Sunteți pe pagina 1din 7

CURICULUM VITAE

PERSONAL DATA Name : TATANG SUTJIPTA

PERMANENT ADDRESS Address : City Country Phone E Mail Address : : : :

Jl Bojonggaling Km. 6 Kp. Ranji Tengah Rt 04 Rw 09 Desa/Kec. Kebonpedes Kab. Sukabumi West Java Sukabumi Indonesia 085281756833, 085723016070 tatangsutjipta@yahoo.com

PERSONAL PARTICULAR Place &Date of Birth : Sex : Marital status : Religion :

Kuningan, September 8th 1957 Male Married Moslem

Objective: I have experience in various disciplines in the most Oil & Gas Industries more than 25 Years. Involved in majoring mechanical/piping on such coordinator both onshore and offshore industries for Fabrication and Installation, pre-com commissioning and start up till hand over to the client. Work Experience :

1. June 20th 2008 to March 20th 2009 : Commissioning Specialist PT. Encona Inti Industri rep. Chevron Pacific Indonesia (CPI). Duties and Responsibilitie : y Check engineering and approval drawing. y Check materials speciation and certificate before fabrication and installation. y Check dossier for electrical, instrument, mechanical, and piping for work completion acceptant. y Preparation for pre-commissioning. y Responsible for commissioning, start up, and hand over to the client. y Reporting activity to rep. coordinator. 2. February 2007 to May 31th 2008 : Area Representative BP West Java Pipe Replacement and Top Site Project Java Sea. Duties and Responsibilities : y Check materials speciation and certificate before fabrication and installation. y Supervise or fabrication piping and structure. y Plan and check of shutdown activity y Responsible for demolish work. y Responsible installation until start up. y Check documentation for mechanical completion pre-com commissioning and hand over of any plat form. y Reporting activity for onshore and offshore to Project Leader 1

3. August 25th 2005 to July 2006 : Mechanical Superintendent PT. Kaliraya Sari Tunu 10 Project TOTAL E&P Indonesia, Handil, East Kalimantan. Duties and Responsibilities : y Responsible for fabrication GTS AX, KX, IX, LX on Yard 1 and Yard 2. y Monitoring all material from delivery and installation. y Transportation of GTS to offshore. y Reporting activity to Site Manager. y As team pre-com and commissioning, and hand over to the client. 4. March 2004 up to May 2005 : Mechanical Superintendent PT. UTOC ENGINEERING Singapore For PT CKG Representative, BCD PetroCina Project Jambi, West Sumatra Duties and Responsibilities : y Monitoring of : - Setting and alignment all mechanical work. - Setting, alignment, centering, position, leveling for pumps and motors, compressors and AFC. - Setting, alignment, centering for vertical and horizontal vessels, exchanger, tank and package. - Installation of internal vessels, tray assembly, filter, demister. - Internal vessels clean-up. - Check documentation for mechanical completion pre-com commissioning, commissioning and hand over to the client.

5. September 2003-February 2004: QUALITY CONTROL ENGGINEER P.T Cemara Semitama Unocal Geothermal Indonesia BRP (Bisnis Recavory Project), Gunung Salak, Sukabumi-West Java. Duties and Responsibilities : y Make ITP (Inspection Test Plan) for step of work according unocal procedure. y Responsible for all mechanical work. y Steel fabrication of new bridge. y Cutting, welding, re-assembly and galvanizing. y Test of material and certification. y Setting and alignment of steel new bridge y Hand over after mechanical completion, pre-com and commissioning, and operation test. 6. May 2003 September 2003 : QC COORDINATOR PT. Guna Nusa Utama Fabricator. Mahakam Barge Accommodation Project, Pan Bahari Ship Yard Tanjung Uncang Batam. Duties and Responsibilities : y To coordinate for check & inspect of fabrication fit-up, setting, installation, erection or block deck, main deck till helly deck. y Check & inspect of modification barge. y Site instruction according drawing revision to subcontractor. y Coordination to inspect for all mechanical work. y Check & inspect of material mill certificate. y As team pre-com and commissioning, and hand start up.

7. August 2002-March 2003 : Construction Enggineer. PT. Tripatra Engineering Gas Transmission from Jambi to Singapore, PGN (Perum Gas Negara) Project. Duties and Responsibilities : y Line survey for pipe line from Grisik to Sakernan. y Check Existing and trenching line. y Transportation from jetty to stock pile. y Coordination with subcontractor for pipe line, cleaning, digging, stringing, double joint, tie-in and back filling. y To check design for road crossing swamp area and dragging. y Responsible for mechanical of Gas Station Plane. y Check documentation for mechanical completion pre-com commissioning, commissioning and hand over to the client.

8. 2001-July 2002 : Pipe Line Construction Engineer. Montgommery Watson and Acc, Kalimantan Urban Development Loa Kula Samarinda East Kalimantan. Duties and Responsibilities : y Prepare for mechanical & pipe line Engineering & Revision. y Make planning for modification route. y Design drawing for crossing, bridge and support pipe. y Prepare & make WPS, PQR, and Quality test. y Inspect to pipe manufacture, raw material sheet, mechanical test, automatic welding machine, radiography, hydro test coating, cement lining, holiday test, authorized of mill certificate of pipe and heat number. y Check documentation for mechanical completion pre-com commissioning, commissioning and hand over to the client.

9. 2000-August 2000 : Site Manager PT. Samudera Ferro Engineering. Repair of CO2 Absorber Vessel BIC-2 Project contact with PT. Badak NGL Pertamina, Bontang-East Kalimantan. Duties and Responsibilities : Responsible to project Manager for the following: y To manage of daily Project Progress evaluation both construction for all mechanical scope (turbine, pump, compressor). Piping electrical and instrument work (for special accessories to equipment). y Prepare andd supervise of Shutdown activity y Preparation Engineering Procedure & Construction book for repair of CO2 Absolver Vessel BIC-2 and Accessories. y Coordination for make schedule of work. y Make daily report and weekly report to client PT. Badak NGL. y To coordinate the quality Assurance Certification of job Completion. y As team pre-com and commissioning, and hand over to the client. 10. 1999-2000 : Mechanical Inspector Engineer. PT. Natindo Netindo Sendiko Konsorsium. Contract by JOB Pertamina SANTA FE, Mudi Fields Development-Tuban East Java. Duties and Responsibilities : y EPC Desulphurization Project. And Shutdown activity y Preparation Engineering Procurement & Construction Plant by Sub Contract. y Review/witness for setting of turbine, pump and compressor. y Review/witness steel structural fabrication & installation. y Review engineering pressure vessel by sub contract. y Field inspection fabrication and installation mechanical equipment piping & pipe line. 3

y y y y

Review/witness test package of piping before hydro test, flushing blowing and pigging. Make daily report and weekly report to client JOB Pertamina Santa FE. Prepare and inspection for cathodic protection. As team pre-com and commissioning, and start up.

11. 1998-1999 : Project Coordinator. Pertamina Pilona Petro Tanjung Lontar Onshore Reccceiving. Facilities KM-69 Project Prabumulih, Palembang-South Sumatera. Duties and Responsibilities : y Surveying of facilities for pipe line Suban Jerigi to Prabumulih. y Shutdown and modification of receiving tank y Modification of trans line to tie in pertamina line, cleming, drigging, and stringing. y Coordinating for fabrication & installation for steel structure tower and foundation of equipment with sub contractor. y Coordination for piping fabrication &installation tie in and new line. y Coordination for electrical and instrument work. y Make schedule of work according material supervisor and the field. y To inspect and certification with pertamina for tank, piping and equipment. y Make procedure of tie in work, hydro test and star up according pertamina specification. y Check documentation pre-com and commissioning and start up. y Make daily report and reporting to construction for construction manager. y Coordination for construction for construction meeting schedule meeting, kick of meeting and emergency meeting.

12. April 1997-January 1998 : QA/QC Officer Engineer. PT. Elnusa Tafu Project & Revamp Project. PT. Badak LNG Pertamina Bontang East Kalimantan. Duties and Responsibilities : y Prepare and supervise of Shutdown activity y Check and study procedure & specification of work coordination with quality control inspector for inspection and test material, tool equipment, manpower. y To coordination of inspection for rotating & static equipment, piping, welding and material. y Make procedure for the tie in work, hot tap and cathode protection. y Prepare document of mechanical completion turn over, hand over to client, include pre-com and commissioning.

13. Jun 1996-April 1997 : Chief Mechanical Engineer. Commonwealth Asia Pacific. PT. Kiani Kertas Pulp Mill Project, Mangkajang Site Berau East Kalimantan. Duties and Responsibilities : Responsible to the area manager & area engineer. Responsible for the following : y All Rotating equipment pump, compressor, turbine and conveyor at area 19, area 48 and area 56. y Inspect equipment for damage & conformance to drawings. y Monitor protective maintenance together with the mechanical superintendent. y Witness opening, cleaning and internal inspection of equipment prior to close. y Witness equipment leveling, alignment and stress check and realease equipment for grouting. y Review installation for compliance with drawing specification. y Perform inspection and make punch list of deficiencies and monitor completion. y As team pre-com and commissioning, and hand over to the client. 4

14. September 1995-June 1996 : QA/QC Engineer. PT. Surfresid Indonesia. Izomerization Project, Kirkale Turkey. Duties and Responsibilities : Duties with quality control, inspector, mechanical, piping, electrical civil and structural and inspect of mill certification of material test. Witness for mechanical, tensile and hardness test, pre-com and commissioning.

15. March 1995-September 1995 : Mechanical Coordination PT. Surya Mas Duta Makmur. Rancamaya Real Estate Project, Bogor West Java. Duties and Responsibilities : Civil work, waterdistribution system, building structure, general supervision, quality control and assurance site preparation, contract administration and management.

16. October 1994-March 1995 : Mechanical Coordinator. Nippon Express (Singapore) Pte Ltd. E.B Plant Project, Merak West Java. Duties and Responsibilities : y To coordination of mechanical work supervision including assembling, installation commissioning and star up of static and rotating equipment. y To prepare of job scheduling and implementation of finding task creation within construction in line with coordination inter department.

17. May 1994-October 1994 : Site Manager PT. Jaya Kencana Geothermal PLN project Garut West Java. Duties and Responsibilities : y To manage daily progress evaluation both construction and engineering for all mechanical scope. y To coordinate the quality assurance certification of job completion. y To manage of manage project commissioning and handling over equipment facilities and pipe line system. y To manage the budget saving and reduction fee. 18. June 1992-June 1994 : Mechanical QA/QC Engineering. PT. Inti Karya Persada Teknik (IKPT). Ammonia and Urea project Petrokimia Gresik East Java. Duties and Responsibilities : y Responsible for all mechanical work static, rotating equipment, steel structure and tank installation. y Coordination and supervise the installation work. y Coordination and supervise the maintenance, repair and modification to pump, turbine, boiler, blower and tank. y To inspect final instrumentation of all plant and equipment prior for commissioning. y To supervise and witness runs test of rotating machinery. y Responsible for quality assurance and handover certificate of all equipment prior commissioning. y Make status report of equipment, material, spare part and start up commissioning work. y Inspection of the fabrication for overhead crane, reformer and boiler. y Coordination of all with other department.

19. June 1991-May 1992 : Millwright/Mechanical Superintendent. PT. Purna Bina Indonesia (PBI). Vico Sembarah Oil & Gas Production facilities project, Sembarah East Kalimantan. Duties and Responsibilities : y Coordinate and supervise mechanical work, fabrication, assembling, installation, commissioning and start up of equipment (static and rotating). y To prepare of work schedule of fabrication and installation of plant and equipment coordinate with other department for the equipment installation. y Inspection of equipment for delivery and transportation. y Responsible for solo run test and run test. y Supervise the maintenance, repair and modification of mechanical plant and equipment. y To coordinate with the client agree the progress of work. y Supervision of pipeline work from Sembarah 13 to Sembarah 14 as commissioning and start up coordinator. y Alignment and internal work of mechanical work being carried out. y Prepare daily report of mechanical work status, pre-com and commissioning till start up. 20. October 1990-April 1991 : Mechanical Inspector KODECO Engineering Co Onshore Receiving Facilities KE-V Gas Project Gresik, East Java. Duties and Responsibilities : y To inspect and supervise the installation of all mechanical plant and equipment static, equipment (vessel, column, heat exchanger, skid tank, condensate, mattering, engine generator, pump, well water and drilling). y To inspect and supervise the fabrication of a slug catcher and condensate tank. y To follow operation manual. y To coordinate with commissioning group. 21. April 1986-March 1990 : Mechanical Inspector CHIYODA Coorporation for LPG & LNG Train E Project, Bontang East Kalimantan. Duties and Responsibilities : y Make procedure for mechanical equipment inspection. y To check and inspect all static and rotating equipment. y To check and inspection of work status for all equipment. y As commissioning with group and start up team coordinator. 22. June 1985-June 1986 : Piping/Mechanical Supervisor JGC Coorperation for Pertamina Refinery Kilang Musi (PKM), Sungai Gerong Palembang. Duties and Responsibilities : y Check and supervise that the work is performed within the tolerance codes standard and specification of construction procedure for each category of work. y Assist for test and inspection to be performed by the field inspection group. y Supervise of shutdown for piping and mechanical. y Pre-com, commissioning and start up.

23. April 1982-April 1985 : Mechanical Supervisor. Pertamina LNG of Expansion (POLE) Arun Train 5 Project Lhoksemawe, Aceh. Duties and Responsibilities : y Responsible for general inspection during installation for all mechanical and piping work. y Supervise of mechanical and piping work. y Check documentation and follow for pre-com and commissioning and start up. y Check documentation for hand over.

S-ar putea să vă placă și