BILL OF MATERIALS AND DETAILED ESTIMATES FOR THE PROPOSED RESIDENTIAL BUILDING

Purok 8, Madaum Tagum City

NO. I. EARTHWORKS

DESCRIPTION

QNTY.

UNIT COST/UNIT

AMOUNT

b. Backfilling d. Formworks - 4 x 8 x 5mm thk. Ordinary plywood e. 4" CW Nails f. 2 1/2" CW Nails f. 3" CW Nails g. 1 1/2" CW Nails

15.00 6 25 10 10 2

cu.m. pcs. kgs. kgs. kgs. kgs.

250.00 310.00 60.00 65.00 65.00 70.00

3,750.00 1,860.00 1,500.00 650.00 650.00 140.00

Sub-Total

8,550.00

II.

CONCRETE & MASONRY WORKS


a. b. c. d. e. Portland cement Washed Sand Washed Gravel 4" thk. CHB Reinforcing bar - 12mm x 6.0m. - 10mm x 6.0m. -8mm x 6.0m. f. #16 tie wire g. Hacksaw Blade (Heavy duty)
215 22 15 2,200 36 89 85 1 3 bags cu.m. cu.m. pcs. pcs. pcs. pcs. roll pcs. 215.00 300.00 300.00 7.50 194.00 133.00 89.00 1,254.00 75.00 46,225.00 6,600.00 4,500.00 16,500.00 6,984.00 11,837.00 7,565.00 1,254.00 225.00

Sub-Total

101,690.00

III.

ROOFING, ROOF FRAMING


a. Roofing
# 26 G.I. Corr. Sheets x 12

- 0.40mm x 0.457m x 2.44m. Ridge roll - 0.40mm x 0.915m x 2.44m. Gutter - 0.40mm x 0.915m x 2.44m. Flashing - 0.40mm x 0.610m x 2.44m. Valley Gutter - Tecksrcrew 12-24 x 45mm - Blind Rivets - Silicon sealant - Touch up paint b. Trusses - 1 1/2" x 1 1/2" x 1/4" thk. Angle bar - 1" x 1" x 1/8" thk. Angle bar - LC 100mm x 50mm x 15mm x 1.0mm Cee purlins - 12mm x 6.0m Plain round bar - Welding rod - Boysen Red lead primer - Steel brush - 4" Globe paint brush - 2 1/2" Globe paint brush

45.00 14 20 4 4 500 200 2 1 34 44 51 15 2 4 2 3 3

pcs. pcs. pcs. pcs. pcs. pcs. pcs. qrts. cans pcs. pcs. pcs. pcs. boxes gals. pcs. pcs. pcs.

586.00 430.00 490.00 490.00 310.00 2.50 1.20 480.00 460.00 400.00 318.00 425.00 157.00 1,100.00 375.00 30.00 70.00 45.00

26,370.00 6,020.00 9,800.00 1,960.00 1,240.00 1,250.00 240.00 960.00 460.00 13,600.00 13,992.00 21,675.00 2,355.00 2,200.00 1,500.00 60.00 210.00 135.00

Sub-Total

104,027.00

IV.

CARPENTRY WORKS
a. Ceiling - 4.5mm thk. x 4 x 8 Ordinary plywood - 4.5mm thk. x 4 x 8 Marine plywood - 135 pcs. - 2 x 2 x 12 Lauan lumber - 3" CW Nail - 2 1/2" CW Nail - 1 1/2" CW Nail
25 15 540.00 10 5 3 pcs. pcs. bd.ft. kls. kls. kls. 310.00 330.00 18.00 60.00 63.00 66.00 7,750.00 4,950.00 9,720.00 600.00 315.00 198.00

Sub-Total

23,533.00

V.

DOORS, WINDOWS AND HARDWARE


a. Doors - 0.80 x 2.10m. Panel Door - 0.60 x 2.10m. PVC Door w/ Door jamb b. Windows - Green Glass w/ powder white Coated frame Steel Casement ( Verify ) c. Accessories - Door Knob - 4x4 LPB Hinges - 11 pcs. - 2 x 6 x 8 lauan lumber
4 1 units unit l.s. 5 10 88.00 pcs. pcs. bd.ft. 380.00 60.00 18.00 2,700.00 1,500.00 10,800.00 1,500.00 20,000.00 1,900.00 600.00 1,584.00

Sub-Total

36,384.00

VI.

TILE WORKS
- 16" x 16" Ceramics Unglazed tiles ( Floor ) - 12" x 12" Ceramics Unglazed tiles ( Floor ) - 12" x 12" Ceramics Glazed tiles ( Wall ) - Tile trim - ABC Grout
450 40 115 8 4 pcs. pcs. pcs. pcs. packs 54.00 28.00 28.00 190.00 55.00 24,300.00 1,120.00 3,220.00 1,520.00 220.00

Sub-Total

30,380.00

VII. ELECTRICAL WORKS


- Panel Board 4 Branches (Bolt-on type) - Circuit Breaker 30A (Bolt-on type) - Circuit Breaker 20A (Bolt-on type) - Circuit Breaker 15A (Bolt-on type) - Meter Base CL 100A (Socket type) - 1" RSC Pipe - 1" Entrance cap - 1" Conduit LB - 1" x 2" Conduit LB - Utility Box (Metal) - Junction Box PVC (Poly) - Secondary Rack w/ two spool Insulator - Electrical Tape (Big) - Rubber Tape (Nitto) - 2 gang Convenience Outlet (Flash type) - 2 Gang Switch (Flash type) - 1 Gang Switch (Flash type) - Pin Light 6" (Gun Metal) - 18 watts Bulb (Genie)
1 unit 800.00 280.00 280.00 280.00 350.00 380.00 49.00 49.00 28.00 23.00 27.00 160.00 32.00 105.00 108.00 108.00 75.00 218.00 185.00 800.00 280.00 280.00 280.00 350.00 760.00 49.00 49.00 56.00 575.00 432.00 320.00 160.00 210.00 756.00 540.00 300.00 1,090.00 925.00 1 set 1 set 1 sets 1 pc. 2 lengths 1 pc. 1 pc. 2 pcs. 25 pcs. 16 pcs. 2 pcs. 5 rolls 2 rolls 7 sets 5 sets 4 sets 5 sets 5 pcs.

- TW Wire # 12/7 (THHN) - TW Wire # 14/7 (THHN) - 40W Flourescent Lamp (Box type) - Mulflex 1/2" (Poly)

2 2 2 4

boxes boxes sets rolls

2,250.00 1,150.00 260.00 550.00

4,500.00 2,300.00 520.00 2,200.00

Sub-Total

17,732.00

VIII. PLUMBING WORKS


a. Water Line - Gate Valve - Check Valve - Hosebibb faucet - shower fitting - 1/2" G.I. pipe - 1/2" x 4" G.I. Nipple - 1/2" G.I. coupling - 1/2" G.I. elbow - 1/2" G.I. tee - Angle Valve - Teflon tape b. Sanitary Line - 4" dia. PVC pipe - 3" dia. PVC pipe - 2" dia. PVC pipe - 4" dia. PVC wye - 4" dia. PVC 1/8 elbow - 4" x 2" dia. PVC wye reducer - 4" dia. PVC clean out - 3" dia. PVC elbow - 2" dia. PVC elbow - 2" dia. PVC Wye - 2" dia. PVC coupling - Solvent cement ( 200 cc ) c. Fixture - Water closet - Kitchen sink ( Stainless ) d. Septic Tank - Portland cement - Washed Sand - Washed Gravel - 4" thk. CHB - 10mm x 6.0m.
1 1 4 1 3 5 3 9 4 2 2 2 2 2 4 5 4 2 10 3 2 3 3 1 1 15 2 1.5 182 28 pc. pc. pcs. set pcs. pcs. pcs. pcs. pcs. pcs. rolls pcs. pcs. pcs. pcs. pcs. pcs. pcs. pcs. pcs. pcs. pcs. cans sets set bags cu.m. cu.m. pcs. pcs. 300.00 250.00 130.00 500.00 380.00 30.00 20.00 25.00 28.00 75.00 20.00 480.00 250.00 170.00 83.00 52.00 70.00 42.00 35.00 22.00 25.00 22.00 75.00 3,500.00 1,000.00 215.00 300.00 300.00 7.50 133.00 300.00 250.00 520.00 500.00 1,140.00 150.00 60.00 225.00 112.00 150.00 40.00 960.00 500.00 340.00 332.00 260.00 280.00 84.00 350.00 66.00 50.00 66.00 225.00 3,500.00 1,000.00 3,225.00 600.00 450.00 1,365.00 3,724.00

Sub-Total

20,824.00

IX.

PAINTING
a. Concrete - Boysen Acrylic Latex Paint - White - Boysen Acrylic Semi-Gloss Latex Paint - White - Boysen Latex Tinting color (Verify color) - Boysen Concrete Neutralizer b. Wood - Boysen Flatwall Enamel Paint - White - Boysen Quick Dry Enamel Paint - White - Boysen Paint thinner c. Accessories - Polituff
10 10 4 1 6 8 7 2 gals. gals. cans gals. gals. gals. gals. gals. 495.00 495.00 168.00 350.00 580.00 701.50 250.00 560.00 4,950.00 4,950.00 672.00 350.00 3,480.00 5,612.00 1,750.00 1,120.00

- Acryrtex Cast - 9" Roller brush w/ tray - 4" Globe paint brush - 2 1/2" Globe paint brush

4 3 3 3

gals. sets pcs. pcs.

410.00 100.00 100.00 60.00

1,640.00 300.00 300.00 180.00

Sub-Total

P P

25,304.00 368,424.00

X.

TOTAL MATERIAL COST

DPWH FORM NO. 2003-001-B

Republic of the Philippines Department of Public Works & Highways Pamahalaang Lungsod/Bayan ng Nabunturan Kalakhang Maynila/Lalawigan ng Compostela Valley

TANGGAPAN NG PUNONG PANGGUSALI

(Office of the Building Official)


APPLICATION FOR BUILDING PERMIT
APPLICATION NO AREA NO BOX 1 (TO BE ACCOMPLISHED IN PRINT BY APPLICANT) OWNER/APPLICANT LAST NAME
DO NOT FILL-UP (NSO USE ONLY)

GABUTAN
FOR CONSTRUCTION OWNED BY AN ENTERPRISE ADDRESS NO STREET BARANGAY

FIRST NAME JERETO FORM OF OWNERSHIP

M.I D.

TIN

CITY/MUNICIPALITY

ZIP CODE

TELEPHONE NO

Poblacion

Nabunturan

LOCATION OF CONSTRUCTION LOT NO _____ BLK NO ______ TCT NO _______ TAX DEC NO _________________ STREET _______Purok 5_________ BARANGAY ________Sta. Maria________ CITY/MUNICIPALITY OF _____Nabunturan____ SCOPE OF WORK / NEW CONSTRUCTION ERECTION ADDITION ALTERATION RENOVATION CONVERSION REPAIR MOVING DEMOLITION ACCESSORY BUILDING/STRUCTURE OTHERS (Specify)

USE OR CHARACTER OF OCCUPANCY / GROUP A RESIDENTIAL, DWELLINGS GROUP B RESIDENTIAL HOTEL, APARTMENT GROUP C EDUCATIONAL, RECREATIONAL GROUP D INSTITUTIONAL GROUP E BUSINESS AND MERCANTILE
NUMBER OF STOREY(S) TOTAL FLOOR AREA TOTAL ESTIMATED COST P

GROUP F INDUSTRIAL

OTHERS (Specify)

GROUP G INDUSTRIAL STORAGE AND HAZARDOUS GROUP H RECREATIONAL, ASSEMBLY OCCUPANT LOAD LESS THAN 1000 GROUP I RECREATIONAL, ASSEMBLY OCCUPANT LOAD 1000 OR MORE GROUP J AGRICULTURAL, ACCESSORY
PROPOSED DATE OF CONSTRUCTION

1 95.25
SQUARE METERS

EXPECTED DATE OF COMPLETION

#REF! (For Statistical Purposes Only)

BOX 2 FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER) Address

Purok 1, New Sibonga, Nabunturan, Compostela Valley Province

ROGER S. DINOPOL
ARCHITECT OR CIVIL ENGINEER
(Signed and Sealed Over Printed Name)

PRC No. PTR No. Issued at

70435
1961248 Nabunturan, Comval

Validity Date Issued TIN

09/19/94 Feb. 2, 2009

920 - 007 - 272

BOX 3 APPLICANT

BOX 4 WITH MY CONCENT: LOT OWNER

JERETO D. GABUTAN
(Signature Over Printed Name) Address CTC No. BOX 5 Purok 2, Poblacion, Nabunturan, Comval Province Date Issued Place Issued Address CTC No. (Signature Over Printed Name) Purok 2, Poblacion, Nabunturan, Comval Province Date Issued Place Issued

REPUBLIC OF THE PHILIPPINES ) MUNICIPALITY OF ___________Nabunturan_____________) S.S BEFORE ME, at the City/Municipality of __________________________________, on _______________________________ personally appeared the following JERETO D. GABUTAN
APPLICANT C.T.C. No. Date Issued Place Issued

ROGER S. DINOPOL
LICENSED ARCHITECT OR CIVIL ENGINEER
(Full-Time Inspector and Supervisor of Construction Works)

05594420
C.T.C. No.

01/29/09
Date Issued

Nabunturan, Comval
Place Issued

Whose signature appear herein above, known to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and voluntary act and deed.
WITNESS MY HAND AND SEAL on the date and place above written.
Doc. No.

Page No. Book No. Series of

NOTARY PUBLIC (Until December ________ )

BOX 6 (SUBMITTALS TO BE CHECKED, RECEIVED AND RECORDED)


(FIVE (5) SETS EACH OF BUILDING DOCUMENTS SIGNED AND SEALED BY A DULY LICENSED PROFESSIONAL OF RESPECTIVE DISCIPLINES)

LOT PLAN WITH VICINITY MAP ARCHITECTURAL PLANS AND SPECIFICATIONS CIVIL/STRUCTURAL PLANS (DESIGN AND COMPUTATION) ELECTRICAL PLANS AND SPECIFICATIONS MECHANICAL PLANS AND SPECIFICATION

SANITARY PLANS AND SPECIFICATIONS PLUMBING PLANS AND SPECIFICATIONS ELECTRONICS PLANS AND SPECIFICATIONS OTHERS (Specify)

BOX 7 (TO BE ACCOMPLISHED BY THE TECHNICAL STAFF OF THE DIFFERENT SECTIONS OF THE OFFICE OF THE BUILDING OFFICIAL) To be shown to the applicant.
RECEIVING AND RECORDING IN DATE TIME DATE OUT TIME PROCESS FLOW ACTION/REMARKS PROCESSED BY

LOCATIONAL/ZONING OF LAND USE LINE AND GRADE (Geodetic) ARCHITECTURAL CIVIL/STRUCTURAL ELECTRICAL MECHANICAL SANITARY PLUMBING ELECTRONICS INTERIOR OTHERS (Specify)
NOTED: CHIEF, PROCESSING AND EVALUATION DIVISION

BOX 8 (TO BE ACCOMPLISHED BY THE TECHNICAL STAFF OF THE DIFFERENT SECTIONS OF THE OFFICE OF THE BUILDING OFFICIAL)
ASSESSED FEES ASSESSED BY AMOUNT DUE DATE PAID O.R. NUMBER

FILING FEE PROCESSING FEE LOCATIONAL/ZONING OF LAND USE LINE AND GRADE (Geodetic) FENCING ARCHITECTURAL ELECTRICAL MECHANICAL SANITARY PLUMBING ELECTRONICS INTERIOR ONE HALF (1/2) OF THE SERVICE FUND (FSF) TOTAL
REVIEWED: CHIEF, PROCESSING AND EVALUATION DIVISION

BOX 9
BP NO.

BUILDING PERMIT
(Owner/Applicant) (Type of Project)

DATE ISSUED

Permit is issued to ___________________________________________ for the proposed _____________________________________ under ________________________________


(Use or Character of Occupancy)

of

group, located at lot no. __________ block no. ____________ OCT/TCT no. ________ Barangay ____________________ City/Municipality of ___________________________ subject to the following 1. That the designer is aware that under Article 1723 of the Civil Code of the Philippines, he/she is responsible for damages if within fifteen (15) years from the completion of the building/structure, it should collapse due to defect in the plans or specification or defect in the ground. He/she is therefore enjoined to conduct periodic inspections of the building/structure to ensure that the conditions under which the building/structure was designed are not being violated or abused. 2. That the proposed construction/erection/additional/alleration/renovation/conversion/repair/moving/demolition, etc. shall be in conformity with the provisions of the National Building Code, and its IRR. 2.1. 2.2. 2.3. 2.4. That prior to commercement of the proposed projects and construction an actual relocation survey shall be conducted by a duly licensed Geodetic Engineer. That before commencing the excavation the person making or causing the excavation is to be made shall notify in writing the owner of adjoining property not less than ten (10) days before such excavation is to be made and show how the adjoining property should be protected. That the supervising Architect/Civil Engineer shall keep at the jobsite at all times a logbook of daily construction activities wherein the actual daily progress of construction including tests conducted, weather condition and other pertinent data are to be recorded. That upon completion of the construction, the said licensed supervising Architect or Civil Engineer shall submit the logbook duly signed and sealed to the Building Official including as-built plans and other documents and shall also prepare and submit a Certificate of Completion of the project stating that the construction of the building/structure conform to the provision of the Code, its IRR as well as the plans and specifications.

3. That no building/structure shall be used until the Building Official has issued a Certificate of Occupancy therefore as provided in the Code. However, a partial Certificate of Occupancy may be issued for the Use/Occupancy of a portions of a building/structure prior to the completion of the entire building/structure. 4. That this permit shall not serve as an exemption from securing written clearances from various government authorities exercising regulatory function affecting building/structures. 5. When tha construction is undertaken by contract, the work shall be done by a duly licensed and registered contractor.

RECOMMENDING ISSUANCE OF BUILDING PERMIT:

CHIEF, PROCESSING AND EVALUATION DIVISION


(Signature Over Printed Name) Date __________________

CHIEF, INSPECTION AND ENFORCEMENT DIVISION


(Signature Over Printed Name) Date __________________

PERMIT ISSUED: