Time Frame for Re-Instatement of EOBI Project

Activity ID Activity Name Origina main Du... D.. Start Finish Quantity July 10 17 24 31 20-Jan-12 14-Sep-11 16-Jul-11 05-Aug-11 105076.... 19500.00 3800.00 10000.00 5700.00 85576.00 15935.00 668.00 Excavation of Ridge upto -10 ft

Activity Schedule
2011 August 07 14 21 28 04 September 11 18 25 02 October 09 16 23 30 November 06 13 20 27 04 December 11 18 25 01

09-Aug-11 16:23
2012 January February 08 15 22 29 05 20-Jan-12, Time Fram

Time Frame for Re-Instatement of EOBI Project


CONSTRUCTION OF RAMP AT PACE PILES CONSTRU
A1000 A1010 A1300 A1310 Excavation of Ridge upto -10 ft Construction of ramp Removal of Loose soil inside the Plot (Debris) Cutting, dismantling and removal of Collapsed Piles inside Plot

178 1... 09-Jul-11 58 5... 09-Jul-11 8 8 09-Jul-11

14-Sep-11, CONSTRUCTION OF RAMP AT PACE PILES

20 2... 17-Jul-11

Construction of ramp Removal of Loose soil inside the Plot (Debris) Cutting, dismantling and removal of Collapsed Piles inside Plot 20-Jan-12, EMBANKM 04-Oct-11, 1ST ADDITIONAL ANCHORS ROW 11-Sep-11, SOUTH SIDE Construction of Embankment upto -10.235 Commencement of Additional Anchor Activities Scaffolding and formwork for 1st Additional Anchor Row Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors with Proof and Performance Tests 24-Sep-11, WEST SIDE Construction of Embankment upto -10.235 Scaffolding and formwork for 1st Additional Anchor Row Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors with Proof and Performance Tests 04-Oct-11, NORTH SIDE Construction of Embankment upto -10.235 (Fill) Scaffolding and formwork for 1st Additional Anchor Row Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof and Performance Testing 30-Oct-11, 2ND ADDITIONAL ANCHORS ROW 08-Oct-11, SOUTH SIDE Removal of Scaffolding & Formwork upto Level -10.237 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests 21-Oct-11, WEST SIDE Removal of Scaffolding & Formwork upto Level -10.237 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Testing 30-Oct-11, NORTH SIDE Removal of Scaffolding & Formwork upto Level -10.237 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests 11-Dec-11, 3RD ADDITIONAL ANCHORS ROW 03-Nov-11, SOUTH SIDE Excavation of soil and construction of Embankment upto -14.937

10 1... 06-Aug-... 15-Aug-11 20 2... 16-Aug-... 14-Sep-11 160 1... 27-Jul-11 60 6... 27-Jul-11 37 3... 27-Jul-11 15 1... 27-Jul-11 2 6 5 5 5 5 5 5 2 6 5 5 5 5 5 5 20-Jan-12 04-Oct-11 11-Sep-11 10-Aug-11

EMBANKMENT & ADDITIONAL ANCHORS EMBANKM


1ST ADDIT ADDITIONAL ANCHORS ROW
SOUTH S SIDE A1840 Construction of Embankment upto -10.235 A1850 A1860 A1870 A1880 A1890 A1900 A1910 A1920 Commencement of Additional Anchor Activities Scaffolding and formwork for 1st Additional Anchor Row Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors with Proof and Performance Tests

11-Aug-... 12-Aug-11 13-Aug-... 18-Aug-11 16-Aug-... 20-Aug-11 17-Aug-... 21-Aug-11 18-Aug-... 22-Aug-11 19-Aug-... 23-Aug-11 20-Aug-... 24-Aug-11 07-Sep-... 11-Sep-11 46.00 1348.00 813.00 107.00 107.00 107.00 107.00 107.00 13919.00 13160.00 444.00 63.00 63.00 63.00 63.00 63.00 2740.00 658.00 438.00 44.00 44.00 44.00 44.00 44.00 1323.00 813.00 102.00 102.00 102.00 102.00 102.00 759.00 444.00 63.00 63.00 63.00 63.00 63.00 41154.00 4668.00 4468.00 438.00 46.00 46.00 46.00 46.00

WEST SI SIDE A1960 Construction of Embankment upto -10.235 A1980 A1990 A2000 A2010 A2020 A2030 A2040 Scaffolding and formwork for 1st Additional Anchor Row Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors with Proof and Performance Tests

33 3... 13-Aug-... 24-Sep-11 6 6 13-Aug-... 18-Aug-11 10 1... 19-Aug-... 07-Sep-11 11 1... 21-Aug-... 10-Sep-11 11 1... 22-Aug-... 11-Sep-11 11 1... 23-Aug-... 12-Sep-11 11 1... 24-Aug-... 13-Sep-11 11 1... 25-Aug-... 14-Sep-11 11 1... 14-Sep-... 24-Sep-11 37 3... 19-Aug-... 04-Oct-11 9 9 19-Aug-... 27-Aug-11 6 6 6 6 6 6 6 6 6 6 6 6 6 6 07-Sep-... 12-Sep-11 11-Sep-... 16-Sep-11 12-Sep-... 17-Sep-11 13-Sep-... 18-Sep-11 14-Sep-... 19-Sep-11 15-Sep-... 20-Sep-11 29-Sep-... 04-Oct-11

NORTH SIDE S A2080 Construction of Embankment upto -10.235 (Fill) A2100 A2110 A2120 A2130 A2140 A2150 A2160 Scaffolding and formwork for 1st Additional Anchor Row Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof and Performance Testing

2ND ADDIT ADDITIONAL ANCHORS ROW


SOUTH S SIDE A2190 Removal of Scaffolding & Formwork upto Level -10.237 A2200 A2210 A2220 A2230 A2240 A2250 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests

48 4... 13-Sep-... 30-Oct-11 26 2... 13-Sep-... 08-Oct-11 6 6 13-Sep-... 18-Sep-11 5 5 5 5 5 5 5 5 5 5 5 5 17-Sep-... 21-Sep-11 18-Sep-... 22-Sep-11 19-Sep-... 23-Sep-11 20-Sep-... 24-Sep-11 21-Sep-... 25-Sep-11 04-Oct-11 08-Oct-11

WEST SI SIDE A2280 Removal of Scaffolding & Formwork upto Level -10.237 A2290 A2300 A2310 A2320 A2330 A2340 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Testing

32 3... 20-Sep-... 21-Oct-11 10 1... 20-Sep-... 29-Sep-11 10 1... 25-Sep-... 04-Oct-11 10 1... 26-Sep-... 05-Oct-11 10 1... 27-Sep-... 06-Oct-11 10 1... 28-Sep-... 07-Oct-11 10 1... 29-Sep-... 08-Oct-11 10 1... 12-Oct-11 26 2... 05-Oct-11 6 6 05-Oct-11 6 6 6 6 6 6 6 6 6 6 6 6 08-Oct-11 09-Oct-11 10-Oct-11 11-Oct-11 12-Oct-11 25-Oct-11 21-Oct-11 30-Oct-11 10-Oct-11 13-Oct-11 14-Oct-11 15-Oct-11 16-Oct-11 17-Oct-11 30-Oct-11

NORTH SIDE S A2370 Removal of Scaffolding & Formwork upto Level -10.237 A2380 A2390 A2400 A2410 A2420 A2430 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests

3RD ADDIT ADDITIONAL ANCHORS ROW


SOUTH S SIDE A2460 Excavation of soil and construction of Embankment upto -14....

56 5... 09-Oct-11 11-Dec-11 26 2... 09-Oct-11 03-Nov-11 7 7 09-Oct-11 15-Oct-11

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary

Page 1 of 2

TASK filter: Normal. Primavera Systems, Inc.

Activity ID

Activity Name

Origina main Du... D.. 4 4 4 4 4 4 4 4 4 4 4 4

Start

Finish

Quantity July 10 17 24 31 07 August 14 21 28 04 September 11 18 25

2011 02 October November 09 16 23 30 06 13 20 Boring for Anchor holes Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors with Proof and Performance Tests 27 04 December 11 18 25 01 08

2012 January 15 22

February 29 05

A2470 A2480 A2490 A2500 A2510 A2520

Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors with Proof and Performance Tests

14-Oct-11 15-Oct-11 16-Oct-11 17-Oct-11 18-Oct-11

17-Oct-11 18-Oct-11 19-Oct-11 20-Oct-11 21-Oct-11

40.00 40.00 40.00 40.00 40.00 27724.00 27239.00 97.00 97.00 97.00 97.00 0.00 97.00 8762.00 8447.00 63.00 63.00 63.00 63.00 63.00 25747.00 3153.00 2565.00 33.00 33.00 33.00 33.00 33.00 423.00 13832.00 11679.00 83.00 83.00 83.00 83.00 83.00 1738.00 8762.00 7809.00 63.00 63.00 63.00 63.00 63.00 638.00 0.00

Tendon Placing and Grouting (Primary & Water Injection)

31-Oct-11 03-Nov-11

WEST SI SIDE A2550 Excavation of soil and construction of Embankment upto -14.... A2560 A2570 A2580 A2590 A2600 A2610 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof and Performance Tests

44 4... 17-Oct-11 07-Dec-11 25 2... 17-Oct-11 18-Nov-11 10 1... 03-Nov-... 20-Nov-11 10 1... 04-Nov-... 21-Nov-11 10 1... 05-Nov-... 22-Nov-11 10 1... 14-Nov-... 23-Nov-11 10 1... 15-Nov-... 24-Nov-11 10 1... 28-Nov-... 07-Dec-11 34 3... 31-Oct-11 11-Dec-11 12 1... 31-Oct-11 19-Nov-11 6 6 6 6 6 6 6 6 6 6 6 6 21-Nov-... 26-Nov-11 22-Nov-... 27-Nov-11 23-Nov-... 28-Nov-11 24-Nov-... 29-Nov-11 25-Nov-... 30-Nov-11 06-Dec-... 11-Dec-11

07-Dec-11, WEST SIDE Excavation of soil and construction of Embankment upto -14.937 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof and Performance Tests 11-Dec-11, NORTH SIDE Excavation of soil and construction of Embankment upto -14.937 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests 20-Jan-12, 4TH ADDIT 17-Dec-11, SOUTH SIDE Excavation of soil and construction of Embankment upto -19.947 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests Excavation upto Bottom of PCC Level 09-Jan-12, WEST SIDE Excavation of soil and construction of Embankment upto -19.9 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Perfo Excavation upto Bottom of PCC Le 20-Jan-12, NORTH SI Excavation of soil and construction of Embankm Boring for Anchor holes Tendon Placing and Grouting (Primary & W Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concretin Stressing of Anchors and Excavation upto Botto

NORTH SIDE S A2640 Excavation of soil and construction of Embankment upto -14.... A2650 A2660 A2670 A2680 A2690 A2700 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests

4TH ADDIT ADDITIONAL ANCHORS ROW


SOUTH S SIDE A2730 Excavation of soil and construction of Embankment upto -19.... A2740 A2750 A2760 A2770 A2780 A2790 A3000 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests Excavation upto Bottom of PCC Level

60 6... 22-Nov-... 20-Jan-12 26 2... 22-Nov-... 17-Dec-11 4 4 22-Nov-... 25-Nov-11 4 4 4 4 4 4 2 4 4 4 4 4 4 2 27-Nov-... 30-Nov-11 28-Nov-... 01-Dec-11 29-Nov-... 02-Dec-11 30-Nov-... 03-Dec-11 01-Dec-... 04-Dec-11 12-Dec-... 15-Dec-11 16-Dec-... 17-Dec-11

WEST SI SIDE A2820 Excavation of soil and construction of Embankment upto -19.... A2830 A2840 A2850 A2860 A2870 A2880 A3010 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests Excavation upto Bottom of PCC Level

40 4... 01-Dec-... 09-Jan-12 16 1... 01-Dec-... 16-Dec-11 8 8 8 8 8 8 4 8 8 8 8 8 8 4 12-Dec-... 19-Dec-11 13-Dec-... 20-Dec-11 14-Dec-... 21-Dec-11 15-Dec-... 22-Dec-11 16-Dec-... 23-Dec-11 29-Dec-... 05-Jan-12 06-Jan-... 09-Jan-12

NORTH SIDE S A2910 Excavation of soil and construction of Embankment upto -19.... A2920 A2930 A2940 A2950 A2960 A2970 A3020 Boring for Anchor holes Tendon Placing and Grouting (Primary & Water Injection) Final Grouting Anchor Block Steel Fixing Anchor Block Form work and Concreting Stressing of Anchors and Proof & Performance Tests Excavation upto Bottom of PCC Level

32 3... 20-Dec-... 20-Jan-12 10 1... 20-Dec-... 29-Dec-11 6 6 6 6 6 6 2 0 6 6 6 6 6 6 2 0 27-Dec-... 01-Jan-12 28-Dec-... 02-Jan-12 29-Dec-... 03-Jan-12 30-Dec-... 04-Jan-12 31-Dec-... 05-Jan-12 13-Jan-... 18-Jan-12 19-Jan-... 20-Jan-12

REMAINING REMAININ ANCHORS

Actual Work Remaining Work

Critical Remaining Work Milestone

Summary

Page 2 of 2

TASK filter: Normal. Primavera Systems, Inc.