Operation of RB1M
An exclusive two-step gear train gives a 15:1 ratio between the chain wheel and the valve. Operation requires only pulling the chain on the wheel, which opens the valve almost instantaneously with respect to element rotation. The valve can be adjusted to bring the blowing media to the correct pressure through the set screw provided on the valve lever even while blowing. All surfaces can therefore be cleaned at optimum pressure and efficiency.
Contd...
The element rotation is normally clockwise, facing the boiler. Recommended speed is 2 rpm. The valve closes automatically at the end of the preset blowing arc. The blowing arc may be changed at any time by merely changing the cams on the main gear.
Operation of RB1E
The drive motor rotates the element, through the bull and pinion gearing, in a full 360 degree arc about its axial centerline. Rotation is normally clockwise at 1.25 rpm. Blowing medium admission is controlled mechanically through a cam operated valve in the head. It is shut off when the blowing sweep is completed. The blowers are designed for either individual operation or for use in a sequential system.
Contd...
selected cams mounted on the bull gear. The "Poppet" type valve is mechanically held open during the blowing cycle. The valve automatically
3
closes after completion of the blowing sweep. After initiation from a start signal, the model RB1E Rotary Blowers are automatically self-controlled.
4 5
The proper stop point is determined by limit switch, positively driven by the bull gear to eliminate the possibility of phase shifting between the blowing arc and rotary blowers stop position.
All the blowers are suitable for sequential operation. The blowers cut in, blow, cut out and bring the next blower in series. Only the first blower need be started.
Features
Blowing Pressure Easily Adjusted - Merely loosen lock nut (1) and turn set screw (2) in clockwise direction to increase blowing pressure. A pressure tap on the head permits installation of pressure gauge, so exact blowing pressure may be known.
Contd...
Merely add or remove cam segments (3) on main gear. No need to remove head
3
or cut new cams. Elements Easily Removed - Simple three step procedure. Element is
4 5
attached by means of four studs (4) and a flange (5). Remove bolts, lift head out, slide element out for inspection and/or replacement. No special tools required.
Main and Power Gears Covered - Final drive pinion is heat treated for maximum service. Head Construction - Valve heads and flanges are made of cast steel for maximum pressure of 54 kg/cm 2.
Contd...
Contd...
Advantages
1. Permits full blowing arc of 360. 2. Minimum number of moving parts for valve action 3. Adjustable pressure control is easily set for each blower to meet optimum individual blowing pressure requirements. Blower need not be stopped for this adjustment. 4. All the working parts readily accessible for maintenance.
Elements
The element material is carefully selected to suit the furnace temperature. The elements are to be supported by welded or clamped bearings, inside the boiler (By the Boiler maker).