Summary
The following proposal outlines several key issues that need to be addressed in this recycling program. H2O Works Approach
We have the capability to implement all aspects of the processes you require from licensing approval to final site location of the bore placements H2O Works will work with your engineers to insure job satisfaction H2O Works team have served in the water industry across a wide cross section of complex operational environments. We bring you hands-on experience in the issues this operation will face every day, combining operational capability with strategic intent. We have a team of preferred workers who bring all the necessary skills in completing the tasks required.
Industry knowledge
Monitoring
Local
Commercial in Confidence
Proposed works
The carting of Class A water from City West Water Class A Recycled Water Stand Pipe with a 25,000ltr Water Cartage Tanker to a required destination for Supply Tanks and/ or the spraying of the Water for Dust Supression etc. Optional -The carting of Class A water to 27,000 litre storage tanks sourced out by H2O Works .Have up to 2 tanks at each location and fill up with Class A water. We can get a number of 27,000 litre storage tanks for Class A storage
Commercial in Confidence
Costings
Solution OneOn a daily basis we can fill up these tanks with Class A water at 78 cents per 1000 litres. This would be in a minimum fill of 20,000 litres @ 3 to 4 loads per day based on a 10 hour day. Over the course of a 6 day week this would be .36 to megalitres of Class A water for one truck. The cost for carting and pumping this water is $89 per hour + GST The truck is filled at one standpipe in Werribee with an average fill time of 15 minutes from the standpipe. When the driver is at the required destination he must be able to get pumping access to the storage facility. Optional One tanker could do the two pilot sites a week with the smaller truck spray support. If we had more storage tanks then the trucks would also do a nightshift increasing the supply.
This proposal is based on minimum of a 10 hr day with 3 to 4 separate drop offs Per Day