ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Doc No: DTP/BBAS/EDC/51505/0001 Rev. 1.0 18/11/2009 1 General 1. Government requirement stated as follows; 1a). Reference to minutes of meeting on Existing KTMB Communication Systems refer KTMBs letter Ref.: Bil (31)dlm.KTMB/PMD/PRO/DTP/IPPB001-SYS3 dated 26/6/09. Item 3a, response (a) that the required interfacing information was not necessary and MGJV to submit its proposal. No change to submission. 1b). Please refer to response given in 1a) above. No change to submission Reviewer: MNY Comments Supervisor Initial: Responses Status

a)

SON 2.29 Provision of Stations & Halts Automation System and CCTV system to control and monitor equipment installed all stations and halts within the project site. The system shall be fully compatible, and to be interfaced and integrated with the KTM Bhds systems installed under the Rawang Ipoh project. SON 7.1 (j) Interfacing and integration of CCTV system to be provided within project site for stations, halts and tunnels with the KTMBs CCTV system installed under Rawang-Ipoh project. It includes modifying and upgrading of the existing equipment.

b)

Please clarify the proposal meet the above government requirement. 2. Is operator of proposed new CCTV/SCADA workstations at CTC-North and CTC-Sentral able to view and monitor video Page 1 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected

2. No. Please refer to response given to 1a) above No change to submission

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments image and SCADA status of RIDT sites? 3. The proposal shall include room layout drawing of CCTV and SCADA systems equipment at CTC-North, CTC Sentral and remote sites installed at project site. 4. Please clarify how the video image and SCADA status can be stored at both CTCs after retrieving the image and data from remote sites. Supervisor Initial: Responses 3. Equipment layout plan will be provided in the Detail Design. No change to submission. 4. Archiving of the recorded video footage:- Use the video export function to export selected video footage for archiving in CD or other storage media. Archiving the recorded alarm event:- Select the alarm event by time duration or type, create the alarm report in CSV or RTF format, save in folder or printout for filing. Submission will be amended. 2 3.1 System Overview Page 7 of 34, para 2: The operator at CTC North and CTC Sentral shall be able to view real-time image and recorded video of tunnels. Page 8 of 34: 1. 2nd & 3rd para: Please confirm that with CTC Sentral as master and CTC North as back-up or vice verse, both CTCs will be able to acknowledge of any triggered alarm. Page 2 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected 1. Only Master CTC is able to acknowledge any triggered alarm. Slave CTC can only monitor status, any acknowledged alarms will be updated Yes, both CTC operators are able to live view and playback recorded video of tunnel CCTV camera supplied under communication package. No change to submission. 3 3.2 CTC Control Centre Operation Concept Status

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments 2. Please clarify why servers are not required for CCTV and Station SCADA system? Supervisor Initial: Responses on Slave CTC display. Either CTC can be Master or Slave, with their status being set by password control. Submission will be amended. 2. Being a decentralised and fully integrated IP video and alarm system, video server will be provided at local stations for video and alarm events recording. Thus, servers are not required at CTCs in this case. CTCs can stream back the video and alarm events from any selected station for display. No change to submission. 3. Yes, total of up to 16 of any selected cameras from station & tunnel can be display in a single video window. No change to submission. Page 9 of 34: 1. Yes, the camera is configurable for this function. Page 3 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected Status

3. Bullets: Please confirm that viewing of image of combination of any station(s) and tunnels up to 16 selected cameras is viable in a single video window. Page 9 of 34: 1. Camera control: Is PTZ camera is capable to return to preset position? 2. SCADA alarm & signal (1st bullet): We believe it should be referring to outgoing MCB for Signalling instead of UPS. Please confirm.

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments Supervisor Initial: Responses No change to submission. 2. Yes, should be MCB for Signalling. Submission will be amended. 4 4.1 Overview Item (f): The system shall be integrated with existing KTMB system instead of extension. Please refer to response on item 1a). No change to submission. Yes, both CTC operators are able to live view and playback recorded video of tunnel CCTV camera supplied under communication package. No change to submission. 6 4.3 Main Equipment The printer at CTC-North and CTC-Sentral should be 2 units at each location (report printer and alarm printer) and able to print out image video. 1. Workstations equipment shall be duplicated, operating in hot standby, dual redundant mode (refer to governments technical specification Clause 6.2.1 (a)). 2. Is interfacing between master clock and CCTV workstation Page 4 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected Only one printer is proposed for video image and report printing. No change to submission. 1. Both main and redundant workstations can be configured to be always online mode and prepare to take over the control when one of the workstation is down. No change to submission. Status

4.2 System Configuration

1st bullet: CTC operator shall be able to view real-time image of the tunnels.

4.3.1 CTC-North and 4.3.2 CTC-Sentral

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments directly or via other equipment? Supervisor Initial: Responses 2. Interfacing will be via TCP/IP network connection. No change to submission. 8 4.3.2 CTC-Sentral 1. 2 para: Should be referring to wall display in CTC Sentral. 2. Last para: Reuse of existing video wall display is not accepted. If new video wall display really cannot be installed due to space constrain, the existing video wall display should be dismantle and replace with new one (subject to KTMB acceptance on dismantling of existing video wall display). 3. Power to equipment shall be taken from UPS.
nd

Status

1. Yes. Submission will be amended. 2. A decision on whether to replace the existing video wall used for CCTV will be taken at the detail design stage, after taking into consideration the final CTC Sentral layout. No change to submission. 3. Power to equipment shall be from UPS. Submission will be amended.

4.4 CCTV System at Major/Minor Stations and Halts

1. Minimum requirement of lighting lux level for good quality video image have to be specified.

1. As per camera specification stated : Appendix D for PTZ camera PAL, F1.4, 50 IRE 0.07 lux at 1/3 sec (color) 0.01 lux at 1/3 sec (mono)

Page 5 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments Supervisor Initial: Responses Appendix E for Fixed Camera PAL, 50IRE, F1.2 Day/Night: 0.5 lux color / 0.05 lux mono No change to submission. 2. Appendix A should be referred as Appendix 1. 2. Appendix A is correct. Submission will be amended. 3. a) Table2: the cameras have to be provided at carpark as stated in Communication Design Brief (1.7.1) document. b) Camera for carpark have to be reflected in single line diagram drawings 3. Indicative locations will be stated in the submission. Confirmation of the actual strategic locations where CCTV cameras will placed will be determined during the Detailed Design. Submission will be amended. 4. The digital video recorder shall have facilities to review image, alarm status and downloading of required information via computer terminal (eg: PC notebook) locally. 5. Discrepancy on the power supply to CCTV and SCADA equipment. In Power Supply and Rectifier Preliminary Design document shown that it will be derived from DC rectifier. Note: Some equipment required either AC & DC supply. Refer to 5.2.1 Page 6 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected 4. Yes, the facility will be provided. Submission will be amended. 5. Power is derived from the DC rectifier using a converter to convert DC to AC. Submission will be amended. Status

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments Supervisor Initial: Responses Status

10

4.4.1 CCTV Camera on Passenger Platform 4.4.7 Operation Station & Prai Control Building, 4.4.8 CCTV System in Berapit Tunnel and 4.5 CCTV System at Feeder Station / MPTSL /Tie Breaker

Is PTZ camera is capable to return to preset position?

Yes, the camera is configurable for this function. Please refer to equipment specification. No change to submission. 1. Refer to response on item 9.4. Submission will be amended. 2. Refer to response on item 9.5. Submission will be amended. 1. Appendix C is correct. Submission will be amended.

11

1. The digital video recorder shall have facilities to review image, alarm status and downloading of required information via computer terminal (eg: PC notebook) locally. 2. Power supply to RTU equipment (for 4.4.7) shall be taken from DC rectifier. 1. 1 para: Appendix C should be referred as Appendix 3. 2. 6th para: Discrepancy on the power supply to CCTV and SCADA equipment. In Power Supply and Rectifier Preliminary Design document shown that it will be derived from DC rectifier (applicable for major/minor station, Control Building and Operation Building). Note: Some equipment required either AC & DC supply. Refer to 5.2.1
st

12

4.6 Station Automation (SCADA) System at Remote Sites

2. Refer to response on item 9.5 above. For DC powered equipment, source input will be 240VAC. Submission will be amended. Yes, the camera is configurable for this function Submission will be amended.

13

4.7.2 PTZ camera

Is PTZ camera is capable to return to preset position? Page 7 of 10

Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item 14 15 16 Referenced Document 4.7 System Equipment and Functional Description 4.7.3 VFF Camera 4.7.5 Digital Video Recording System Reviewer: MNY Comments Please provide detail / functional description on the IR camera and its housing. The cameras have to be provided at carpark as stated in Communication Design Brief (1.7.1) document. Last para:: Discrepancy on the power supply to digital video recorder equipment. In Power Supply and Rectifier Preliminary Design document shown that it will be derived from DC rectifier (applicable for major/minor station and Control Building). Note: Some equipment required either AC & DC supply. Refer to 5.2.1 The maximum number of event can be recorded has to be specified in the event of communication failure from station to CTC-North and CTC-Sental. Supervisor Initial: Responses Description will be revised. Submission will be amended. Refer to response on item 9.3 Submission will be amended. Refer to response on item 9.5. Submission will be amended. Status

17

4.7.6 Remote Terminal Unit

Each stations Digital Video / SCADA Alarm Recording System can store up to 100,000 alarm events and during failure of the communication link from station to the CTC will not affect the recording of the video and alarm events within the particular station. Submission will be amended. 1. Will be included in the Appendix. Submission will be amended.

18

4.7.7 Video Cable

1. Types of fibre optic video cable and its specification (refer to Appendix 4) for tunnel application have to be specified. 2. Type of power cable for normal and tunnel application and its specifications (refer to Appendix 4) have to be specified. Page 8 of 10

Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments Supervisor Initial: Responses 2. Power cables are not considered major components of the system. Specifications will be provided in detail design. No change to submission. 19 20 Appendix 1 Drawing List Appendix 4 Equipment Specification Discrepancy on the drawing number between the list and drawings attached (refer item 2 to 19). 1. Please provide specification for IR camera and its enclosure. 2. Please provide power cable specification for normal and tunnel application. 3. The cross section view of proposed video, data, network and power cable shall be included. Discrepancy will be resolved Submission will be amended. 1. Will be added in Appendix. Submission will be amended. 2. Refer to response on item 18.2 No change to submission. 3. Shall be provided in the detail design stage. No change to submission. 21 Appendix 5 Environmental Specifications Drawings Compliance to technical standard for IR camera shall be included. 1. The FS/MPTSL/TSL sites and interfacing to master clock shall be included in overall block diagram. Page 9 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected Appendix will be amended to include compliance to technical standards. Submission will be amended. 22 1. Drawing will be amended Status

/opt/scribd/conversion/tmp/scratch3227/60604612.doc

(360541-U)

KONSORTIUM
KINTA SAMUDRA-EMENEA-TECHART

EMENEA PMC SDN BHD


(505091-K)

ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN IPOH - PADANG BESAR REVIEW SHEET
To: Submittal: MMC-GAMUDA JV SDN BHD UNOFFICIAL SUBMISSION OF PRELIMINARY DESIGN OF CCTV & STATION SCADA SYSTEM Date: 10 December 2009 DWG/SPEC/CALCS/OTHER (DOCUMENTS) Submittal Stage: Preliminary Our Ref.: Division/Discipline: DMS/SYSTEM Item Referenced Document Reviewer: MNY Comments 2. Normally open, normally close shown in single line diagram drawing does not tally with Appendix 3. 3. Input status for DB door is not included in the single line diagram. 4. CCTV number should be in sequence in single line diagram drawing. The location of cameras shown in station/halt/FS/MPTSL/TSL should be tallied with single line diagram drawing. Supervisor Initial: Responses Submission will be amended. 2. Drawing will be amended Submission will be amended. 3. Drawing will be amended Submission will be amended. 4. Drawing will be amended Submission will be amended. 23 2.3 References Reference No.1 should be referring to contract number between Government and MGJV. Will be amended to read Contract Requirements: Communications and Related Systems. Submission will be amended. Status

Page 10 of 10 Note : Status of Approval 1. 2. 3. 4. Approved Approved as Noted Revise and Resubmit Rejected