M.Tech. – I Semester Supplementary Examinations,
September, 2008
OPERATIONS RESEARCH
(Common to Power Electronics/ Electrical Power Engineering)
3. A company has 4 wave houses and 6 stores, the cost of shipping one
unit from ware house i to store j is Cij.
7 10 7 4 7 8
5 1 5 5 3 3
If C = [Cij ] =
4 3 7 9 1 9
4 6 9 0 0 8
and the requirements of the six stores are 4, 4, 6, 2, 4, 2 and
quantities at the ware house are 5, 6, 2, 9. Find the minimum cost
solution.
Contd…2
Code No: 52106/MT :2:
Men
I II III IV V
A 1 3 2 8 8
B 2 4 3 1 5
Tasks C 5 6 3 4 6
D 3 1 4 2 2
E 1 5 6 5 4
b) Use the graphical method to minimize the time needed to process
the following jobs on the machines shown below, i.e for each
machine find the job which should be done first. Also calculate the
total time needed to complete both the jobs:
Contd…3
Code No: 52106/MT :3: