nos. of hoses found open .
PL Primary Filter changed
Quaterly maintenance done.
PL
PL Store audit of ACH done for spare parts.
PL Fire hydrant line leakage identification progress.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 90 nos. of hoses found open
PL Complete Air Audit done
PL Water sample collection done.
PL Maint. Of 6" Gate valve done.
PL Satrtes at 5:45 pm
PL Running at Auto mode at 5:55pm

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 93 nos. of hoses found open
PL Readings of Pot Room taken

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 67 nos. of hoses found open .
PL Primary Filter changed.
PL Bi-Monthly Maintenance done.
PL Air line leakage in carbon area.
PL Water line leakage arresting work under progress.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total nos.67 of hoses found open.
PL New 2inch Instrumrntation line fabrication work under progress.
PL 5-S of Store
PL Rack in done, Now Running in AUTO mode

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 75 nos. of hoses found open
PL ADV Maint. Done

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 83 nos. of hoses found open .
PL Primary Filter changed.
PL HFO Line up done requested by Mr. Aswin.
PL HFO Line up done.
PL Watermeter installation & strainer maintenance work under progress.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total nos.86 of hoses found open.
PL Watermeter installation & strainer maintenance done
PL 5-S of Store
PL Dosing Done
PL Unit#1 Back Washed and running.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 86 nos. of hoses found open
PL Readings of Pot Room taken
PL Comp#1 stopped at 11:11 PM

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 77 nos. of hoses found open
PL Readings of Pot Room taken
I/V,B/V maint done.New I to P used in B/V
PL
PL Primary filter changed.

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total nos.79 of hoses found open.
PL Unit#1 Back Washed and running.
PL FRL cleaning-done
PL Dryer backflushing-done
PL Gap Voltage Checking-done
PL Secondary Filter Changed- 8 nos.
PL Primary filter changed.
PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 76 nos. of hoses found open
PL Readings of Pot Room taken
PL comp#1 external cleaning with cotton done.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 71 nos. of hoses found open
PL Readings of Plant area taken
PL Primary filter changed.

PL Motor & MOP allignment,End cover cleaning,Gap voltage setting.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 86 nos. of hoses found open .
PM Motor Allignment done.
PM MOP Allignment done.
PM End cover cleaning done.
PM Oil top up 60 litres done.
PL Maintenance work done.
PM Aftercooler inlet air pipe gasket fitting done.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 81 nos. of hoses found open
PL Readings of Pot Room taken
PL comp#1 external cleaning with cotton done.
PL JP#1 racked in.

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 92 nos. of hoses found open
PL Readings of Plant area taken
PL Primary filter changed.
PL Backwashed done.
PL New Water meter installed(1")

PL Primay filter cleaned- 8 nos.


PL Airaudit done in potroom & total nos.80 of hoses found open.
PL HFO Line up done.
PL Water flow meter installation-compleated
PL Water flow meter installation-completed
PL New 2inch Instrumrntation line fabrication work under progress.
PL Gap voltage setting and checking-done
Air release from NRV, MOP-done
Duplex filter interchanged-done
manual shaft rotation-done
PL Started @ 06:29 PM

BD Fire hydrant leakage, new fire hydrant valve changed.


Watermeter reading taken.
PL
PL Back wash done.

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 101 nos. of hoses found open
PL Readings of Plant area taken
PL Primary filter changed.
PL New 2inch Instrumrntation line fabrication work under progress.
PL NRV changed

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 101 nos. of hoses found open
PL New 2inch Instrumrntation line fabrication work .
PL NRV changed
PL Bi-monthly maintenance done.
PL CWP#4 started at 3 pm
PL CWP#3 stopped at 3:05 PM

PL Watermeter reading taken.


PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 109 nos. of hoses found open

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 80 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL Maintenance
PL Water Line Fabrication
PL CBM
PL New 2inch Instrumrntation line fabrication work .
PL HFO Line up done.
PL shifting at compressor # 1
PL started @ 10:35 am
PL stopped @ 10:40 am
UPL checking done

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 74 nos. of hoses found open
PL New 2inch Instrumrntation line fabrication work .
PL Unit#1 Back Washed and running.
PL Water Line Fabrication
PL fitting fixing done.
PL Maintenance

PL Watermeter reading taken.


PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 107 nos. of hoses found open

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 86 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL Maintenance-in progress
PL stopped @ 08:35 AM ( Rack Out Done)
PL Bi-monthly maintenance- Completed
PL HFO Line up done as per Mr.Debojit
PL New 2inch Instrumrntation line fabrication work .
PL started @ 12:25 PM

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total nos. of hoses found open
PL Maintenance
PL CBM
PL Unit#1 Back Washed and running.
PL Primary filters (new) checking.

PL Watermeter reading taken.


PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 115 nos. of hoses found open
PL Started at 10:45 pm
PL Stopped at 1:00 am as flow was 45m3/hr

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 84 nos. of hoses found open
PL Unit#1 Back Washed and running.
PL New 2inch Instrumrntation line fabrication work .
PL Gate valve maintenance/ replacement-done
PL stopped at 11 AM
PL manual backwash done
PL manual backwash done
PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 109 nos. of hoses found open
PL Maintenance
PL manual backwash done
PL manual backwash done
PL Fire line charged at 3:15 PM,MP#2 started
PL Unit#1 Back Washed and running.
PL JP#3 started at 4:30 PM
PL JP#2 started at 4 PM,MP#2 put in auto mode.
PL P&I identification work done
PL TP#3 stopped @ 6:30 PM

PL Watermeter reading taken.


PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 114 nos. of hoses found open
PL Both AVGF's backwashed manually
PL Valve opened

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 110 nos. of hoses found open

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 109 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL HFO Line up done as per Mr.Sudipto.

PL Watermeter reading taken.


PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 102 nos. of hoses found open

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 81 nos. of hoses found open
PL Instrument line fabrication work under progress.
PL Drinking water line flushing under progress.
PL Baterry connection for Diesel compressor done.

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 93 nos. of hoses found open
PL Unit#2 Back Washed and running.
PL Instrument line fabrication work under progress.
PL 42 litres oil top-up done in diesel engine pump#2.

PL Watermeter reading taken.


PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 91 nos. of hoses found open

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 95 nos. of hoses found open
PL HFO Line up done on requested by Mr. Satish.
PL Drinking water line flushing under progress.
PL Instrument line fabrication work under progress.
PL 2 technicians send to Switchyard.
PL AVGF # 1 & 2 Backwash done.
PL Battery stand fabrication work under progress.
PL Fire line restored for rectifier area after Leakage arresting work.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 80 nos. of hoses found open
PL Instrument line fabrication work under progress.
PL 2 technicians send to Switchyard.
PL AVGF # 1 & 2 Backwash done.
PL Battery stand fabrication work under progress.
PL Watermeter reading taken.
PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 76 nos. of hoses found open
PL CT#3 stopped at 5 am, motor racked out.

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 72 nos. of hoses found open
PL CT#3 started at 10 am, motor racked in.
PL DW unit#1 backwashed and running.
PL Maintenance done.
PL Filter platform fabrication in progress.
PL Pipe stand fabrication under progress.
Water line dummy work in progress.
PL

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 75 nos. of hoses found open
PL AVGF Backwash done at RPH
PL Filter House fabrication work at ACH done.
PL Fire Hydrant line shut down taken for Switchyard Only.
PL JP # 3 maintenance work done.
Process water line shut down for leakage arresting work on requested
PL by Mr. Mohit(FTP Shift In-Charge).

PL Watermeter reading taken.


PL Primary filter cleaned- 8 nos. done.
PL Air audit done in potroom & total 81 nos. of hoses found open

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 66 nos. of hoses found open
Process water line shut down for leakage arresting work on requested
PL by Mr. Neelkandan(FTP Shift In-Charge).
PL DW unit#1 backwashed and running.
PL JP # 3 maintenance in progress.
PL Scrap shifting in progress.
PL Filter platform fabrication in progress.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 79 nos. of hoses found open
PL JP # 3 maintenance work done.
PL Process water line shut down for leakage arresting work from A-shift.

PL Scrap shifting work done.


PL Filter platform fabrication work done.
PL HFO Line up done for cast house.

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 71 nos. of hoses found open
PL Both AVGF's backwashed manually
PL Both AVGF's backwashed manually
PL HFO Line up done on requested by Mr. Subrato

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 81 nos. of hoses found open
PL DW unit#1 backwashed and running.
PL Filter platform fabrication in progress.
PL Fire hydrant valve maintenance in progress.
PL AVGF #1 valve maintenance done.
PL Stopped at 1:30 PM for Electrical PM
PL HWP#4 started at 1:25 PM

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 96 nos. of hoses found open
PL Monthly Maint. Done, motor racked in.
PL Connection of Sheet b/w Comp#2 and Comp#3 done
PL Job done.

PL Primary filter cleaned- 8 nos. done.


PL Air audit done in potroom & total 98 nos. of hoses found open

PL Primary filter changed.


PL Primary filter cleaned- 8 nos. done.
PL Airaudit done in potroom & total 80nos. of hoses found open
PL DW unit#1 backwashed and running.
PL Filter platform fabrication in progress.
PL Fire hydrant valve maintenance in progress.
PL Stopped at 10:49 AM;vibn:I-0.32,II-0.26,III-1.30 mils
PL Intercooler paper gasket cutting
PL HFO Line up done for cast house.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 89 nos. of hoses found open
PL Leakage arresting work done.(SH -99)
PL Gasket cutting for Intercooler # 1 & 2 done.
Second stage dismantelled& cleaning done. & found full of dust particles

Tube leakage checking done for Intercooler # 1.


Tube leakage checking done for Intercooler # 1.
PL Leakage arresting work done.(SH -98)
PL CWP# 2 put in AUTO mode & CWP # 3 put in open loop.

PL Gasket Cutting done for intercooler 1 & 2


PL Primary filter cleaned- 8 nos. done.
PL HFO Line up done on requested by Mr. Subrato

PL Primary filter changed.


PL Airaudit done in potroom & total 60 nos. of hoses found open
PL DW unit#1 backwashed and running.
PL 2nd stage assembly done.
intercooleer # 1cleaning & Y-gasket fitting in progress
intercooleer # 2cleaning & Y-gasket fitting in progress
Motor alignment in progress
MOP alignment in progress.
PL TP#3 started at 6:48 AM
PL TP#4 stopped at 6:58 AM

PL Primary filter cleaned- 16 nos. done.


PL Airaudit done in potroom & total 76 nos. of hoses found open
PL intercooleer # 1cleaning & Y-gasket fitting under progress.
PL intercooleer # 2cleaning & Y-gasket fitting under progress.
PL Motor alignment under progress.
PL MOP alignment under progress.
PL Dryer back flushing done.
New Vibration probe replaced & 3rd vibration transmitter changed & gap
PL
voltage setting done @ 6.20 volt.
PL Motor end cover cleaning done.

PL intercooleer # 1 Y-gasket fitting and box up- done


PL Primary filter cleaned- 08 nos. done.

PL Primary filter changed.


PL Airaudit done in potroom & total 64 nos. of hoses found open
PL DW unit#1 backwashed and running.
PL Primary filter cleaned- 8 nos. done.
PL HFO lined up for cast house on request by Mr. Bala.
PL Intercooler#2 box-up in progress.
MOP box-up and alignment done.
Motor alignment and coupling done

PL Primary filter cleaned- 16 nos. done.


PL Airaudit done in potroom & total 59 nos. of hoses found open
PM Maintenance of intercooler# 2 done. & 4 nos. leakage point made dummy.
PL Air release from NRV & MOP line & manual shaft rotation.
PL Comp # 4 started @ 3:35 pm

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 103 nos. of hoses found open
PL external Cleaning -done
PL Manual backwash -done

PL Primary filter cleaned- 16 nos. done.


PL Primary filter changed.
Filter house platform fabrication work & intercooler#2 cooling
PL
arrangementwork under progress
PL Drinking water line flushing work under progress.
PL Line up done on request.

PL Primary filter cleaned- 8 nos. done.


Filter house platform fabrication work & intercooler#2 cooling arrangement
PL
done
PL Drinking water line flushing work done.
PL Airaudit done in potroom & total 59 nos. of hoses found open
PL Work in Panel done.
PL Dosing Done line restored

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 92 nos. of hoses found open

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed.
PL Airaudit done in potroom & total 84 nos. of hoses found open
PL Filter house platform fabrication work under progress.
Bi-Monthly maintenance work under progress.(Allignment done set at 0.06
PL mm).
CBM done for running equipments(ACH,CPH,PPH completed) under
PL progress.
PL New Battery connection done(Shifted from FFPH to ACH).
PL MP # 3 cable connection work done by Switchyard.
PL New -Gasket fitting in Intercooler # 2 work under progress.

PL Primary filter cleaned- 8 nos. done.


PL I/C#2 of Comp#4 (new) Y-Gasket fitting done.
PL Airaudit done in potroom & total 97 nos. of hoses found open
PL HFO line opened for CH
PL Dosing Done line restored
PL Maint. Done and motor racked in .

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 77 nos. of hoses found open
PL Watermeter reading taken.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed.
PL Airaudit done in potroom & total 97 nos. of hoses found open
PL HFO Line up done.
PL Filter house platform fabrication work under progress.
PL New Intercooler box up & shifting to store.
PL fire hydrant valve punching work done.

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 69 nos. of hoses found open
PL Filter house platform fabrication work under progress.
PL hydrant valve maintenance
PL DW unit#2 backwashed and running.
PL current suply checking done by switchyard side
PL 5-S of area
UPL hydrant Valve maintenance

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 77 nos. of hoses found open
PL Watermeter reading taken.
PL Line up done on request by Mr. Jitendra.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed.
PL Airaudit done in potroom & total nos. of hoses found open
PL Filter house platform fabrication work under progress.
PL Sec-7 side DW line leakage arrested.Fire hydrant job WIP
PL Unit#1 backwashed and running

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 69 nos. of hoses found open
PL Filter house platform fabrication work under progress.
PL DW unit#2 backwashed and running.
PL Pipe line extension
PL hydrant valve PCD matching
PL HFO Line up done.

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 70 nos. of hoses found open
PL Watermeter reading taken.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed.
PL Airaudit done in potroom & total nos. of hoses found open
PL Filter house platform fabrication work under progress.
PL Maintenance work done.
PL Drinking water line maintenance work done.
PL Primary filter cleaned- 8 nos. done.
Water line leakage arresting done(Drinking water flushing line valve found
PL open.).

PL Primary filter cleaned- 08 nos. done.


PL Watermeter reading taken.
PL Line up done on request by Mr. Sudipto.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed.
PL Pipe line work fabrication work done for canteen.
PL Leakage arresting work done.

PL Primary filter cleaned- 8 nos. done.


PL Pipe line work fabrication work done for canteen.

PL Primary filter cleaned- 08 nos. done.


PL Watermeter reading taken.

PL Primary filter changed.


PL Filter house platform fabrication work under progress.
PL Airaudit done in potroom & total 97 nos. of hoses found open
PL Pipe line work fabrication work done for canteen.

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 92 nos. of hoses found open
PL Filter house platform fabrication work under progress.
PL Drinking water line extension work
PL Compleate Air line Audit for leakage-done
PL DW unit#2 backwashed and running.
PL HFO Line up done as per Mr.Ashwin
PL Primary filter cleaned- 08 nos. done.
PL Watermeter reading taken.
PL Airaudit done in potroom & total 91 nos. of hoses found open

PL Primary filter changed.8 new filters used


PL 16 new sec. filters installed.
PL Airaudit done in potroom & total 82 nos. of hoses found open
PL PM done.
PL Backwash done.
PL Unit#1 backwashed and running,reading of Totaliser was found normal
PL HFO line is running for BO

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 84 nos. of hoses found open
PL Filter house platform fabrication work under progress.
Fire hydrant valve maintenance done-(SH-3,4,17 & 19 )
PL

PL 5S -done
UPL stopped @ 03:25 PM
UPL started @ 06:05 PM
PL stopped @ 02:50 PM
PL started @ 06:20 PM

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 91 nos. of hoses found open.
PL Watermeter reading taken.

PL Primary filter changed.8 new filters used


PL Airaudit done in potroom & total 74 nos. of hoses found open
PL PM done
PL Maint. WIP
PL Unit#1 backwashed and running
PL Primary filter cleaned- 08 nos. done.
PL Airaudit done in potroom & total 84 nos. of hoses found open
PL Filter house platform fabrication work under progress.
PL DW unit#2 backwashed and running.
PL Fire hydrant valve maintenance done-(SH-9,10.16,19,23 )

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 79 nos. of hoses found open.
PL Watermeter reading taken.
PL HFO Line up done.

PL Primary filter cleaned- 08 nos. done.


PL Filter house platform fabrication work under progress.
PL Unit#1 backwashed and running
PL Primary filter changed
PL NEW secondary filter installed-8 nos.
PL Maintenance of fire hydrant v/v -SH-29,39,45,52,61
PL stopped at 09:30 AM

PL Primary filter cleaned- 08 nos. done.


PL Airaudit done in potroom & total 79 nos. of hoses found open
PL Filter house platform fabrication work under progress.
PL DW unit#2 backwashed and running.
Fire hydrant valve maintenance done-SH-61,gate v/v replacement in GAP
PL
water monitor
PL DEP#1 Maintenance by service engineer.
PL HFO Line up done for cast house.
PL Comp#4 stopped at 08:07 PM,Rack-out done(Danger tag # 14154)
PL Fire line restored for plant 2.

PL Primary filter cleaned- 8 nos. done.


PL Airaudit done in potroom & total 86 nos. of hoses found open.
PL Watermeter reading taken.
PL Comp # 4, POP oil line NRV cleaning done.
PL Comp # 4 , Gasket cutting done for bypass valve.
PL Dewatering pump started for draining.

PL Primary filter cleaned- 08 nos. done.


PL Unit#1 backwashed and running
PL Primary filter changed
PL BYPASS v/v, intercooler #2 y-gasket changing
PL maintenance-done
PL maintenance
PL Airaudit done in potroom & total 88 nos. of hoses found open.

PL Primary filter cleaned- 08 nos. done.


PL DW unit#2 backwashed and running.
PL DEP#1 Maintenance.
PL TP#1 Maintenance done,rack-in done.
PL Watercooler maintenance done.
PL Roof light frame fabrication work.
PL Comp#4 Gap voltage setting done.(all stages)
PL Intercooler#2 gasket fitting & box-up
PL Inlet Valve maintenance
PL MOP alignment
PL White washing job started.

PL Bellow Box Up of IC#2 done


PL Cleaning of Body done
PL Primary filter cleaned- 8 nos. done.
PL Watermeter reading taken.

PL HFO Line up done.


PL Unit#1 backwashed and running
PL Dewatering pump started
PL Dewatering pump stopped
PL Airaudit done in potroom & total 89 nos. of hoses found open.
PL Primary filter changed
PL Primary filter cleaned- 08 nos. done.
PL Maintenance-Done
PL Filter house Platform fabrication
PL Cleaning of chamber
PL 5-S and Store Audit
PL Whitewashing of walls and Floor

PL Primary filter cleaned- 08 nos. done.


PL DW unit#2 backwashed and running.
PL CT#3 Racked in and started at 2:40 pm
PL Cleaning of chamber
PL Whitewashing of walls and Floor
PL Filter house Platform fabrication
PL condition based maintenance at FFPH
PL Manual shaft rotation & air release from NRV
PL Comp#4 started at 07:03 PM

PL Primary filter cleaned- 8 nos. done.


PL Watermeter reading taken.
PL Airaudit done in potroom & total nos. 76 of hoses found open.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed- comp#1,5,6
PL Airaudit done in potroom & total nos. 76 of hoses found open.
pl cover babricatiom on process

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 84 nos. of hoses found open.
PL Barrication for Flowmeter chamber at CPH done.
PL HFO Line up done on requested by Mr. Aswini.
PL Primary filter cleaned- 8 nos. done.
PL Watermeter reading taken.
PL Airaudit done in potroom & total 98 nos. of hoses found open.
PL Both units manual backwash done.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed- comp#2,3,4
PL Airaudit done in potroom & total nos. 79 of hoses found open.
PL Chemical barrel shifting from CPH to PPH and scrap shifting
PL Monthly Maintenance-Done
PL Whitewashing of walls
PL Filterhouse platform fabrication work done.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 89 nos. of hoses found open.
PL Maintenance work for new drinking line.
PL Filterhouse platform fabrication work done.
PL New Flowmeter installed at PPH.

PL Primary filter cleaned- 8 nos. done.


PL Watermeter reading taken.
PL Airaudit done in potroom & total 73 nos. of hoses found open.
PL Motor racked out

PL Unit#1 backwashed and running


PL Primary filter changed
PL Primary filter cleaned- 08 nos. done.
PL structure cleaning-done
PL Filter house Platform fabrication
PL Whitewashing of walls and Floor
PL Surrounding area cleaning
PL drinking water line extension
PL Airaudit done in potroom & total nos. 94 of hoses found open.
PL Primary filter cleaned- 8 nos.
PL Potroom airaudit done & total 85 nos. of hoses found open.
PL Filter house Platform fabrication
PL Surrounding area cleaning & chemical room.
PL Drinking water line work done.
PL CWP # 2 atarted @ 4:25 pm & CWP # 3 stopped @ 4:28 pm.

PL Primary filter cleaned- 8 nos. done.


PL Watermeter reading taken.
PL Airaudit done in potroom & total 110 nos. of hoses found open.
PL Motor racked out
PL BO side valve is now open.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed- comp#2,3,4
PL Airaudit done in potroom & total nos. 80 of hoses found open.
PL Cleaning done,motor racked in at 9 am,started.
PL Cleaning & 5S of area RPH
PL Unit#1 backwashed and running
PL CWP#3 maintenance
PL Filter house Platform fabrication/ladder fabrication
PL Whitewashing of walls and Floor
PL Light frame fixing

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 70 nos. of hoses found open.
PL Filter house Platform fabrication
PL White washing of ACH done.
Maintenance work done.

PL

PL Primary filter cleaned- 8 nos. done.


PL Watermeter reading taken.
PL Airaudit done in potroom & total 81 nos. of hoses found open.

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed- comp#1,5,6
PL Airaudit done in potroom & total nos. 83 of hoses found open.
PL Unit#1 backwashed and running
PL HFO Line up done for cast house.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 80 nos. of hoses found open.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 72 nos. of hoses found open.
PL Cooling tower 2 stopped and rack out done

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed- comp#2,3,4
PL Airaudit done in potroom & total 63 no of hoses found open.
PL Unit#1 backwashed and running
PL Cleaning of CT#2 @ RPH
PL Bi-monthly maintenance of MP#2
PL Filter house Platform fabrication/ladder fabrication
PL CBM of all running equipments done.
PL Whitewashing of walls and Floor
PL HFO lined up for bake-oven.
PL Steam valve replacement at ACH,CH line closed

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 73 nos. of hoses found open.
PL Filter house Platform fabrication/ladder fabrication
PL Motor Racked in
PL Unit#2 backwashed and running
PL Steam valve replacement at ACH,CH line running now
PL Job Done

PL Rack in done
PL Primary filter cleaned- 8 nos.
PL Potroom airaudit done & total 81 nos. of hoses found open.
PL Cooling tower# 1 stopped and rack out done

PL Primary filter cleaned- 8 nos. done.


PL Primary filter changed- comp#1,5,6
PL Airaudit done in potroom & total 82 no of hoses found open.
PL Unit#1 backwashed and running
PL Cleaning of CT#1 @ RPH
PL Filter house Platform fabrication/ladder fabrication
PL Whitewashing of walls and Floor
PL Dryer #6 maintenance
PL HWP#2 maintenance.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 71 nos. of hoses found open.
PL Filter house Platform fabrication/ladder fabrication
PL Unit#2 backwashed and running
PL Todays scheduled job completed.
PL Allignment done to +0.02 mm,motor racked in
PL PM WIP

PL Bimonthly maintenance- & racked in done,Alignment -0.05 mm


PL Primary filter cleaned- 8 nos.
PL Potroom airaudit done & total nos. 94 of hoses found open.
PL Manual backwash - done

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 71 nos. of hoses found open.
PL Unit#1 backwashed and running
PL HFO line opened
PL Primary filter changed- comp#2,3,4

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 88 nos. of hoses found open.
JP # 1 started @ 2:40 pm & JP # 2 stopped @ 2:42 pm as abnormal sound
PL coming from JP # 2 Panel.

PL HFO line opened


PL Primary filter cleaned- 8 nos.
PL Potroom airaudit done & total nos. 99 of hoses found open.
PL stopped and rack out done

PL HWP # 2 started @ 6:25 am & HWP # 3 stopped @ 6:30 am


PL Primary Filter changed.
PL Primary filter cleaned - 8 nos.
PL HWP # 3 ,Bi-Monthly maintenance done.
PL Ladder fabrication work under progress.
PL White washing of ACH under progress.
PL Airaudit done & total - 87 nos. of cooling hoses found open.
Structure cleaning of CT # 3 at RPH (not done because of valve passing).
PL
PL CT # 3 started @ 8:54 am.
Online Secondary filter changed.

PL

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 62 nos. of hoses found open.
PL Monthly Maintenance done
PL Maintenance of Diesel Compressor Done
PL Ladder fabrication work under progress.
PL White washing of ACH under progress.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total nos. 93 of hoses found open.

PL Primary Filter changed.


PL Primary filter cleaned - 8 nos.
PL Ladder fabrication work under progress.
PL White washing of ACH under progress.
PL Airaudit done & total - 90 nos. of cooling hoses found open.
PL Leakage arresting work unde progress.
PL 5S of chemical room under progress.
PL HFO Line up done.
PL Monthly maintenance of air dryer done.
PL Backwash done.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 62 nos. of hoses found open.
PL Monthly Maintenance done
PL Maintenance of Diesel Compressor Done
PL Ladder fabrication work done
PL White washing of ACH done

UPL Making compressor ready to start


PL gasket cutting
PL RESTORED at 09:30 PM
PL CWP# 3,4-HWP# 1,2,4-CT# 1,2,3-RESTORED at 10:00 PM
PL RESTORED at 10:20 PM
PL RESTORED at 12:15 AM
PL Started at 11:05 PM
PL Started at 11:11 PM
PL Started at 11:19 PM
PL Started at 11:46 PM
PL Started at 12:56 AM
PL Primary filter cleaned- 8 nos.

PL Primary Filter changed.


PL Primary filter cleaned - 8 nos.
PL White washing of ACH under progress.
CT # 3 at RPH put in AUTO mode & started in Manual mode @ 10:40 am
PL
PL CT # 2 started @ 6:02 am & CT # 3 stopped @ 6:05 am.
PL White washing of ACH under progress.
PL Structure cleaning work under progress for CT # 3 at CPH.
PL Cold well pump VFD setting for toggle switch corrected at CPH.
PL HWP # 2 started 7:30 am & HWP # 1 stopped @ 7:35 am.
PL HWP # 1, Maintenance work done.
Maintenance work for intercooler # 1tube leakage arresting under progress(1
PL tube leakage found).
PL Intercooler # 1 , gasket cutting done.
PL Ladder fabrication work under progress.
PL CT# 3 at CPH started.
PL RPH chemical store & HFO line up sorrounding area cleaned.
PL Airaudit done & total - 54 nos. of cooling hoses found open.

PL Primary filter cleaned- 8 nos.


PL Started at 06:45 PM
PL Started at 06:10 PM
UPM I/C-1 Box up done.
PL RPH chemical store & HFO line up surrounding area cleaning done
PL Backwash done of Unit#2
PL Potroom airaudit done & total 50 nos. of hoses found open.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 70 nos of hoses found open.
PL HFO line opened for bake oven
PL Primary Filter changed.
PL Primary filter cleaned - 8 nos.
PL White washing of ACH under progress.
PL Airaudit done & total - 78 nos. of cooling hoses found open.
PL HWP # 3 started @ 9:35 am & HWP # 1 stopped @ 9:40 am.
PL HWP # 1 ,maintenance work done.
PL 5S work under progress at RPH
PL CT # 1 stopped at CPH for checking by Paharpur colling tower engineers.
PL Ladder fabrication work under progress.

PL Primary filter cleaned - 12 nos.


PL Airaudit done & total - 76 nos. of cooling hoses found open.
PL White washing of ACH
PL 5S work at RPH
PL Ladder fabrication work under progress.
PL Process water line v/v opened as per FTP shift incharge
PL Backwash done of Unit#2
PL TP # 4 changeover done, TP# 1& 3 Running
PL Diesel tp up done in both pump

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 82 nos of hoses found open.

PL Primary Filter changed.Comp#1 sec filter found choked and slightly torn out
PL Primary filter cleaned - 8 nos.
PL Both units backwashed
PL Unit#1 backwashed

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total - 94 nos. of cooling hoses found open.
PL HFO line opened for Casthouse
PL Unit#2 backwashed and running
PL Chemical Dosing done

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 95 nos of hoses found open.
PL HFO line opened for Bake Oven.

PL Primary Filter changed.Found ok


PL Primary filter cleaned - 8 nos.
PL Both units backwashed
PL Unit#1 backwashed

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total - 93 nos. of cooling hoses found open.
PL White washing of ACH
PL Ladder fabrication work under progress.
PL 5-s of Store/ FFPH strainer area cleaning
PL Chamber v/v maintenance
PL Backwash done of Unit#2
PL Chemical Dosing done

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 98 nos of hoses found open.

Primary Filter changed.Found ok(8 no. new pri. Filter installed at comp#6)
PL
PL Primary filter cleaned - 8 nos.
PL Unit#1 backwashed

PL Primary filter cleaned - 8 nos.


PL Airaudit done & total -91 nos. of cooling hoses found open.
PL Diesel Indicator fixed.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 92 nos of hoses found open.
PL HFO line opened for Bake Oven.

PL Primary Filter changed.


PL Primary filter cleaned - 8 nos.
PL White washing of ACH under progress.
PL Airaudit done & total - 88 nos. of cooling hoses found open.
PL Ladder fabrication work under progress.
PL maint. Work on progress
PL water sample collection abd sent to LAB
PL 5S area cleaning
PL Carpentary and massion work on progress

PL Primary filter cleaned - 8 nos.


PL Airaudit done & total - 89 nos. of cooling hoses found open.
PL White washing of ACH done.
PL Ladder fabrication work at ACH done for filter house.
PL Water sample collection done and sent to LAB .
PL 5S & area cleaning done at CPH.
Quaterly maintenance of Secondary & Diesel Compressor done.
PL
PL Cast House HFO line up done.

PL Primary filter cleaned- 8 nos.


PL Potroom airaudit done & total 91 nos of hoses found open.

PL Primary Filter changed.Found ok


PL Primary filter cleaned - 8 nos.
PL Unit#1 backwashed
PL PM going on,motor racked out,Stopped at 9:05 am
PL Started at 9:00 am
PL Airaudit done & total - 97 nos. of cooling hoses found open.
PL White washing of ACH under progress.
PL Ladder fabrication work under progress.
PL maint. Work in progress
PL 5S and House keeping job going on

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total - 88 nos. of cooling hoses found open.
PL Unit#2 backwashed and running
PL Chemical Dosing done
PL maintenance Work
PL White washing of ACH
PL maintenance Work
PL Ladder/ platform fabrication work at ACH done for filter house.
PL Fire extinguisher hanging
5-S of SURROUNDING area
PL
PL gate v/v maintenance
PL stopped
PL started
PL BACKWASH done

PL Primary filter cleaned - 8 nos.


PL Airaudit done & total - 90 nos. of cooling hoses found open.
PL Watermeter reading taken.
PL HWP # 4 Rack in done at CPH.
PL CT # 1 at CPH stopped at 5:00 am & rack out done.
PL Chamber # 9 valve opened at ,fire line restored for Bakeoven.
PL HFO Line up done for Bakeoven at 4:00 am

PL Primary Filter changed.Found ok


PL Primary filter cleaned - 8 nos.
PL Unit#1 backwashed
PL PM done,motor racked in at 11:15 am
PL Airaudit done & total - 90 nos. of cooling hoses found open.
PL Ladder fabrication work under progress.
PL maint. Work in progress
PL 5S and House keeping job done
PL Rodding and GAP completed.

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total - 97 nos. of cooling hoses found open.
PL Unit#2 backwashed and running
PL Chemical Dosing done
PL Ladder fabrication work under progress.
PL maint. Work in progress
PL 5S and House keeping job done
PL HFO lined up for cast house.

PL Primary filter cleaned - 8 nos.


PL Airaudit done & total - 103 nos. of cooling hoses found open.
PL Watermeter reading taken.

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total - 92 nos. of cooling hoses found open.
PL Unit# 1 backwashed and running
PL Stopped at 06:25 AM
PL Cleaning of shell-done
PL Started at 09:20 AM
PL Stopped at 09:20 AM
PL Cleaning of shell-done
PL Started at 01:55 pm
PL Stopped at 09:50 am
PL bimonthly maintenance-done
PL Started at 01:30 PM
PL Planned running/Testing for 10 min. done
PL Primary Filter changed.
PL Ladder fabrication work under progress.
PL WATER FLOW METER maintenance/ replacement
PL White washing of ACH
PL Paint box & Brush taken from FTP
PL All sling & lifting tools testing/ colour coding by safety department
PL Scrap moved from ACH area by ABHINAV ENGG.

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total -101 nos. of cooling hoses found open.
PL Unit#2 backwashed and running
PL Chemical Dosing done
PL Ladder fabrication work under progress.
PL WATER FLOW METER maintenance/ replacement
PL White washing of ACH
PL Paint box & Brush returned to FTP
PL SH 114,116 valve maintenance done.

PL Primary filter cleaned - 8 nos.


PL Airaudit done & total - 106 nos. of cooling hoses found open.
PL Watermeter reading taken.
PL CT # 3 stopped at 5:00 am @ CPH
PL HFO Line up done for BAKEOVEN.

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total - 95 nos. of cooling hoses found open.
PL Unit# 1 backwashed and running
PL Primary Filter changed.
PL Dranage cleaning-done
PL White washing of ACH
PL Water flow meter installation
PL CT # 3 started at 07:40 am
PL started 7:30:00 AM
PL stopped 7:35:00 AM
PL bimonthly maintenance
PL White washing of Chemical Room
PL stopped at 10:25 am

PL Primary filter cleaned - 08 nos.


PL Airaudit done & total -103 nos. of cooling hoses found open.
PL Unit#2 backwashed and running
PL Chemical Dosing done
PL Ladder fabrication work under progress.
PL White washing of ACH
PL bimonthly maintenance
PL Dranage cleaning-done
PL started at 6:05 pm
PL started at 6:10 pm
PL Put In Auto
PL HFO lined up for cast house.

PL Primary filter cleaned - 8 nos.


PL Airaudit done & total - 115 nos. of cooling hoses found open.
PL Watermeter reading taken.

PL Primary filter cleaned - 8 nos.


PL Airaudit done & total -94 nos. of cooling hoses found open.
PL Comp#1,5 & 6,primary filter changed.
PL CT # 3 stopped at 6:20 am @ CPH
PL Structure cleaning of CT # 3 at CPH done.
PL Wahite washing of ACH wall under progress.
PL Ladder fabrication work at ACH under progress.
PL CT # 3 started at 6:50 am @ CPH
PL Complete air line audit of Potroom done.
PL 5S underprogress at PPH & RPH.
From To Notification no. Remarks

9:30 AM 1:00 PM

2:00 PM 10:00 PM
2:00 PM 10:00 PM
2:00 PM 10:00 PM
2:00 PM 10:00 PM

9:30 AM 1:00 PM

2:00 PM 10:00PM
2:00 PM 10:00PM

9:30 AM 1:00 PM
9:30 AM 1:00 PM
2:30 PM 10:00PM

10:30 PM 12:00 AM
10:30 PM 12:00 AM

9:30 AM 1:00 PM
9:30 AM 1:00 PM

9:30 AM 1:00 PM

9:30 AM 12:30 PM
2:30 PM 10:00 PM
2:30 PM 10:00 PM
9:30 AM 1:00 PM

2:30 PM 10:00 PM
2:30 PM 10:00 PM

10:00 PM 1:00 AM
10:00 PM 1:00 AM

9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

2:30 PM 9:30 PM
2:30 PM 9:30 PM
2:30 PM 9:30 PM
4:15 PM 5:15 PM
2:30 PM 5:00 PM
2:30 PM 5:00 PM
2:30 PM 5:00 PM

2:30 PM 6:00 PM

9:30 AM 1:00 PM

9:30 AM 1:00 PM

9:30 AM 1:00 PM

2:30 PM 6:00 PM
2:30 PM 6:00 PM
2:30 PM 6:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

2:30 PM 6:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

2:30 PM 8:00 PM

9:30 AM 12:30 PM
9:30 AM 1:00 PM

11:30 PM 1:30 AM
11:30 PM 1:30 AM
11:30 PM 1:30 AM
7.00AM 2.00PM

2.30PM 5.00PM
16:30 17:00
15:10 15:30

15:30 17:40

11:05 12:40
9.30 13.00

9:30 AM 12:30 PM

14.30 17.30
9.30 13.00
9.30 13.00

14.30 17.30

9.30 13.00

14.30 17.30

9.30 13.00
16:30 18:15

17:15 22:00

9.30 14.00

14.30 18.00
9:35 14.00
9:45 14.00

14.30 17.50
14.30 15.50
14.30 17.30
10.00 13.00

14.00 18.00
9:30 AM 12:45 PM
12:45 PM

2:20 PM 5:45 PM

9:30 AM 12:45 PM

2:30 PM 4:30 PM

6:45 PM
6:45 PM 7:50 PM
6:30 PM
9:30 AM 12:45 PM
9:30 AM 12:45 PM

2:15 PM 5:45 PM

9:30 AM 12:45 PM

2:30 PM 5:50 PM
9:30 AM 12:45 PM

2:30 PM 5:50 PM

2:30 PM 5:45 PM
2:30 PM 5:45 PM

9:30 AM 12:45 PM

2:30 PM 5:00 PM
9:30 AM 1:00 PM

2:15 PM 6:00 PM

9:30 AM 1:00 PM
2:15 PM 9:00 PM
6:00 PM

9:00 AM 1:00 PM

2:00 PM 6:00 PM

9:00 AM 1:00 PM

2:00 PM 6:00 PM
2:00 PM 6:00 PM
2:00 PM 6:00 PM
2:00 PM 6:00 PM contd.

4:10 PM
5:40 PM
9:00 AM 1:00 PM

2:00 PM 6:00 PM
2:00 PM 6:00 PM

11:00 12:45

9:40 12:55
9:00 AM 1:00 PM

9:00 AM 1:00 PM

2:00 PM 6:00 PM
7:30 PM

10:40 PM
11:30 PM
11:30 PM 12:30 AM
11:00 PM 4:30
6:00 AM 2:00 PM
6:00 AM 2:00 PM
6:00 AM 2:00 PM

2:00 PM 10:00 PM
2:00 PM 10:00 PM
2:00 PM 10:00 PM

11:37 PM

9:30 AM 1:00 PM

10:45 AM

2:00 PM 6:00 PM
4:15 PM

4:00 PM 5:30 PM
5:58 PM
3:00 PM 7:00 PM

3:00 PM 6:00 PM
4:50 PM
5:05 PM
5:10 PM

9:30 AM 1:00 PM
8:00 AM

2:15 PM 6:00 PM

9:00 PM 1:00 PM

2:15 PM 6:00 PM
9.42 AM 1035 AM
11.50 AM 1.00 PM

4:00 PM 5:30PM
10:00 PM 11:20 PM
1:10 AM 6:00 AM
2:30 PM 6:00 PM
6:00 PM 9:00 PM

9:30 AM to 12:30 AM
9:30 AM to 12:30 AM
9:30 AM to 12:30 AM
14:20 PM 6:00 PM
14:20 PM 6:00 PM
14:20 PM 6:00 PM
14:20 PM 6:00 PM
7:45 PM

14:30 PM 16:00 PM
14:30 PM 20:00 PM
14:30 PM 20:00 PM
14:30 PM 20:00 PM

10:30 AM 11:00 PM

9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

3:00 PM 6:30 PM
3:30 PM 10:00 PM

10.30PM 12.30 AM

3:00 PM 3:30 PM

2:00 PM 4:30 PM
3:00 PM 5:45 PM
4:40 PM 4:50 PM
2:00 PM 10:00 PM
7:00 PM

9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

2:00 PM 5:30 PM
2:30 PM 4:00 PM
2:30 PM 7:00 PM

2:30 PM 9:30 PM

9:30 AM 1:00 PM

9:30 AM 1:00 PM

12 noon 1:00 PM
12 noon 1:00 PM
2:30 PM 7:00 PM

8:00 PM 9:00 PM

10:00 AM 11:00 AM

4:00 PM 6:00 PM
6:00 PM 10:00 PM
2:00 PM 6:00 PM
6:00 PM 10:00 PM

11:00 AM 12:00 PM
12:00 PM 1:00 PM

6:00 PM 6:30 PM
6:00 PM 6:30 PM

10:30 AM 12:50 PM
2:30 PM 3:00 PM
2:30 PM 3:00 PM
2:30 PM 5:30 PM
6:00 PM 7:00 PM
3:00 PM 6:00 PM
7:00 PM 7:15 PM

12:00 AM 1:00 AM
11:00 PM 12:00 AM

9:30 AM 1:00 PM
10:00 AM 1:00 PM

2:30 PM 3:00 PM
6:00 PM 6:30 PM
3:00 PM 6:00 PM
3:00 PM 6:00 PM
3:00 PM 6:00 PM
3:00 PM 8:30 PM
3:00 PM 3:30 PM

4:30 PM 5:00 PM
5:00 PM

9:30 AM 1:00 PM

6:00 PM 6:30 PM
6:30 PM 7:00 PM
3:00 PM 6:00 PM
9:30 AM 1:00 PM
11:00 AM
9:30 AM 11:00 AM
11:15 AM 1:00 PM

2:00 PM
3:00 PM 6:00 PM
3:00 PM 6:00 PM
3:00 PM 6:00 PM
6:00 PM 10:00 PM

11:00 PM 4:00 AM

9:30 AM 10:50 AM

10:50 AM 12:20 PM
11:30 AM 12:20 PM
12:40 PM
12:50 PM

2:30 PM 3:00 PM
3:00 PM
3:30 PM 4:00 PM
4:00 PM
4:00 PM 7:00 PM
4:00 PM 7:00 PM
7:00 PM 9:00 PM
9:00 PM 10:00 PM
8:00 PM 9:00PM

10:00 PM 1:00 AM
10:00 PM 1:00 AM
2:00 AM 3:00 AM

10:30 AM 11:00 AM
11:15 AM 12:15
9.30 AM 1:00 PM

3:30 PM 4:00 PM
3:00 PM 6:00 PM

10:45 AM 11:00 AM
12:10 12:35 PM

12:13 PM

9:45 AM 10:00 AM
12:10 12:35 PM
9:45 AM 1:00 PM
9:00 AM 11:30 AM

2:40 PM 3:00 PM
7:15 PM 7:45 PM
2:40 PM 6:00 PM
5:45 PM 6:00 PM

9:45 AM 10:00 AM
12:10 12:35 PM
9.30 AM 1:00 PM

2:40 PM 6:00 PM

1:00 AM 2:00 AM

6:00 AM 10:00 AM
10:00 AM 1:00 PM

8:00 PM 9:00 PM

4:00 PM 10:00 PM
3:00 PM 10:30 PM

10:30 PM

9:45 AM 10:00 AM
9.45 AM 1.00 PM
8.30 AM 12:05

2:00 PM 6:00 PM
2:40 PM 6:00 PM
2:00 PM 6:00 PM

9:30 AM 9:45 AM
9:45 AM 10:00 AM

10:20 AM 1:00 PM

11:15 AM 1:00 PM

2:00 PM 6:00 PM

8:55 PM

10.30 PM 11.15 PM
11.20 PM 11.30 PM
11.15 PM

10:00 AM 2:00 PM

2:00 PM 5:00 PM
3:00 PM 4:00 PM

2:00 PM 6:00 PM

9:30 13:00
9:30 13:00

2:00 PM 5:00 PM
2:00 PM 5:40 PM

10:00 13:00
10:00 13:00

14:20 14:40
17:30 18:00
16:30 17:00
14:30 18:00
14:30 19:30

11.20 PM 11.45 PM

9:30 AM 1:00 PM

14:30 18:00

9:30 10:00
10:00 13:00

10:00 13:00
10:00 13:00
10:00 13:00
10:00 13:00
10:00 13:00
10:00 13:00

2:00 PM 8:00:00 PM
2:00 PM 8:00:00 PM
2:00 PM 4:00 PM

11.20 PM 11.45 PM

10.00AM 1.00 PM
11.30 AM 1.00 PM
10.00AM 1.00 PM
10.00AM 1.00 PM
10.30AM 2.00PM
8.30AM 11.00AM

16:30 18:00
14:30 17:00

17:00 17:15

09:30AM 1.00 PM

2:30 PM 5:30 PM
7:15 PM 8:30 PM

09:30AM 1.00 PM
9:30 AM 11:00 AM
11:00 AM 1:00 PM

2:15 PM 3:00 PM
4:00 PM 6:00 PM
9:30 AM 1:00 PM

9:30 AM 1:00 PM

14:30 PM 18:00 PM

14:30 PM 20:00 PM

10:00 AM 1:00 PM

2:30 PM 5:00 PM

10:30 AM 1:00 PM
10:00 PM 2:00 AM
5:00 AM 6:00 AM

10:00 AM 1:00 PM
10:30 AM 1:00 PM

10:00 AM 1:00 PM

11:00 PM 11:30 PM
5:15 AM 6:00 AM

9:30 PM 1:00 PM

2.30 PM 4.30 PM
3.30 PM 3.45 PM
5:00 PM 5.30PM
2.00PM 7.00PM

11:00 PM 11:30 PM
5:05 AM 5:40 AM

5.30 PM 5.45 pm
7.00 PM 7.30 PM
10:30 PM 1:30 AM
2:00 AM 3:00 AM
5:15 AM 6:00 AM

10.30 AM 11.00 AM
12 12.30 PM

3.30 PM 3.45 PM
7.00 PM 7.30 PM
4:00 PM 5:00 PM

5:15 AM 6:00 AM
11:00 PM 12:30 AM

9:30 AM 1:00 PM
9:30 AM 10:30 AM
10:30 AM 1:30 PM
9:30 AM 1:00 PM
9:30 AM 10:30 AM

3.30 PM 3.45 PM
7.00 PM 7.30 PM
4:00 PM 5:00 PM

4:00 PM 5:00 PM
7.00 PM 7.30 PM
6:00 PM 7:00 PM

5:15 AM 6:00 AM
9:30 AM 10:10 AM

7.00 AM 9:30 AM
9:30 AM 1:00 PM

4:00 PM 5:45 PM
4:00 PM 4:45 PM
4:30 PM 5:00 PM
5:00 PM 6:00 PM
4:00 PM 5:00 PM
7.00 PM 7.30 PM

5:15 AM 6:00 AM

6:45 AM 7:30 AM
7:30 AM 8:30 AM
9:00 AM 1:00 PM

3:00 PM 9:45 PM
4:00 PM 5:45 PM
4:00 PM 5:00 PM
7.00 PM 7.30 PM

12:00 AM 1:00 AM
1:00 AM 4:00 AM
5:15 AM 6:00 AM

7:00 AM 9:30 AM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:00 AM 9:30 AM

3:00 PM 3:45 PM
2:00 PM 5:45 PM
4:00 PM 5:00 PM

9:40 PM

10:30 PM 11:30 PM
11:50 PM
12:00 AM 1:00 AM
1:00 AM 1:45 AM
2:15 AM 2:45 AM
5:00 AM 6:00 AM

7.00 AM 7.50 AM
9:00 AM 9:30 AM

3:45 PM 4:00 PM
4:00 PM 6:00 PM
4:15 PM
4:00 PM 5:00 PM
7.00 PM 7.30 PM

11.00PM 1.30 AM
11.30 PM 4.30AM
5:15 AM 6:00 AM
2:15 AM 2:45 AM
7.00 AM 7.30 AM
9:00 AM 9:30 AM

6:00 PM 7:00 PM

3:05 PM
3:20 PM

11.00PM 1.30 AM
11.30 PM 4.30AM
2:15 AM 3.00AM
5:15 AM 6:00 AM
12.30 AM

7.00 AM 9:00 AM
9:00 AM 9:30 AM

2:00 PM 6:00 PM

6:00 PM 7:00 PM
6:15 PM
5:40 PM

11.00PM 1.30 AM
11.30 PM 4.30AM
5:15 AM 6:00 AM
10.40 PM
10.45 PM
10.46 PM
7.00 AM 1:00 PM
9:00 AM 9:30 AM
1:00 PM 1:30 PM
11:00 AM 1:00 PM
12 noon 2:00 PM
9:00 AM 10:00 AM

3:00 PM 4:00 PM
4:00 PM 4:30 PM

6:00 PM 7:00 PM

2:00 PM 6:00 PM

11.30PM 1.30 AM
11.30 PM 4.30AM
1:45 AM 2.10AM
5:15 AM 6:00 AM

10.00 AM 1:00 PM
12:00 PM 12:30 PM
1:00 PM 1:30 PM
10:00 AM 1:00 PM

2:00 PM 4:30 PM

2:00 PM 6:00 PM

5:00 AM 5:45 AM
1.30 AM 3.30AM
4:20 AM 5:00 AM

10.00 AM 1:00 PM
10.00 AM 1:00 PM
10.00 AM 11:00 AM
10.00 AM 11:00 AM

3:00 PM 4:00 PM
4:00 PM 4:30 PM
2:00 PM 4:30 PM
4:30 PM 6:00 PM
2:15 PM 6:00 PM
6:00 PM 7:00 PM

5:00 AM 5:45 AM
1:00 AM 2:30AM
4:20 AM 5:00 AM
12:30 AM 1:00 AM
10:45 PM 12:20 AM

11:00 AM 2:00 PM
10.00 AM 1:00 PM
10.00 AM 11:00 AM
1:00 PM 1:30 PM

5:00 PM 5:30 PM
8:00 PM 8:30 PM
2:40 PM
2:45 PM
3:00 PM 6:00 PM
2:00 PM 6:00 PM
6:00 PM 7:00 PM
5:00 AM 5:45 AM
11:00 PM 2:00AM
11:00 PM 11:30 PM

11:10 AM
11:30 AM 12:30 PM
10.00 AM 1:00 PM
10.00 AM 11:00 AM
1:00 PM 1:30 PM
12:30 PM 1:00 PM

3:00 PM 3:15 PM
4:00 PM 4:30 PM
2.30 PM

6.00 PM
2.30 PM 6.00 PM
8.00 PM 9.00 PM

2:00 AM 3:00 AM

7:00 AM 1:00 PM
8:30 AM 9:30 AM

6.00 PM 6.15 PM
6.30 PM 7.00 PM

10:00 PM 12:00 AM
5:00 AM 5:45 AM

9:30 AM 1:00 PM
8:30 AM 9:30 AM

5.15 PM 5.30 PM
8.00 PM 8.30 PM
2.30 PM 5.30 PM
6.30 PM
3.30 PM 5.00 PM

1:00 AM 2:00 AM
4:00 AM 5:00 AM
3:10 AM
5:00 AM 5:45 AM

10:00 AM 1:00 PM
9:30 AM 1:00 PM

5:30 PM 5:45 PM
7:45 PM 8:00 PM
2:30 PM 10:00 PM
2:30 PM 6:00 PM

1:00 AM 2:00 AM
5:00 AM 5:45 AM

9.00 AM 1:00 PM

10:00 AM 1:00 PM
9:30 AM 1:00 PM
5:30 PM 5:45 PM
7:45 PM 8:00 PM
2:30 PM 6:00 PM
5:00 PM 6:00 PM

11:00 PM 5:00 AM
5:00 AM 5:45 AM
4:00 AM 5:00 AM

9.00 AM 1:00 PM

10:00 AM 1:00 PM
9:30 AM 1:00 PM

5:30 PM 5:45 PM
7:45 PM 8:00 PM
2:30 PM 6:00 PM
2:30 PM 6:00 PM

11:00 PM 12:00 AM
5:00 AM 5:45 AM

10:00 AM 1:00 PM
9:30 AM 10:30 AM
10:30 AM 11:00 AM
9:30 AM 1:00 PM

4:00 PM 4:15 PM
5:30 PM 5:45 PM
2:30 PM 6:00 PM
2:30 PM 6:00 PM

5:00 AM 5:45 AM
3:00 AM 4:00 AM

9.45 AM 10.00 AM
11.15 AM 11.45 AM
9.45 AM 1.00 PM
9.45 AM 1.00 PM
9.45 AM 1.00 PM

5:00 PM 5:30 PM
5:30 PM 5:45 PM
2:30 PM 6:00 PM
2:30 PM 6:00 PM

5:00 AM 5:45 AM
1:00 AM 1:30 AM
2:30 AM 3:30AM

9.30 AM 10.00 AM
10.30 AM 11.00 AM

4:00 PM 4:15 PM
5:30 PM 5:45 PM

5:00 AM 5:45 AM
4:00 AM 5:00 AM

9.45 AM 10.00 AM
11.00 AM 11.30 AM
9.30AM 12.30 PM
9.30 AM 1.00 AM
9.45 AM 11.00 AM
10.00 AM 11.00 AM
11.10 AM 1.00 PM
5:00 PM 5:30 PM
5:30 PM 5:45 PM
2:30 PM 6:00 PM
2:30 PM 6:00 PM
3:05 PM
3:30 PM 4:00 PM
3:30 PM
3:30 PM 9:00 PM
7:00 PM 8:00 PM

10:30 PM 11:45 PM
5:00 AM 5:45 AM

5:00 PM 5:30 PM
5:30 PM 5:45 PM
3:00 PM 6:00 PM
6:05 PM

10:30 PM 11:45 PM
2:00 AM 2:30 AM
5:00 AM 5:45 AM

9.45 AM 10.00 AM
11.00 AM 11.30 AM
9.30 AM 1.00 AM

3:00 PM 8:00 PM
5:00 PM 10:00 PM
5:00 PM 5:30 PM
5:30 PM 6:00 PM

10:00 PM 12:00 AM
12:30 AM 1:00 AM
5:00 AM 5:45 AM

9.45 AM 10.00 AM
11.00 AM 11.30 AM
6:00 AM 2:00 PM
9.45 AM 1:00 PM

2.30PM 6.00PM
2.30PM 6.00PM
5:30 PM 6:00 PM

11:45 PM 12:30 AM
12:30 AM 1:00 AM
2:00 AM 3:00 AM
5:00 AM 5:45 AM

9.45 AM 10.30 AM
11.00 AM 11.30 AM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

2.30PM 6.00PM
5:00 PM 5:30 PM
2.30PM 5.00PM
4:00 PM 4:30 PM
4:30 PM 5:00 PM
1:00 AM 2:00 AM
11:00 PM 12:30 AM
5:00 AM 5:45 AM

12:00 PM 1:00 PM
12:00 PM 1:00 PM
12:00 PM 1:00 PM
12:00 PM 1:00 PM

2.30PM 6.00PM
2.45 PM 4.30 PM
4.15 PM 6.00 Pm
4.00 PM 5.00 Pm

11:00 PM 1:00 AM
5:00 AM 5:45 AM

10:00 AM 10.30 AM

3:30 PM 4:00 PM
4:00 PM 4:50 PM

11:30 PM 1:00 AM
5:15 AM 5:45 AM

9.45 AM 10.00 AM
11.00 AM 11.30 AM
9.45 AM 1:00 PM
9.45 AM 1:00 PM
9.45 AM 1:00 PM

2:30 PM 6:00 PM
2:30 PM 6:00 PM
3:30 PM 6:00 PM
5:00 PM 6:00 PM

11:30 PM 1:30 AM

11.30 PM 1.00 AM
12.15 AM 12.30 AM
5:15 AM 5:45 AM
12.30 AM 1.15 AM

10.00 AM 10.30 AM
9.30 AM 11.30 AM
10.30 AM 1:00 PM
11:10 AM
11:20 AM

3:00 PM 4:50 PM
5:00 PM 6:00 PM
4:00 PM 4:50 PM
9:36 PM
9:50 PM

11.15 PM 11.30 PM
11.30 PM 12.30 Pm
12 4.30 AM
5:15 AM 5:45 AM

6.30 AM 1.00 PM
9.30 AM 1.00 PM
11.30 AM 1.00 PM

2:00 PM 5:00 PM
2:00 PM 8:15 PM

2:30 PM 9:00 PM
9:00 PM 9:30 PM
5:00 PM 6:00 PM
4:00 PM 4:50 PM
8:30 PM

11.30 PM 12.30 Pm
5:15 AM 5:45 AM

9:00 AM 10:00 AM
10:30 AM 11:45 AM
9.30 AM 1.00 PM
9:30 AM 1:00 PM

7:00 PM 7:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
4:00 PM 4:50 PM
8:55 PM
9:10 PM

11:55 PM
12:00 AM 2:00 AM
4:30 AM 5:00 AM

10.30Am 11.30Am
11.00Am
11.00Am 1.00Am

3:00 PM 3:30 PM
2:30 PM 4:30 PM
2:30 PM 6:00 PM
4:00 PM 5:30 PM
2:30 PM 6:00 PM

11.30 PM 12.00 AM
5:00 AM 5:45 AM

10.00AM 10.30am
9.30AM 12.00PM

4.30 PM 5.00 PM
6..00 PM 6.30 PM
8.00 PM 8.30 PM

12:20 AM 01:00AM

8:30 AM 9:00 AM
9:20 AM 10:00 AM

6.00 PM 6.15 PM
7.30 PM 8.00 PM

12:20 AM 01:00AM

9.20AM 11.20AM
9.20AM 12.00PM
12.00PM 12.30PM
09.30 AM 12.30 PM
3.00PM 3.15 PM
6.00PM 6.30 PM
2.30 PM 5.30 PM
2.30 PM 5.30 PM
4.00PM 5.00PM
8.00 PM 8.30 PM

10:30 PM
11:45 PM
11:50 PM
12:00 AM 01:00AM
1:00 AM 2:00 AM
5:00 AM 5:45 AM

9:20 AM 10:00 AM
10:00 AM 10:30 AM
9.20AM 12.00PM

10:00 AM 1:00 PM

2:30 PM 10:00 PM
11:00 PM 4:00 AM

5:00 AM 5:45 AM
9:30 AM 12:50 PM
9:30 AM 10:30 AM

10:30 AM 11:00 AM
4.00 PM 4.15 PM
6.00 PM 6.30 PM
3.30 PM 5.30 PM
9.00 AM 2.00PM
8.00 PM 8.30 PM
12:20 AM 01:00AM

5:00 AM 5:45 AM
11:00 AM 12:30 PM 1000870611

9:30 AM 11:00 AM 1000870612

11:00 AM 12:30 AM 1000870612

10:30 AM 11:30 AM 1000870616

9:20 AM 10:00 AM
10:00 AM 10:30 AM

10:30 AM 11:30 AM
3.00PM 4.0PM 1000870672

4.00PM 5.00PM 1000870673

3.00pm 4.00PM
7.00pm 8.00PM
5.00PM 6.00PM

11:00 PM 12:00 AM 1000870755

5:00 AM 5:45 AM

11:00 AM 12:30 PM

9:25 AM
9:45 AM
10:15 AM
10:50 AM 12:10 PM
10:30 AM 11:30 AM 1000870616

7.00 AM 12:10 PM

3.21PM 5.55PM
3.25PM 6.00PM
3.25PM 6.00PM

11:00 PM 12:00 AM
5:00 AM 5:45 AM

8.30 AM 1.30 AM 1000871459

9.45 AM 10.15 AM
12.45 Pm 1.10 PM
11.35 AM 12.40 Pm
9.40 AM 1.00PM 1000871401

9.00 AM 12.30 PM 1000871500

9.00 AM 12.30 PM 1000871487

3.00PM 6.00PM 1000871542

3.00PM 6.00PM 1000871544

3.00PM 4.00PM

11:00 PM 12:00 AM
5:00 AM 5:45 AM

8.00 AM 8.30 AM
8.35 AM 9.00 AM

5.00PM 5.30PM
11:00 PM 12:00 AM
5:00 AM 5:45 AM

7.00 AM 12.00 HRS 1000871780

10.30 AM 12.30 PM 1000871846

10.45 AM 12.00 PM 1000871847

10.00 AM 10.15 AM
11.00 AM 11.30 AM
11.00 AM 12.45 PM
10.30 AM
10.20 AM

5.00PM 5.30PM
3:00 PM 5:00 PM 1000871896

8:00 PM 9:00 PM

5:00 AM 5:45 AM

12:00 AM 1:30 AM

10.10 am 1000872467

5.00PM 5.30PM
3:00 PM 7:00 PM 1000872467

8:00 PM 9:00 PM
5:30 PM
5:30 PM
8:30 PM
8:35 PM

5:00 AM 5:45 AM
11:00 PM 12:00 AM

111.00AM
12.40PM
10.45AM 12.15PM

7:00 PM 8:00 PM
7:00 PM 8:00 PM
4:00 PM 5:00 PM

5:00 AM 5:45 AM
12:00 AM 1:00 AM

9.30AM 11.00AM 1000872777

10.00AM

6:00 PM 7:00 PM
7:00 PM 8:00 PM
3:00 PM 6:00 PM 1000872777

5:00 PM 10:00 PM
3:00 PM 6:00 PM 1000872833

10:00 PM 12:45 AM
3:00 AM 4:30 AM
5:00 AM 5:45 AM

10.00AM 12.00PM 1000872961

9.30AM 12.00PM 1000872963

10.00AM
11.00AM

5:00 PM 6:00 PM
5:00 PM 6:00 PM
7:00 PM 8:00 PM
3:00 PM 6:00 PM 1000873024

5:00 PM 10:00 PM 1000873026

1:00 AM 1:30 AM
3:00 AM 4:30 AM
5:00 AM 5:45 AM

10.00AM
10.00AM 12.00PM 1000872961

10.00AM
11.30AM

5:00 PM 6:00 PM
3:00 PM 6:00 PM
7:00 PM 8:00 PM
3:00 PM 6:00 PM 1000873741

11.00 PM 4.00 AM
5:00 AM 5:45 AM

10.00AM
11.45 AM
9.40AM 12.00PM
5:00 PM 6:00 PM
5:00 PM 6:00 PM
7:00 PM 8:00 PM
2:00 PM 3:00 PM
7:00 PM 8:00 PM

3.00 AM 3.30 AM
12.15 AM 1.30 AM
5:00 AM 5:45 AM

11.00AM 11:30 AM
11.00AM 1:00PM
11.30AM 12:30 PM 1000874547

1:00 PM 5:00 PM
3:00 PM 4:00 PM
4:00 PM 4:30 PM
4:30 PM 7:00 PM
7:00 PM

11.48 PM
12.15 AM 1.30 AM
5:15 AM 5:45 AM

10:00 AM 11:00 AM
10.00AM 1:00PM 1000874867

11.30AM 12:30 PM 1000874547

2:30 PM 5:00 PM 1000874867

2:00 PM 3:00 PM
2:00 PM 3:00 PM
6:00 PM 7:30 PM
3:30 PM 4:30 PM 1000874866

5:15 PM
5:30 PM
5:30 PM 1000874865

5:00 PM 5:15 PM

12.00AM
1.00AM

10.00AM 1:00PM
11.30AM 12:30 PM 1000875073

12:30 PM 12:45 PM

3:00 PM 4:00 PM
5:00 PM 5:30 PM
4:00 PM 4:30 PM
2:00 PM 5:30 PM

1.30PM 2.15AM

10:00 AM 11:00 AM
10.00AM 12:45 PM
10.00AM 1:00PM

2:00 PM 3:00 PM
2:00 PM 3:00 PM
4:00 PM 4:30 PM
3:00 PM 4:30 PM
2:00 PM 5:00 PM 1000875397

1.30PM
10:00 AM 1:00PM 1000875527

10.00AM 1:00PM 1000875526

10:30 AM
10:35 AM

3:00 PM 4:00 PM
5:00 PM 5:30 PM
4:00 PM 4:30 PM
2:00 PM 5:00 PM 1000875527

2:00 PM 4:30 PM 1000875526

4:30 PM
4:35 PM

1.00AM
6.00PM

10.00 AM 10.15AM
11.15AM 11.45AM
9.55AM 1.00PM 1000875845

9.00AM 1.00PM

5:00 PM 5:30 PM
5:00 PM 5:30 PM
4:00 PM 4:30 PM
2:00 PM 6:00 PM 1000875990

2:00 PM 4:30 PM 1000875845

8:00 PM 9:00 PM
1.00AM
6.00PM
11.20PM 1.00AM

8:30 AM 10:00 AM

5.00PM
5.00PM
6.00 PM
7.00PM

1.00AM

10.00 AM 10.15AM
9:40 AM 1:00 PM
7:30 AM 8:40 AM
9:40 AM 1:00 PM 1000876564

9:30 AM 1:00 PM 1000876579

9:30 AM 1:00 PM
9:30 AM 1:00 PM

2:00 PM 3:00 PM
2:00 PM 3:00 PM
4:00 PM 4:30 PM
2:30 PM 3:30 PM 1000876989

4:00 PM 5:30 PM 1000877030

2:30 PM 4:30 PM 1000876564

3:45 PM 5:00 PM
6:00 PM 7:00 PM
11:00 PM 12:00 AM
5:00 AM 6:00 AM
1:00 AM 5:00 AM

10:00 AM 1:00 PM
11:00 AM 12:00 PM
8:27 AM
8:38 AM
9:30 AM 1:00 PM 1000877178

10:00 AM 1:00 PM

2:30 PM 6:00 PM 1000877178

5:00 PM 5:30 PM
5:00 PM 5:30 PM
7:15 PM 7:45 PM

11:00 PM 12:00 AM
5:00 AM 6:00 AM
1:00 AM 2:00 AM

10.00AM
12.00AM
9.30AM 12.00PM
9.35AM 12.00PM
9.50AM 11.50AM

5:00 PM 5:30 PM
5:00 PM 5:30 PM
7:15 PM 7:45 PM

3:00 AM 4:00 AM
5:00 AM 6:00 AM
1:00 AM 2:00 AM
10:00 AM 1:00 PM
9:30 AM 10:30 AM
10:00 AM 1:00 PM
10:00 AM 1:00 PM

6.00PM
6.00PM
8.00PM

5:00 AM 6:00 AM
1:00 AM 2:00 AM

10.00 AM 10.30AM
10:00 AM 1:00 PM
11:00 AM 12:00 PM
9:30 AM 12:30 AM
9:30 AM 1:00 PM

5:00 PM 5:30 PM
5:00 PM 5:30 PM
7:15 PM 7:45 PM
4.40PM 6.30PM
2:25PM 5.30PM

5:00 AM 6:00 AM
3:00 AM 4:00 AM

12.28PM
10.16AM 12.28PM
9.39 AM 2.00PM
10.00AM 2.00PM
9.50AM 2.00PM
11.40AM 2.00PM

6.00PM
6.00PM
8.00PM

5:00 AM 6:00 AM
3:00 AM 4:00 AM
1:00 AM 2:00 AM

10.30 AM 10.45 AM
11.00AM 11..30 AM
11.30 AM 12.30AM

5:00 PM 5:30 PM
5:00 PM 5:30 PM
7:15 PM 7:45 PM

3:00 AM 4:00 AM
1:00 AM 2:00 AM
5:00 AM 6:00 AM

8.00 AM 9.00AM
10.00 AM 11.00AM
10.00AM 12.00HRS
10.00AM 12.00 AM

5:00 PM 5:30 PM
5:00 PM 5:30 PM
7:15 PM 7:45 PM

3:00 AM 4:00 AM
1:00 AM 2:00 AM
5:00 AM 6:00 AM

10.30 AM 10.45 AM
11.00AM 11..30 AM
9:00 AM 11:00 AM
10:00 AM 12:30 PM
10:00 AM 12:00 PM 1000880598

10:00 AM 12:30 PM 1000885828

5:00 PM 5:30 PM
5:00 PM 5:30 PM
7:15 PM 7:45 PM
2:30 PM 10:00 PM 1000885828

2:30 PM 5:30 PM

10:35 PM
10:40 PM
10:00 PM 10:45 PM 1000885828

12:25 AM
1:55 AM
2:10 AM
3:00 AM 4:00 AM
5:00 AM 6:00 AM

10:00 AM 12:30 PM 1000880788

10:00 AM 12:30 PM
10:35 PM
10:40 PM

5.00PM 6.00PM
4.00PM 4.15PM
4.15PM 4.30PM
8.15PM 8.45PM
2.30PM 5.30PM

3:00 AM 4:00 AM
5:00 AM 6:00 AM
2:00 AM 3:00 AM

7:00 AM 7:30 AM
10.30 AM 11:00 AM
11:00 AM 11.45 AM
10:00 AM 12:30 PM
10:00 AM 12:30 PM

3.00PM 3.15PM
7.30PM 8.00PM
2.30PM 5.30PM
2.30PM 5.30PM
2.30PM 4.30PM
2.30PM 3.30PM

3:00 AM 4:00 AM
5:00 AM 6:00 AM

10:00 AM 1:00 PM
10:50 AM
11:10 AM
1130 AM 2:00 PM 1000881891

1130 AM 2:00 PM 1000881940

4.00PM 4.15PM
4.15PM 4.30PM
5.15PM 5.45PM
2.15PM 10.00PM

2.15PM 6.00PM
2.15PM 10.00PM

10:00 PM 2:00 AM 1000881891

3:00 AM 4:00 AM
5:00 AM 6:00 AM

10:00 AM 10:30 AM
10.30 AM 11:00 AM
11:00 AM 11.45 AM
10:00 AM 1:00 AM 1000882154

11:30 AM 1:00 PM 1000882166

3:00 PM 3:30 PM
2:00 PM 6:00 PM 1000882154

2:00 PM 6:00 PM 1000882283

1.00AM 2.00AM
2.30AM 3.00AM
5.00AM 5.30AM
5:00 AM 6:00 AM

6:00 AM 1:00 PM
10:50 AM
11:35 AM
11:35 AM 1:00 PM 1000882318

2:15 PM 5:00 PM 1000882318

5:00 PM 6:15 PM 1000882318

6:35 PM
6:55 PM
7:00 PM 9:00 PM
2:15 PM 10:00 PM
4.00PM 4.15PM
4.15PM 4.30PM
5.15PM 5.45PM
6:00 PM 6:30 PM 1000882690

1.00AM 2.00AM
10.30PM 12.00AM 1000882393

12.00AM 1.30AM 1000882394

5:00 AM 6:00 AM

11:00 AM 11:30 AM
9:30 AM 1:00 PM 1000882606

12.00AM 1:00 PM

2:15 PM 7:00 PM 1000882393

5:00 PM 6:15 PM 1000882688

2:15 PM 10:00 PM 1000882606

8:00 PM 10:00 PM
2:15 PM 5:00 PM 1000882689

8:00 PM 8:30 PM
8:30 PM 9:00 PM
9:30 PM 10:00 PM

12.30AM 2.00AM
3.00AM 3.15AM
3.30AM 4.00AM
10.30AM 6.00AM
5:00 AM 5:45 AM

11:00 AM 1:00 PM
9:00 AM 1:00 PM 1000882766

11:00 AM 1:00 PM

4.00PM 4.15PM
4.15PM 4.30PM
9:30 PM 10:00 PM
2:15 PM 6:30 PM
10008883413
2:15 PM 5:00 PM
5:00 PM 6:00 PM

1.00AM 2.30AM
5:00 AM
3.30AM

12.15PM 12.30PM
1.15PM 1.45PM
9.15AM 11.00AM 1000883467

10.00AM 11.00AM
11.00AM
11.00AM
11.15AM
11.30AM
1000883538
1000883539
1000883539
1000883540
1000883541
1000883542

3:00 PM 3:30 PM 1000883540

2:15 PM 10:00 PM 1000883538

7:00 PM 8:30 PM 1000883539

7:00 PM 8:30 PM 1000883539

2:15 PM 4:15 PM 1000883541

4:15 PM 6:30 PM 1000883542

8:30 PM 9:00 PM

3.00AM 3.15AM
3.30AM 4.00AM
1.00AM 2.30AM
5:00 AM

9.30AM 11.30AM 1000883760


1000883761

9.20AM 11.00AM
9.40AM
1000883766

2:30 PM 1000883761

3:00 PM 3:30 PM
2:30 PM 4:00 PM 1000883815

4:00 PM 6:00 PM 1000883818

10:00 PM 2:20 PM 1000883761

1.00AM 2.30AM
5:00 AM

9.20AM 2.00PM 1000883871

10.00AM
11.00AM
10.00AM 10.30AM

2:30 PM 5:45 PM
3:00 PM 3:30 PM
3:30 PM 4:00 PM
4:00 PM 4:30 PM
3:00 PM 5:30 PM 1000884177

6:00 PM 7:15 PM
3:45 PM
3:50 PM

1.00AM 2.30AM
3.00AM 3.15AM
3.30AM 4.00AM
5:00 AM

9.30 AM 1000884315

11.:00AM
1000884333

5.00pm 5.15pm
7.30PM 8.00PM
6.00PM 6.30PM
2.30PM 5.30PM

1.00AM 2.30AM
3.30AM 4.00AM
5:00 AM
10:00 PM 6:00 AM

10.00AM 10:30 AM
11.00AM 11:30 AM

5.45PM 6.00PM
6.00PM 6.15PM
2.30PM 4.30PM
8.15PM

3.30AM 4.00AM
5:00 AM
10:00 PM 6:00 AM

9:30 AM 12:00 PM -
9:30 AM 11:00 AM 1000885111

11:00 AM 1:00 PM 1000885112

11:00 AM 2:00 PM

5.00PM 5.15PM
7.30PM 8.00PM
2.30PM 8.00PM 1000885143

4.30PM 6.00PM 1000885157/158

11:30PM 1:00AM
2:25AM 3:00AM
3:00AM 3:30AM

9:30 AM 1:00 PM 1000885362 &


1000885363
9:30 AM 1:00 PM
9:30 AM 11:00 AM
11:00 AM 1:00 AM
10.00AM 10:30 AM
11.00AM 11:30 AM

3:00 PM 3:30 PM
3:30 PM 4:00 PM
4:00 PM 4:30 PM

1:00AM 3:00AM
12:00PM 1:30AM

6:00 AM 1:00 PM
9:30 AM 11:30 AM
11:30 AM 1:15 PM

3:00 PM 3:30 PM
3:30 PM 4:00 PM
4:00 PM 4:30 PM
2.30PM 5:30 PM 1000885753

11:20PM 2:00AM
2:00am 2:30 AM

10:30 AM 12:45 PM 1000886038

6:00 AM 1:00 PM
10.00AM 10:30 AM
11.00AM 11:30 AM
1000886053

4:00AM 4:30AM

9:00 AM 11:00 AM 1000886165

9:00 AM 1:00 PM
11:00 AM 1:00 PM 100088268

3:00 PM 3:30 PM
3:30 PM 4:00 PM
4:00 PM 4:30 PM
2:00 PM 10:00 PM

2.:00AM 4:00AM
4:30AM 5:00AM

9.30AM 1.00PM
11.45AM 1.00PM

3:00 PM 3:30 PM
3:30 PM 4:00 PM
4:00 PM 4:30 PM
2:00 PM 10:00 PM
2:00 PM 10:00 PM

3:00AM 3:30AM
12:00AM 2:00AM
2:00 AM 3:0AM

10.30AM 11.50AM
10.00AM 12.30PM

3:00 PM 3:30 PM
3:30 PM 4:00 PM
4:00 PM 4:30 PM
8:30 PM
4:00 PM

4:30AM 5:00AM

1000887144

4:00PM 4:30PM

8:00PM 10:00PM

1:00 AM 1:30 AM
5:00 AM
2:30 AM 3:30 AM
10:00 AM 12:00 PM
12:00 PM 2:00PM

3:00PM 3:30PM
4;40PM 5:30PM 1000887480

8:00PM 9:45PM
5:30PM 6:00PM
4;40PM 5:30PM
7:30PM 8:00PM

1:00 AM 1:30 AM
5:00 AM
2:30 AM 4:00 AM

2:30PM 5:00PM
3:00PM 3:30PM
3:30PM 4:00PM

7:00PM 9:45PM

1:00 AM 1:30 AM
5:00 AM
3:15 AM 4:00 AM

9:00 AM 9:30 AM
9:30 AM 1:00 PM 1000887801

10:30 AM 11:00 AM

5:40PM 7:30PM
3:00PM 9:40PM
4:28PM 5:30PM
1000887908

3:30 AM 4:00 AM 1000887914

5:00 AM
1:30 AM 3:00 AM

9:00 AM 9:30 AM
9:30 AM 1:00 PM 1000888025

10:30 AM 11:00 AM
9:00 AM 11:00 AM
10:30 AM 12:00 PM
9:30 AM 11:00 AM 1000888022

11:00 AM 12:30 PM 1000888023

12:30 PM 3:22 PM 1000888024

3:00PM 3:30PM
3:30PM 4:00PM
6:30PM 8:30PM
6:00AM 3:40PM
9:00pm 9:30PM

1:00 AM 1:30 AM
11:30 PM 12:15 AM
1:30 AM 3:00 AM
4:13 AM
4:58 AM

10:00 AM 11:30 AM 1000888627

11:30 AM 1:00 PM 1000888630

10:00 AM 11:30 AM
10:00 AM 1:00 PM 1000888633

10:00 AM 1:00 PM 1000888634

2:38 PM 6:00 PM 1000888664

3:15PM 6:30PM
4:10PM 6:30PM
7:00PM 9;30PM
9:00PM 9:30PM

12.30AM 1.45AM
5:00 AM

10:00 AM 11:00 AM
10:00 AM 12:00 PM

3:00PM 3:30PM
3:30PM 4:00PM

2.30AM 4.00AM
12.30AM 1.00AM
11.00PM 11.15PM
12.00AM 12.30AM
11.20AM 12.00AM
5:00 AM

10:00 AM 11:30 AM
9:30 AM 10:00 AM
11:30 AM 12:00 PM
10:00 AM 1:00 PM 1000890822

10:30 AM 1:00 PM 1000890807

10:15 AM 1:00 PM 1000890820

2:30 PM 4:00 PM 1000890822

6:00 PM 7:30 PM
2:15 PM 6:00 PM 1000890807

2:15 PM 5:30 PM 1000890820

4:00 PM 4:30 PM
6:00 PM 6:30 PM

2.20AM 4.00AM
12.30AM 1.00AM
5:00 AM

9:40AM
11:00AM 1:00PM
9:50:AM

2:15 PM 5:30 PM 1000890820

2:15 PM 3:30 PM
4:20 PM 5:15 PM 1000891039

3:00PM 3:30PM
3:30PM 4:00PM
6:00 PM 6:30 PM
2.30AM 4.00AM
12.30AM 1.00AM
11.00PM 11.15PM
5:00 AM

11:05 AM 12:45 PM
9:30 AM 10:00 AM
10:30 AM 1:00PM
10:00 AM
10:00 AM 10:30 AM
9:00AM

6:00 PM 7:30 PM
3:00 PM 3:30 PM
3:30 PM 4:00 PM
2:15 PM 9:15 PM 1000891258

2.30AM
12.30AM
5:00 AM

11:00 AM 12:30 PM
9:34 AM 12:00 PM
8:27 AM
10:00AM 12:00 PM

4:00 PM 5:30 PM 1000891458

3:00PM 3:30PM
3:30PM 4:00PM
6:00 PM 6:30 PM

2.30AM
11.00PM
12.30AM
5:00 AM

10:30 AM 11:54 AM
9:30 AM 10:00 AM
12:30 PM 1:00 PM

3:30PM 4:00PM
3:00PM 6:00PM 1000891665

7:30Pm 8:30PM
5:00PM 5:30PM

2.30AM
12.30AM
5:00 AM

9:45 AM 10:50 AM 1000892022

9:57 AM 12:00PM
10:00 AM
11:10AM 1:10PM

3.45 PM 4.00PM
4.05PM 4.20PM
7.15PM 8.20PM
6.30PM 7.00PM
2.30PM 8.30PM

2.30AM
11.00PM
12.30AM
5:00 AM
9:45 AM 10:15 AM
9:57 AM 12:00PM
12:45 PM 2:00 PM

8.30 PM 8.45 PM
8.45PM 9.10PM
9.15PM 9.45PM 1000892761

9.10PM

1:15AM 3:40AM
5:00AM 5:30AM

10.00AM 12.30PM
9.45AM 1.00PM 1000893042

10.15PM 11.30PM
10.30PM 1.00PM
12.00PM 1.00PM

3:45 PM 6:30 PM 1000892022

5:00 PM 6:00 PM
4:00 PM 6:00 PM 1000893433

5:00 PM 6:00 PM

1:30AM 3:10AM
10:30 PM 11:00 PM
4:15AM 4:45AM
5:15 AM

1:00 PM 1:30 PM
9:45 AM 10:00 AM
10:00 AM 1:00 PM 1000893638

11:45 AM 12:45 PM
9:00 AM 10:00 AM

4:00 PM 4:30 PM
5:00 PM 5:00 PM
4:00 PM 6:00 PM 1000893744

4:00 PM 6:00 PM

12:00AM 12:30AM
1:00AM 2:15AM

6.30AM 11.00AM 1000893819

9.30AM 11.30AM 1000893830

7.00AM 8.30AM

10.30AM 11..50AM

3.45 PM 4.00PM
4.05PM 4.20PM
5:00 PM 5:00 PM
3:00 PM 6:00 PM 1000893937

7:00 PM 9:00 PM

1:17 AM 3:00AM
11:00 PM 11:30 PM
10:30 PM 11:00 PM

10.00AM 10.15AM
10.30AM 11.00AM
9.00AM 10.30AM 1000894116

10.30AM 12.00PM 1000894147


11.00AM 12.30PM
1.30PM

4:00 PM 4:30 PM
5:00 PM 5:00 PM
2:30 PM 1000894189

2:30PM 12:00PM

3:00AM 3:30AM
1:00AM 2:15AM
5:00AM 6:00AM

9.15AM 11.00AM 1000894319

10.46AM
10.53AM
11.00AM

1.00AM

3.45 PM 4.00PM
4.05PM 4.20PM
5:00 PM 5:00 PM
5:30 PM 6:00 PM
2:00 PM 4:30 PM 1000894438
1000894438
2:00 PM 4:30 PM
10:30 PM 11:00 PM
11:115 PM 11:45 PM
1:45 AM 3:15 AM

11.00AM 11.15AM
12.15PM 12.40PM
9.15AM 10.30AM 1000894519

7.00AM

1.00PM

2:00 PM 6:30 PM 1000894759

4:00 PM 4:30 PM
5:00 PM 5:00 PM

1:30 AM 3:55AM
5:00 AM 5:30 AM

6.30AM 1.00Pm 1000895166

11.00AM 12.30AM

6.45 PM 7:00 PM
9:00 PM 9:30 PM
7:00 PM 9:00 PM

1:00 AM 1:30 AM
1:30 AM 2:00 AM
5:00 AM 5:50 AM
2:00 AM 4:00 AM

9.15Am 1.00PM 1000895166

10.00Am 10.15AM
11.30AM 12.00PM
10.50Am 1000895168

2.00PM

3:00 PM 4:00 PM
4:00 PM 6:00 PM
7:30 PM 8:00 PM
8:00 PM 8:30 PM
8:30 PM 9:00 PM

1:30 AM 2:00 AM
5:00 AM 5:50 AM
2:00 AM 4:00 AM

6:30 AM 9:30 AM 1000895656

11:00 AM 1:00 PM 1000895670

6:30 AM 1:00 PM 1000895658

12:00 PM 12:30 PM 1000895655


4:30PM 5:30PM
2:00PM 2:30PM
6:00PM 6:30PM
5:00PM 5:30PM
7:00PM 7:30PM
11:00AM 2:00PM 1000895696

2:00PM 9:15 PM

1:00 AM 1:30 AM
1:30 AM 2:00 AM
5:00 AM 5:50 AM
2:00 AM 4:00 AM

6:30 AM 1:00 PM 1000895658

12:00 PM 1:30 PM
10:30 AM 12:00 PM 1000896275

12:00 PM 1:00 PM 1000896276

2:30PM 4:00PM 1000896307

4:00PM 5:30PM 1000896308

4:30PM 5::00PM
5:00 PM 5:30 PM
2:30PM 9:20PM 1000895658

1:30 AM 2:00 AM
5:00 AM 5:50 AM

10:00 AM 12:30 PM 1000896504

12:00 PM 1:30 PM
5:00 PM 5:30 PM
3:00 PM 4:30 PM 1000896525

4:30 PM 6:00 PM 1000896526

7:30 PM 8:00 PM
8:30 PM 9:45 PM

1:00 AM 1:30 AM
1:30 AM 2:00 AM
5:00 AM 5:50 AM

10.00Am 10.15AM
11.30AM 12.00PM
10.00AM 1:00 PM 1000896767

11:15 AM 12:00 PM

12:00 PM 1:00 PM

5:30 PM 6:30 PM
3:00 PM 5:30 PM 1000896814

2:10PM 6:00 PM
2:30PM 5:30PM
7:30PM 9:05 PM
6:30 PM 9:45 PM

1:30 AM 2:00 AM
5:00 AM 5:50 AM
2:00 AM 4:00 AM

10:00 AM 1:00 PM 1000897113

10:00 AM 1:00 PM
10:00 AM 10:00 AM
12:00 PM 2:00 PM
10:00 AM 1:00 PM 1000897112
7:10 PM 9:20 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM 1000897163

2:00 PM 6:00 PM
5:00 PM 5:30 PM
6:30 PM 7:00 PM

10.45PM 11.00PM
11.30AM 12.00AM
1.30AM 3.00AM

8:30 AM 9:00 AM
9:15 AM 9:45 AM
10:15 AM 10:45 AM
12:00 PM 1:30 PM

7:00 PM 7:30 PM
7:30 PM 8:00 PM
8:00 PM 8:30 PM

5:00 AM 6:00 AM
1:00 AM 1:30 AM

10:00 AM progress 1000897378

10:25 AM 12:10PM 1000897400

10:35 AM
9:30 AM 12:20 PM
9:00 AM 2:00 PM
9:30 AM
12:30 PM 1:55 PM

2:30 PM 3:00 PM
3:00 PM 3:30 PM
2:15 PM 5:00 PM 1000897378

2:30 PM 4:30 PM
5:00 PM 10:00 PM

5:00 AM 6:00 AM
12:30 AM 1:00 AM
11:00 PM 11:30 PM

8:45 AM
9:30AM
9:30AM 10:00AM
10:00 AM 1:10 AM
10:35 AM 12:15 PM 1000897944

10:00 AM 1000897946

12:30PM 2:00PM
11:30 AM 12:00 PM

2:30 PM 3:00 PM
4:00 PM 4:30 PM
4:30 PM 5:00 PM
4:30 PM 6:00 PM 1000898041

4:25 PM
4:40 PM
4:45 PM 5:10 PM 1000898042

5:10 PM 5:35 PM 1000898043

12:30 AM 1:00 AM
5:00 AM 6:00 AM
1:00 AM 2:30 AM

9:30AM 11:00AM 1000898169


1000898182
1000898181

12:30PM 2:00PM

3:30 PM 5:45 PM 1000898181

2:15 PM 3:30 PM 1000898181

2:15 PM 3:15 PM 1000898182

5:30 PM 6:30 PM
7:00 PM 7:30 PM
2:15 PM 5:00 PM 1000898230

5:00 AM 6:00 AM
2:00 AM 2:30 AM
1:00 AM 1:30 AM
10:00 PM 11:45 PM

11:00 AM 12:20 PM
9:20 AM 1:00 PM 1000898364

9:20 AM 11:30 AM 1000898367

10:00 AM 10:30 AM
10:30 AM 11:00 AM
1000898420
1000898408

2:20 PM 5:45 PM 1000898364

2:20 PM 5:45 PM 1000898481

2:30 PM 3:00 PM
3:00 PM 3:30 PM

2:15 PM 4:00 PM 1000898408

2:15 PM 5:30 PM 1000898464

5:00 AM 6:00 AM
2:00 AM 2:30 AM
11.10 am 12:10 PM
9:30AM 1:00 PM

2:00 PM 5:30 PM

3:15 PM 3:40 PM
3:40 PM 4:00 PM

8:15 PM 9:30 PM

5:00 AM 6:00 AM
4:00 AM 4:30 AM
3:30 AM 4:00 AM
1:00 AM 3:00 AM

9:30AM 10:00AM
12:00 PM
10:00 AM 10:30 AM
1000899209
1000899232

3:00 PM 3:45 PM
3:00 PM 3:45 PM
4:00 PM 4:30 PM

5:00 AM 6:00 AM
4:00 AM 4:30 AM
1:00 AM 3:00 AM

10:00 AM 12:00 PM

7.00PM 7.15PM
9.00PM 9.30PM

7.30PM 8.50PM

5:00 AM 6:00 AM
4:00 AM 4:30 AM
3:30 AM 4:00 AM
1:00 AM 3:00 AM

9:30AM 10:00AM
10:30 AM 11:00 AM
10:30 AM 1:00 PM
9:30AM 1:00 PM
9:30AM 1:00 PM

9:30 AM 1:00 PM

4.00PM 4.30PM
2.30PM 6.00PM

8.00PM 9.15PM

2:00 AM 2:30 AM
2:45 AM 4:15 AM

11:30 PM 1:00 PM
9:30 AM 10:30 AM 1000900129

9:30 AM 1:00 PM
7.00PM
9.00PM

7.30PM

2:30 AM 4:15 AM
1:30 AM 2:00 AM
4:15 AM 4:45 AM

9:30AM 10:00AM
10:30 AM 11:00 AM
8:50 AM
8:50 AM 10:30 AM
11:20 AM

5:00 PM 6:00 PM
7:15 PM 7:45 PM
8:15 PM 10:00 PM

1:15 AM 2:50 AM
11:17 PM
2:21 AM
4:00 AM 4:30 AM

10:00 AM 10:30 AM 1000901883

8:30 AM 10:00 AM 1000901877

9:15 AM 1:00 PM 1000901888

9:15 AM 1:00 PM 1000901885

8:15 PM 8:45 PM
9:00 PM 10:15 PM
2:00 PM 6:00 PM 1000901888
2:00 PM 10:00 PM 1000901885

2:30 AM 4:00PM
12:00 AM 12:30 AM
10:00 PM 10:15 PM
1:30 AM 2:00 AM

9:30 AM 10:00 AM
10:00 AM 10:30 AM
8:15 AM 9:00 AM
11:15 AM 12:30 PM
9:30 AM 1:00 PM 1000902400

9:30 AM 1:00 PM 1000902402

2:00 PM 10:00 PM 1000902402

2:00 PM 10:00 PM 1000902400

6:00 PM 6:30 PM
4:00 PM 6:00 PM
8:15 PM 10:00 PM

2:30 AM 4:10 AM
12:00 AM 12:45 AM

8.00AM 9.30AM
9.30AM 12.30PM
6.30AM 1.00PM 1000902402

9.30AM 11.00AM 1000902668

12.25PM 12.50PM
11.05AM 12.15PM
10.00AM 11.00AM

4:00 PM 4:30 PM
8:15 PM 10:00 PM
2:00 PM 10:00 PM 1000902402

7:00 PM 7:30 PM

12:30 AM 1:00 AM
1:30 AM 3:00 AM
4:00 AM 4:30 AM

8:00 AM 8:30 AM
8:30 AM 9:00 AM
10:00 AM 10:30 AM
10:45 AM 12:00 PM
8:30 AM 9:15 AM
12:50 PM 2:00 PM

2:45 PM
5:00 PM 5:30 PM
6:15 PM 6:45 PM
8:15 PM 10:00 PM

1:30 AM 2:00 AM
5:00 AM 5:50 AM

6:00 AM 10:00 AM
7:15 AM 7:45 AM
7:15 AM 9:15 AM 1000903317

9:30 AM 11:30 AM 1000903319

7:15 AM 1:00 PM 1000903330

11:30 AM 1:00 PM

8:00AM 9:10 PM
5:00 PM 5:30 PM
2:31 PM 3:53 PM
3:20 PM 8:35 PM 1000903486

3:40 PM 6:30 PM 100090485

8:40 PM 9:10 PM

11:00 PM 11:30 PM
2:00 AM 3:30 AM
3:30 AM 4:00 AM
10:30 PM 10:50 PM
5:00 AM 5:50 AM

9:35 AM 10:00 AM
10:00 AM 10:25 AM
12:30 PM 1:00 PM
8:20 AM 8:45 AM
10:30 AM 12:00 PM

9:35 AM 11:15 AM 1000903544

11:15 AM 1:00 PM 1000903547

10:00 AM 1:00 PM

3:00PM 3:30PM
2:20PM 4:20PM
2:30PM 3:30PM
600PM 6:30PM
7:30PM 10:00PM
4:30PM 5:30PM

1:30 AM 2:00 AM
5:00 AM 5:50 AM

10:30 AM 12:00 PM
10:30 AM 1:00 PM 1000903987
8:20 AM 8:45 AM
9:00 AM 1:00 PM

3:30 PM 4:00 PM
2:45 PM 5:15 PM 1000904068

2:20PM 6:00 PM
2:41PM 6:00 PM
6:40PM 8:00 PM
8:30PM 9:00PM

1:00 AM 1:30 AM
2:00 AM 3:30 AM
3:30 AM 4:00 AM
5:00 AM 5:50 AM

9:35 AM 10:00 AM
10:00 AM 10:25 AM
12:30 PM 1:00 PM
8:20 AM 8:45 AM
10:30 AM 12:00 PM
10:30 AM
10:35 AM
10:45 AM 1:00 PM 1000903986

11:00 AM 11:20 AM
11:15 AM 11:50 AM 1000904060

9:00 AM 1:00 PM 1000904056

12:00 PM 1:00 PM 1000904055

12:50 PM
12:55 PM

2:14PM 6:00PM 1000904070

12:00PM 6:00PM 1000904116

3:00PM 3:30PM
3:26PM 6:30PM
8:00PM 9:30PM
8:30PM 8:40PM
4:00PM 4;30PM

1:30 AM 2:00 AM
5:00 AM 5:50 AM

8:20 AM 8:45 AM
10:30 AM 12:00 PM
9:30 AM 1:00 PM 1000904158

10:00 AM 1:00 PM 1000904055

12:30 PM 1:00 PM 1000904201

5:00PM 6:00Pm
2:00PM 6:48PM
4:00PM 4:30PM
9:00PM 9:30PM
7:40PM 9:00PM
2:00PM 5;00Pm
2:44PM 9:50PM

11:00 PM 11:30 PM
2:00 AM 3:30 AM
3:30 AM 4:00 AM
5:00 AM 5:50 AM
9:35 AM 10:00 AM
10:00 AM 10:25 AM
12:30 PM 1:00 PM
8:20 AM 8:45 AM
10:00 AM 1:00 PM 1000904055

10:30 AM 12:00 PM
9:35 AM 1:00 PM 1000904357

11:00AM 12:30PM 1000904452

4:00PM 4:30PM
7:00PM 8:PM
6:00PM 6:30PM
2:30PM 3:30PM
2:25PM 9:45 PM

11:30 PM 12:00 AM
2:40 AM 4:00 AM
12:20 AM 2:30 AM
5:00 AM 5:50 AM

8:20 AM 8:45 AM
10:30 AM 12:00 PM

1000904524

2:00 PM 6:00 PM 1000904524

4:30 PM 5:00 PM
5:30 PM 6:00 PM
6:30 PM 8:00 PM

2:45 AM 3:10 AM
12:40 AM 1:00 AM
1:15 AM 2:30 AM
3:30 AM 4:30 AM
5:00 AM 5:50 AM

9:00AM 1000AM
10:30AM 12:00AM
9:15AM
9:30AM 12:00PM 1000905054

2:00 PM 4:00 PM 1000904524

2:00 PM 4:30PM 1000905129

3:00PM 4:30PM
5:30 PM 6:00 PM
1:15 AM 1:45 AM
11:15 PM 12:45 AM
5:00 AM 5:50 AM

9:00AM 9:30AM
10:00AM
9:48AM
11:30PM 1:00AM
9:00AM
11:30AM 12:00PM

2:00 PM 4:00 PM
14:00 8:30 PM

4:15 AM 4:45 AM
2:30 AM 2:55 AM
12:20 AM 2:00 AM
5:15 AM 5:45 AM

9:00AM
9:33AM 11:50AM
10:00AM 1000905625

10:48AM 12:10AM
9:30AM 10:00AM
10:30AM
9:35AM 12:40PM
12:30PM 1:00PM

2:45 PM 5:30 PM 1000905689

3:00 PM 3:30 PM
4:00 PM 4:30 PM
2:30 PM 4:30 PM
9:30AM 10:00AM
9:26AM
11:15AM
11:15AM
11:00AM 1:00AM
10:30AM 11:00AM

9:40AM 12:50PM
10:15AM
11:45AM 1:20PM
11:30AM
12:10PM 2:00PM
9:30AM 10:00AM
10:30AM 11:00AM

5:00 PM 5:30 PM
4:00 PM 4:30 PM
2:15 PM 6:30 PM
3:00 PM 6:00 PM 1000906078
3:00 PM 6:00 PM 1000906079

9:30 AM 10:00 AM
8:40 AM
6:48 AM 12:45 PM 1000906210

10:00 AM 10:30 AM
10:25 AM 12:40 PM 1000906211

10:30 AM 1000906212

10:30 AM
11:30 AM

3:38 PM
6:00 PM
4:15 PM 6:45 PM
5:00 PM 6:30 PM

11:30 PM 12:05 AM
1:00 AM 2:00 AM
10:00 AM 10:30 AM
5:00 AM 6:00 AM

10.30 AM 10.45 AM
12.30 PM 12.55PM

7.15 AM 9.00AM
11.00 Am 2.00PM
11.10 AM 11.30 AM

5:00 PM 5:30 PM
7:00 PM 7:30 PM

5:30 PM 6:00 PM

6:00 PM 6:50 PM

9:30 AM 10:00 AM
12:00 PM 12:30 PM
10:00 AM 1:20 PM 1000907085

9:15 AM 12:00 PM 1000907083

9:30 AM 10:30 AM 1000907083

11:00 AM 1:00 PM 1000907087

9:30 AM 1:00 PM 1000907089

4.30 PM 4.45PM
5.15 PM 5.30 PM
7.30PM 8.00PM
2.15 PM 4.30PM
2.15PM 3.00PM
2.15PM 5.00PM
4.20PM 10.00PM

1:00 AM 1:30 AM
12:30 AM 3:00am
4:00am 5:30 AM
1:45 AM 2:45 AM

10:00 AM 10:30 AM
10:30 AM 10:50 AM
7:00 AM 10:00 AM
10:00 AM 1:00 PM 1000907323

9:30 AM 1:00 PM 1000907322

11:30 AM 12:50 PM

5:00 PM 6:00 PM
9:00 PM 10:00 PM
2:00 PM 10:00 PM 1000907323

3:00 PM 4:00 PM 1000907322

4:00 PM 5:00 PM
4:00 PM 6:00 PM 1000907338

1:30 AM 3:00 AM
12:00 AM 2:30 AM

9:30 AM 11:10 AM

1:30 AM 3:00 AM
4:30 AM 5:00am

10:00 AM 10:30 AM
10:30 AM 10:50 AM
6:30 AM 11:00 AM 1000907751

9:30 AM 1:00 PM
12:45 PM
12:55 PM
6:00 PM 7:00 PM
9:00 PM 10:00 PM
6:00 PM 7:30 PM
2:00 PM 10:00 PM 1000907801

11:10PM 1:40AM
2:30AM 4:10AM

12:00 PM 12:30 PM
12:30 PM 1:00 PM
9:30 AM 10:00 AM
7:30 AM 10:30 AM 1000907954

10:00 AM 12:30 PM
11:00 AM 1:00 PM
9:30 AM 11:00 AM

10:00 PM 4:20AM
1:00AM 1:45AM
2:45 AM 4:15AM

9:30 AM 12:30 PM 1000908167

9:30 AM 12:30 PM 1000908166

11:30 AM 12:30 PM
9:30 AM 12:30 PM

5.00 PM 6.15 PM
5.30 PM 6.00PM
6.15 PM 7.45 PM
3.00 PM 5.00 PM
3.00 PM 7.00 PM
5.30 PM 10.00PM

1:30AM 4:00AM
10:00 PM 11:30 PM

11.00 AM 11.15 AM
11.20 AM 11.35 AM
12.15 PM 12.40 PM
8.30 AM 10:00 AM

12:00 AM 2:30 AM
1:00 AM 2:00 AM
5:00 AM 6:00 AM

9.15 AM 11.00AM 1000908360

9.15 AM 12.45 PM 1000908361

9.45 AM 1.00 PM 1000908364

10.30 AM 12.00PM

2:00 PM 5:00 PM 1000908364

2:15 PM 4:45 PM
3:10 PM 6:30 PM
5:30 PM 6:00 PM
7:00 PM 7:30 PM
3:00 PM 6:00 PM
2:00 PM 5:00 PM 1000908361

12:00 AM 2:30 AM
5:00 AM 6:00 AM

9:20 AM 9:45 AM
9:50 AM 10:15 AM
11:15 AM 11:45 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM 1000908364

5:00PM 5:30PM
2:30PM 3:00PM
9:00AM 9:30AM
3:00 PM 3:30 PM
2:50 PM 7:15 PM
2:25 PM 9:30 PM
2:00 PM 6:00 PM
8:00 PM 9:00 PM

5:00 AM 6:00 AM
1:00 AM 2:00 AM
1:25 AM
1:35 AM

6:00 AM 10:00 AM 1000908364

9:15 AM 11:00 AM
11:15 AM 11:45 AM

10:00 AM 1:00 PM 1000910165

5:00 PM 5:30 PM
4:00 PM 4:30 PM
3:30 PM 5:20 PM
4:30 PM 5:30 PM
7:30 PM 9:05 PM
6:30 PM 7:00 PM
2:20 PM 7:00 PM
2:00 PM 5:40 PM

12:00 AM 2:30 AM
5:00 AM 6:00 AM

11:35 AM 11:50 AM 1000910594

10:00 AM 1:00 PM 1000910680

11:35 AM 1:00 PM
10:00 AM 1:00 PM

3:30 PM 4:00 PM
3:00 PM 3:30 PM
4:10 PM
3:40 PM 5:50 PM 1000910672

2:25 PM 6:20 PM
5:00 PM 5:30 PM
7:45 PM 9:10 PM

5:00 AM 6:00 AM
1:00 AM 2:00 AM
10:30 AM 11:45 AM
8:30 AM 12:00 PM
9:45 AM
11:50 AM
10:10 AM 12:00 PM
11:10 AM 12:30 PM
7:30AM 8:00AM

3.45 PM 4.00 PM
8.15 PM 8.40 PM
2:30 PM 5.45 PM
1000911478
5.00 PM 5.25 PM

6.30 PM 8.00 PM
2.30 PM 5:00 PM

5:00 AM 6:00 AM

11:00 AM 1:00 PM
10:00 AM 11:00 AM
10:00 AM 11:00 AM

4:00pm 4:30 PM
4:00pm 4:30 PM
4:30 PM 5:30 PM
4:00 PM 5:00 PM
7:40 PM 9:30PM
4:00PM 4:30PM

5:00 AM 6:00 AM
1:00 AM 2:00 AM
9:15 AM 11:00 AM
11:15 AM 11:45 AM

7.00 PM 7.15 PM
8.30 PM 9.00 PM
2.30 PM 6.30 PM 1000912627

10:20 PM 4:30 AM
1:30 AM 3:20 AM

9.40 AM 9.55 AM
10.10 AM 10.25 AM
10.35 AM 11.00 AM
9.30 AM 1.00 AM 1000912892

11.20 AM 12.30 PM
9.50 AM 1.00 PM
10.30 AM 1.00 PM

5:00 PM 6:00 PM
5:00 PM 6:00 PM
8:00 PM 9:00 PM
4:00 PM 9:00 PM

1:30AM 3:10AM
4:45AM 5:00AM

11.30 AM 12.30 PM

11.30 AM 12.30 PM
10.30 AM 10.45 AM
1000916229
11.30 AM 1.00 PM
9.30 AM 10.00 AM

11.30 AM 1.00 PM

3:15 PM 3:45 PM
5:15 PM 5:45 PM
1000916229
2:15 PM 6:00 PM

2:15 PM 6:00 PM

1000916294

1:30 AM 2:30 AM
2:45 AM

10.00 AM 10.15 PM
10.20 AM 10.35 AM
12.30 PM 1.00 PM

10.45 AM 12.15 PM

10.30 AM 12.30 PM
10.00 AM 11.00 AM
9.00 AM 10.30 AM
11.00 AM 11.20 AM
11.00 AM 1.00 PM
11.30 AM 12.30PM

3:15 PM 3:45 PM
3:15 PM 3:45 PM

2:15 PM 6:00 PM
3:30 PM
6:30 PM
3:10 PM
9:30 PM

9:45 PM 12:00 AM

1:15 AM 3:00 AM

2:30PM 2:50PM
2:20 PM 5:30PM
2:38 PM 5:30 PM
2:38 PM 5:30 PM
5:45 PM 7:30 PM
5:20 PM 5:45 PM
3:00PM 3:30PM
10:30 PM 11:00 PM

10.00 AM 10.15 PM
10.20 AM 10.35 AM
12.30 PM 1.00 PM
9:20 AM 11:00 AM
10:00 AM 1:00 PM

4:20 PM 5:00 PM
3:20 PM 3:55 PM
6:30 PM 7:10 PM

1000917208
2:00 PM 5:30 PM
3:20 PM 5:00 PM
3:00 PM
6:15 PM
6:30 PM
6:45 PM 7:20 PM
5:00 PM 5:30 PM

10:43 PM

8:00 AM 12:00 PM
9:30 AM 1:00 PM 1000917399

9:30 AM 1:00 PM 1000917399

9:30 AM 1:00 PM 1000917400

12:20 PM
2:30 PM 5:30 PM 1000917399

2:30 PM 6:15 PM 1000917399

2:30 PM 5:30 PM 1000917400

2:30 PM 3:00 PM
3:00 PM 5:05 PM
3:00 PM 6:00 PM
3:00 PM 6:30 PM
8:30 PM 9:00 PM

6:30 AM 12:30 PM 1000917481

6:30 AM 1:00 PM

10.35 AM 11:00 AM
11:00 AM 11:30 AM

3:30 PM 4:00 PM
4:35 PM 5:00 PM
5:30 PM 7:15 PM
4:15 PM 4:35 PM

7:30 AM 1:00 PM 1000917586

9:45 AM 10:30 AM 1000917585

9:00 AM 1:00 PM
9:00 AM 11:00 AM

2:45 PM 7:30 PM 1000917586

7:30 PM 9:15PM
2:45 PM 3:10 PM
3:15 PM 6:00 PM 1000917720

9;15PM 9:40PM

6:35 PM
5:30 PM 6:00 PM

3.15 AM 4.45 AM
11.30 PM 12.30 AM
3.00 AM 6.00 AM

10.35 AM 11:00 AM
11:00 AM 11:30 AM

9:30 AM 1:00 PM 1000920054

4:30 PM 4:55 PM
5:20 PM 5:40 PM
5:00pm 5:20 PM
4:30 PM 7:30 PM
2:30PM 3:30PM 1000920215

10:00AM 5:30PM 1000920214

2:18 PM 8:00 PM 1000920054

7:15 PM 8:55 PM

2.15 AM 3.30 AM
11.45 PM 2.00 AM
02.00 AM 6.00AM
4.00 AM 4.30AM

9:15 AM 11:00 AM
10:15 AM 12:00 PM
9:35 AM 1:00 PM 1000920446

12:15 PM 12:50 PM
10:00 AM 1:00 PM 1000920326

3.00 PM 3.15 PM
4.15 PM 4.40 PM
2.30 PM 5.30 PM 1000920326

4.00 PM 5.30 PM 1000920528

6.15 PM 7.30 PM
4.30 PM 5.00 PM

2.15 AM 3.30 AM
02.00 AM 6.00AM
5:00 AM 6:00 AM

9:25 AM 9:45 AM
9:45 AM 10:05 AM
1:10PM 1:30PM
11:40AM 1:05PM
9:10 AM 1000920636

9:10 AM 1000920650

9:10 AM 1:30 PM 1000920657

4:30 PM 5:00 PM
4:30 PM 5:00 PM
4.15 PM 4.40 PM
3:30 PM 5:00 PM 1000920636

7:30 PM 8.30 PM

2.15 AM 3.30 AM
02.00 AM 6.00AM
5:00 AM 6:00 AM

9:30 AM 12:30 PM 1000920852

9:30 AM 11:30 AM 1000920853

10:00 AM Extended 1000920851

8:35 AM 9:00 AM
9:20 AM
9:50 AM 11:00AM
11:20AM 11:45 AM
11:30AM 1:05 PM

4:30 PM 5:00 PM
7:00 PM 8:00 PM
3:00 PM 6:00 PM 1000921022

4:00 PM 10:00 PM
5:00 PM 8:00 PM
5:00 PM 6:00 PM

2.15 AM 3.30 AM
02.00 AM 6.00AM
5:00 AM 6:00 AM

10:00 AM 1:00 PM 1000920851

10:00 AM 1:00 PM
10:00 AM 1:00 PM
4:00PM 4:30PM
4:30PM 5;00PM
3:35 PM 4:00 PM
2:00 PM 6:20pm 1000920851

2:15 PM 3:15 PM
7:00 PM 8:30 PM

02.00 AM 6.00AM
5:00 AM 6:00 AM

12:30 PM 1:00 PM
8:30 AM 9:00 AM
7:20 AM 1:00 PM 1000920851

10:15 AM 12:00 PM

3:25 PM 3:50 PM
5:15 PM 5:40pm
3:00 PM 4:15 PM
6:15 PM 8:05 PM

02.00 AM 6.00AM
5:00 AM 6:00 AM

9:30 AM 9:55 AM
10:20AM 10:40AM
10:50AM 11:20AM
11:45 AM 1:30 PM
1000921991
9:15 AM 1:00 PM
9:35 AM 1:00 PM 1000921995
9:35 AM 12:45 PM

5:15 PM 5:40pm
5:15 PM 5:40pm
5:15 PM 5:40pm
3:00 PM 5:00 PM 1000921991

3:00 PM 6:00 PM 1000922212

2:30 PM 10:00 PM 1000921995

4:00 PM
8:00 PM
8:00 PM

10:00 PM 1:20 AM
02.00 AM 6.00AM
5:00 AM 6:00 AM

12:30 PM 1:00 PM
8:30 AM 9:00 AM
9:30 AM 1:00 PM
10:15 AM 12:00 PM
11:30 AM 1:00 PM

5:15 PM 5:35 PM
8:30PM 8:55PM
2:00 PM 3:15 PM
3:00 PM 1000922426

2:00PM 5:30PM
8:00 PM 8:20 PM
1000922437
4:00 PM 6:00 PM

1:00 AM 5:00 AM
5:00 AM 6:00 AM

9:30 AM 9:55 AM
10:20AM 10:40AM
10:50AM 11:20AM
8:30 AM 9:00 AM
10:15 AM 12:00 PM
9:45 AM 1:00 PM

2:30 PM 3:00 PM
3:00 PM 3:30 PM
5:15 PM 5:40pm
2:30 PM 4:00 PM
4:30 PM 6:00 PM
1000922740
2:30 PM 5:30 PM

2:00 AM 5:00 AM
5:00 AM 6:00 AM
2:00 AM 3:00 AM

10:50AM 11:20AM
8:30 AM 9:00 AM
9:30 AM 1:00 PM
10:00 AM 12:00 PM 1000923076

10:00 AM 12:00 PM 1000923075

2:40 PM 3:05 PM
4:00PM 4:30PM
3:10PM 4:43PM 1000923108

6:15 PM 8:00PM

3:37PM 3:50PM
4:05PM 4:10PM
2:35 PM 5:30 PM

5:00 AM 6:00 AM
5:00 AM 6:00 AM
12:30 AM 2:00 AM

10:00 AM 11:00 AM
10:00 AM 11:00 AM

10:00 AM 1:00 PM 1000923232

10:00 AM 12:00 PM 1000923230

4:30 PM 5:00 PM
5:00 PM 5:30 PM
5:30 PM 6:00 PM
4:30 PM 5:30 PM 1000923232 Job not done
4:30 PM 5:30 PM 1000923230 Job not done

4:30AM 5:00AM
1:15 AM 3:19 AM

10.00 AM 10.30 AM

7.15 AM 9.00 AM
1000923232
6.45 AM 1.00 PM
10.45 AM 1.00 PM
10.30 AM 11.00 AM

2:40 PM 3:05 PM
4:00PM 4:30PM
1000923232
2:00 PM 5:40 PM Unplanned
4:00PM 5:30 PM 1000923230 Unplanned

1:30 AM 3:15 AM
11:20 PM 2:30 AM

9:30 AM 9:55 AM
10:20AM 10:40AM
10:50AM 11:20AM
8:30 AM 9:00 AM
10:15 AM 12:00 PM

10:15 AM 12:00 PM

2:30 PM 3:00 PM
3:00 PM 3:30 PM
5:15 PM 5:40pm

4:00AM 4:30AM
1:30AM 3:19AM
12:00AM

9:30 AM 9:55 AM
10:50AM 11:20AM
8:30 AM 9:00 AM
10:15 AM 12:00 PM
1:00 PM 2:00 PM
9:00 AM 1:00 PM 1000924864

9:00 AM 1:00 PM
10:00 AM 12 noon 1000924865

5.00 PM 5.15 PM
5.30 PM 5.55 PM
6.15 PM 7.45 PM

12:30 AM 1:00 AM
1:30 AM 2:50 AM
3:00am 5:00 AM
11:05 PM 3:00 AM

9:30 AM 9:55 AM
10:50AM 11:20AM
8:30 AM 9:00 AM
1:00 PM 2:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

3.15 PM 3.30 PM
4.15 PM 4.30 PM
8.15 PM 8.40 PM
6.15 PM 7.45 PM
5.00 PM 5.30 PM
2.30 PM 3.30 PM
3.45 PM 5.00 PM
2.30 PM 5.30 PM

11:00 PM 11:20 PM
2:40 AM 4:00 AM
11:15 PM 4:00 AM

9.45 AM 10.00 AM
11.30 AM 11.50 AM
7.30 AM 9.00 AM
10.00 AM 1.00 PM 1000925123

10.00 AM 10.30 AM 1000925133

9.30 AM 1.00 PM
2.00 PM 4.30 PM 1000925243

5.00 PM 5.30 PM 1000925240

3:00 PM 3:30 PM

2:00 PM 5:30 PM
4:57 PM

5:00 AM 6:00 AM
12:00 AM 1:30 AM
1:00 AM 4:00 AM

9:30 AM 9:55 AM
10:50AM 11:20AM
11:00 AM 12:30 PM 1000925387

9:30 AM 12:00 PM 1000925388

9:30 AM 11:00 AM 1000925389

11:00 AM 1:00 PM 1000925400

12:00 PM 1:00 PM 1000925402

3:00PM 3:30PM
4:30PM 5:00PM
2:31 PM 5:54PM 1000925402

3:00PM 4:30PM 1000925404

4:30PM 6:00PM 1000925443

2:30 PM 5:45 PM
4:00 PM 4:30 PM
7:15 PM 8:50 PM
2:00PM 3:00PM

5:00 AM 6:00 AM
12:00 AM 1:30 AM
2:00 AM 4:00 AM
4:00 AM 4:30 AM

9.45 AM 10.00 AM
11.30 AM 11.50 AM

10:00 AM 12:50 PM 1000925527

11:00 AM 11:45 AM 1000925605

10:00 AM 12:50 PM

4:35 PM 5:00 PM
6:30 PM 8:55 PM
2:35 PM 9:30 PM 1000925527

2:40 PM 4:00 PM
2:35 PM 4:35 PM
3:30 PM 5:00 PM

5:00 AM 6:00 AM
11:00 AM 1:30 AM

9:30 AM 9:55 AM
10:30 AM 12:00 PM
10:50AM 11:20AM
10:00 AM 11:00 AM
12:00 PM 1:00 PM
10:00 AM 12:50 PM
6:00 AM 7:00 AM

3:00PM 3:20 PM
3:20 PM 3:45 PM
2:40PM 5:50PM
6:40 PM 8:14 PM
2:30PM 5:50PM
4:30PM 4:50PM
4:45PM 5:00PM
2:00PM 5:00PM
2:30PM 5:38PM
7:25 PM 9:30pm
4:30 PM 1000926600

5:00 AM 6:00 AM
12:00 AM 1:30 AM
4:00 AM 4:30 AM

9.45 AM 10.00 AM
11.30 AM 11.50 AM

2:50 PM
2:20 PM
5:20 PM 6:45 PM
7:57 PM
8:25 PM 9:30 PM

2:30AM 4:00AM

10:00 AM 11:30 AM
10:00 AM 1:00 PM
9:45 AM 12:50 PM 1000927253

9:30 AM 9:55 AM
11.30 AM 11.50 AM

6:30 PM 8:00 PM
2:45 PM 5:30 PM 1000927276

2:30 PM 6:30 PM 1000927253

4:30 PM 5:00 PM
4:30 PM 5:00 PM
5:30 PM 6:00 PM
3:00 PM 5:00 PM

11.15 PM 11.40 PM
10.45 PM 11.00 PM
1.15 AM 2.45 AM

11:00 AM 12:30 AM
10:00 AM 1:00 PM
12:00 PM 12:50 PM 1000927625

1:00 PM 1:50 PM
11:00 AM 12:50 PM 1000927627

1000927627
2:30 PM 6:00 PM
2:45 PM 3:27 PM 1000927625

2:48 PM 3:00 PM
3:25 PM 4:30 PM
6:30 PM 7:55 PM
2:44 PM 6:00 PM
4:00PM 5:30 PM
4:00 PM 5:59 PM
4:35 PM 5:50 PM
4:30 PM 5:00 PM
9:05 PM

11.45 PM 1:30 AM

11.30 AM 11.50 AM
12.30 PM 1.00 PM
9:30 AM 11:00 AM
10:00 AM 1:00 PM
10:00 AM 1:00 PM

10:00 AM 1:00 PM
10:00 AM 1:00 PM

5:20 PM 6:45 PM

2:25 PM 5:45 PM
2:40 PM 5:30 PM
2:30 PM 3:00 PM
4:20 PM 4:40 PM

4:15 PM 5:45 PM
4:40 PM 4:55 PM
5:20 PM 6:35 PM
8:30 PM 10:00 PM
5:30 PM 6:00 PM

1.30 AM 3.00 AM
3.00 AM 6.00 AM
3.30 AM 4.00 AM

6:45 AM
8:35 AM
8:52 AM
11:30 AM
9:30 AM 11:00 AM
11:00 AM 1:00 PM

10:00 AM 1:00 PM
10:00 AM 1:00 PM 1000929038

10:00 AM 1:00 PM 1000929037

11:00 AM 1:00 PM

3.15 PM 3.30 PM
8.15 PM 8.40 PM
5.40 PM 7.15 PM
2.30 PM 4;00 PM
3.30 PM 5.30 PM
3.00 PM 3.30 PM
4.15 PM 5.45 PM

1.30 AM 3.00 AM

9:30 AM
8:15 AM 9:30 AM
10.05 am 12:40 PM

11:00 AM 12:15 PM
8:15 AM 9:30 AM
9:30 AM 12:45 PM
10.:00 am 10:25 AM

3.15 PM 3.30 PM
8.15 PM 8.40 PM
5.40 PM 7.15 PM
2.30 PM 4;00 PM
2.30 PM 5:00 PM
7.30 PM
4.15 PM 5.45 PM
3:00 PM 5:00 PM
3:00 PM 5:00 PM

4:00 AM 5:00 AM
1.30 AM 3.00 AM
3.30 AM 4.00 AM
5:00 AM 6:00 AM
12:00 AM 12:30 AM

7.30 AM 9.00 AM
9.30 AM 1.00AM 1000929480

9.30 AM 1.00AM 1000929481

10.00 AM 1.00 AM

6:30 PM 8:00 PM
4:15 PM 4:40 PM
4:40 PM 5:00 PM
2:40 PM 5:30 PM 1000929480

2:40 PM 5:30 PM 1000929481

2:45 PM 5:30 PM
2:45 PM 5:30 PM
2:20 PM 5:30 PM

1.30 AM 3.00 AM
5:00 AM 6:00 AM

10:20 AM 10:42 AM
12:30 PM 12:45 PM
8:20 AM 10:00 AM
11:20 AM 12:30 PM
9:00 AM 11:00 AM
1:15 PM

4:30 PM 5:00 PM
4:30 PM 5:00 PM
5:30 PM 6:00 PM

6:30 PM 8:00 PM

12:00 AM 1:30 AM
5:00 AM 6:00 AM
2:00 AM 5:00 AM
5:00 AM 6:00 AM

6:15 AM 6:35 AM

8:30 AM 10:00 AM
10:20 AM 12:30 PM
9:30am 12:45 PM
9:20 AM 12:30 PM
9:20 AM

3.00 PM 3.15 PM
7.75 PM 8.10 PM
5.30 PM 6.00 PM

3.00 PM 5.15 PM
5.30 PM 6.00 PM
2.30 PM 5.30 PM
6.15 PM 7.45 PM
2.30 PM 5.30 PM

5:00 AM 6:00 AM

6.00 AM 2.00 PM

2.00 PM 10.00 PM

10.00 PM 6.00 AM
1:27 AM 1000930462

7:40 AM
7:50 AM 8:15 AM
8:15 AM 8:35 AM
9:10 AM 9:30 AM
8:45 AM 9:00 AM
9:30 AM 12:30 PM 1000930465

9:30 AM 11:45 AM 1000930464

9:30 AM 12:30 PM
11:15 AM 12:45 PM

7:40 AM

2:30 PM 10:00 PM 1000930465

4:00 PM 5:30 PM
2:30 PM 4:00 PM
4:00 PM 5:30 PM
4:00 PM 6:00 PM
8:00 PM

5:00 AM 6:00 AM

12 .00 PM 1:00 PM
8:30 AM 10:00 AM
9:20 AM 12:30 PM
9.30 AM 11.30 AM 1000930645

11.30 am 12.00 PM

6:30 PM 7:00 PM
3:00 PM 6:00 PM
3:00 PM 6:00 PM 1000930645

8:00 PM 8:30 PM
3:00 PM 6:00 PM
3:00 PM 4:00 PM
5:00 AM 6:00 AM
1:00 AM 3:00 AM
3:00 AM 5:00 AM

9:40 AM 10:00 AM
10:00 AM 10:30 AM
11:00 AM 11:30 AM
11:30 AM 12:00 PM
10:00 AM 1:00 PM
10:00 AM 1:00 PM

6:30 PM 7:00 PM
3:00 PM 6:00 PM 1000931213

8:00 PM 8:30 PM
3:00 PM 6:00 PM
3:00 PM 8:00 PM

1:15 AM 2:45 AM
11:15 PM 1:40 AM
1:15 AM 1:45 AM
3:15 AM 3:40 AM

10.00 AM 10.15 AM
10.20AM 10.35 AM
9.30 AM 9.55 AM
10.30 AM 1.00 PM
9.30 AM 12.30 PM 1000931263

9.30 AM 12.45 PM 1000931262

7.30 AM 9.00 AM

6:30 PM 7:00 PM
6:00 PM 6:30 PM
3:00 PM 6:00 PM
9.30 AM 12.45 PM 1000931262

1:15 AM 2:45 AM
1:15 AM 1:45 AM
11:15 PM 11:40 PM

11:30 AM 12:00 PM
12:00 PM 12:30 PM
9.30 AM 9.55 AM

7:30 PM 9:00 PM
6:00 PM 6:30 PM
5:30 PM 6:00 PM

1:15 AM 2:55 AM
4:30 AM 4:50 AM
5:15 AM 5:40 AM

10.00 AM 10.15 AM
10.20AM 10.35 AM
9.30 AM 9.55 AM
9.30 AM 12:45 PM
9.30 AM 11:30 AM
9.30 AM 12:45 PM

6:30 PM 8:00 PM
6:00 PM 6:30 PM
5:30 PM 6:00 PM
3:00 PM 6:00 PM
3:00 PM 6:00 PM
5:30 PM
3:00 PM 6:00 PM

1:15 AM 2:45 AM
5:15 AM 5:45 AM

9:30 AM 9.55 AM
10.00 AM 10.15 AM
10.20AM 10.35 AM
10.00 AM 1:00 PM 1000932245
1000932248

11:00 AM 1:00 PM 1000932246

2.30 PM 5.00 PM 1000932245

2.30 PM 3.30 PM 1000932254

2.30 PM 5.30 PM 1000932311

5.50 PM 7.20 PM
8.30 PM 8.55 PM

3:15 AM 4:45 AM
12:20 AM 12:55 AM
1:15 AM 2:30 AM
5:30 AM 5:45 AM

7:15 hrs 8:30 hrs


10:00 hrs 10:30 hrs
10:30 hrs 11:00 hrs
9:45 hrs 14:00 hrs
9:30 hrs
9:30 hrs

9:45 hrs

2:30 PM 6:00 PM
2:30 PM
6:00 PM 8:00 PM
2:30 PM 6:00 PM
2:30 PM 6:00 PM
4:45 PM 6:00 PM

1:15 AM 3:40 AM
5:15 AM 5:40 AM

9:30 AM 9.55 AM
10.00 AM 10.15 AM
10.20AM 10.35 AM
9:30 AM 11:00 AM
11:00 AM 12:30 PM
10.00 AM 12:30 PM

14:20 hrs 14:45 hrs


15:00 hrs 15:25 hrs
15:00 hrs 17:0 hr

1.30 AM 2.45 AM

10:00 hrs 10:30 hrs


10:30 hrs 11:00 hrs
11:00 AM 1:00 PM

6:15 PM 7:45 AM
4:15 PM 4:55 PM

12.30 AM 2.00 AM
11.40 PM
11.45 PM
12:00 PM 1:00 PM
12:00 PM 1:00 PM
11:00 AM 12:00 PM

12:00 PM 1:00 PM

8.30 PM 9.00PM
1000933188
3:00 PM 9.00 PM
6:00 PM 7.30 PM
9.30 PM 10.00 PM

1:15 AM 2:50 AM
5:20 AM 5:40 AM

10:15 AM 12:00 PM
1000933188

10:00 AM 1:00 PM

5:15 PM 6:45 PM
1000933188
2:00 PM 6:00 PM

2:30 AM 4:00 AM
5:00 AM 6:00 AM

11.00 AM 11.15 AM
12.15 PM 12.45 PM
7.15 AM 8.45 AM
1000933188
7.00 AM 1.00 PM
9.30 AM 1.00 PM 1000933399

9.30 AM 1.00 PM 1000933401

3:34 PM 6:00 PM
1000933865
3:45 PM 3:55 PM
4:10 PM 5:45 PM

2:55 PM 3:50 PM
4:25 PM 5:30 PM
2:30 PM 5:00 PM

8:15 PM 8:40 PM
7:30 PM 7:55 PM

9:10 PM

2:30 AM 4:00 AM
5:00 AM 6:00 AM
12:15 AM 1:15 AM 1000933869

8:00 AM 10:00 AM
10:30 AM 11:00 AM
6:30 AM 1:00 PM 1000933865

12:15 PM 12:50 PM

9:30 AM 12:00 PM 1000934025

2:00 PM 5:30 PM 1000933865

5:31 PM 5:45 PM
2:00 PM 5:30 PM
7:50 PM 8:00 PM

5:30 PM 8:20 PM
7:20 PM 7:40 PM

2:30 AM 4:00 AM
5:00 AM 6:00 AM

10:00 AM 12:00 PM
9:30 AM 1:00 PM 1000934645

9:30 AM 1:00 PM 1000934646

6:15 PM 7:45 PM
2:30 PM 3:30 PM
2:;50 pm 3:10 PM

2:30 AM 3:00 AM
5:00 AM 6:00 AM
5:10 AM 5:40 AM

11:15 AM 11:40 AM
12:30 PM 12:50 PM
9:30 AM
1000934800
11:00 AM 1:00 PM
9:40 AM

6:15 PM 7:45 PM
2:30 PM 9:30 PM 1000934800

2:;50 pm 3:10 PM
2:30 AM 4:00 AM
5:00 AM 6:00 AM
5:10 AM 5:40 AM

7:20 AM 8:30 AM

9:30 AM 1000935265

9:30 AM 1000935269

11:15 AM
1:00 PM

2:15 PM 10:00 PM 1000935269

4:15 PM 5:00 PM
6:30 PM 8:00 PM
6:00 PM 6:30 PM

2:30 AM 4:00 AM
5:00 AM 6:00 AM
5:10 AM 5:40 AM
10:00 PM 1:00 AM 1000935269

1:00 AM 2:00 AM 1000935503

10.15 AM 10.30 AM
7.20 AM 8.50 AM
11.15 AM 12.00 PM
10.00AM 11.30 AM 1000935576

9.45 AM 1.00 PM 1000935503

10.30 AM 1.00 PM
12.15 PM
2:15 PM 3:30 PM 1000935503

4:15 PM 6:00 PM
4:50 PM 5;20 PM
6:45 PM 7:15 PM
2:30 PM 5:30 PM
1000935662/

3:35 PM 6:00 PM 1000935663


3:35 PM 1000935664

2:00 AM 3:00 AM
5:00 AM 6:00 AM
11:00 PM 4:00 AM

8:20 AM 10:00 AM
7:30 AM 8:00 AM

4:00 PM 4:30 PM
4:30 PM 5:00 PM
5:00 PM 5:30 PM
6:30 PM 8:00 PM

8:20 AM 10:00 AM
7:30 AM 8:00 AM
9.30 AM 1.00 PM 1000936257

9.30 AM 1.00 PM 1000936258

9.30 AM 1.00 PM
9.30 AM 1.00 PM 1000936189

10:30 AM

7:30 PM 8:00 PM
8:00 PM 8:30 PM
8:30 PM 9:00 PM
3:27 PM
5:30 PM 6:30 PM 1000936255

2:30 PM 5:00 PM 1000936256

2:30 PM 5:30 PM 1000936258

3:00 PM 5:00 PM
4:00 PM 5:30 PM

10:30 AM 12:00 PM
9:30 AM 1:00 PM 1000936341

10:22 AM
10:35 AM 12:30 PM 1000936348

12:20 PM 12:45 PM

2:30 PM 3:20 PM
2:30 PM 5:50 PM 1000936341

2:30 PM 5:30 PM 1000936480


5:50 PM 6:20 PM
6:20 PM 6:50 PM
2:30 PM 5:50 PM

9:12 PM

23:10 hrs

8:25 AM 10:00 AM
9:30 AM
9:30 AM 11:00 AM
10:10 AM
10:00 AM
9:30 AM 9:55 AM

11:30 AM 12:00 PM

3:00 PM 5:30 PM 1000937059


3:00 PM 5:00 PM 1000937052
4:00 PM 4:30 PM
4:30 PM 5:00 PM

9:30 AM 1:00 PM 1000937255


1000937256
9:30 AM 1:00 PM
9:30 AM 12:00 PM 1000937804

9:30 AM 10:00 AM
10:00 AM 10:30 AM
10:00 AM 11:30 AM 1000937807

11:30 AM 1:00 PM 1000937806

10:15 AM 10:45 AM
8:25 AM
8:30 AM

2:30 PM 9:00 PM 1000937255


1000937256
2:30 PM 3:40 PM
2:30 PM 3:45 PM 1000937941

3:45 PM 6:00 PM 1000937940

2:30 PM 2:40 PM
7:15 PM 8:40 PM

1:15 hrs 2:45 hrs


3:30 hrs 4:00 hrs
23:20 hrs 23:55 hrs

5:15 hrs 5:40 hrs

6:00 AM 2:00 PM 1000938637

6:00 AM 2:00 PM 1000938644

9:00 AM 1:00 PM 1000938646

2:30 PM 5:30 PM 1000938637

2:30 PM 5:30 PM 1000938644


2:30 PM 3:15 PM 1000938646

8:00 PM 8:30 PM
4:30 PM 8:00 PM
5:30 PM 10:00 PM

12:30 AM 12:55 AM
2:15 AM 3:40 AM
3:40 AM 4:00 AM
10:50 AM 11:10 AM
11:30 PM
4:00 AM

9:30 AM 10:00 AM
10:00 AM 10:30 AM

10:20 AM 12:00 PM

18:00 hrs

16:30 hrs
16:10 hrs
18:30 hrs
18:00 hrs

11:30 PM 12:00 AM
3:30 AM 4:00 AM
1:15 AM 2:45 AM
2:45 AM 3:00am

9:30 AM 10:00 AM
7:15 AM 8:50 AM
2:15 AM 3:45 AM
3:45 AM 4:00 AM

10:30 AM 11:30 AM
9:15 AM 11:45 AM 1000939792

11:00 AM 12:15 PM 1000939708

9:30 AM 10:30 AM
11:00 AM 12:00 PM
12:25 PM 1:00 PM

14:30 hrs 1000939779

14:30 hrs 16:30 hrs 1000939793

2:15 AM 3:45 AM
3:40 AM 3:55 AM
4:10 AM 4:25 AM
11:30 PM 2:00 AM

9.00 AM 12.00 PM 1000939853

9:00 AM 10.00 AM 1000939854

9.00 AM 1.00 PM 1000939859

7.15 AM 8.45 AM
3:00 PM
19:30 hrs
3:30 PM 5:30 PM
3:30 PM 5:30 PM
8:30 PM 9:00 PM
6:00 PM 7:30 PM

12:15 AM 1:50 AM
1:50 AM 2:15 anm
11:00 PM 1:20 AM

9:30 AM 10:00 AM
7:15 AM 8:50 AM
9:30 AM 10:30 AM
11:00 AM 12:00 PM

11:00 PM 2:30 AM

1:30 AM 2:00 AM
11:50 PM 2:40 AM

9:30 AM 10:00 AM
7:15 AM 8:50 AM
9:15 AM 1:00 PM 1000940646

10:00 AM 1:00 PM 1000940650


6:00 PM
3:30 PM 4:00 PM

3:30 PM 5:30 PM

5:00 PM 5:30 PM

10:20pm 11:50am
11:30am 01:00pm
12:00am 12.15 am
5:15am 5:45am
4:00am 5:00 AM

9:30 AM 10:00 AM
7:15 AM 8:50 AM
9:30 AM 10:30 AM
11:00 AM 12:00 PM
9:20 AM 1:00 PM 1000941470

7:00 AM 1:00 PM 1000940650

2:00 PM 2:30 PM

3:00 PM 3:50 PM

2:20 PM 6:45 PM 1000941470


1000940650

2:30 PM 2:45 PM
7:25 PM 7:55 PM
4:35 PM 8:00 PM
6:30 PM 7:30 PM
6:30 PM 8:00 PM

11:15 PM 12:45 AM

4:10AM 4:45:AM
11.30PM 12:00 AM
2:30AM 3:00AM

5:15 PM 6:45 PM
1000941756
2:30 PM
3:15 PM 3:40 PM
2:20 PM 5:30 PM
2:30 PM 5:00 PM
4:15 PM 4:40 PM
7:30 PM 8:00 PM
7:00 PM 7:30 PM

12.:15 AM 1:45AM
3:30 AM 4:00 AM
10:30 PM 11:30 PM
2:30 AM 3.:00 AM 1000941761

12.00 AM 12.5.AM 1000941760

1:00 AM
1000941756
2:30 PM 4:00 PM
6:15 PM 7:45 PM
5:10 PM 5:40 PM
8:30 PM 9:00 PM
4:00 PM 4:45 PM

11:30 PM 1:00am
1:00am
2:00am 3:00am
3:00am 3:30am
5:00am 5:30

1000941756

7:15 PM 8:45 PM
4:30 PM 5:00 PM
5:40 PM 6:00 PM
1000941756
2:30 PM 5:15 PM
4:00 PM 4:40 PM

1:15am 3:00am
1:15am 3:00am
11:00pm

1000940650

6:15 PM 7:45 PM
2:30 PM 3:00 PM
8:00 PM 8:30 PM
2:30 PM 5:45 PM
3:00 PM 6:00 PM 1000942348

5:30 PM 6:00 PM
4:00 PM 6:10 PM

3:00 AM 4:30 AM
4:30 AM 5:00 AM
2:00 AM 2:30 AM
12:00 AM 2:00 AM

1000942348

6:15 PM
4:30 PM 5:00 PM
5:10 PM 5:40 PM
2:30 PM 5:00 PM 1000942348

3:30 PM 4:00 PM
5:40 PM
2:30 PM 6:00 PM
2:30 PM
5:00 PM 6:35 PM

6:40 PM 7:00 PM

3:00 AM 4:30 AM
4:30 AM 5:00 AM

9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 11:30 AM
12:30 PM

10:00 AM

6.15pm 7:40pm
3:00pm 3:40pm
3:40pm 4:10pm
2:30pm 5:30pm
2:30pm
2:30pm 5:30pm
2:30pm 5:30pm
6:00pm 7:00pm
3:00 AM 4:30 AM
4:30 AM 5:00 AM
2:00 AM 2:30 AM

9:25 AM 11:50 AM
9:25 AM
9:25 AM
9:10 AM 9:40 AM
9:30 AM
11:15 AM 12:45 PM
12:00 PM 1:00 PM

2:30pm 3:15pm
2:30pm 5:30pm
6:30 PM 8:00pm
3:00pm 4:00pm
8:00pm 8:30 AM
6:00pm 6:30pm
2:30pm 5:30pm
3:00 PM 5:30pm
6:30pm 7:00pm

3:00 AM 4:30 AM
4:30 AM 5:00 AM
2:00 AM 2:30 AM

9:15 AM 10:00 AM
11:10 AM 11:40 AM
10:20 AM 10:45 AM

9:00 AM 11:15 AM 1000944256

11:30 AM 1:00 PM 1000944257


9:00 AM 11:00 AM 1000944258

11:15 AM 1:00 PM 1000944270

9:40 AM 1:00 PM
9:45 AM 1:00 PM
9:30 AM 1:00 PM

6:15 PM 7:45 PM
5:00pm 5:30pm
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM 1000944385

2:00 PM 5:30 PM
8:00pm 8:30pm
3:30pm 4:00pm
2:00 PM 3:25 PM
2:30 PM 5:30 PM
2:30 PM 4:30 PM

11:00 AM 1:00 PM
8:30 AM 9:00 AM
10:00 AM 10:15 AM

6:15pm 7:45pm
8:30pm 9:00pm
4:30 PM 5:30 PM
8:00pm 8:30pm
3:15pm 4:15pm
3:00pm

12:45 AM

11:15 AM 12:45 PM
9:30 AM 1000944521

9:30 AM 10:15 AM
8:30 AM 9:00 AM
7:30 AM
9:00 AM 11:40 AM 1000944552

10:00 AM 12:30 PM

11:40 AM 12:20 PM 1000944552

1:30 PM 1:50 PM
12:30 PM

7:15pm 9:45pm
2:30 2:35 AM
6:00pm 6:30pm
3:00pm 3:30pm
9:10pm 9:30pm
3:00pm 4:00pm
2:30pm 5:30pm
2:30pm 3:30pm
2:30pm 3:30pm
3:30pm 5:30pm

11:15 AM 12:45 PM
9:00 AM 9:45 AM
10:00 AM 10:30 AM
9:45 AM 11:50 AM

9:00 AM 1:00 PM
9:00 AM 11:55 AM 1000944826

12:00 PM 1000944864

11:00 AM
6:00 AM 7:00 AM

8:15pm 9:45pm
3:00pm 3:15pm
3:30pm 4:00pm
6:00pm 6:30pm
2:30 PM 5:30 PM
2:30pm 5:30pm 1000944864

11:15 PM 11:25 PM

11:00 AM 11:45 AM
8:15 AM 8:40 AM
6:00 AM 7:00 AM
11:50 AM 12:10 PM
9:00 AM 12:50 PM 1000944974

9:30 AM
9:15 AM
9:30 AM
12:15 PM 1:25 PM

2:30pm 5:15 PM 1000945159

5:00 PM 5:30 PM
5:30 PM 6:00 PM
2:40 PM 5:00 PM
2:30 PM 5:00 PM
6:15 PM 7:45 PM

2:15 AM 3:45 AM
4:15 AM 5:30 AM
1:05 AM 2:00 AM

12:00 PM 12:20 PM
8:15am 9:50am
9:00am 1:00pm 1000945620

9:00am 1:00pm 1000945623

9:00am 1:00pm 1000945622

9:00am 9:20am
9:00am 11:00am 1000945605

9:30am 11:00am

11:00am 1:00pm

2:30 PM 4:00 PM 1000945620

4:00 PM 4:30 PM 1000945623


4:30 PM 7:00 PM 1000945622

3:00 PM 5:00 PM
3:00 PM 5:30 PM
3:30pm 4:00pm
6:00pm 6:30pm

3:00 AM 4:30 AM
1:30 AM 2:15 AM
4:45 AM 5:35 AM
4:40 AM

6:42 AM 10:00 AM 1000945836

10:30 AM 11:00 AM
11:00 AM 11:30 AM
11:30 AM 12:00 PM
9:30am 10:30 AM
9:30 AM 1:00 PM 1000945839

10:30 AM 1000945841

6:00pm 6:30pm
6:30pm 7:00pm
8:15pm 9:00pm
3:00pm 3:30pm
4:06pm
2:30pm 7:00pm 1000945839

3:00pm 3:30pm 1000945839

6:00pm 7:00pm 1000945947

7:00pm 7:15pm
7:40 PM 8:00 PM
6:17 PM
8:05 PM
11:10 PM
12:40 AM 1:40 AM
4:45 AM 5:00 AM
3:10 AM 4:45 AM

8:00AM 8:20AM
7:30am 09:00am
9:00AM 11:00AM
9:00AM 1:00AM
8:30AM 2:00PM 1000946482

09:00am 2:00pm
10:00AM 12:AM

3:00 PM 4:00 PM
3:00 PM 5:30 PM
3:00 PM 5:30 PM
7:10 PM 8:40 PM
3:00 PM 3:45 PM
2:30 PM
4:00 PM 5:00 PM

3:40 AM 3:50 AM
2:15 AM 3:50 AM

9:30am 10:00am
7:30am 09:00am
9:00am 11:30am
11:30am 12:30pm
12:30am 01:00am

5:30 PM 7:00 PM
8:20 PM
8:40 PM
3:00 PM 4:00 PM
5:00 PM 6:00 PM

3:40 AM 3:55 AM
2:15 AM 3:55 AM
10:00 PM 12:25 AM
12:45 AM 4:00 AM
4:30 AM 5:00 AM

9:10am 9:35am
7:30am 9:00am
9:56am 10:15am
9:00am 2:00pm 1000946885

9:00am 2:00pm 1000946885

10:30am 11:00am

2:30 PM 3:00 PM
3:00 PM 4:00 PM

8:00 PM 10:00 PM 1000947226

2:30 PM 5:30 PM 1000946885

12:20 AM 4:00 AM
4:30 AM 5:00 AM
12:45 AM 4:00 AM
10:30 PM 12:00 AM

9:00am 9:30am
7:15am 9:00am
9:30am 1:00pm 1000947144
9:00am 10:00am
12:00am 12:30am
9:30am 1:00pm

4:00 PM 5:00 PM
2:45 PM 5:30 PM 1000947234

2:30 PM 1000947144

3:30 PM
2:43 PM 5:30 PM
5:00 PM 5:30 PM
7:30 PM 8:00 PM

11:15 PM 2:15 AM
3:10 AM 3:30 AM
10:40 PM 11:15 PM
10:30 PM 10:45 PM
5:10 AM 5:40 AM
10:30 AM 2:00 AM

9:30am 10:am
9:00am 1:00pm 1000947378

8:30am 1:00pm 1000947379

7:15am 9:00am
10:00am 10:30am
12;30pm 12:45pm
12:45 PM 1:00pm
1:47pm
10:00 AM 11:00 PM 1000947468

2:30 PM 5:30 PM 1000947378

4:40 PM 6:20 PM
3:00 PM 5:00 PM
2:30 PM 4:00 PM 1000947467
3:00 PM 3:30 PM
8:45 PM 9:15 PM
7:00 PM 8:00 PM
3:30 PM 4:00 PM

2:35 AM 2:50 AM
1:15 AM 2:45 AM
11:10 PM 1:00 AM
10:20 PM 10:40 PM

9:00 AM
9:40 AM
9:30 AM 10:30 AM

9:25 AM 1:00 PM
12:30 PM 1000947716

4:00 PM 5:00 PM
3:00 PM 4:00 PM
6:30 PM 8:15 PM

2:30 PM 1000947784

6:30 PM 7:00 PM
2:30 PM 4:30 PM
2:30 PM 5:30 PM

1:15am 3:00am
1:15am 3:00am
3:10am 3:30am
11:30pm 12:00am

9:05 AM 1:00 PM
10:15 AM 11:15 AM
9:10 AM

2:30 PM 5:30 PM 1000947919

6:35 PM 9:10 PM 1000947919

6:15 PM 7:50 PM
3:00 PM 3:25 PM
4:10 PM 4:30 PM
3:30 PM 4:00 PM

1000947919 Extend 2:00am to


10:30pm 2:00am 3:30am
1000947919 Extend 2:00am to
10:30pm 3:30am 3:30am
1:15am 3:00am
11:00pm 11:30pm
1:15am 3:00am

6:15 AM 12:30 PM 1000948060

9:00 AM 9:40 AM
8:10 AM 8:25 AM
8:10 AM 8:40 AM
9:10 AM
10:30 AM 12:30 PM
10:30 AM 1:00 PM
12:10 PM 12:30 PM

2:15 PM 4:00 PM
4:00 PM 5:00 PM
8:00 PM 9:00 PM
5:00 PM 7:30 PM
5:15 PM 6:45 PM
3:00 PM 4:00 PM
02:10am 3:45am
02:10am 3:45am
04:00am 04:30am

6:30 AM 7:15 AM
7:25 AM 8:55 AM
11:30 AM 12:00 PM

3:20 PM 3:50 PM
7:15 PM 7:50 PM
4:10 PM 4:30 PM

3:25am 5:00am
3:25am 5:00am
5:00am 5:30am

6:30 AM 7:15 AM

09:20pm
7:15pm 8:30pm
8:30pm 9pm

1.15am 3:00am
1.15am 3:00am
10:55 PM 1:00am
10:10 AM 11:50 AM

9:30 AM 1:00 PM
11:20 AM 11:50 AM

03:10pm 04:00pm
03:10pm 04:00pm
02:15pm 05:30pm 1000950888
02:30pm 05:30pm

1:30 AM 3:30 AM
1:30 AM 3:30 AM
11:00 PM 11:30 PM

9:30 AM 1000950997
9:30 AM 1000950998
9:30 AM 1000951014
11:00 AM 12:00 PM
12:00 PM 12:30 PM
8:00 AM 1:00 PM
1:00 PM

2:40 PM 5:20 PM 1000950997


2:40 PM 5:20 PM 1000951111
3:30 PM 4:00 PM
4:00 PM 4:30 PM
3:10 PM 4:00 PM

09:00am 12:30pm
09:00am 12:30pm 1000951233
09:00am 12:30pm 1000951243
09:0am 10:15am

11:25am 12:30pm
10am 10:30am

2:30 PM 4:30pm
2:30 PM 4:30pm
4:00 PM
4:33pm 5:30pm 1000951364

4:33pm 5:30pm
8:50 PM
3:00 PM
4:30 PM
9:00 PM
7:40 PM 9:10 PM

9:15am 10:45am
11:15am 11:40am
12:30pm 01:00pm

06:30pm 08:00pm
03:20pm 04:00pm
03:20pm 04:00pm
5:50 PM 5:55 PM

1:30 AM 3:30 AM
1:30 AM 3:30 AM
10:10 AM 12:00 PM
10:10 AM 1:00 PM
10:10 AM 12:00 PM
9:00 AM 1:00 PM 1000951588

9:07 AM 1:00 PM 1000951589

9:00 AM 1:00 PM 1000951588

4:30 PM 5:00 PM
6:15 PM 8:00 PM
3:00 PM 5:20 PM
3:30 PM

10:30 PM 11:00 PM
10:15 PM 10:25 PM
1:00 AM
4:30 AM 5:30 AM
1:30 AM 2:00 AM

10:50 AM 11:50 PM
10:50 AM 11:50 PM

3:30 PM 3:55 PM
4:10 PM 4:30 PM
5:00pm 6:00pm

12:30 AM
5:20 AM 6:00 AM

9:00 AM 10:00 AM done


9:00 AM 10:00 AM done
9:00 AM 10:00 AM done
9:00 AM 1:00 PM 1000952138 done
8:55 AM 1:00 PM 1000952137 done
9:00 AM 1:00 PM done
8:30 AM 9:00 AM done

2:50 PM 5:50 PM 1000952527

2:50 PM 5:50 PM 1000952528

3:00 PM 5:40 PM
3:30 PM 5:50 PM
7:30 PM 7:50 PM

12:00 AM 1:00 AM
5:30 AM 6:00 AM

9:00 AM 11:00 AM
9:00 AM 11:00 AM
9:00 AM 11:00 AM
9:00 AM 1:00 PM

2:35 PM 5:50 PM
3:20 PM 5:50 PM 1000952727

3:50 PM 5:50 PM
6:15 PM 7:30 PM

11:15 PM 12:00 AM

2:15 AM 3:45 AM
2:15 AM 3:45 AM

6:30 AM 7:00 AM
9:00 AM 10:00 AM
9:00 AM 1:00 AM 1000952820

9:00 AM 1:00 AM
10:30 AM 11:30 AM
9:00 AM 10:00 AM
10:00 AM 2:00 PM
11:43 AM

2:30 PM 5:15 PM
2:30 PM 5:30 PM
6:10 PM 7:30 PM
2:30 PM 5:30 PM 1000952915

4:00 PM 5:00 PM

2:15 AM 3:45 AM
12:15 AM 12:45 AM
2:15 AM 3:45 AM

4:45 AM 5:45 AM

9:00am 1:00pm 1000953140

9:00am 1:00pm
9:00am 1:00pm 1000953129

9:00am 1:00pm 1000953128

9:00am 12:00pm
12:00pm 12:30pm
12:15pm 1:00pm
9:30 AM
1:00 PM
8:15 AM 9:45 AM
7:30 AM 8:00 AM

3:00 PM 5:00 PM 1000953141

2:20 PM 5:15 PM
6:20 PM 8:00 PM
3:00 PM 5:00 PM

9:00am 01:00pm 1000953290

9:00am 01:00pm
9:00am 01:00pm
9:00am 01:00pm
11:15am 12:30pm

4:00 PM 4.30 pm
2.30 pm 10.00pm 1000953311

2.30 pm 5.00 pm
6.15 pm 7.30 pm

10.00pm 1:00 AM 1000953311

2:15 AM 3:45 AM
3:45 AM 4:00 AM
4:30 AM 5:00 AM

10:15 AM 11:15 AM
9:00 AM 1:00 PM 1000953376

9:40 AM 11:00 AM 1000953617

11:30 AM 1:00 PM 1000953616

11:10 AM 11:40 AM
9:00 AM 1:00 PM
9:20 AM 3:00 PM

2:45 PM 5:30 PM 1000953931

2:45 PM 5:30 PM 1000953923

7:00 PM 8:15 PM
8:30 PM 9:00 PM

2:15 AM 3:45 AM
3:45 AM 4:00 AM
10:30 PM 1:00 AM

9:00 AM 9:30 AM
9:30 AM 10:00 AM
10:00 AM 10:30 AM
10:30 AM 12:00 PM

6:15 PM 7:45 PM
2:15 PM 2:45 PM
8:00 PM

2:15 AM 3:45 AM
3:45 AM 4:00 AM

9:00 AM 9:30 AM
9:30 AM 10:00 AM
10:00 AM 10:30 AM
9:00 AM 1:00 PM 1000954224

9:00 AM 1:00 PM
9:00 AM 1:00 PM 1000954222

11:15 AM 1:00 PM

2:30pm 3:00 PM
2:30 PM 3:00 PM 1000954224

2:30 PM 5:30 PM
8:00 PM 1000954286

2:30 PM 5:30 PM

2:15 AM 3:45 AM
3:45 AM 4:00 AM
9:00 AM 11:00 AM
9:00 AM
9:00 AM 1000954940

9:00 AM
8:30 AM 10:00 AM
11:00 AM 1:00 PM

11:30 AM
12:25 PM 1:00 PM

2:30 PM 5:30 PM
6:15 PM 7:45 PM
8:15 PM 8:50 PM

2:15 AM 3:45 AM
3:45 AM 4:00 AM
4:00 AM 4:30 AM
11:30 PM 12:45 AM

9:30 AM 10:00 AM
10:00 AM 10:30 AM
10:30 AM 11:00 AM

11:00 AM 11:30 AM

2:15 AM 3:45 AM
3:45 AM 4:00 AM

9:10 AM 10.15 AM
11.15 AM 11.45 AM
7.15 AM 8.30 AM
9.15 AM 12.30PM 1000955127

9.15 AM 1.00 PM 1000955128

9.15 AM 11.30 AM 1000955140

10.30 AM 1000955141

11.50 AM 1.00 PM
11.50 AM 1.00 PM

2:30 PM 3:15 PM

3:30 AM 4:30 AM
4:30 AM 5:00 AM
11:15 PM 12:15 AM

9:30 AM 10:30 AM
10:30 AM
9:30 AM 10:30 AM
9:30 AM 12:00 PM

11:00 AM 1:00 PM

11:15 AM

8:00 AM 9:00am
12:00 PM 1:00 PM

2:30 PM 4:30 PM 1000955716


1000955715
2:30 PM 5:30 PM
2:30 PM 5:30 PM
7:00 PM

3:30 AM 4:30 AM
4:30 AM 5:00 AM

7:10 AM 8:50 PM

7:15 AM 7:45 AM
9:30 AM 1:00 PM
9:10 AM 1:00 PM
9:10 AM 1:00 AM
10:00 AM 12:00 PM

22:35 pm 5:30 PM
3:10 PM 5:10 PM 1000955968

2:50 PM
3:00 PM 5:30 PM

5:10 PM 9:45 PM

1:15 AM 1:45 AM
10:45 PM 12:45 AM
2:15 AM 3:15 AM
3:15 AM 3:45 AM

7:05 AM 8:45 AM

10:00 AM 2:00 PM
8:55 AM 12:30 PM
8:55 AM 12:30 PM

4:00 PM 5:00 PM
2:15 PM 2:40 PM
2:40 PM 3:00 PM
6:15 PM 7:45 PM
4:00 PM 4:30 PM

5:00 AM 5:30 AM
2:30 AM 5:00 AM
2:30 AM 5:00 AM
2:00 AM 5:00 AM

6:15 AM 6:45 AM
6:20 AM 6:25 AM
7:10 AM 8:40 AM
9:30 AM 11:30 AM
11:05 AM 11:45 AM

6:15 PM 7:45 PM
8:30 PM 9:00 PM
2:20 PM 5:30 PM 1000956227

4:30 PM 5:30 PM 1000956529

6:00 PM 6:15 PM

1:30 AM 2:00 AM
3:00 AM 4:30 AM
3:00 AM 4:30 AM
2:00 AM 2:30 AM

7:15 AM 8:45 AM
1:00 PM 1:30 PM
9:30 AM 10:30 AM
9:30 AM 1:00 PM 1000957267
6:15 PM 7:45 PM
8:15 PM 8:45 PM
2:30 PM 6:00 PM 1000957267

3:00 PM 5:00 PM
6:00 PM 1000956227

3:00 PM 5:30 PM
6:10 PM 6:45 PM

3:15 AM 04:45am
4:15 AM 04:45am
11:00 PM 1:30 AM
4:00 AM 5:00 AM

11:30 AM 1:00 PM
9:00 AM 10:00 AM

8:30 PM 9:00 PM
2:30 PM 5:30 PM 1000957595

6:15 PM
2:30 PM 5:30 PM 1000956227

2:30 PM 1000956529

4:15 PM 4:45 PM
1000957584
4:15 PM 6:40 PM

3:15 AM 04:45am
4:15 AM 04:45am
1:30 AM 2:00 AM
8:15 AM 9:30 AM
1:00 PM 1:30 PM
7:00 AM 7:30 AM
6:00 AM 1:00 PM 1000957814

9:30 AM 1:30 AM
11:30 AM 1:00 PM

2:30 PM 8:30 PM 1000957815

2:30 PM 8:30 PM 1000957816

2:30 PM 5:30 PM
2:30 PM 3:00 PM 1000957813

7:30 PM 9:00 PM
7:00 PM 7:30 PM

3:15 AM 04:45am
4:15 AM 04:45am

9:00 AM 11:00 PM
9:00 AM 12:30 PM 1000958702

10:15 PM 10:45 PM
9:00 AM 1000958704

9:00 AM
9:30 PM 10:30 PM
9:00 AM

2:30 PM 3:00 PM

6:00 PM 7:30 PM
2:25 PM 3:30 PM
4:00 PM 5:30 PM 1000959112
1000958704

2:15 PM 5:30 PM
2:30 PM 5:30 PM
4:35 PM 5:30 PM
4:25 PM 5:30 PM

2:00 AM 3:30 AM
3:30 AM 4:00 AM

9:00 AM 10:00 AM
9:00 AM 12:30 PM 1001025322

7:30 AM 9:00 AM
9:00 AM 12:30 PM 1001025323

9:30 AM 1:00 AM

2:30 PM 5:30 PM 1001015122

2:30 PM 5:30 PM 1001018622

4:15 PM 4:45 PM
2:30 PM 5:30 PM 1001025368

7:00 PM 8:30 PM
5:30 PM

12:30 AM 2:30 AM
3:30 AM 4:00 AM
4:00 AM 4:30 AM

8:40 AM 10:05 AM
9:30 AM 9:55 AM
11:15 AM 12:45 PM

6:00 PM 6:30 PM
7:00 PM 8:30 PM
4:30 PM
2:00 AM 3:30 AM
3:30 AM 4:00 AM

9:00 AM 10:00 AM
9:00 AM 12:30 PM 1001025651

12:30 PM
9:00 AM 1:00 PM
12:30 PM 1:00 PM
7:30 AM 9:00 AM

5:30 PM 6:00 PM
6:00 PM 7:30 PM
2:00 PM 5:30 PM 1001025771

9:10 AM 3:00 PM
9:10 AM 5:30 PM 1001025772

11:00 PM 12:30 AM
5:30 AM 6:00 AM
5:00 AM 6:00 AM

7:30 AM 9:00 AM
9:30 AM 1:00 PM
11:15 AM 12:40 PM
9:15 AM 1:00 PM
9:15 AM 9:45 AM
12:00 PM 12:30 PM
9:15 AM 11:15 AM
10:00 AM 1:00 PM
11:30am 12:45 PM
11:30 AM 12:45 PM

10:00 AM 5:30 PM
5:00 PM 5:30 PM
6:00 PM 7:30 PM
5:30 PM

9:00 AM 5:30 PM
5:30 PM 6:00 PM
2:45 PM 5:30 PM
2:45 PM

12:00 AM 12:30 AM
5:30 AM 6:00 AM
5:00 AM 6:00 AM

7:30 AM 9:00 AM

7:00 PM 8:00 PM
7:30 PM 10:00 PM

12:30 AM 1:30 AM
1:30 AM 2:20 AM
4:15 AM 4:45 AM

NOT DONE
NOT DONE
NOT DONE
NOT DONE
4:30 AM 4:45 AM
11:20 PM 11:55 PM
5:30 AM 6:00 AM

1001028396
9:15 AM 1:00 PM
9:30 AM 12:00 PM
12:00 PM 1:00 PM
10:30 AM

3:00 PM 5:00 PM 1001028396

4:00 PM 4:30 PM
7:00 PM 7:30 PM

4:30 AM 4:45 AM
11.30 PM 12.00 AM

11.30 PM 1.00 AM

9:00 AM 1:00 PM
12:00 PM 12:30 PM
9:30 AM 1:00 PM
10:00 AM 1:00 PM

12:10 PM 2:00 PM

4:00 PM 5:30 PM 1001028825

5:00 PM 5:10 PM
3:00 PM 5:30 PM
6:30 PM 6:50 PM
7:10 PM 7:35 PM

4:30 AM 4:45 AM
11.30 PM 12.00 AM

11.30 PM 12:30 AM

9:30 AM 10:45 AM
11:00 AM 11:30 AM
10:30 AM

5:00 PM 6:00 PM
5:00 PM 6:00 PM
3:00 PM 4:00 PM
4:00 PM 5:00 PM

4:30 AM 4:45 AM
11.30 PM 12.00 AM

9:30 AM 10:30 AM
10:30 AM 11:00 AM
10:00 AM 5:30pm 1001029151

3:00 PM 4:30 PM
4:30 PM 6:30 PM 1001029508

5:00 PM 6:00 PM
7:00 PM 8:00 PM
3:00 PM 4:00 PM
5:15 AM 5:45 AM

9:30 AM 10:30 AM
1:00 PM 1:30 PM
9:30 AM 1:00 PM 1001029520

11:30 AM 12:30 PM 1001029522

9:30 AM 1:00 PM

5:15 AM 5:45 AM
4:30 AM 5:00 AM
10:45 PM 11:30 PM
10:30 PM 12:30 PM

3:00pm 3:30pm
2:30pm 4:30pm
2:30pm 5:30pm 1001030270

2:30pm 5:30pm 1001030271

3:00pm 5:30pm
6:00pm 18:30
7:00pm
5:15 AM 5:45 AM
1:20 AM 1:50 AM
1:10 AM 3:00 AM

9:30 AM 11:30 AM
9:30 AM 1:00 PM

11:30 AM 1:00 PM

9:30 AM 1:00 PM
11:30 AM 12:15 PM

3:00pm 3:30pm
2:30pm 5:30pm
4:30 7:30

4:30 7:30

9;00am 1:00pm 1001030585

9;00am 12:00pm 1001030589

9;00am 1:00pm
9;30am 11:00am
9;00am 10;00am
12:30pm 1:00pm 1001030679

12:30pm 1:00pm

1001030585
2:30 PM 6:45 PM
2:30 PM 5:30 PM 1001030690

2:30 PM 5:30 PM
4:20 PM 4:45 PM
4:25 PM 5:00 PM
6:15 PM 6:30 PM
4:10 PM 5:30 PM
6:10 PM 7:30 PM

10:36 PM

2:30 PM
3:00 PM 5:00 PM
2:40 PM 3:10 PM

8:20 PM 8:40 PM
9:10 PM 9:25 PM
7:30 PM 8:00 PM

11:30 PM 12:00 AM
12:00 AM 6:00 AM
4:15 AM 5:00 AM
5:45

10:15 AM 11:30 AM
11:30 AM 12:00 PM
9:30 AM 12:30 PM 1001031694

2:15 PM 3:30 PM 1001031720

4:00 PM 5:30 PM 1001031723,


1001031725
4:30 PM 5:00 PM

11:30 PM 12:00 AM

1001031726

2:10 PM 6:30 PM 1001031726

2:15 PM 5:30 PM 1001032810

7:30 PM 8:00 PM
2:20 PM 3:10 PM 1001031874

3:10 PM 5:30 PM 1001031876

5:20 PM 5:50 PM

4:30 AM 5:00 AM

9:00am 2:00pm
9:00am 2:00pm
9:00am 10:15am
10:30am 11:00am
7:10 PM 7:40 PM
2:00 PM 5:30 PM
2:30 PM 5:30 PM 1001032996

4:00 PM 5:00 PM
7:45 PM 1001033027

11:00 PM 12:50 AM
2:15 AM 3:00 AM

9:00 AM 12:15 PM 1001033206

9:00 AM 12:00 PM
9:00 AM 10:15 AM
10:30 AM 11:00 AM

3:00 PM
7:00 PM 7:30 PM 1001033283

2:30 PM 7:00 PM
8:00 PM 8:30 PM
5:00 PM 5:30 PM

4:00 AM 4:30 AM

5:20 AM 5:45 AM

9:00 AM 11:30 AM
9:30 AM 12:00 PM
11:00 AM 12:00 PM
12:00 PM 12:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

7:58 PM

12:00AM 12:30AM

5:20 AM 5:45 AM

9:30 AM 10:30 AM
10:30 AM 11:00 AM
9:30 AM 1:00 PM 1001033633

11:00 AM 12:50 PM
9:30 AM
9:10 AM

2:30 PM 5:30 PM
2:30 PM 5:30 PM
1001033633

2:30 PM 5:30 PM
2:30 PM 5:30 PM
9:00 PM 9:30 PM
7:58 PM

5:20 AM 5:45 AM
5:30am 6:00am

9:30 AM 11:30 AM
11:25 AM 11:55 AM
11:30 AM 1:00 AM
9:30 AM 12:50 PM 1001034585
9:30 AM 12:30 PM 1001033842

9:00 AM 1:00 PM
11:30 AM 12:50 PM

9:00 PM 9:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:50 PM 5:30 PM
2:50 PM 5:30 PM

11:30 PM 12:45 AM
10:30 PM 11:15 PM

3:00 AM

11:45 AM 12:30 PM
12:30 PM 1:00 PM
7:00 AM 8:00 AM

10:00 AM 10:30 AM
9:00 AM 12:30 PM
10:15 AM 10:45 AM
9:30 AM 1:00 AM
9:30 AM 1:00 PM
9:25 AM 1:00 PM 1001034888

10:00 AM 1:00 PM

2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
6:00 PM 6:30 PM
6:00 PM 6:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

5:00 AM 5:30 AM
11:00 PM 11:30 PM

9:30 AM 10:30 AM
11:00 AM 11:30 AM
9:30 AM 10:30 AM
9:00 AM 1:00 AM
12:35 PM 1001034897

9:00 AM 1:00 PM

9:30 PM 12:20 PM 1001034925


5:00 AM 5:30 AM
11:00 PM
10:00 AM 2:30 AM

5:00pm 5:30pm
7:10pm 7:30pm
2:30pm 5:30pm
5:00pm 6:00pm
2:30 5:30pm
2:30pm 5:30pm

5:00 AM 5:30 AM
11:00 PM 11:30 PM
12:00 AM
12:00 AM 12:30 AM
10:45 AM 12:00 PM
11:30 AM 12:00 PM
9:00 AM 12:00 PM 1001035336

12:00 PM 1:00 PM 1001035337

9:00 AM 1:00 PM
9:00 AM 1:00 PM

7:10pm 7:30pm
2:30pm 5:30pm
3:00pm 5:00pm
2:30pm 7:30pm 1001045308

3:30pm 5:30pm
3;30 5:30pm

9:00 AM 1001034888

12:00 PM 12:30 PM
9:00 AM
9:00 AM 11:00 AM
9:15 AM 1001035871

10:00 AM

10:40 AM

7:10pm 7:30pm
2:30pm 5:30pm
2:30pm 7:00pm 1001035871

7:00pm
7:05pm
7:10pm
2:30pm 5:30pm
2:30pm 7:00pm 1001034888

12:25 AM 12:50 AM
5:20 AM 5:50 AM

5:20 AM 5:50 AM

7:10pm 7:30pm
4:00pm 5:00pm

12:25 AM 12:50 AM
5:20 AM 5:50 AM

9:00 AM 10:30 AM
1:15 PM 1:45 PM
12:00 PM 1:00 PM
11:50 AM 11:55 AM
8:30 AM 1:00 PM
9:00 AM 1:00 PM
9:30 AM 1:00 PM

2:30 PM 4:30 PM 1001036663

4:30 PM 5:00 PM
3:00 PM 5:00 PM 1001036669

3:30 PM 5:00 PM 1001034888

5:20 AM 5:50 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
9:00 AM 1:00 PM 1001037163

9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

1001036669

1:40 AM 2:10 AM
5:20 AM 5:50 AM

9:00 AM 10:30am
12:00 PM 12:30 PM
6:15 AM 1:00 PM 1001037327

9:00 AM 1:00 PM
9:00 AM 1:00 PM 1001037340

9:00 AM 1:00 PM
11:45 AM 1:00 PM

6:00 PM 6:30 PM
2:30 PM 5:30 PM
2:30 PM 5:00 PM
2:30 PM 7:00 PM
5:00 PM 6:00 PM
2:30 PM 5:30 PM
3:30 PM 5:30 PM

5:20 AM 5:50 AM
3:20 AM 4:00 AM

9:00 AM 10:30am
12:00 PM 12:30 PM
9:00am 1:00am 1001045306

9:00 AM 1:00 PM
9:00 AM 1:00 PM 1001037340

9:00 AM 1:00 PM
9:00am 1:00 PM

6:00 PM 6:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
5:00 PM 6:00 PM
4:30 PM 5:30 PM

1:40 AM 2:10 AM
5:20 AM 5:50 AM
10"15 pm

9:00 AM 10:30am
1:00 PM 1:30 PM
9:00am 1:00am
9:00 AM 1:00 PM
9:00 AM 1:00 PM 1001039443

9:00 AM 1:00 PM
9:00am 1:00 PM
9:00am 2:00 PM 1001045305

10:00am 12:00 PM

5:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM

3:30 PM 5:30 PM 1001039443

2:40 PM 5:30 PM
2:00 PM 5:30 PM
4:45 PM
6:20 PM

5:20 AM 5:50 AM

4:30 PM 5:00 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
5:10 AM 5:50 AM
1:40 AM 2:10 AM

4:30 PM 5:00 PM
6:15 PM 7:45 PM
3:20 PM
6:35 PM

5:10 AM 5:50 AM
3:00 AM 5:00 AM

7:30 PM 8:00 PM
8:00 PM 9:30 PM
2:30 PM 5:30 PM 1001041048

2:30 PM 4:30 PM
3:15 PM
4:30 PM 5:30 PM
10:00 PM
1:40 AM 2:10 AM
5:10 AM 5:50 AM
3:00 AM 5:00 AM

8:30 AM
9:30 AM 11:00 AM
11:00 AM 11:30 AM
9:30 AM 1:00 PM
9:15 AM 1:00 PM

11:30 AM 12:30 AM
10:00 AM 12:30 AM

2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM 1001041135

6:30 PM 8:00 PM
5:30 PM

10:00 PM
5:10 AM 5:50 AM
3:00 AM 5:00 AM
11:00 PM

9:30 AM 11:00 AM
11:00 AM 11:30 AM
9:30 AM 1:00 PM
9:15 AM 1:00 PM
4:30 PM 5:00 PM

2:15 PM 5:30 PM
2:15 PM 5:30 PM
2:15 PM 5:30 PM
2:15 PM 5:30 PM
3:00 PM 5:15 PM
3:40 PM 3:50 PM

2:20AM
1:40 AM 2:10 AM
5:10 AM 5:50 AM
2:30AM 4:00 AM

9:30 AM 11:00 AM
11:30 AM 12:00 PM
9:30 AM 1:00 PM
9:15 AM 1:00 PM

11:30 AM 1:00 PM

6:20 PM 7:30 PM
5:30 PM 6:00 PM
2:30 PM 7:00 PM
3:15 PM

2:20AM
5:10 AM 5:50 AM
2:30AM 4:00 AM

6:45 AM
7:10 AM
9:30 AM

9:30 AM
9:30 AM

6:20 PM 7:30 PM

2:30 PM 5:30 PM
2:30 PM 3:30 PM
2:30 PM
2:30 PM 5:30 PM

2:20AM
5:10 AM 5:50 AM
2:30AM 4:00 AM

9:30 AM 10:30 AM
11:00 AM 11:30 AM
9:00 AM 1:00 PM
9:30 AM 1:00 PM 1001042345

11:30 AM
7:10 AM
8:00 AM
8:05 AM
9:30 AM 1:00 PM
9:30 AM 10:00 AM
10:00 AM 10:30 AM
8:00 PM 9:30 PM
7:15 PM 7:45 PM
2:30 PM 5:00 PM
2:30 PM 7:30 PM
2:30 PM
6:00 PM 7:00 PM

3:30 AM 5:00 AM
5:00 AM 5:30 AM
10:00 PM 11:00 PM

4:00 AM 4:40 AM

10:00am 12:00 AM
11:00 AM 11:30 AM
12:15 PM 1:45 PM
7:10 AM

8:00 PM 9:30 PM
6:15 PM 6:45 PM
6:00 PM 7:00 PM

3:30 AM 5:00 AM
5:00 AM 5:30 AM
10:15 PM
4:00 AM 4:40 AM

9:30 AM 10:30 AM
10:30 AM 11:00 AM
9:00 AM
9:40 AM 11:10 AM
7:10 AM
8:00 AM
8:05 AM
9:30 AM 12:30 PM
9:45 AM
11:00 AM
11:05 AM
11:05 AM

9:30 PM 10:00 PM
6:00 PM 7:00 PM
2:00 PM 5:30 PM
3:00 PM 5:30 PM 1001044820

2:00 PM 5:30 PM
3:00 PM 4:30 PM

4:45 PM 5:30 PM
6:20 PM

3:30 AM 5:00 AM
5:00 AM 5:30 AM
10:15 PM
4:00 AM 4:40 AM

9:30 AM 11:40 AM
10:30 AM 11:00 AM
12:30 PM 2:00 PM
7:10 AM
9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 1:00 PM

6:00 PM 7:30 PM
5:15 PM 5:45 PM
6:00 PM 7:00 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM 1001045025

2:00 PM 5:30 PM
2:00 PM 5:30 PM 1001045040

11:30 PM 12:00 AM

12:00 PM 12:40 PM
1:00 PM 1:30 PM
9:00 AM 1:00 PM
8:35 AM
9:00 AM 10:00 AM
9:35 AM
9:30 AM 1001045191

10:00 AM

3:30 PM 4;15pm
6:00pm 6:30pm
4:15pm 5:30pm 1001045303

5:30pm
5:50pm
3:13pm
2:00pm 5:30pm
2:00pm

2:30 AM 3:00 AM

1:00 AM 2:00 AM

7:00 AM 8:30 AM
9:00 AM 12:00 PM
12:15 PM 12:45 PM
6:00 AM 7:00 AM
9:00 PM 1:00 PM
9:00 AM 1:00 PM 1001045361

9:00 AM
9:15 PM 1:00 PM
12:00 PM
1:30 PM
9:15 PM 1:00 PM

12:00 PM 1:00 PM

6:00 PM 7:30 PM
8":30 pm 9:00 PM
5:30 PM 6:00 PM
3:00 PM
2:00 PM 5:30 PM
2:15 PM 4:00 PM 1001045476

2:00 PM 5:30 PM 1001045361

2:30 PM 5:30 PM
8:30 PM 9:30 PM

12:00 AM 12:30 AM
3:30 AM 4:00 AM
2:30 AM 4:00 AM

7:30 AM 9:00 AM
1:15 PM 1:45 PM
8:00 AM 8:45 AM
9:00 AM 10:30 AM
9:00 AM 1:00 PM

9:00 AM 1:00 PM 1001045632

9:00 AM 1:00 PM
9:00 AM 1:00 PM

2:30pm 5:30pm
2:30pm 5:30pm 1001045686

3:00pm 5:30pm
3:00 PM 5:00pm
7:00pm 8:30pm
8":30 pm 9:00 PM
8":30 pm 9:00 PM
2:30 PM 5:30 PM 1001045687

2:30 AM 4:00 AM
5:20 AM 5:45 AM

7:15 AM 8:45 AM
1:15 PM 1:45 PM
6:00 AM 7:00 AM
9:00 AM 11:00 AM
9:00 AM 1:00 PM 1001045699
9:00 AM 1:00 PM
9:30 AM 11:30 AM 1001045794
11:45 AM 1:00 PM 1001045797
1001045798
11:45 AM 1:00 PM

4:45 PM 5:45 PM

2:30 PM 5:30 PM

2:30 PM 5:30 PM
2:30 PM 5:30 PM

2:30 PM

2:30 AM 4:00 AM
5:20 AM 5:45 AM

8:00 AM 9:30 AM
12:00 PM 12:30 PM
6:30 AM 7:30 AM
11:15 PM 12:30 PM
7:30 AM 9:00 AM
9:00 AM 11:30 AM
12:15 PM 12:45 PM
6:30 AM 7:15 AM

1001046141

9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

2:30 AM 4:00 AM
4:00 AM 4:10 AM
4:15 AM 4:45 AM

7:30 AM 9:00 AM
9:00 AM 11:30 AM
12:15 PM 12:45 PM
6:30 AM 7:15 AM
7:15 AM
9:00 AM 1:00 PM
1001046791
9:00 AM 1:00 PM

10:00 AM 12:00 PM 1001046690


6:30 PM 8:00 PM
3:00 PM 3:30 PM
4:30 PM 5:30 PM
2:30 PM
2:30 PM 5:30 PM

2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

2:30 AM 4:00 AM
4:00 AM 4:10 AM

9:30 AM 11:00 AM
11:00 AM 11:30 AM

2:30 PM 5:30 PM
5:00 PM 5:30 PM
6:30 PM 8:00 PM
8:30 PM 9:00 PM

2:30 AM 4:00 AM
4:00 AM 4:10 AM
12:30 AM 1:00 AM

9:30 AM 11:00 AM
11:00 AM 11:30 AM
9:30 AM 1:00 PM
10:00 AM 12:30 PM
9:30 AM 1:00 PM
7:00 AM 8:30 AM
9:30 AM 1:00 PM
10:00 AM 11:00 AM

8:00 PM 8:30 PM
2:30 PM 5:30 PM
3:00 PM 5:00 PM
5:00 PM 6:00 PM
5:00 PM 6:00 PM
5:00 PM 6:30 PM 1001047914

2:00 AM 3:30 AM
3:30 AM 3:45 AM
12:30 AM 1:00 AM

7:00 AM 9:00 AM

9:30 AM 12:50 PM

9:30 AM 11:00 AM
11:00 AM 11:30 AM

9:30 AM 12:30 PM 1001048615

7:15 PM 8:45 PM
6:10 PM 6:40 PM
2:15 PM 3:00 PM 1001048557

4:00 PM 4:45 PM 1001048558

2:30 PM 4:15 PM 1001048559

4:50 PM 5:20 PM 1001048572

4:00 PM 5:20 PM 1001048588

3:10 PM
1:00 AM 3:00 AM
4:00 AM 5:30 AM

3:15 AM 3:45 AM

7:30 AM 9:00 AM

9:30 AM 12:30 PM 1001048675

7:10 PM 8:45 PM
6:00 PM 6:30 PM
2:30 PM 5:30 PM
1001048771

2:30 PM 8:00 PM

3:30 PM 5:30 PM

2:00 AM 4:00 AM

12:15 AM 12:30 AM
12:30 AM 2:00 AM
4:30 AM 5:30 AM
7:30 AM 9:00 AM
11:00 AM
1:30 PM 2:00 PM 1001048872

6:30 AM 7:30 AM
6:30 AM 7:15 AM
9:00 AM 10:30 AM

6:10 PM 7:45 PM
5:00 PM 5:30 PM

1:00 AM 3:00 AM
2:30 AM 3:00 AM
2:00 AM

7:30 AM 9:00 AM

12:00 PM 12:30 PM
9:00 AM 1:00 PM 1001048873

9:00 AM 1:00 PM 1001049940

11:30 AM 12:00 PM
6:30 AM 7:30 AM

6:30pm 8:00pm
8:00pm 8:30pm
2:30pm 10:00pm 1001048873

2:30pm 5:30pm 1001049940

2:30pm 9:30pm 1001049980

6:00pm 6:30pm
6:00pm 7:00pm

1:00 AM 2:00 AM
10:00 PM 12:00 AM
2:00 AM 2:10 AM
4:00 AM 6:00 AM
1230 am 1:00 AM

1001051016,
1001051023,
1001051026,
1001051029

6:15 PM 7:45 PM
3:00 PM 5:15 PM
3:30 PM 4:00 PM
3:00 PM 5:30 PM
8:00 PM 9:00 PM

3:00 AM 5:00 AM

10:00 PM 3:00 AM
12:00 AM 12:30 AM

8:00 AM

7:30 PM 9:00 PM
3:30 PM 4:00 PM
2:30 PM 3:30 PM

4:00 PM 9:30 PM
5:00 PM

2:00am 3:30am
11:30pm 12:00am
10:30pm 11:00pm
3:00am
2:00am 3:30am

2:45 PM 3:30 PM
6:00 PM 6:30 PM
3:00 PM 5:00 PM
6:00 PM 7:00 PM
2:30 PM 4:30 PM
8:00 PM 9:30 PM

11:00pm 11:30pm
2:00am 3:30am
2:00am 3:30am

9:30 AM 1:00 PM
7:30 AM 9:00 AM
1001051711
9:30 AM 1:00 PM
10:30 AM 11:00 AM
9:30 AM
9:30 AM 1:00 AM
12:00 PM

7:00 PM 7:30 PM
8:00 PM 9:30 PM
6:00 PM 7:00 PM
3:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM 1001051830

2:00 PM 5:30 PM

11:00pm 11:30pm
2:00am 3:30am
2:00am 3:30am

9:30 AM 11:30 AM
7:30 AM 9:00 AM
10:30 AM 11:00 AM
9:30 AM 1:00 AM 1001051887

9:30 AM 1:00 PM
9:30 AM 1:00 PM
9:30 AM 11:15 AM

7:00 PM 7:30 PM
8:00 PM 9:30 PM
6:00 PM 7:00 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM

12:30 AM 1:00 AM
3:00 AM 4:15 AM
4:15 AM 4:30 AM
11:00 PM

10:00 AM 11:45 AM
8:00 AM 9:30 AM
10:50 AM 11:20 AM
1:25 PM

6:00 PM 6:30 PM
7:00 PM 8:30 PM
6:00 PM 7:00 PM

12:00 AM 12:30 AM
2:15 AM 3:45 AM
4:00 AM 4:10 AM

9:00 AM 11:00 AM
11:30 AM 1:00pm
10:00am 10:30am
9:00am 1:00pm
9:00am 1:00pm
9:30 AM 1:00 PM

6:00 PM 6:30 PM
7:00 PM 8:30 PM
6:00 PM 7:00 PM
9:00 PM
2:15 PM 5:30 PM
2:15 PM 5:30 PM
2:00 PM 5:30 PM

12:00 AM 12:30 AM
2:15 AM 3:45 AM
4:00 AM 4:10 AM
9:30 AM
11:20 AM 11:45 AM
9:30 AM 1:00 PM
10:00 AM 1:00 PM 1001053547

9:00 AM 1:00 PM
1001053549

9:30 AM 1:00 PM 1001053561

10:50 AM

6:00 PM 6:30 PM
8:00 PM 9:30 PM
6:00 PM 7:00 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
4:30 PM 5:30 PM
2:00 PM 5:15 PM

12:00 AM 12:30 AM
4:00 AM 4:10 AM

9:15 AM 12:00 PM
9:15 AM 1:00 PM
9:15 AM 1:00 PM 1001053547

9:15 AM 1:00 PM
11:00 AM 11:30 AM
9:15 AM 1:00 PM
9:15 AM 1:00 PM
11:30 AM 1:00 PM

2:00 PM 8:00 PM
2:00 PM 4:00 PM
2:00 PM 5:30 PM
8:00 PM 8:30 PM
2:00 PM 5:30 PM
3:00 PM 5:30 PM
6:00 PM 7:00 PM
6:30 PM 8:00 PM
7:40 PM

12:00 AM 12:30 AM
2:15 AM 3:45 AM
4:00 AM 4:10 AM
3:00 AM

9:00 AM 12:30 PM
12:00 PM 12:30 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

10:15 AM 2:00 PM
12:15 PM 1:00 PM

2:00 PM 6:00 PM
8:00 PM 8:30 PM
2:30 PM 4:30 PM
6:30 PM 8:00 PM
2:30 PM
2:30 PM 5:30 PM 1001055384

4:30 PM 5:30 PM
3:30 PM
6:00 PM 7:00 PM
7:12 PM
7:17 PM

4:30 AM 5:00 AM
2:15 AM 3:45 AM

9:30 AM 12:30 PM
12:00 PM 12:30 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM 1001055507

9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:30 AM 1:00 PM

2:30 PM 9:00 PM 1001055507

2:30 PM 5:30 PM
2:30 PM 10:00 PM
2:30 PM 5:30 PM
8:00 PM 8:30 PM
6:30 AM 7:30 AM
6:30 PM 8:00 PM

10:00 PM 11:30 PM
4:30 AM 5:00 AM
2:15 AM 3:45 AM
4:00 AM 4:10 AM

9:00 AM 11:30 AM
11:30 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
8:00 AM
6:00 AM 1:00 PM 1001055719
1001055723

9:00 AM 1:00 PM 1001055729

6:30 PM 7:00 PM
5:00 PM 5:30 PM
3:30 PM 4:30 PM 1001055726

7:30 PM 8:00 PM 1001055721

7:00 PM
4:30 PM 5:00 PM
7:00 PM 8:30 PM
2:45 PM 3:45 PM 1001055764

3:45 PM 4:30 PM 1001055765

5:00 PM
3:00 PM
2:35 PM 5:30 PM

2:15 AM 3:45 AM
4:00 AM 4:10 AM

9:30 AM 11:30 AM
11:30 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM

3:30 PM 4:00 PM
6:00 PM 6:45 PM
7:20 PM 8:00 PM
8:05 PM
7:30 PM
10:00 PM

2:15 AM 3:45 AM
4:00 AM 4:10 AM
4:30 AM 5:00 AM
12:00 AM

9:00 AM 11:30 AM
11:30 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 12:00 PM
9:00 AM
9:00 AM 1:00 PM
12:00 PM 1:00 PM 1001056005

9:00 AM 1:00 PM 1001055931

2:00 PM 3:30 PM 1001055964

4:00 PM 5:30 PM 1001055932

4:00 PM 5:30 PM 1001055933

4:00 PM 5:30 PM 1001055934

4:00 PM 5:30 PM 1001055935

4:00 PM 5:30 PM 1001055936

3:15 PM 5:00 PM 1001055930

3:25 PM 5:30 PM
6:00 PM 6:30 PM
5:00 PM 5:30 PM
7:00 PM 8:30 PM

2:15 AM 3:45 AM
4:00 AM 4:10 AM
4:30 AM 5:00 AM
4:30 AM

4:30 AM

9:00 AM 12:30 AM
11:30 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

6:00 PM 6:30 PM
3:00 PM 5:30 PM
2:30 PM 4:00 PM 1001056941

3:00 PM 5:30 PM

2:15 AM 3:45 AM
4:00 AM 4:10 AM
4:30 AM 5:00 AM

9:00 AM 11:30 AM
11:30 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

5:00 PM 5:30 PM
6:15 PM 7:45 PM
2:30 PM 10:00 PM
2:30 PM 5:30 PM
5:25 PM

2:15 AM 3:45 AM
4:00 AM 4:10 AM
4:30 AM 5:00 AM

9:00 AM 12:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
8:00 AM
11:30 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM

5:00 PM 5:30 PM
6:15 PM 7:45 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
3:00 PM

10:50 PM
4:00 AM 5:30 AM
1:00 AM 1:30 AM

9:00 AM 11:30 AM
11:30 AM 12:00 PM
7:30 AM 9:00 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:15 AM
9:17 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

2:30 PM 5:30 PM
3:00 PM
6:30 PM 7:30 PM
2:30 PM 9:40 PM
07:35 PM

1:00 AM 1:30 AM
4:00 AM 5:30 AM

9:00 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

4:30 PM 5:00 PM
6:15 PM 7:45 PM
2:30 PM 7:00 PM

2:30 PM 5:30 PM
2:30 PM 5:15 PM
9:12 PM

1:00 AM 1:30 AM
4:00 AM 5:30 AM
11:30 PM

12:15pm 1:30pm
8:00 AM 9:30 AM
6:30 AM 7:30 AM
9:30am 10:30am
12:30 PM 1:00pm
10:10am 10:20am
10:10am 10:20am

4:30 PM 5:00 PM
6:15 PM 7:45 PM

3:00 PM 3:30 PM
3:40 PM

12:30 AM 1:00 AM
4:00 AM 5:30 AM
10:00 PM 12:00 AM

9:00 AM 10:30 AM
7:30 AM 9:00 AM
6:30 AM 7:00 AM
9:00 AM 1:00 PM 1001085803

9:00 AM 1:00 PM 1001085804

9:00 AM 1:00 PM

11:30 AM 12:00 PM

7:00 PM 7:30 PM
5:10 PM 6:30 PM
2:30 PM 5:30 PM 1001085846

2:30 PM 5:30 PM
4:30 PM
3:00 PM
2:30 PM

12:00 AM 1:15 AM
12:42 AM
1:00 AM
4:00 AM 5:30 AM
5:50 AM

9:15 AM 11:30 AM
12:15 PM 12:40 PM
8:00 AM 9:15 AM
10:30 AM 12:00 PM 1001085988

9:15 AM 1001085986

10:30 12:30PM
10:30 AM
10:20 AM
6:45 AM

7:30 PM 8:00 PM
6:00 PM 7:30 PM
2:30 PM 5:30 PM 1001086057
1001085986
2:30 PM 5:30 PM
2:30 PM 5:30 PM

11:00 PM 11:30 PM
3:00 AM 4:45 AM

9:30 AM 12:00 PM
12:15 PM 12:40 PM
7:15 AM 8:45 AM
9:30 AM 1:00 PM
10:00 AM 11:00 AM 1001086057
1001085986
10:00 AM 11:00 AM

11:00 AM 12:00 PM
9:30 AM 1:00 PM

7:30 PM 8:00 PM
6:00 PM 7:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM 1001086057
1001085986
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

11:00 PM 11:30 PM
3:00 AM 4:00 AM
4:00 AM 4:15 AM

9:15 AM 11:30 AM
10:30 PM 11:00 PM
7:30 AM 9:00 AM
9:15 AM 1:00 AM
9:15 AM 1:00 AM 1001086303

6:15 AM
11:40 AM

3:00 PM 5:30 PM
3:00 PM 5:30 PM
3:00 PM 5:30 PM
3:00 PM 5:30 PM
5:00 PM 5:30 PM
6:00 PM 7:30 PM
6:30 PM 7:30 PM

11:00 PM 11:30 PM
3:00 AM 4:00 AM
4:00 AM 4:15 AM
1:00 AM 1:30 AM

9::00 AM 11:30 AM
10:30 PM 11:00 PM
7:30 AM 9:00 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM 1001086303

6:30 AM
6:40am

2:30 PM 5:30 PM
2:30 PM 5:30 PM

2:30 PM 3:30 PM
2:30 PM 6:15 PM
5:00 PM 5:30 PM
6:30 PM 8:00 PM
6:00 PM 7:00 PM

11:00 PM 11:30 PM
3:00 AM 4:00 AM
4:00 AM 4:15 AM
1:00 AM 1:10 AM
9:15 AM 11:30 AM
10:30 PM 11:00 PM
7:10 AM 8:30 AM
7:25 AM
9:15 AM 1:00 PM
9:15 AM 11:45 AM 1001087075

9:00 AM 1:00 PM
8:30 AM

2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

6:00 PM 8:45 PM
5:00 PM 5:30 PM
6:30 PM 8:00 PM
6:00 PM 7:00 PM

11:00 PM 11:30 PM
3:00 AM 4:00 AM
4:00 AM 4:15 AM

9:15 AM 11:30 AM
10:30 PM 11:00 PM
7:10 AM 8:30 AM
9:15 AM 2:00 PM

3:00 PM 4:00 PM
6:15 PM 7:45 PM

11:00 PM 11:30 PM
3:00 AM 4:00 AM
4:00 AM 4:15 AM

9:15 AM 11:30 AM
10:30 PM 11:00 PM
7:10 AM 8:30 AM
9:15 AM 1:00 PM

9:30 AM 12:00 PM 1001087327

2:00 PM 2:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
5:00 PM 5:30 PM
7:00 PM 8:30 PM
6:00 PM 7:00 PM

11:00 PM 11:30 PM
3:00 AM 4:00 AM
4:00 AM 4:15 AM

9:00 AM 12:00PM
9:00AM 12:00PM 1001125408

8:30AM 12:00PM 1001125842

7:00AM 8:30AM
9:00 AM 12:00PM
11:00AM

3:00 PM 3:20 PM
6:20 PM 7:45 PM
5:15 PM 5:30 PM
5:00 PM 6:00 PM
3:00 AM 3:30 AM
4:00 AM 5:30 AM

10:00 AM 11:00 AM

9:30 AM 11:30 AM
12:00 PM 1:00 PM 1001130266

9:30 AM 1:00 PM
7:00 AM

3:15 PM 3:40 PM
6:30 PM
6:00 PM 7:15 PM
2:30 PM 6:00 PM 1001130266

3:30 PM

11:20 PM 11:45pm
3:00 AM 4:30 AM

9:00 AM 12:30 AM
11:30 AM 12:00 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
7:00 AM 1:00 PM 1001130266

7:40 AM
11:00 AM 12:15 PM
9:50 AM 1:00 PM
12:30 PM 2:00 PM
10:45 AM 1:00 PM
9:15 AM 1:00 PM
10:45 AM
11:00 AM
3:15 PM 3:40 PM
6:00 PM 7:20 PM
1001130266
2:00 PM 6:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

11:20 PM 11:45pm
3:00 AM 4:30 AM

9:00 AM 12:00 AM
11:30 AM 12:00 PM
12:00 PM 1:30 PM
6:30 AM 7:30 AM
9:00 AM 1:00 PM 1001131341

9:00 AM 1:00 PM
9:20 AM
9:25 AM
9:00 AM 1:00 PM 1001131343

9:00 AM 1:00 PM
12:00 PM 1:00 PM
9:00 AM 1:00 PM 1001130266

4:15 PM 4:40 PM
6:00 PM 7:30 PM
2:50 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 9:30 PM 1001130266

3:30 PM
4:15 AM 4:40 PM
3:30 AM 5:00 AM
11:30 PM
3:30 AM 5:00 AM

9:00 AM 11:00 AM
11:30 AM 12:00 PM
7:30 AM 9:00 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
11:00 AM 1:00 PM

7:00 PM 7:20pm
7:30pm 9:00pm
6:30 PM 7:30 PM
2:00pm 5:30pm
2:00pm
2:00pm 5:30pm
2:00pm 5:30pm

4:15 AM 4:40 PM
3:30 AM 5:00 AM
3:30 AM 5:00 AM

9:00 AM 11:45 AM
11:45 AM 12:15 PM
12:30 PM 2:00 PM
6:30 AM 7:30 AM
10:10 AM
12:00 PM
1:30 PM

3:30pm 4:00pm
6:30pm 8:00pm
6:00pm 6:30 PM
5:00pm
6:30pm
3:00pm 3:30pm

4:15 AM 4:40 PM
3:30 AM 5:00 AM
3:30 AM 5:00 AM

9:00 AM 11:00 AM
6:20 AM
11:30 AM 12:00 PM
7:30 AM 9:00 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 10:30 AM
10:08 AM
11:17 AM
11:25 AM
11:15 AM 1:00 PM 1001132894

11:15 AM 1:00 PM 1001132896

12:30 PM

2:30pm 5:30pm
2:30pm 5:30pm 1001132971

6:00pm 6:30pm
7:30 AM 9:00 AM
6:30 PM 7:00 PM
2:30pm 5:30pm
2:30pm 8:30pm
3:30pm
3:30pm
2:30pm 8pm 1001132972

2:30pm 8pm 1001132973

5:30pm 7:30pm
5:30pm 6:00pm 1001132976

6:00pm 7:00pm 1001132976

6:00pm 7:00pm 1001132974

4:15 AM 4:40 PM
3:30 AM 5:00 AM
3:30 AM 5:00 AM
10:30 PM

9:00 AM 11:45 AM
11:45 AM 12:15 PM
12:30 PM 2:00 PM
6:30 AM 7:30 AM
7:00 AM 7:15 AM 1001133647

6:30 AM 1:00 PM
6:30 AM 1:00 PM 1001133638

10:45 AM
7:20 AM
7:25 AM
9:00 AM 1:00 PM 1001133139

10:30 AM 2:00 PM 1001130266

3:30pm 4:00pm
6:30pm 8:00pm
6:30pm 7:00pm
2:30 PM 10:00:00pm
2:30 PM 10:00pm 1001133638

2:30 PM 9:00pm 1001130266

2:30PM
8:15pm 10:00pm
2:30 PM 10:00pm

4:15 AM 4:40 PM
3:30 AM 5:00 AM
3:30 AM 5:00 AM
10:30 PM 11:30 PM

9:00 AM 10:15 AM
11:45 AM 12:15 PM
8:00 AM 9:30 AM
6:30 AM 7:30 AM
11:00 AM 2:00 PM 1001130266

9:00 AM 12:00 PM 1001133858

10:30 AM
12:14 PM

7:30 PM 8:00 PM
5:30 PM 7:00 PM
2:30 PM 5:30pm
2:30 PM 5:30pm

2:30 PM 5:30pm
3:10 PM

4:15 AM 4:40 PM
3:30 AM 5:00 AM
3:30 AM 5:00 AM

9:00am 11:30am
9:00am 9:30am
7:30am 9:00am
9:00am 1:00pm
10:30am 5:30pm
10:00am 1:00am
9:00am 10:00am
9:00am 1:00pm

7:30 PM 8:00 PM
6:15 PM 7:45 PM
2:30 PM 6:30 PM
3:30 PM 5:20 PM
2:30 PM 5:30 PM

10:30 PM 11:00 PM
4:15 AM 5:45 AM
5:50 AM

9:00am 12:00pm
9:00am 9:30am
7:30am 9:00am
9:00am 1:00pm
9:00am 1:00pm
9:00am 1:00pm
9:00am 1:00pm
11:00 PM 11:30 PM
4:00 AM 6:00 AM
10:00 PM 12:00 AM

10:30 AM 11:00 AM
7:15 AM 8:45 AM

9:15 AM 11:30 AM
8:42 AM 9:00 AM
9:15 AM 1:00 PM
9:15 AM 1:00 PM
9:15 AM 1:00 PM

6:30 PM 7:45 PM
3:00 PM
5:30 PM
2:30 PM 9:00 PM

11:00 PM 11:30 PM
4:00 AM 6:00 AM
4:15 AM

11:10 AM 11:30 AM
8:20 AM 10:00 AM

10:15 AM 12:10 AM
7:15 AM 8:00 AM

6:30 PM 7:45 PM
6:30 PM 8:00 PM
5:30 PM 6:15 PM

11:30 PM 12:00 AM
3:00 AM 5:00 AM

10:30 AM 11:00 AM
7:15 AM 8:45 AM
9:15 AM 11:30 AM
9:15 AM 1:00 PM
7:30 AM
9:15 AM 1:00 PM 1001135705

11:30 AM 1:00 PM

6:30 PM 7:45 PM
6:30 PM 8:00 PM
5:30 PM 6:15 PM
3:00 PM 8:30 PM
3:00 PM 10:00 PM
3:00 PM 7:00 PM

11:00 PM 11:30 PM
3:00 AM 5:00 AM

10:30 AM 11:00 AM
7:15 AM 8:45 AM

9:15 AM 11:30 AM
6:35 AM
9:15 AM 1:00 PM 1001135705

9:15 AM 1:00 PM
1001135995,96,97,99
,1001136000

12:00 AM 12:30 AM
4:00 AM 6:00 AM

10:30 AM 11:00 AM
7:15 AM 8:45 AM

9:15 AM 11:30 AM
7:45 AM

7:32 AM 8:00 AM
9:15 AM 1:00 PM 1001136049

9:15 AM 1:00 PM

6:30 PM 7:00 PM
6:30 PM 8:00 PM
5:30 PM 6:15 PM
2:30 PM 5:30 PM
5:00 PM 6:00 PM

12:00 AM 12:30 AM
4:00 AM 6:00 AM
2:00 PM 2:30 PM

10:30 AM 11:00 AM
7:15 AM 8:45 AM
9:15 AM 11:30 AM
1101136570 ,
9:15 AM 1:00 PM 1001136572
10:00 AM 1:00 PM
9:15 AM 1:00 PM

6:30 PM 7:00 PM
6:30 PM 8:00 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

12:00 AM 12:30 AM
4:00 AM 6:00 AM
5:00 AM 6:00 AM

10:30 AM 11:00 AM
7:15 AM 8:45 AM
9:15 AM 11:30 AM
9:15 AM 1:00 PM 1001137387

9:15 AM 1:00 PM
11:00 AM 1:00 PM

3:30 PM 4:00 PM
8:00 PM 10:00 PM
2:45 PM 10:00 PM
2:45 PM 5:30 PM
5:33 PM

12:00 AM 12:30 AM
4:00 AM 6:00 AM
10:45pM 11:45pm

10:30 AM 11:00 AM
7:15 AM 8:45 AM
9:15 AM 11:30 AM
6:20 AM
11:00 AM
9:15 AM 1:00 PM

3:30 PM 4:00 PM
6:00 PM 8:00 PM
2:45 PM 5:30 PM
2:45 PM 5:30 PM
4:11 PM
6:30 AM 7:30 AM

12:00 AM 12:30 AM
3:00 AM 5:00 AM
5:00 AM 6:00 AM
11:11 PM

1001137704

1001137706

3:30 PM 4:00 PM
6:00 PM 8:00 PM
6:30 AM 7:30 AM
2:30 PM 5:30 PM 1001137708

2:30 PM 5:30 PM 1001137705

2:30 PM 5:30 PM
2:30 PM 5:30 PM 1001137714

2:30 PM 5:30 PM
12:00 AM 12:30 AM
3:00 AM 5:00 AM
5:00 AM 5:15 AM
11:00 PM 12:00 AM

11:00 AM 11:30 AM
7:30 AM 8:50 AM

1001137861
1001137863
1001137865
1001137866

5:30 PM 6:00 PM
6:15 PM 7:45 PM
2:30 PM 5:30 PM 1001137861

5:30 PM 6:30 PM 1001137863

2:30 PM 4:30 PM 1001137865

6:00 PM 7:00 PM 1001137866

2:30 PM 5:30 PM 1001137898

7:00 PM 7:40 PM 1001138096

12:00 AM 12:30 AM
3:00 AM 5:00 AM
5:00 AM 5:15 AM
11:00 PM 12:00 AM
10:40 PM

11:00 AM 11:30 AM
7:30 AM 8:50 AM
8:00 AM
9:30 AM 10:30 AM
9:30 AM 1:00 PM

3:30 PM 4:00 PM
6:00 PM 8:00 PM
3:45 PM
2:30 PM 4:15 PM
4:20 PM 5:30pm
2:30 PM 3:30 PM
2:30 PM 6:39 PM

6:29 PM

11:15 PM 3:40 AM

4:30 AM 5:00 AM

11:00 AM 11:30 AM
7:30 AM 8:50 AM
8:00 AM
9:30 AM 10:30 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

3:30 PM 4:00 PM
6:00 PM 8:00 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM 1001139055

2:00 PM 5:30 PM 1001139054


3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:00 AM 9:00 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM 1001139105

9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
7:45 AM
11:30 AM 1:00 PM
10:35 AM
10:40 AM
12:15 PM

3:30 PM 4:00 PM
6:00 PM 8:00 PM
2:00 PM 5:30 PM
7:00 PM 7:30 PM
2:00 PM 5:30 PM
6:30 PM 7:00 PM
2:00 PM 5:30 PM

3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:00 AM 9:00 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM 1001139105

8:35 AM
9:00 AM 1:00 PM 1001139335

7:20 AM
9:00 AM 11:30 AM
12:25 PM

3:30 PM 4:00 PM
6:00 PM 8:00 PM
2:00 PM 6:30 PM
2:00 PM 5:30 PM
5:00 PM 5:30 PM
2:00 PM 5:30 PM

3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:00 AM 9:00 AM
6:30 AM 7:30 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM 1001139848

11:00 AM
11:55 AM
12:30 PM
3:30 PM 4:00 PM
7:00 PM 9:00 PM
6:00 PM 7:00 PM
8:00 PM 9:00 PM
9:15 PM 10:00 PM

6:00 PM 6:30 PM

5:00 PM 5:30 PM

3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

5:30 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:15 AM 9:00 AM

3:30 PM 4:00 PM
6:00 PM 8:00 PM
5:00 PM 5:30 PM
3:00 PM

3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:15 AM 9:00 AM
11:05 AM 1:00 PM
9:00 AM 1:00 PM 1001141165

11:05 AM 11:30 AM

3:30 PM 4:00 PM
6:00 PM 8:00 PM
5:00 PM 5:30 PM
2:00 PM 5:30 PM
4:30 PM 5:30 PM

3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:15 AM 9:00 AM
9:00 AM 9:19 AM
9:00 AM 1:00 PM 1001141165

9:00 AM 1:00 PM
9:00 AM
11:00 AM 11:30 AM
11:30 AM 1:00 AM
1:30 PM

7:00 PM 7:30 PM
8:00pm 9:30pm
2:30pm 5:30pm
2:30pm 5:30pm
5:00pm 5:30pm
2:30pm 5:30pm
3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:15 AM 9:00 AM

6:30 AM 7:00 AM
6:00 AM 10:00 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

9:00 AM 1:00 PM

4:30 PM 5:00 PM
6:15 PM 7:45 PM
3:30 PM 4:00 PM
2:30 PM 5:30 PM
3:30 PM
3:30 PM 6:30 PM 1001141694

5:20 PM

3:45 AM 4:00 AM
12:00 AM 12:30 AM
2:15 AM 3:45 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:15 AM 9:00 AM

12:00 PM
6:30 AM 7:00 AM
9:00 AM 1:00 PM 1001141694

10:30 AM 12:00 PM
9:00 AM 1:00 PM

5:15 PM 5:40 PM
6:15 PM 7:45 PM
3:30 PM 6:50 PM 1001141694

2:30 PM 5:30 PM
2:30 PM 5:30 PM
3:20 PM

11:00 PM 11:30 PM
4:30 AM 6:00 AM
12:00 AM 12:30 AM
4:00 AM 4:30 AM
6:00 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:15 AM 9:00 AM
6:30 AM 7:00 AM
9:00 AM 1:00 PM
11:00 AM 1:00 PM
9:00 AM 1:00 PM

5:15 PM 5:40 PM
6:15 PM 7:45 PM
3:30 PM 6:50 PM 1001142116

2:30 PM 5:30 PM
2:30 PM 5:30 PM

11:30 PM 12:00 AM
4:00 AM 6:00 AM

9:00 AM 11:30 AM
12:00 PM 12:30 PM
7:15 AM 9:00 AM
6:30 AM 7:00 AM
9:00 AM 11:00 AM
9:00 AM 1:00 PM
10:49 AM
12:15 PM 1:00 PM
8:15 PM

5:15 PM 5:40 PM
6:15 PM 7:45 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
1001142556
2:00 PM 10:00 PM
2:00 PM 10:00 PM 1001142559

2:00 PM 10:00 PM 1001142582

6:00 PM 10:00 PM
8:30 PM

12:00 AM 4:15 AM
11:30 PM 12:00 AM
5:55 AM

9:00 AM 11:30 AM
7:15 AM 9:00 AM
6:30 AM 7:00 AM
9:00 AM 11:30 AM 1001142556

9:00 AM 1:00 PM 1001142559

9:00 AM 1:00 PM 1001142582

9:00 AM 1:00 PM 1001142620

9:00 AM 1:00 PM 1001142623

5:15 PM 5:40 PM
6:15 PM 7:45 PM
2:00 PM 10:00 PM 1001142559

2:00 PM 10:00 PM 1001142582

2:00 PM 10:00 PM 1001142620

2:00 PM 10:00 PM 1001142623

4:25 PM 5:20 PM 1001142632

5:45 PM 6:20 PM

5:00 PM 10:00 PM 1001142636

10:45 PM 6:00 AM 1001142559

10:00 PM 10:30 PM

10:00 AM 12:30 AM
8:15 AM 10:00 AM
6:30 AM 7:00 AM
12:30 PM 1:00 PM
10:30 AM
9:00 AM 2:00 PM
9:00 AM 11:00 AM
9:00 AM 11:00 AM

5:15 PM 5:40 PM
6:15 PM 7:45 PM
2:00 PM 2:45 PM
2:30 PM 3:30 PM
3:35 PM

10:00 PM 10:30 PM
3:00 AM 5:00 AM
1:00 AM 2:00 AM
2:00 AM 3:00 AM

10:00 AM 10:40 AM
9:15 AM 11:30 AM

9:15 AM 1:00 PM

9:15 AM 1:00 PM
9:15 AM

5:15 PM 5:40 PM

2:30 PM 3:30 PM
2:00 PM 5:30 PM
6:15 PM 7:45 PM
7:30 PM 7:45 PM
8:00 PM 8:30 PM

11:00 PM 11:30 PM
3:00 AM 5:00 AM

10:00 AM 10:40 AM
9:15 AM 11:30 AM

7:30 AM 9:00 AM
9:15 AM 1:00 PM
1001143810
9:15 AM 1:00 PM
9:15 AM 1:00 PM

12:20 PM 1:00 PM
10:00 AM 1:00 PM
12:30 PM 2:00 PM

5:15 PM 5:40 PM
2:00 PM 2:10 PM
6:15 PM 7:45 PM
8:00 PM 8:30 PM
8:00 PM 8:30 PM
2:30 PM 5:30 PM

11:00 PM 11:30 PM
3:00 AM 4:45 AM
4:45 AM 5:00 AM

10:00 AM 10:40 AM
9:15 AM 11:30 AM

7:30 AM 9:00 AM
7:45 AM
9:15 AM 1:00 PM
9:15 AM 1:00 PM
9:15 AM 12:00 PM

4:30 PM 5:00 PM
6:30 PM 7:30 PM
2:40 PM 5:30 PM

2:00 PM 5:30 PM

7:00 PM 8:00 PM
3:00 PM
3:00 PM 4:15 PM

4:15 PM 5:30 PM

11:00 PM 11:30 PM
3:00 AM 4:45 AM
4:45 AM 5:00 AM
12:30 AM

11:30 AM 11:55 AM
9:15 AM 11:30 AM

7:30 AM 9:00 AM
9:15 AM 1:00 PM
9:15 AM 1:00 PM
6:15 AM 7:30 AM

4:00 PM 4:30 PM
6:00 PM 8:00 PM
2:20 PM 5:30 PM

7:00 PM 8:00 PM
2:20 PM 5:30 PM
2:20 PM 5:30 PM
7:50 PM

11:00 PM 11:30 PM
3:00 AM 4:45 AM
4:45 AM 5:00 AM

7:30 AM 9:00 AM
4:30 PM 5:00 PM

7:00 PM 7:30 PM

11:00 PM 11:30 PM
4:45 AM 5:00 AM
1:30 AM

4:30 PM 5:00 PM
2:45 PM 5:30 PM

11:00 PM 11:30 PM
4:45 AM 5:00 AM

9:00 AM 11:30 AM
9:00 AM 1:00 PM

12:00pm 1:15pm
9:00 AM 1:00 PM

4:00 PM 4:30 PM
6:00 PM 8:00 PM
2:00 PM 10:00 PM
2:20 PM 8:00 PM
2:20 PM 5:30 PM

5:30 PM 6:3 0 pm
3:00 PM
11:00 PM 11:30 PM
4:45 AM 5:00 AM
3:00 AM 4:45 AM

9:00 AM 11:30 AM
9:00 AM 1:00 PM

7:30 AM 9:00 AM
9:00 AM 1:00 PM 1001147927 O.No.4001051333
11:00 AM 12:00 PM
6:15 AM 7:15 AM
6:00 AM 6:45 AM

4:00 PM 4:30 PM
6:00 PM 8:00 PM
2:15 PM 5:30 PM

2:30 PM 6:15 PM

3:15 PM 5:30 PM
3:25 PM
6:05 PM
2:50 PM
6:20 PM

1:20 AM 1:45 AM
2:15 AM 3:45 AM
3:45 AM 4:00 AM

9:00 AM 11:30 AM

7:30 AM 9:00 AM
9:00 AM 1:00 PM 1001147923 O.No.4001051329 1001148831
9:00 AM 1:00 PM
6:15 AM 7:15 AM
4:00 PM 4:30 PM
6:00 PM 8:00 PM
2:15 PM 10:00 PM 1001148952

5:30 PM 6:00 PM
2:15 PM 8:15 PM

1:20 AM 1:45 AM 1001149000

2:15 AM 3:45 AM
3:45 AM 4:00 AM
12:00 AM 12:20 AM

11:30 AM 12:00 PM
11:30 AM 2:00 PM
6:15 AM 7:15 AM
9:00 AM 11:30 AM 1001149257
10:00 AM 10:15 AM
9:00 AM 2:00 PM
9:30 AM

4:00 PM 4:30 PM
6:00 PM 8:00 PM
2:15 PM 10:00 PM

5:30 PM 6:00 PM

2:00 PM 8:00 PM

2:00 PM 5:30 PM O. No. 4001052425 1001149340


4:15 PM
8:07 PM
8:45 PM

1:20 AM 1:45 AM 1001149342

2:15 AM 3:45 AM
3:45 AM 4:00 AM
1001149342

11:00 PM 1:00 AM
4:00 AM 4:30 AM
10:30 PM 11:05 PM

11:30 AM 12:00 PM
6:15 AM 7:15 AM
9:00 AM 12:00 PM
9:00 AM 2:00 PM 1001149487
9:00 AM 2:00 PM
9:00 AM 2:00 PM

7:00 AM 9:00 AM

4:00 PM 4:30 PM
5:30 PM 6:00 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
4:00 PM 5:30 PM
3:00 PM 10:00 PM 1001149547
4:30 PM 5:00 PM 1001149521 4001052574
2:30 PM 9:30 PM 1001149437 4001052537
2:00 PM 4:00 PM 1001149434 4001052532
7:30 PM 10:00 PM 1001149441 4001052539
4:00 PM 5:30 PM

10:00 PM 2:00 AM
1:00 AM 2:00 AM
1001149566
2:20 AM 2:55 AM
4:45 AM 5:00 AM

6:05 AM
6:15 AM 7:15 AM

7:30 AM
9:00 AM
1001149602
7:00 AM 9:00 AM 1001149602
9:00 AM 11:30 AM
12:00 PM 12:30 PM
9:00 AM 1:00 PM
9:00 AM 12:00 PM
9:15 AM 1:00 PM
10:00 AM 1:00 PM
9:00 AM 1:00 PM

4:00 PM 4:30 PM 1001149908

5:30 PM 6:00 PM
2:40 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 9:00 PM
2:40 PM 5:30 PM
4:30 PM 7:00 PM
7:03 PM

2:20 AM 2:55 AM
4:45 AM 5:00 AM 1001149921

4:30 AM 5:55 AM

11:30am 12:00pm
9:30am 11:30am 1001149921

7:15am 8:45am
9:00am 1:00pm

4:30 PM 5:00 PM 1001149969

6:15 PM 7:45 PM
3:00 PM 8:30 PM
2:30 PM 2:45 PM
2:20 AM 2:55 AM 1001150028

4:45 AM 5:00 AM
4:30 AM 5:55 AM
1:15 AM 2:00 AM

11:30am 12:00pm
9:30am 11:30am
7:15am 8:45am
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

4:30 PM 5:00 PM 1001150265

6:15 PM 7:45 PM
2:30 PM 5:30 PM
2:45 PM 5:30 PM
3:30 PM 4:45 PM

2:20 AM 2:55 AM 1001150288

4:45 AM 5:00 AM
4:30 AM 5:55 AM
5:00 AM

6:10 AM 7:10 AM 1001150428

9:00 AM 12:00 AM
11:30 PM 12:00 PM
9:00 AM 9:45 AM
9:00 AM 2:00 PM
9:00 AM 2:00 PM
10:30 AM 2:00 PM
10:30 AM 2:00 PM

7:00 AM 9:00 AM
4:30 PM 5:00 PM 1001150546

6:15 PM 7:45 PM
2:15 PM 9:30 PM
2:15 PM 5:30 PM
2:15 PM 7:30 PM

2:20 AM 2:55 AM 1001150597

4:45 AM 5:00 AM
4:30 AM 5:55 AM
5:00 AM
5:10 AM

12:00 PM 12:30 PM
9:00 AM 11:30 AM
7:00 AM 9:00 AM
6:00 AM 9:00 AM
9:00 AM 1:00 PM
1001150706
6:10 AM 7:10 AM
9:00 AM 1:00 PM
9:00 AM 2:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

4:30 PM 5:00 PM
6:15 PM 7:45 PM
2:15 PM 5:30 PM
2:30 PM 5:00 PM 1001150949
1001150945 / Order

2:30 PM 9:45 PM no.-4001051291

2:20 AM 2:55 AM
1001150995
4:45 AM 5:00 AM 1001150995

4:30 AM 5:55 AM

12:00 PM 12:30 PM
9:00 AM 11:30 AM
7:00 AM 9:00 AM 1001151023

6:10 AM 7:10 AM
7:30 AM

4:30 PM 5:00 PM 1001151037

6:15 PM 7:45 PM

11:00 PM 11:30 PM 1001151065

3:00 AM 5:00 AM
5:25 AM

12:00 PM 12:30 PM
9:00 AM 11:30 AM
7:00 AM 9:00 AM
6:10 AM 7:10 AM
7:00 AM
9:00 AM 1:00 PM 1001151190

9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
11:00 AM
12:30 PM 1:00 PM

4:30 PM 5:00 PM
6:15 PM 7:45 PM
2:30 PM 10:00 PM
1001151275

7:00 PM 8:00 PM
1001151275

2:30 PM 8:45 PM
3:30 PM 10:00 PM 1001151274

10:45 PM 1001151297

11:30 PM 12:00 AM
3:00 AM 5:00 AM
5:35 AM

12:00 PM 12:30 PM
9:00 AM 11:30 AM
7:00 AM 9:00 AM
6:10 AM 7:10 AM
1001151335
7:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 2:00 PM
9:00 AM 1:00 PM

4:30 PM 5:00 PM
6:15 PM 7:45 PM
2:30 PM 10:00 PM
5:00 PM 6:00 PM 1001151477

2:30 PM 8:45 PM
2:30 PM 5:30 PM
5:00 PM 10:00 PM 1001151474

10:15 PM 4:00 AM 4001051294 1001151498

11:30 PM 12:00 AM
4:00 AM 5:45 AM
4:20 AM 4:40 AM

12:00 PM 12:30 PM 1001151550

7:30 AM 9:00 AM
1001151550

6:10 AM 7:10 AM
9:35 AM
11:30 AM 12:30 AM

4:30 PM 5:00 PM 1001151552

8:15 PM 9:45 PM

9:35 AM 1001151595

11:30 PM 12:00 AM
4:00 AM 6:00 AM
5:15 AM

9:15 AM 10:30 AM
10:30 AM 11:00 AM
7:00 AM 12:15 PM 1001151611

9:15 AM 1:00 PM
9:00 AM 1:00 PM
1001151612
7:15 AM 8:45 AM

6:30 AM 8:00 AM
8:54 AM
1001151711 Order

11:00 AM 12:05 PM No.-4001054123

4:30 PM 5:00 PM
8:15 PM 9:45 PM
2:30 PM 5:30 PM
1001151848
2:30 PM 5:30 PM
2:30 PM 5:30 PM
1001151848

2:30 PM 10:00 PM

11:00 PM 11:30 PM 1001151871

3:00 AM 5:00 AM

9:15 AM 10:30 AM 1001151892

10:30 AM 11:00 AM
9:15 AM 1:00 PM
9:00 AM 1:00 PM
7:15 AM 8:45 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
10:40 AM
11:30 AM 1:00 PM
1:00 PM 1:15 PM

4:30 PM 5:00 PM 1001152622

8:15 PM 9:45 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM
2:30 PM 5:30 PM

9:00 PM 12:30 AM 1001152204

3:00 AM 6:00 AM
9:30 PM
10:00 PM
10:20 PM
12:15 AM
11:05 PM
11:11 PM
11:19 PM
11:46 PM
12:56 AM
5:30 AM 6:00 AM

9:15 AM 10:30 AM 1001152521

10:30 AM 11:00 AM
9:00 AM 1:00 PM

6:05 AM

9:00 AM 1:00 PM
6:00 AM 9:30 AM
7:00 AM

9:00 AM 1:00 PM 1001152527


1001152525

9:00 AM 1:00 PM
6:45 AM 9:00 AM
9:00 AM 1:00 PM
10:25 AM
9:30 AM 1:00 PM
11:15 AM 12:45 PM

4:30 PM 5:00 PM
6:45 PM
6:10 PM
2:30 PM 5:00 PM 1001152688

2:30 PM 5:30 PM
5:30 PM 6:15 PM
8:15 PM 9:45 PM

11:30 PM 12:00 AM
2:30 AM 4:30 AM 1001152704

3:30 AM
9:15 AM 10:30 AM 1001152714

10:30 AM 11:00 AM
9:00 AM 1:00 PM
7:15 AM 8:45 AM

9:00 AM 1:00 PM 1001152715

11:00 AM 11:15 AM
9:00 AM 1:00 PM

5:30 PM 6:00 PM
7:00 PM 9:00 PM
2:15 PM 5:30 PM
2:30 PM 5:30 PM
1001153179
3:30 PM 5:30 PM
4:30 PM 5:00 PM
5:30 PM 6:30 PM
5:30 PM 6:30 PM
4:00 PM 5:30 PM

11:30 PM 12:00 AM
1001153214
3:00 AM 5:00 AM

9:30 AM 10:15 AM
10:15 AM 10:45 AM
6:00 AM 2:00 PM
6:15 AM 7:15 AM

5:30 PM 6:00 PM 1001153296

7:00 PM 9:00 PM
4:10 PM
4:30 PM 5:15 PM
1001153296

5:30 PM

11:30 PM 12:00 AM
3:00 AM 5:00 AM 10011533337

3:00 AM

9:30 AM 10:15 AM
10:15 AM 10:45 AM
6:00 AM 2:00 PM
6:15 AM 7:15 AM

5:30 PM 6:00 PM
6:00 PM 8:00 PM
2:20 PM 5:30 PM
2:20 PM 5:30 PM
1001153514
2:20 PM 5:30 PM
2:20 PM 5:30 PM 1001153511

5:30 PM 6:30 PM
7:00 PM

11:30 PM 12:00 AM
1001153536
3:00 AM 5:00 AM

9:30 AM 10:30 AM
1001153562
10:15 AM 10:45 AM
6:30 AM 7:15 AM

4:30 PM 5:00 PM 1001153595

6:15 PM 7:45 PM
3:00 PM 5:30 PM

11:30 PM 12:00 AM
1001153637
3:00 AM 5:00 AM 1001153637

3:00 AM

9:15 AM 10:30 AM 1001153772

10:30 AM 11:00 AM
9:00 AM 1:00 PM
7:15 AM 8:45 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
10:00am 01:00pm

4:30 PM 5:00 PM 1001153798

7:15 PM 8:45 PM
2:15 PM 5:30 PM
2:15 PM 5:30 PM
2:15 PM 5:30 PM
2:15 PM 5:30 PM

2:15 PM 5:30 PM
4:00 PM

11:30 PM 12:00 AM
1001153840
3:00 AM 5:00 AM

9:30 AM 10:15 AM
10:15 AM 10:45 AM
6:15 AM 7:15 AM
9:40 AM 1:00 PM
9:00 AM
1001153854
7:15 AM 8:45 AM
1001153854

9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
9:00 AM 1:00 PM

9:00 PM 9:30 PM
7:00 PM 9:00 PM
5:30 PM 6:30 PM
7:00 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM 1001154034

2:00 PM 3:30 PM

2:00 PM 5:30 PM
2:20 PM 4:30 PM 1001154029

2:20 PM
4:10 PM
4:00 PM 4:30 PM

12:10 AM 12:35 AM 1001154047

2:15 AM 3:45 AM
3:45 AM 4:00 AM
11:20 PM
5:00 AM
10:30 PM
4:00 AM 4:20 AM

9:30 AM 11:30 AM
10:15 AM 10:45 AM
6:15 AM 7:15 AM
6:00 AM 11:00 AM
7:15 AM 8:45 AM
9:00 AM 1:00 PM
9:00 AM 1:00 PM
6:30 AM 1:00 PM
11:30 AM 2:00 PM

9:00 PM 9:30 PM
7:00 PM 9:00 PM
5:30 PM 6:30 PM
7:00 PM
1001168739
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:30 PM

12:10 AM 12:35 AM 1001155335

2:15 AM 3:45 AM
3:45 AM 4:00 AM

6:15 AM 6:45 AM 1001168729

7:00 AM 9:00 AM
6:15 AM 7:00 AM
6:25 AM
9:00 AM 2:00 PM
9:20 AM
9:20 AM
9:00 AM 2:00 PM
1:55 PM
9:50 AM
9:15 AM 2:00 PM
1:30 PM
10:00 AM
9:00 AM 10:30 AM
9:00 AM 2:00 PM
9:00 AM 2:00 PM
9:00 AM 2:00 PM
11:30 AM 12:00 PM
12:00 PM 12:30 PM

9:00 PM 9:30 PM
7:00 PM 9:00 PM
5:30 PM 6:30 PM
6:30 PM
2:00 PM 5:30 PM 1001168791

2:00 PM 5:30 PM
2:00 PM 5:30 PM
3:10 PM
2:00 PM 5:30 PM

12:10 AM 12:35 AM 1001168809

2:15 AM 3:45 AM
3:45 AM 4:00 AM

6:15 AM 6:45 AM
7:00 AM 9:00 AM
6:15 AM 7:00 AM
9:00 AM 10:30 AM
9:00 AM 2:00 PM
9:00 AM 2:00 PM
2:00 PM 5:30 PM 1001168974

7:40 AM
7:30 AM
1001168974

7:35 AM
9:20 AM 2:00 PM
9:20 AM 2:00 PM
10:25 AM

9:00 PM 9:30 PM 101169028

7:00 PM 9:00 PM
5:30 PM 6:30 PM
6:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
2:00 PM 5:30 PM
6:05 PM
6:10 PM
6:10 PM
6:30 PM

12:10 AM 12:35 AM 1001169049

2:15 AM 3:45 AM
3:45 AM 4:00 AM

10:30 AM 11:00 AM 1001169063

7:15 AM 8:45 AM
9:15 AM 11:00 AM
6:20 AM
6:30 AM
9:15 AM 1:00 PM
9:15 AM 1:00 PM
8:50 AM
9:15 AM 12:50 PM
9:30 AM 1:00 PM
.
Life Cycle Trends- January Onwards

Running Idle BD Running Idle PM Running Idle


Compressor # 1 142.4 132.06 11 1121.53 91.25 5.75 505 111.25

Compressor # 2 Running Idle BD PM Running Idle BD PM


493.75 287.75 10.5 28 26 150 10.5 29.5

Compressor # 3 Idle PM Running Idle BD Running Idle BD


42.05 8.5 773.45 12.17 9.83 225 50 18

Compressor # 4 BD running BD running BD Running BD Running


1546.25 23 27 4.5 359.75 1119 5 155.5

Compressor # 5 running idle BD running idle BD running idle


421 0.75 3.25 714 226.5 19.5 887.5 71

Compressor # 6 Running Idle PM BD Running Idle BD Running


1929 143 44.75 0.25 239 68 4.25 358.5

Running Hrs BD Hrs Idle hrs

142 142 132 11 1122

0 0 0 0
Run nin g

7-May-01 13-Oct-00 9-Jan-00


27-Jan-00
25-Jan-00
29-May-00
9-Jan-00
28-Jan-0
7-May-01 13-Oct-00 9-Jan-00
27-Jan-00
25-Jan-00
29-May-00
9-Jan-00
28-Jan-0

0% 10% 20% 30%


Ru n n in g Id le

0% 10% 20% 30%


Id le PM Ru nn in g Id le BD

25-Mar-04

0% 10% 20% 30%


24-Feb-01 30-Dec-99
2-Jan-00 14-Dec-01

0% 10% 20% 30%


ru nn in g id le

12-Apr-05

0% 10% 20% 30%


nuary Onwards

PM Running Idle PM BD Running Idle BD Running


13.25 5 219.5 6.5 2.25 71.25 22 1.5 788

Running Idle PM BD Running Idle PM Running


1081.33 8.92 11.5 12.75 454.5 21.25 1 457.75

Running Idle BD PM Running Idle PM Running Idle


570 50.5 0.5 9 679 159.3 6.5 13.7 153.5

PM Running Idle PM Running idle


22.75 602.25 80 25 147 16

Idle BD PM Running
163.5 11 10.75 268

PM hrs

Comp# 1 Lifecycle from January onwards

1122 91 6 505 111 135

0 0 1 1
Run nin g Id le BD Run nin g Id le PM Ru nn in g Id le PM Run nin g Id le PM BD Run nin g Id le BD

Comp# 02 Lifecycle from january onwards

an-00
-00
-Jan-00
29-May-00
9-Jan-00
28-Jan-00 16-Dec-02
an-00
-00
-Jan-00
29-May-00
9-Jan-00
28-Jan-00 16-Dec-02

30% 40% 50% 60%


Ru n n in g Id le BD PM Ru n n in g Id le BD PM Ru n n in g Id le PM BD Ru n n in g Id le PM

Comp# 3 Lifecycle from January onwards

30% 40% 50% 60%


PM Ru nn in g Id le BD Ru nn in g Id le BD Ru nn in g Id le BD PM Ru nn in g Id le PM Run nin g Id le bd PM Ru nn in g

Comp # 4 Lifecycle from january onwards

22-Jan-00
26-Jan-00
3-Jan-00 24-Dec-00

30% 40% 50% 60%


BD ru nn in g BD ru n nin g BD Ru nn in g BD Ru nn in g

Comp # 5 Lifecycle from january onwards


Comp # 5 Lifecycle from january onwards

13-Aug-00 18-Jan-00 5-Jun-02

30% 40% 50% 60%


ru nn in g id le BD ru n nin g id le BD ru n nin g id le PM Ru nn in g Id le PM Ru nn in g id le

Comp # 6 Lifecycle from january onwards

12-Apr-05 22-May-0012-Feb-00
30-Dec-9

30% 40% 50% 60%


Run nin g Id le PM BD Ru nn in g Id le BD Ru nn in g Id le BD PM Run nin g
bd PM Running idle PM Running
4.5 1 362.75 42.83 31.25 16.67

111 135 220 72 71 222 788

1 1 1 1
PM BD Run nin g Id le BD Ru nn in g

wards

7-Jan-00
10-Jan-00
11-Jan-00 29-Mar-01 20-Jan-00
31-Dec-99 1-Apr-01
7-Jan-00
10-Jan-00
11-Jan-00 29-Mar-01 20-Jan-00
31-Dec-99 1-Apr-01

60% 70% 80% 90%


BD Ru n n in g Id le PM Ru n n in g

ards

60% 70% 80% 90%


Run nin g Id le bd PM Ru nn in g id le PM Ru nn in g

ards

00 23-Jan-03 4-Jan-0

60% 70% 80% 90%


Ru nn in g

nwards
nwards

un-02 11-Mar-00
21-Jan-00 24-Aug-01 20-Mar-00
24-Jan-00
26-M

60% 70% 80% 90%


Id le PM Ru nn in g id le

ards

22-May-0012-Feb-00
30-Dec-99 26-Aug-00 8-Mar-00
3-Jan-00 23-Dec-00 11-Jun-0010-Jan-00
9-Jan-00 24-Sep

60% 70% 80% 90%


BD PM Run nin g
788

1 1

00
-99 1-Apr-01
00
-99 1-Apr-01

90% 100%

90% 100%

4-Jan-003-Jun-00

90% 100%
20-Mar-00
24-Jan-00
26-May-00
15-Jan-00

90% 100%

11-Jun-0010-Jan-00
9-Jan-00 24-Sep-00

90% 100%
Shift Incharge/ Shift
Date Shift Technician System(Air or Water) Equipment

11-Mar-10 A Vendan Air comp 3

12-Mar-10 C Prashant Air Dryer#2

14-Mar-10 B Subhashish Air comp 3

16-Mar-10 C Vendan Air comp 3


21-Mar-10 B Amit Air Comp 1

22-Mar-10 A Subhashish Air Comp 2

24-Mar-10 A Amit Air Comp 1

27-Mar-10 B Subhashish Air Comp 4

28-Mar-10 B Pratick Rai Air All Running Compressor

28-Mar-10 C Subhashish Air comp 3

28-Mar-10 C Subhashish Air Comp 4

30-Mar-10 B Pratick Rai Air Comp 1

31-Mar-10 A Venkat/Saket Air comp 4

Air comp 1

31-Mar-10 B Pratick Rai Air Comp 2

10-Apr-10 B Venkat Air comp 1

11-Apr-10 B Venkat Air comp 1

12-Apr-10 B Vendan Air comp 1

12-Apr-10 B Vendan Air comp 1

15-Apr-10 B Vendan Air comp 3

20-Apr-10 A Vendan Air comp 3


20-Apr-10 C Amit Air comp 3

24-Apr-10 C Venkat/Amit Air flowmeter

24-Apr-10 A Subhashish Air ADV

27-Apr-10 A Pratick Rai Air Comp 6

2-May-10 B Amit Air comp 1

4-May-10 C Pratick Rai Air comp 5

7-May-10 A Amit Air comp 4

Subhashish Air Comp 6

18-May-10 B Amit Air Comp 4

18-May-10 C Venkat/Sahoo Air Comp 4

20-May-10 C Venkat/Sahoo Air Comp 6

23-May-10 C Venkat/DDSahoo Air Comp 4

26-May-10 B Venkat/DDSahoo Air comp 5

4-Jun-10 A Pratick Rai/DDSahoo Air Dryer # 06

6-Jun-10 A Vendan Air Dryer # 01

22-Jun-10 B VENKAT Air COMP#1

24-Jun-10 A DD sahoo/Venkatesh Air Dryer # 6

28-Jun-10 C DD sahoo/Venkatesh Air Exhaust fan # 2

30-Jun-10 C DD sahoo/Venkatesh Air comp #4

30-Jun-10 C DD sahoo/Venkatesh Air comp #4

2-Jul-10 A Prashant Air Comp # 6

4-Jul-10 A Prashant Air Dryer # 5

4-Jul-10 C Pratick Rai Air Dryer # 5


4-Jul-10 B DD sahoo/Venkatesh Air Dryer # 5

5-Jul-10 C Pratick Rai Air dryer # 6

20-Jul-10 B E Vendan Air comp 2

30-Jul-10 C Subhashish Air dryer # 5

31-Jul-10 A E Vendan Air comp 1

30-Aug-10 B E Vendan Air Alumina Flowmeter

3-Sep-10 C Pratick Air Comp # 04

7-Sep-10 Air
B Subhashish Comp # 05

7-Sep-10 Air
B Subhashish Comp # 06
9-Sep-10 B Subhashish/ Praveen Air Comp # 01

9-Sep-10 Air
B Subhashish/ Praveen Comp # 05
15-Sep-10 A Praveen Air Dryer#3

22-Sep-10 C Pratick Air Comp # 05

22-Sep-10 C Pratick Air Comp # 05

22-Sep-10 A DDSahoo Air Comp # 06

A DDSahoo Air Comp # 05

Air
11-Oct-10 C Vinod Rathore Comp#3
12-Oct-10 B DD Sahoo Air Sec. Compressor
Air
15-Oct-10 A DDSAHOO Diesel Compressor

Air
17-Oct-10 A DDSAHOO Comp # 3

Air
17-Oct-10 A DDSAHOO Comp # 4
17-Oct-10 B Vinod Rathore Air Comp # 3

Air
18-Oct-10 A DDSAHOO Dryer # 5
Air
18-Oct-10 B Vinod Rathore AC#1

Air
20-Oct-10 B Pratick Rai/ Mayank Comp # 05
Air
20-Oct-10 C Praveen Comp#1 St-3 vib
20-Oct-10 C Praveen Air Comp#1

Air
22-Oct-10 C DDSAHOO dryer # 6
Air
23-Oct-10 A Vinod Rathore Comp#6

Air
23-Oct-10 A Vinod Rathore comp#5
24-Oct-10 B Praveen/Mayank Air comp#5
25-Oct-10 A Vinod Rathore Air dryer # 6

Air
25-Oct-10 B Praveen/Mayank comp#5
25-Oct-10 C DDSAHOO Air Comp # 3

Air
26-Oct-10 A Vinod Rathore dryer # 6

Air
27-Oct-10 C DDSAHOO Intercooler # 2, Comp # 5
27-Oct-10 A Vinod Rathore Air Comp#2 press.gauge

Air
28-Oct-10 C vinod/eshant comp#5

Air
31-Oct-10 C vinod/eshant comp#1
Air
4-Nov-10 A Praveen/Eshant comp#2

Air
7-Nov-10 C Praveen/Mayank Comp#4
Air
8-Nov-10 B DDSAHOO Comp#4
Air
9-Nov-10 B MAYANK/DDSAHOO Comp#5

Air
16-Nov-10 C DDSAHOO Comp # 3
Air
18-Nov-10 B Praveen Dryer#6

Air
26-Nov-10 A DDSAHOO Dryer # 6
Air
30-Nov-10 ESHANT/ MAYANK dryer#6
Air
1-Dec-10 B E Vendan dryer 1
Air
2-Dec-10 A ESHANT/ MAYANK Comp#5
3-Dec-10 A ESHANT/ MAYANK Air Comp#3

Air
3-Dec-10 A ESHANT/ MAYANK dryer 1

Air
3-Dec-10 A ESHANT/ MAYANK comp# 3
Air
4-Dec-10 B Praveen Comp#5
Air
4-Dec-10 B Praveen Comp#6

Air
5-Dec-10 A ESHANT/ MAYANK dryer 6

Air
5-Dec-10 B Praveen Comp#2

12-Dec-10 C ESHANT/ MAYANK Fire Alarm Feeder


12-Dec-10 C ESHANT/ MAYANK Air Comp#1,2,6

14-Dec-10 B DD Sahoo/Praveen Water CWP # 3

15-Dec-10 A Praveen Water CWP-1


18-Dec-10 C Praveen Water Cold Well and Hot Well

20-Dec-10 C Praveen Air Comp#4&5

20-Dec-10 C Praveen Air Comp#4


23-Dec-10 C Praveen Air Air Line
27-Dec-10 A ESHANT/ MAYANK Water HWP#2

28-Dec-10 C ESHANT/ MAYANK Water Cold header pressure

7-Jan-11 A Praveen Air Duplex filter of Comp#4


10-Jan-11 B ESHANT Air Manometric reading

11-Jan-11 C Praveen Air Duplex Filter


13-Jan-11 A ESHANT Air Manometric reading comp#1

13-Jan-11 B Vinod/Mayank Air Comp#1(Aftercooler)

13-Jan-11 C Praveen Air Comp#4


13-Jan-11 C Praveen Air Comp#2

14-Jan-11 A Mayank/Eshant Water HWP#4(CPH)


14-Jan-11 C DDSAHOO water CWP # 4,ACH
18-Jan-11 B Praveen water PPH,DW line
18-Jan-11 B Vinod/Mayank Air Comp#2(Aftercooler)
22-Jan-11 B DDSAHOO Air DRYER # 5

23-Jan-11 A Praveen Air Comp#2


23-Jan-11 A Praveen Air Comp#3

23-Jan-11 A Praveen Water DW unit at PPH


23-Jan-11 B DDSAHOO Water DW Unit # 1,MGF

23-Jan-11 C ESHANT Air comp#3


26-Jan-11 A Praveen Water Fire Line near PetCoke Area
26-Jan-11 A Praveen Water BO isolation gate v/v
26-Jan-11 A Praveen Water Unit#1 at PPH
Sec filter condition of Comp
26-Jan-11 A Praveen Air 1& 5

27-Jan-11 A DDSAHOO Water Water meter - Stores

27-Jan-11 A DDSAHOO Water Fire hydrant line

Feb-11
1-Feb-11 A DDSAHOO Air Comp#6,secondary filter
1-Feb-11 C Praveen Water MP-1 at FFPH
1-Feb-11 C Praveen Water CWP-1 at RPH
1-Feb-11 C Praveen Air Dryer-4

6-Feb-11 C Praveen Air Comp#5

7-Feb-11 C Praveen Water Flow meter

11-Feb-11 B DDSAHOO Water TP#3


9-Feb-11 A Mayank Water HWP#2

12-Feb-11 B DDSAHOO Water TP#4

13-Feb-11 B DDSAHOO Air Dryer # 1

19-Feb-11 A DDSAHOO Air Dryer # 5


20-Feb-11 A DDSAHOO Air Comp#5,aftercooler
20-Feb-11 B Praveen Water HWP#2 at RPH
22-Feb-11 B Praveen Water Outflow meter
25-Feb-11 C Praveen Water CWP#4

26-Feb-11 C Praveen Air Comp#5

28-Feb-11 A ESHANT Air Comp#4

Mar-11
3-Mar-11 A Vinod Water Water meter -FFPH& ACH

3-Mar-11 B DDSAHOO Air Comp # 1 & 2

3-Mar-11 B DDSAHOO Air Comp# 2

3-Mar-11 B DDSAHOO HFO HFO Line

4-Mar-11 A Vinod ADV Dryer01

5-Mar-11 A DDSAHOO Air Comp # 1


5-Mar-11 A DDSAHOO Water TP#4
6-Mar-11 A DDSAHOO Water Water meter- CPH
6-Mar-11 C Eshant Air Bridge software

9-Mar-11 A DDSAHOO Water CWP #2

11-Mar-11 A DDSAHOO Air Pipe line 2 inch

15-Mar-11 C DDSAHOO Fire Water Chamber # 7

21-Mar-11 A DDSAHOO Air Comp # 6


21-Mar-11 B MAYANK Air Dryer#5
21-Mar-11 B MAYANK WATER CWP#3
21-Mar-11 C Praveen Air Cooling Fan
22-Mar-11 B Vinod WATER AVGF
26-Mar-11 B DDSAHOO Water AVGF # 1
24-Mar-11 A MAYANK Water Dosing chemical at PPH

25-Mar-11 C ESHANT Water Cooling Tower


26-Mar-11 G Praveen Air Comp#3
26-Mar-11 C ESHANT Water CPH-WATER METER
28-Mar-11 A MAYANK Air Comp#3
29-Mar-11 A DDSAHOO Water Water meter
31-Mar-11 A DDSAHOO Water dewatering pump swuitch

31-Mar-11 B ESHANT Air Comp# 2,


April-11

2-Apr-11 B DDSAHOO Water PPH,Mass flow meter

4-Apr-11 B ESHANT Air Comp#5


6-Apr-11 A Praveen Air Diesel Comp
6-Apr-11 A Praveen Water Chemical Dosing point
6-Apr-11 B Mayank Water MP#3
6-Apr-11 B Mayank Air Comp#2 stg 2 temp
11-Apr-11 A Vinod AIR Dryer#1
16-Apr-11 B Praveen Water Steam line

16-Apr-11 B Praveen Water Steam line

17-Apr-11 B DDSAHOO Water JP # 2, Panel & switch

21-Apr-11 A DDSAHOO Water HWP # 1


23-Apr-11 A Praveen Others Roof of filter house
22-Apr-11 C Mayank Air Diesel Comp

24-Apr-11 B DDSAHOO Air Comp # 6

24-Apr-11 B DDSAHOO Air Comp # 6


29-Apr-11 B Mayank Water TP#1
Problem / Observation Suggestions
stg 2 vib. Stepped up by 0.05; Condensate drain & air
tap valve were opened/inspected. Also high manometer Secondary filter to be changed
reading

Auto Drain valve not working not even in manual mode Needs overhauling/repairing

Oil leakage from MOP end Need to be arrested

Stg 3 vib. Values fluctuating heavily. Suspecting probe malfuction


Motor winding temperature high alarm Cooling fan placed
Wire mesh to be changed for
Motor winding temperature high alarm (point 3) 118 c the fan as the mesh size is very
small

Motor winding temperature high alarm (point 3) 119 c Cooling fan placed

Cooling fan placed with good


Motor winding temperature high
gap quality wire mesh fixing
Winding temperature for all running compressor
Cooling fan placed
reading on scanner is showing high (above100 c)

Stg 3 vib. Values fluctuating heavily. Suspecting probe malfuction

Inlet valve malfunctioning Suspecting invet valve stucking

Cooling fan placed &


Motor NDE bearing temperature high (85.6 c)
changeover comp.

temperature transmittter after dryer not working needs reparing

scanner not working and not showing any display needs reparing

Cold water supply line (newly installed) - First inlet If at all flow reduces, check the
valve lock not properly working position of the valve
Driving end temperature above 80 put pedestal fan on comp #1

Driving end temperature above 81

Motor bearing temp (NDE) reading showing "open" at Inspection for any loose
scanner connection
Inspection of vibration
Stg 2 vib.reading shows spikes even when the m/c was
transmitter system / Gap
not running
voltage checking

No reading in stg 3 during manual rotation Discontinuity suspected

Stg 2 temp. showing -ve values RTD suspected malfunctiong


4-20 mA supply was
Stg 2 temp. now showing normal value disconnected from the
communication card
intimatede to switch yard and
flow meter for comp no #6 not working
mail sent

RHS, ADV not working in Dryer 06 Maintenance to be done

Inlet valve stuck @ 45% Maintenance to be done

Low oil level in Oil tank Oil Topup required

Stage 1 vibration increase (0.67 to 0.81 mils) Suspecting vibration probe

Low instrument line pressure FRL to be cleaned/change


Motor winding temperature high alarm point all ,
Cooling fan placed
110degc

Oil temp. high Monitor till alarm

Oil temp. high Monitor till alarm

stage 2 vibration gradually increasing Monitor till alarm

Oil temp. high Monitor till alarm

stage 2 water droplets are falling

H1 alarm Monitor till alarm

Pressure reset. Still there was


alarm. Compressor stopped.
FH alarm
Strainer cleaned; Condensate
drained & alarm reset

winding temperature no 3 of comp #1 is 113.4 RTD suspected malfunctiong

Alarm coming "A1" in dryer panel and value was 15 it is kept in H2 mode

moving very slow

low oil temp alarm at 2:21 am during stand by mode.

Low oil pressure trip in comp # 4 , differential oil


pressure showing zero, POP was running but no oil
flow.

temperature transmittter before dryer not working intimated to switch yard

Readings not displayed, supply not coming intimated to switch yard

F 1 alarm intimated to switch yard


Alarm coming on blue colour(right one) auto drain
valve.observed that moisture not drained because of
drain pipe jammed.

H1 alarm coming

3rd stage Vib. Stepped up from 0.65 to 0.68

H1 alarm coming

Stg 2 vibration fluctuating even in standby mode

Newly installed flowmeter display malfunctioning

Comp # 04 manometer not working

Oil leakage from MOP suction side 1/2" ball valve


Alarm in right side ADV for dryer # 06, moisture not
getting drained in Auto mode ADV need to be changed
04 nos secondary filter found damaged need to be changed
Stage III - impellar polygon and pinion shaft polygon
found damaged while dismantling by service Engineer Need to corrected while
(IR) balancing
Water droplets are coming at the discharge line.

Stage 2 temp. found high (114 F)

Stage 3 vibration increase (0.35 to 0.51)


Petestrial fan shifting near
DE bearing temperature high. (77 C) comp # 06

Water drops from inlet air line to 2nd stage.


Stage 3 vibration increase (0.45 to 0.57) under starting
decreasing
V-belt loose outer side(Alumina Handling side)
Informed to Mr.Amit choudhury
Window side engine base corner(both) found crack. Immediately.

3rd stage vibration raises from 0.50 to 0.57 mils Informed to Amit sir,subhashis
suddenly sir,nagesh sir,pratick sir.

Informed to Amit sir,subhashis


Bypass valve gasket damaged and heavy air leakage. sir,nagesh sir,pratick sir.
3rd stage vibration running b/w 0.56 to 0.58 mils
Most of the time dew Point temp. raising to 5degree
centigrade. Informed to P nagesh Sir
2nd stage average. vib. Value raise from shift to shift Informed to P nagesh Sir

Air leakage in back side of intercooler # 02 Bolt to be tightning


Vib increased frm 0.3 to 0.35 mils,ma be bcoz of flow
change from 1870 to 2011 Nm3/hr Informed via sms to all
Sec. filter checked some of them found damaged. Informed via sms to all

H1 alarm coming Informed via sms

dryer inlet temp gauge not working informed to swith yard

stage 3 vibration increased from 0.25 to .40


stage 3 vibration shoot up from .36 to .60 Informed via sms.
dew point temp. increasing 4 to 13 informed to subhashish sir
informed to subhashish sir &
Water coming out of the header may be tube damaged. nagesh sir
LED not glowing during stand by Informed via sms.
H1 alarm coming temp increasing upto 20degree
Centigrade informed to subhashish sir

After box up , also water leakage from moisture header Informed via sms.
Before Dryer press. Gauge not working informed to subhashish sir

Water drop coming out of the header. nagesh sir

manometric reading reaches to 9" at shift end


ADV removed (as per nagesh
stage 2 vib. Inc. from 0.15 to 0.45 sir)

Gasket damaged of By Pass v/v To be changed


Gasket damaged of By Pass v/v ,air leakage minor ,can
be tolerated. Informed to Amit Sir

POP is not running but LED showing POP running. Informed to Amit Sir.

informed by sms to nagesh,amit


manometer reading high showing 8.0 & subhashis sir.
When DPT increases it was found that water outlet flow Strainer and Water regulating
reduces. v/v to be checked.

Ice coming from discharge moisture Intimated to all.

dew point temp. increasing 2 to 16 ( A1 alarm)


DECEMBER

FH alarm

Before dryer pressure gauge not working.


Main water header line leakage at various points.

F1 alarm from Dryer#1

Pri. & sec. filter must be


MANOMETER reading upto 10.5" checked for choking
To be changed when
Direction of filter installed is wrong compressor stops
To be changed when
Direction of filter installed is wrong compressor stops

A1 alarm coming, ADV drained for 15 min(few times)

MANOMETER reading upto 10.5 inchWC Sec filter to be changed


Fire alarm coming from zone-2 & zone-3 but no fire Feeder to be checked by
when inspected personally. switchyard and reset.
"Control Supply On" LED is not glowing.

Discharge valve is not ok abut can run at present.

Vibration and noise coming


Not Working

Both running in Max. load most of the time.

Motor Current drawn 73.9 A


Bulker line given from Pot Room
Impeller rotating in reverse direction.

Cold header pressure down to 1.94 from 2.12@RPH

JANUARY--2011

Change over to be taken at


Value reached 0.68 0.75
secondary filter running hrs
comp#4 & 5 reading high more than 1000

Change over to be taken at


Comp#4: Reading is 0.7 mmWC 0.75
Abnormal i.e. 0.6 MANOMETER to be changed
Minor leakage on hot and cold ends(suction &
Discharge)
Sec filter poor condition heavy suction felt during filter
change. To be changed
Minor Air leakage from the inlet of A/C joint. Gasket to be checked.
pipe to be cut & shortened at
Drop-by-drop leakage from NDE side of cooling pipe. NDE side.
pump ,NDE, slidely temp. high.
Pin Hole found To be welded
Minor leakage on hot ends(suction )
FH alarm & ice particle formation. informed to Subhashis.
One of the Sec. Filter found tilted towards the suction
side. To be replaced
One of the Sec. Filter's fins found distorted. To be replaced
Both units found online in morning at present turned To be careful regarding unit
unit-2 off online
Water leakage from pressure gauge of MGF Informed to vendan sir
secondary filter running hrs
more than 1000, (to be changed
Manometric reading comp#3 : 13.4 when comp stops)
Heavy Water Leakage To be arrested
Stucking problem To be arrested
Heavy Water Leakage To be arrested
Good Quality Filters to be
Deteriorating started from top and bottom side. Installed.

Water meter filled with water & no reading To be checked & corrected
Water leakage from Fire hydrant line in GAP- 3
positions(Mr. Nitin,GAP) To be checked & corrected

Feb-11
Gap is there in filter. infomed to Amit Sir.
Noise from NDE bearing To be arrested
Vibration in Pump To be arrested
R to A ADV not working in Auto mode. To be replaced
Oil leakage from the End cover of the 2nd stage pinion
shaft. To be arrested

Not showing any values. To be arrested

TP#2 found stand by & only TP # 4 running, Pressure Immediate informed to


drop at around 6:35 pm, TP # 3 motor temp. found high. E.vendan Sir & TP # 2 started.
Noise from DE of pump@ rph. Informed to Vendan sir.

Motor temp. high Informed to vendan Sir.


Informed to Amit Sir, Switched
FH & F1 alarm coming at 4:35 pm off as per SOP.

Oil leakage & bad smell coming from Dryer # 5 Informed to Amit Sir.
Icing from moisture discharge valve. Informed to Amit Sir.
Noise coming from DE side of the pump To be arrested
No Display To be arrested
Water droplets coming from the drain v/v. To be arrested
Oil leakage from the End cover of the 2nd stage pinion
shaft. To be arrested
POP Running but oil press showing 0 kg/cm2 on
SCADA

Mar-11
Not Working To be arrested
Aftercooler, inlet air pipe gasket leakage,Comp # 1 To be rectified when equipemt
more than Comp#2. will be stopped.

DE Temperature - 80.1 degree Celcius, alarm coming, To be observed periodically, fan


pedestal fan shifted from Comp # 5 to Comp # 2. to be run.
HFO line leakage at Cast House valve gland leakage
may be)as HFO dropped near valve. Informed to Pratick Sir.

Not working in Aoto/manual Dismantal and maint.


Informedto Subhahshis sir &
Second stage vibration incresing gradually. nagesh Sir
Found stopped & started after talking with Pratick Sir Informed to Pratick Sir.
Water meter not working Informed to Pratick Sir.
not working
Water droplets coming from the drain v/v after suction
valve of pump. Informed to Pratick Sir.
heavy air leakage near elbow ,2 inch air pipe at gate
no.-2, stone crusher area. Informed to Amit Sir

Chamber filled with water found Informed to Pratick Sir.

Bypass valve gasket leakage found. Informed to Amit Sir.


Water leakage from strainer. Informed to Amit Sir.
Leakage from inlet valve drain Informed to Pratick Sir.
Kept near exit door To be removed
manual valve leakage change gasket
Valve gasket leakage Informed to Pratick sir.
Chemical stock for dosing pump is empty. Stock to be renewed
Cooling tower chamber was full of water due to strainer
chocking strainer cleaning done
Air lkg from 2nd stage outlet. To be arrested
make up done but meter showing same reading To be arrested
comp#3 before dryer pr. Gauge not working.
Water meter not working @ CPH Informed to Pratick Sir.
stop switch not working Informed to Pratick Sir.
to be rectified when comp.
medium vibration in M.O.P suction line stops
April-11

Totalizer mass flow indicator not working &also checked


by Switchyad(Mr.Abhinav) & found it is malfunctioned. Informed to Pratick Rai.
minor air leakage from before dryer pressure gauge to be arrested when
suply connection compressor stops
Slide Rail damage To be arrested
Screen dislocated To be properly placed
Gland leakage found To be arrested
Display not clear to be replaced
after dryer temp. display not working properly
Pin hole in Steam line to ACH To be welded
Steam drain valve to be
Minor leakage from steam valve. replaced.
Abnormal sound coming from electrical Panel &
stopping switch not working. Informed to switchyard
HWP # 1 started at CPH,but suction valve found closed, Immediate suction valve
due to this casing temp. high & hot water lable was opened & informed to amit sir &
high. pratick sir
One green color roof top has left its seat. To be arrested
belt drive displaced to be replaced
informed to amit sir. &
DE bearing temp. high & alarm coming switchyard
informed to amit sir. &
DE bearing temp. high(80.1 celcius) & alarm coming switchyard
Suction v/v wheel missing New wheel to be installed
Status on .
Remarks

done by Roshan close

oil leakage arrested close

Informed to Switchyard close

Informed to Switchyard

Informed to Switchyard

Informed to Switchyard

Informed to ACH
close
Incharge
Informed to ACH
close
Incharge

Informed to Switchyard,
close
ACH incharge & HOD

informed to switch yard


& rectified
Kept at 50% opening tied
with wire
close

informed to switch yard close

informed to switch yard

informed to switch yard

Informed to Mr. Abhishek

Informed switchyard
Done by Roshan close

less moisture
accumulation observed
unless working fine.
Comp 06 stop for inlet
close
valve mainteanance
Oil Topup done Qty- 110
close
lts
Comp # 05 stop for
close
checking
New FRL installed close

Informed to Switchyard

Informed to ACH
close
Incharge
Informed to ACH
close
Incharge
Informed to ACH
close
Incharge
close
Informed to ACH
Incharge
Informed to ACH
close
Incharge

Informed to ACH
close
Incharge

Informed to ACH
Incharge
Informed to ACH
close
Incharge
informed to switchyard ( it is not running)
informed to ACH
close
incharge.

informed to A- shift
close
incharge

informed to switch yard close

Informed to ACH
close
Incharge
MCCB replaced close
Informed to Prashant sir
& manual drain done & close
pipe jamming rectified
Informed to ACH
close
incharge
2nd intercooler
Close(running
condensate drain union
0.49)
opened.
sensor for ADV need to
close
be checked
Informed Incharge &
close
Switchyard team
Informed Incharge &
close
Switchyard team
Cheked water of
manometer or replace
POP switched off and
close
applied M-seal

close
Changed on 08.09.10
Closed(done)

close

close
Water flow increasing of
comp # 05 & also
close
informed to utilities &
compressor incharge
informed to utilities &
close
compressor incharge
close
Informed to switchyard
informed to utilities &
close
compressor incharge
close
informed incharge
close
Informed to utility
close
Incharge also.

Running
Informed to utility
Presently 0.57
Incharge also.

Informed to utility Close(done)


Incharge also.
Informed to nagesh sir, close

close
Informed to P nagesh Sir
close
Informed to P nagesh Sir
Bolt tight & leakage
close
arrested

close

close
Dew point temp. brought
down to 2 degree close
Centigrade.
informed to subhashish
close
sir
Informed to P nagesh
close
Sir, subhashish sir,
informed to deptt. close

close

Informed via sms.

close

open
Informed via sms.
open
Informed via sms.
(Nagesh sir,Sibhashish close
sir)
closed:
Secondary filter
changed

close

Informed to Amit
Close: Gasket is
Sir,Subhashish Sir and
changed
Nagesh Sir.
Close: Gasket is
changed
Informed to
switchyard
Closed:
Secondary filter
changed
Informed to nagesh sir, Condensate valve
amit Sir regulate
Moisture drain in
every 15 min
informed to subhashish Service enng.
sir Called
Maintenance
required
Informed to subhashish
Informed to switch
Informed to Amit sir. yard
Informed to Vendan sir. Close
Maintenance
done & it is ok
Informed to Amit sir. now

Close: Secondary
filter change
Informed to Amit sir.

Close
Informed to Amit sir.

Close
Informed to Amit sir.
Informed to subhashish Service enng.
Sir. Called

Close: Secondary
Informed via SMS to
filter change
concerned.
Informed to
Open
switchyard(Bibhasis) .
Informed to switchyard . Open
Informed to EZHIL
Vendan,Praveen,Pratick
sir.
Informed to EZHIL
Vendan,Pratick
Informed to concerns
Close: impellar is
Informed o Amit Sir & new & inform to
Subhashish Sir. switch yard
Close: impellar is
Informed to Amit Sir new & inform to
&Subhashish Sir. switch yard
Informed to Amit Sir. Confirmed
Informed to Vendan Sir. Close
Informed via sms to
Close
dept.

Close: online
change over is to
be done after it
values beyond
Indformed to Amit Sir. 0.85
Close: Secondary
filter change
Indformed to Amit Sir.
Close: online
change over is to
be done after it
values beyond
Indformed to Amit Sir. 0.85
Indformed to Amit Sir. Closed
Closed
Indformed to Amit Sir.

Closed
Informed to Concerned
Informed to Concerned

Close
Informed to Pratick sir.
Informed to Vendan Sir
Informed to Vendan Sir Close
Indformed to Amit Sir. Closed
Indformed to Amit Sir.

Closed
Informed to concerned
Informed to concerned Closed

Informed to Vendan Sir


Informed to vendan sir
(SEC. FILTER
CHANGED)
Informed to Amit Sir. Closed
Informed to Vendan Sir Closed
Informed to Vendan Sir
Informed to Vendan Sir Closed
Informed to Amit Sir and
Subhashish Sir.

Closed
Informed to E.vendan Sir

Informed to E.vendan Sir

infomed to Amit Sir.


Informed to Vendan Sir
Informed to Vendan Sir
infomed to Amit Sir.

Informed to concerned
Closed: Now
Informed to Vendan Sir showing readings
Informed to Vendan Sir
& checked by E. vendan
Sir.
Informed to Vendan sir/
pratick sir

Closed
Informed to vendan Sir.

Informed to Amit Sir.


Dryer# 5 switched
Informed to Amit Sir. off.
Informed to Amit Sir.
Informed to Amit Sir.
Informed to Amit Sir.
Informed to Amit Sir.

Informed to Amit Sir.

Informed to Amit Sir.

Informed to Subhashis
Leakge
Sir,

pedestal fan
Informed to Nagesh Sir
running.
& Subhashis Sir.

Informed to Pratick Sir.


Informed to subhashish
sir
Informedto Subhahshis
sir & nagesh Sir
Informed to Pratick Sir.
Informed to Pratick Sir.
Closed

Informed to Pratick Sir.

Informed to Amit Sir

Informed to Pratick Sir.

Informed to Amit Sir.


Informed to Amit Sir.
Informed to Pratick Sir.

inform to pratick
Informed to Pratick sir.
Informed to Pratick sir.

Closed
Informed to Pratick sir.
Informed to concerned.
Informed to Pratick sir. open
Informed to Amit sir.
Informed to Pratick Sir.
Informed to Pratick Sir.

open
Informed to amit Sir.

Informed to Pratick Rai.

open
Informed to Amit Sir.
Informed to concerned

Informed to Pratick sir.


Informed to amit sir.
inform to switch yard
Informed to concerned.

Informed to concerned.

Informed to Pratick sir.

informed to amit sir &


pratick sir
Informed to Concerned
Informed to amit sir

Informed to Pratick Sir.


Parameters Unit
Compressor # 1
Sl No 09.12.09 06.07.10
1 pH 7.32 7.938
2 Conductivity µs/cm 271.5 122.5
3 Dissolve Solid ppm 133 60
4 Suspended Solid ppm 10 5
5 Total Fe ppm 0.04 0.16

Parameters Unit
Compressor # 2

Sl No 25.11.09
1 pH 6.312
2 Conductivity µs/cm 829.0
3 Dissolve Solid ppm 406.0
4 Suspended Solid ppm
5 Total Fe ppm 0.95

Parameters Unit
Compressor # 3

Sl No 25.11.09 06.07.10
1 pH 6.082 6.828
2 Conductivity µs/cm 827.0 183.4
3 Dissolve Solid ppm 405.0 90.0
4 Suspended Solid ppm 2.0
5 Total Fe ppm 0.85 0.09

Parameters Unit
Compressor # 4

Sl No
1 pH
2 Conductivity µs/cm
3 Dissolve Solid ppm
4 Suspended Solid ppm
5 Total Fe ppm

Parameters Unit
Compressor # 5

Sl No 26.05.10 08.07.10
1 pH 7.240 7.740
2 Conductivity µs/cm 94.7 101.7
3 Dissolve Solid ppm 46.0 50.0
4 Suspended Solid ppm 11.0 6.0
5 Total Fe ppm 0.29 0.11

Parameters Unit
Compressor # 6

Sl No 16.12.09 06.07.10
1 pH 5.258 7.646
2 Conductivity µs/cm 509.0 124.6
3 Dissolve Solid ppm 249.0 61.0
4 Suspended Solid ppm 10.0 3.0
5 Total Fe ppm 0.32 0.09
Parameters Unit
Compressor # 1
Sl No 09.12.09 24.12.09 05.01.10
1 pH 8.009 6.933 8.167
2 Conductivity µs/cm 92.8 93.1 502.0
3 Dissolve Solid ppm 45.0 46.0 246.0
4 Suspended Solid ppm 12.0 14.0 15.0
5 Total Fe ppm 0.04 0.59 0.19

Parameters Unit
Compressor # 2

Sl No 25.11.09 05.01.10 26.05.10


1 pH 6.109 6.160 6.690
2 Conductivity µs/cm 827.0 112.2 47.1
3 Dissolve Solid ppm 405.0 55.0 23.0
4 Suspended Solid ppm 6.0 5.0
5 Total Fe ppm 0.69 0.02 0.39

Parameters Unit
Compressor # 3

Sl No 25.11.09 06.04.10 10.05.10


1 pH 5.832 7.005 7.270
2 Conductivity µs/cm 825.0 139.0 71.5
3 Dissolve Solid ppm 404.0 68.0 35.0
4 Suspended Solid ppm 4.0 4.0
5 Total Fe ppm 0.69 0.04 0.02

Parameters Unit
Compressor # 4

Sl No
1 pH
2 Conductivity µs/cm
3 Dissolve Solid ppm
4 Suspended Solid ppm
5 Total Fe ppm

Parameters Unit
Compressor # 5

Sl No
1 pH
2 Conductivity µs/cm
3 Dissolve Solid ppm
4 Suspended Solid ppm
5 Total Fe ppm

Parameters Unit
Compressor # 6

Sl No 16.12.09 14.01.10 16.03.10


1 pH 7.549 5.972 7.458
2 Conductivity µs/cm 95.3 224.8 169.8
3 Dissolve Solid ppm 47.0 110.0 83.0
4 Suspended Solid ppm 3.0 5.0 9.0
5 Total Fe ppm 0.03 0.17 0.28
03.02.10 10.05.10 26.05.10 08.07.10
6.249 7.530 6.300 7.988
142.5 125.9 45.0 122.4
70.0 62.0 22.0 60
7.0 5.0 2.0 2.0
0.09 0.02 0.02 0.16

06.07.10
7.864
122.7
60.0
3.0
0.02

08.07.10
7.475
95.3
44.0
5.0
0.12

06.04.10 10.05.10 26.05.10 06.07.10


6.703 6.600 6.050 7.056
209.3 206.7 47.7 72.3
103.0 101.0 23.0 35.0
15.0 22.0 5.0 2.0
0.94 0.46 0.02 0.25
Sl No Parameters Unit
Compressor # 1
09.12.09 24.12.09 05.01.10
1 pH 6.708 6.434 8.360
2 Conductivity µs/cm 704.0 121.7 351.0
3 Dissolve Solid ppm 345.0 60.0 172.0
4 Suspended Solid ppm 35.0 24.0 8.0
5 Total Fe ppm 0.05 0.24 0.54

Parameters Unit
Compressor # 2

Sl No 25.11.09 05.01.10 06.04.10


1 pH 5.778 5.770 7.170
2 Conductivity µs/cm 835.0 94.7 138.1
3 Dissolve Solid ppm 409.0 46.0 68.0
4 Suspended Solid ppm 5.0 13.0
5 Total Fe ppm 0.74 0.17 0.13

Parameters Unit
Compressor # 3

Sl No 25.11.09 06.04.10 10.05.10


1 pH 5.672 7.249 7.070
2 Conductivity µs/cm 831.0 58.5 50.7
3 Dissolve Solid ppm 407.0 29.0 25.0
4 Suspended Solid ppm 10.0 5.0
5 Total Fe ppm 0.85 0.09 0.02

Parameters Unit
Compressor # 4

Sl No
1 pH
2 Conductivity µs/cm
3 Dissolve Solid ppm
4 Suspended Solid ppm
5 Total Fe ppm

Parameters Unit
Compressor # 5

Sl No 26.05.10 08.07.10
1 pH 7.240 7.740
2 Conductivity µs/cm 94.7 101.7
3 Dissolve Solid ppm 46.0 50.0
4 Suspended Solid ppm 11.0 6.0
5 Total Fe ppm 0.29 0.11

Parameters Unit
Compressor # 6

Sl No 16.12.09 14.01.10 16.03.10


1 pH 7.646 6.760 7.353
2 Conductivity µs/cm 74.3 57.4 154.5
3 Dissolve Solid ppm 36.0 28.0 76.0
4 Suspended Solid ppm 3.0 2.0 6.0
5 Total Fe ppm 0.02 0.02 0.20
03.02.10 10.05.10 08.07.10
5.980 7.530 8.115
90.5 125.9 214.9
44.0 62.0 105.0
5.0 5.0 5.0
0.15 0.02 0.06

10.05.10 26.05.10 06.07.10


7.470 6.100 7.795
145.9 70.5 217.5
71.0 35.0 107.0
5.0 4.0 12.0
0.02 0.06 0.35

08.07.10
7.750
145.9
72.0
2.0
0.09

06.04.10 10.05.10 08.07.10


7.291 6.440 7.755
78.6 306.0 118.7
39.0 150.0 58.0
17.0 22.0 5.0
0.19 0.21 0.17