SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Operational Testing is carried out by :Correct Answer Your Answer True/False Question Correct Answer Stress Testing , Performance Testing , Recovery Testing Alpha & Beta Test , Recovery Testing , Stress Testing Spiral model itself is a model which is base for other software development models False

Select The Blank Question SE Methodology rides on two components, System Engineering and ________. Correct Answer Development Engineering Correct Answer Non Functional Requirements Structured System Analysis Design Documentation Functions & Features Your Answer Non Functional Requirements Structured System Analysis Design Documentation Functions & Features

Match The Following Question Performance of the System SRS Design Phase SSAD

Select The Blank Question ________ evaluates the run time performance of the system developed. Correct Answer Performance Testing

Multiple Choice Single Answer Question An Output of a Structured System Analysis is:Correct Answer Software Requirement Specification

Multiple Choice Multiple Answer Question OOSAD development approach uses Correct Answer Your Answer Objects , Process modeling , Object attributes Objects , Object attributes , Sub-system approach

Select The Blank Question An accounting System based on rules and Principles could be an example of ________ System. Correct Answer Deterministic True/False Question A Software solution is evolved in parts as in an incremental fashion in incremental model Correct Answer True Multiple Choice Single Answer Question Who Defines SE as the application of a Systematic, disciplined and quantifiable approach to the development and maintenance of a Software Correct Answer IEEE

Page 1 of 85

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 2 of 85

SCDL 3rd Semester Software Engineering and Project Management


True/False Question Correct Answer True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer True/False Question Correct Answer Your Answer An E-R Diagram explain in graphical Model the nature of relations and attributes. True Decomposition breaks the System into smaller modules and components. True True PRM stands for ________ Prototyping Model People, Procedures and Parameters are the Drivers of the Technology. False True

Multiple Choice Multiple Answer Question A good test is one that has:Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer High Probability of detecting an error , Not Redundant , Simple to execute & Independent High Probability of detecting an error , Not Redundant , Simple to execute & Independent Cohesion and Coupling is the criteria for measuring ________. Functional Dependency System Dependency

Multiple Choice Single Answer Question How to develop or build a particular software module is defined by Correct Answer Software Engineering Methods

Multiple Choice Multiple Answer Question The Functionality of the Client application is tested using :Correct Answer Your Answer True/False Question Correct Answer Your Answer Select The Blank Server Tests , Database Tests , Transaction Tests Server Tests , Transaction Tests Systems running on web platforms needs high level of protection from testers. False True

Page 3 of 85

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 4 of 85

SCDL 3rd Semester Software Engineering and Project Management


Select The Blank Question Correct Answer Your Answer

A ________ Measures the Efforts / cost / time used to achieve the output. Efficiency Effort Estimation

Select The Blank Question Correct Answer Your Answer

________ type of testing evaluate the logical access to the basic functionality of the System. Security Testing Security Testing

Multiple Choice Multiple Answer Question Legacy software -Poor quality has Correct Answer Your Answer Inextensible design , Convoluted Code , Poor or nonexistent documentation Convoluted Code , Poor or nonexistent documentation

Multiple Choice Single Answer Question A System in which next state of the system cannot be predicted even if the current state of the system is known:Correct Answer Probabilistic Your Answer Probabilistic

Multiple Choice Single Answer Question The extent of software functions with precision without any failure is :Correct Answer Your Answer Reliability Reliability

Multiple Choice Single Answer Question A set of Computer Programs which performs set of preset functions is called as ? Correct Answer Your Answer Software Interface

Multiple Choice Single Answer Question A process which breaks statement of work into smaller activities with clear start - finish definition is called as :Correct Answer Work Break Down Structure Your Answer Work Break Down Structure

Page 5 of 85

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 6 of 85

SCDL 3rd Semester Software Engineering and Project Management

Multiple Choice Multiple Answer Question Operational Testing is carried out by :Correct Answer Recovery Testing , Stress Testing , Performance Testing Your Answer Recovery Testing , Stress Testing , Performance Testing

Multiple Choice Multiple Answer Question OOSAD development approach uses Correct Answer Objects , Process modeling , Object attributes Your Answer Objects , Process modeling , Object attributes

Select The Blank Question In ________ model the data elements are organized indifferent areas that work together through network communications. Correct Answer Network Your Answer Network - Relational

Multiple Choice Multiple Answer Question Project Risk Management Includes:Correct Answer Risk Prevention , Risk Avoidance , Risk Mitigation Your Answer Risk Avoidance , Risk Mitigation

Multiple Choice Single Answer Question A Process in which subsystems are organized into clusters with clear boundary and defined goal is:Correct Answer Simplification Your Answer Decomposition

Select The Blank Question A Module Tests focuses on ________. Correct Answer Functions & Design Your Answer Functions & Design

True/False Question

Recovery testing focuses on the Cost Recovery Plan of the Software Implemented.

Correct Answer False Your Answer False

Page 7 of 85

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 8 of 85

SCDL 3rd Semester Software Engineering and Project Management

Multiple Choice Single Answer Question A type of testing which eliminates the errors in the design, architecture and development & deployment process is. Correct Answer Non Execution based testing Your Answer Module based testing

Multiple Choice Multiple Answer Question Legacy software -Poor quality has Correct Answer Your Answer Inextensible design , Convoluted Code , Poor or nonexistent documentation Inextensible design , Convoluted Code , Poor or nonexistent documentation

Select The Blank Question Correct Answer Your Answer

Cohesion and Coupling is the criteria for measuring ________. Functional Dependency Functional Dependency

True/False Question Correct Answer Your Answer

Integration testing is done when the modules are integrated or when new component is added to the system. True True

Select The Blank Question Correct Answer Your Answer

In ________model two sets of data are linked by a relationship. Relational Relational

Match The Following Question Closed System Deterministic System Probabilistic System Open System

Correct Answer Parameter are fixed Predictable Behavior Unpredictable Behavior Parameters are Variables

Your Answer Parameter are fixed Predictable Behavior Unpredictable Behavior Parameters are Variables

Multiple Choice Single Answer Question A type of testing carried out during the software product development process is:-

Page 9 of 85

SCDL 3rd Semester Software Engineering and Project Management

Page 10 of 85

10

SCDL 3rd Semester Software Engineering and Project Management


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 11 of 85

11

SCDL 3rd Semester Software Engineering and Project Management


software efficiency Software Usability Optimum use of resources Good Documentation Good Documentation Optimum use of resources

True/False Question Correct Answer Your Answer

Software Development becomes a costly and risky if the the development process does not follow a systematic, scientific approach to produce the software True True

Select The Blank Question ________ tests confirms that the needs and requirements are fulfilled on the deployment platform. Correct Answer Beta Your Answer Beta

Select The Blank Question The Failure Curve of a Hardware is called as ________ Correct Answer Your Answer Bathtub Curve Bathtub Curve

True/False Question Correct Answer Your Answer

The ultimate goal of the SQA is to write test cases which fixes the errors. False False

True/False Question Correct Answer Your Answer

The Data Management is not easy with relational Model. False False

Select The Blank Question A ________ is largely depends upon the meeting of functional requirements and performance measures with ease in operations. Correct Answer Customer Satisfaction Your Answer Customer Satisfaction

Multiple Choice Multiple Answer Question Risk Management is a Process based on application of :-

Page 12 of 85

12

SCDL 3rd Semester Software Engineering and Project Management

Page 13 of 85

13

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer Your Answer True True LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer Question A type of testing in which all the requirements of the module is cross referenced with the developed module is called as:Correct Answer Validation Testing Your Answer Integration Testing

Select The Blank Question A ________ is an activity incorporating both software quality control and quality assurance. Correct Answer Your Answer Software Quality Management Software Quality Management

Multiple Choice Single Answer Question The Application of a systematic, disciplined, quantifiable approach to the development, operation and maintenance of the software is termed as Correct Answer Software Engineering Your Answer Software Engineering

Multiple Choice Multiple Answer Question The responsibilities of Software Managerare Correct Answer Your Answer To maintain budget , Keep schedules from slipping , Improve quality To maintain budget , Keep schedules from slipping , Improve quality

Select The Blank Question ________ type of testing evaluate the logical access to the basic functionality of the System. Correct Answer Your Answer Security Testing Security Testing

True/False Question Correct Answer Your Answer

Functional Testing focuses on the Basic Functionality of the Software. True True

Multiple Choice Single Answer Question The Scope of the work in a Software Project is defined by :-

Page 14 of 85

14

SCDL 3rd Semester Software Engineering and Project Management

Page 15 of 85

15

SCDL 3rd Semester Software Engineering and Project Management


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 16 of 85

16

SCDL 3rd Semester Software Engineering and Project Management


Select The Blank Question Correct Answer Your Answer

The basic tangible measure of the software is ________ Lines of Code Lines of Code

Multiple Choice Single Answer Question A technique in which participants have freedom to express their views is known as :Correct Answer Your Answer Brainstorming Questionnaire

Multiple Choice Single Answer Question A Modification of the Software is done to accommodate the changes forced by the external environment is Correct Answer Adaptive Maintenance Your Answer Adaptive Maintenance

Multiple Choice Single Answer Question The Application of a systematic, disciplined, quantifiable approach to the development, operation and maintenance of the software is termed as Correct Answer Software Engineering Your Answer Software Engineering

Multiple Choice Single Answer Question The variation in quality is monitored by keeping the attributes at the desired level, this phenomenon is called as :Correct Answer Quality Control Your Answer Check & Go Tactics

Multiple Choice Multiple Answer Question Project Risk Management Includes:Correct Answer Your Answer Risk Prevention , Risk Avoidance , Risk Mitigation Risk Prevention , Risk Avoidance , Risk Mitigation

Multiple Choice Single Answer Question A Discipline that integrates Process, Methods and tools for development of a software is Correct Answer Your Answer Software Engineering Software Engineering

Page 17 of 85

17

SCDL 3rd Semester Software Engineering and Project Management

Page 18 of 85

18

SCDL 3rd Semester Software Engineering and Project Management


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 19 of 85

19

SCDL 3rd Semester Software Engineering and Project Management

Match The Following Question Testing Test Plan Functional Testing Test Case

Correct Answer Error Tracing Test Cases Functions & Features Test Document

Your Answer Error Tracing Test Cases Functions & Features Test Document

True/False Question Correct Answer Your Answer

People, Procedures and Parameters are the Drivers of the Technology. False False

Select The Blank Question A ________ arises due to uncertainties involved in assessing, estimating various inputs to the software process. Correct Answer Process Risk Your Answer Process Risk

Select The Blank Question A unit tests major focuses on ________ Correct Answer Your Answer Processes & Code Processes & Code

True/False Question Correct Answer Your Answer

SRS is one of the cause of not meeting the SQA. True True

True/False Question Correct Answer Your Answer

The Emphasis in SSAD is on functions and features. True True

Multiple Choice Single Answer Question The variation in quality is monitored by keeping the attributes at the desired level, this phenomenon is called as :-

Page 20 of 85

20

SCDL 3rd Semester Software Engineering and Project Management


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 21 of 85

21

SCDL 3rd Semester Software Engineering and Project Management


Question Correct Answer Your Answer ________ is a System Engineering approach that is used to define architecture that enables a business to use Information Effectively. Business Processing Engineering Business Processing Engineering

Multiple Choice Multiple Answer Question SQA efforts most primarily assures:Correct Answer Your Answer Software Quality , Software Reliability , Software Availability Software Quality , Software Reliability , Software Maintenance

Select The Blank Question ________ testing confirms that the needs and requirements are fulfilled in the development environment. Correct Answer Alpha Your Answer Alpha

Select The Blank Question An Operational deviation made by the user leading to improper result is said to be ________. Correct Answer Fault or Mistake of the System Your Answer Error

Match The Following Question Entity Hierarchical Model Network Model Relational Model

Correct Answer Object which is Uniquely Distinguished Tree Structure Network Communications Data are Linked

Your Answer Object which is Uniquely Distinguished Tree Structure Mesh Structure Sequence Structure

Multiple Choice Multiple Answer Question A documentation is tested through :Correct Answer Your Answer Technical Review , Actual Operational Review Technical Review , Actual Operational Review

Select The Blank Question In ________Model the risk of the Software development is almost Nil Correct Answer Water Fall

Page 22 of 85

22

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 23 of 85

23

SCDL 3rd Semester Software Engineering and Project Management


Your Answer Fatal

True/False Question Correct Answer Your Answer

SE is applied for software development through Engineering Methods True True

Multiple Choice Single Answer Question A Discipline that integrates Process, Methods and tools for development of a software is Correct Answer Your Answer Software Engineering Software Engineering

Multiple Choice Single Answer Question A testing technique which is critically important and it ensures correctness of all inputs and basic processes of a unit is called as ? Correct Answer White Box Testing Your Answer White Box Testing

Multiple Choice Multiple Answer Question Resources required for a Software development activity could be :Correct Answer Your Answer People , Development Environment , Reusable Components People , Development Environment , Reusable Components

Multiple Choice Multiple Answer Question A documentation is tested through :Correct Answer Your Answer Technical Review , Actual Operational Review Technical Review , Actual Operational Review

Multiple Choice Single Answer Question How to develop or build a particular software module is defined by Correct Answer Your Answer Software Engineering Methods Software Engineering Methods

Multiple Choice Single Answer Question A software which directly communicates with the hardware and provides an interface to perform certain tasks is termed as Correct Answer System Software Your Answer System Software

Page 24 of 85

24

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 25 of 85

25

SCDL 3rd Semester Software Engineering and Project Management


True/False Question System testing Starts when Software Integration is about to be completed.

Correct Answer False Your Answer False

Select The Blank Question ________ is a System Engineering approach that is used to define architecture that enables a business to use Information Effectively. Correct Answer Business Processing Engineering Your Answer Business Processing Engineering

Multiple Choice Multiple Answer Question Characteristics of a test could be:Correct Answer Not Redundant , Best of Breed , Neither too simple Nor to Complex Your Answer Not Redundant , Yield Better Results

Multiple Choice Single Answer Question A set of Computer Programs which performs set of preset functions is called as ? Correct Answer Software Your Answer Software

Multiple Choice Multiple Answer Question In a Software Risk Management Risk drivers are :Correct Answer Technology , People , Requirements Your Answer Technology , People , Requirements

Match The Following Question Normalization Performance Management Relational Model E-R Diagrams

Correct Answer Table Design Efficiency & Effectiveness Data Management With Ease Strong & Weak Entities

Your Answer Data Management With Ease Efficiency & Effectiveness Relationship Management Table Design

True/False Question

Six Sigma is one of the most widely used strategy for statistical quality assurance in an industry. Correct Answer True

Page 26 of 85

26

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 27 of 85

27

SCDL 3rd Semester Software Engineering and Project Management


Question The responsibilities of Software Managerare

Correct Answer To maintain budget , Keep schedules from slipping , Improve quality Your Answer To maintain budget , Keep schedules from slipping , Improve quality

Multiple Choice Single Answer Question A Cost which includes quality planning, measuring & monitoring the quality aspect and its training is :Correct Answer Achievement Cost Your Answer Achievement Cost

Multiple Choice Single Answer Question A process of acquiring hardware, software and development services and entering into contract with customers and business partners to deliver the software product is :Correct Answer Project Procurement Management Your Answer Project Procurement Management

Multiple Choice Multiple Answer Question Software Risk could be of :Correct Answer Process Risk , Project Risk , Product Risk Your Answer Process Risk , Project Risk , Product Risk

True/False Question

People, Procedures and Parameters are the Drivers of the Technology.

Correct Answer False Your Answer True

Match The Following Question Development of the Software Corrective Process, Tools & Methods Requirement Specifications

Correct Answer Software Programs Maintenance Software Engineering Layers Definition Phase

Your Answer Software Programs Maintenance Software Engineering Layers Definition Phase

Multiple Choice Single Answer Question A type of testing which verifies that all the system elements are meshed properly and that overall system function / performance is achieved is:Correct Answer System testing Your Answer System testing

Page 28 of 85

28

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 29 of 85

29

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Single Answer Question A process which breaks statement of work into smaller activities with clear start - finish definition is called as :Correct Answer Work Break Down Structure Your Answer Project Planning

Multiple Choice Multiple Answer Question A formal Technical Review may include:Correct Answer Walkthroughs , Inspections , Roundrobin reviews Your Answer Walkthroughs , Inspections , Roundrobin reviews

Multiple Choice Single Answer Question An Approach which majorly focuses on Functions and data structure designed for those functions. Correct Answer SSAD Your Answer OOSAD

Multiple Choice Single Answer Question Source Code of the Software is available so that the engineers can make the local modifications and use the component Correct Answer Open Source Your Answer Open Source

Multiple Choice Single Answer Question At Functional Level of the SSAD the design focuses on:Correct Answer Functions and Features Your Answer Structured Approach

Multiple Choice Multiple Answer Question The software designed with the correct choice of technology and architecture to ensure: Correct Answer Customer Satisfaction , On-time Delivery , Developed with the budgeted cost Your Answer Customer Satisfaction , On-time Delivery , Developed with the budgeted cost

Multiple Choice Multiple Answer Question RMMM Plan deals with :Correct Answer Mitigation , Monitoring , Management Your Answer Mitigation , Monitoring , Management

Select The Blank

Page 30 of 85

30

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Page 31 of 85

31

SCDL 3rd Semester Software Engineering and Project Management


Question The next development in software engineering is

Correct Answer The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Your Answer The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Multiple Choice Multiple Answer Question Resources required for a Software development activity could be :Correct Answer People , Development Environment , Reusable Components Your Answer People , Development Environment , Reusable Components

Select The Blank Question ________is a key management in the development of effective software solutions Correct Answer Software Process Management Your Answer Software Process Management

Multiple Choice Multiple Answer Question Work Break Down Structure can also be traced back to ? Correct Answer System Requirements Specifications , Requirement Definition & Description Your Answer System Requirements Specifications , Requirement Definition & Description , Statement of Work

Multiple Choice Multiple Answer Question SQA efforts most primarily assures:Correct Answer Software Quality , Software Reliability , Software Availability Your Answer Software Quality , Software Reliability , Software Availability

Match The Following Question Quality Management ISO 9000 Customer Satisfaction Testing

Correct Answer Cost Quality Assurance System Malcolm Baldridge Approach Finding Errors & Fixing it

Your Answer Cost Quality Assurance System Malcolm Baldridge Approach Finding Errors & Fixing it

Multiple Choice Multiple Answer Question Black Box testing attempts to find error in following categories :Correct Answer Incorrect or Missing Functions , Interface Errors , Performance Errors Your Answer Incorrect or Missing Functions , Interface Errors , Performance Errors

Page 32 of 85

32

SCDL 3rd Semester Software Engineering and Project Management

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question: Changes in the Customer requirements are understood and incorporated in which phase? Correct Answer: Support Your Answer: Analysis Multiple Choice Single Answer Question: A Software that makes use of non numerical algorithms to solve complex problems that are not amenable to straightforward analysis Correct Answer: Artificial Intelligence Your Answer: Artificial Intelligence Multiple Choice Multiple Answer Question: Following are the data models namely:Correct Answer: Hierarchical Model , Network Model , Relational Model Your Answer: Hierarchical Model , Network Model , Relational Model Multiple Choice Multiple Answer Question: Project Metrics helps the project manager in following ways :Correct Answer: Minimize the Development Schedule , Assess Product Quality regularly Your Answer: Assess Product Quality regularly , Planning the Task , Planning the Risk Multiple Choice Multiple Answer Question: White Box Testing Checks :Correct Answer: All Paths in the process are correctly operational , All Logical decision are executed with true or false , All Loops are executed Your Answer: All Logical decision are executed with true or false , All Loops are executed , Interfaces are designed Properly Match The Following Question Development of the Software Corrective Process, Tools & Methods Requirement Specifications Correct Answer Software Programs Maintenance Software Engineering Definition Phase Your Answer Software Modules Software Programs Layers Analysis Definition Phase

Multiple Choice Single Answer Question: A type of testing where the focus is on design and development of the software architecture is termed as:Correct Answer: Integration Testing Your Answer: Integration Testing Multiple Choice Single Answer Question: An activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks is :Correct Answer: Software Project Scheduling Your Answer: Project Planning Multiple Choice Multiple Answer Question: Testing a Design Includes:Correct Answer: Test Procedures , Test Plans , Design Renew Plans Your Answer: Test Procedures , Test Plans

Page 33 of 85

33

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Multiple Answer Question: Project Metrics enable a software project manager to:Correct Answer: Uncover problem areas before they go Critical , Assess the Status of the Ongoing Project , Identify the Risk Potential Your Answer: Assess the Status of the Ongoing Project , Identify the Risk Potential , Manage the resources Match The Following Question Correct Answer Your Answer Normalization Table Design Table Design Performance Management Efficiency & Effectiveness Efficiency & Effectiveness Relational Model Data Management With Ease Data Management With Ease E-R Diagrams Strong & Weak Entities Strong & Weak Entities Select The Blank Question: An accounting System based on rules and Principles could be an example of ________ System. Correct Answer: Deterministic Your Answer: Deterministic True/False Question: Proactive risk strategies are applied to deal with risk when it occurs. Correct Answer: False Your Answer: False Multiple Choice Single Answer Question: A set of Computer Programs which performs set of preset functions is called as ? Correct Answer: Software Your Answer: Software True/False Question: Systems running on web platforms needs high level of protection from testers. Correct Answer: False Your Answer: True Select The Blank Question: ________ testing confirms that the needs and requirements are fulfilled in the development environment. Correct Answer: Alpha Your Answer: Beta Multiple Choice Single Answer Question: Most of the Software's Continues to be custom built because Correct Answer: Reusability of the Component Your Answer: Reusability of the Component Multiple Choice Multiple Answer Question: SQA efforts most primarily assures:Correct Answer: Software Quality , Software Reliability , Software Availability Your Answer: Software Quality , Software Reliability , Software Availability Multiple Choice Single Answer Question: A System which operates in a unpredictable manner is :Correct Answer: Probabilistic Your Answer: Probabilistic

Page 34 of 85

34

SCDL 3rd Semester Software Engineering and Project Management


True/False Question: The Data Management is not easy with relational Model. Correct Answer: False Your Answer: False Multiple Choice Multiple Answer Question: Risk Management is a Process based on application of :Correct Answer: Game Theory , Probability Theory , Decision Theory Your Answer: Game Theory , Probability Theory , Decision Theory Multiple Choice Single Answer Question: A layer in which rules and regulations , functions and processes, dataflows and process flows are visualized:Correct Answer: Logical Your Answer: Operational Multiple Choice Single Answer Question: A Phenomenon which states that over a period of times the system gets into a phase of degrading and disorganization is:Correct Answer: Entropy Your Answer: Entropy Select The Blank Question: Inventory Control System which is designed based on demand and supply variations could be an example of ________ system Correct Answer: Probabilistic Your Answer: Probabilistic Select The Blank Question: PRM stands for ________ Correct Answer: Prototyping Model Your Answer: Prototyping Model Multiple Choice Multiple Answer Question: Project Risk Management Includes:Correct Answer: Risk Avoidance , Risk Mitigation , Risk Prevention Select The Blank Question: A Module Tests focuses on ________. Correct Answer: Functions & Design Multiple Choice Single Answer Question: A process in which a project is broken down into smaller manageable units is called as :Correct Answer: Project Compartmentalization Select The Blank Question: The company should establish a ________ and maintain a documented quality system as a means of ensuring that it conforms to the specified requirements of ISO. Correct Answer: Quality System Procedure True/False Question: SRS is Systems requirement specifications in the software development phase Correct Answer: True Select The Blank

Page 35 of 85

35

SCDL 3rd Semester Software Engineering and Project Management


Question: One of the most important guideline for the reviewing the product is review the product not the ________. Correct Answer: Producer True/False Question: The Emphasis in SSAD is on functions and features. Correct Answer: True Multiple Choice Single Answer Question: Application of Knowledge, Resources , tools and techniques to deliver customer needs within agreed terms of cost and time is :Correct Answer: Project Management Multiple Choice Multiple Answer Question: RMMM Plan deals with :Correct Answer: Mitigation , Monitoring , Management True/False Question: A Software solution is evolved in parts as in an incremental fashion in incremental model Correct Answer: True True/False Question: Documentation testing tests and verifies whether the troubleshooting is easily achieved or not. Correct Answer: True Multiple Choice Multiple Answer Question: Design Constraints include:Correct Answer: Resource Limitations , Platform Limitations , Protocol Limitations Multiple Choice Single Answer Question: Software Engineering attempts to identify what information is to be processed, what function and performance is desired in which phase? Correct Answer: Definition Phase Multiple Choice Single Answer Question: A Modification of the Software is done to accommodate the changes forced by the external environment is Correct Answer: Adaptive Maintenance Multiple Choice Single Answer Question: A System flow chart is also called as:Correct Answer: State Transaction Diagram Select The Blank Question: Cohesion and Coupling is the criteria for measuring ________. Correct Answer: Functional Dependency Multiple Choice Single Answer Question: A software metrics use a measure of the functionality delivered by the application as a normalisation value is :Correct Answer: Function oriented Software Metrics Select The Blank Question: The basic tangible measure of the software is ________ Correct Answer: Lines of Code

Page 36 of 85

36

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Single Answer Question: A testing methodology where two types of testing techniques are applied viz. Black Box & White Box Testing is ? Correct Answer: Unit Testing Multiple Choice Single Answer Question: A testing technique which is critically important and it ensures correctness of all inputs and basic processes of a unit is called as ? Correct Answer: White Box Testing Your Answer: Component Testing True/False Question: A computer system without system software can not function Correct Answer: True Your Answer: True Select The Blank Question: The ________ phase of software engineering focuses on how data are to be structured and programs are to be developed Correct Answer: Development Your Answer: Development LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question: Test cases are designed to tests:Correct Answer: Internal Logic , Software Requirements Your Answer: Internal Logic , Software Requirements , A Quality aspect of a Program Select The Blank Question: Requirements Management Begins with ________. Correct Answer: Identification Your Answer: Identification Select The Blank Question: A collection of programs written to service other set of programs and its functions is called as ________ Correct Answer: System Software Your Answer: System Software True/False Question: System testing Starts when Software Integration is about to be completed. Correct Answer: False Your Answer: True Select The Blank Question: ________ layer of the Systems focuses on User Interfaces, data entry, operation flows and maintenance. Correct Answer: Operational Your Answer: Conceptual Select The Blank Question: Inadequacy or misout in SRS & RDD is ________. Correct Answer: Defect Your Answer: Error

Page 37 of 85

37

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Single Answer Question: An Approach foucsses on Objects and Processing Methods Correct Answer: OOSAD Your Answer: OOSAD Multiple Choice Multiple Answer Question: Some of the Steps involve in Integration Testing is :Correct Answer: Main Control Module is a Test Driver , Tests are conducted as each component is added , Regression Testing is done Your Answer: Main Control Module is a Test Driver , Tests are conducted as each component is added , Regression Testing is done , Stress Testing Multiple Choice Single Answer Question: When the System requirements are easy to establish and are stable, the development is customer specific, and changes are not foreseen then the model used is? Correct Answer: Water Fall Model Your Answer: Spiral Model Match The Following Question Correct Answer World Wide Web Content provider Software Deteriorates System Software File Management Application Software Standalone Programs Your Answer Deteriorates Wear's Out Integrated System File Management

Multiple Choice Multiple Answer Question: The stages of the Iterative Models are Correct Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Your Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Multiple Choice Single Answer Question: At the beginning testing focuses on each component individually, ensuring that it function properly as a unit or not this is termed as:Correct Answer: Unit Testing Your Answer: Component Testing Select The Blank Question: An Operational deviation made by the user leading to improper result is said to be ________. Correct Answer: Fault or Mistake of the System Your Answer: Failure Multiple Choice Single Answer Question: An outcome of Requirements Management Stage is :Correct Answer: Software Requirement Specifications Your Answer: Software Requirement Specifications Multiple Choice Single Answer Question: A set of activities ensure that the software that has been built is traceable to customer requirements:Correct Answer: Validation Your Answer: Verification & Validation Multiple Choice Multiple Answer Question: The Examples of Business Software are Correct Answer: Payroll ,Accounting, , Inventory , customer Relation Management

Page 38 of 85

38

SCDL 3rd Semester Software Engineering and Project Management


Your Answer: Inventory , customer Relation Management , Compiler , Payroll ,Accounting, Select The Blank Question: ________ is a System Engineering approach that is used to define architecture that enables a business to use Information Effectively. Correct Answer: Business Processing Engineering Your Answer: Business Processing Engineering Multiple Choice Multiple Answer Question: Boehm's Model has following Stages:Correct Answer: Production , Engineering Your Answer: Engineering , Engineering , Inception Multiple Choice Multiple Answer Question: Fourth generation technology helps to control Correct Answer: Effort , Resource , Cost development Your Answer: Effort , Resource , Cost development , Coding Match The Following Question Closed System Deterministic System Probabilistic System Open System Parameters Correct Answer Parameter are fixed Predictable Behavior Unpredictable Behavior Parameters are Variables Your Answer Parameter are fixed Parameters are Variables Unpredictable Behavior Normalized External

True/False Question: SQA is ensured through a Quality Management System. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: The next development in software engineering is Correct Answer: The use of Component technology , The use of tool generate the code , The extensive use od CASE tool for analysis and design Your Answer: Graphical tool , The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Select The Blank Question: Usually the test cases are written using ________. Correct Answer: Testing Techniques Your Answer: Requirements Specifications Select The Blank Question: A ________ is all about providing hardware and software tools as and when required by the development team to manage process effectively Correct Answer: Configuration Management Your Answer: Configuration Management Multiple Choice Multiple Answer Question: The types of Software are Correct Answer: Business Software , Embedded Software , System Software Your Answer: Business Software , Embedded Software , System Software Multiple Choice Single Answer Question: The Behavioral Aspect of the System could be Shown using :Correct Answer: Data Flow Diagrams

Page 39 of 85

39

SCDL 3rd Semester Software Engineering and Project Management


Your Answer: System Design True/False Question: People, Procedures and Parameters are the Drivers of the Technology. Correct Answer: False Your Answer: True True/False Question: The ultimate goal of the SQA is to write test cases which fixes the errors. Correct Answer: False Your Answer: True Multiple Choice Multiple Answer Question: Software Risk could be of :Correct Answer: Process Risk , Project Risk , Product Risk Your Answer: Process Risk , Project Risk , Product Risk Multiple Choice Multiple Answer Question: SQA efforts most primarily assures:Correct Answer: Software Quality , Software Reliability , Software Availability Your Answer: Software Quality , Software Reliability , Software Availability Multiple Choice Single Answer Question: A System which is designed to interact and to exchange with the environment and reacts to the inputs accordingly:Correct Answer: Open System Your Answer: Open System Multiple Choice Multiple Answer Question: A documentation is tested through :Correct Answer: Technical Review , Actual Operational Review Your Answer: Technical Review , Testing Techniques Multiple Choice Single Answer Question: A Model which Supports Modern Software Development is :Correct Answer: Boehm's Your Answer: Boehm's True/False Question: SRS is one of the cause of not meeting the SQA. Correct Answer: True Your Answer: False Multiple Choice Multiple Answer Question: Resources required for a Software development activity could be :Correct Answer: People , Development Environment , Reusable Components Your Answer: People , Development Environment , Reusable Components Multiple Choice Single Answer Question: A process in which a project is broken down into smaller manageable units is called as :Correct Answer: Project Compartmentalization Your Answer: Project Management Multiple Choice Single Answer

Page 40 of 85

40

SCDL 3rd Semester Software Engineering and Project Management


Question: A process to commit the organisation to start the project and complete the project document providing a broad spectrum of the project is :Correct Answer: Project Initiation Your Answer: Project Planning Select The Blank Question: ________is a key management in the development of effective software solutions Correct Answer: Software Process Management Your Answer: Software Development Model Select The Blank Question: The company shall establish a ________ to control flow of documents that relate to the requirements of the ISO. Correct Answer: Document Control System Your Answer: Document Control System Select The Blank Question: ________ type of testing evaluate the logical access to the basic functionality of the System. Correct Answer: Security Testing Your Answer: Security Testing Multiple Choice Multiple Answer Question: A good test is one that has:Correct Answer: High Probability of detecting an error , Not Redundant , Simple to execute & Independent Your Answer: High Probability of detecting an error , Not Redundant , Simple to execute & Independent Multiple Choice Multiple Answer Question: The responsibilities of Software Managerare Correct Answer: To maintain budget , Keep schedules from slipping , Improve quality Your Answer: To maintain budget , Keep schedules from slipping , Improve quality True/False Question: The last step in the design process is the Software development. Correct Answer: False Your Answer: False Multiple Choice Single Answer Question: A software which resides in the read only memory and controls the functions of the resident Products Correct Answer: Embedded Software Your Answer: Embedded Software Multiple Choice Single Answer Question: A model which creates sources and destinations for the data flows of data i.e. input and output is:Correct Answer: Data Flow Diagrams Your Answer: Data Flow Diagrams Multiple Choice Multiple Answer Question: The software designed with the correct choice of technology and architecture to ensure: Correct Answer: Customer Satisfaction , On-time Delivery , Developed with the budgeted cost Your Answer: Customer Satisfaction , On-time Delivery , Developed with the budgeted cost

Page 41 of 85

41

SCDL 3rd Semester Software Engineering and Project Management


True/False Question: Database Design is a major component of system design and development. Correct Answer: True Your Answer: True LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question: In Interface Stage of SSAD phase the focus is on:Correct Answer: User Comfort Your Answer: Functions Multiple Choice Multiple Answer Question: The Customer Requirements could be analyzed by:Correct Answer: Interviewing , Questionnaire , Meeting with Key Users Your Answer: Interviewing , Questionnaire , Meeting with Key Users Multiple Choice Single Answer Question: How to develop or build a particular software module is defined by Correct Answer: Software Engineering Methods Your Answer: Software Engineering Methods True/False Question: E-R Diagrams are used to identify the Weak and Strong Relations. Correct Answer: True Your Answer: False True/False Question: Black Box testing Finds out Missing Functions & Interface Errors. Correct Answer: True Your Answer: True True/False Question: The ultimate goal of the SQA is to write test cases which fixes the errors. Correct Answer: False Your Answer: False Select The Blank Question: A ________ is largely depends upon the meeting of functional requirements and performance measures with ease in operations. Correct Answer: Customer Satisfaction Your Answer: Customer Satisfaction Multiple Choice Single Answer Question: A testing is carried out before the execution of the development Process is :Correct Answer: Non Execution based testing Your Answer: Execution Based testing Select The Blank Question: A ________ Measures the Quality of the output produced by the System Correct Answer: Effectiveness Your Answer: Effectiveness Select The Blank

Page 42 of 85

42

SCDL 3rd Semester Software Engineering and Project Management


Question: The key requirements of the systems are identified in ________ Phase Correct Answer: Definition Your Answer: Definition Multiple Choice Single Answer Question: A type of testing which eliminates the errors in the design, architecture and development & deployment process is. Correct Answer: Non Execution based testing Your Answer: Execution Based testing Select The Blank Question: A unit tests major focuses on ________ Correct Answer: Processes & Code Your Answer: Interface True/False Question: Domain Specific applications are developed mostly integrating components which are similar in functionality Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A Discipline that integrates Process, Methods and tools for development of a software is Correct Answer: Software Engineering Your Answer: Software Engineering Select The Blank Question: ________ is developed or engineered not manufactured Correct Answer: Software Your Answer: Software True/False Question: ISO 9001 is used to develop quality assurance systems. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Architecture Design Consists of:Correct Answer: Module Structure , Program Structure , Hierarchy in the Structure True/False Question: System Performance is measured through effectiveness and its efficiency. Correct Answer: True Multiple Choice Single Answer Question: The Application of a systematic, disciplined, quantifiable approach to the development, operation and maintenance of the software is termed as Correct Answer: Software Engineering Multiple Choice Multiple Answer Question: The most affected elements of the Quality of the software is:Correct Answer: Customer , Developer , Stake Holders Your Answer: Customer , Developer , Stake Holders Multiple Choice Single Answer Question: A system which operates in a predictable manner is :-

Page 43 of 85

43

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Deterministic System Your Answer: Deterministic System Multiple Choice Multiple Answer Question: The Functionality of the Client application is tested using :Correct Answer: Server Tests , Database Tests , Transaction Tests Your Answer: Server Tests , Database Tests Multiple Choice Multiple Answer Question: Software Risk could be of :Correct Answer: Process Risk , Project Risk , Product Risk Your Answer: Process Risk , Project Risk , Product Risk Multiple Choice Multiple Answer Question: Test cases are designed to tests:Correct Answer: Internal Logic , Software Requirements Your Answer: Internal Logic , Software Requirements Multiple Choice Single Answer Question: A Step in risk Management which identifies and enumerates the risk is :Correct Answer: Risk Identification Your Answer: Risk Identification True/False Question: SE is applied for software development through Engineering Methods Correct Answer: True Your Answer: True Select The Blank Question: The Errors which have impact on look and feel of the system is classified as ________ errors Correct Answer: Cosmetic Your Answer: Fatal True/False Question: Spiral model itself is a model which is base for other software development models Correct Answer: False Your Answer: False Match The Following Question Correct Answer Data Dictionary Meta Data SSAD Analysis Tools DFD Source & Destination of Data ERD Relationship of the Attributes Attributes Your Answer Meta Data Analysis Tools Normalization Relationship of the

Multiple Choice Multiple Answer Question: The next development in software engineering is Correct Answer: The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Your Answer: The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Multiple Choice Single Answer Question: A model in which software development cycle is sequential process is :Correct Answer: Waterfall Model

Page 44 of 85

44

SCDL 3rd Semester Software Engineering and Project Management


Your Answer: Waterfall Model True/False Question: The major resources in the project is people and funds. Correct Answer: False Your Answer: True Multiple Choice Multiple Answer Question: The Software Risk affects :Correct Answer: Project Development , Software Product , Process of Development Your Answer: Project Development , Software Product , Process of Development Multiple Choice Single Answer Question: A tool used to understand the system and used for analysis of the system is:Correct Answer: System Modeling Your Answer: System Modeling Match The Following Question Correct Answer IEEE Institute of Electrical and Electronics Engineers Water Fall Model Customer Specific SSAD Structured Approach OOSAD Object Oriented Approach Multiple Choice Multiple Answer Question: The Factors enabling easy change are :Correct Answer: Maintainability , Flexibility , Testability Your Answer: Maintainability , Flexibility , Reusability True/False Question: CAD/CAM/CAE are the examples of embedded Software Correct Answer: False Your Answer: False Select The Blank Question: ________ is the Significant project risk the management has to face in software development activity due to budgeting constraints. Correct Answer: Funding Your Answer: Man Power Multiple Choice Multiple Answer Question: Database Design Specification include:Correct Answer: Data Model , Internal & External File Structure , Referential Details Your Answer: Data Model , Internal & External File Structure , Referential Details Multiple Choice Single Answer Question: A software which directly communicates with the hardware and provides an interface to perform certain tasks is termed as Correct Answer: System Software Your Answer: System Software Multiple Choice Multiple Answer Question: A formal Technical Review may include:Correct Answer: Walkthroughs , Inspections , Roundrobin reviews Your Answer: Inspections , Roundrobin reviews , Testing Techniques Your Answer Institute of Electrical and Electronics Engineers Customer Specific Structured Approach Object Oriented Approach

Page 45 of 85

45

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Multiple Answer Question: Resources required for a Software development activity could be :Correct Answer: People , Development Environment , Reusable Components Your Answer: People , Development Environment , Reusable Components Multiple Choice Single Answer Question: A process of acquiring hardware, software and development services and entering into contract with customers and business partners to deliver the software product is :Correct Answer: Project Procurement Management Your Answer: Project Procurement Management Select The Blank Question: A ________ arises due to uncertainties involved in assessing, estimating various inputs to the software process. Correct Answer: Process Risk Your Answer: Process Risk Select The Blank Question: A ________ is understood as a possibility of Loss. Correct Answer: Risk Your Answer: Risk Select The Blank Question: The company shall establish a ________ to control flow of documents that relate to the requirements of the ISO. Correct Answer: Document Control System Your Answer: Document Scanning System Select The Blank Question: A ________ is the most effective filter from a quality assurance stand point. Correct Answer: Formal Technical Review Your Answer: A good Tests LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question: The stages of the Iterative Models are Correct Answer: Development Coding & Unit Testing , Requirement Analysis , System Design Your Answer: Development Coding & Unit Testing , Requirement Analysis , System Design Select The Blank Question: Requirements Management Begins with ________. Correct Answer: Identification Your Answer: Identification Multiple Choice Multiple Answer Question: System Design Consists of:Correct Answer: Level DFD's , System Flowcharts , ERD's Your Answer: Level DFD's , ERD's Multiple Choice Single Answer Question: The Paradigm Structured System Analysis and Design was developed by:Correct Answer: Yourdon & De Macro Your Answer: Yourdon & Boehm Multiple Choice Multiple Answer

Page 46 of 85

46

SCDL 3rd Semester Software Engineering and Project Management


Question: In a Software Risk Management Risk drivers are :Correct Answer: Technology , People , Requirements Your Answer: Technology , People , Programmers Multiple Choice Multiple Answer Question: IN OOSAD, Objects have Correct Answer: attribute , Methods , relationship Your Answer: attribute , Methods , relationship Multiple Choice Single Answer Question: A Standard Method which helps in keeping the system as an acceptable standards is:Correct Answer: Periodical Maintenance Your Answer: Periodical Maintenance Select The Blank Question: For managing change the SQA plan inculcates ________ to monitor the change. Correct Answer: Software Configuration Management Your Answer: ISO Auditor Multiple Choice Multiple Answer Question: Artificial Intelligent Domain Systems Could be Correct Answer: Expert System , Image & Voice Recognition System , Neural Networks Your Answer: Expert System , Image & Voice Recognition System Multiple Choice Multiple Answer Question: Characteristics of a test could be:Correct Answer: Not Redundant , Best of Breed , Neither too simple Nor to Complex Your Answer: Best of Breed , Neither too simple Nor to Complex , Yield Better Results True/False Question: Software Development becomes complex due to the variety and heterogeneity of requirement of different Users and Stakeholders Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: The outcome of Debugging Process is :Correct Answer: The Error cause will be detected and corrected , The Error Cause will not be detected Your Answer: The Error Cause will not be detected , Product Errors , Design Errors True/False Question: Integration testing is done when the modules are integrated or when new component is added to the system. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Risk Management is a Process Made up of following :Correct Answer: Risk Identification , Risk Analysis , Risk Assessment Your Answer: Risk Assessment , Risk Handling , Risk Identification Multiple Choice Multiple Answer Question: The broad quality parameters are:Correct Answer: Reliability , Safety , Security Your Answer: Reliability , Security , Development

Page 47 of 85

47

SCDL 3rd Semester Software Engineering and Project Management


Select The Blank Question: ________ evaluates the run time performance of the system developed. Correct Answer: Performance Testing Your Answer: Beta Test Multiple Choice Single Answer Question: An Activity that has a definite Start and a definite end is termed as ? Correct Answer: Project Your Answer: Program True/False Question: Six Sigma is one of the most widely used strategy for statistical quality assurance in an industry. Correct Answer: True Your Answer: True True/False Question: The Water Fall Model is used where the risk factor is almost nil Correct Answer: True Your Answer: True Match The Following Question Stress testing Debugging Black Box Testing White Box Testing Correct Answer Testing with Abnormal SituationsFix It Finding & Fixing Errors Incorrect or Missing Functions Glass Box Testing Your Answer Locating Errors Incorrect or Missing Functions Glass Box Testing

Select The Blank Question: SE Methodology rides on two components, System Engineering and ________. Correct Answer: Development Engineering Your Answer: Requirement analysis Select The Blank Question: A ________ Measures the Efforts / cost / time used to achieve the output. Correct Answer: Efficiency Your Answer: Efficiency Select The Blank Question: ________ is a System Engineering approach that is used to define architecture that enables a business to use Information Effectively. Correct Answer: Business Processing Engineering Your Answer: Business Processing Engineering Match The Following Question Correct Answer Your Answer Performance of the System Non Functional Requirements Functional Requirements SRS Structured System Analysis Documentation Design Phase Design Documentation Design Documentation SSAD Functions & Features Structured System Analysis Multiple Choice Single Answer Question: A principle in which the system is factored into smaller sub systems:Correct Answer: Decomposition Your Answer: Decomposition

Page 48 of 85

48

SCDL 3rd Semester Software Engineering and Project Management


True/False Question: Decomposition breaks the System into smaller modules and components. Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A project management activity globally viewed as :Correct Answer: A System Your Answer: A System Select The Blank Question: ________ tests confirms that the needs and requirements are fulfilled on the deployment platform. Correct Answer: Beta Your Answer: Beta Multiple Choice Multiple Answer Question: Some of the Steps involve in Integration Testing is :Correct Answer: Main Control Module is a Test Driver , Tests are conducted as each component is added , Regression Testing is done Your Answer: Tests are conducted as each component is added , Regression Testing is done , Stress Testing Multiple Choice Single Answer Question: A process which audits and inspects whether the people responsible for quality and customer satisfaction follow the quality control measures & standards or not is :Correct Answer: Quality Assurance Your Answer: Quality Assurance Multiple Choice Single Answer Question: The Extent of effort to locate the error and fix it is :Correct Answer: Maintainability Your Answer: Reliability Multiple Choice Single Answer Question: The Scope of the work in a Software Project is defined by :Correct Answer: Statement of Work Your Answer: Requirement Specifications True/False Question: Stress Testing is a part of Integration testing. Correct Answer: False Your Answer: True Select The Blank Question: The Failure Curve of a Hardware is called as ________ Correct Answer: Bathtub Curve Your Answer: Bathtub Curve Multiple Choice Single Answer Question: A testing is carried out continuously as the software components are built or incremented is:Correct Answer: Incremental Testing Your Answer: Incremental Testing Select The Blank

Page 49 of 85

49

SCDL 3rd Semester Software Engineering and Project Management


Question: LOC Means________ Correct Answer: Lines of Code Your Answer: Lines of Code Multiple Choice Multiple Answer Question: OOSAD development approach uses Correct Answer: Objects , Process modeling , Object attributes Your Answer: Objects , Process modeling , Object attributes True/False Question: System testing checks the abnormality in the software system. Correct Answer: False Your Answer: False True/False Question: System testing Starts when Software Integration is about to be completed. Correct Answer: False Your Answer: True Multiple Choice Single Answer Question: The Software development engineering which builds objects of models independent of the system under consideration is ? Correct Answer: OOSAD Your Answer: OOSAD Select The Blank Question: ________ type of testing evaluate the logical access to the basic functionality of the System. Correct Answer: Security Testing Your Answer: Security Testing Multiple Choice Single Answer Question: A software which resides in the read only memory and controls the functions of the resident Products Correct Answer: Embedded Software Your Answer: Embedded Software Select The Blank Question: A ________ deals with identification and assessment of potential hazards of software failing and its impact on the systems. Correct Answer: Software Safety Your Answer: Software Implementation Multiple Choice Single Answer Question: A system for the support of software development is called Correct Answer: Computer Aided Software Engineering Your Answer: Supporting Modules True/False Question: Recovery testing focuses on the Cost Recovery Plan of the Software Implemented. Correct Answer: False Your Answer: False True/False Question: A software review is a filter for the software development process. Correct Answer: True Your Answer: False

Page 50 of 85

50

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Multiple Answer Question: Black Box testing techniques are:Correct Answer: Graph Based Testing Methods , Equivalence Portioning , Boundary Value Analysis Your Answer: Stress Testing , Boundary Value Analysis LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question: The success of the software depends upon ? Correct Answer: Usability Your Answer: Maintenance Match The Following Question Correct Answer Your Answer System Software Operating System Operating System Machine & assembly Language Scientists and engineers Scientists and engineers Software efficiency Optimum use of resources Optimum use of resources Software Usability Good Documentation Good Documentation Multiple Choice Single Answer Question: A process which audits and inspects whether the people responsible for quality and customer satisfaction follow the quality control measures & standards or not is :Correct Answer: Quality Assurance Your Answer: Quality Assurance Multiple Choice Single Answer Question: A Process of organizing the sub systems as one system to reduce the number of connectivities or interfaces:Correct Answer: Simplification Your Answer: Simplification True/False Question: Risk which can be known is termed as unpredictable risk. Correct Answer: False Your Answer: False Multiple Choice Single Answer Question: How to develop or build a particular software module is defined by Correct Answer: Software Engineering Methods Your Answer: Software Engineering Methods Multiple Choice Single Answer Question: A system for the support of software development is called Correct Answer: Computer Aided Software Engineering Your Answer: Computer Aided Software Engineering Multiple Choice Single Answer Question: The extent the software meets the customer quality goals and expectations is termed as :Correct Answer: Correctness Your Answer: Correctness Multiple Choice Multiple Answer Question: Risk Management is a Process based on application of :-

Page 51 of 85

51

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Game Theory , Probability Theory , Decision Theory Your Answer: Game Theory , Probability Theory , Decision Theory Multiple Choice Single Answer Question: A System which is adaptable to changes arising out of environmental changes:Correct Answer: Open System Your Answer: Open System True/False Question: The Major risk involved in software project is to identify the programmers required and the pay scales of them. Correct Answer: False Your Answer: True Select The Blank Question: ________ tests confirms that the needs and requirements are fulfilled on the deployment platform. Correct Answer: Beta Your Answer: Beta Multiple Choice Multiple Answer Question: IN OOSAD, Objects have Correct Answer: attribute , Methods , relationship Your Answer: attribute , Methods , relationship Select The Blank Question: Inventory Control System which is designed based on demand and supply variations could be an example of ________ system Correct Answer: Probabilistic Your Answer: Probabilistic Multiple Choice Multiple Answer Question: Risk Management is a Process Made up of following :Correct Answer: Risk Identification , Risk Analysis , Risk Assessment Your Answer: Risk Identification , Risk Analysis , Risk Assessment Select The Blank Question: Generally in an ongoing project a project manager fixes up more ________ to have proper control measurement of the project activities Correct Answer: Major Milestone Your Answer: Milestone Multiple Choice Multiple Answer Question: The outcome of Debugging Process is :Correct Answer: The Error cause will be detected and corrected , The Error Cause will not be detected Your Answer: The Error Cause will not be detected , The Error cause will be detected and corrected Select The Blank Question: An accounting System based on rules and Principles could be an example of ________ System. Correct Answer: Deterministic Your Answer: Deterministic Multiple Choice Single Answer

Page 52 of 85

52

SCDL 3rd Semester Software Engineering and Project Management


Question: A Discipline that integrates Process, Methods and tools for development of a software is Correct Answer: Software Engineering Your Answer: Software Engineering True/False Question: Six Sigma is one of the most widely used strategy for statistical quality assurance in an industry. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: A formal Technical Review may include:Correct Answer: Walkthroughs , Inspections , Roundrobin reviews Your Answer: Walkthroughs , Inspections , Roundrobin reviews Select The Blank Question: A ________ has to be performed regularly throughout the achievement life cycle. Correct Answer: Risk Management Your Answer: Risk Analysis True/False Question: SRS is Systems requirement specifications in the software development phase Correct Answer: True Your Answer: True Select The Blank Question: In the ________ model data elements are organized in tree structure in parent-child format. Correct Answer: Hierarchical Your Answer: Hierarchical True/False Question: System testing checks the abnormality in the software system. Correct Answer: False Your Answer: False Multiple Choice Multiple Answer Question: System Design Consists of:Correct Answer: Level DFD's , System Flowcharts , ERD's Your Answer: Level DFD's , System Flowcharts , ERD's Multiple Choice Multiple Answer Question: Characteristics of a test could be:Correct Answer: Not Redundant , Best of Breed , Neither too simple Nor to Complex Your Answer: Not Redundant , Best of Breed , Neither too simple Nor to Complex Multiple Choice Single Answer Question: An Activity that has a definite Start and a definite end is termed as ? Correct Answer: Project Your Answer: Project True/False Question: The Unit of the Software is the smallest entity to be tested. Correct Answer: True Your Answer: True Select The Blank

Page 53 of 85

53

SCDL 3rd Semester Software Engineering and Project Management


Question: ________ is a process of executing a program with the intent of finding an error. Correct Answer: Testing Your Answer: Validations Select The Blank Question: A ________ is used to show the system flow stage by stage in a logical sequence Correct Answer: System Flow Chart Your Answer: System Flow Chart Multiple Choice Multiple Answer Question: The Scope of the Software Project is defined by Statement of Work which is agreed by ? Correct Answer: Users , Stakeholders , Customers Your Answer: Users , Stakeholders , Customers Multiple Choice Multiple Answer Question: Artificial Intelligent Domain Systems Could be Correct Answer: Expert System , Image & Voice Recognition System , Neural Networks Your Answer: Expert System , Image & Voice Recognition System , Neural Networks Match The Following Question Correct Answer Spiral Model Boehm Spiral model Legacy software Poor Quality Objects Attribute, Methods SSAD yourdan & DeMarco Your Answer Boehm Spiral model Poor Quality Attribute, Methods yourdan & DeMarco

Multiple Choice Multiple Answer Question: Design Constraints include:Correct Answer: Resource Limitations , Platform Limitations , Protocol Limitations Your Answer: Resource Limitations , Platform Limitations , Protocol Limitations Multiple Choice Single Answer Question: The Application of a systematic, disciplined, quantifiable approach to the development, operation and maintenance of the software is termed as Correct Answer: Software Engineering Your Answer: Software Engineering Multiple Choice Single Answer Question: A type of testing which verifies that all the system elements are meshed properly and that overall system function / performance is achieved is:Correct Answer: System testing Your Answer: Component Testing True/False Question: CAD/CAM/CAE are the examples of embedded Software Correct Answer: False Your Answer: False Select The Blank Question: Software is classified into two categories, Generic and ________. Correct Answer: Cutomised Your Answer: Cutomised Multiple Choice Single Answer Question: A Step in risk Management which identifies and enumerates the risk is :Correct Answer: Risk Identification Your Answer: Risk Identification

Page 54 of 85

54

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Multiple Answer Question: The Contents which are recorded by the Data Dictionary for an typical item is:Correct Answer: Definition , Identification , Validation Text & Relationship Your Answer: Definition , Identification , Validation Text & Relationship Multiple Choice Single Answer Question: A costs which includes cost of rework, repair and failure analysis is :Correct Answer: Failure Cost Your Answer: Maintenance Cost True/False Question: Recovery testing focuses on the Cost Recovery Plan of the Software Implemented. Correct Answer: False Your Answer: False Select The Blank Question: For managing change the SQA plan inculcates ________ to monitor the change. Correct Answer: Software Configuration Management Your Answer: Software Configuration Management True/False Question: System Performance is measured through effectiveness and its efficiency. Correct Answer: True Your Answer: True True/False Question: A software review is a filter for the software development process. Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: The Extend to which the software product is protected from an unauthorized access is :Correct Answer: Integrity Your Answer: Integrity LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question: Legacy software -Poor quality has Correct Answer: Inextensible design , Convoluted Code , Poor or nonexistent documentation Your Answer: Poor or nonexistent documentation , Inextensible design , Convoluted Code Multiple Choice Single Answer Question: A System which is not influenced by the external environment:Correct Answer: Closed System Your Answer: Closed System Select The Blank Question: ________ combines software, Hardware and a software engineering database to create a software engineering environment for hardware Correct Answer: CASE Your Answer: Integrated Wizard Multiple Choice Single Answer

Page 55 of 85

55

SCDL 3rd Semester Software Engineering and Project Management


Question: An Approach which majorly focuses on Functions and data structure designed for those functions. Correct Answer: SSAD Your Answer: SSAD Select The Blank Question: To become a registered, one of the quality assurance system models contained in ISO 9000 a company's quality system is scrutinized by ________. Correct Answer: Third Party Auditor Your Answer: Third Party Auditor Multiple Choice Single Answer Question: A Modification of the Software is done to accommodate the changes forced by the external environment is Correct Answer: Adaptive Maintenance Your Answer: Corrective Maintenance Multiple Choice Single Answer Question: A set of Computer Programs which performs set of preset functions is called as ? Correct Answer: Software Your Answer: Software Multiple Choice Multiple Answer Question: The Factors enabling easy change are :Correct Answer: Maintainability , Flexibility , Testability Your Answer: Maintainability , Flexibility , Reusability Select The Blank Question: In ________ model the data elements are organized indifferent areas that work together through network communications. Correct Answer: Network Your Answer: Network - Relational True/False Question: Software Development becomes a costly and risky if the the development process does not follow a systematic, scientific approach to produce the software Correct Answer: True Your Answer: True Select The Blank Question: ________ testing confirms that the needs and requirements are fulfilled in the development environment. Correct Answer: Alpha Your Answer: Beta Multiple Choice Single Answer Question: Changes in the Customer requirements are understood and incorporated in which phase? Correct Answer: Support Your Answer: Development Multiple Choice Multiple Answer Question: Black Box testing techniques are:Correct Answer: Graph Based Testing Methods , Equivalence Portioning , Boundary Value Analysis Your Answer: Graph Based Testing Methods , Stress Testing , Boundary Value Analysis

Page 56 of 85

56

SCDL 3rd Semester Software Engineering and Project Management


Select The Blank Question: A ________ Measures the Quality of the output produced by the System Correct Answer: Effectiveness Your Answer: Efficiency True/False Question: Simplification rationalizes the complex , breakdown into clusters, making a meaningful and functionally complete design. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Resources required for a Software development activity could be :Correct Answer: People , Development Environment , Reusable Components Your Answer: Modules , People , Development Environment Select The Blank Question: One of the most important guideline for the reviewing the product is review the product not the ________. Correct Answer: Producer Your Answer: Developer True/False Question: The Emphasis in SSAD is on functions and features. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Project Metrics enable a software project manager to:Correct Answer: Assess the Status of the Ongoing Project , Identify the Risk Potential , Uncover problem areas before they go Critical Your Answer: Assess the Status of the Ongoing Project , Identify the Risk Potential , Manage the resources Multiple Choice Single Answer Question: Most of the Software's Continues to be custom built because Correct Answer: Reusability of the Component Your Answer: Reusability of the Component Select The Blank Question: A ________ is an activity incorporating both software quality control and quality assurance. Correct Answer: Software Quality Management Your Answer: ISO Standards Multiple Choice Multiple Answer Question: Operational Testing is carried out by :Correct Answer: Recovery Testing , Stress Testing , Performance Testing Multiple Choice Single Answer Question: A process of creating a document Statement of Work, and planning the major task deliveries is :Correct Answer: Project Planning Multiple Choice Single Answer Question: Source Code of the Software is available so that the engineers can make the local modifications and use the component

Page 57 of 85

57

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Open Source True/False Question: The Data Management is not easy with relational Model. Correct Answer: False Match The Following Question Development of the Software Corrective Process, Tools & Methods Requirement Specifications Correct Answer Software Programs Maintenance Software Engineering Layers Definition Phase Your Answer Software Engineering Layers Software Modules Analysis Definition Phase

True/False Question: A Software solution is evolved in parts as in an incremental fashion in incremental model Correct Answer: True Select The Blank Question: The Errors which have impact on look and feel of the system is classified as ________ errors Correct Answer: Cosmetic True/False Question: Software Development becomes complex due to the variety and heterogeneity of requirement of different Users and Stakeholders Correct Answer: True Select The Blank Question: SE Methodology rides on two components, System Engineering and ________. Correct Answer: Development Engineering Multiple Choice Single Answer Question: A Software that makes use of non numerical algorithms to solve complex problems that are not amenable to straightforward analysis Correct Answer: Artificial Intelligence Select The Blank Question: PRM stands for ________ Correct Answer: Prototyping Model Multiple Choice Single Answer Question: A DD type which models internals of the process i.e. the details namely how , where, by whom and so on is known as:Correct Answer: Physical DFD Match The Following Question Verification & Validation Testing Incorrect Logical Decision Incorrect Functions In a program Data Structure & Specific Values Correct Answer Testing White Box Testing Black Box Testing Test Case Debugging Tracing Black Box Testing Your Answer

Multiple Choice Single Answer Question: Software Engineering attempts to identify what information is to be processed, what function and performance is desired in which phase? Correct Answer: Definition Phase

Page 58 of 85

58

SCDL 3rd Semester Software Engineering and Project Management


Your Answer: Development Phase Multiple Choice Single Answer Question: The Quality aspect which includes the grade of materials, physical and performance specifications, tolerance and process standards is :Correct Answer: Design Your Answer: Requirements Specifications Multiple Choice Multiple Answer Question: Architecture Design Consists of:Correct Answer: Module Structure , Program Structure , Hierarchy in the Structure Your Answer: Module Structure , Hierarchy in the Structure , Process Structure Multiple Choice Multiple Answer Question: The Functionality of the Client application is tested using :Correct Answer: Server Tests , Database Tests , Transaction Tests Your Answer: Server Tests , Transaction Tests , Client Tests True/False Question: The results of the test case is recorded in the test specification document. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Project Risk Management Includes:Correct Answer: Risk Prevention , Risk Avoidance , Risk Mitigation Multiple Choice Multiple Answer Question: Project Metrics helps the project manager in following ways :Correct Answer: Minimize the Development Schedule , Assess Product Quality regularly Multiple Choice Single Answer Question: A process which ensures that the materials input (Process input), the manufacturing process (software development process) and outgoing quality are of requisite standards is :Correct Answer: Quality Assurance Multiple Choice Single Answer Question: A process of identifying, assessing , evaluating risk exposure, prioritizing the risk incidences, and developing risk monitoring, management and mitigation plan is :Correct Answer: Project Risk Management Multiple Choice Single Answer Question: A type of testing where the focus is on design and development of the software architecture is termed as:Correct Answer: Integration Testing Select The Blank Question: ________ is characterized by longetivity and business criticality Correct Answer: Legacy Software Multiple Choice Single Answer Question: Who Defines SE as the application of a Systematic, disciplined and quantifiable approach to the development and maintenance of a Software Correct Answer: IEEE Multiple Choice Single Answer

Page 59 of 85

59

SCDL 3rd Semester Software Engineering and Project Management


Question: A Software developed to perform certain functionality and later on embedded into the hardware is called as Correct Answer: Embedded Software LIST OF ATTEMPTED QUESTION:S AND ANSWERS Multiple Choice Multiple Answer Question: The software designed with the correct choice of technology and architecture to ensure: Correct Answer: Customer Satisfaction , On-time Delivery , Developed with the budgeted cost Your Answer: Customer Satisfaction , On-time Delivery , Developed with the budgeted cost True/False Question: Risk which can be known is termed as unpredictable risk. Correct Answer: False Your Answer: False Multiple Choice Single Answer Question: A type of testing which eliminates the errors in the design, architecture and development & deployment process is. Correct Answer: Non Execution based testing Your Answer: Non Execution based testing Multiple Choice Multiple Answer Question: The broad quality parameters are:Correct Answer: Reliability , Safety , Security Your Answer: Reliability , Safety , Security True/False Question: E-R Diagrams are used to identify the Weak and Strong Relations. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Resources required for a Software development activity could be :Correct Answer: People , Development Environment , Reusable Components Your Answer: People , Development Environment , Reusable Components Multiple Choice Multiple Answer Question: A good test is one that has:Correct Answer: High Probability of detecting an error , Not Redundant , Simple to execute & Independent Your Answer: High Probability of detecting an error , Not Redundant , Simple to execute & Independent Multiple Choice Single Answer Question: A System in which next state of the system can be predicted without doubt is :Correct Answer: Deterministic Your Answer: Probabilistic Multiple Choice Multiple Answer Question: System Design Consists of:Correct Answer: Level DFD's , System Flowcharts , ERD's Your Answer: Level DFD's , System Flowcharts , ERD's Match The Following Question: Correct Answer: World Wide Web Content provider Your Answer: Content provider

Page 60 of 85

60

SCDL 3rd Semester Software Engineering and Project Management


Software System Software Application Software Deteriorates File Management Standalone Programs Integrated System Deteriorates File Management

True/False Question: A software review is a filter for the software development process. Correct Answer: True Your Answer: True True/False Question: Reactive risk strategies are applied to deal with risk when it occurs. Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A type of testing where the focus is on error/ mistake or fault detection and correction is:Correct Answer: Process based Testing Your Answer: Process based Testing Match The Following Question: Correct Answer: IEEE Institute of Electrical and Electronics Engineers Water Fall Model Customer Specific SSAD Structured Approach OOSAD Object Oriented Approach Your Answer: Institute of Electrical and Electronics Engineers Structured Approach Customer Specific Object Oriented Approach

Multiple Choice Multiple Answer Question: The Scope of the Software Project is defined by Statement of Work which is agreed by ? Correct Answer: Customers , Users , Stakeholders Your Answer: Users , Stakeholders , Customers Select The Blank Question: ________ testing confirms that the needs and requirements are fulfilled in the development environment. Correct Answer: Alpha Your Answer: Alpha True/False Question: SQA is ensured through a Quality Management System. Correct Answer: True Your Answer: True Select The Blank Question: The Failure Curve of a Hardware is called as ________ Correct Answer: Bathtub Curve Your Answer: Bathtub Curve Multiple Choice Multiple Answer Question: The next development in software engineering is Correct Answer: The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Your Answer: The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Multiple Choice Multiple Answer Question: A formal Technical Review may include:-

Page 61 of 85

61

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Walkthroughs , Inspections , Roundrobin reviews Your Answer: Walkthroughs , Inspections , Roundrobin reviews True/False Question: Domain Specific applications are developed mostly integrating components which are similar in functionality Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A Principle in which the Functional Cohesion between the sub system is maintained:Correct Answer: Decomposition Your Answer: Decomposition Multiple Choice Multiple Answer Question: Architecture Design Consists of:Correct Answer: Module Structure , Program Structure , Hierarchy in the Structure Your Answer: Module Structure , Hierarchy in the Structure , Process Structure True/False Question: White Box Testing Measures the Correctness of the Inputs and Basic Processes. Correct Answer: True Your Answer: True Select The Blank Question: A ________ is understood as a possibility of Loss. Correct Answer: Risk Your Answer: Risk Select The Blank Question: An incorrect decision by the designer, programmer or analyst that leads to improper result is an ________. Correct Answer: Error Your Answer: Error Multiple Choice Single Answer Question: An Approach which majorly focuses on Functions and data structure designed for those functions. Correct Answer: SSAD Your Answer: SSAD True/False Question: CAD/CAM/CAE are the examples of embedded Software Correct Answer: False Your Answer: False Multiple Choice Single Answer Question: A process which ensures that the materials input (Process input), the manufacturing process (software development process) and outgoing quality are of requisite standards is :Correct Answer: Quality Assurance Your Answer: Quality Management True/False Question: Simplification rationalizes the complex , breakdown into clusters, making a meaningful and functionally complete design. Correct Answer: True Your Answer: True

Page 62 of 85

62

SCDL 3rd Semester Software Engineering and Project Management


Select The Blank Question: In the ________ model data elements are organized in tree structure in parent-child format. Correct Answer: Hierarchical Your Answer: Hierarchical Select The Blank Question: A Module Tests focuses on ________. Correct Answer: Functions & Design Your Answer: Functions & Design Multiple Choice Multiple Answer Question: White Box Testing Checks :Correct Answer: All Paths in the process are correctly operational , All Logical decision are executed with true or false , All Loops are executed Your Answer: All Paths in the process are correctly operational , All Logical decision are executed with true or false , All Loops are executed Multiple Choice Single Answer Question: A process which breaks statement of work into smaller activities with clear start - finish definition is called as :Correct Answer: Work Break Down Structure Your Answer: Work Break Down Structure True/False Question: Errors in documentation give rise to fatal results. Correct Answer: True Your Answer: True Select The Blank Question: ________ is a process of executing a program with the intent of finding an error. Correct Answer: Testing Your Answer: Testing Select The Blank Question: ________ is achieved by carving out a module that is responsible for any unique function and which does not need to interact with other parts of the system. Correct Answer: Functional Dependency Your Answer: Functional Dependency Multiple Choice Multiple Answer Question: System Testing Techniques are :Correct Answer: Alpha Test , Beta Test Your Answer: Alpha Test , Beta Test Multiple Choice Single Answer Question: A model in which software development cycle is sequential process is :Correct Answer: Waterfall Model Your Answer: Waterfall Model Select The Blank Question: To become a registered, one of the quality assurance system models contained in ISO 9000 a company's quality system is scrutinized by ________. Correct Answer: Third Party Auditor Your Answer: SQM Multiple Choice Single Answer

Page 63 of 85

63

SCDL 3rd Semester Software Engineering and Project Management


Question: A software which resides in the read only memory and controls the functions of the resident Products Correct Answer: Embedded Software Your Answer: Embedded Software Multiple Choice Single Answer Question: A document which identifies and helps the project manager to focus on the grey areas or critical functions in the project is :Correct Answer: Software Requirement Specifications Your Answer: Software Requirement Specifications Multiple Choice Multiple Answer Question: Project Metrics enable a software project manager to:Correct Answer: Assess the Status of the Ongoing Project , Identify the Risk Potential , Uncover problem areas before they go Critical Your Answer: Assess the Status of the Ongoing Project , Identify the Risk Potential , Uncover problem areas before they go Critical Multiple Choice Single Answer Question: A system for the support of software development is called Correct Answer: Computer Aided Software Engineering Your Answer: Computer Aided Software Engineering Multiple Choice Single Answer Question: A Collection of Interrelated, Interdependent group of elements which interact to achieve certain objectives is called as:Correct Answer: System Your Answer: Software Select The Blank Question: Inadequacy or misout in SRS & RDD is ________. Correct Answer: Defect Your Answer: Defect Select The Blank Question: LOC Means________ Correct Answer: Lines of Code Your Answer: Lines of Code LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question: A process of identifying, assessing , evaluating risk exposure, prioritizing the risk incidences, and developing risk monitoring, management and mitigation plan is :Correct Answer: Project Risk Management Your Answer: Project Risk Management Multiple Choice Single Answer Question: A Modification of the Software is done to accommodate the changes forced by the external environment is Correct Answer: Adaptive Maintenance Your Answer: Corrective Maintenance Multiple Choice Multiple Answer Question: A documentation is tested through :Correct Answer: Technical Review , Actual Operational Review

Page 64 of 85

64

SCDL 3rd Semester Software Engineering and Project Management


Your Answer: Technical Review , Actual Operational Review , Code Multiple Choice Single Answer Question: In Interface Stage of SSAD phase the focus is on:Correct Answer: User Comfort Your Answer: Design of the Output Formats Multiple Choice Single Answer Question: A type of testing which verifies that all the system elements are meshed properly and that overall system function / performance is achieved is:Correct Answer: System testing Your Answer: Component Testing Select The Blank Question: A ________ deals with identification and assessment of potential hazards of software failing and its impact on the systems. Correct Answer: Software Safety Your Answer: Software Testing True/False Question: The Water Fall Model is used where the risk factor is almost nil Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A System in which next state of the system can be predicted without doubt is :Correct Answer: Deterministic Your Answer: Open System True/False Question: Spiral model itself is a model which is base for other software development models Correct Answer: False Your Answer: True True/False Question: System testing checks the abnormality in the software system. Correct Answer: False Your Answer: True True/False Question: ISO 9001 is used to develop quality assurance systems. Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A type of testing where the focus is on design and development of the software architecture is termed as:Correct Answer: Integration Testing Your Answer: Module testing True/False Question: The results of the test case is recorded in the test specification document. Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A Principle in which the Functional Cohesion between the sub system is maintained:-

Page 65 of 85

65

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Decomposition Your Answer: Decoupling Multiple Choice Multiple Answer Question: SQA efforts most primarily assures:Correct Answer: Software Quality , Software Reliability , Software Availability Your Answer: Software Quality , Software Reliability , Software Availability Multiple Choice Multiple Answer Question: The Customer Requirements could be analyzed by:Correct Answer: Interviewing , Questionnaire , Meeting with Key Users Your Answer: Questionnaire , Case Study , Meeting with Key Users Multiple Choice Single Answer Question: The extent the software meets the customer quality goals and expectations is termed as :Correct Answer: Correctness Your Answer: Reliability Multiple Choice Multiple Answer Question: The Factors enabling easy change are :Correct Answer: Maintainability , Flexibility , Testability Your Answer: Maintainability , Flexibility , Reusability Match The Following Question Development of the Software Corrective Process, Tools & Methods Requirement Specifications Correct Answer Software Programs Maintenance Software Engineering Layers Definition Phase Your Answer Software Engineering Layers Analysis Software Modules Software Programs

Select The Blank Question: Cohesion and Coupling is the criteria for measuring ________. Correct Answer: Functional Dependency Your Answer: Functional Dependency Select The Blank Question: A collection of programs written to service other set of programs and its functions is called as ________ Correct Answer: System Software Your Answer: Integrated Software Select The Blank Question: ________ is a System Engineering approach that is used to define architecture that enables a business to use Information Effectively. Correct Answer: Business Processing Engineering Your Answer: Business Process Models Multiple Choice Single Answer Question: The Application of a systematic, disciplined, quantifiable approach to the development, operation and maintenance of the software is termed as Correct Answer: Software Engineering Your Answer: Software Maintenance Multiple Choice Multiple Answer Question: RMMM Plan deals with :-

Page 66 of 85

66

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Mitigation , Monitoring , Management Your Answer: Mitigation , Monitoring , Management Select The Blank Question: In ________Model the risk of the Software development is almost Nil Correct Answer: Water Fall Your Answer: Water Fall True/False Question: Stress Testing is a part of Integration testing. Correct Answer: False Your Answer: False Multiple Choice Multiple Answer Question: Black Box testing techniques are:Correct Answer: Graph Based Testing Methods , Equivalence Portioning , Boundary Value Analysis Your Answer: Graph Based Testing Methods , Stress Testing , Boundary Value Analysis Multiple Choice Multiple Answer Question: The types of Software are Correct Answer: Business Software , Embedded Software , System Software Your Answer: Business Software , Embedded Software , System Software Multiple Choice Multiple Answer Question: Following are the data models namely:Correct Answer: Hierarchical Model , Network Model , Relational Model Your Answer: Hierarchical Model , Network Model , Relational Model Select The Blank Question: ________ is achieved by carving out a module that is responsible for any unique function and which does not need to interact with other parts of the system. Correct Answer: Functional Dependency Your Answer: Functional Dependency Multiple Choice Multiple Answer Question: The stages of the Iterative Models are Correct Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Your Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Multiple Choice Multiple Answer Question: In a Software Risk Management Risk drivers are :Correct Answer: Technology , People , Requirements Your Answer: Technology , People , Requirements Select The Blank Question: ________ tests confirms that the needs and requirements are fulfilled on the deployment platform. Correct Answer: Beta Your Answer: Stress True/False Question: The major resources in the project is people and funds. Correct Answer: False Your Answer: False Match The Following

Page 67 of 85

67

SCDL 3rd Semester Software Engineering and Project Management


Question Entity Hierarchical Model Network Model Relational Model Correct Answer Object which is Uniquely Distinguished Tree Structure Network Communications Data are Linked Your Answer Object which is Uniquely Distinguished Tree Structure Network Communications Data are Linked

Select The Blank Question: The company should establish a ________ and maintain a documented quality system as a means of ensuring that it conforms to the specified requirements of ISO. Correct Answer: Quality System Procedure Your Answer: Quality Management System Multiple Choice Single Answer Question: Who Defines SE as the application of a Systematic, disciplined and quantifiable approach to the development and maintenance of a Software Correct Answer: IEEE Your Answer: ISO - 9001 True/False Question: People, Procedures and Parameters are the Drivers of the Technology. Correct Answer: False Your Answer: True True/False Question: Six Sigma is one of the most widely used strategy for statistical quality assurance in an industry. Correct Answer: True Your Answer: False Select The Blank Question: A ________ has to be performed regularly throughout the achievement life cycle. Correct Answer: Risk Management Your Answer: Risk Management Multiple Choice Multiple Answer Question: Work Break Down Structure can also be traced back to ? Correct Answer: System Requirements Specifications , Requirement Definition & Description Your Answer: System Requirements Specifications , Statement of Work , Planning Multiple Choice Single Answer Question: A type of testing where the focus is user and user Behavior is:Correct Answer: Usage based testing Your Answer: Usage based testing True/False Question: A Software solution is evolved in parts as in an incremental fashion in incremental model Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: System Testing Techniques are :Correct Answer: Alpha Test , Beta Test Your Answer: Alpha Test , Beta Test , Stress Testing Select The Blank

Page 68 of 85

68

SCDL 3rd Semester Software Engineering and Project Management


Question: ________ testing confirms that the needs and requirements are fulfilled in the development environment. Correct Answer: Alpha Your Answer: Beta Multiple Choice Single Answer Question: In Design Phase at data and data Structure stage the focus is on:Correct Answer: Entities and Attributes Your Answer: Entities and Attributes Multiple Choice Single Answer Question: The Extent of effort to locate the error and fix it is :Correct Answer: Maintainability Your Answer: Flexibility Multiple Choice Single Answer Question: A process of identifying, assessing , evaluating risk exposure, prioritizing the risk incidences, and developing risk monitoring, management and mitigation plan is :Correct Answer: Project Risk Management Your Answer: Project Risk Management Multiple Choice Multiple Answer Question: RMMM Plan deals with :Correct Answer: Mitigation , Monitoring , Management Your Answer: Mitigation , Monitoring , Management Select The Blank Question: In ________Model the risk of the Software development is almost Nil Correct Answer: Water Fall Your Answer: Water Fall True/False Question: Stress Testing is a part of Integration testing. Correct Answer: False Your Answer: False Multiple Choice Multiple Answer Question: Black Box testing techniques are:Correct Answer: Graph Based Testing Methods , Equivalence Portioning , Boundary Value Analysis Your Answer: Graph Based Testing Methods , Stress Testing , Boundary Value Analysis Multiple Choice Multiple Answer Question: The types of Software are Correct Answer: Business Software , Embedded Software , System Software Your Answer: Business Software , Embedded Software , System Software Multiple Choice Multiple Answer Question: Following are the data models namely:Correct Answer: Hierarchical Model , Network Model , Relational Model Your Answer: Hierarchical Model , Network Model , Relational Model Select The Blank Question: ________ is achieved by carving out a module that is responsible for any unique function and which does not need to interact with other parts of the system. Correct Answer: Functional Dependency Your Answer: Functional Dependency

Page 69 of 85

69

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Multiple Answer Question: The stages of the Iterative Models are Correct Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Your Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Multiple Choice Multiple Answer Question: In a Software Risk Management Risk drivers are :Correct Answer: Technology , People , Requirements Your Answer: Technology , People , Requirements Select The Blank Question: ________ tests confirms that the needs and requirements are fulfilled on the deployment platform. Correct Answer: Beta Your Answer: Stress True/False Question: The major resources in the project is people and funds. Correct Answer: False Your Answer: False Match The Following Match The Following Question Correct Answer Entity Object which is Uniquely Distinguished Hierarchical Model Tree Structure Network Model Network Communications Relational Model Data are Linked

Your Answer Object which is Uniquely Distinguished Tree Structure Network Communications Data are Linked

Select The Blank Question: The company should establish a ________ and maintain a documented quality system as a means of ensuring that it conforms to the specified requirements of ISO. Correct Answer: Quality System Procedure Your Answer: Quality Management System LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer Question: The software designed with the correct choice of technology and architecture to ensure: Correct Answer: Customer Satisfaction , On-time Delivery , Developed with the budgeted cost Your Answer: Customer Satisfaction , On-time Delivery , Developed with the budgeted cost True/False Question: Risk which can be known is termed as unpredictable risk. Correct Answer: False Your Answer: False Multiple Choice Single Answer Question: A type of testing which eliminates the errors in the design, architecture and development & deployment process is. Correct Answer: Non Execution based testing

Page 70 of 85

70

SCDL 3rd Semester Software Engineering and Project Management


Your Answer: Non Execution based testing Multiple Choice Multiple Answer Question: The broad quality parameters are:Correct Answer: Reliability , Safety , Security Your Answer: Reliability , Safety , Security True/False Question: E-R Diagrams are used to identify the Weak and Strong Relations. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Resources required for a Software development activity could be :Correct Answer: People , Development Environment , Reusable Components Your Answer: People , Development Environment , Reusable Components Multiple Choice Multiple Answer Question: A good test is one that has:Correct Answer: High Probability of detecting an error , Not Redundant , Simple to execute & Independent Your Answer: High Probability of detecting an error , Not Redundant , Simple to execute & Independent Multiple Choice Single Answer Question: A System in which next state of the system can be predicted without doubt is :Correct Answer: Deterministic Your Answer: Probabilistic Multiple Choice Multiple Answer Question: System Design Consists of:Correct Answer: Level DFD's , System Flowcharts , ERD's Your Answer: Level DFD's , System Flowcharts , ERD's Match The Following Question: World Wide Web Software System Software Application Software Correct Answer: Content provider Deteriorates File Management Standalone Programs Your Answer: Content provider Integrated System Deteriorates File Management

True/False Question: A software review is a filter for the software development process. Correct Answer: True Your Answer: True True/False Question: Reactive risk strategies are applied to deal with risk when it occurs. Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A type of testing where the focus is on error/ mistake or fault detection and correction is:-

Page 71 of 85

71

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Process based Testing Your Answer: Process based Testing Match The Following Question: Correct Answer: IEEE Institute of Electrical and Electronics Engineers Water Fall Model Customer Specific SSAD Structured Approach OOSAD Object Oriented Approach Your Answer: Institute of Electrical and Electronics Engineers Structured Approach Customer Specific Object Oriented Approach

Multiple Choice Multiple Answer Question: The Scope of the Software Project is defined by Statement of Work which is agreed by ? Correct Answer: Customers , Users , Stakeholders Your Answer: Users , Stakeholders , Customers Select The Blank Question: ________ testing confirms that the needs and requirements are fulfilled in the development environment. Correct Answer: Alpha Your Answer: Alpha True/False Question: SQA is ensured through a Quality Management System. Correct Answer: True Your Answer: True Select The Blank Question: The Failure Curve of a Hardware is called as ________ Correct Answer: Bathtub Curve Your Answer: Bathtub Curve Multiple Choice Multiple Answer Question: The next development in software engineering is Correct Answer: The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Your Answer: The use of tool generate the code , The extensive use od CASE tool for analysis and design , The use of Component technology Multiple Choice Multiple Answer Question: A formal Technical Review may include:Correct Answer: Walkthroughs , Inspections , Roundrobin reviews Your Answer: Walkthroughs , Inspections , Roundrobin reviews True/False Question: Domain Specific applications are developed mostly integrating components which are similar in functionality Correct Answer: True Your Answer: True Multiple Choice Single Answer Question: A Principle in which the Functional Cohesion between the sub system is maintained:-

Page 72 of 85

72

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer: Decomposition Your Answer: Decomposition Multiple Choice Multiple Answer Question: Architecture Design Consists of:Correct Answer: Module Structure , Program Structure , Hierarchy in the Structure Your Answer: Module Structure , Hierarchy in the Structure , Process Structure True/False Question: White Box Testing Measures the Correctness of the Inputs and Basic Processes. Correct Answer: True Your Answer: True Select The Blank Question: A ________ is understood as a possibility of Loss. Correct Answer: Risk Your Answer: Risk Select The Blank Question: An incorrect decision by the designer, programmer or analyst that leads to improper result is an ________. Correct Answer: Error Your Answer: Error Multiple Choice Single Answer Question: An Approach which majorly focuses on Functions and data structure designed for those functions. Correct Answer: SSAD Your Answer: SSAD True/False Question: CAD/CAM/CAE are the examples of embedded Software Correct Answer: False Your Answer: False Multiple Choice Single Answer Question: A process which ensures that the materials input (Process input), the manufacturing process (software development process) and outgoing quality are of requisite standards is :Correct Answer: Quality Assurance Your Answer: Quality Management True/False Question: Simplification rationalizes the complex , breakdown into clusters, making a meaningful and functionally complete design. Correct Answer: True Your Answer: True Select The Blank Question: In the ________ model data elements are organized in tree structure in parentchild format. Correct Answer: Hierarchical Your Answer: Hierarchical

Page 73 of 85

73

SCDL 3rd Semester Software Engineering and Project Management


Select The Blank Question: A Module Tests focuses on ________. Correct Answer: Functions & Design Your Answer: Functions & Design Multiple Choice Multiple Answer Question: White Box Testing Checks :Correct Answer: All Paths in the process are correctly operational , All Logical decision are executed with true or false , All Loops are executed Your Answer: All Paths in the process are correctly operational , All Logical decision are executed with true or false , All Loops are executed Multiple Choice Single Answer Question: A process which breaks statement of work into smaller activities with clear start finish definition is called as :Correct Answer: Work Break Down Structure Your Answer: Work Break Down Structure True/False Question: Errors in documentation give rise to fatal results. Correct Answer: True Your Answer: True Select The Blank Question: ________ is a process of executing a program with the intent of finding an error. Correct Answer: Testing Your Answer: Testing Select The Blank Question: ________ is achieved by carving out a module that is responsible for any unique function and which does not need to interact with other parts of the system. Correct Answer: Functional Dependency Your Answer: Functional Dependency Multiple Choice Multiple Answer Question: System Testing Techniques are :Correct Answer: Alpha Test , Beta Test Your Answer: Alpha Test , Beta Test Multiple Choice Single Answer Question: A model in which software development cycle is sequential process is :Correct Answer: Waterfall Model Your Answer: Waterfall Model Select The Blank Question: To become a registered, one of the quality assurance system models contained in ISO 9000 a company's quality system is scrutinized by ________. Correct Answer: Third Party Auditor Your Answer: SQM Multiple Choice Single Answer Question: A software which resides in the read only memory and controls the functions of the resident Products Correct Answer: Embedded Software

Page 74 of 85

74

SCDL 3rd Semester Software Engineering and Project Management


Your Answer: Embedded Software Multiple Choice Single Answer Question: A document which identifies and helps the project manager to focus on the grey areas or critical functions in the project is :Correct Answer: Software Requirement Specifications Your Answer: Software Requirement Specifications Multiple Choice Multiple Answer Question: Project Metrics enable a software project manager to:Correct Answer: Assess the Status of the Ongoing Project , Identify the Risk Potential , Uncover problem areas before they go Critical Your Answer: Assess the Status of the Ongoing Project , Identify the Risk Potential , Uncover problem areas before they go Critical Multiple Choice Single Answer Question: A system for the support of software development is called Correct Answer: Computer Aided Software Engineering Your Answer: Computer Aided Software Engineering Multiple Choice Single Answer Question: A Collection of Interrelated, Interdependent group of elements which interact to achieve certain objectives is called as:Correct Answer: System Your Answer: Software Select The Blank Question: Inadequacy or misout in SRS & RDD is ________. Correct Answer: Defect Your Answer: Defect Select The Blank Question: LOC Means________ Correct Answer: Lines of Code Your Answer: Lines of Code

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question: The objective of a ________ is to test for what we want to achieve and not what is actually achieved. Correct Answer: Test Plan Your Answer: Testing Multiple Choice Multiple Answer Question: The Functionality of the Client application is tested using :Correct Answer: Server Tests , Database Tests , Transaction Tests Your Answer: Transaction Tests , Client Tests , Server Tests Multiple Choice Single Answer Question: COCOMO Model is :Correct Answer: Constructive Cost Model Your Answer: Cost Control & Observe Model

Page 75 of 85

75

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Multiple Answer Question: OOSAD development approach uses Correct Answer: Objects , Process modeling , Object attributes Your Answer: Objects , Process modeling , Object attributes Multiple Choice Multiple Answer Question: Test cases are built for :Correct Answer: Data Structure , Specific Value Conditions Your Answer: Data Structure , Specific Value Conditions , Units & Functions Multiple Choice Single Answer Question: A process of creating a document Statement of Work, and planning the major task deliveries is :Correct Answer: Project Planning Your Answer: Project Planning Multiple Choice Multiple Answer Question: The stages of the Iterative Models are Correct Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Your Answer: Requirement Analysis , System Design , Development Coding & Unit Testing Multiple Choice Single Answer Question: Source Code of the Software is available so that the engineers can make the local modifications and use the component Correct Answer: Open Source Your Answer: Open Source True/False Question: System Performance is measured through effectiveness and its efficiency. Correct Answer: True Your Answer: True True/False Question: Software Development becomes complex due to the variety and heterogeneity of requirement of different Users and Stakeholders Correct Answer: True Your Answer: True Select The Blank Question: Usually the test cases are written using ________. Correct Answer: Testing Techniques Your Answer: Testing Techniques True/False Question: SRS is Systems requirement specifications in the software development phase Correct Answer: True Your Answer: True True/False Question: Proactive risk strategies are applied to deal with risk when it occurs. Correct Answer: False Your Answer: True

Page 76 of 85

76

SCDL 3rd Semester Software Engineering and Project Management


Multiple Choice Single Answer Question: A Systematic approach to organise and documents the need of the customer which is a basis for software development is :Correct Answer: Requirements Management Your Answer: Requirements Management True/False Question: System testing checks the abnormality in the software system. Correct Answer: False Your Answer: False Select The Blank Question: ________ is the Significant project risk the management has to face in software development activity due to budgeting constraints. Correct Answer: Funding Your Answer: Funding Multiple Choice Single Answer Question: A System which is not influenced by the external environment:Correct Answer: Closed System Your Answer: Closed System Multiple Choice Multiple Answer Question: SQA efforts most primarily assures:Correct Answer: Software Quality , Software Reliability , Software Availability Your Answer: Software Quality , Software Reliability , Software Availability True/False Question: People, Procedures and Parameters are the Drivers of the Technology. Correct Answer: False Your Answer: True Multiple Choice Multiple Answer Question: Testing a Design Includes:Correct Answer: Test Procedures , Test Plans , Design Renew Plans Your Answer: Test Procedures , Test Plans , Design Renew Plans Select The Blank Question: Inventory Control System which is designed based on demand and supply variations could be an example of ________ system Correct Answer: Probabilistic Your Answer: Probabilistic Multiple Choice Single Answer Question: Who Defines SE as the application of a Systematic, disciplined and quantifiable approach to the development and maintenance of a Software Correct Answer: IEEE Your Answer: ISO - 9001 Select The Blank Question: SE Methodology rides on two components, System Engineering and ________. Correct Answer: Development Engineering Your Answer: Requirement analysis

Page 77 of 85

77

SCDL 3rd Semester Software Engineering and Project Management


Select The Blank Question: A unit tests major focuses on ________ Correct Answer: Processes & Code Your Answer: Processes & Code Match The Following Question: Correct Answer: Entity Object which is Uniquely Distinguished Hierarchical Model Tree Structure Network Model Network Communications Relational Model Data are Linked Your Answer: Object which is Uniquely Distinguished Tree Structure Network Communications Data are Linked

True/False Question: Recovery testing focuses on the Cost Recovery Plan of the Software Implemented. Correct Answer: False Your Answer: False Multiple Choice Multiple Answer Question: Risk Management is a Process based on application of :Correct Answer: Game Theory , Probability Theory , Decision Theory Your Answer: Game Theory , Probability Theory , Decision Theory True/False Question: The prime objective of Formal Technical Review is to locate the error before it passes on to the other activity. Correct Answer: True Your Answer: True Select The Blank Question: A ________ Measures the Quality of the output produced by the System Correct Answer: Effectiveness Your Answer: Effectiveness Multiple Choice Multiple Answer Question: RMMM Plan deals with :Correct Answer: Mitigation , Monitoring , Management Your Answer: Mitigation , Monitoring , Management Select The Blank Question: ________ tests confirms that the needs and requirements are fulfilled on the deployment platform. Correct Answer: Beta Your Answer: Beta Select The Blank Question: A collection of programs written to service other set of programs and its functions is called as ________ Correct Answer: System Software Your Answer: System Software Multiple Choice Multiple Answer

Page 78 of 85

78

SCDL 3rd Semester Software Engineering and Project Management


Question: The responsibilities of Software Managerare Correct Answer: To maintain budget , Keep schedules from slipping , Improve quality Your Answer: To maintain budget , Keep schedules from slipping , Improve quality Multiple Choice Single Answer Question: A Step in risk Management which identifies and enumerates the risk is :Correct Answer: Risk Identification Your Answer: Risk Mitigation Multiple Choice Multiple Answer Question: Software Risk could be of :Correct Answer: Process Risk , Project Risk , Product Risk Your Answer: Process Risk , Project Risk , Product Risk Multiple Choice Single Answer Question: A Process of organizing the sub systems as one system to reduce the number of connectivities or interfaces:Correct Answer: Simplification Your Answer: Simplification Multiple Choice Single Answer Question: A layer in which rules and regulations , functions and processes, dataflows and process flows are visualized:Correct Answer: Logical Your Answer: Operational Multiple Choice Multiple Answer Question: IN OOSAD, Objects have Correct Answer: attribute , Methods , relationship Your Answer: attribute , Methods , relationship Multiple Choice Single Answer Question: The Software development engineering which builds objects of models independent of the system under consideration is ? Correct Answer: OOSAD Your Answer: OOSAD Multiple Choice Single Answer Question: A Modification of the Software is done to accommodate the changes forced by the external environment is Correct Answer: Adaptive Maintenance Your Answer: Adaptive Maintenance Select The Blank Question: The ________ phase of software engineering focuses on how data are to be structured and programs are to be developed Correct Answer: Development Your Answer: Development True/False Question: Stress Testing is a part of Integration testing. Correct Answer: False Your Answer: False

Page 79 of 85

79

SCDL 3rd Semester Software Engineering and Project Management


True/False Question: ISO 9001 is used to develop quality assurance systems. Correct Answer: True Your Answer: True Multiple Choice Multiple Answer Question: Test Case Design for real time systems strategically should include:Correct Answer: Task Testing , Behavioral Testing , Intertask Testing Your Answer: Task Testing , Behavioral Testing , Intertask Testing Select The Blank Question: Cohesion and Coupling is the criteria for measuring ________. Correct Answer: Functional Dependency Your Answer: Functional Dependency Multiple Choice Single Answer Question: A system is divided broadly into how many layers? Correct Answer: 4 layers Your Answer: 3 layers Match The Following Question: Closed System Deterministic System Probabilistic System Open System Correct Answer: Parameter are fixed Predictable Behavior Unpredictable Behavior Parameters are Variables Your Answer: Parameter are fixed Predictable Behavior Unpredictable Behavior Parameters are Variables

LIST OF ATTEMPTED QUESTIONS AND ANSWERS


Multiple Choice Multiple Answer Question Software Risk could be of :Correct Answer Process Risk , Project Risk , Product Risk Your Answer Product Risk , Process Risk , Project Risk Multiple Choice Single Answer Question A type of testing which verifies that all the system elements are meshed properly and that overall system function / performance is achieved is:Correct Answer System testing Your Answer System testing Multiple Choice Multiple Answer Question Black Box testing techniques are:Correct Answer Graph Based Testing Methods , Equivalence Portioning , Boundary Value Analysis Your Answer Graph Based Testing Methods , Equivalence Portioning , Boundary Value Analysis

Page 80 of 85

80

SCDL 3rd Semester Software Engineering and Project Management

Multiple Choice Single Answer Question A unit testing technique which concentrates only of the functions and features of the software product is:Correct Answer Black Box Testing Your Answer Black Box Testing Multiple Choice Multiple Answer Question Design Constraints include:Correct Answer Resource Limitations , Platform Limitations , Protocol Limitations Your Answer Resource Limitations , Platform Limitations , Protocol Limitations True/False Question The Unit of the Software is the smallest entity to be tested. Correct Answer True Your Answer True True/False Question The Major risk involved in software project is to identify the programmers required and the pay scales of them. Correct Answer False Your Answer False Select The Blank Question The Plat Form of the software is developed keeping in mind of certain hardware and ________ Correct Answer Operating System Your Answer Operating System Multiple Choice Single Answer Question To set the standards and measure and compare the quality according to American Heritage dictionary, what is essential? Correct Answer Attribute Your Answer Attribute True/False Question SRS is one of the cause of not meeting the SQA. Correct Answer True Your Answer True Select The Blank Question ________ is achieved by carving out a module that is responsible for any unique function and which does not need to interact with other parts of the system. Correct Answer Functional Dependency Your Answer Functional Dependency True/False Question

Functional Testing focuses on the Basic Functionality of the Software.

Page 81 of 85

81

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Test Case Design for real time systems strategically should include:Correct Answer Task Testing , Behavioral Testing , Intertask Testing Your Answer Task Testing , Behavioral Testing , Intertask Testing Multiple Choice Single Answer Question A System flow chart is also called as:Correct Answer State Transaction Diagram Your Answer State Transaction Diagram Multiple Choice Single Answer Question A Systematic approach to organise and documents the need of the customer which is a basis for software development is :Correct Answer Requirements Management Your Answer Requirements Management Match The Following Question Correct Answer Development of the Software Corrective Maintenance Process, Tools & Methods Requirement Specifications

Your Answer Software Programs Software Programs Maintenance Software Engineering Layers Software Engineering Layers Definition Phase Definition Phase

Multiple Choice Multiple Answer Question RMMM Plan deals with :Correct Answer Mitigation , Monitoring , Management Your Answer Mitigation , Monitoring , Management Multiple Choice Single Answer Question The extent of software functions with precision without any failure is :Correct Answer Reliability Your Answer Reliability Multiple Choice Multiple Answer Question IN OOSAD, Objects have Correct Answer attribute , Methods , relationship Your Answer attribute , Methods , relationship Select The Blank Question A ________ Measures the Efforts / cost / time used to achieve the output. Correct Answer Efficiency Your Answer Efficiency True/False Question

The major resources in the project is people and funds.

Page 82 of 85

82

SCDL 3rd Semester Software Engineering and Project Management


Correct Answer False Your Answer False Multiple Choice Single Answer Question A Standard Method which helps in keeping the system as an acceptable standards is:Correct Answer Periodical Maintenance Your Answer Periodical Maintenance Multiple Choice Single Answer Question A System is one that is self contained and self reliant:Correct Answer Closed System Your Answer Closed System Multiple Choice Multiple Answer Question The Factors enabling easy change are :Correct Answer Maintainability , Flexibility , Testability Your Answer Maintainability , Flexibility , Testability Multiple Choice Single Answer Question At the beginning testing focuses on each component individually, ensuring that it function properly as a unit or not this is termed as:Correct Answer Unit Testing Your Answer Unit Testing Select The Blank Question LOC Means________ Correct Answer Lines of Code Your Answer Lines of Code Multiple Choice Single Answer Question A Cost which includes quality planning, measuring & monitoring the quality aspect and its training is :Correct Answer Achievement Cost Your Answer Achievement Cost Multiple Choice Multiple Answer Question Fourth generation technology helps to control Correct Answer Effort , Resource , Cost development Your Answer Effort , Resource , Cost development True/False Question System Performance is measured through effectiveness and its efficiency. Correct Answer True Your Answer True True/False Question Reactive risk strategies are applied to deal with risk when it occurs. Correct Answer True

Page 83 of 85

83

SCDL 3rd Semester Software Engineering and Project Management


Your Answer True

Select The Blank Question Inadequacy or misout in SRS & RDD is ________. Correct Answer Defect Your Answer Defect Match The Following Question Correct Answer Your Answer Entity Object which is Uniquely Distinguished Object which is Uniquely Distinguished Hierarchical Model Tree Structure Tree Structure Network Model Network Communications Network Communications Relational Model Data are Linked Data are Linked Select The Blank Question Requirements Management Begins with ________. Correct Answer Identification Your Answer Identification Multiple Choice Multiple Answer Question Project Metrics enable a software project manager to:Correct Answer Assess the Status of the Ongoing Project , Identify the Risk Potential , Uncover problem areas before they go Critical Your Answer Assess the Status of the Ongoing Project , Identify the Risk Potential , Uncover problem areas before they go Critical Select The Blank Question The company should establish a ________ and maintain a documented quality system as a means of ensuring that it conforms to the specified requirements of ISO. Correct Answer Quality System Procedure Your Answer Quality System Procedure Select The Blank Question SE Methodology rides on two components, System Engineering and ________. Correct Answer Development Engineering Your Answer Development Engineering Multiple Choice Multiple Answer Question The stages of the Iterative Models are Correct Answer Requirement Analysis , System Design , Development Coding & Unit Testing Your Answer Requirement Analysis , System Design , Development Coding & Unit Testing Multiple Choice Single Answer Question The Scope of the work in a Software Project is defined by :Correct Answer Statement of Work Your Answer Statement of Work True/False

Page 84 of 85

84

SCDL 3rd Semester Software Engineering and Project Management


Question People, Procedures and Parameters are the Drivers of the Technology. Correct Answer False Your Answer False Select The Blank Question ________ testing confirms that the needs and requirements are fulfilled in the development environment. Correct Answer Alpha Your Answer Alpha Multiple Choice Multiple Answer Question The Software Risk affects :Correct Answer Project Development , Software Product , Process of Development Your Answer Project Development , Software Product , Process of Development Select The Blank Question In ________model two sets of data are linked by a relationship. Correct Answer Relational Your Answer Relational Multiple Choice Single Answer Question A Phenomenon which states that over a period of times the system gets into a phase of degrading and disorganization is:Correct Answer Entropy Your Answer Entropy Multiple Choice Multiple Answer Question Project Risk Management Includes:Correct Answer Risk Prevention , Risk Avoidance , Risk Mitigation Your Answer Risk Prevention , Risk Avoidance , Risk Mitigation True/False Question SE is applied for software development through Engineering Methods Correct Answer True Your Answer True Select The Blank Question An accounting System based on rules and Principles could be an example of ________ System. Correct Answer Deterministic Your Answer Deterministic True/False Question A Software solution is evolved in parts as in an incremental fashion in incremental model Correct Answer True Your Answer True