CHAPTER 2 - SURVEY AND INVESTIGATION

Notes: 1. For departmental Survey progress of labour employed shall be verified with the rates given in this chapter. 2. Length of the survey will be measured along the lines on which particular type of survey is to be done. For example, for chain and compass survey, it would be the length along which the chaining and compassing is to be done. For levelling, it would be the total length of the lines along which levels are to be taken.

3. (a) The rates are based on the following average daily progress that can be normally achieved under average conditions by one survey party:Item Chain and compass survey Levelling (above 15 m interval) Head works 2 km 2 km Canals 3 km 2.5 km

(b) The labour strength of one survey party for chain and compass survey considered in (a) above is 12 mazdoors (3 for ranging, 1 for preparing pegs, 1 peg man, 2 chainman, 1 compass man, 2 axe men for removing obstacles, 1 waterman and 1 watchman for watch and ward of camp). For levelling (above 15m interval) the labour strength considered is 8 mazdoors (2 chain and tape man, 1 staff man, 1 instrument man, 1 umbrella man, 1 waterman and 2 axe men for removing obstacles). (c) In very difficult terrain and special circumstances where the progress may be less special sanction for the rate should be obtained from the Superintending Engineer and the provision for the same be made in the estimate. 4. (a) The items against which multiplying numbers suffixed by "R" have been given in the rates column, the payable rates on NMR shall be arrived at as per following formulaPayable (in Rs) rate (in Rs) =Coefficient X Current labour rate(R)

For example if Rs. 100.00 is the current labour rate for unskilled mazdoor, the payable rate for item 205 (a) will be 6 x Rs. 100.00 = Rs. 600.00 per km. (b) In (a) above, the current labour rate shall be the daily labour rate of unskilled mazdoor applicable in the area at the time of execution of work. (c)The categories of labour other than unskilled mazdoor may also be engaged wherever required but the maximum payable rate shall not exceed the amount arrived at as per (a) above. The rates so arrived at shall be rounded off to the next ten paise.

(b) The multiplying numbers given under this chapter are exclusively for survey and investigation work. 5. (a) The rate for item 202 (6) does not include the cost of blasting materials. (b) When depth of the trial pit or trial trench exceeds 1.5 times the top width, 10% extra rate shall be payable for 202 (1) to (7) as per item 202 (10). 6. (a) The theodolite shall invariably be used for survey and setting of curves for irrigation channels carrying discharge above 1 cumec and layout of important structures etc. (b) The chaining of final alignment shall be done with due precision preferably after setting of curves. (c) The surveyed alignments and cross-sections shall also be marked on village maps. (c) The cross-sections for catchments area survey may be taken at 150 m interval. The ridgeline and cross-sections may also be marked on village maps for computation of catchement area. (d) The survey party for double levelling shall be headed by the S.D.O. (e) While checking progress of NMR/contract work ,the completion of plotting, wherever required shall also be ensured. 7. The items 211 and 212 shall be payable, when construction of temporary approach road is considered necessary by the Superintending Engineer/Chief Engineer. Prior written sanction of the Superintending Engineer/Chief Engineer is necessary which will include the width (2.5 m or 3.8 m) and type (non-hilly or hilly terrain) of road in different lengths as considered necessary. (a) For execution of item 215, one Sub Engineer Unit may engage a maximum of one Amin. (Qualified) or Survey Attendant (ITI certificate holder), One field Asstt. Abhiyana (Matric) or Time-Keeper (matric) and 3 mazdoors. Item 215 shall be executed on prior written sanction of the Superintending Engineer/Chief Engineer, specifying the number of SubEngineer units in each Sub Division and the period for which they are to be engaged which shall be issued by first week of proceeding month quarter wise (Jan. to March, April to June, July to Sept. and Oct to Dec.) after assessment of work. 8. The following Indian Standards may be referred to:IS No. 273-1990 1492-1970 1759-1986 Title Picks and beaters (Third revision)(Reaffirmed 2006) Metric surveying chains (first amendments) (Reaffirmed 1998) revision)(with 2

Powrahs (Second revision). (Reaffirmed 2002)

1779-1961 1842-1961 1955-1961 1957-1961

4-Metre levelling staff, folding type (reaffirmed 2006). Surveying chain pins (arrows) (reaffirmed20006). Prismatic compass, liquid (Reaffirmed 2000(Reaffirmed 2006) . Prismatic compass, non-liquid (reaffirmed-2006).

2288-1963 Ranging rods (reaffirmed 2006). 2976-1964 Optical theodolite (reaffirmed 2000). 2988-1995 Venire theodolite (with 3 amendments) (reaffirmed 2007). 4080-1994 Specification for Vertical staff gauges. (Reaffirmed 2000) 4590-1980 Secondary 'level.(First revision)(reaffirmed 2006) 5497-1983 Guide for topographical surveys for river valley projects. (Reaffirmed 2000) 5510-1969 Guide for soil survey projects(Reaffirmed 2005) 8330-2004 for river valley

Telescopic tripod for surveying instruments. Unit m m Rate 0.02R 0.03R Remark

Item No. Item 201 Dag-belling in all types of soil:(a)Single spade stroke (minimum75 mm deep) (b)Double spade "V" shaped stroke(100 mm deep) 202 Trial pit or trial trench excavation as per various items of chapter 4:(1) Item 401 (a) (2) Item 401 (b) (3) Item 402 (4) Item 403 (5) Item 404 (6) Item 405 (a) (7) Item 405 (b) (8) Item 407 (a) (iv) (9) Item 407 (b) (iv)

cum cum cum cum cum cum cum cum cum

0.55R 0.75R 1.00R 2.00R 3.20R 4.70R 6.60R 0.50R 0.68R

Item No. (1) (2) (10)Item 410

Item

Unit (3) cum

Rate

Remark

(11) item 411 (a)

cum

(12) Item 411 (b)

cum

203

204

205

206

(13) Item 412 cum (14) Item 413 cum (15) Item 414 Sq. m (16) Item 416 (a) cum (17) Item 416 (b) cum (18) Item 416 (c) cum (19) Item 416 (d) cum (20) Item 416 (e) cum Boring holes with auger in all types of soil up to 5 m depth below G. L. including collecting samples:(a) 200 mm dia m (b) 250 mm dia m (c) 300 mm dia m (a) Chain and compass survey. (i) Headworkskm (ii) Canals km (b) Chain and theodolite survey:(i) Headworks km (ii) Canals km (c)Theodolite work involving fixing km of stones at every tenth chain, tangent, apex and vertex points of final alignment. Fly levelling for fixing temporary bench marks:(a) Up to 15 m interval km (b) Above 15 m interval km Levelling:(a) Headwork (i) below 5 m interval km

(4) (5) 10% of the item 202(1) to 202(7) 30% of the item 202(1) to 202(3) 8% of the item 202(4) to 202(7) 0.04R 0.06R 0.08R 0.04R 0.11R 0.15R 0.20R 0.25R Augers will be supplied by the Deptt. 1.3R 1.7R 2.00R 6R 4R 6R 4R 12R

6R 3R

10R

For basin survey and dam seat survey.

Item No.

Item (ii) 5 to 10 m interval (iii) more than 10 but up to 15m interval (iv) above 15 m interval (b) Canals(i) below 5 m interval

Unit km km km km

Rate 8R 6R 4R 8R

Remark

For command survey and canal survey, including survey for C. D. works

207

208

209

(ii) 5 to 10 m interval (iii) more than 10 but up to 15 m interval. (iv) above 15 m interval Double levelling for transfer of bench marks(a) up to 15 m interval (b) above 15 m interval Standard bench marks as per type design 8 of Water Resources Deptt:(a) Providing MS plate of size 12x12x0.6 cm and 2 Nos. anchor bolts of 10 mm dia and 30 cm length including shaping and welding etc., complete. (b) Cost of cement, metal and sand (for 0.13 cum 1:2:4 cc) (c) Labour for excavation (any type of soil) mixing, laying and curing of concrete including erection and removal of form work and fixing of MS plate. (d) Cost of water for mixing and curing of concrete. White washing and figuring of benchmarks as per type design 7 of Water Resources Department. Benchmark as per type design 6 of Water Resources Department. (a) Bench mark stone of size 15x15x75 cm-

km Km km

6.4R 4.8R 3.2R

km km

24R 12R

each

32

Drawing enclosed vide Appendix- IV

each each

151 5R

each each

2R 29 Drawing enclosed vide Appendix- V

210

Drawing enclosed vide

Item No.

211

212

213

Item (i) Chisel dressed cut stone (ii) 1:2:4 RCC including cost of steel(b) Erection and fixing (embedding 45 cm depth of stone with 15 cm concrete all around and in bottom)(i) cost of cement, metal and sand (for 0. 11 cu m 1:4:8 C. C. with 40 mm graded metal) (ii) Labour for excavation (any type of soil), handling and fixing of B.M. stone including mixing, laying & curing of concrete. (iii) cost of water for mixing and curing of concrete Construction of temporary approach road of 2.5 m average width for survey vehicles, involving cutting of field boundaries, providing ramps at depressions and touching the uneven surface and jungle clearance(a) In non-hilly terrain (b) Hilly terrain Construction of temporary approach road of 3.8 m average width for survey vehicles, involving cutting of field boundaries, providing ramps at depressions and touching the uneven surface and jungle clearance(a) In non-hilly terrain (b) Hilly terrain Providing and fixing centre line stone(a)Chisel dressed cut stone of size 15x15x60 cm (b)Embedding 30 cm depth of stone with 15 cm concrete all around and in bottom (0.09 cum 1:4:8 c.c. with 40 mm graded metal)(i) cost of cement, metal and sand

Unit each each

Rate 32 53

Remark Appendix- VI

each

74

each

2R

each

1R Payable only with the prior written approval of the Superintending Engineer.

km km

50 R 100 R Payable only with the prior written approval of the Superintending Engineer.

km km

75 R 150 R

each

26

each

61

Item No.

214

215

216

217

Item Unit Rate 1.50 R (ii)Labour for excavation (any type each of soil), handling and fixing of stone Including mixing laying and curing of concrete. (iii)Cost of water for mixing and each 0.50 R curing of concrete. Catchment area survey(a)Chain and compass survey km 6R along ridge line (b)Levelling along ridgeline and km Same as per item 206 (b) cross-sections. As per note Survey for Govt. or private Day 7(a) buildings Kachha, pucca houses or wells including taking detailed measurements thereof, measuring components like fencing etc., and entering in register, sketching, if required, noting specifications for foundation plinth, superstructure, roofing, flooring and doors and windows etc., directly at site. 1845 Resistivity Survey for selection of 1 Site site for Dug well/Tube well/Dug cum bore well including all required material, equipment and labour etc. for one site three soundings. 9R Labour only for Resistivity Survey 1 Site work for selection of site for Dug well/Tube well/Dug cum bore well for one site three soundings.

Remark

Item No. Item Unit 218 Total station survey Ha Topographic and cadastral survey for command areas of irrigation projects using digital state of art total stations GPS , automatic levels etc. including transfer of entire data to computer system in different georefrenced layers / themes using features of standard softwares. Compatible with canal irrigation system design software packages including supply of soft copies and hard copies in appropriate scale. Reconnaissance survey 219 Labour only for general reconnaissance survey of the total geographical area for tracing out the forest area, hillock and area suitable for detailed study. Study Sq.Km of strata of wells and also selection of representative wells of the area for ground water survey purpose only. Geological Investigation 220 Labour only for systematic geological investigation for ground water survey purpose including Sq.Km carrying instrument at site breaking and collection of rock sample etc. complete. Well Inventory 221 (A) Labour only for well inventory for regular observation well(OW) at regular interval in each season One well complete where distance between 2 OW not more than 1 Km. (B) Labour only for well inventory of regular permanent observation well (P.O.W)) at regular interval in One well each season complete where distance between 2 P.O.W is not less than 10 Km.

Rate 128

Remark

0.20R

0.80R

0.20R

2.00R

Item No.

Item

Unit

Rate

Remark

222

223

224

Interference Study Labour only for interference study of wells complete for ground water Job survey purpose only. Collection of Water Sample Labour only for collection of water samples for chemical analysis for One well in area of 10SQ,Km per day 2 Sample No. samples Pumping Test Pumping test of well departmentally with 5 HP pump. Only for ground water draw down observation, including cost of Hour P.O.L i.e. diesel, M.oil, Lubricants etc. and cost of labour crew charges and all material complete.

4.00R

0.50 R

140