ecell BTS Maintenance Manual


PE/DCL/DD/0090 14.03/EN Standard April 2003 4119001090

< 90 >

: ecell BTS Maintenance Manual

Wireless Service Provider Solutions

ecell BTS Maintenance Manual


Document number: PE/DCL/DD/0090 4119001090 Document status: Standard Document issue: 14.03/EN Product release: GSM/BSS V14 Date: April 2003

Copyright 19992003 Nortel Networks, All Rights Reserved Originated in France


NORTEL NETWORKS CONFIDENTIAL: The information contained in this document is the property of Nortel Networks. Except as specifically authorized in writing by Nortel Networks, the holder of this document shall keep the information contained herein confidential and shall protect same in whole or in part from disclosure and dissemination to third parties and use for evaluation, operation and maintenance purposes only. You may not reproduce, represent, or download through any means, the information contained herein in any way or in any form without prior written consent of Nortel Networks. The following are trademarks of Nortel Networks: *NORTEL NETWORKS, the NORTEL NETWORKS corporate logo, the NORTEL Globemark, ecell. GSM is a trademark of France Telecom. All other brand and product names are trademarks or registered trademarks of their respective holders.

Nortel Networks Confidential

Publication history

iii

PUBLICATION HISTORY
System release: GSM/BSS V14.2
April 2002 Issue 14.03/EN Standard Minor editorial update. October 2002 Issue 14.02/EN Preliminary Update after internal review Minor editorial update carried out on all chapters. August 2002 Issue 14.01/EN Draft

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

iv

Publication history

Nortel Networks Confidential

System release: GSM/BSS V13


August 2002 Issue 13.05/EN Preliminary Update after internal review May 2002 Issue 13.04/EN Draft Added 1900 Mhz ecell March 2002 Issue 13.03/EN Standard Modification of PEC code of radio cabinet June 2001 Issue 13.02/EN Preliminary Minor editorial update October 2000 Issue 13.01/EN Preliminary Minor editorial update

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Publication history

System release: GSM/BSS V12


September 2001 Issue 12.06/EN Preliminary Minor editorial update June 2001 Issue 12.05/EN Preliminary Minor editorial update September 2000 Issue 12.04/EN Standard New chapter 6 for the CPM tool introduction April 2000 Issue 12.03/EN Preliminary The following changes were made throughout the document: updated the manual for system release V12 after review. introduced the preventive maintenance for pPLPRO and pALPRO boards January 2000 Issue 12.02/EN Draft The following changes were made throughout the document: updated the manual for system release V12 after review (PE/DCL/GES/183) deleted integrated antenna and RF lightning protector replacement procedures September 1999 Issue 12.01/EN Draft

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

vi

Publication history

Nortel Networks Confidential

PAGE INTENTIONALLY LEFT BLANK

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Table of contents

vii

About this document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Related documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . How this document is organized . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Typographic conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Graphic conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Vocabulary conventions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Regulatory Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Safety regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Precautionary messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

01
01 01 01 02 02 03 03 03 03 04 04 04

1
1.1

How to use this manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 1.1.2 1.1.3 1.1.4 Corrective maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preventive maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Intervention restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Safety of personnel and equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11
11 11 11 12 15

2
2.1 2.2 2.3

Description of the units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


Composition of the ecell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Description of an ecell base unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Description of an ecell extension unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

21
21 21 21

3
3.1 3.2 3.3

Description of a startup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ecell power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ecell power on / power off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.3.1 3.3.2 Power on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Power off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

31
31 31 31 31 31 32

3.4

Startup phases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4
4.1

Preventive maintenance procedures . . . . . . . . . . . . . . . . . . . . . . . .


Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

41
41 41

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

viii

Table of contents

Nortel Networks Confidential

4.1.2 4.1.3 4.2 4.2.1 4.2.2 4.3

Summary of the preventive maintenance schedule . . . . . . . . . . . . . . . . . Description of a preventive maintenance procedure sheet . . . . . . . . . . . Preliminary operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Final operations after having performed preventive maintenance procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preliminary checks before performing the preventive maintenance procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Final checks after having performed the preventive maintenance procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preventive maintenance procedure of the battery pack . . . . . . . . . . . . . Preventive maintenance procedure for the pPLPRO and pALPRO boards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

41 42 43 43 43 44 44 44 45 45 47

Onsite checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Checks at the OMCR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.3.1 4.3.2

4.4

Preventive maintenance procedure sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.4.1 4.4.2

5
5.1

Replacement procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.1.1 5.1.2 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Description of a replacement sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preliminary operations before performing replacement procedures . . . Final operations after having performed replacement procedures . . . . Replacement of the battery pack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Replacement of the radio cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Replacement of the PSU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Replacement of the pPLPRO board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Replacement of the pALPRO board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

51
51 51 51 52 52 52 53 54 58 515 523 534

5.2

Onsite checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.2.1 5.2.2

5.3

Replacement sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5

6
6.1 6.2

CPM Tool . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CPM tool installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.2.1 6.2.2 6.2.3 PC configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CPM application installation from CDROM . . . . . . . . . . . . . . . . . . . . . . . Driver installation from PC Hard Disk . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starting and exiting the CPM application . . . . . . . . . . . . . . . . . . . . . . . . . .

61
61 61 61 62 65 69 69

6.3

CPM tool user manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6.3.1

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Table of contents

ix

6.3.2 6.3.3 6.3.4 6.3.5

Direct setting of the ecell parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . Smart card programming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ecell parameter setting using a programmed smart card . . . . . . . . . . . Options of the menus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

611 617 621 623

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

List of figures

Nortel Networks Confidential

Figure 11 Figure 12 Figure 21 Figure 22 Figure 23 Figure 24 Figure 25 Figure 31 Figure 41 Figure 42 Figure 51 Figure 52 Figure 53

Guide to using the maintenance manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Corrective maintenance diagnostic on the OMCR . . . . . . . . . . . . . . . . . . . . . . General view of an ecell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Detailed view of an ecell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Radio cabinet connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Detailed view of the installation kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Interconnection box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Startup phases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Detailed view of the installation kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Interconnection box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Impregnable screws of the radio cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Impregnable screws of the radio cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Impregnable screws of the radio cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13 14 22 23 24 25 26 33 46 48 519 527 538

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

About this document

01

ABOUT THIS DOCUMENT


This document describes the corrective and preventive maintenance procedures applicable to the ecell.

Applicability
This document applies to the GSM 900, 1800, and 1900. This document is one of the maintenance NTPs concerning Base Transceiver Stations (BTS), Base Station Controllers (BSC), and Transcoder Units (TCU) of the cellular radiotelephone system. It applies to the V14.2 BSS system release.

Audience
The document is intended for operations and maintenance personnel and for those who want to know the principles of BTS corrective and preventive maintenance.

Prerequisites
It is recommended that readers also become familiar with the following NTPs: < 00 > : BSS Product Documentation Overview < 01 > < 07 > < 39 > < 41 > < 51 > < 92 > : BSS Overview : BSS Operating Principles : BSS Maintenance Principles : BSC Maintenance Manual : TML (BTS) User Manual : ecell BTS Reference Manual

< 104 > : Fault Number Description Volume 4 of 6: S2000 H/L and ecell BTS < 105 > : Fault Number Description Volume 5 of 6: Advanced Maintenance Procedures < 124 > : BSS Parameter Dictionary < 125 > : Observation Counter Dictionary < 128 > : OMCR User Manual Volume 1 of 3: Object and Fault menus < 129 > : OMCR User Manual Volume 2 of 3: Configuration, Performance, and Maintenance menus < 130 > : OMCR User Manual Volume 3 of 3: Security, Administration, SMSCB, and Help menus

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

02

About this document

Nortel Networks Confidential

Related documents
The NTPs listed in the above paragraph are quoted in the document.

How this document is organized


This document consists of six chapters. Chapter 1 How to use this Manual describes how to use this maintenance manual. Chapter 2 Description of the cabinets provides a brief description of the boards and modules contained in ecell BTS. Chapter 3 Description of a startup describes the procedure for starting up an ecell BTS and for monitoring the BTS startup. It also provides a brief description of the BTS power supply. Chapter 4 Preventive maintenance procedures provides a guide for maintenance personnel to perform preventive maintenance to the ecell BTS. Preventive maintenance allows you to take recommended actions at scheduled intervals to decrease the number of problems that can affect the BTS. Chapter 5 Replacement procedures provides a guide for maintenance personnel to perform replacement procedures to the ecell BTS. Replacement procedures allow you to replace boards and modules of the BTS. These procedures are applicable:
when an item of equipment is faulty (refer to NTP < 104 > and NTP < 105 >

in which the fault numbers are analyzed).


when an item of equipment has to be replaced according to the preventive

maintenance. Chapter 6 CPM Tool provides an installation and user manual for the TILlike tool used to set the transmission parameters of the Abis interface link.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

About this document

03

Typographic conventions
Graphic conventions The following symbols are used in the flowcharts:

Start of the flowchart, showing a start point in the form of the state of the subsystem or a fault number

Action to be taken before or after the test

Action to be taken during the test

Condition

Pointer allowing the flowchart to be divided

Vocabulary conventions
The glossary is presented in NTP < 00 >.

Regulatory Information
ecell complies with Part 68 of the FCC rules. On the equipment, is a label that contains, among other information, the FCC registration. If requested, this information must be provided to the telephone company. Refer to NTP < 01 >.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

04

About this document

Nortel Networks Confidential

Safety regulations
Introduction All the following steps must be taken during the various cabinet maintenance procedures in order to guarantee the safety of personnel and equipment. Account must be taken of the following aspects: general personnel safety instructions equipment safety instructions Precautionary messages Caution, warning and danger messages indicate the following possible risks.

CAUTION
Impact on the service and on the equipment

DANGER
Electric shock

DANGER
Environment and personnel protection

CAUTION
ESDS handling precautions

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

How to use this manual

11

HOW TO USE THIS MANUAL


1.1
1.1.1

Introduction
Corrective maintenance The network maintenance is based on the graphical supervision of the network on the OMCR. It is also based on the identification and the replacement of faulty items of equipment, using the maintenance principles described in NTP < 39 >. This process is divided into two steps (see Figure 11): locating and identifying the faulty items of equipment, using information given in NTPs < 104 > and < 105 > replacing the faulty items of equipment, using the replacement procedures given in this manual (see Figure 12) When a faulty item of equipment sends an alarm to the OMCR, this alarm is identified by a fault number. NTPs < 104 > and < 105 > give the procedures associated with the various fault numbers. When a faulty item of equipment triggers several alarms, NTP < 105 > enables the operator to locate this faulty item of equipment. It also helps the operator when an abnormal operation occurs in a BTS, a TCU, a BSC or on PCM links.

1.1.2

Preventive maintenance The implementation of the preventive maintenance procedures is the responsibility of each customer. The execution of these procedures may trigger alarms at the OMCR. This process is divided into two steps (see Figure 11): the test procedures of the items of equipment the replacement procedures of the items of equipment All these procedures are necessary and are described in this manual.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

12

How to use this manual

Nortel Networks Confidential

1.1.3

Intervention restrictions There may be a lapse of time between the identification of the alarm at the OMCR and the time the operator responsible for the intervention arrives at the site. The operator must be synchronized with the OMCR (by telephone) before an onsite intervention, in the following cases: isolating procedure on the OMCR intervention because alarms are triggered at the OMCR completion of an onsite intervention return to service procedure

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

How to use this manual

13

Preventive and corrective maintenance NTP < 90 >

Fault number description NTPs < 104 > and < 105 >

Start: recommended test schedule

Start: recommended replacement schedule

Start: notifications and/or alarms

Test procedure described in Chapter 4.

Location Identification Diagnostic help

Procedure associated with the fault number.

Is a replacement required? No

Yes

End

Replacement procedure described in Chapter 5.

Figure 11

Guide to using the maintenance manual

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

14

How to use this manual

Nortel Networks Confidential

Detection of a problem on the BSS

The fault number is known Multiple alarms

Abnormal operation of a BSC, a BTS or PCM links

Consult the Index of fault numbers in NTP < 104 >.

Refer to NTP < 105 >.

Perform the procedure associated with the fault number.

Perform the replacement procedure described in Chapter 5.

Figure 12

Corrective maintenance diagnostic on the OMCR

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

How to use this manual

15

1.1.4
1.1.4.1

Safety of personnel and equipment


General safety instructions for personnel

The personnel must obey the safety instructions specific to the installation site: rules concerning the premises (see instructions posted on site or in the building) rules linked to the general personnel safety instructions The personnel working on the cabinet must be authorized to work according to the security standards. The cabinet main external power supply is switched off by opening the circuit breaker on the operator box. The main power supply supplying the cabinet means that no work must be done on the cabinet internal wiring without first cutting its external main power supply. The power to the various active components of the cabinet is cut by the mains circuit breaker. The external mains socket is no longer supplied. This BTS has been evaluated under IEEE C95.1 requirements, regarding safety levels with respect to human exposure to radio frequency electromagnetic fields, 3 kHz to 300 GHz. The leakage fields and equivalent power densities are orders of magnitude less than the maximum permissible exposures (MPEs) given in the IEEE safety guidelines.
1.1.4.2 Equipment safety

The operating temperature range of the ecell is between 40C and +50C. Before an intervention on the PSU, at an abnormal temperature, wait for the cooling.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

16

How to use this manual

Nortel Networks Confidential

PAGE INTENTIONALLY LEFT BLANK

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Description of the units

21

DESCRIPTION OF THE UNITS


2.1 Composition of the ecell
The ecell contains one base unit in O2 configuration. It contains one base unit and one extension unit in O4 configuration. The ecell is designed for Outdoor and Indoor use.

2.2

Description of an ecell base unit


An ecell base unit contains in its maximum configuration, the main following elements (see Figure 21 to Figure 25): one radio cabinet secured to an installation kit one pALPRO board that provides lightning protections on the external alarms (optional) one pPLPRO board that provides protections on Abis PCM links (optional) one PSU (optional) one battery pack (optional)

2.3

Description of an ecell extension unit


The extension unit is identical to the base unit with the same options. It is recommended to have the same variant of antennas (integrated or external) on both units (base and extension).

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

22

Description of the units

Nortel Networks Confidential

Installation kit

Radio cabinet

Figure 21

General view of an ecell

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Description of the units

23

Ground cable (towards ground bar) Optional integrated antenna Optional lightning protector for external antenna (mandatory for Northern America)

Antenna connector

Protective cover

Radio cabinet

Figure 22

Detailed view of an ecell

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

24

Description of the units

Nortel Networks Confidential

ANTENNA

Antenna connector towards external antenna or integrated antenna (optional) RADIO CABINET : Top view

Smart board reader

Status led

Powering led

26 pts connector (signalling)

DC connector

TEST & CONFIGURATION

NETWORK & SITE LINK

POWER IN 48 vdc

GND

Ethernet link (RJ45) RADIO CABINET : Bottom view

Figure 23

Radio cabinet connectors

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Description of the units

25

Installation kit

AC cable

PSU (optional)

Interconnection box

DC cable (towards radio cabinet)

Chain Or

Standard cosmetic cover

Battery pack (optional)

Figure 24

Detailed view of the installation kit

Copyright E 19992003 Nortel Networks

DC cable (towards battery pack)

Signaling cable (towards radio cabinet) Ground cable (towards radio cabinet) AC connector AC cable (towards operator box)

ecell BTS Maintenance Manual

26

Description of the units

Nortel Networks Confidential

Alarm cable

Gland of external alarm cable Interconnexion box

pALPRO board

pPLPRO board

Connection of ground wires

Ground connector

Interunits cable gland (private PCMs)

Gland of external PCM cable Ground bar

Installation kit

Ground cable (towards radio cabinet) Connector to the extension unit

26pin connector to the radio cabinet

Figure 25

Interconnection box

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Description of a startup

31

DESCRIPTION OF A STARTUP
3.1 Introduction
This chapter contains the procedure for starting up an ecell. To start up a BTS, perform successively the following steps: Power on the unit. Monitor the startup phases (see Paragraph 3.4). As a help, a brief description of the ecell power supply is provided in Paragraphs 3.2 and 3.3.

3.2

ecell power supply


The ecell radio cabinet is supplied from a DC network with 48 V dc. However the BTS may be optionnally supplied from the AC operator box. In this case, the use of a Nortel PSU is mandatory. This PSU is able to deliver a secure power supply with an optional battery pack. The backup time is 15 minutes at ambient temperature.

3.3
3.3.1

ecell power on / power off


Power on Switch on each circuit breaker of each unit of the operator box.

3.3.2

Power off Switch off each circuit breaker of each unit of the operator box.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

32

Description of a startup

Nortel Networks Confidential

3.4

Startup phases
The ecell startup falls into a number of phases, which are summarized in the following flowchart (see Figure 31). To perform the startup, follow the following steps.
Step Action

1 2 3

Open the hatch at the bottom of the radio cabinet. Power on the ecell (see Paragraph 3.3.1). Follow the steps of the startup with the leds located at the bottom of the radio cabinet. They should be in the following states:

Powering led ecell poweron PCM scanning Downloading of the BSC End of the startup green green green green

Status led blinking red blinking orange blinking green green

4 5

At the OMCR, perform a Display hardware configuration to check the state of the ecell. Close the hatch at the bottom of the unit.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Description of a startup

33

Spontaneous displays at the OMCR

Change of lapdLink operationalState enabled

Figure 31

Startup phases

Copyright E 19992003 Nortel Networks


BTS startup BSC operational Introduction into service of a PCM link between the BSC and the BTS Introduction into service of site lapdLink OML Identification of the BTS Verification of the identifier and the hardware reference by the BSC Downloading of files of the BTS if necessary A ecell BTS Maintenance Manual

34

Description of a startup

Nortel Networks Confidential

Spontaneous displays at the OMCR

Change of btsSiteManager operationalState to enabled

Change of operationalState of transceiverEquipment, transceiver, and bts objects to enabled

Figure 31

Startup phases (end)

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003


A Activation of programs loaded into the BTS


Configuration of the btsSiteManager object (bts number, pcmCircuit number, etc.) Confirmation of signaling connection Configuration of bts object (TRX number, general parameters, etc). Connection of a signaling link for each TRX Configuration of the transceiverEquipment, and transceiver objects and distribution of the TSs/TDMA to the TSs/PCM BTS in operation: the green led is ON Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Preventive maintenance procedures

41

PREVENTIVE MAINTENANCE PROCEDURES


4.1
4.1.1

Introduction
Presentation This chapter contains the preventive maintenance procedures applicable to the ecell. The table bellow presents a summary of the preventive maintenance schedule. It is possible to group some procedures, which reduces the intervention time. The provided intervention time corresponds to the intervention time for only one item of equipment.

4.1.2

Summary of the preventive maintenance schedule The following table summarizes the preventive maintenance schedule.
Recommended replacement schedule every four years if T = 20C (average) every five years every five years Maintenance preventive sheet 4.4.1 4.4.2 4.4.2

Equipment Battery pack (*) pPLPRO board (**) pALPRO board (**)

Note: (*) In the case of a particular environment (high (35C) or very high (45C) average ambient temperature), it is recommended to reduce the periodicity of replacement to two or one year. Note: (**) It is recommended to replace simultaneously the pPLPRO and pALPRO boards.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

42

Preventive maintenance procedures

Nortel Networks Confidential

4.1.3

Description of a preventive maintenance procedure sheet A preventive maintenance procedure sheet is divided into the following paragraphs: the title the main body composed of eight main steps explaining how to test an item of equipment the figure(s) if necessary

4.1.3.1

Main body of the procedure sheet

The main body contains the following information: the product reference(s) the range of application, which explains which item of equipment is concerned by the test procedure the schedule, which reminds how often the test procedure must be performed the intervention time the tools required the impact of the preventive maintenance procedure:
on the operation of the BTS at the OMCR

the location of the equipment to be tested the action, which contains the stepbystep actions of the test procedure.
4.1.3.2 Figures

The figures are provided to help the operator to execute the actions. They show the item of equipment schematically.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Preventive maintenance procedures

43

4.2
4.2.1

Onsite checks
Preliminary operations

DANGER
Personnel safety rules The personnel working on the unit must be authorized to work according to the safety standards.

CAUTION
ESDS handling precautions During every maintenance action, the operator must wear an antistatic bracelet.

4.2.2

Final operations after having performed preventive maintenance procedures After having performed the preventive maintenance procedures, leave the premises clean and tidy.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

44

Preventive maintenance procedures

Nortel Networks Confidential

4.3
4.3.1

Checks at the OMCR


Preliminary checks before performing the preventive maintenance procedures Preventive maintenance procedures can be performed only when there are no alarms on the equipment concerned. Before taking any action, check the OMCR Browser windows at the OMCR, which provides a means of graphically monitoring the network. When the graphical objects of the display are gray, no alarms are active. The preventive maintenance procedures can be performed.

4.3.2

Final checks after having performed the preventive maintenance procedures After having performed the preventive maintenance procedures, check that the network has resumed its correct operation. The graphical objects must appear without any alarm in the OMCR Browser windows at the OMCR. The preventive maintenance procedures are complete. If there are alarms on the graphical objects concerned, check the condition of the site using the Display all interrogation on the btsSiteManager object: If the operationalState is enabled, clear the alarms to complete the preventive maintenance procedures. If the operationalState is disabled, set the btsSiteManager object to locked and then back to unlocked, and then perform a Display hardware configuration interrogation on the btsSiteManager object:
If all equipment is working, clear the active alarms. The preventive

maintenance procedures are complete.


If certain items of equipment have failed, refer to the corrective maintenance

procedures (see Chapter 5).

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Preventive maintenance procedures

45

4.4

Preventive maintenance procedure sheets


The procedure sheets for preventive maintenance are given in the following pages.

4.4.1

Preventive maintenance procedure of the battery pack


FRU reference
Refer to the Nortel GSM catalogue.

Range of application
This procedure applies to the ecell base or extension unit for GSM 900, 1800, and 1900.

Schedule
Perform preventive replacement of the battery pack every four years. Respect the following restrictions: in the case of a particular environment (high (35C) or very high (45C) average ambient temperature), it is recommended to reduce the periodicity of replacement to two or one year.

Impact on service

DANGER
Electric shock The ecell remains supplied with the mains power supply.

Location
The battery pack is shown in Figure 41.

Procedure
Step 1 Action At the OMCR, search for a fault number 1067 with power fault cause to check that the ecell is not running on the battery. If there is no 1067 fault number with power fault cause, go to step 2. If there is a fault number 1067 with power fault cause, solve the problem of the AC power supply. Go to step 1. 2 3 Replace the battery pack: refer to Paragraph 5.3.1. End The procedure is complete.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

46

Preventive maintenance procedures

Nortel Networks Confidential

Installation kit

AC cable

PSU (optional)

Interconnection box

DC cable (towards radio cabinet)

Chain Or

Standard cosmetic cover

Battery pack (optional)

Figure 41

Detailed view of the installation kit

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

DC cable (towards battery pack)

Signaling cable (towards radio cabinet) Ground cable (towards radio cabinet) AC connector AC cable (towards operator box)

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Preventive maintenance procedures

47

4.4.2

Preventive maintenance procedure for the pPLPRO and pALPRO boards


FRU reference
Refer to the Nortel GSM catalogue.

Range of application
This procedure applies to the ecell base or extension unit for GSM 900, 1800, and 1900.

Schedule
Perform preventive replacement of the pPLPRO and pALPRO boards every five years. Replace the two boards simultaneously.

Impact on service

CAUTION
Service interruption The ecell must be poweredoff for this procedure.

Location
The pPLPRO and pALPRO boards are shown in Figure 42.

Procedure
Step 1 2 3 Action At the OMCR, set the administrativeState of the bts objects to shutting down to isolate the site (stopping of traffic on the associated cells). Switch off each circuit breaker of each unit. Replace: the pPLPRO board: refer to Paragraph 5.3.4 the pALPRO board: refer to Paragraph 5.3.5 4 End The procedure is complete.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

48

Preventive maintenance procedures

Nortel Networks Confidential

Alarm cable

Gland of external alarm cable Interconnexion box

pALPRO board

pPLPRO board

Connection of ground wires

Ground connector

Interunits cable gland (private PCMs)

Gland of external PCM cable Ground bar

Installation kit

Ground cable (towards radio cabinet) Connector to the extension unit

26pin connector to the radio cabinet

Figure 42

Interconnection box

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

51

REPLACEMENT PROCEDURES
5.1
5.1.1

Introduction
Presentation This chapter contains the replacement procedures applicable to the ecell. The operator must refer to the figures in Chapter 2 to locate the FRUs concerned by the replacement procedures. The structure of a replacement procedure sheet is described below.

5.1.2

Description of a replacement sheet A replacement procedure sheet is divided into the following paragraphs: the title the main body composed of four steps explaining how to replace a FRU the figure(s), if necessary

5.1.2.1

Main body of the procedure sheet

The main body contains the following information (if applicable): the product references the tools required the impact of the replacement procedure:
on the operation of the BTS on service

the location of the FRU to be replaced the procedure which contains the following steps:
the preliminary operations, which precede the removal of the FRU the removal operations the reinsertion operations the additional operations, which include the return to service of the replaced

FRU, and additional onsite checks on the state of the replaced FRU
5.1.2.2 Figures

The figures are provided to help the operator execute the actions. They show the FRU schematically.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

52

Replacement procedures

Nortel Networks Confidential

5.2
5.2.1

Onsite checks
Preliminary operations before performing replacement procedures

DANGER
Personnel safety rules The personnel working on the unit must be authorized to work according to the safety standards.

CAUTION
ESDS handling precautions During every maintenance action, wear an antistatic bracelet.

5.2.2

Final operations after having performed replacement procedures After having performed the replacement procedures, leave the premises clean and tidy.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

53

5.3

Replacement sheets
The replacement sheets are given in the following pages. The table below gives the numbers of the replacement sheets concerning each FRU.
Equipment Battery pack Radio cabinet PSU pPLPRO board pALPRO board FRU name Battery backup assembly Radio cabinet PSU outdoor assembly PPLPRO assembly PALPRO assembly Replacement sheet 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

54

Replacement procedures

Nortel Networks Confidential

5.3.1

Replacement of the battery pack


FRU reference
PEC code Battery pack (except for 1900 Mhz) Battery pack (for 1900 Mhz) NT0122AA CPC code A0768959

NT0122BA

A0991419

Procedure
Step Action

Preliminary operation a. On the new battery, read the date of the next battery charge. It must be posterior to the date of the replacement day. i. ii. If it is, go to step 2. If not, take another new battery. Go to step 1.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

55

Step

Action (Continued)

Removal of the battery pack a. Locate the battery pack in the ecell (see figure below).

Battery pack

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

56

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

b. Undo the impregnable screw on each side of the battery pack (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The battery pack holds by a chain, fixed on the installation kit.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

57

Step

Action (Continued)

c. Disconnect (on the PSU side) the DC cable between the PSU and the battery pack (see figure below).

d. Undo the chain retaining the battery pack. e. Remove the battery pack. 3 Insertion of the new battery pack a. Fix the chain coming from the installation kit to the battery pack. b. Reconnect to the PSU the DC cable coming from the battery pack. c. Put the battery pack in its place and secure it by the two impregnable screws. 4 End The procedure is complete.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

58

Replacement procedures

Nortel Networks Confidential

5.3.2

Replacement of the radio cabinet


FRU reference
PEC code P GSM 900 E1 900 PHASE 2 E1 GSM 1800 E1 1800 PHASE 2 E1 GSM 1900 E1 GSM 1900 T1 NT0110AA NT0110FA NT0110BA NT0110GA NT0110EA NT0110DA CPC code A0773831 A0862338 A0773835 A0862339 A0808224 A0777615

Impact of the replacement on service

CAUTION
Service reduction In cause of a fault on the base unit, the site will be lost.

Procedure
Step 1 Action Preliminary operations Note: in case of 1900 Mhz, the protector above the lightning protector must be removed also.

a. Switch off the circuit breaker associated to the concerned unit. b. Depending on the configuration: With an integrated antenna:

Unscrew the antenna connector located on the top of the radio cabinet.
Without RF lightning protector:

Undo the RF antenna jumper/feeder on the top of the radio cabinet.


With RF lightning protector:

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

59

Step

Action (Continued)

Unscrew the nut fixing the RF antenna jumper/feeder on the top of the
radio cabinet.

Unscrew the RF lightning protector.


c. Depending on the configuration, remove: the standard cosmetic cover. Go to step 1d. the battery pack. Go to step 1e. d. Removal of the standard cosmetic cover Undo the impregnable screw on each side of the standard cosmetic cover (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The standard cosmetic cover is held by a chain, fixed on the installation kit. Go to step 2.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

510

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

e. Removal of the battery pack Locate the battery pack in the ecell (see figure below).

Battery pack

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

511

Step

Action (Continued)

Undo the impregnable screw on each side of the battery pack (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The battery pack is held by a chain, fixed on the installation kit. Go to step 2.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

512

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

Removal of the radio cabinet a. Disconnect the following cables from the radio cabinet side (see figure below): signaling cable ground cable 48V cable

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

513

Step

Action (Continued)

b. Undo the impregnable screw on each side of the radio cabinet (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

c. Remove the radio cabinet. 3 Insertion of the new radio cabinet a. Secure the radio cabinet to the installation kit by tightening the impregnable screw on each side of the radio cabinet with the specific tool (BOSSARD Ref. A0808966). b. Reconnect the cables previously disconnected from the radio cabinet side: signaling cable ground cable (torque tightness: 1 Nm) 48 V dc cable c. Parametrize the new radio cabinet: from a preprogrammed SIM board from the CPM application via a PC

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

514

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

Additional operations

CAUTION
Equipment Damage Before locking a connector, ensure that the connector is aligned facing the other connector.

a. Reinsertion of the RF lightning protector, if necessary. Perform the following actions: Put the RF lightning protector in its place. Tighten the nut fixing the RF antenna to the RF lightning protector (torque tightness: 1.5 Nm). Tighten the nut fixing the RF lightning protector to the radio cabinet (torque tightness: 1.5 Nm). Tighten the nut fixing the ground cable to the ground bar, located on the below right side of the installation kit (torque tightness: 1 Nm). b. Reinsertion of the integrated antenna, if necessary. Perform the following actions: Put the antenna connector on the top of the radio cabinet. c. Switch on the circuit breaker associated to the concerned cabinet. d. Check the state of the right led of the Test & Configuration panel (located on the bottom of the radio cabinet): it must be led on green. e. Reinsertion of the battery pack, if necessary. Put the battery pack in its place and secure it by the four impregnable screws. f. Reinsertion of the standard cosmetic cover, if necessary. Tighten one screw on each side of the standard cosmetic cover. 5 End The procedure is complete.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

515

5.3.3

Replacement of the PSU


FRU reference
PEC code PSU Outdoor Assembly PSU ASSL UL NT0121AA NT0121BA CPC code A0769029 A0810709

Impact of the replacement on service

CAUTION
Service interruption In cause of a fault on the base unit, the site will be lost.

Procedure
Step Action

Preliminary operations a. Switch off the circuit breaker associated to the concerned unit. b. Depending on the configuration, remove: the standard cosmetic cover. Go to step 1c. the battery pack. Go to step 1d.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

516

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

c. Removal of the standard cosmetic cover Undo the impregnable screw on each side of the standard cosmetic cover (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The standard cosmetic cover is held by a chain, fixed on the installation kit. Go to step 1e.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

517

Step

Action (Continued)

d. Removal of the battery pack Locate the battery pack in the ecell (see figure below).

Battery pack

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

518

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

Undo the impregnable screw on each side of the battery pack (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The battery pack is held by a chain, fixed on the installation kit. Go to step 1e. e. Set the radio cabinet in low position. To do that, perform the following actions. Disconnect all the cables: signaling cable, ground cable, 48V cable, antenna jumper/feeder.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

519

Step

Action (Continued)

Undo the impregnable screw on each side of the radio cabinet (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

Figure 51

Impregnable screws of the radio cabinet


Lift up the radio cabinet to extract it of its fastening.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

520

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

If possible, slide it along the installation kit until the lowest fastening. Otherwise remove it.

Removal of the PSU a. To facilitate the screw access, cut the tyraps retaining the cables between the PSU and the interconnection box. b. Open (by unscrewing) the AC connector powering the PSU.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

521

Step

Action (Continued)

c. Undo the four impregnable screws on each side of the PSU with the specific tool (BOSSARD Ref. A0808966).

DANGER
Heavy lifting Hold the PSU during the unscrewing to avoid it falling.

d. Remove the PSU. 3 Insertion of the new PSU a. Install the PSU in its place. b. Tighten the four impregnable screws on each side of the PSU.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

522

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

CAUTION
Equipment Damage Before locking the AC connector, ensure that the cable connector is aligned facing the radio cabinet connector.

c. Tighten the three screws of the connecting block of the AC cable. d. Close the connector of the AC cable. e. Introduce the cables between the PSU and the interconnection box and maintain them with a tyrap. 4 Additional operations a. Set the radio cabinet in high position. To do that, perform the following actions. Lift up the radio cabinet to extract it of its fastening. Slide it along the installation kit until the highest fastening. Put the radio cabinet in the high position. Tighten the impregnable screw on each side of the radio cabinet (see Figure 51) with the specific tool (BOSSARD Ref. A0808966). Reconnect the previous cables: signaling cable, ground cable, 48V cable, antenna jumper/feeder. b. Switch on the circuit breaker associated to the concerned unit. c. Check the state of the right led of the Test & configuration panel (located on the bottom of the radio cabinet): it must be led on green. d. Reinsertion of the battery pack, if necessary. Put the battery pack in its place and secure it by the four impregnable screws. e. Reinsertion of the standard cosmetic cover, if necessary. Tighten one screw on each side of the standard cosmetic cover. 5 End The procedure is complete.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

523

5.3.4

Replacement of the pPLPRO board Note: In the case of 1900 Mhz and for indoor use only, shunts replace the primary lightning protectors on the pPLPRO board.

FRU reference
PEC code pPLPRO board (except for 1900 Mhz) shunt (for 1900 Mhz) NT0124AA NT0124BA CPC code A0761543 A0808114

Impact of the replacement on service

CAUTION
Service reduction In cause of a fault on the base unit, the site will be lost.

Procedure
Step Action

Preliminary operations a. Switch off the circuit breaker associated to the concerned unit. b. Depending on the configuration, remove: the standard cosmetic cover. Go to step 1c. the battery pack. Go to step 1d.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

524

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

c. Removal of the standard cosmetic cover Undo the impregnable screw on each side of the standard cosmetic cover (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The standard cosmetic cover is held by a chain, fixed on the installation kit. Go to step 1e.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

525

Step

Action (Continued)

d. Removal of the battery pack Locate the battery pack in the ecell (see figure below).

Battery pack

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

526

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

Undo the impregnable screw on each side of the battery pack (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The battery pack is held by a chain, fixed on the installation kit. Go to step 1e.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

527

Step

Action (Continued)

e. Set the radio cabinet in low position. To do that, perform the following actions: Disconnect: signaling cable, ground cable, 48V cable, RF antenna jumper/feeder (if no RF lightning protector), RF lightning protector if present. Undo the impregnable screw on each side of the radio cabinet (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

Figure 52

Impregnable screws of the radio cabinet


Lift up the radio cabinet to extract it of its fastening.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

528

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

Slide it along the installation kit until the lowest fastening (see figure below).

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

529

Step

Action (Continued)

f. Undo the six quarter turn screws on the front face of the interconnection box and remove the cover (see figure below).

Installation kit

Interconnexion box Optional PSU

Ground bar Ground cable (towards radio cabinet)

Removal of the pPLPRO board

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

530

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

a. Locate the pPLPRO board in the bottom of the interconnection box (see figure below).

Alarm cable Installation kit External alarm cable gland

Gland (for future use) pALPRO board

Interconnexion box

pPLPRO board

PCM Abis cable

Ground connector

Interunit cable gland (private PCM)

External PCM cable gland

b. Disconnect the eight wires of the PCM Abis cable.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

531

Step

Action (Continued)

c. Undo the five Phillips head screws securing the pPLPRO board on the ground bar. d. Cut the tyraps that contain wires linked to the pPLPRO board, if necessary. e. Return the pPLPRO board. f. Disconnect the eight wires (coming from the signaling cable) connected to the interface block of the pPLPRO board. g. Remove the pPLPRO board. 3 Specific case of 1900 Mhz only: 2 shunts are fitted on the pPLPRO board and the spare part is without shunts but with primary protectors (NT0124AA) The pPLPRO board that has been removed includes 2 shunts (held by screws to the pPLPRO board). Thus , the maintenance operator must perform the following procedure: a. Remove the two shunts from the pPLPRO board which has just been removed (see the following figure). b. Remove the primary protectors from the spare part. c. Install the two shunts on the pPLPRO spare part by reusing screws, washes and nuts as follows: screws and washes under the board nuts on the shunt side

4 nuts

Shunts

Figure showing pPLPRO board fitted with two shunts (case of 1900 Mhz)

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

532

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

Insertion of the new pPLPRO board a. Reconnect the eight wires (coming from the signaling cable) to the interface block of the pPLPRO board with the table below help. Pin on the connector 1 2 3 4 5 6 7 8 Color of the wire Green / White White / Green Brown / White White / Brown Grey / White White / Grey Red / Blue Blue / Red Signal PEPCM0 NEPCM0 PRPCM0 NRPCM0 PEPCM1 NEPCM1 PRPCM1 NRPCM1

b. Tighten the five Phillips head screws securing the pPLPRO board on the ground bar. c. Connect the eight wires of the PCM Abis cable. 5 Additional operations a. Put the cover of the interconnection box in its place and tighten the six quarter turn screws on the front face. b. Set the radio cabinet in high position. To do that, perform the following actions. Lift up the radio cabinet to extract it of its fastening. Slide it along the installation kit until the highest fastening. Put the radio cabinet in the high position. Tighten the impregnable screw on each side of the radio cabinet (see Figure 52) with the specific tool (BOSSARD Ref. A0808966). Reconnect: signaling cable, ground cable, 48V cable, RF antenna jumper/feeder (if no RF lightning protector), RF lightning protector if present. c. Switch on the circuit breaker associated to the concerned unit. d. Check the state of the right led of the Test & configuration panel (located on the bottom of the radio cabinet): it must be led on green. e. Reinsertion of the battery pack, if necessary. Put the battery pack in its place and secure it by the four impregnable screws.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

533

Step

Action (Continued)

f. Reinsertion of the standard cosmetic cover, if necessary. Tighten one screw on each side of the standard cosmetic cover. 6 End The procedure is complete.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

534

Replacement procedures

Nortel Networks Confidential

5.3.5

Replacement of the pALPRO board


FRU reference
PEC code: NT0123AA CPC code: A0761540

Impact of the replacement on service

CAUTION
Service reduction In cause of a fault on the base unit, the site will be lost.

Procedure
Step Action

Preliminary operations a. Switch off the circuit breaker associated to the concerned unit. b. Depending on the configuration, remove: the standard cosmetic cover. Go to step 1c. the battery pack. Go to step 1d.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

535

Step

Action (Continued)

c. Removal of the standard cosmetic cover Undo the impregnable screw on each side of the standard cosmetic cover (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The standard cosmetic cover is held by a chain, fixed on the installation kit. Go to step 1e.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

536

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

d. Removal of the battery pack Locate the battery pack in the ecell (see figure below).

Battery pack

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

537

Step

Action (Continued)

Undo the impregnable screw on each side of the battery pack (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

The battery pack is held by a chain, fixed on the installation kit. Go to step 1e.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

538

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

e. Set the radio cabinet in low position. To do that, perform the following actions: Disconnect: signaling cable, ground cable, 48V cable, RF antenna jumper/feeder (if no RF lightning protector), RF lightning protector if present. Undo the impregnable screw on each side of the radio cabinet (see figure below) with the specific tool (BOSSARD Ref. A0808966).

Impregnable screw

Figure 53

Impregnable screws of the radio cabinet


Lift up the radio cabinet to extract it of its fastening.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

539

Step

Action (Continued)

If possible, slide it along the installation kit until the lowest fastening (see figure below). Otherwise, remove it.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

540

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

f. Undo the six quarter turn screws on the front face of the interconnection box and remove the cover (see figure below).

Installation kit

Interconnexion box Optional PSU

Ground bar Ground cable (towards radio cabinet)

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

541

Step

Action (Continued)

Removal of the pALPRO board a. Locate the pALPRO board in the bottom of the interconnection box (see figure below)

Alarm cable Installation kit External alarm cable gland

Gland (for future use) pALPRO board

Interconnexion box

pPLPRO board

PCM Abis cable

Ground connector

Interunit cable gland (private PCM)

External PCM cable gland

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

542

Replacement procedures

Nortel Networks Confidential

Step

Action (Continued)

b. Disconnect the four wires of the alarm cable. c. Undo the three screws securing the pALPRO board on the ground bar. d. Cut the tyraps that contain wires linked to the pALPRO board. e. Return the pALPRO board. f. Disconnect the five wires (coming from the signaling cable) connected to the interface block of the pALPRO board. g. Remove the pALPRO board. 3 Insertion of the new pALPRO board a. Reconnect the five wires (coming from the signaling cable) to the interface block of the pALPRO board with the table below help. Pin on the connector 1 2 3 4 5 Color of the wire Black / Orange Orange / Black Black / Green Green / Black Orange / Red Signal ALEXT1 ALEXT2 ALEXT3 ALEXT4 GND AL

b. Tighten the three screws securing the pALPRO board on the ground bar. c. Connect the four wires of the alarm cable. 4 Additional informations a. Put the cover of the interconnection box in its place and tighten the six quarter turn screws on the front face. b. Set the radio cabinet in high position. To do that, perform the following actions. Lift up the radio cabinet to extract it of its fastening. Slide it along the installation kit until the highest fastening. Put the radio cabinet in the high position. Tighten the impregnable screw on each side of the radio cabinet (see Figure 53) with the specific tool (BOSSARD Ref. A0808966). Reconnect the previous cables: signaling cable, ground cable, 48V cable, RF antenna jumper/feeder (if no RF lightning protector), and RF lightning protector, if present.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

Replacement procedures

543

Step

Action (Continued)

c. Switch on the circuit breaker associated to the concerned unit. d. Check the state of the right led of the Test & configuration panel (located on the bottom of the radio cabinet): it must be led on green. e. Reinsertion of the battery pack, if necessary. Put the battery pack in its place and secure it by the four impregnable screws. f. Reinsertion of the standard cosmetic cover, if necessary. Tighten one screw on each side of the standard cosmetic cover. 5 End The procedure is complete.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

544

Replacement procedures

Nortel Networks Confidential

PAGE INTENTIONALLY LEFT BLANK

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

61

CPM TOOL
6.1 Introduction
The transmission parameters a BTS needs to configure the communication link with a BSC, such as PCM type (E1 or T1), TEI, etc... are usually set onto electronic boards using hardware devices such as micro switches or jumpers. This is not the case with the ecell BTS which has been designed to restrict and therefore to simplify the installation and maintenance processes. Here, the transmission parameters are stored in memory and must be read at powering up to be taken into account. To set or change these parameters, there are two ways to proceed. The first one is to bring a portable PC on the BTS site and to program the parameters, using directly the CPM application. The second way to set the parameters is to have a smart card, previously programmed, read by the ecell BTS. CPM stands for Commissioning Parameter Modification. The equipment must be configured prior the first connection of the BTS (commissioning) and any time the radio cabinet need to be changed (maintenance).

6.2
6.2.1

CPM tool installation


PC configuration The minimum hardware configuration is: Pentium processor 16 Mb RAM 1 Mb HD space available Floppy or CDROM driver, according to the installation disk type The software system operating the PC must be Microsoft Windows 95/98/2000 or NT 4.0.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

62

CPM Tool

Nortel Networks Confidential

6.2.2

CPM application installation from CDROM Insert the disk in the CDROM drive From the Start menu, select Programs/Windows Explorer, click on the CDROM icon and access to the Tmltools/Tml_cpm file folder. Doubleclick on Setup.exe

Wait until the InstallShield Setup window is substituted by a Cpm v01a104 warning window with a Cpm setup v01a104 background screen.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

63

Click on Next. The CPM application installation starts.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

64

CPM Tool

Nortel Networks Confidential

When complete, exit the setup by clicking on Finish in the Setup Complete window.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

65

6.2.3

Driver installation from PC Hard Disk From the Start menu of the Taskbar, select Settings/Control Panel In the Control Panel window, double click on Add New Hardware

In the Add New hardware Wizard window, click on Next

Select No to answer the question: Do you want Windows to search for your new hardware ? and click on Next

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

66

CPM Tool

Nortel Networks Confidential

Select Other devices as hardware type to install and click on Next

Click Have Disk... to set the path to the hardware driver

In the Install From Disk window, click on Browse...

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

67

In the various boxes of the Open window, select the C: drive, then the c:\windows\system folder and finally enter gemplus.inf as file name (you cant select it from the list below) before clicking on OK

Back to the Install From Disk window, click on OK

GCR400 is displayed in the models box of the Add New hardware Wizard window ; click on Next

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

68

CPM Tool

Nortel Networks Confidential

To end the driver installation, clik on Finish

When complete, restart the PC.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

69

6.3
6.3.1
6.3.1.1

CPM tool user manual


Starting and exiting the CPM application
Starting

From the Start menu of the desktop Programs\Tml\BTS Tools\Cpm v01a104\Cpm

taskbar,

select

In the CPM window, choose: the read/write mode you need:


smart card to connect the smart card programmer radio cabinet configuration to connect the ecell BTS

the MMI language:


English French

Select Open connection and click the OK button

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

610

CPM Tool

Nortel Networks Confidential

6.3.1.2

Exiting

Select Exit in the File menu

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

611

6.3.2

Direct setting of the ecell parameters The ecell must be powered (switched on from the operator distribution box) The pcm and btsSiteManager objects must be locked at the OMCR (The ecell status LED is blinking orange) Connect the PC to the Ethernet plug of the BTS Start the CPM tool

Select in the CPM window:


the Read/write radio cabinet configuration mode the Open connection option

In the BTS connection window, choose the Peer to Peer type of connection and click Connect

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

612

CPM Tool

Nortel Networks Confidential

Click on Yes to confirm there is only one connected target

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

613

In the Configuration Parameters Modification Software window, select the proper parameters to configure the BTS and click on Write to validate the change

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

614

CPM Tool

Nortel Networks Confidential

Check out for the Configuration sucessfully written message in the lower status bar

Accept the BTS reseting Ask the OMCR operator to unlock the btsSiteManager to download the BTS software Check the auto test / status LED sequence

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

615

If you want to check the parameters stored in the flash PROM, select the Read button Check out for the Configuration sucessfully read message in the lower status bar

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

616

CPM Tool

Nortel Networks Confidential

Here is the kind of screen you get when the BTS cabinet is not yet commissioned (flash empty)

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

617

6.3.3

Smart card programming Connect the smart card programmer to the serial and keyboard ports of the PC Insert the smart card in the programmer in such a way to have the programmer LED at righthand when facing the card chip Start the CPM tool

Select in the CPM window:


the Read/write smart card mode the Open connection option

Click on OK

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

618

CPM Tool

Nortel Networks Confidential

In the Configuration Parameters Modification software window, select the proper PCM configuration parameters and click on Write to validate the changes.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

619

Check out for the Configuration sucessfully written message in the lower status bar Exit the CPM application

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

620

CPM Tool

Nortel Networks Confidential

If you want to check the parameters stored in the smart card, select the Read button. Check out for the Configuration sucessfully read message in the lower status bar

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

621

6.3.4

ecell parameter setting using a programmed smart card Power off the ecell at the operator distribution box Insert the smart card in the radio cabinet, the chip facing the front of the BTS Switch on the BTS Check the correctness of the status LED sequence You can also check the programming of the smart card using the BTS as a smart card reader (but you wont be able to overwrite the smart card parameters). To do so, connect the CPM tool to the ecell BTS (see Paragraph 6.3.2).

Change the Source of information from Flash to Smart Card

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

622

CPM Tool

Nortel Networks Confidential

Select the Read button to check the parameters stored in the smart card. Check out for the Configuration sucessfully read message in the lower status bar

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

623

6.3.5

Options of the menus

The File menu The standard editing functions of a File menu.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

624

CPM Tool

Nortel Networks Confidential

The Connexion menu If you didnt chose the Open connexion option at the CPM startup, you can even so get connected afterwards by selecting Connection/Connect. Conversely, you can get disconnected without exiting the application by selecting Connection/Disconnect.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

625

The Action menu Same functions as the Write and the Read buttons.

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

626

CPM Tool

Nortel Networks Confidential

The Option menu To manage the application MMI.

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Nortel Networks Confidential

CPM Tool

627

The Help menu To get the information about the CPM sofware (version, etc...).

Copyright E 19992003 Nortel Networks

ecell BTS Maintenance Manual

628

CPM Tool

Nortel Networks Confidential

PAGE INTENTIONALLY LEFT BLANK

PE/DCL/DD/0090 4119001090

Standard

14.03/EN

April 2003

Copyright E 19992003 Nortel Networks

Wireless Service Provider Solutions ecell BTS Maintenance Manual


Copyright 19992003 Nortel Networks, All Rights Reserved NORTEL NETWORKS CONFIDENTIAL: The information contained in this document is the property of Nortel Networks. Except as specifically authorized in writing by Nortel Networks, the holder of this document shall keep the information contained herein confidential and shall protect same in whole or in part from disclosure and dissemination to third parties and use for evaluation, operation and maintenance purposes only. You may not reproduce, represent, or download through any means, the information contained herein in any way or in any form without prior written consent of Nortel Networks. The following are trademarks of Nortel Networks: *NORTEL NETWORKS, the NORTEL NETWORKS corporate logo, the NORTEL Globemark, ecell. GSM is a trademark of France Telecom. All other brand and product names are trademarks or registered trademarks of their respective holders. Publication Reference PE/DCL/DD/0090 4119001090 14.03/EN April 2003 Originated in France

For more information, please contact: For all countries, except USA: Documentation Department Parc dactivit de MagnyChateaufort CHATEAUFORT 78928 YVELINES CEDEX 9 FRANCE Email : umtsgsm.ntp@nortelnetworks.com Fax : (33) (1) 39445029 In the USA: 2221 Lakeside Boulevard Richardson TX 75082 USA Tel: 18004 NORTEL 18004667838 or (972) 6845935

Internet Address: http://www.nortelnetworks.com