DETAILS OF TRANSMISSION LINE TOWER

1. 400KV/220KV TOWERS:
Voltage Class & No. of Circuits
Tower Type

400KV DC

400KV SC

0.2

0.15

0.30

0.60

Total height above ground level in Mtr.

46.3

46.0

46.0

Height of Bottom cross arms in mtr.

26.3

22.3

Base width of Ground Lelvel

10.4

13.6

Angle of Deviation

200KV DC

0.2

0.15

0.30

0.60

46.0

31.0

31.0

31.0

22.3

22.3

26.3

22.3

14.6

14.6

8.1

10

200KV SC

0.2

0.15

0.30

0.60

0.2

0.15

0.30

0.60

31.0

32.8

32.6

33.0

33.1

27.4

27.0

27.4

27.9

22.3

22.3

22.3

17.5

14.9

14.9

17.6

14.9

14.9

14.1

10.1

10.7

5.95

8.5

9.9

10.6

4.2

6.6

6.8

8.1

Approximate Conductor spacing in Mtr.


Vertical

8.0

8.0

8.0

8.0

4.9

4.9

5.0

5.0

5.1

5.6

14.8

17.3

18.3

19.2

11.0

11.6

12.2

13.5

9.2

10.0

11.2

10.4

8.8

8.6

9.5

9.7

Normal Tower inclding stubs

9.0

1.5

18.0

23.0

6.0

8.5

9.5

12.6

3.4

5.3

6.2

7.6

2.8

2.8

3.9

4.6

Blot & Nuts

0.4

0.5

0.6

0.7

0.3

0.4

0.4

0.5

0.2

0.2

0.3

0.3

0.1

0.1

0.2

0.2

87.0 155.0

57.0 110.0

Horizantal

Approximate Tower Weight in MT

Approximate foundation volumes in CMT for normal & dry soil foundation
Earth Excavation

16.0 146.0 170.0 300.0

Cement Concrete

6.0

14.0

21.0

23.0

Reinforcement required in MT

0.4

0.6

1.1

2.6

40.0

56.0

32.0

48.0

28.0

30.0

36.0

58.0

4.1

7.0

9.5

16.5

3.6

5.4

6.8

10.9

3.8

4.0

4.8

7.0

0.6

12.0

2. 110KV & 66KV TOWERS:


Voltage Class & No. of Circuits

110KV DC

110KV SC

66KV DC

Tower Type

Angle of Deviation

0-2

0-15

0-30

0-60

0-2

0-15

0-30

0-60

Total height above ground level in Mtr.

24.5

24.7

26.6

24.9

21.5

21.5

21.6

Height of Bottom cross arms in mtr.

15.1

13.4

13.4

13.4

15.1

13.4

13.4

4.3

5.4

6.0

7.2

3.4

3.6

Vertical

3.2

3.2

3.2

3.3

3.2

Horizantal

6.0

6.0

6.8

8.8

5.6

2.0

3.2

3.3

4.7

0.05

0.1

0.1

0.2

Base width of Ground Lelvel

66KV SC

0-2

0-15

0-30

0-60

0-2

0-15

0-30 0-60

22.5

19.4

15.9

19.4

20.6

16.8

17.1

17.1

17.2

13.4

12.6

11.4

11.4

11.4

12.3

11.7

11.7

11.7

4.6

5.4

4.2

5.2

5.3

5.8

2.5

3.4

4.3

4.7

3.2

3.2

3.2

2.3

2.1

2.2

2.4

2.1

2.2

2.3

2.3

4.6

5.8

7.4

4.2

4.4

4.8

6.2

3.7

3.7

4.2

5.4

1.5

2.1

2.3

3.0

1.3

16

1.9

2.6

1.1

1.4

1.6

2.0

0.05

0.1

0.1

0.2

0.05

0.07

0.07

0.2

0.05

0.06

0.07

0.1

Approximate Conductor spacing in Mtr.

Approximate Tower Weight in MT


Normal Tower inclding stubs
Blot & Nuts

Approximate foundation volumes in CMT for normal & dry soil foundation
Earth Excavation

24.0

37.0

45.0

67.0

21.0

24.0

29.0

44.0

15.0

21.0

28.0

42.0

18.0

22.0

25.0

36.0

Cement Concrete

2.40

3.40

4.4

7.7

2.2

2.3

2.8

4.3

1.6

2.1

2.7

4.1

2.6

3.0

3.2

4.6

Reinforcement required in MT