Pantex Plant
Quarteriy Report f o r April, May, June, 1968 Engineering Order Nos. 504- 198 and 504-003
Bill M. Washburn
-121-
charges t o ob1 ique impact, a =condi tion resembling possible operational accidents
Quarterly Report for A p r i l , May, June, I968 Engineering Order Nos 504- 198 and 504-003
DISCLAIMER
T i report was prepared as an account of work sponsored by an agency of the United States hs
Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, rewmmendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.
Portions of this doaxmat m y be illegible i tlectmnic image pmdltftE. fmnpes are n produced fmm the best avaiiabie original documex&
-122I
Several RX-09 formulations have been t e s t e d ; a l l were relatively sensitive w i t h #6 r e a c t i o n s a t low heights when impacting a t 14".
Of a l l the RX-09's t e s t e d ,
One formulation of RX-09, LX-07-1 and RX-04-CW (an HMX-Vi ton v a r i a n t ) was
t e s t e d t o determine the s k i d sensitiv t y . Compositions o f the formulations
were as follows:
RX-09-CD Lot 8117-114-01 LX- 07- 1 Lot 71-10 & 71-11 RX-04-CW Lot LRL 7639
HMX/DNPA/FEFO (94.3/3.6/1.7 % by weight) 3/4 Class A 701-26 and 1/4 Class B SR-1B-65 HMX/AG Run 3 DNPA/AG FEFO
HMX/Viton A (92.2/9.8 % by weight) Special Grade (700-10) HMX/Lot 17 & Lot 18 Viton A HMX/Viton A (94.14/5.86 % by weight)
-123- .
The t e s t pieces were store( i n a 60F chamber pending testing. results are l i s t e d below and i n Table I . the target pad:
The t e s t
the epoxy bond t o the steel plate was imperfect, so t h a t Prior t o bonding the steel plates t o t h e concrete
25%) are discarded.
upon impact of the t e s t piece, the epoxy would flake o f f . T h i s caused two
t e s t s t o be discounted. and steel. block, a l l plates are now checked by ultrasonics for voids between the epoxy Those plates showing voids
Height
.88 2,5
(t .
Mater i a 1
.
(ft)
0
14 45
Angle
RX-09-CD
O,OO
6600
RX-04-CW
14 14 45 45
o,o,o
o,o,o,o,o*
060 0,06
*The f i r s t two drops 2.5 were discounted because of the epoxy problem and questionable pieces (had been dropped several times without new surface cut).
-124-
three drops from 3 . 5 ' , and three drops from 5.0' ( t h u s "recalibrated" a t 45").
RX-04-CW will have six t e s t s a t 1.75'/45". RX-04-CX (95% HMX/5% Viton) will be tested a t 1.75'/45"
i n six drops.
Table I
Skid No. 514 515 516 517 518 519. 520 521 522 523* 524** 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 . 546 547 548 Material RX-04-CW RX- 04- CW RX- 04- C W RX-04-CW RX-04-CW RX-04-CW RX- 04- CW RX- 04-CW RX- 04- CW RX- 04-CW RX-04-CW RX-09-CD RX-09-CD RX-09-CD RX-09-CD RX-04-CW RX-04-CW RX- 04-CW LX-07-1 LX-07-1 LX-07-1 LX-07- 1 LX-07-1 LX-07- 1 LX-07- 1 LX-07-1 LX-07- 1 LX- 07- 1 LX-07- 1 LX-07-1 RX-09-CD RX - 09-C D RX-09-CD LX-07- 1 LX-07- 1 Height (ft) .88 .88 .88 1.25 1.25 1.25 1.75 1.75 1.75 2.5 2.5 .88 .88 .88 .88 2.5 2.5 2.5 .88 .88 .88 1.25 1.25 1.25 1.75 1.75 1.75 2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 Angle
("1
Reaction
0 0 0 0 6
Remarks
14 14 14 14 14 14 45 45 45 45 45 14 14 14 14 45 45 45 14 14 14 14 14 14 14 14 14 14 14 14 45 45 45 45 45
0 0 0 6 0 0 6 6 0 0
0 0 0 0 0
0 0
3 to 4 3 to 4 6 0 6
0 0 0 0
0
0
No Camera One Camera No Camera One Camera One Camera N Camera o No Camera One Camera One Camera One Camera No Camera No Camera No Camera One Camera No Camera No Camera One Camera N Camera o No Camera One Camera No Camera No Camera One Camera N Camera o No Camera One Camera No Camera No Camera One Camera No Camera One Camera One Camera No Camera
*Sand-Epoxy surface flaked o f f of steel p l a t e upon t e s t piece impact. **Piece which had been impacted several times; therefore, these results were d i s coun ted