Sunteți pe pagina 1din 11

Exam Title

: IBM 000-228 : IBM Seystem p Technical Sales Support

Version : R6.1

www.Prepking.com

Prepking - King of Computer Certification Important Information, Please Read Carefully


Other Prepking products A) Offline Testing engine Use the offline Testing engine product to practice the questions in an exam environment. B) Study Guide (not available for all exams) Build a foundation of knowledge which will be useful also after passing the exam. Latest Version We are constantly reviewing our products. New material is added and old material is updated. Free updates are available for 90 days after the purchase. You should check your member zone at Prepking and update 3-4 days before the scheduled exam date. Here is the procedure to get the latest version: 1.Go towww.Prepking.com 2.Click on Member zone/Log in (right side) 3. Then click My Account 4.The latest versions of all purchased products are downloadable from here. Just click the links. For most updates,it is enough just to print the new questions at the end of the new version, not the whole document. Feedback If you spot a possible improvement then please let us know. We always interested in improving product quality. Feedback should be send to feedback@Prepking.com. You should include the following: Exam number, version, page number, question number, and your login ID. Our experts will answer your mail promptly. Copyright Each PDF file contains a unique serial number associated with your particular name and contact information for security purposes. So if we find out that a particular PDF file is being distributed by you, Prepking reserves the right to take legal action against you according to the International Copyright Laws. Explanations This product does not include explanations at the moment. If you are interested in providing explanations for this exam, please contact feedback@Prepking.com.

www.Prepking.com

1. A customer wants to upgrade their existing System p server. The installed inventory does not match the customer's description of the machine. What should the System p technical specialist do in order to best correct IBM inventory records? A. Submit an MES order to add any missing feature B. Submit an RPO-MES changing the inventory records C. Confirm the customer's actual configuration and then submit an RPO-MES D. Confirm the customer's actual configuration and then submit an MES order to add any missing feature Answer: C

2. After visiting several customer groups, the System p technical specialist returns to the office late in the day and makes a list of the various customer requests. The specialist has time to complete at least one task before leaving for the day. Which of the following is most important to complete immediately? A. Send a flyer on new p520 B. Provide shipment delivery status. C. Send a whitepaper on SCSI performance. D. Order a new system per the purchase order. Answer: D

3. If a partition has 2.5 processing units, what is the maximum number of virtual processors it can have? A. 3 B. 25 C. 30 D. Total system physical processors X 10 Answer: B

4. Which of the following services offers scheduled telephone support for complex questions on AIX systems? A. Alert B. Techline C. Consultline

www.Prepking.com

D. Supportline Answer: C 5. A customer requires a 2-way solution now that will be the easiest and least disruptive to upgrade to a 4-way in the future. Which of the following solutions best matches these requirements? A. p5-510 2-way Active 2-way Inactive B. p5-570 2-way Active 2-way Inactive C. p5-520 2-way Active 2-way Inactive D. p5-55A 2-way Active 2-way Inactive Answer: B

6. A customer currently has five partitioned POWER4 systems and is adding new systems. When the System p technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled? A. Upgrade the existing HMC B. Reload the HMC microcode C. Order a new HMC to support the p5 system D. Attach the new p5 system to the existing HMC Answer: C

7. A customer is adding a new p5 machine with VIOS to their environment. The machine will host several DB2 partitions running AIX 5L v5.3. They currently have two SAN directors and an IBM DS8100 using FlashCopy. The SAN design allows for concurrent maintenance. What is the minimum required on each

VIOS to attach to the SAN and why? A. Two HBAs using SDD B. Four HBAs using SDD C. Two HBAs using MPIO D. Four HBAs using MPIO Answer: C

8. A customer asks the System p technical specialist to recommend which remote access (SSH or Telnet)

www.Prepking.com

method to use. What question should the customer be asked to determine the proper recommendation? A. Is Kerberos domain in place? B. Is there a need for end-to-end encryption? C. Is there a need for a PKI Management System? D. Which clients are installed on their desktops? Answer: B

9. An account executive is preparing for an initial one-on-one meeting with a high-level executive who recently read about System p technology. The account executive needs technical assistance to prepare

for the meeting. How can a System p technical specialist best provide assistance in this situation? A. Create a POWER5 technical presentation for the account executive's use. B. Mentor the account executive with the most important POWER5 features and benefits. C. Attend the meeting instead of the account executive to present the POWER5 features and benefits. D. Join the meeting via teleconference at a prescheduled time to present the POWER5 features and benefits. Answer: B

10. A System p customer plans to installed a partitioned p550 alongside older POWER4 servers.

The

customer wants to verify the the existing HMC (7315) will connect to the old and new servers. Which of the following will address this issue A. Add a new HMC for the POWER5 system B. Purchase additional serial connections to the HMC C. Purchase additional Ethernet connections to the HMC D. Update the HMC firmware update to support both POWER4 and POWER5 Answer: A

11. When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why? A. Services specialist to recommend services B. Storage specialist to recommend disk and tape

www.Prepking.com

C. Finance specialist to recommend financing options D. SSR (Support Services Representative) to plan the installation Answer: B

12. A p570 customer has a write-intensive database application.

Recently the order entry team has

complained about unusually slow response times. Which of the following should be increased to address the problem? A. processors B. memory DIMMs C. network adapters D. SCSI buses and disks Answer: D

13. A customer has just purchased a p5 595 and needs to plan for delivery. Who is responsible at the installation location for unpacking the system from the shipping crate, moving it to the installation location, and removing the wooden shipping crate? A. The mover B. The customer C. The Business Partner D. IBM authorized service personnel Answer: A

14. A customer has an HMC controlling numerous POWER4 servers running different AIX versions. They plan to move to POWER5. A. Upgrade to AIX 5.2 B. Upgrade to AIX 5.3 with APV C. Reload microcode on HMC to support POWER5 D. Install a new HMC to support both POWER4 and POWER5 Answer: A Which of these options would position them for the migration?

www.Prepking.com

15. A new p5 550 customer is concerned about hardware and software support. Which of the following addresses this issue? A. Introduce the customer to the local System p SSR. B. Introduce the customer to the local System p FTSS. C. Provide the customer with the web page for IBM System p support. D. Generate a Customer Support Plan and review it with the customer. Answer: D 16. A state agency has recently deployed a new critical application on an 8-way p570. The state

government has just mandated that all agencies have disaster recovery plans to recover critical applications in acceptable periods of time with no loss of performance. Which of the following will best address this new requirement? A. HACMP/XD and a 4-way p570 in a second location B. HACMP/XD and a 8-way p570 in a second location C. HACMP/XD and an 8-way p570 in the same location D. HACMP and a 4-way p570 in the same location for the critical applications only Answer: B

17. A customer plans to order several new System p servers and is concerned that the additional heat load may exceed the capacity of the current air-handling system. customer in addressing this concern with their personnel? A. System p Q & A to identify system requirements for each new server B. Facts and Features for each system to identify the power requirements C. Redbooks to confirm that enough space is available in the rack to allow for proper airflow D. Physicial site planning section in the IBM Systems Hardware Information Center for each server Answer: D Which of the following resources aid the

18. A credit union is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. specialist should make the customer aware of which IBM offering? A. Grid Toolbox The System p technical

www.Prepking.com

B. Capacity on Demand C. Cluster Systems Management D. Advanced Power Virtualization Answer: A

19. A request for hardware proposal with a very short lead time includes several non workable hardware specifications. Which of the following will address this issue? A. Decide not to bid B. Provide the hardware bid as specified C. Bid with recommended changes identified D. Meet with the customer to discuss options Answer: C

20. The System p technical specialist has a number of tasks to perform and does not have time to do them all. It is a week before the end of quarter and the account executives all state that their individual requests are the highest priority. How should the following task list be prioritized? 1. Return a call from customer seeking compatibility information. 2. Configure three p570 servers to be ordered in two weeks. 3. Prepare a virtualization presentation to give to a customer in two weeks. 4. Configure three p570 servers to be ordered this quarter. A. 4,2,1,3 B. 4,3,1,2 C. 2,3,4,1 D. 2,4,3,1 Answer: A

21. A customer is evaluating the purchase of a new p570 8-way Express to replace their three year old ten 2-way database and application servers. What significant savings component should be highlighted? A. Power B. Downtime

www.Prepking.com

C. Floor space D. Maintenance Answer: D

22. A System p customer has an 8-way p550 running an application for about 200 users; the required amount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a new database will be added to the p550. What is the most likely result of this projected growth next year? A. User demand will increase 30% B. Processor demand will increase 10% C. Disk usage will increase more than 10% D. Memory demand will increase more than 10% Answer: D

23. A company has a large data center with hundreds of AIX 5L v5.3 and Linux OS images on both stand-alone and LPARed machines. The IT Director plans to manage the environment with fewer staff members. What software should the System p technical specialist recommend to address efficient management, quicker provisioning, and monitoring? A. CSM B. NIM C. PSSP D. IBM Director Answer: A

24. A customer is moving to AIX 5L from a competitor's product.

They need onsite assistance with the

initial software installation of the new servers. Which of the following offerings would be most appropriate to recommend? A. Consultline B. Supportline C. Account Advocate

www.Prepking.com

D. Implementation Services Answer: D

25. The System p technical specialist arrives at a new customer site to install a p5 550. The customer has powered up the 550 but the HMC is still in the box. A. Call IBM service to reset the HMC configuration B. Install and configure the HMC and then attach to the 550 C. Power off the 550, then power on the 550 and HMC together D. Power off the 550, install and configure the HMC, then attach and install the 550 Answer: D Which of the following is necessary?

26. The customer plans to install a 7310-CR3 into an existing p590 frame. Which of the following is an important consideration of the HMC in this case? A. 19" form factor B. number of serial ports C. requires a 100-120 volt power connection D. requires a 200-240 volt power connection Answer: A

27. A customer with an IBM System p wants to attach an IBM Total Storage DS6800 and needs to know if the Fiber Channel Adapter is at the latest firmware level. Which of the following is the fastest way for the customer to determine the latest supported microcode level? A. Call Techline B. Validate via DS6800 menu C. Access IBM Storage Website D. Contact the IBM Business Partner Answer: C

28. A customer is considering a second System p590 at a second site for disaster recovery purposes. Which of the following On Demand offerings is most applicable in this environment?

www.Prepking.com

100% Pass Guaranteed or Full Refund Word to Word Real Exam Questions from Real Test Buy full version of exam from this link below http://www.prepking.com/000-228.htm

S-ar putea să vă placă și