Fundatiile S3-S4

Grinda de echilibrare
1 2
Scara 1:50
40 40
20 20 20 20

pardoseala
sapa de egalizare
placa de beton armat
strat separatie
termoizolatie polistiren extrudat
strat de pietris
umplutura pamant
±0.00

4 15 5
S500
S500

20
4 4Ø16 L=1.5m
3 4Ø16 L=1.3m

Hidroizolatie

20
-0.65

C25/30

-1.15 20 20 -1.15

100
C25/30 Beton de egalizare
80
C25/30

-1.95

-2.15
150

200

1 4Ø25 L=6.08m S500 -sus Clasa de expunere XC2


Beton C25/30
538 Clasa structurala S4
35 35 Otel Bst500C
cnom=50mm
Clasa de importanta: "III"

30
25 25
35 35
2 3Ø25 L=6.08m S500 -jos 40 40
25 25 30
538
11 Ø8/10 L=1.10m S500 12 Ø8/10 L=1.50m S500

23
20

50 35
50

50 35

38
20
30
S500

20
S500

S500
3 3

S500
4
5 4Ø12 L=2.40m

6 4Ø12 L=1.70m

8 6Ø12 L=2.55m
150

170

9 6Ø12 L=1.85m
50

50
100 100 4 115 115

38
20
30

50 35 S3 20
50

50 35
20

S4

23
A
150 SECTIUNEA A-A
49 30 40 30 51
40 40 70 30 200

1 40 40
35 35 30 35 35
70 13 Ø14/30 L=1.50m S500 90
2
7 4Ø12 L=1.40m S500 10 6Ø12 L=1.60m S500

UNIVERSITATEA TEHNICĂ FUNDAȚII Nr. pl.


CLUJ-NAPOCA
FACULTATEA DE CONSTRUCȚII Anul IV Grupa 32301/B 3

Nume Semnat Scara:


Chînța 1:20 DETALII P
Desenat Darius Daniel
Data: S3+S4
Călin
Verificat DEC. 2022
Gherman