Sunteți pe pagina 1din 157

DETAILED CUM ABSTRACT ESTIMATE

N.W:- Construction of high level Bridge on R/F R&B Road to rajoli at 6/8-7/0 Km S No
1 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding VAT & Seigniorage chares.

Description

No.

Length

Breadth

Depth

Quantity

5m to 35m 120m to 150m

1 x1 1 x1

30.00 30.00

15.00 15.00

450.00 450.00 900.00

deduct voids @ 25%

-225.00 675.00

2 Construction of granular shoulders by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN capacity to achieve the desired density, complete as per Technical Specification Clause 402 MORD, including overhead charges & Contractor profit, But excluding VAT Approach towards rajoli Approach towards waddepalli 1 1 1 1 x1 x2 x1 x2 80.60 80.60 280.00 280.00 4.000 1.875 4.000 1.875 0.150 0.150 0.150 0.150 48.36 45.34 168.00 157.50 419.20

WBM Grading 2 (using Graded Metal) 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD .For compacted thickness of 75 mm including overhead charges & Contractor profit, but excluding VAT

Approach towards rajoli Approach towards waddepalli WBM Grading 3 (using Graded Metal)

1 x1 1 x1

80.60 280.00

3.75 3.75

0.075 0.075

22.67 78.75 101.42

4 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD/ MORTH 404. For compacted thickness of 75 mm, including overhead charges & Contractor profit, But excluding VAT Approach towards rajoli Approach towards waddepalli 1 x1 1 x1 80.60 280.00 3.75 3.75 0.075 0.075 22.67 78.75 101.42 5 Prime Coat- Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including overhead charges & Contractors profit but excluding VAT. Approach towards rajoli Approach towards waddepalli 1 x 1 1 x1 80.60 280.00 3.75 3.75 302.25 1050.00 1,352.25

Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding VAT. Approach towards rajoli Approach towards waddepalli 1 x1 1 x1 80.60 280.00 3.75 3.75 302.25 1050.00 1,352.25

Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per Technical Specification Clause 508 MORD. Approach towards rajoli Approach towards waddepalli 1 x1 1 x1 80.60 280.00 3.75 3.75 302.25 1050.00 1,352.25

Seal Coat

Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B, as per Technical Specification Clause 510 MORD. (using Three wheel 80-100 kN static roller) Approach towards rajoli Approach towards waddepalli 1 x1 1 x1 80.60 280.00 3.75 3.75 302.25 1050.00

1,352.25 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing

Approaches towards rajoli

1 x1

400.00

3.75

0.2

300.00

Asst Exe Engineer PIU SD.Manopad

Dy.Exe.Engineer PIU.SD.Manopad

Executive Engineer PIU.Narayan pet

Superintending Engineer PR Circle Mahabubnagar

Quantity

sqm

cum

cum

cum

sqm

sqm

sqm

sqm

Cum

ABSTRACT ESTIMATE Name of the Work:- Detailled cum Abstract estimate for C/o of Construction of High level Bridge on R/F R&B Road to pedda dhanwada via Mandoddi at 10/6-10/8 Km Est Rs 400.00 Lakhs Sl. Description of Item No L B D Quantity Rate (Rs) No. 1 2 3 4 5 6 7 8 1 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding VAT & Seigniorage chares. unit 9

By Machanical Means 6080.00 2 Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD/ 305 MORTH including overhead charges & Contractor profit, But excluding VAT

1.35

/10 sqm

as per calculation sheet from 1862.88 3 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN capacity to achieve the desired density, complete as per Technical Specification Clause 402 MORD, including overhead charges & Contractor profit, But excluding VAT 432.00

117.34

1cum

348.06 /1 Cum

Construction of granular shoulders by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN capacity to achieve the desired density, complete as per Technical Specification Clause 402 MORD, including overhead charges & Contractor profit, But excluding VAT 306.56 348.06 /1 Cum

Shoulders 5 WBM Grading 2 (using Graded Metal) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD .For compacted thickness of 75 mm including overhead charges & Contractor profit, but excluding VAT

6 184.78 7 WBM Grading 3 (using Graded Metal) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD/ MORTH 404. For compacted thickness of 75 mm, including Prime Coat- charges & Contractor profit, But overhead Low porosity excluding VAT 2030.81 Cum

153.28

2258.90 Cum

Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including overhead charges & Contractors profit but excluding VAT.

2,043.75 9 Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but 2,043.75 excluding VAT. 10 20mm thick Open-Graded Premix Carpet using Bituminous (Penetration grade / Modified Bitumen ) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per Technical Specification Clause 508 MORD.

26.48 /1 sqm

9.53 /1 sqm

2,043.75 11 Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B, as per Technical Specification Clause 510 MORD. (using Three wheel 80-100 kN static roller) 2,043.75 12

126.33 /1 sqm

42.54 /1 sqm

Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and 90.00 4829.70 Cum Total Rs.

Asst Exe Engineer PIU SD.Manopad

Dy.Exe.Engineer PIU.SD.Manopad

Executive Engineer PIU.Narayan pet

Superintending Engineer PR Circle Mahabubnagar

on of High level Bridge on

Amount(Rs) 10

8208.00

218597.00

gsb 150362.00

738.56

106701.00

89

375253.00

346244.00

54119.00

19477.00

258187.00

86941.00

434673.00 2058762

tending Engineer cle Mahabubnagar

DETAILED CUM ABSTRACT Name of the Work:- Detailled cum Abstract estimate for C/o of Construction of High level Bridge on R/F R&B Road to rajoli at 6/8-7/0 Km Est Rs 410.00 Lakhs
Sl.No

Measurement No Length Breadth Depth 1 2 3 4 5 6 1 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding VAT & Seigniorage chares. Description of Work

Quantity 7

Rate/Per 8

Amount 9

5m to 35m 120m to 150m deduct voids @ 25%

1x1 1x1

30.00 30.00

15.00 15.00

450.00 450.00
900.00 -225.00 675.00

1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares.

Above water level up to 3.0m depth


P3 : (97.415 to 96.02) P4 :(96.2 to 94.2) P1 : (97.415 to 96.02) P5 :(96.10 to 95.65) Abutment A1 :(98.165 to 96.345) 1x1 1x1 1x1 1x1 1x1 8.50 8.50 8.50 8.50 11.00 8.20 8.20 8.20 8.25 9.00 1.40 2.00 1.40 0.45 1.82 97.58 139.40 97.23 31.56 180.18

Vp 3,4 of A/121/09-10 Abutment A2 :(98.165 to 96.345) P8 :(97.415 to 96.02) P7 :(96.685 to 95.30) P6 & P2 : (96.105 to 95.65) 1x1 1x1 1x1 1x2 11.00 8.50 8.50 8.50 9.00 8.20 8.20 8.25 1.82 1.40 1.39 0.455 180.18 97.23 96.53 63.81 983.708 For ramp Body walls : On Waddepalli side (0 to 10m) On Waddepalli side (10 to 20m) On Rajoli side (0 to 10m) On Rajoli side (10 to 20m) 1x1 1x1 1x1 1x1 10.00 10.00 10.00 10.00 4.30 4.10 4.30 4.00 (1.65+0.45) (1.65+0.45) (1.65+0.45) (1.65+0.45) 62.25 61236

2 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares.
SDR Soils not requiring blasting For P4 (94.20 to 93.20) Abutment A1 :(96.345 to 95.10) 1x1 1x1 (8.5+8.25)/2 10.80 Vp 4of A/121/09-10 Abutment A2 :(96.345 to 95.25) 1x1 10.80 8.90 1.095 105.25 293.381 71.15 20874 (8.25+8.1)/2 8.90 1.000 1.245 68.46 119.67

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares.

F&F Rock requiring blasting For P1 (96.02 to 93.50) For P2 (95.65 to 93.50) For P3 (95.02 to 93.50) For P5 (95.65 to 93.50) Abutment A1 :( 95.10 to 93.10) 1x1 1x1 1x1 1x1 1x1 (8.5+8.25)/2 (8.5+8.25)/2 (8.5+8.25)/2 (8.5+8.25)/2 10.80 (8.25+8.1)/2 (8.25+8.1)/2 (8.25+8.1)/2 (8.25+8.1)/2 8.90 2.520 2.450 1.520 2.450 2.000 172.52 167.73 104.06 167.73 192.24

Vp 5of A/121/09-10
Abutment A2 :(95.25 to 93.10) For P8 (96.02 to 93.50) For P7 (95.30 to 93.50) For P6 (95.65 to 93.55) 1x1 1x1 1x1 1x1 (10.8+10.6)/2 (8.5+8.2)/2 (8.5+8.25)/2 (8.5+8.25)/2 (8.9+8.6)/2 (8.25+8.1)/2 (8.25+8.1)/2 (8.25+8.1)/2 2.150 2.520 1.800 2.400 201.29 172.53 123.23 164.31 1465.64 Filling sand in foundation trenches of wing walls including all labour charges etc complete For ramp Body walls : On Waddepalli side (0 to 10m) On Waddepalli side (10 to 20m) On Rajoli side (0 to 10m) On Rajoli side (10 to 20m) 1x1 1x1 1x1 1x1 10.00 10.00 10.00 10.00 4.30 4.10 4.30 4.00 0.45 0.45 0.45 0.45 19.35 18.45 19.35 18.00

4 Providing concrete for plain concrete M 15 grade in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT& Seigniorage charges for Leveling Coarse below Foundation
For Abutments A1 P1 to P5 : 1x1 1x5 9.30 6.70 6.70 6.70 0.30 0.30 18.693 67.335

Vp 6 of A/121/09-10
For Abutments A2 P6 : P7 : P8 : 1x1 1x1 1x1 1x1 9.30 6.70 6.70 6.70 6.70 6.70 6.70 6.70 (0.25+0.3)/2 0.25 (0.25+0.3)/2 0.30 17.135 11.220 12.345 13.467

For ramp Body walls : Bed concrete On Waddepalli side (0 to 10m) On Waddepalli side (10 to 20m) On Rajoli side (0 to 10m) On Rajoli side (10 to 20m) For ramp Body walls : Ist Footing On Waddepalli side (0 to 10m) On Waddepalli side (10 to 20m) On Rajoli side (0 to 10m) 1x1 1x1 1x1 10.00 10.00 10.00 4.25 4.00 4.05 0.50 0.50 0.50 21.25 20.00 20.25 1x1 1x1 1x1 1x1 10.00 10.00 10.00 10.00 4.30 4.10 4.30 4.00 0.15 0.15 0.15 0.15 6.45 6.15 6.45 6.00

On Rajoli side (10 to 20m) For ramp Body walls : IInd Footing On Waddepalli side (0 to 10m) On Waddepalli side (10 to 20m) On Rajoli side (0 to 10m) On Rajoli side (10 to 20m) 5

1x1

10.00

3.90

0.50

19.50

1x1 1x1 1x1 1x1

10.00 10.00 10.00 10.00

(3.25+2.25)/2 (3.00+2.00)/2 (3.05+2.05)/2 (2.90+1.90)/2

1.00 1.00 1.00 1.00

27.50 25.00 25.50 24.00 348.25

Providing concrete for VRCC M 15 grade in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT& Seigniorage charges for ramp body walls superstructure above G.L
For ramp Body walls : Super structure walls On Waddepalli side (0 to 10m) 1x1 On Waddepalli side (10 to 20m) 1x1 On Rajoli side (0 to 10m) 1x1 On Rajoli side (10 to 20m) 1x1 10.00 10.00 10.00 10.00 (2.25+0.45)/2 (2.00+0.45)/2 (2.05+0.45)/2 (1.90+0.45)/2
(5.175+4.775)/2 (4.775+4.375)/2 (4.34+3.94)/2 (4.00+3.595)/2

27.50 25.00 25.50 24.00 658.30

5 VRCC M 25 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel below G.L 3.0 to 5.0m ht BELOW WATER LEVEL For 1st footing For Piers (P1 to P8) For abutments A1 , A2 For 2nd footing For abutments A1,A2 For Piers P1 to P5 1x8 1x2 1x2 1x8 6.5 9.0 8.65 3.5 6.50 6.40 4.00 3.50 1.100 1.500 1.000 1.000 371.8 172.8 34.6 98.0

Ramp Wing walls from Ch +02m to +32.0m on Mandoddi side 1x2 30.00 1x2 30.00 Ramp Wing walls from Ch +199m to +219.0m on Nasanoor side 1x2 20.00 1x2 20.00

5.70 5.10 5.70 5.10

0.60 0.45 0.30 0.45

205.20 137.70 68.40 91.80

1180.3 Cum

4238.05 /1 Cum

5002170

6 VRCC M 25 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel for Piers & Abutments up to 5.0m ht in superstructure Above water level For abutments A1,A2 For Piers 1x2 3.14x8/4 8.45 1.60 (1.50+1.00)/ 2 1.60 4.40 3.00 92.95 48.23

Ramp Wing walls from Ch +02m to +32.0m on Mandoddi side 1x2 30.00 (4.5+0.45)/2 (6.5+5.5)/2 891.00

Ramp Wing walls from Ch +199m to +219.0m on Nasanoor side 1x2 20.00 (4.5+0.45)/2 (6.5+5.85)/2 611.32

1643.50 Cum

4347.30 /1 Cum

7144789

7 VRCC M 30 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel for Piers & Abutments above G.L for superstructure For Bed blocks For Pier caps For Over Abutment Hammer head blocks (bottom) Hammer head blocks (Top) For Backing Walls 1x8 1x2 1x8 1x8 1x2 1.6 8.45 (1.6+6.2)/2 6.2 8.45 1.6 1.08 1.6 1.6 0.50 0.500 0.500 0.700 0.700 1.375 Cum 8 10.240 9.084 34.944 55.552 11.619 121.439

4963.54 /1 Cum

602765

Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel For deck slab(As per MOST Drg no:Vol:III BD/13-76,BD/14-76A,BD/15-76A P.no 77 to 81) For deck slab 1x9 61.2 550.800 550.800 4914.78 2707061

P.C.C. M 15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD & 2700 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares For leveling course below approach slab.

3.500

8.450

0.150
Cum

8.873

3199.76

28390

10 Providing and laying cement concrete wearing course M 30 grade excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares For Over deck slab For Over approach slabs 1x9 1x2 17.11 3.50 7.5 7.5 0.075 0.075 Cum 86.619 3.938 90.557

4221.31 /1 Cum

382269

10 Reinforced cement concrete M30 for approach slab including reinforcement and formwork complete as per drawing and Technical specification Clause 800, 1211 MORD / 1500, 1600, 1700 & 2704 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares ,Cost of Steel For Approach slab 1x2 3.50 7.5 0.300 Cum 15.750 15.750

4218.59 /1 Cum

66443

11 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. 495.000 495.000 504.20 Supplying, fitting, and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding VAT 1x2 110.00 7.5 0.300

249579

As per Designs incl skin reinforcement for Ramp body walls on either side of bridge

281250

42.52

11958750

13 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares.

1x1 1x1

30.00 20.00

7.5 (3.9+2.9)/2 7.5 (3.9+3.35)/2

765.000 543.750 532498

1308.750 406.88 14 Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications MORD ,including overhead charges and contractors profit but excluding VAT & seigniorage chareges etc.complete 1x12 12.000 LS

2673

16 Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. 2x50 17 Provision for Soil investigation charges as per Bill 2.50 100.000 235.75 58938 212000

29030435

Asst Exe Engineer PIU SD.Manopad

Dy.Exe.Engineer PIU.SD.Manopad

Executive Engineer PIU.Narayan pet

Superintending Engineer PR Circle Mahabubnagar

26 30.8 0 25.3 14 0

1.100 1.500 0.000 1.000 1.000 0.000

28.6 46.2 0 25.3 14 0 114.1

1.9 1.03

20.7 68.38

91.08 205.14

doubt whether VRCC M25 can be given

Note File No. W23/AP II IX LB 10 /Pedda Dhanwada/MBNR/2010 Subject:- Mahabubnagar Dist - PMGSY-Ph-IX- AP 11 IX LB 10- C/o of High Level Bridge on R/F R&B Road to Pedda Dhanwada (via)Mandoddi @ 10/6 to 10/8KM - Rs.401.80 lakhs

Submitted Sir, Please peruse the Subject cited where in the SE,PR, Mahabubnagar has submitted estimate for the work , construction of High Level Bridge on R/F R&B Road to Pedda Dhanwada (via) Mandoddi @ 10/6 to 10/8KM , Est. cost Rs.401.80 lakhs for accoridng technical sanction. Name of the District Name of the Division Name of the sub division Name of the Mandal Name of the work : Mahabubnagar : Mahabubnagar : Narayanpet : Waddepalli : Construction of high level Bridge on Road from R&B Road to Pedda Dhanwada (via) Mandoddi @ 10/6 to 10/8KM : GO Ms No 330 dt 17.9.2010 of PR & RD (Progs II) Dept Sl.No.294 : AP 12 IX LB 10 : yes cleared : Rs.401.80 lakhs ( Rs 71.66 GOI + Rs.330.124 State share)

Administrative sanction Ref. No. & date Package No Whether cleared by STA or not Admn sanction Cost Bridge Design approval Ref Habitations benefitted

: Drawings given by Design section of this office. Approved copy yet to be given : Chinna Danwada - 1255 Mandoddi - 3845 Nasanur-1227 Pedda Dhanwada - 2500 Palcherla-3093 Pangal-3465

Hydraulic particulars Linear water way of the proposed bridge HFL RCL LBL Type of bridge Type of foundation

: 165 m : +99.950 m : +102.015 m : + 97.405m : High level bridge Isolated foundation

No of vents proposed as per design : 11 vents of 10.37 M effecitve span No of vents proposed by SE 14 vents of 10.37 M effecitve span width of the structure proposed : 7.50m wide

Length of the structure proposed Back to Back of abutments cost per m Approach road proposed if any Whether inspection report of SE/EE is furnished

: 165 m

meters

: 2.44

lakhs

: Approach road for a length of 0.545 KM BT and 0.03 KM M30 CC proposed : Not Furnished

SSR & DATA used for preparation : Common SSR 2010-11 & As per AP Revised Standard DATA with Estimate 14% OH & CP excluding 4% VAT and Seigneorage Rates of Cement, steel Item Cement Steel Fe-415 Steel MS Bitumen Prime coat Tack coat Provisions made in the estimate Sl. No I Description Part-A Bridge work 14v 10.37 m span Foundation 1(i) Earth work excavationOrdinary soils below water level up to 3m depth 983.71 ii Ordinary Soil below water level from 3m to 6m depth 293.38 2 Earth work excavationOrdinary soils below water level up to 3m depth for Ramp body wall 2 PCC (1:3:6) levelling course for piers ,Abutments below Foundation 3 PCC M 15 for Foundations of piers,Abutments 1180.30 Sub structure 6 PCC M 15 for piers,Abutments 7 RCC M 25 for bed blocks 121.44 cum 4963.54 1Cum 602765 1643.50 cum 4347.30 1Cum 7144789 cum 4238.05 1Cum 5002170 cum 71.15 1Cum 20874 cum 62.25 1Cum 61236

: : : : : : : Quantity

Rate Rs Rs Rs Rs Rs Rs unit

4600.00 34500 34500 29486.03 22128.83 22678.04 Rate

Unit MT MT MT MT MT MT per

Date Oct -2010 Oct -2010 Oct -2010 01-11-10 01-11-10 01-11-10 Amount

#REF!

cum

#REF!

1 cum

#REF!

6.00

cum

0.00

1Cum

8 Weep holes 9 Back filling 10 Filter media Super sructure 11 RCC M 25 for Deck slabs

100.00 1308.75 495.00

No cum cum

235.75 406.88 504.20

1Nos 1Cum 1Cum

58938 532498 249579

550.80 12 RCC M 30 for Approach slabs 13 RCC M 30 for Wearing course 14 PCC M15 for levelling Course below Approach slab 15 20mm thick premoulded joints Steel 17 HYSD Reinforcement for footings 18 HYSD Reinforcement for Sub structure 19 HYSD Reinforcement for super structure Provision for Soil investigation charges as per Bill Total Approach Road Jungle clearence 6080.00 Earth work excavation using side earth GSB Shoulders 306.56 Gr - II 184.78 Gr - III 153.28 Prime coat 2043.75 Tack Coat 2043.75 OGPC 2043.75 Seal coat 2043.75 1862.88 432.00 15.75 90.56

cum Cum cum

4914.78 4218.59 4221.31

1Cum 1Cum 1Cum

2707061 66443 382269

8.87 12.00

cum Rm

3199.76 LS

1Cum 1Rm

28390 2673

0.00 #REF! #REF!

MT MT MT

42.52 #REF! #REF!

1 MT 1MT 1MT

11958750 #REF! #REF! 212000

#REF!

8208 10sqm 1.35 218597 Cum Cum Cum Cum Cum Sqm Sqm Sqm Sqm 117.34 150362 348.06 106701 348.06 375253 2030.81 346244 2258.90 54119 26.48 19477 9.53 258187 126.33 86941 42.54

CC Pavement 90.00 II III IV V VI VII Approach road (CC Pavement) Vat @ 4% Seignioragre charges Provision for Name boards & sign boards Soil testing and DPR preparation charges unforeseen items Cum 4829.70

434673 2058762 1243568 1000000 20000 310892 5004721 38668377

PART B Maintenance cost Grand Total Hence if agreed the estimate may be put up for technical sanction. Subject to approval The estimate is h/w put up for technical sanction for Rs.401.80 lakhs against the OAS amount of Rs.401.80 lakhs for PART A and technical approval for Rs.402.805 lakhs for PART (A+B).And also a draft memo to the SE,PR, Mahabubnagar is here with put up for perusal & approval 100500 38768877

Note File No. W23/AP I2 IX LB 03 /RangaReddy guda/MBNR/2010 Subject:- Mahabubnagar Dist - PMGSY-Ph-IX- AP 12 IX LB03- C/o of Cause way on R/F NH7
RangaReddyguda to Palugu thanda (via) Kallepally @ 2/4 to 2/6 KM - Rs.201.44 lakhs

Submitted, Sir, Name of the District Name of the Division Name of the Mandal Name of the work : Mahabubnagar : Mahabubnagar : Balanagar : Construction of Cause way on R/F NH7 RangaReddy guda to Palugu thanda (via) kallepally

Administrative sanction Ref. No. & date Package No

: GO Ms No 330 dt 17.9.2010 of PR & RD (Progs II) Dept Sl.No.294 : API2 IX LB 03 : Drawings given by Design section of this office

Admn sanction Cost Bridge Design approval Ref Linear water way of the proposed bridge MFL RCL Type of bridge Type of foundation No of vents proposed with span width of the structure proposed Length of the structure proposed Back to Back of abutments cost per m Approach road proposed if any

Rs.201.44 lakhs (state share:Rs.0.00 Llaks)

: Approved copy yet to be given : 83.70 : 101.2 : 103.13 : High level bridge Isolated footings : 10 vents of 8.37 M effective span : 7.50m wide : 8.70 : 24.96 :
Proposed

meters

meters

Whether inspection report of SE/EE is furnished SSR & DATA used for preparation Estimate

: Not Furnished : Common SSR 2010-11 & As per AP Revised Standard DATA with 14% OH & CP excluding 4% VAT and Seigneorage

Rates of Cement, steel Item Cement Steel Fe-415 Steel MS Emulsion (SS1) Emulsion (RS1) Bitumen (60/70 Grade) Provisions made in the estimate Description Bridge part (9V 10.37m effective span) Foundation Earth for foundatio up to 3.00 m below water level Earth for foundatio up to 3.00 m to 6.00 m below water level PCC (1:3:6) levelling course for piers ,Abutments PCC M 15 for Foundations of piers,Abutments Sub structure PCC M 15 for Body walls #REF! #REF! 62.25 138039 71.15 38944 #REF! 3180.33 490461 #REF! 3850.00 3367129 Quantity Rate Amount : : : : : : : Rate 4600.00 34500.00 34500.00 22128.83 22678.04 29486.03 Unit MT MT MT MT MT MT

PCC M 15 for piers,Abutments

439.74

4040.31

1776669

RCC M 25 for bed blocks RCC M 15 forBody walls Super sructure RCC M 25 for Deck slabs RCC M 30 for Approach slabs RCC M 30 for Wearing course PCC M15 for levelling Course below Approach slab RCC M25 for Railling Steel HYSD Reinforcement for Deck slab HYSD Reinforcement for Sub structure HYSD Reinforcement for Foundations Protection works Back filling Filter media Weep holes Drainage sprouts,Piching of slops etc Misllaneous items

25.03 1068.00

4949.66

123895
4040.31

4315051
621.9 17.1 58.75 5.25 207.68 5330.63

3315119
4651.16

79535
4725.87

277635
3751.56

19696
1897.50

394074
36.70 16.50 2.50 44467.11

1631943
43720.87

721394
43622.56

109056
3660.00 157.82 232.00 314.00 1149222 950.79 150049 236.86 54951 LS 75961 95000 Total Approach road Vat @ 4% Seignioragre charges Provision for Logo Board and Information Boards soil testing and DPR preparation charges unforeseen items 18323823 0 732953 500100 20000 183238 2017886

21778000 PART B Maintenance cost 544000 22322000

Hence if agreed the estimate may be put up for technical sanction.Subject to approval The estimate is h/w put up for technical sanction for Rs.217.78 lakhs against the OAS amount of Rs.217.78 lakhs for PART A and technical approval for Rs.232.22 lakhs for PART (A+B)

BNR/2010

Cause way on R/F NH7 KM - Rs.201.44 lakhs

on R/F NH7 RangaReddy kallepally

0 of PR & RD (Progs II)

ection of this office

te share:Rs.0.00 Llaks)

en

span

s per AP Revised OH & CP excluding 4%

Date Oct -2010 Oct -2010 Oct -2010 Nov-2010 Nov-2010 Nov-2010

Amount

:: GENERAL ABSTRACT :: Name of Work : Construction of High level Bridge on R/F R&B Road to Pedda Dhanwada @ KM 10/6 to 10/8 KM S.No. 1 2 Description Bridge Proper (14V x 10.370 m eff) Road part for approaches (BT+CC Pavement) SUB TOTAL 3 4 5 6 Add Seigniorage charges as per statement Provision for Cautionery Board and Nomeclature Boards Add VAT @ 4% Add DPR charges @ 1% Amount (Rs.) 29030435 2058762 31089197 1000000 20000 1243568 310892 5004721 TOTAL PART-B 7 Provision for Routine Maintenance PART-B Total PART (A+B) 100500 100500 38768877 (Rs.) 38668377

The work is Administratively Sanctioned for RS.401.80 Lakhs vide Go MS .No:300,dt:17.09.2010 of PR&RD Progs II Dept

PART-A is Technically Sanctioned for Rs.401.80 Lakhs (Rupees Four crores one lakh and eighty thousands only) and entered in the register as TSR No: /2010-11,dt: .11.2010 Technically approved for RS.402.805 lakhs for PART (A+B)

LEAD STATEMENT -SSR - 2010-11 Name of Work : Construction of High level Bridge on R/F R&B Road to Pedda Dhanwada @ KM 10/6 to 10/8 KM
Sl No.
Conveyance charges including OH,CP@14%

Description in Material

Name of the Quarry

Lead in Km

Initial of Material 6

Blasting Charges 7

Machine Crushing Charges 25% extra on Initial cost

Total Cost material (6+ 7+ 8) 9

Unit

1 1 Gravel

2 Konkal Local

4 14 5 69 69 69 69 69 69 69 69 69 69 69 69 6 69 69 69

5 134.80 57.40 553.20 553.20 553.20 553.20 553.20 553.20 553.20 553.20 553.20 553.20 553.20 553.20 66.00 553.20 553.20 553.20

50.50 70.00 360.00 390.00 500.00 830.00 950.00 500.00 830.00 950.00 690.00 560.00 430.00 260.00 220.00 500.00 844.00 688.00 70.00 70.00 70.00 125.00 211.00 172.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 125.00 207.50 237.50 172.50 140.00 107.50 65.00

10 50.50 1Cum 70.00 1Cum

2 Sand for Blindage 3 60-63mm HBG metal 4 50 -55mm HBG Metal 5 40-45mm HBG Metal 6 25-27mm HBG Metal 7 19 - 22mm HBG metal 8 40-45mm HBG M/C Metal 9 25-27mm HBG M/C Metal 10 19 - 22mm HBG M/C metal 11 12-14 mm HBG M/C Metal 12 9.5-11.2 mm HBG M/C Metal 13 5-7 mm HBG M/C Metal 14 2.36 -5 mm HBG M/C Metal 15 Sand for Mortor 16 40 mm HBG M/C Metal-SS5 17 20 mm HBG M/C Chips-SS5 18 12 mm HBG M/C Chips-SS5

Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram Mannapuram TB River Mannapuram Mannapuram Mannapuram

430.00 1Cum 460.00 1Cum 570.00 1Cum 900.00 1Cum 1020.00 1Cum 695.00 1Cum 1107.50 1Cum 1257.50 1Cum 932.50 1Cum 770.00 1Cum 607.50 1Cum 395.00 1Cum 220.00 1Cum 695.00 1Cum 1125.00 1Cum 930.00 1Cum
WMM2
OGPC 66% 12-14, 34% 57mm Type-A Scr.100% 5-7mm Type-B Scre- Avg. of 5-7 mm & 2.365mm

WMM1

1 2 19 10 mm HBG M/C Metal-SS5 20 2.36 mm Below Metal 21 Jeddy stone above 450 to 600mm
for approns

3 Mannapuram Mannapuram Mannapuram Mannapuram

4 69 69 69 69 69 69

5 553.20 553.20 553.20 553.20 553.20 553.20 89.80 79.20

6 560.00 236.00 156.00 95.00 34.10 82.00

7 70.00

8 140.00

9 10 770.00 1Cum 236.00 1Cum


Type-B SC 100% 2.36mm below

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

156.00 1Cum 95.00 1Cum 34.10 1Cum 82.00 1Cum 89.80 1Cum 79.20 1Cum

22 For SS revtement 300mm thick

23 Stone spalls ( 25 to 80mm size Mannapuram (SS 5)) 24 Soling stone of 150 mm size of granite, Mannapuram
trap and Dolamite varieties.

24 25 26 27 28

Loading manual & Unloading by mechanical means -Metal (78.90+10.90)


Loading manual & Unloading charges by mechanical means - Gravel, Sand, earth (68.30+10.90)

Emulsion (SS-1) including 4% CST as on 1-10-2010 Emulsion (RS-1) including 4% CST Bitumen 60/70 grade including 4% CST

Chennai Chennai Chennai Kurnool Kurnool Kurnool Kurnool Kurnool

1038 1038 1038 52 52 52

3114.00 3114.00 3114.00 420.10 0.00 222.80 0.00 192.50

22128.83 22678.04 29486.03 4885.00 866.00 2370.00 466.00 1915.00

Ad % S d 4 CT

885.15 907.12 1179.44

26127.98 1 MT 26699.16 1 MT 33779.47 1 MT 5305.10 Rm 866.00 Each 2592.80 Rm 466.00 Each 2107.50 Rm 349.00 Each 4,600.00 1 MT 34,500.00 1 MT 34,500.00 1 MT

29 1000mm Dia NP3 Class 30 1000mm Dia Collar 31 700mm Dia NP3 Class 32 700mm Dia Collar 33 600mm Dia NP3 Class 34 26 27 28

600mm Dia Collar Kurnool 0.00 349.00 Rate approved by GOAP Sep-10 Cement 4600.00 Steel - Fe-415 - do 34,500.00 Mild Steel - do 34,500.00 1):- Certified that the leads provided above are true and nearest to the best of my knowledge and belief 2):- Certified that the HBG materials are procured after blasting. 3):- Water Cost Provision required for Road work and CD works ( Y/ N ) N

Page 41 of 157 RATE ANALYSIS (ROAD WORK) - SSR 2010-11 Name of Work : Construction of High level Bridge on R/F R&B Road to Pedda Dhanwada @ KM 10/6 to 10/8 KM S. No. 1 Index Description of item Code RBR- Clearing and grubbing road land including uprooting wild STCL-2 vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding VAT & Seigniorage chares. Unit = 10 sqm Taking output = 1 hectare By Mechanical Means In area of non-thorny jungle (light jungle) a) Labour Mazdoor (Unskilled) b) Machinery Dozer D 50 with attachment or suitable machinery for removal of trees & stumps Tractor with trolley 3t hour hour 10.00 1.00 1081.19 345.00 14% 10811.9 345.00 11972.26 c) Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per hectare a+b+c Rate per 1 Sqm=(a+b+c)/10116.81 2 RBR- Construction of embankment with material obtained EECD-3 from road way cutting by using Machinery Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including overhead & Contract profit but excluding VAT & Seigniorage chares Rs. 1676.12 13648.38 1.35 day 4.16 196.00 815.36 Unit Qty Rate Amount

a)

b)

c)

d)

Taking Out put = 100 Cum Labour Mate Mazdoor day 0.52 Machinery Dozer D-50 for spreading @ 200 cum per hour hour 0.50 Motor grader for grading @ 200cum per hour hour 0.50 Water tanker 6kl capacity hour 2.00 Vibratory Roller 80-100 KN @100cum per hour hour 1.00 Material Cost of water Kl 12.00 Seignorage charges for earth Cum 100.00 Total Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate for 100 cum Rate per cum

196.00 1081.19 2600.00 345.00 1704.60 0.00 22.00 14% Rs.

101.92 540.60 1300.00 690.00 1704.60 0.00 2200.00 4337.12 607.2 7144.32 71.44

Page 42 of 157 S. No. 3 Index Description of item Code RBR- Construction of Embankment with Material Obtained EECD-4 from Borrow pits by Machinery Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including overhead charges & Contractor profit, But excluding VAT & Seigniorage chares Unit Qty Rate Amount

a) b)

c)

d)

Unit = cum Taking output = 100 cum Labour Mazdoor (Unskilled) day Machinery Hydraulic Excavator 0.9 cum bucket capacity @ 60 cum hour per hour Tipper 5.5cum with 10T capacity hour Dozer D50 for spreading @ 200 cum per hour hour Motor grader for grading @ 200cum per hour hour Water tanker 6 KL capacity hour Vibratory Roller 80-100 KN @100cum per hour hour Material Cost of water Kl Basic rate of formation of road with borrow soils per 100Cum Basic rate of formation of road with borrow soils per 1 Cum Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per cum

1.04 1.670 4.50 0.50 0.50 2.00 1.00 12.00

196.00 1808.50 629.80 1081.19 2,600.00 345.00 1704.60 0.00

203.84 3020.20 2834.10 540.60 1300.00 690.00 1704.60 0.00 10293.34 102.93

14% Rs.

14.41 117.34

RBR- WBM Grading 2 (using Graded Metal) - Hand Broken SBBS-9 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD. For compacted thickness of 75 mm including overhead charges & Contractor profit, but excluding VAT & Seigniorage chares for Gr-II ( Hand Broken metal )

By Manual means Taking out put = 360 cum a) Labour Mazdoor (Skilled) Mazdoor (unskilled) b) Machinery Vibratory Roller 80-100 KN @60cum per hour Water tanker 6kl capacity c) Material (Total Qty 435.60 Cum) 60-63 mm IRC HBG Metal (50% of 435.60 cum) 40-45 mm IRC HBG Metal (46% of 435.60 cum) Cum Cum 217.80 200.38 430.00 570.00 93654.00 114216.60 hour hour 6.00 24.00 1704.60 345.00 10227.60 8280.00 day day 12.08 250.00 196.00 196.00 2367.68 49000.00

Page 43 of 157 S. No. Index Code Stone Screening Type B 11.2 mm for Grading 2 @ 0.18cum/10sqm (Avg. rate of 5-7 mm chips & 2.36 -5mm chips ) Binding Material @ 0.06 cum per 10 sqm for Grading 2 material size 2.36mm & below having PI value 2-6% ( 66% stone dust +34% Gravel )-> Stone dust 66% --> Gravel 33% cum 86.40 501.25 43308.00 Description of item 19-22 mm IRC HBG Metal (4% of 435.60 cum) Unit Cum Qty 17.42 Rate 1020.00 Amount 17768.40

cum

19.01

236.00

4486.36

cum Kl

9.79 144.00

50.50 0.00

494.40 0.00 343803.04 955.01

Cost of water Basic rate for 360 Cum d)

Rate per Cum Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per cum Add Manual Loading & Mech.Unloading for Hand broken Metal Add for conveyance for Hand broken Metal Add for conveyance for Metal (m/c) Add for conveyance for Gravel Rate per cum cum cum cum cum 1.21 1.21 0.29 0.027

14%

133.7 1088.71 108.66 669.37 160.43 3.64 2030.81

89.80 553.20 553.20 134.80 Rs.

RBR- WBM Grading 3 (using Graded Metal) Machine crushed metal SBBS-9
(i) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD/ MORTH 404. For compacted thickness of 75 mm, including overhead charges & Contractor profit, But excluding VAT & Seigniorage chares for Gr-III ( Machine Crushed )

a)

b) c)

By Manual means Taking out put = 360 cum Labour Mazdoor (Skilled) Mazdoor (unskilled) Machinery Vibratory Roller 80-100 KN @60cum per hour Water tanker 6kl capacity Material (total Qty of Metal 435.60 Cum)
40-45 mm IRC HBG M/c Metal ( 82% of 435.60 Cum) 19-22.40 mm IRC HBG M/c Metal ( 18% of 435.60 cum)

day day hour hour Cum Cum cum Cum

12.08 250.00 6.00 24.00 357.19 78.41 86.40 0

196.00 196.00 1704.60 345.00 695.00 1257.50 501.25

2367.68 49000.00 10227.60 8280.00 248247.05 98600.58 43308.00

Stone Screening

Type-B 11.2mm @ 0.18 cum per 10 sqm (Avg. rate of 5-7 mm chips & 2.36 -5mm chips )

Binding Material ( BT tobe teken up simultaneously)

d)

Cost of water Kl 144.00 Basic rate for 360 Cum Rate per Cum Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Add for conveyance for Metal Rate per cum cum 1.45

0.00

14% 553.20 Rs.

0.00 460030.91 1277.86 178.9 1456.76 802.14 2258.90

Page 44 of 157 S. No. 5 Index Description of item Code RBR- Granular Sub-base coarse Graded SBBS-1 material(Table:400.2) Construction of granular sub-base / shoulders by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface mixing by mixing place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification clause 401 MORD/MORTH , including overhead charges & Contractor profit, But excluding VAT & Seigniorage chares Unit Qty Rate Amount

For Grading III Material ( CBR Value min 20)

a) b)

c)

Taking out put = 300 cum Labour Mazdoor (Skilled) Mazdoor (Un-Skilled) Machinery Motor grader for grading 110 HP @ 50cum per hour Vibratory Roller 80-100 KN @10cum per hour Tractor with rotavator @ 25 cum per hour Water tanker 6kl capacity Material
Well graded granular sub-base material as per table 400.2

day day hour hour hour hour

2.40 8.00 6.00 6.00 12.00 3.00

196.00 196.00 2,600.00 1704.60 345.00 345.00

470.40 1568.00 15600.00 10227.60 4140.00 1035.00

a) c)

Cost of materials 9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 2.36 mm below @ 34% (Sand) cum 129.00 Cost of water Kl 18.00 Basic rate of Granular sub base for 300 cum Basic rate of Granular sub base cum Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Add for conveyance for Gravel Add for conveyance for blindage sand Rate per cum cum cum 0.85 0.43

50.50 70.00 0.00

14% 134.80 57.40 Rs.

12877.50 9030.00 0.00 54948.50 183.16 25.64 208.80 114.58 24.68 348.06

Page 45 of 157 S. No. 6 Index Description of item Code RBR- Cement Concrete Pavement CCPV-5 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Unit Qty Rate Amount

Technical Specification Clause 1501 MORD including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Unit = cum Taking output = 75cum (172.50 t) (100x3.75 x 0.200) Labour Mason (1st class) Mason (2nd class) Mazdoor (unskilled) Mazdoor(skilled) Surveyor Mazdoor (semi-skilled) Black smith for cutting of dowel bars including removal of burrs, fabrications & fixing of dowel bars Machinery Concrete mixer 0.28/0.40 cum capacity ( 6 mixers) with weight batcher and suitable capacity calibrated water tank Needle vibrator Screed vibrator Plate vibrator Water tanker 6 Kl. Capacity Air compressor ( 1hour initial + 1 hour final) c) (I) Material Crushed stone coarse aggregates, grading will be as per clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90 Cum/cum of concrete 20mm 10mm Sand as per IS:383 and conforming to clause 1500.2.4.2. @ 0.45 cum of concrete Cement @ 350 Kg/cum of concrete Polythene sheet 125 micron Mild steel dowel bar 25mm dia of grade S 240.500 mm long 20 Nos. at culvert/bridge slab and at construction joint including 5 percent wastage Cum Cum cum t sqm 44.55 22.95 33.75 26.25 412.5 1125.00 770.00 220.00 4600.00 15.00 50,118.75 17,671.50 7,425.00 120,750.00 6,187.50

a)

day day day day day day day

5.00 5.00 150.00 6.00 2.00 6.00 1.00

258.00 237.00 196.00 196.00 237.00 196.00 237.00

1,290.00 1,185.00 29,400.00 1,176.00 474.00 1,176.00 237.00 34938.00

b)

Hour

36.00

345.00

12,420.00

Hour Hour Hour Hour Hour

9.00 9.00 9.00 5.00 2.00

345.00 370.00

0.00 0.00 1,725.00 740.00 14,885.00

(ii) (iii) (iv) (v)

Page 46 of 157 S. No. Index Code Description of item (4x20x0.500) + 5 per cent wastage = 42m @ 2.80 Kg per m = 117.6 kg. Bitumen primer @ 200ml.Per joint for 23 joints(SS-1) Bituminous sealant 800 ml. Per joint for 23 joints Jute rope 12mm dia including 5 per cent wastage Debonding strips 3.75m. (length) x 10mm (width) x 5 mm (thick) cut-out of rubber filter board of similar material including 5 per cent wastage Polythene sheathing, covering 2/3rd dowel bars (20x23) and tight fit including 5 per cent wastage Plasticizer 0.5 per cent by weight of cement Curing compound (if used) @ 0.33 liter per sqm Joint filler board 20mm thick as per IS:1838 (4x3.75x0.200 = 3 sqm) Cost of water Unit Kg t Liter m m Qty 117.6 0.01 19.00 90.00 90.00 Rate 34.50 26127.98 26.00 5.00 9.00 Amount 4057.2 130.64 494.00 450.00 810.00

No Liter Liter sqm Kl

483.00 122.00 131.25 3.00 18.00

0.50 57.00 57.00 732.00 0.00

241.50 6954.00 7481.25 2196.00 0.00 224967.34 274790.34 8243.71 283034.05 3773.79 528.33 4302.12 497.88 29.70 4829.70

(d)

(e)

Total ( a+b+c) Form work @ 3% on (a+b+c) Cost for 75 cum = a+b+c+d Rate per Cum = (a+b+c+d+e)/75 Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Add for conveyance for Metal Add for conveyance for Sand Rate per cum cum cum 0.90 0.45

14% 553.20 66.00 Rs.

Page 47 of 157 S. No. 7 Index Description of item Code RBR- Prime Coat BASC-1 Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Unit = sqm Taking output = 1750 sqm a)Labour Mate Mazdoor (Unskilled) b) Machinery Hydraulic broom @ 1250 sqm per hour Air compressor 210 cfm Bitumen emulsion pressure distributor @ 1750 sqm/hour Water tanker 6 kl capacity 1 trip per hour c) Material Bitumen emulsion (SS-1) @ 0.85 kg per sqm Cost of water Unit Qty Rate Amount

day day hour hour hour hour t kl

1.040 1.400 1.400 1.000 0.500 1.480 3.000

196.00 290.00 370.00 690.00 345.00 26127.98 0.00

203.84 406.00 518.00 690.00 172.50 38669.42 0.00 40659.76 40659.76 23.23 3.25 26.48

Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per sqm = (a+b+c+d+e)/1750 RBR- Providing and applying tack coat with Bitumen emulsion BASC-2 (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Unit = sqm Taking output = 1750 sqm a)Labour Mate Mazdoor (Unskilled) b) Machinery Hydraulic broom @ 1250 sqm per hour Air compressor 210 cfm Emulsion pressure distributor @1750 sqm per hour c) Material Bitumen emulsion (RS-1) @ 0.275 kg per sqm

14% Rs.

day day hour hour hour t

1.040 1.400 1.400 1.000 0.480

196.00 290.00 370.00 690.00 26699.16

203.84 406.00 518.00 690.00 12815.60

(e) 9

Cost of 1750 sqm = (a+b+c+d+e) Rate per sqm = a+b+c+d+e/1750 Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

14% Rs.

14633.44 8.36 1.17 9.53

20mm thick Open-Graded Premix Carpet using RBR- Bituminous (penetration grade/modified bitumen) BASC-14 Binder

Page 48 of 157 S. No. Index Code Description of item Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type B as per Technical Specification Clause 508 MORD. Unit Qty Rate Amount

(II)

a)

b)

c)

Case-II - By mechanical means Bitumen (S-65) Unit = sqm Taking output = 4000 sqm (80 cum) Labour Mate Mazdoor (Unskilled) Mazdoor ( Skilled) Machinery HMP 40/60 t per hour Electric generator set 125 KVA Front end loader 1 cum bucket capacity Tipper 5.5 cum - 10 t/ 5-6t capacity Paver finisher Three wheel 80-100 kN static roller Material Bitumen (S-65) @ 14.60 kg per 10 sqm
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm(66% of 9.5-11.2mm & 34% 5-7 mm metal) Basic rate for 4000 Sqm Basic rate per Sqm

day day day hour hour hour hour hour hour t cum

10.00 3.52 4.500 6.000 6.000 3.640 6.000 16.00 5.84 108.00

196.00 196.00 15,525.00 1,090.00 1320.00 629.80 2,530.00 746.50 33,779.47 714.75

1,960.00 689.92 69,862.50 6,540.00 7,920.00 2,292.47 15,180.00 11944.00 197,272.11 77,193.00 390,854.00 97.71

d)

Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Add for conveyance for Metal Rate per sqm Seal Coat -Case - I : Type A - Mechanical Means Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, as per Technical Specification Clause 510 MORD. (using Three wheel 80-100 kN static roller) Case - I : Type A
By Mechanical Means

14% 0.027 553.20 Rs.

13.68 14.94 126.33

cum

10

RBRBASC-17

a)

b)

c)

Bitumen (S-65) Unit = sqm Taking out put = 7500 Sqm ( 67.50cum) Labour Mate Mazdoor (un-skilled) Machinery Hydraulic self propelled chips spreader Tipper 5.5 cum capacity Front end loader 1 cum bucket capacity Bitumen pressure distributor Three wheel 80-100 kN static roller Materials Bitumen (S-65) 60/70 grade @ 9.80 kgs per 10 sqm.
Crushed stone chipping of 6.7 mm size 100 per cent passing 11.2 mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm

day day hour hour hour hour hour t cum

6.24 6.00 6.00 6.00 6.00 15.00 7.350 67.50

196.00 2070.00 629.80 1320.00 940.00 746.50 33779.47 607.50

1223.04 12420.00 3778.80 7920.00 5640.00 11197.50 248279.11 41006.25 331464.70 44.20 6.19

c)

Basic rate of Seal coat Type-A for 7500 Sqm Final Rate per sqm Add 14% for Over head charges & Contractors profit (excl. 4% VAT )

14%

Page 49 of 157 S. No. Index Code Description of item Unit cum By Qty 0.009 Rate 553.20 Rs. Amount 4.98 55.37

11

Add for conveyance for Metal Rate per sqm RBR- Seal Coat - Case - II : Type B (510 - MORD)BASC-17 Mechanical Means

Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B, as per Technical Specification Clause 510 MORD. (using Three wheel 80-100 kN static roller)

Case - II : Type B (510 - MORD)

a)

b)

c)

By Mechanical Means Bitumen (S-65) Unit = sqm Taking out put = 5000 Sqm ( 30 Cum ) Labour Mate Mazdoor (un-skilled) Machinery HMP of 30/40 t per hour Electric generator set 125 KVA Front end loader 1 cum bucket capacity Tipper 5.5 cum - 10 t capacity Paver finisher Three wheel 80-100 kN static roller Materials Bitumen (S-65) 60/70 grade @ 6.80 kgs per 10 sqm.
Crushed sand or grit as passing 2.36 mm sieve and retained on 180 micron sieve applied @ 0.06 cum/10 sqm

day day hour hour hour

4.16 2.00 2.00 2.00 1.36 2.00 10.00 3.400 30.00

196.00 15,525.00 1090.00 1320.00 629.80 2530.00 746.50 33779.47 236.00

815.36 31050.00 2180.00 2640.00 856.53 5060.00 7465.00 114850.20 7080.00 171997.09 34.40 4.82 3.32 42.54

t cum

c)

Basic rate of Seal coat Type-A for 5000 Sqm Final Rate per sqm Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Add for conveyance for crushed dust 2.36 below cum Rate per sqm

0.006

14% 553.20 Rs.

Page 50 of 157 RATE ANALYSIS ( CD WORK) - ASPER SSR 2010-11 Name of Work : Construction of High level Bridge on R/F R&B Road to Pedda Dhanwada @ KM 10/6 to 10/8 KM S. No. Index Description of item Code 7 RBR- Excavation for Structures FNDN1 Excavation of structures: 1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Unit Qty Rate Amount

ii

Ordinary soil below water Level Mechanical Means Up to 3 m depth Unit = cum Taking output = 240 cum a) Labour Mate Mazdoor (Unskilled) b) Machinery Hydraulic Excavator 1 cum bucket capacity

day day hour

8.32 6.00 5%

196.00 1808.50 12481.72 14% Rs.

1630.72 10851.00 12481.72 624.09 13105.81 1834.81 14940.62 62.25

Add Dewatering charges @5% on (a+b) c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Cost for 240 cum = a+b+c Rate per cum = (a+b+c) /240 2 3 m to 6 m depth below water Level Mechanical Means Unit = cum Taking output = 210 cum a) Labour Mate Mazdoor (Unskilled) b) Machinery Hydraulic excavator 1.0 cum bucket capacity Add Dewatering charges @5% on (a+b)

day day hour

8.32 6.00 5%

196.00 1808.50 12481.72 14% Rs.

1630.72 10851.00 12481.72 624.09 13105.81 1834.81 14940.62 71.15

vi

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Cost for 210 cum = a+b+c Rate per cum = (a+b+c)/210 Ordinary rock (not requiring blasting) Mechanical Means Up to 3 m depth Unit = cum Taking output = 180 cum a) Labour Mate day Mazdoor (Unskilled) day 6.24 b) Machinery Hydraulic Excavator 1 cum bucket capacity hour 6.00 c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Cost for 180 cum = a+b+c Rate per cum = (a+b+c) /180 Note :1).Cost of dewatering up to 5 per cent of (a+b) may be added, where required. Assessment for dewatering shall be made as per site conditions. 2. Cost of shoring and shuttering, where needed, may be taken @ 10 per cent on cost of excavation for open foundation.

196.00 1808.50 14% Rs.

1223.04 10851.00 12074.04 1690.37 13764.41 76.47

Page 51 of 157 S. No. Index Description of item Code 3 RBR- Providing concrete for plain concrete M 10 grade in FNDN- open foundations using 40 mm nominal size Graded 4 hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT& Seigniorage charges for Leveling Coarse below Foundation Unit Qty Rate Amount

P.C.C grade M 10 Nominal mix 1:3:6 Unit = cum (a) Material Cement Coarse sand

t cum

0.22 0.45

4600.00 220.00

1012.00 99.00

Page 52 of 157 S. No. Index Code Description of item 40 mm aggregate Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Machinery Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water measuring device and preferably also with load cell. Water tanker 6 kl capacity Unit cum kl day day day hour Qty 0.9 1.2 0.10 1.39 0.40 Rate 695.00 0.00 Amount 625.50 0.00

258.00 196.00 345.00

25.80 272.44 138.00

hour

0.13

345.00

4.00% (d) Formwork @ 4% on cost of material, labour and machinery (a+b+c) e). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) f). Add for conveyance for Metal cum 0.90 Add for conveyance for Sand cum 0.45 Rate per cum = a+b+c+d+e+f 4 RBR- Supplying, fitting, and placing HYSD bar reinforcement in FNDN- foundation complete as per drawing and technical 4 specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding VAT Unit = t (a) Material HYSD bars including 5 per cent for laps and wastage

44.85 2217.59 88.70 2306.29 322.88 497.88 29.70 3156.75

14% 553.20 66.00 Rs

1.05

34500.00 52.00

36225.00 312.00

Binding wire kg 6.00 (b) Labour for cutting, bending, tying and placing in position Mate day Blacksmith/ Rod Binder day 2.00 Mazdoor (Unskilled) day 6.40 c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per t = a+b+c RBR- Providing concrete for plain concrete M15 ( Desigen FNDN- mix) in open foundations using 40,20 & 10mm size 4 Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT& Seigniorage charges for Foundations

237.00 196.00 14% Rs

474.00 1254.40 38265.40 5357.16 43622.56

Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions Coarse Aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view Unit = cum P.C.C grade M 15 ( Desigen mix ) MORTH ( for Abutments, Piers, cut-off walls below Bed Level

Page 53 of 157 S. No. Index Code Description of item Unit = cum (a) Material Cement Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA Unit Qty Rate Amount

t cum cum cum cum kl day day day hour hour

0.275 0.450 0.540 0.270 0.090 1.2 0.100 1.390 0.400 0.400

4600.00 220.00 695.00 1125.00 770.00 0.00

1265.00 99.00 375.30 303.75 69.30 0.00

258.00 196.00 345.00 584.57

25.80 272.44 138.00 233.83 2782.42 111.30 2893.72 405.12 497.88 29.70 3826.42

4.00% (d) Formwork @ 4% on cost of material, labour and machinery (a+b+c) e). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) f). Add for conveyance for Metal cum 0.90 Add for conveyance for Sand cum 0.45 Rate per cum = a+b+c+d+e+f RBR- Plain cement concrete M15grade (desigen mix) using SBST- 40,20 & 10mm metal mechanically mixed in 5 substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions Coarse Aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view For height up to 5 m Unit = cum P.C.C grade M15 (desigen mix) MORTH for Abutments, Piers, cut-off walls above Bed Level Unit = cum (a) Material Cement Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA

14% 553.20 66.00 Rs

t cum cum cum cum kl day day day hour hour

0.275 0.450 0.540 0.270 0.090 1.2 0.100 1.390 0.400 0.400

3333.00 333.50 1107.80 1661.85 1305.62 0.00

916.58 150.08 598.21 448.70 117.51 0.00

188.00 206.00 345.00 620.00

18.80 286.34 138.00 248.00

Page 54 of 157 S. No. Index Code Description of item Unit Qty 10.00% Rate Amount 2922.22 292.22 3214.44 401.81 3616.25

(d) Formwork @ 10% on cost of material, labour and machinery (a+b+c) e). Add 12.5% for Over head charges & Contractors profit Rate per cum = a+b+c+d+e+f 7 RBR- Supplying, fitting, and placing HYSD bar reinforcement in SBST- sub structure complete as per drawing and technical 6 specifications Clauses 1002, 1010 and 1202,1005MORD / 1600 &2200 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding VAT

12.5% Rs

Unit = t (a) Material t HYSD bars including 5 per cent for laps and wastage Fe 415 Binding wire kg (b) Labour for cutting, bending, tying and placing in position Mate day Blacksmith/ Rod Binder day Mazdoor (Unskilled) day c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per t = a+b+c

1.05 6.00

34500.00 52.00

36225.00 312.00

2.00 6.84

237.00 196.00 14% Rs

474.00 1340.64 38351.64 5369.23 43720.87

Page 55 of 157 S. No. Index Description of item Code 9 RBR- Providing concrete for reinforced concrete M 25 grade SBST- (Design Mix) in open foundations using 20 & 10 mm 5 nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel Unit Qty Rate Amount

R.C.C grade M 25 (Design Mix) using 20 mm Graded Metal -For Bed Blocks , Backing walls and Fly wings CASE I : Using Concrete Mixer Unit = cum Height up to 5m (a) Material Cement Coarse sand 20 mm aggregate 10 mm aggregate Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA

(i)

t cum cum cum kl day day day hr / cum hour

0.4 0.45 0.54 0.36 1.2 0 0.1 1.39 0.4 0.4

4600.00 220.00 1125.00 770.00 0.00 196.00 258.00 196.00 345.00 584.57

1853.80 99.00 607.50 277.20 0.00 0.00 25.80 272.44 138.00 233.83 3507.57 350.76 3858.33 540.17 497.88 29.70 4926.08

10

(d) Formwork @ 10% on (a+b+c) 10.00% e). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) f). Add for conveyance for Metal cum 0.90 Add for conveyance for Sand cum 0.45 Rate per cum = a+b+c+d+e+f RBR- Providing weep holes in brick masonry/stone masonry, SBST- plain/reinforced concrete abutment, wing wall, return wall 9 with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares.

14% 553.20 66.00 Rs

Unit = Nos Taking output = 30 Nos CM (1:3) Sand for mortar Cement Mazdoor (Unskilled) (a) Material AC pipe 100 mm dia including wastage @ 5 per cent. Average length of weep hole is taken as one metre for the purpose of estimating MS clamps Collar for AC pipe (average taking 10% of above pipe rate)

Cum mt day

1.050 0.480 0.200

220.00 4600.00 196.00

231.00 2208.00 39.20 2478.20 5575.50

31.500 177.00

Nos.

30 10.00%

10.00 177.00

300.00 17.70

Page 56 of 157 S. No. Index Code Description of item Cement mortar 1:3 (For rate refer to item 11.5 I) (b) Labour Mate Mason 1st Class Mazdoor (Unskilled) Unit cum day day day Qty 0.050 0.500 0.280 Rate 2478.20 Amount 123.91

258.00 196.00 14%

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) d). Add for conveyance of sand Rate per Each = a+b+c+d Note in MORTH : 1. In case of stone masonry, the size of the weep hole shall be 150 mm x 80 mm or circular with 150 mm diameter. 2. For structure in stone masonry, the weep holes shall be deemed to be included in the item of stone masonry work and shall not be paid separately. 11 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical RBR- specification Clause 1204.3.8 MORD / 710.14 of IRC, SBST- 78 & 2200 MORTH ,including overhead charges & 10 Contractors profit but excluding VAT & Seigniorage chares. Unit = cum Taking output = 10 cum Granular material (a) Material Granular material (b) Labour Mate Mazdoor (Unskilled) (c) Machinery Plate compactor / power rammer Water Tanker of 6 KL capacity 0.053

66.00 Rs

129.00 54.88 6200.99 868.14 7069.13 3.47 235.75

cum day day hour hour

12.000 7.280 2.500 0.050

50.50

606.00

196.00 40.00 345.00 14%

1426.88 100.00 17.25 2150.13 301.02 2451.15 245.12 161.76 406.88

d). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per 10 cum = a+b+c+d Rate per 1 cum = e). Add for conveyance for Gravel 12 Rate per cum = (a+b+c+d+e ) Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and RBR- bigger size towards the wall and providing over the entire SBST- surface behind abutment, wing wall, return wall to the full 11 height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT Unit = cum & Seigniorage chares. Taking output = 10 cum Granular material (a) Material Filtermedia ( 50% sSoling stone +50% 40mm metal Soling stone of 150 mm size of granite, trap and Dolamite varieties. 40-45mm HBG metal cum cum 6.000 6.000 cum 1.20

134.80 Rs

82.00 570.00

492.00 3420.00

Page 57 of 157 S. No. Index Code Description of item (b) Labour Mate Mazdoor (Unskilled) Mazdoor (skilled) (c) Machinery Water Tanker of 6 KL capacity Unit day day day hour Qty 7.320 1.000 0.060 Rate Amount

196.00 196.00 345.00 14%

1434.72 196.00 20.70 5563.42 778.88 6342.30 634.23 331.92 331.92 1298.07

13

d). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per 10 cum = a+b+c+d Rate per 1 cum = e). Add for conveyance for Stone spalls cum 0.60 Add for conveyance for Metal cum 0.60 Rate per cum = (a+b+c+d+e ) RBR- Providing and laying reinforced cement concrete M25 SPST- grade (Design Mix) using 20 & 10mm metal mechanically 1 mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel

553.20 553.20 Rs

R.C.C M 25 Grade (Design Mix) For Deck Slabs, guide stones Unit =cum (i) Height up to 5m Case I : Using Concrete Mixer. (a) Material Cement t Coarse sand cum 20 mm aggregate cum 10 mm aggregate cum Water kl (b) Labour Mate day Mason (1st Class) day Mazdoor (Unskilled) day c) Machinery Concrete mixer 0.4/0.28 cum capacity H/cum Generator 33 KVA hour d) For formwork and staging refer to sub-item I (B) case I above e) Formwork and staging of (a+b+c) f). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) g). Add for conveyance for Metal cum Add for conveyance for Sand cum Rate per cum = a+b+c+d+e+f+g RBR- Supplying, fitting, and placing HYSD bar reinforcement in SPST- superstructure complete as per drawing and technical 2 specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding VAT

0.40 0.45 0.54 0.36 1.2 0.10 1.39 0.40 0.40

4600.00 220.00 1125.00 770.00 0.00

1840.00 99.00 607.50 277.20 0.00

258.00 196.00 345.00 584.57

25.80 272.44 138.00 233.83 3493.77

20.00% 14% 553.20 66.00 Rs

0.90 0.45

698.75 4192.52 586.95 497.88 29.70 5307.05

14

Unit = t (a) Material HYSD bars including 5 per cent for laps and wastage Binding wire (b) Labour for cutting, bending, tying and placing in position t kg 1.05 8.00 34500.00 52.00 36225.00 416.00

Page 58 of 157 S. No. Index Code Mate Blacksmith/ Rod Binder Mazdoor (Unskilled) c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Rate per t = a+b+c 15 RBR- Providing and laying cement concrete wearing course SPST- M 30 grade excluding reinforcement complete as per 5 drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares 14% Rs Description of item Unit day day day Qty 3.00 8.44 237.00 196.00 711.00 1654.24 39006.24 5460.87 44467.11 Rate Amount

Unit = cum For Wearing coarse over Deck slab (a) Material Cement Sand 20 mm aggregate 10 mm aggregate HYSD bar reinforcement including binding wire (Rate as per item 13.2) except OH & CP Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) Mazdoor (Unskilled) for cleaning deck slab concrete surface c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA. (d) Formwork @ 3% of cost of concrete

t cum cum cum t kl day day day day

0.407 0.45 0.54 0.36 0.075 1.2 0.10 1.39 0.15

4600.00 220.00 1125.00 770.00 0.00 0.00

1872.20 99.00 607.50 277.20 0.00 0.00

258.00 196.00 196.00

25.80 272.44 29.40

hour hour

0.40 0.40 3.00%

345.00 584.57

e). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) f). Add for conveyance of metal Add for conveyance of sand Rate per cum = a+b+c+d+e+f 16 RBR- Construction of R.C.C. railing of M 25 grade in cast-inSPST- situ with 20 mm nominal size aggregate, true to line and 7 grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD. ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares Unit = Running m Taking output = 4x12 m Span = 48 m 0.900 0.450

14% 553.20 66.00 Rs

138.00 233.83 3555.37 106.66 3662.03 512.68 4174.71 497.88 29.70 4702.29

Page 59 of 157 S. No. Index Code Description of item (a) M 25 grade R.C.C. No. of vertical posts = (6+1) 4 = 28 nos Cross-sectional area of vertical post = 0.25x0.275 = 0.069 sqm Concrete in vertical posts = 0.069x28x1.00 = 1.932 cum Hand rail in 3 tiers = 3x48 = 144 m Cross-sectional area = 0.17x0.175 = 0.03 sqm Concrete in hand rails = 0.03 x 144 = 4.32 cum Total concrete = 1.932+4.32 = 6.252 cum (b) HYSD bar reinforcement (Rate as per item 13.2) cum t 6.252 1.36 4273.37 39006.24 26717.11 53048.49 79765.60 c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) Cost for 48 m = (a+b+c ) Rate per m = (a+b+c )/48 Sub Analysis for Rate of Concrete (a) Material Cement Coarse sand 20 mm aggregate 10 mm aggregate Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) c) Machinery Concrete mixer 0.4/0.28 cum capacity d). Formwork @ 12% Total (a+b+c+d) f). Add for conveyance for Metal Add for conveyance for Sand Rate per cum = a+b+c+d+e+f 17 P.C.C. M 15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and RBR- technical specifications Clauses 800 and 1211 MORD SPST- & 2700 MORTH ,including overhead charges and 12 contractors profit but excluding VAT & Seigniorage chares (i) Nominal mix (1:2.5:5) / PCC M 15 using Concrete Mixture leveling course below approach slab Unit = cum (a) Material Cement Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate Water (b) Labour Mate Mason (1st Class0 Mazdoor (Unskilled) day day day 0.10 1.39 258.00 196.00 25.80 272.44 t cum cum cum cum kl 0.275 0.48 0.54 0.27 0.09 1.2 4600.00 220.00 695.00 1125.00 770.00 0.00 1265.00 105.60 375.30 303.75 69.30 0.00 hour 0.40 12.00% cum cum 0.90 0.45 485.26 57.89 Rs 345.00 138.00 3402.30 408.28 3810.58 436.74 26.05 4273.37 day day day 0.12 2.09 258.00 196.00 30.96 409.64 t cum cum cum kl 0.40 0.45 0.54 0.36 1.2 4600.00 220.00 1125.00 770.00 0.00 1840.00 99.00 607.50 277.20 0.00 Rs 14% 11167.18 90932.78 1894.43 Unit Qty Rate Amount

Page 60 of 157 S. No. Index Code c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA. hour hour 0.40 0.40 345.00 584.57 14% 0.90 0.48 553.20 66.00 Rs 138.00 233.83 2789.02 f). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) g). Add for conveyance for Metal Add for conveyance for Sand Rate per cum = a+b+c+d+e+f+g 18 Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing RBR- and Technical specification Clause 800, 1211 MORD / SPST- 1500, 1600, 1700 & 2704 MORTH ,including overhead 13 charges and contractors profit but excluding VAT & Seigniorage chares ,Cost of Steel Unit = 1 cum For Approach Slab Taking output = 1 cum a) Material Cement concrete M30 Grade Refer relevant item of concrete in item 1(III) by using batching plant, excluding steel formwork i.e. per cum basic cost (a+b+c) (Excluding OH & CP, steel cost,deck slab cleaning ) asper Item no : 15 b). Form Work : Refer relevant item of concrete in item No. 1(III) except that form work may be added at the rate of 2 per cent of cost against 3.5 per cent provided in the foundation concrete. c). HYSD bar reinforcement Rate as per item No:14 (Excluding OH&CP) cum cum 390.46 497.88 31.68 3709.04 Description of item Unit Qty Rate Amount

cum

1.00

3525.97

3525.97

cum

2.00%

3525.97

70.52

0.05

0.00

0.00 3596.49 503.51 4100.00 497.88 29.70 4627.58

d). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) e). Add for conveyance of metal Add for conveyance of sand Rate per cum = a+b+c+d+e RBR- Providing and laying boulder apron for bed protection PTWK- with stone boulders of minimum size and weight as per 1 Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares Unit = cum (a) Material Stone boulder (25 kg / 40 Kg minimum) Stone spalls (b) Labour Mate Mason 1st Class Mazdoor (Unskilled) 0.900 0.450

14% 553.20 66.00 Rs

19

cum cum day day day

1.00 0.20 0.00 0.35 0.79

95.00 34.10

95.00 6.82 0.00 90.30 154.84 346.96 48.57 395.53 663.84 1059.37

258.00 196.00 14%

c). Add 14% for Over head charges & Contractors profit (excl. 4% VAT ) d). Add for conveyance of metal Rate per cum = a+b+c+d 1.200

553.20 Rs

WATER COST REQUIREMENT CERTIFICATE

Name of Work : Construction of High level Bridge on R/F R&B Road to Pedda Dhanwada @ KM 10/6 to 10/8 KM
This is to certify that there is no suitable water available at work site for construction purpose and also for curing purpose of the cement concrete work and also for road work .Hence the water cost provision is required in this work accordingly water cost provision is made in the data's of road work and CD work.

Superintending Engineer #REF!

Page 62 of 157 Schedule A (Part -I) Schedule of Rates and Approximate Quantities Name of the work:- model Estt.Cost Rs.141.31 lakhs. Grant:PMGSY Ph-IX Package No.AP-12 IX LB 01 A) The quanties here given are those upon which the lumpsum tender cost of work is based but they are subject to alteration, omissions, deductions, or additions as provided for in the conditions of this contract and do not necessarily show the actual quantities of work to be done. The total contract value and unit rates noted below are those governing payment of extras or deductions for omissions according to the conditions to the contract as set forth in the preliminary specifications of the AP Standard Specifications and other conditions of specification of this contract. B) It is to be expressly understood that the measured work is to be taken net (not withstanding any custom or practice to the contrary) according to the actual quantities when in place and finished according to the drawings or as may be ordered from time to time by the Executive Engineer and the cost calculated by measurmeent or weight, at their respective rates wihtout any additional charge for any necessary or contingent works connected works connected therewith. The total contract value is for works in situ and complete in every respect. C) Additions and alterations in the Schedule of quantities will disqualify the tender D) In case of discrepancies between the written description of the item in the Schedule 'A" and the detailed description in the specification of the same item, the latter shall be adopted. Sl. Probable No quantity both in figures Per Description of works Most specification Unit of Measure ment in figures and words 6 Rate in figures Amount

1 1

Bridge portion
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Ordinary soil above water Level - Mechanical Means -Up to 3 m depth 0.000 2 Cum Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Ordinary soil below water Level - Mechanical Means -Up to 3 m depth 305 MORD / 304 MORTH 1.00 Cum

Page 63 of 157 1 2 3 Cum 4 5 305 MORD / 304 MORTH 6 1.00 Cum 7 8

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Ordinary soil Above water Level - Mechanical Means -3 m to 6 m depth Cum 305 MORD / 304 MORTH Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Ordinary soil Below water Level - Mechanical Means -3 m to 6 m depth Cum 305 MORD / 304 MORTH Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Ordinary soil Below water Level - Mechanical Means -above 6 m depth 1.00 Cum 1.00 Cum

Cum 6 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Ordinary rock (not requiring blasting) above water Level - Mechanical Means -Up to 3 m depth

305 MORD / 304 MORTH

1.00 Cum

Page 64 of 157 1 2 3 Cum 4 5 305 MORD / 304 MORTH 6 1.00 Cum 7 8

Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Hard rock (requiring blasting) without dewatering - Mechanical Means -Up to 3 m depth Cum 305 MORD / 304 MORTH Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Hard rock (requiring blasting) including dewatering - Mechanical Means -Up to 3 m depth Cum 305 MORD / 304 MORTH Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Hard rock (blasting prohibited) with out dewatering - Mechanical Means -Up to 3 m depth Cum 305 MORD / 304 MORTH Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. For Sand filling Cum 305.3.9 MORD 1.00 Cum & 304 MORTH 1.00 Cum 1.00 Cum 1.00 Cum

10

Page 65 of 157 1 11 2 3 4 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT& Seigniorage charges for Leveling Coarse below raft 5 6 7 8

Cum

802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,i Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares for 1000 mm dia RCC NP3 Plain end pipes

1.00 Cum

12

Rmt

1106 MORD ,

1.00 Rmt

13

Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares for 750 mm dia RCC NP3 Plain end pipes Rmt 1106 MORD , 1.00 Rmt

14

Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares for 600 mm dia RCC NP3 Plain end pipes Rmt 1106 MORD , 1.00 Rmt

Page 66 of 157 1 15 2 3 4 Providing concrete for plain concrete M15 Grade ( Desigen mix) in open foundations using 40,20 & 10mm size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT& Seigniorage charges for Foundations ( for Abutments, Piers, cut-off walls below Bed Level) 5 6 7 8

Cum

802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH Providing concrete for reinforced concrete M 20 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel -For Raft Foundations

1.00 Cum

15

Cum

802, 803, 1202 1.00 Cum & 1203 MORD and 1500, 1700 & 2100 MORTH Providing concrete for reinforced concrete M 20 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel -For Ramp Foundations

16

Cum

802, 803, 1202 1.00 Cum & 1203 MORD and 1500, 1700 & 2100 MORTH

Page 67 of 157 1 17 2 3 4 Supplying, fitting, and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding VAT 5 6 7 8

MT

1002, 1010 and 1202 MORD / 1600 MORTH, Supplying, fitting, and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202,1005MORD / 1600 &2200 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding VAT

1.0 MT

18

MT

1002, 1010 and 1202,1005MO RD / 1600 &2200 MORTH, Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding VAT

1.0 MT

19

MT

1002, 1010 and 1202 MORD / 1600 MORTH Plain cement concrete M15 Grade (desigen mix) using 40,20 & 10mm metal mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. for Abutments, Piers, cut-off walls above Bed Level 0- 5.00m ht

1.0 MT

20

Page 68 of 157 1 2 3 Cum 4 5 6 802, 804, 805, 1.00 Cum 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH 7 8

21

Providing concrete for reinforced concrete M 20 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel For Ramp body walls Height up to 5m

Cum

802, 803, 1202 1.00 Cum & 1203 MORD and 1500, 1700 & 2100 MORTH Providing concrete for reinforced concrete M 20 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel For Ramp body walls Height 5m to 10 m

22

Cum

802, 803, 1202 1.00 Cum & 1203 MORD and 1500, 1700 & 2100 MORTH Providing concrete for reinforced concrete M 25 grade (Design Mix) in open foundations using 20 & 10 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel For Bed Blocks Height up to 5m

23

Page 69 of 157 1 2 3 Cum 4 5 6 802, 803, 1202 1.00 Cum & 1203 MORD and 1500, 1700 & 2100 MORTH 7 8

24

Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH.,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Nos 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH. Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Cum 1204.3.8 1.00 Cum MORD / 710.14 of IRC, 78 & 2200 MORTH Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Cum 1204.3.8 1.00 Cum MORD / 710.14 of IRC, 78 & 2200 MORTH 1 Nos

23

24

Page 70 of 157 1 25 2 3 4 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares,Cost of Steel For Deck Slabs, guide stones Height up to 5m 5 6 7 8

Cum

800, 1205.4 1.00 Cum and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH Providing and laying cement concrete wearing course M 30 grade excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares

26

Cum

800 and 1206.3 MORD and 2702 MORTH Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD. ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares

1.00 Cum

27

Rmt

800, 900 and 1208.3 MORD

1.00 Rmt

28

P.C.C. M 15 ordinary grade (1:2.5:5) leveling course below Approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD & 2700 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares Cum 800 and 1211 1.00 Cum MORD & 2700 MORTH

Page 71 of 157 1 29 2 3 4 Reinforced cement concrete approach slab M 30 grade including reinforcement and formwork complete as per drawing and Technical specification Clause 800, 1211 MORD / 1500, 1600, 1700 & 2704 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares ,Cost of Steel 5 6 7 8

Cum

800, 1211 MORD / 1500, 1600, 1700 & 2704 MORTH Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per drawing and technical specifications MORD ,including overhead charges and contractors profit but excluding VAT

1.00 Cum

30

Rmt 31 Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight MORD ,including overhead charges and contractors profit but excluding VAT Rmt 32 Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares Cum

MORD

1.00 Rmt

MORD

1.00 Rmt

1301 MORD / 2503 MORTH Jeddy Stone Dry Packing for Aprons and Revetments Section 1300 MORD ,including overhead charges and contractors profit but excluding VAT & Seigniorage chares

1.00 Cum

33

Cum

1300 MORD

1.00 Cum

Approaches

Page 72 of 157 1 34 2 3 4 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD including overhead and contractor profit but excluding VAT & Seigniorage chares. 5 6 7 8

Sqm 35 Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with all lifts and leads up to 1000 m as per Technical Specification Clause 301.4.MORD Sqm 36 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including overhead & Contract profit but excluding VAT & Seigniorage chares Cum

201 MORD 1.00 Sqm

301.4.MORD

1.00 Sqm

300.1 and 300.2 as per Technical Specification Clause 301.5 MORD Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including overhead charges & Contractor profit, But excluding VAT & Seigniorage chares

1.00 Cum

37

Cum

300.1 and 300.2 as per Technical Specification Clause 301.5 MORD

1.00 Cum

Page 73 of 157 1 38 2 3 4 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD. For compacted thickness of 75 mm including overhead charges & Contractor profit, but excluding VAT & Seigniorage chares for Gr-II ( Hand Broken metal ) 5 6 7 8

Cum

405 MORD/ MORTH 404. Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD/ MORTH 404. For compacted thickness of 75 mm, including overhead charges & Contractor profit, But excluding VAT & Seigniorage chares for GrIII ( Machine Crushed )

1.00 Cum

39

Cum 40 Construction of granular sub-base / shoulders by providing well graded material / Close graded material, spreading in uniform layers with motor grader on prepared surface mixing by mixing place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification clause 401 MORD/MORTH , including overhead charges & Contractor profit, But excluding VAT & Seigniorage chares For Grading III Material ( CBR Value min 20) Cum

405 MORD/ MORTH 404.

1.00 Cum

401 MORD/MORT H

1.00 Cum

Page 74 of 157 1 41 2 3 4 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. 5 6 7 8

Cum 42 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Sqm 43 Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,including overhead charges & Contractors profit but excluding VAT & Seigniorage chares. Sqm

1501 MORD

1.00 Cum

502 MORD

1.00 Sqm

503 MORD

1.00 Sqm

Page 75 of 157 1 44 2 3 4 Providing and laying Open Graded Premix Carpet(OGPC) surfacing material of 20mm thick composed of 13.20mm to 5.60mm size machine crushed hard blasted Granite chips usig bitumen of 60/70 grade at the rate of 14.60 kgs per 10 sqm area of road surface over tack coat to required line, level, grade to serve as wearing course on previously prepared bae including mixing in a Hot Mix plant of 40 TPH, laying with mechanical paver finisher and rolling with three wheeled 8-10 Tonnes capacity power roller and finishing to required level and grades including cost and conveyance of all materials from approved sources, seigniorage,labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidential and operational charges etc.complete for finished item of work as per clause 508 of MORD including all over heads, and Contractors profit excluding VAT and seignorage charges 5 6 7 8

Sqm 45 Providing and laying bituminous seal coat (Type B) comprising of Crushed sand or grit as passing 2.36 mm sieve and retained on 180 micron sieve applied @ 0.06 cum/10 sqm to be laid simuiltaneously along with the bitumenous course using 6.80 kgs of 60/70 grade per 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to required level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery tools and plants providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per Technical Specification clause 510 of MORDincluding all over heads, and Contractors profit excluding VAT and seignorage charges

508 of MORD

1.00 Sqm

Sqm

510 of MORD

1.00 Sqm

Page 76 of 157 Slno


Item

Quantity (finished item)

unit

Loose Qty Factor

Loose Qty
Factor

Earth Loose Qty

Metal/Stone Factor Loose Qty Factor

Chips Loose Qty Factor

Gravel Loose Qty Factor

Sand Loose Qty

1 Earth work for widening-Side


earth 0/0 to 3/0km

0.000 Cum #REF! Cum 0.000 Cum 0.000 Cum #REF! Cum #REF! Cum 0.000 Cum #REF! Sqm #REF! Sqm 0.000 Cum #REF! Cum 0.000 Cum #REF! Cum

1.00

0.00 #REF! 0.00 0.00 #REF! #REF! 0.00 #REF! #REF! 0.00 #REF! 0.00 #REF!

1.00

0.00 1.50 0.85 0.85 1.21 1.21 1.21 #REF! #REF! 0.00 0.32 0.24 0.24 0.027 0.006 #REF! #REF! 0.00 #REF! #REF! 0.85 0.00 0.43 0.00 #REF! 0.00 0.43 0.00 0.43 0.00 0.00

2 Gravel sub base ( 100% Gravel


150mm loose to -100mm compacted ) +34% Sand )

1.50

3 Gravel sub base ( 66% Gravel 4


Gravel Shoulders 66% Gravel +34% Sand )

1.28

1.28

5 WBM -GR-II 6 WBM -GR-III 7 WBM -GR-III 8 OGPC 9 Seal Coat 10 Gravel shoulders 11 CD Work s fundations 12 filling of sand 13 PCC -M10

1.56

1.45

1.45

1.00

1.00

1.28

1.00

1.00

#REF!
1.00

1.00

0.00 #REF!

1.00

0.96

#REF!

0.48

Seig_Calculations

Page 77 of 157 Slno


Item

Quantity (finished item)

unit

Loose Qty Factor

Loose Qty
Factor

Earth Loose Qty

Metal/Stone Factor
0.80

Chips Factor Loose Qty Factor

Gravel Loose Qty Factor


0.48

Sand Loose Qty

Loose Qty

14 VCC 15 VCC

-M-15

#REF! Cum 0.000 Cum #REF! Cum


Road dam

1.00

#REF! 0.00 #REF! #REF! 0.00 #REF!


Rate Amount

#REF! 0.00 #REF! #REF! 0.00 #REF!


50.00 #REF!

#REF! 0.00 #REF! #REF!

-M-20

1.00

0.90

0.45

16 VRCC M-25 17 V.C.C _M-30 For


wearing coat

1.00

0.90

0.45

#REF! Cum 0.000 Cum

1.00

0.90

0.45

18 Rough stones

1.00

1.10

#REF!
50.00 #REF!

#REF!
22.00 #REF!

#REF!
40.00 #REF!

22.00 #REF!

Total Seignorage Charges for this bill is Rs.

#REF!

Seig_Calculations

Lead Chart 2010-11 Lead 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Earth, Sand, Gravel 21.50 30.20 40.20 48.80 57.40 66.00 74.60 83.20 91.80 100.40 109.00 117.60 126.20 134.80 143.40 152.00 160.60 169.20 177.80 186.40 195.00 203.60 212.20 220.80 229.40 238.00 246.60 255.20 263.80 272.40 279.60 286.80 294.00 301.20 308.40 315.60 322.80 330.00 337.20 344.40 351.60 358.80 366.00 373.20 380.40 387.60 SS rate for 2010-11 Metal, Stone 19.10 26.70 40.20 48.80 57.40 66.00 74.60 83.20 91.80 100.40 109.00 117.60 126.20 134.80 143.40 152.00 160.60 169.20 177.80 186.40 195.00 203.60 212.20 220.80 229.40 238.00 246.60 255.20 263.80 272.40 279.60 286.80 294.00 301.20 308.40 315.60 322.80 330.00 337.20 344.40 351.60 358.80 366.00 373.20 380.40 387.60

47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97

394.80 402.00 409.20 416.40 423.60 430.80 438.00 445.20 452.40 459.60 466.80 474.00 481.20 488.40 495.60 502.80 510.00 517.20 524.40 531.60 538.80 546.00 553.20 560.40 567.60 574.80 582.00 589.20 596.40 603.60 610.80 618.00 625.20 632.40 639.60 646.80 654.00 661.20 668.40 675.60 682.80 690.00 697.20 704.40 711.60 718.80 726.00 733.20 740.40 747.60 754.80

394.80 402.00 409.20 416.40 423.60 430.80 438.00 445.20 452.40 459.60 466.80 474.00 481.20 488.40 495.60 502.80 510.00 517.20 524.40 531.60 538.80 546.00 553.20 560.40 567.60 574.80 582.00 589.20 596.40 603.60 610.80 618.00 625.20 632.40 639.60 646.80 654.00 661.20 668.40 675.60 682.80 690.00 697.20 704.40 711.60 718.80 726.00 733.20 740.40 747.60 754.80

98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148

762.00 769.20 776.40 783.60 790.80 798.00 805.20 812.40 819.60 826.80 834.00 841.20 848.40 855.60 862.80 870.00 877.20 884.40 891.60 898.80 906.00 913.20 920.40 927.60 934.80 942.00 949.20 956.40 963.60 970.80 978.00 985.20 992.40 999.60 1006.80 1014.00 1021.20 1028.40 1035.60 1042.80 1050.00 1057.20 1064.40 1071.60 1078.80 1086.00 1093.20 1100.40 1107.60 1114.80 1122.00

762.00 769.20 776.40 783.60 790.80 798.00 805.20 812.40 819.60 826.80 834.00 841.20 848.40 855.60 862.80 870.00 877.20 884.40 891.60 898.80 906.00 913.20 920.40 927.60 934.80 942.00 949.20 956.40 963.60 970.80 978.00 985.20 992.40 999.60 1006.80 1014.00 1021.20 1028.40 1035.60 1042.80 1050.00 1057.20 1064.40 1071.60 1078.80 1086.00 1093.20 1100.40 1107.60 1114.80 1122.00

149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199

1129.20 1136.40 1143.60 1150.80 1158.00 1165.20 1172.40 1179.60 1186.80 1194.00 1201.20 1208.40 1215.60 1222.80 1230.00 1237.20 1244.40 1251.60 1258.80 1266.00 1273.20 1280.40 1287.60 1294.80 1302.00 1309.20 1316.40 1323.60 1330.80 1338.00 1345.20 1352.40 1359.60 1366.80 1374.00 1381.20 1388.40 1395.60 1402.80 1410.00 1417.20 1424.40 1431.60 1438.80 1446.00 1453.20 1460.40 1467.60 1474.80 1482.00 1489.20

1129.20 1136.40 1143.60 1150.80 1158.00 1165.20 1172.40 1179.60 1186.80 1194.00 1201.20 1208.40 1215.60 1222.80 1230.00 1237.20 1244.40 1251.60 1258.80 1266.00 1273.20 1280.40 1287.60 1294.80 1302.00 1309.20 1316.40 1323.60 1330.80 1338.00 1345.20 1352.40 1359.60 1366.80 1374.00 1381.20 1388.40 1395.60 1402.80 1410.00 1417.20 1424.40 1431.60 1438.80 1446.00 1453.20 1460.40 1467.60 1474.80 1482.00 1489.20

200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250

1496.40 1503.60 1510.80 1518.00 1525.20 1532.40 1539.60 1546.80 1554.00 1561.20 1568.40 1575.60 1582.80 1590.00 1597.20 1604.40 1611.60 1618.80 1626.00 1633.20 1640.40 1647.60 1654.80 1662.00 1669.20 1676.40 1683.60 1690.80 1698.00 1705.20 1712.40 1719.60 1726.80 1734.00 1741.20 1748.40 1755.60 1762.80 1770.00 1777.20 1784.40 1791.60 1798.80 1806.00 1813.20 1820.40 1827.60 1834.80 1842.00 1849.20 1856.40

1496.40 1503.60 1510.80 1518.00 1525.20 1532.40 1539.60 1546.80 1554.00 1561.20 1568.40 1575.60 1582.80 1590.00 1597.20 1604.40 1611.60 1618.80 1626.00 1633.20 1640.40 1647.60 1654.80 1662.00 1669.20 1676.40 1683.60 1690.80 1698.00 1705.20 1712.40 1719.60 1726.80 1734.00 1741.20 1748.40 1755.60 1762.80 1770.00 1777.20 1784.40 1791.60 1798.80 1806.00 1813.20 1820.40 1827.60 1834.80 1842.00 1849.20 1856.40

251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301

1863.60 1870.80 1878.00 1885.20 1892.40 1899.60 1906.80 1914.00 1921.20 1928.40 1935.60 1942.80 1950.00 1957.20 1964.40 1971.60 1978.80 1986.00 1993.20 2000.40 2007.60 2014.80 2022.00 2029.20 2036.40 2043.60 2050.80 2058.00 2065.20 2072.40 2079.60 2086.80 2094.00 2101.20 2108.40 2115.60 2122.80 2130.00 2137.20 2144.40 2151.60 2158.80 2166.00 2173.20 2180.40 2187.60 2194.80 2202.00 2209.20 2216.40 2223.60

1863.60 1870.80 1878.00 1885.20 1892.40 1899.60 1906.80 1914.00 1921.20 1928.40 1935.60 1942.80 1950.00 1957.20 1964.40 1971.60 1978.80 1986.00 1993.20 2000.40 2007.60 2014.80 2022.00 2029.20 2036.40 2043.60 2050.80 2058.00 2065.20 2072.40 2079.60 2086.80 2094.00 2101.20 2108.40 2115.60 2122.80 2130.00 2137.20 2144.40 2151.60 2158.80 2166.00 2173.20 2180.40 2187.60 2194.80 2202.00 2209.20 2216.40 2223.60

302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352

2230.80 2238.00 2245.20 2252.40 2259.60 2266.80 2274.00 2281.20 2288.40 2295.60 2302.80 2310.00 2317.20 2324.40 2331.60 2338.80 2346.00 2353.20 2360.40 2367.60 2374.80 2382.00 2389.20 2396.40 2403.60 2410.80 2418.00 2425.20 2432.40 2439.60 2446.80 2454.00 2461.20 2468.40 2475.60 2482.80 2490.00 2497.20 2504.40 2511.60 2518.80 2526.00 2533.20 2540.40 2547.60 2554.80 2562.00 2569.20 2576.40 2583.60 2590.80

2230.80 2238.00 2245.20 2252.40 2259.60 2266.80 2274.00 2281.20 2288.40 2295.60 2302.80 2310.00 2317.20 2324.40 2331.60 2338.80 2346.00 2353.20 2360.40 2367.60 2374.80 2382.00 2389.20 2396.40 2403.60 2410.80 2418.00 2425.20 2432.40 2439.60 2446.80 2454.00 2461.20 2468.40 2475.60 2482.80 2490.00 2497.20 2504.40 2511.60 2518.80 2526.00 2533.20 2540.40 2547.60 2554.80 2562.00 2569.20 2576.40 2583.60 2590.80

353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403

2598.00 2605.20 2612.40 2619.60 2626.80 2634.00 2641.20 2648.40 2655.60 2662.80 2670.00 2677.20 2684.40 2691.60 2698.80 2706.00 2713.20 2720.40 2727.60 2734.80 2742.00 2749.20 2756.40 2763.60 2770.80 2778.00 2785.20 2792.40 2799.60 2806.80 2814.00 2821.20 2828.40 2835.60 2842.80 2850.00 2857.20 2864.40 2871.60 2878.80 2886.00 2893.20 2900.40 2907.60 2914.80 2922.00 2929.20 2936.40 2943.60 2950.80 2958.00

2598.00 2605.20 2612.40 2619.60 2626.80 2634.00 2641.20 2648.40 2655.60 2662.80 2670.00 2677.20 2684.40 2691.60 2698.80 2706.00 2713.20 2720.40 2727.60 2734.80 2742.00 2749.20 2756.40 2763.60 2770.80 2778.00 2785.20 2792.40 2799.60 2806.80 2814.00 2821.20 2828.40 2835.60 2842.80 2850.00 2857.20 2864.40 2871.60 2878.80 2886.00 2893.20 2900.40 2907.60 2914.80 2922.00 2929.20 2936.40 2943.60 2950.80 2958.00

404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454

2965.20 2972.40 2979.60 2986.80 2994.00 3001.20 3008.40 3015.60 3022.80 3030.00 3037.20 3044.40 3051.60 3058.80 3066.00 3073.20 3080.40 3087.60 3094.80 3102.00 3109.20 3116.40 3123.60 3130.80 3138.00 3145.20 3152.40 3159.60 3166.80 3174.00 3181.20 3188.40 3195.60 3202.80 3210.00 3217.20 3224.40 3231.60 3238.80 3246.00 3253.20 3260.40 3267.60 3274.80 3282.00 3289.20 3296.40 3303.60 3310.80 3318.00 3325.20

2965.20 2972.40 2979.60 2986.80 2994.00 3001.20 3008.40 3015.60 3022.80 3030.00 3037.20 3044.40 3051.60 3058.80 3066.00 3073.20 3080.40 3087.60 3094.80 3102.00 3109.20 3116.40 3123.60 3130.80 3138.00 3145.20 3152.40 3159.60 3166.80 3174.00 3181.20 3188.40 3195.60 3202.80 3210.00 3217.20 3224.40 3231.60 3238.80 3246.00 3253.20 3260.40 3267.60 3274.80 3282.00 3289.20 3296.40 3303.60 3310.80 3318.00 3325.20

455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505

3332.40 3339.60 3346.80 3354.00 3361.20 3368.40 3375.60 3382.80 3390.00 3397.20 3404.40 3411.60 3418.80 3426.00 3433.20 3440.40 3447.60 3454.80 3462.00 3469.20 3476.40 3483.60 3490.80 3498.00 3505.20 3512.40 3519.60 3526.80 3534.00 3541.20 3548.40 3555.60 3562.80 3570.00 3577.20 3584.40 3591.60 3598.80 3606.00 3613.20 3620.40 3627.60 3634.80 3642.00 3649.20 3656.40 3663.60 3670.80 3678.00 3685.20 3692.40

3332.40 3339.60 3346.80 3354.00 3361.20 3368.40 3375.60 3382.80 3390.00 3397.20 3404.40 3411.60 3418.80 3426.00 3433.20 3440.40 3447.60 3454.80 3462.00 3469.20 3476.40 3483.60 3490.80 3498.00 3505.20 3512.40 3519.60 3526.80 3534.00 3541.20 3548.40 3555.60 3562.80 3570.00 3577.20 3584.40 3591.60 3598.80 3606.00 3613.20 3620.40 3627.60 3634.80 3642.00 3649.20 3656.40 3663.60 3670.80 3678.00 3685.20 3692.40

506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556

3699.60 3706.80 3714.00 3721.20 3728.40 3735.60 3742.80 3750.00 3757.20 3764.40 3771.60 3778.80 3786.00 3793.20 3800.40 3807.60 3814.80 3822.00 3829.20 3836.40 3843.60 3850.80 3858.00 3865.20 3872.40 3879.60 3886.80 3894.00 3901.20 3908.40 3915.60 3922.80 3930.00 3937.20 3944.40 3951.60 3958.80 3966.00 3973.20 3980.40 3987.60 3994.80 4002.00 4009.20 4016.40 4023.60 4030.80 4038.00 4045.20 4052.40 4059.60

3699.60 3706.80 3714.00 3721.20 3728.40 3735.60 3742.80 3750.00 3757.20 3764.40 3771.60 3778.80 3786.00 3793.20 3800.40 3807.60 3814.80 3822.00 3829.20 3836.40 3843.60 3850.80 3858.00 3865.20 3872.40 3879.60 3886.80 3894.00 3901.20 3908.40 3915.60 3922.80 3930.00 3937.20 3944.40 3951.60 3958.80 3966.00 3973.20 3980.40 3987.60 3994.80 4002.00 4009.20 4016.40 4023.60 4030.80 4038.00 4045.20 4052.40 4059.60

557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607

4066.80 4074.00 4081.20 4088.40 4095.60 4102.80 4110.00 4117.20 4124.40 4131.60 4138.80 4146.00 4153.20 4160.40 4167.60 4174.80 4182.00 4189.20 4196.40 4203.60 4210.80 4218.00 4225.20 4232.40 4239.60 4246.80 4254.00 4261.20 4268.40 4275.60 4282.80 4290.00 4297.20 4304.40 4311.60 4318.80 4326.00 4333.20 4340.40 4347.60 4354.80 4362.00 4369.20 4376.40 4383.60 4390.80 4398.00 4405.20 4412.40 4419.60 4426.80

4066.80 4074.00 4081.20 4088.40 4095.60 4102.80 4110.00 4117.20 4124.40 4131.60 4138.80 4146.00 4153.20 4160.40 4167.60 4174.80 4182.00 4189.20 4196.40 4203.60 4210.80 4218.00 4225.20 4232.40 4239.60 4246.80 4254.00 4261.20 4268.40 4275.60 4282.80 4290.00 4297.20 4304.40 4311.60 4318.80 4326.00 4333.20 4340.40 4347.60 4354.80 4362.00 4369.20 4376.40 4383.60 4390.80 4398.00 4405.20 4412.40 4419.60 4426.80

608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658

4434.00 4441.20 4448.40 4455.60 4462.80 4470.00 4477.20 4484.40 4491.60 4498.80 4506.00 4513.20 4520.40 4527.60 4534.80 4542.00 4549.20 4556.40 4563.60 4570.80 4578.00 4585.20 4592.40 4599.60 4606.80 4614.00 4621.20 4628.40 4635.60 4642.80 4650.00 4657.20 4664.40 4671.60 4678.80 4686.00 4693.20 4700.40 4707.60 4714.80 4722.00 4729.20 4736.40 4743.60 4750.80 4758.00 4765.20 4772.40 4779.60 4786.80 4794.00

4434.00 4441.20 4448.40 4455.60 4462.80 4470.00 4477.20 4484.40 4491.60 4498.80 4506.00 4513.20 4520.40 4527.60 4534.80 4542.00 4549.20 4556.40 4563.60 4570.80 4578.00 4585.20 4592.40 4599.60 4606.80 4614.00 4621.20 4628.40 4635.60 4642.80 4650.00 4657.20 4664.40 4671.60 4678.80 4686.00 4693.20 4700.40 4707.60 4714.80 4722.00 4729.20 4736.40 4743.60 4750.80 4758.00 4765.20 4772.40 4779.60 4786.80 4794.00

659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709

4801.20 4808.40 4815.60 4822.80 4830.00 4837.20 4844.40 4851.60 4858.80 4866.00 4873.20 4880.40 4887.60 4894.80 4902.00 4909.20 4916.40 4923.60 4930.80 4938.00 4945.20 4952.40 4959.60 4966.80 4974.00 4981.20 4988.40 4995.60 5002.80 5010.00 5017.20 5024.40 5031.60 5038.80 5046.00 5053.20 5060.40 5067.60 5074.80 5082.00 5089.20 5096.40 5103.60 5110.80 5118.00 5125.20 5132.40 5139.60 5146.80 5154.00 5161.20

4801.20 4808.40 4815.60 4822.80 4830.00 4837.20 4844.40 4851.60 4858.80 4866.00 4873.20 4880.40 4887.60 4894.80 4902.00 4909.20 4916.40 4923.60 4930.80 4938.00 4945.20 4952.40 4959.60 4966.80 4974.00 4981.20 4988.40 4995.60 5002.80 5010.00 5017.20 5024.40 5031.60 5038.80 5046.00 5053.20 5060.40 5067.60 5074.80 5082.00 5089.20 5096.40 5103.60 5110.80 5118.00 5125.20 5132.40 5139.60 5146.80 5154.00 5161.20

710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760

5168.40 5175.60 5182.80 5190.00 5197.20 5204.40 5211.60 5218.80 5226.00 5233.20 5240.40 5247.60 5254.80 5262.00 5269.20 5276.40 5283.60 5290.80 5298.00 5305.20 5312.40 5319.60 5326.80 5334.00 5341.20 5348.40 5355.60 5362.80 5370.00 5377.20 5384.40 5391.60 5398.80 5406.00 5413.20 5420.40 5427.60 5434.80 5442.00 5449.20 5456.40 5463.60 5470.80 5478.00 5485.20 5492.40 5499.60 5506.80 5514.00 5521.20 5528.40

5168.40 5175.60 5182.80 5190.00 5197.20 5204.40 5211.60 5218.80 5226.00 5233.20 5240.40 5247.60 5254.80 5262.00 5269.20 5276.40 5283.60 5290.80 5298.00 5305.20 5312.40 5319.60 5326.80 5334.00 5341.20 5348.40 5355.60 5362.80 5370.00 5377.20 5384.40 5391.60 5398.80 5406.00 5413.20 5420.40 5427.60 5434.80 5442.00 5449.20 5456.40 5463.60 5470.80 5478.00 5485.20 5492.40 5499.60 5506.80 5514.00 5521.20 5528.40

761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811

5535.60 5542.80 5550.00 5557.20 5564.40 5571.60 5578.80 5586.00 5593.20 5600.40 5607.60 5614.80 5622.00 5629.20 5636.40 5643.60 5650.80 5658.00 5665.20 5672.40 5679.60 5686.80 5694.00 5701.20 5708.40 5715.60 5722.80 5730.00 5737.20 5744.40 5751.60 5758.80 5766.00 5773.20 5780.40 5787.60 5794.80 5802.00 5809.20 5816.40 5823.60 5830.80 5838.00 5845.20 5852.40 5859.60 5866.80 5874.00 5881.20 5888.40 5895.60

5535.60 5542.80 5550.00 5557.20 5564.40 5571.60 5578.80 5586.00 5593.20 5600.40 5607.60 5614.80 5622.00 5629.20 5636.40 5643.60 5650.80 5658.00 5665.20 5672.40 5679.60 5686.80 5694.00 5701.20 5708.40 5715.60 5722.80 5730.00 5737.20 5744.40 5751.60 5758.80 5766.00 5773.20 5780.40 5787.60 5794.80 5802.00 5809.20 5816.40 5823.60 5830.80 5838.00 5845.20 5852.40 5859.60 5866.80 5874.00 5881.20 5888.40 5895.60

812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862

5902.80 5910.00 5917.20 5924.40 5931.60 5938.80 5946.00 5953.20 5960.40 5967.60 5974.80 5982.00 5989.20 5996.40 6003.60 6010.80 6018.00 6025.20 6032.40 6039.60 6046.80 6054.00 6061.20 6068.40 6075.60 6082.80 6090.00 6097.20 6104.40 6111.60 6118.80 6126.00 6133.20 6140.40 6147.60 6154.80 6162.00 6169.20 6176.40 6183.60 6190.80 6198.00 6205.20 6212.40 6219.60 6226.80 6234.00 6241.20 6248.40 6255.60 6262.80

5902.80 5910.00 5917.20 5924.40 5931.60 5938.80 5946.00 5953.20 5960.40 5967.60 5974.80 5982.00 5989.20 5996.40 6003.60 6010.80 6018.00 6025.20 6032.40 6039.60 6046.80 6054.00 6061.20 6068.40 6075.60 6082.80 6090.00 6097.20 6104.40 6111.60 6118.80 6126.00 6133.20 6140.40 6147.60 6154.80 6162.00 6169.20 6176.40 6183.60 6190.80 6198.00 6205.20 6212.40 6219.60 6226.80 6234.00 6241.20 6248.40 6255.60 6262.80

863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913

6270.00 6277.20 6284.40 6291.60 6298.80 6306.00 6313.20 6320.40 6327.60 6334.80 6342.00 6349.20 6356.40 6363.60 6370.80 6378.00 6385.20 6392.40 6399.60 6406.80 6414.00 6421.20 6428.40 6435.60 6442.80 6450.00 6457.20 6464.40 6471.60 6478.80 6486.00 6493.20 6500.40 6507.60 6514.80 6522.00 6529.20 6536.40 6543.60 6550.80 6558.00 6565.20 6572.40 6579.60 6586.80 6594.00 6601.20 6608.40 6615.60 6622.80 6630.00

6270.00 6277.20 6284.40 6291.60 6298.80 6306.00 6313.20 6320.40 6327.60 6334.80 6342.00 6349.20 6356.40 6363.60 6370.80 6378.00 6385.20 6392.40 6399.60 6406.80 6414.00 6421.20 6428.40 6435.60 6442.80 6450.00 6457.20 6464.40 6471.60 6478.80 6486.00 6493.20 6500.40 6507.60 6514.80 6522.00 6529.20 6536.40 6543.60 6550.80 6558.00 6565.20 6572.40 6579.60 6586.80 6594.00 6601.20 6608.40 6615.60 6622.80 6630.00

914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964

6637.20 6644.40 6651.60 6658.80 6666.00 6673.20 6680.40 6687.60 6694.80 6702.00 6709.20 6716.40 6723.60 6730.80 6738.00 6745.20 6752.40 6759.60 6766.80 6774.00 6781.20 6788.40 6795.60 6802.80 6810.00 6817.20 6824.40 6831.60 6838.80 6846.00 6853.20 6860.40 6867.60 6874.80 6882.00 6889.20 6896.40 6903.60 6910.80 6918.00 6925.20 6932.40 6939.60 6946.80 6954.00 6961.20 6968.40 6975.60 6982.80 6990.00 6997.20

6637.20 6644.40 6651.60 6658.80 6666.00 6673.20 6680.40 6687.60 6694.80 6702.00 6709.20 6716.40 6723.60 6730.80 6738.00 6745.20 6752.40 6759.60 6766.80 6774.00 6781.20 6788.40 6795.60 6802.80 6810.00 6817.20 6824.40 6831.60 6838.80 6846.00 6853.20 6860.40 6867.60 6874.80 6882.00 6889.20 6896.40 6903.60 6910.80 6918.00 6925.20 6932.40 6939.60 6946.80 6954.00 6961.20 6968.40 6975.60 6982.80 6990.00 6997.20

965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000

7004.40 7011.60 7018.80 7026.00 7033.20 7040.40 7047.60 7054.80 7062.00 7069.20 7076.40 7083.60 7090.80 7098.00 7105.20 7112.40 7119.60 7126.80 7134.00 7141.20 7148.40 7155.60 7162.80 7170.00 7177.20 7184.40 7191.60 7198.80 7206.00 7213.20 7220.40 7227.60 7234.80 7242.00 7249.20 7256.40

7004.40 7011.60 7018.80 7026.00 7033.20 7040.40 7047.60 7054.80 7062.00 7069.20 7076.40 7083.60 7090.80 7098.00 7105.20 7112.40 7119.60 7126.80 7134.00 7141.20 7148.40 7155.60 7162.80 7170.00 7177.20 7184.40 7191.60 7198.80 7206.00 7213.20 7220.40 7227.60 7234.80 7242.00 7249.20 7256.40

Loading Unloading

34.30 10.90

68.30 10.90

S-ar putea să vă placă și