PM Lucas Enterprises Limited

www.pmlucas.com

PM Lucas Enterprises Limited


THE PM LUCAS ENTERPRISES GROUP OF COMPANIES
PM Lucas Enterprises Limited represents a multidisciplinary group of engineering and services companies,
offering both products and services to the Oil, Gas, Water, Civil, Construction, Facilities and other related industries. The group was established to meet requirements for a more flexible: customer focused integrated Engineering and Services Company capable of being engaged in work on small, even marginally economic projects, particularly in remote and distant areas. The group offers customers a wide range of services of E&P companies. The scope of services ranges from seismic acquisition & processing management, reservoir modelling through drilling and evaluation to engineering design, installation, construction and management of production facilities and pipelines. The group comprises three business units: PM Lucas Projects PM Lucas Oil & Gas PM Lucas Civil & Facilities

PM Lucas Projects The Services provided are: Project Management Business Development Sales & Marketing PM Lucas Oil & Gas The Services provided are: Project Management Consulting & Supervision Drilling & Production Engineering Drilling & Production Operations PM Lucas Civil & Facilities The Services provided are: Project Management Consulting & Supervision Process Engineering Detailed Engineering Procurement Services Inspections

Corporate Support Agency Services Legal & Contractual

Drilling & Production Services Logistic Support Procurement Services Training & Manuals

Logistic Support Fabrication Support Construction Services Commissioning Services Maintenance Services Training & Manuals

1 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Current Projects: PM Lucas Enterprises Limited has grown to a multimillion dollar organisation having offices located in
Kazakhstan, Russia, Tunisia, Algeria, France, United Kingdom, Canada and Serbia. The group currently employs over 300 Engineers and 250 support staff in the above-mentioned countries. PM Lucas has managed/supervised the drilling on a fixed price or turnkey basis over 150 Oil Wells for various clients in Kazakhstan in the past four years. The main clients were Hurricane Hydrocarbons (PetroKazakhstan), Kazgermunai (EEG, JV RWE-DEA & Gas de France), Nelson Resources, Kuat/Amlon (USA), Orient (USA) and First International Oil Corporation FIOC (USA), ARAWAK (Altius), Vector Energy (Big Sky) in Kazakhstan. Drilling Contracts awarded for 2006 in Kazakhstan: Petro Kazakhstan: Drilling / Workover Supervision/Management and Fluids Management for a 60+ well programme 1200 - 2500m including 8 horizontal wells with 1000m horizontal section at 1300m TVD; Fields: Kumkol, Aryskum, Kyzilkia, Dongelek, Zhanmasu, Doshan, North Nuraly, Maybulak, Karavanchy. Turnkey Drilling 19 wells 1100-1600 m; Kyzylkia, North Nuraly and Aryskum KazGerMunai: Drilling / Workover Supervision/Management and Fluids Management for a 15- well programme 1800 2200m; Akshabulak, Aksay, Nuraly

Kuat Amlon Munai: Fix price drilling 15 wells 1450 - 2200 m; Konys, Bektas ARAWAK: ADAI FIOC: Kalmeastern: Turnkey Drilling 25 wells 450-750 m; Akzhar, Besbolek and Karatakyz Day Rate Drilling 4 wells 800 1900m; Bikzhal Supervision and Management of drilling 3 horizontal wells at 2750m TVD with 600m horizontal section Turnkey Drilling of 4 structural wells from 1000-1400m; fields: Zhanatalap, Zhambay Turnkey Drilling of 8 exploration wells from 1400m to 2400m; fields: Karatal, Daulataly, West Ongar Supervision and Management of 2 gas wells 1100m

Potential Oil:

Vector Energy: KUAT Zaysan:

Petrom (OMV group): Well testing program for gas/oil on South Rovnoe field Total number of wells awarded is 135 or 150,000 m. In addition to this engineering & oilfield facilities, the services are provided for the abovementioned clients. The Engineering team was responsible for Engineering, Design and Construction Management, Commissioning and O & M services for most of its clients and completed over 80 major EPCM contracts; In 2006, the Engineering group was engaged in the following projects: PetroKazakhstan: South Aryskum Gathering System AR-117 Kumkol Oil Field Water simulation Feasibility Study
2 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Aryskum CPF As Built Design Kyzylkia CPF As Built Design Aryskum 2000 m3 Tank Installation. Kyzylkia 2000 m3 Tank Installation. Detail Engineering of South Kumkol BKNS 6000 m3 Detail Engineering of Aryskum BKNS Facility Detail Engineering of Kyzylkia BKNS Facility Addition of the Control and Utility Room at SK BKNS Project # 729 Design of Reconstruction of Produced Water Injection System at Kumkol South KazGermunai: Akshabulak Gas Treatment Plant and LPG Storage Early Gas Supply System Akzhar Field Development Phase 1A Akzhar Field Development Phase 1B Akzhar Field Development Phase 2 Karsak CPF Design Yadavaran Oil Field Surface Facility Conceptual Study Compressor Station Elemir Konys - Kumkol Pipeline Second Compressor Design Project Konys Kumkol 8 Pipeline - SCADA

Altius:

HOL: NIS-Naftagas: KAM:

Petrom/ Kom Munai: Komsomolskoe Oil Field Development Project Komsomolskoe Field Access Road PM Lucas commissioning and inspection staff keeps on providing inspection and acceptance services in Germany, Austria, Italy, Holland, France, Russia, Romania and Canada. PM Lucas keeps on providing the operation and maintenance services for Burlington (USA) through Michael Baker Corp (USA); In Kazakhstan PM Lucas is responsible for field operation services for the Konys and Bektas Oilfields in Kazakhstan. PM Lucas set up an engineering group in Calgary, Canada to access the Canadian oilfield equipment market and engineering resources in the Alberta province. This group keeps on providing engineering and procurement services for western clients in Kazakhstan on behalf of PM Lucas. These new contracts, giving a boost to the company, will certainly require employment of additional 300 staff within the future two years.

3 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Organised and managed through 12 offices in:


Belgrade Serbia PM Lucas Enterprises Limited Kraljice Marije 1 / XVI, 11000 Belgrade +381 11 33 76 666 +44 870 127 3592 fax. Regional Support Office Head Quarters Almaty Kazakhstan PM Lucas Enterprises (Kazakhstan) Limited Po. Box 238 Baitursynov Str. 113, Almaty +73 272 50 12 22 +73 272 50 12 21 fax. Main Branch Office Local Office Algiers Algeria PM Lucas Enterprises SARL 8, Boulevard Said Hamdine, Hydra +213 21 60 27 98 +213 61 55 15 56 or 57 +213 21 48 42 20 fax. Main Branch Office Aktau, Kazakhstan PM Lucas Enterprises Limited Vira Base Promzone Aktau, Mangistau Tel +7 (3292) 42 60 58 +7 (3292) 42 60 59 Fax:+7 (3292) 42 60 63 Nicosia Cyprus PM Lucas Enterprises Limited Po. Box 23282 8, Kennedy Ave. 1680 Nicosia +357 22 76 77 70 +44 870 127 3592 fax. Novi Sad Serbia PM Lucas Enterprises Limited Zeleznicka 44 21000 Novi Sad IP 1-708-668-4500 +381 21 426-629 Local Office

Kyzylorda Kazakhstan PM Lucas Enterprises Limited 4-iy Ukrupneniy kvartal, 1/1 +7 3242 26-13-00 +7 3242 27-68-42 fax. . Local Office

Atyrau Kazakhstan PM Lucas Enterprises Limited Satpaeva Ave, 5B, Premier City Building 0600011Atyrau tel: +7 3122 97-04-27 + 7 3122 97-04-28 fax: +7 3122 97-04-30 Local Office

Shymkent Kazkhstan PM Lucas Enterprises Limited OntustykMunaiGas IP 170 8668 4506 +7-32547-666-71 tel. +7-32547-666-74 tel. Local Office

Moscow, Russian Federation

London, UK PM Lucas Enterprises Limited C/O EastLand Engineering Limited 99 Wynchgate, London N14 6RJ +44 20 888 21 812 +44 20 888 21 878. Local Associated Office

Calgary, Canada PM Lucas Enterprises Limited C/O MPS ALBERTA LTD. #102, 811 Manning Road NE Calgary, Alberta T2E 7L4 +1 403 235 20 40 +1 403 272 83 26 fax. Local Associated Office

PM Lucas Enterprises Limited Podcofensky side-street 14/1 +7 095 101 30 20 Main Branch Office

In addition to the above PM Lucas currently disposes of agents and associated offices in: Germany, Austria and Romania.

4 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

OIL & GAS SERVICES


PM Lucas Enterprises Limited offers its customers a wide range of services aimed to support exploration
and production companies. The scope of services ranges from seismic acquisition & processing, reservoir modelling, through drilling and evaluation, to engineering design, installation, construction and management of production facilities and pipelines.

PM Lucas Enterprises Limited provides every type of Oil & Gas services such as:
Petroleum Engineering & Services: Reservoir and Fluid Characterization; Full Field Reservoir Development Plan; Well Test Design & Analysis; Reservoir Evaluation; EOR Evaluation; Production Forecasting; Geological Services; Feasibility Studies; Reservoir Engineering Services; Reservoir Management Services;

Drilling Engineering & Workover & Fluids Services:

Well Planning & Design; Drilling Services; Supervision; Management; Slimhole Drilling Services; Workover Services; Coil Tubing & Nitrogen Services;

Cementing & Pumping Services; Well Logging & Perforating Services; Mud Logging; Fluids Engineering Services; Stimulation Services; Well Testing Services;

Production Engineering & Services: Well Completion Design; Stimulation Design; Well Problem Analysis; Well Diagnosis; Workover Planning; Inflow Well Performance; Vertical Flow Performance; Future Well Performance; Selection of Artificial Lift Systems; Artificial Lift Design; Production Optimisation; Field Supervision; Field Management;

Process & Surface Facilities Engineering & Operations Services:

PM Lucas Enterprises Limited provides engineering, procurement, inspection, construction, commissioning,


start-up and maintenance services for Oil & Gas Facilities. Services include mechanical, electrical and control installation and equipment at gathering station, water injection system, central processing facilities, and facilities for oil dewatering, loading and unloading facilities, tank farms, gas utilisation plants and gas electrical power plants. Oil and water treatment plants can also be provided. Lucas provides every type of Engineering services:

5 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Flow lines Pipelines Production facilities Pump stations Compressor stations Water Injection facilities Gathering stations Early production facilities Top Loading facilities Central Processing Facilities Free Water Knock Out Systems Electrical installations Control Systems SCADA systems

Civil Engineering and Building Services:

PM Lucas Enterprises Limited provides every type of civil engineering, construction and maintenance
services to oil & gas, water, civil, construction and related industries. These services include, but are not limited to obtaining earth works, concrete foundations, roads, air-strips, bridges, harbour works (including service wharves) and buildings for administration, workshops, warehousing, residential and camp facilities. Mechanical and electrical installations, HVAC systems, water supply, waste and potable water treatment plants, power generation, gas supply systems and long distance heating systems can also be provided. Engineering, design, manufacture and assembly services of equipment and installation services in civil engineering and industry: Water supply and sewage utilities; Facilities for waste water and potable water treatment; Central heating installations and boiler plants; Steam, hot water, water supply pipeline systems; Oil & Gas long distance pipeline systems and plants; Fire protection systems; Automatic control and regulation systems; Air conditioning and ventilation systems; Cooling plants and cold stores; Dust removal and pneumatic transport systems;

Air-handling units and ventilation equipment, equipment for HVAC plants, potable and waste water treatment equipment.

6 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

GEOLOGICAL & GEOPHYSICAL RESERVOIR ENGINEERING & PRODUCTION ENGINEERING SERVICES

7 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

PM Lucas Petroleum Engineering


Recent International Project Experience
Country Field Client Project Scope
Integrated field operations management; Geological Interpretation, Reservoir Engineering, Production Engineering; Field Operations, Drilling Engineering; Data base; Field Production Optimization; Integrated field operations management; Geological Interpretation, Reservoir Engineering, Production Engineering; Field Operations, Drilling Engineering; Data base; Field Production Optimization; Artificial Lift (Gas Lift) Design and Optimization; Equipment Selection; Reserve Evaluation, Infill Drilling and Workover Design. Well Performance Analysis Development Evaluation for four oil fields Reserves and Cash Flow for Financing Reservoir Evaluation. Economic Estimation. Reserve Calculations, Production Forecasting and Development Cost Estimate Reserve Studies and Economic Evaluation for Financing. Surface Facilities Development Basis Design Production and Economic Study. Prospect Evaluation; Reserve Evaluation. Well Evaluation. Wellbore completion Conceptual Design.

Kazakhstan

Konys

KAM

Kazakhstan

Bektas

KAM

Mexico

Ogario Blasiljjo

PEMEX-HALLIBURTON

Russia

Western Siberia

NAFTAGAS

Angola Turkmenistan Kalmikia (Russia)

Block-I;Block-3 Kotur tepe Rava

JV Elf-Naftagas-Ina,.. NAFTAGAS NAFTAGAS

Iraq Iraq Uzbekistan USA

Hamrin Noor Hayrabol Dickie

NOC-NAFTAGAS NOC NAFTAGAS MISSIPIEN Oil

8 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Country
Azerbaijan

Field
Muradhandli Adziveli Dashgil Duvany Kyanidazag Kumkol Aryskum

Client
RAMCO-Meduza

Project Scope
MOC Well Problem Analysis, Workover Completion Design and WO Options. Production Rate Decline Analysis; Feasibility Review.

Azerbaijan

RAMCO

Kazakhstan Kazakhstan

Hurricane. Hurricane

Artificial Lift (ESP) DesignPhase I and Phase II Field Development Conceptual Design Volumetric Reservoir Evaluation. Material Balance Calculations. Production Forecasting. Artificial Lift Selection and Design. Well Test Design and Analysis. Well System Analysis. Well Problem Analysis. Workover Planning and WO Design. Volumetric Reservoir Evaluation. Production Forecasting. Artificial Lift Selection and Design. Well Test Design and Analysis. Well System Analysis. Well Problem Analysis. Workover Planning and WO Design. Reserve Evaluation, Production Forecasts and Development Cost Estimate Pre-Engineering and Design Studies. Completion Design Studies including Sand Control Evaluation Artificial Lift Review Study Reserve Estimates, simulation modeling, EOR Planning. Production Forecasts, Artificial Lift Design and Optimization HPHT Sour Gas Production Well Completion. Well Testing Design and Analysis Sand Control Study. Well Design for Gas Storages.

Kazakhstan

Konys

KuatAmlonMunai

Kazakhstan

Bektas

KuatAmlonMunai

Kazakhstan

Koza Juzni

KGN

Kazakhstan Libya Yugoslavia

Akhzar Mabruk Turija

Altius Total-Libya NIS-NAFTAGAS

Yugoslavia

Maj-X

NIS-NAFTAGAS

Yugoslavia

B.Dvor

NIS-NAFTAGAS

9 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Country
Yugoslavia

Field

Client
NIS-NAFTAGAS

Project Scope
Remaining Reserve Evaluation. Oil and Gas Production Forecasting. Cash Flow forecasts Reservoir Description; Conventional Reservoir Studies (MB, Decline Analysis); Completion Design; ALS Design Optimization; Problem Well Analysis, Stimulation Design and Analysis; Workover Selection and Programming Oudeh Well Optimization Review: ALS System Analysis and Design Well Problem Analysis Well Formation Evaluation Surface Facility System Review Reservoir Pressure Maintenance: Numerical Simulation (Petrel; Eclipse) Gas Utilization Project: Gas ReInjection FEED

Mkz

Yugoslavia

23 Oil Fields +19 Gas Field

NIS-NAFTAGAS

Syria

Oudeh Oil Field

Dublin International(Syria)

Kazakhstan

Konys

J.V. KuatAmlonMunai

10 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

DRILLING & WORKOVER OPERATIONS

11 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

CURRENT PROJECTS
Customer Project name Kumkol, Aryskum, Kyzilkia, Dongelek, Zhanmasu, Doshan, Nuraly Drilling&Workover Programme 1000 2500 m Kumkol Drilling Programme 1400 1600 m Akshabulak, Aksay Nuraly Drilling&Workover Programme 1800 - 2200 m Konys Turnkey Drilling Programme 1300 1600 Besbolec Turnkey Drilling Programme 400-800m Bikzhal Day Rate Drilling Programme 800 - 2000 m Kalmykya Drilling & Workover 2300m West Ongar, Karatal Drilling & Workover 1500m Konys Production & Geological Management No. of Wells 528-horizontal + 160 19 Project level Drilling / Workover Supervision/ Management Mud Engineering Turnkey Drilling / Workover Supervision/ Management Mud Engineering Fix Price Year

1.

PKKR

2006

2.

PKKR

2006

3.

KGM

12+2 directional

2006

4.

KAM

15

2006

5.

ALTIUS

20 + 5 high angle wells

Turnkey

2006

6. 7. 8.

ADAI KALMEAS TERN BIG SKY

2 3 horizontal wells 8

Day Rate Drilling Turnkey Turnkey Production & Geological Management/ Supervision Drilling / Workover Supervision/ Management Turnkey

2006 2006 2006

9.

KAM

2006

10.

ZAYSAN Potential Oil

Saribulah Drilling & Workover Zhambai Turnkey Drilling Programme 750 1300m

2006

11.

2006

TOTAL WELLS

133 Drilling 200 WO

All of PM Lucas Drilling Projects had within their Scope of Work the Construction of Gravel access roads, that link the Well sites with Field communication roads. These roads were built to support mobilization and de-mobilization of drilling towers, heavy equipment and machinery, as well as to be used for day-to-day Operation and Well Maintenance purposes.

12 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

KAZAKHSTAN DRILLING & PRODUCTION PROJECT LIST

Customer KALME ASTER N BIG SKY ZAYSA N

Project name Kaspiskoe - Drilling&Workover Programme 2000-2500m Morskoe - Drilling&Workover Programme 1350-1500m Saribulah - Drilling&Workover Programme 1200-2000m Akshabulak, Aksay Nuraly Drilling&Workover Programme 1800 - 2200 m Bikzhal, Malkomgen Day Rate Drilling Programme 1200-2500m Konys Turnkey Drilling Programme 1300-1650m Akzhar-Turnkey Drilling Programme 500-800m Kumkol, Aryskum , Kyzylkya, Nuraly, - Drilling&Workover Programme 1000-4000m Konys Production & Geological Management Bikzhal Day Rate Drilling Programme 800 - 2000 m Bezbolek Turnkey Drilling Programme 250 m - 900 m Karataikyz Turnkey Drilling Programme 300 m - 1000 m Akzhar Turnkey Drilling Programme 650 m Konys Turnkey Drilling Programme 1450 1600

No. of Wells

Project level Day Rate Drilling/Workover/ /Supervision/ Management Drilling/Workover/ /Supervision/ Management Drilling/Workover/ /Supervision/ Management Drilling / Workover Supervision/ Management Mud Engineering Day Rate Drilling

Year

1.

2 horizontal+ 8

2005

2.

2005

3.

2005

4.

KGM

12

2005

5.

ADAI

2005

6.

KAM

15

Fixed Price

2005

7.

ALTIUS

15

Turnkey Drilling / Workover Supervision/ Management Mud Engineering Production & Geological Management/ Supervision Turnkey Day Rate Drilling Turnkey Day Rate Drilling Turnkey Day Rate Drilling Turnkey

2005

8.

PKKR

40+2 horizontal+120

2005

9.

KAM

2004

10.

ADAI

2004

11.

ALTIUS

2004.

12. 13 14.

ALTIUS ALTIUS

7 12

2004. 2004.

KAM

14

Turnkey

2004.

13 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Customer

Project name Akshabulak, Aksay Nuraly Drilling&Workover Programme 1800 - 2200 m Kumkol, Aryskum, Kyzilkia, Dongelek, Zhanmasu, Doshan, Nuraly Drilling&Workover Programme 1000 4000 m Doshan Drilling&Workover Programme 2300 m Bikzhal Turnkey Drilling Programme 1100 - 2000 m Konys Production & Geological Management Bektas Turnkey Drilling Programme 1100 m Konys Turnkey Drilling Programme 1450 1600 0 m Nuraly Drilling&Workover Programme 2000 m Aksay Drilling&Workover Programme 1900 m Akshabulak Drilling&Workover Programme 2100 m Nuraly Drilling&Workover Programme 2000 3700 m

No. of Wells

Project level Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Fixed Price Drilling Day Rate Drililing Production & Geological Management/ Supervision

Year

15.

KGM

12

2004.

16.

PKKR

42 2-horizontal + 170

2004.

17.

ORIENT

2003

18.

ADAI

2003.

19.

KAM

2003

20. 21.

KAM KAM

7 6

Turnkey Turnkey Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Workover Supervision/ Management Workover Supervision/ Management

2003. 2003.

22

KGM

2003

23.

KGM

2003.

24.

KGM

2003

25.

HKMPKKR

10+10

2003.

26.

HKMPKKR HKMPKKR HKMPKKR

Maybulak Drilling&Workover Programme 1200 1500 m Aryskum Workover Programme 1200 2300 m Kumkol Workover Programme 1200 1500 m

4+19

2003.

27.

6+12

2003

28.

120

2003

14 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Customer 29. KAM

Project name Bektas Turnkey Drilling Programme 1100 m Konys Turnkey Drilling Programme 1350 m Nuraly Workover Programme 2000 m Aksay Workover Programme 1900 m Nuraly Drilling&Workover Programme 2000 m Aksay Drilling&Workover Programme 1900 m Akshabulak Drilling&Workover Programme 2100 m Aryskum Drilling&Workover Programme 1200 2300 m Kumkol Drilling&Workover Programme 1200 2300 m Akshabulak Drilling Programme 2100 m Aryskum Drilling&Workover Programme 1200 2300 m Kumkol Drilling&Workover Programme 1200 2300 m

No. of Wells 4

Project level Turnkey

Year 2002.

30.

KAM

Turnkey Workover Supervision/ Management Workover Supervision/ Management Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering Drilling Supervision Drilling / Workover Supervision/ Management Mud Engineering Drilling / Workover Supervision/ Management Mud Engineering

2002.

31.

KGM

2002.

32.

KGM

2002.

33

KGM

2002.

34

KGM

2002.

35

KGM

2002.

36

HKM

10

2002.

37

HKM

4+144

2002.

38

KGM

2001.

39

HKM

3+12

2001.

40

PKKR

9 + 45

2001.

TOTAL WELLS

1100

15 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

PROCESS SURFACE FACILITIES ENGINEERING OPERATIONS SERVICES

16 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

KAZAKHSTAN ENGINEERING PROJECT LIST


Customer 1. HOL Project name Yadavaran Oil Field Surface Facility Conceptual Study Akzhar Field Development Phase 2 Location Yadavaran Oil Field Akzhar Oil Field Project level Conceptual Design Detailed design Procurement Construction support services Detailed design Procurement Construction support services Detailed design Procurement Construction support services Operations Detail Design Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Feasibility Study Detail Design As-Built Design As-Built Design As-Built Design As-Built Design Detail Design Conceptual Design Detail Design Detail Design Detail Design Detailed design Construction support services Detailed design Construction support services Year 2005.

2.

ALT

2005.

3.

ALT

Akzhar Field Development Phase 1B

Akzhar Oil Field

2005.

4.

ALT

Akzhar Field Development Phase 1A Early Sales Gas Production Facility Kyzylkia 2000m3 Tank Addition Kyzylkia BKNS Facility

Akzhar Oil Field Akshabulak Oil Field Kyzylkia Oil Field Kyzylkia Oil Field

2005.

5. 6. 7.

KGM HKM PKKR HKM PKKR HKM PKKR HKM PKKR HKM PKKR HKM PKKR HKM PKKR KAM HKM PKKR HKM PKKR HKM PKKR KAM KAM NIS ALT HKM PKKR HKM PKKR

2005. 2005. 2005.

8.

Aryskum BKNS Facility South Kumkol BKNS Facility 6000 m3 Kumkol Oil Field Water Simulation Feasibility Study Kyzylkia Tank Fire Suppression Reconstruction Electrical design drafting the Aryskum CPF Konys CPF as Built Design Kyzylkia CPF As Built Design Aryskum CPF As Built Design Tie-In Pipeline package Bektas Gathering System Gas Re-Injection facility Compressor Station - Elemir Karsak CPF Kyzylkia 2000 m3 Tank Additions Electrical & fire Suppression Aryskum 2000 m3 Tank Installation

Aryskum Oil Field

2005.

9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21.

Kumkol Oil Field Kumkol Oil Field Kyzylkia Oil Field Aryskum Oil Field Konys Oil Field Kyzylkia Oil Field Aryskum Oil Field Aryskum Oil Field Bektash Oil Field Elemir Karsak Oil Field Kyzylkia Oil Field

2005. 2005. 2005. 2005. 2005. 2005. 2005. 2005. 2005. 2005. 2005. 2005. 2005.

22.

Aryskum Oil Field

2005.

17 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Customer 23. 24. 25. 26. 27. 28. 29. HKM PKKR KGM KGM ALT ALT ALT HKM PKKR HKM PKKR KAM HKM HKM HKM HKM HKM HKM HKM HKM

Project name South Aryskum Gathering System AR-117 Early Sales Gas Production Facility Gas Treatment Plant and LPG Storage Akzhar Sales Oil Pipeline Akzhar Field Gathering System Akzhar Central Trial Process Facility Aryskum Field Gathering System

Location Aryskum Oil Field Akshabulak Oil Field Akshabulak Oil Field Akzhar Oil Field Akzhar Oil Field Akzhar Oil Field Aryskum Oil Field

Project level Detailed design Construction support services EPC Operations Detail Design Detail Design Detailed design Procurement Detailed design Procurement Detailed design Detailed design Construction support services Commissioning Detail design Construction Modification

Year 2005. 2004. 2004. 2004. 2004. 2004. 2004.

30.

Aryskum Gas Re-Injection

Aryskum Oil Field

2004.

31. 32. 33. 34. 35. 36. 37. 38. 39.

Electrical installation BAGA Terminal Single well batteries installation at North Nuraly field Conversion of wells to injection Gas Utilization Study for Kumkol Oilfields LPG Loading at Shymkent New Terminal in Aktau Druzhba Terminal Kyzylkia CPF Upgrade for Water Separation Maybulakh Water Injection pipelines

Konys Oil Field

2003. 2003. 2003.

Nuraly Kumkol Oil Field Kumkol Oil Field Shymkent Aktau Detailed design Study Conceptual engineering Conceptual engineering Study Detailed design Construction support services Commissioning Detailed design Construction support services Detailed design Construction support services Commissioning EPC Operations Study Detailed design Construction support services Commissioning Detailed design Construction support services Commissioning

2003. 2003. 2003. 2003. 2003 2003.

Kyzylkia Oil Field

40.

HKM

Maybulakh Oil Field

2003.

41.

HKM

Aryskum Truck Offloading Station

Aryskum Oil Field

2003.

42. 43. 44.

KGM KGM HKM

Water injection Facility Gas Utilization Study Mini Free Water Knock Out at GS 24

Askhabulah

2003. 2003. 2003.

Kumkol Oil Field

45.

HKM

Mini Free Water Knock Out-at GS 4

Kumkol Oil Field

2003.

18 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Customer

Project name Free Water Knock Out South Kumkol CPF Debottleneck and Vapor Recovery Kumkol Oil Field Hydraulic Model Kyzylkia to Aryskum 6 inch pipeline CPF 28,000 Crude Oil StoragePhase 1 Kyzylkia CPF Upgrade & connection to Kumkol - Dzhusaly pipeline Dzhusaly Rail Siding

Location

Project level Detailed design Construction support services Commissioning Detailed design Construction support services Study Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Commissioning Detailed design Construction support services Commissioning Detailed design Construction support services Commissioning Detailed design Construction support services Study Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services

Year

46.

HKM

Kumkol Oil Field

2003.

47. 48. 49.

HKM HKM HKM

Kumkol Oil Field Kumkol Oil Field Kyzylkia, Aryskum

2003. 2003. 2003. 20022003 20022003 20022003

50.

HKM

Kumkol Oil Field

51.

HKM

Kyzylkia

52.

HKM

Dzhusaly

53.

HKM

Aryskum Pump Station

Aryskum

20022003

54.

HKM

Kumkol Pump Station

Kumkol Oil Field

20022003

55. 56. 57.

KGM HKM HKM

Early production skid mounted unit Kumkol CPF Capacity Increase Study CPF Tank Farm Expansion 2002-11-28 CPF Upgrade-Safety-Tank farm

Nuraly Oil Field Kumkol Oil Field

2002. 2002. 2002.

58.

HKM

Kumkol Oil Field

2002.

59.

HKM

Single well equipment KK 19

2002.

60.

HKM

Brine mixing unit Flowline from well 27SK to MS-2, SK Heating cable in Workowers Base GS-4 Line replacing

Kumkol Oil Field

2002.

61.

HKM

Kumkol Oil Field

2002.

62.

HKM

Kumkol Oil Field

2002.

63.

HKM

Kumkol Oil Field

2002.

19 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Customer 64. HKM

Project name Power Supply to KUDU pump on wells ESP Installation Phase-II Skid Mounted Water Injection Unit Skid Mounted Early Oil Production and testing Unit Early production skid mounted unit CPF Tank Farm Extension

Location Kumkol Oil Field

Project level Detailed design Construction support services Detailed design Construction support services Conceptual design Conceptual design Conceptual design

Year 2002.

65. 66. 67. 68. 69.

HKM KGM KGM Lucas HKM

Kumkol Oil Field Akshabulak Oil Field Nuraly Oil Field

2002. 2002. 2002. 2002. 2002.

Kumkol Oil Field

70.

HKM

Dzhusaly Station Upgrade

Dzhusaly

71.

HKM

KAM Inter Field Pipelines

Kumkol Oil Field

72.

HKM

Dzhusaly rail loading terminal

Dzhusaly

73.

HKM

Kumkol-Dzhusaly, oil pipeline Aryskum Pump Station-Diesel and cooling water piping systems Mini Free Water Knock Out at GS 2 Mini Free Water Knock Out-at GS 14 Free Water Knock Out 2

Kumkol, Dzhusaly

74.

HKM

Kumkol Oil Field

75.

HKM

Kumkol Oil Field

76.

HKM

Kumkol Oil Field

77.

HKM

Kumkol Oil Field East Kumkol Oil Field East Kumkol Oil Field Kumkol Oil Field

78.

HKM

Top Loading Facility-well No: 7

79.

HKM

Top Loading Facility-well No: 6 New Gathering Station 3 Flow lines New Gathering Station 2 Flow lines Water Injection System upgrade Pipelines Water Injection System upgrade

80.

HKM

81.

HKM

Kumkol Oil Field

82. 83.

HKM HKM

Kumkol Oil Field Kumkol Oil Field

Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services FEED

2002.

2002.

2002.

2002.

2002.

2002.

2002.

2002.

2001.

2001.

2001.

2001.

2001. 2001.

20 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Customer 84. HKM

Project name Top Loading Facility

Location Aryskum Oil Field

Project level Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services Detailed design Construction support services

Year 2001.

85.

HKM

Flow lines (pipelines)

Aryskum Oil Field

2001.

86.

HKM

Central Processing Facility

Aryskum Oil Field

2001.

87.

HKM

Upgrade of GS-1 & S GS-2

South Kumkol

2001.

21 of 39

PM Lucas Enterprises Limited


www.pmlucas.com

Library

REFERENCE LIST

Document Control Office

22 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Komsomolskoe Field Access Road Reconstruction Service: Detailed design, Procurement, Construction Year: 2006. AFE amount: The intent of the project is to provide a cost effective and reliable solution for the Access road which is to connect Komsomolskoe oil field with 86 km distant village of Akshimirau in Oblast of Actau in Kazakhstan. Chosen material for road construction is stone material from the pit located 120km away from the beginning of the road route (village Akshimirau). Road route is divided into three sections to correspond to different types of terrain.Road design has been made to support the construction plan which provides resources of 300 directly supervised man-power, 140 transport vehicles, 50 specialized construction machines. Project schedule plans the overall duration of the project to be 150 working days. Project is ongoing. Project name: Konys Kumkol 8" Pipeline Service: Detailed design Procurement Construction Year: 2006. AFE amount: Konys-Kumkol Pipeline project is planned to supply 600,000 tonnes per year of oil to the KTO facilities located in Kumkol based on average throughput conditions. It will be integrated into the current operation of the Konys Central Production Facility by addition of new pumping equipment, new metering facility and a new pig launching facility all of which will. The pipeline will be 219 mm in diameter, having a wall thickness of 5.6 mm. and will be a Class API-5L-X52 grade steel. The pipeline will be designed for a maximum operating pressure of 100 Barg, however actual operating pressure will be about 85 Barg depending upon the operating conditions in the KazTransOil Pipeline at Kumkol. The pipeline will be approximately 72.4 km in length and will have an access road along the Pipeline route. Project is ongoing and it is scheduled to be finished in October 2006. Project name: Konys Process Study

Service: Process Study Year: 2006. AFE amount: Study has been commissioned to PM Lucas by Kuat Amlon Munai to make an evaluation of Konys CPF performance, which is currently having problems producing Spec Oil. The Study is proposing the solutions for installing of new equipment and Tanks, which will ensure future oil production to be in spec. Study has been entirely done by PML Canada process engineering team.

Project name: North Nuraly Oil and Gas Gathering System Service: Detailed design Year: 2006. AFE amount: Present project The North Nuraly Gathering System calls for well site development of the following producing wells NN1, NN2, NN3, NN4, NN7, NN9, NN10, NN11, NN12, NN13, NN14 and flow lines from the existing and future wells to the future Satellite 1. From North Nuraly field, crude oil will be transported to Kumkol South field via 8 oil collector, tying in to the existing GS-23 in Kumkol South. Project is ongoing.

23 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Gas supply line at Kumkol CPF for New Users Service: Detailed design Year: 2006. AFE amount: Project which is to ensure sufficient fuel gas supply for the new users in the vicinity of Kumkol CPF. A new 6 line is introduced to supply gas from a Gas Separator on CPF grounds to a distribution manifold with equipped with 4 flowmeters, for future consumers. Project is scheduled to be finished before commissioning of Konys-Kumkol Pipeline, which is going to be one of future major consumers.

Project name: Aryskum Oil Tank Addition

Service: Detailed design Year: 2006. AFE amount: The Project has extended Aryskum CPF Tank Farm. Two new 2000m Oil Tanks have been added and the existing piping was extended to allow for the settling of oil.
3

Project name: Aryskum CPF PLC program update Service: As-Built Design Year: 2006. AFE amount: PLC program update has been made to incorporate the newly added Tanks at Aryskum Tank Farm to the existing PLC. This reprogramming enables the remote control of new tanks operation and their inclusion to existing Safety System.

Project name: Gathering System engineering Services Akzhar Oil Field Service: Detailed Design, Procurement, Construction support Year: 2005. AFE amount: The project includes further development of Akzhar field gathering system, complete with installation of remote field headers. Also, the phase 1A developed Central Process Facility is to be extended and to include process solution for providing the spec oil in two 1000m3 oil tanks. This phase is to prepare facility for the future oil transport via sales pipeline. The faciulity is to be winterized completly (installlation of line heater and utility heaters, heat tracing, etc)

24 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Kyzylkia BKNS Facility Service: Detailed Design, Construction support Year: 2005. AFE amount: Due to increased produced water rates and to improve Kyzylkia oil field overall performance, a multi well water injection system, called BKNS, is installed including new high pressure distribution system from the BKNS location to injection wells. Along with the timely increased water injection rate requirements and with regards to the produce water flow rates forecasted, make up from source water wells is provided.

Project name: Ariskum BKNS facilities Service: Detailed Design, Construction support Year: 2005. AFE amount: Due to increased produced water rates and to improve Aryskum oil field overall performance, a multi well water injection system, called BKNS, is installed including new high pressure distribution system from the BKNS location to injection wells. Along with the timely increased water injection rate requirements and with regards to the produce water flow rates forecasted, make up from source water wells is provided.

Project name: South Kumkol BKNS Facility 6000 m3 Service: Detailed Design, Construction support Year: 2005. AFE amount: The purpose of this project is to install water injection Pump Station at the South Kumkol Oil field, consisting of Pump Station Building (BKNS) equipped with High Pressure Injection pumps and Interconnection piping to tie in the existing 6 inch produced water collector, running from the Kumkol CPF to BKNS and existing South Kumkol injection water distribution system. It was necessary to increase the water injection rate in the South Kumkol field to replace voidage and increase net oil recovery. Providing a dedicated BKNS in South Kumkol helped alleviate the water injection bottlenecks in the Kumkol South water distribution system.

Project name: Konys CPF as Built Design Service: As - Built Design Year: 2005. AFE amount: PM Lucas has been engaged from its client Kuatamlon Munai to make As Built Design of existing Central Process Facility at Konys Oil Field. This project includes collection of all data for installed equipment as well as making of Topological Survey.

25 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Bektas Gathering System Service: Conceptual Design Year: 2005. AFE amount: Bektas Gathering System is Project for collecting and transport of oil from KuatAmlonMunai Bektas field to Konys CPF.

Project name: Konys Oil Field Development GUP PHASE I Gas Re-Injection Facility Installation Service: Detailed Design Year: 2005. AFE amount: As per the Year 2005 development budget, the scope of this project is designing and installation of a Gas Re-injection Facility at the location of the Konys CPF, as the first phase of this project. The Gas Re-injection facilities are sized for the Design Flow Rate (gas injection capacity) of 200 000 Sm3/day, which will be in the first phase injected into the wells K-105 and K-400. Gas Separation and Flaring Facilities are the part of the existing Konys Oil Field Central Process Facility (CPF). Future Gas Handling System will be based on the produced gas quantities from existing Gas Scrubber (VE-302) on CPF and potential other sources, like the produced gas from Aryskum South Dome.

Project name: Karsak New Truck Off-Loading Station Service: Detailed Design Year: 2005. AFE amount: PM Lucas has been invited to perform detail design in order to move out existing Truck-off loading facility out of fence of Karsak NGDU CPF.

Project name: Aryskum 2000 m3 Tank Installation Service: Detailed Design, Construction support Year: 2005. AFE amount: To meet Kazakh regulatory requirement, PML performed design with regard to relocation of the existing Aryskum CPF produced water pump station relocation to meet safety codes and distances.

26 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: South Aryskum Gathering System AR-117 Service: Detailed Design, Construction support Year: 2005. AFE amount: Detail Design Project of connecting well AR-117 to Aryskum TOLF via future Satelite S-04. 4" Oil Flowline originates from Well AR-117 erminates at point where in the future Satellite S-04 is to be installed. 4" flowline length is approx. 660 m. By a 4" by-pass line is provided a connection to 8" collector pipeline (aprox. 2400 m in length) running to TOLF Inlet Manifold. The both line are pigged.

Project name: Aryskum LPG Storage - Akshabulak Service: Engineering, Procurement Supp, Construction Supp. (MSS) Year: 2005. The LPG from the GTP process shall be pumped to an LPG storage system to be located on an adjacent site to the GTP facility. Therefore PM Lucas has designed Liquefied Petrol Gas storage and tank cars loading facility, with the following capacities: Storing capacity: 12 LPG above ground bullets, 200 m3 each, 2400 m3 total storing volume Loading capacity: three pumps and three tank loading stations 45 m3/h unit capacity

Project name: Gas Treatment Plant - Akshabulak Service: Engineering, Procurement Supp, Construction Supp. (MSS) Year: 2005. In the existing COPS facilities all incoming inlet fluids was directed to the high-pressure separators. The gas and oil are separated and oil is then heated and enters the low-pressure separator. The produced crude oil is then sent to the storage tanks, while all gas (from all stages - high pressure 7.5-9.0 bars, low pressure 1.5-3.0 bars and tank gas recovery) was flared. This facility is designed to capture all of the gas currently being flared and direct it to the proposed gas treatment facility. In order to sell the gas, the same must be treated to meet hydrocarbon and water dewpoint so that it can be pipelined to the delivery point at Kyzlorda.

Project name: CPF - SEPARATOR SYSTEM INSTALLATION Service: Year: 2004. AFE amount: Konys Oil Field Gathering System involves 25 wells, located in the north part of the Konys Oil Field (Republic of Kazakhstan). Three of them are equipped to produce by gas lift system; others produce as natural flowing wells. The Gathering System comprises four (4) Measuring Stations with Satellite Units , Line Heaters, three 8" collector pipelines, 25 flowlines (3") and Inlet Manifold at the CPF. At each colector pipeline and flowline are installed pigging devices. Line Heater and Chemical Injection Package are installed at each Well Site too. Well casing gas is used as fuel gas and power gas for pump chemical injection.

27 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: KazGerMunai Akshabulakh Early Sales Gas Production Facility Service: Engineering, Procurement, Commissioning, Construction (MSS), Maintenance Year: 2004. AFE amount: $ 1,200,000 Early Sales Gas Production Facility is designed in order to provide temporary Sales Gas supply for City of Kyzylorda, before regular Gas Treatment Plant is going to be finalized. After two phase separation using conventional horizontal separator, produced gas is going to be treated by BORSIG Membrane Filtration Unit obtaining good quality Sales Gas and Permeate going to further process. Produced Sales Gas is transported by existing NPS 12 Sales Gas Pipeline to the City of Kyzylorda. This Facility is Designed, Procured and Constructed in two months only. PM Lucas is providing Maintenance of this Facility. Design capacity of the system is 2100 Scm/h of Sales Gas. Project name: Akzhar Field Development Central Trial Process Facility Service: Engineering, Procurement, Commissioning, Construction Year: 2004. The Main Facility (CTPF) would be designed to handle 5000 BFPD with a 20% water cut and design GOR of 4m3/m3 and would include all tankage, utilities and water injection equipment to handle this. Provisions for installation of future required equipment necessarily for handling the flow rate of 7500 BOPD with 40% water cut will be provided. The key element of the approach is to install the CTPF in three distinct stages to match the cash flow with the drilling and overall development. The first stage would provide for the expected production from the existing wells and the 2004 drilling program together with the basic infrastructure. The second stage would provide for additional production and/or increased water cut or special additions to handle operational problems that may have arisen after the initial phase. The final phase would bring the facility to full throughput with any additional tankage and pumping or to address operational problems. The test and group lines from the North and Southeast wing will be flowlined to the main facility with suitable inlet manifolding and test separation. Project name: Gas Treatment Plant and LPG Storage Service: Detailed Design Year: 2004. GU KAZGERMUNAI (KGM), a joint venture of RWE-Dea AG, Erdgas-Erdl GmbH, IFC and PetroKazakhstan Kumkol Resources (PKKR), installed a Gas Treatment Plant (GTP) on a location adjacent to the Akshabulak Oilfield Central Oil Processing Station (COPS) in Kazakhstan. The new GTP is a stand-alone facility and receive wet gas feed stock from the COPS. The processed gas is delivered to KazTransGas (KTG). KTG designed and installed a gas pipeline and transport the gas to the city of Kyzylorda.The LPG from the GTP process is pumped to an LPG storage system to be located on an adjacent site to the GTP facility. The total LPG storage system in Akshabulak and Kyzlorda is designed for 7 days of LPG production capacity. Capacity of GTP Facility is 300 MM3/year of Wet gas.

28 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: CENTRAL TRIAL PROCESS FACILITY Akzar Field Service: Detailed Design Year: 2004. The Main Facility (CTPF) is designed to handle 5000 BFPD with a 20% water cut and design GOR of 4m3/m3 and includes all tankage, utilities and water injection equipment to handle this. Provisions for installation of future required equipment necessarily for handling the flow rate of 7500 BOPD with 40% water cut will be provided. The test and group lines from the North and Southeast wing are flowlined to the main facility with suitable inlet manifolding and test separation.

Project name: Gathering System Akzar Field Service: Detailed Design Year: 2004. Gathering System Remote header packages will be installed in the North and SouthEast fields to minimize the flowlines to the Central Trial Process Facility (CTPF) and to provide the greatest flexibility for additional wells as they are drilled. The wells in the wings will be flowlined to the remote headers located at central locations in each wing. Each remote header package will contain ten spot test and group line manifolds. From the Remote headers flow will be provided to Main Facility (CTPF) through two independent lines-group and test line. Group line will be sized to accept the flow rates of 20 wells

Project name: Akzhar Field Development Oilfield Gathering System Service: Engineering, Procurement, Commissioning, Construction Year: 2004. Gathering System Remote header packages will be installed in the North and SouthEast fields to minimize the flow lines to the Central Trial Process Facility (CTPF) and provide maximum flexibility for additional wells as they are drilled. The wells in the wings will be flowlined to the remote headers set at central locations in each wing. Each remote header package will contain ten spot test and group line manifolds. From the Remote headers flow will be provided to Main Facility (CTPF) through two independent linesgroup and test line. Group line will be sized to accept the flow rates of 20 wells

Project name: Konys Oil Field Development Oilfield Gathering System Service: Engineering Year: 2004. Konys Oil Field Gathering System includes 25 wells, located in the north part of the Konys Oil Field (Republic of Kazakhstan), three of which are equipped to produce by gas lift system; others produce as natural flowing wells. The Gathering System comprises four (4) Measuring Stations with Satellite Units , Line Heaters, three 8" collector pipelines, 25 flowlines (3") and Inlet Manifold at the CPF. At each collector pipeline and flowline are installed pigging devices. Line Heater and Chemical Injection Package are installed at each Well Site too. Well casing gas is used both as a fuel gas and power gas for pump chemical injection.

29 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Aryskum Oil Field Development Gas Re-Injection Plant Service: Engineering, Commissioning Supp., Construction Supp. Year: 2004. The low-pressure solution gas from Aryskum TOLF is collected off the degassing vessel and pipelined in a single 10 NPS low-pressure pipeline to the Aryskum Central GUP. A single new multi-stage reciprocating gas injection compressor is installed. A single 3 NPS high-pressure injection gas pipeline run from injection compressor discharge to injection well and AR-3. Provision will be made in the pipeline for future connecting the injection well to AR-2.The gas injection compressor station will be designed with inlet gas manifold, and Process drain system will be connected into a new flare KO drum. The compressor station will have necessary electrical power and utilities from the Aryskum TOLF facility. Project name: Konys Oil Field Development Early Production System Service: Engineering, Commissioning Supp., Construction Supp. Year: 2003.

Project name: Konys Oil Field Development Gas Motor Generator Building Design Service: Engineering Year: 2003. Brief Description: Dimensions of the building: 9.0 x 15.0 m, H=5.0 m. Steel frame structures are covered by metal sheet sandwich panels.

Project name: Konys Oil Field Development Tank Farm Electrical installation Service: Engineering Year: 2003. Brief Description: Complete Electrical installation of Konys Tank Farm was designed, Including Transformer stations, MCC, Grounding and Lightning and external lights. Gas Motor Generator installation and connection were designed, as well.

30 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Akshabulak Water Injection Unit Service: Engineering, Commissioning, Construction, Maintenance Year: 2003. Brief Description: The design includes Pump Station consisted of two 3 3 injection pumps: main - BRN1 (136,8 m /h) and spare - 9MGR (64 m /h). Water from water well is pumped by submersible pump through chemical dosing units and filtration units to BRN-1 injection pump. This pump injects water into oil well. This facility was completely designed, procured and constructed by PM Lucas Enterprises Ltd. Management and maintenance services are also provided by PM Lucas Enterprises Ltd. Project name: KAM Fields Development - KAM Pipeline Automation Program Service: Engineering Supp., Commissioning Supp. Year: 2003. AFE amount: Part of the KAM Pipeline Project Brief Description: Automation system on Two Pump Stations was implemented: Main Kumkol Pump Station, Aryskum Pump Station and Tank Farm and Railway Loading Facilities on Dzushaly. DCS system DELTA V was distributed on three locations, with approximate distance between them of 170 km. All Work Stations are connected through redundant fibre optic line. Control, indication, recording and alarming of about 1000 IO points in the field is achieved. It is possible to control KAM Pipeline equipment from each of the three control rooms. Maintenance: it is possible to maintain the complete pipeline system from Kumkol Control Room. Project name: KAM Fields Development - Dzhushaly Rail Loading Block 1 & 2 Service: Engineering Supp., Commissioning Supp., Construction Supp. Year: 2003. AFE amount: Part of the KAM Pipeline Project Brief Description: Composed of all requested railway facilities necessary for safe terminal function, Oil Loading Terminal enables loading of six trains with sixty oil tank cars per day. It means that the terminal is capable to load 21600t of oil per day. Railway oil loading terminal consists of: main line, receiving and dispatching tracks, two shunting tracks, two loading tracks, track for storage defective oil tank cars, tracks for transferring oil from defective oil tank cars to good ones and inspection tracks for repaired cars. Project name: KAM Fields Development - Dzhushaly Oil Rail Loading Terminal Service: Engineering Supp., Commissioning Supp. Year: 2003. AFE amount: Part of the KAM Pipeline Project Brief Description: Dzhusaly Oil Road Loading Terminal accommodates crude oil from Kumkol and KAM oil fields. From four storage tanks, 20000 m3 each, crude oil is pumped to sixty hermetic loading arms (max loading capacity of arms is 90 m3/hour) located on both sides of a loading rack. Loading capacity is 1000 m3/hour. Vapour from rail cars is flared by flaring system. Apart from storage tanks and loading rack, the Terminal is equipped by electrical power source, heating system and sewage treatment plant.

31 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: 12 Oil Collector Extension Service: Engineering, Construction Supp. Year: 2003. AFE amount: $ 250,000 Brief Description: At the distance of 4,5 km upstream of the CPF Inlet, there is a tie in point where the flows from two existing oil collectors (Oil Collector #3 i.e. New Gas Collector flow into Oil Collector #1 i.e. Old Oil Collector) are brought together. Due to evident problems with incremental flow rates and pressures, Oil Collector #3 was extended.

Project name: 10 South Kumkol Oil Collector Service: Engineering, Construction Supp. Year: 2003. AFE amount: $ 250,000 Brief Description: Oil Collector #4 i.e. 10 South Kumkol Oil Collector was designed to release and relieve the existing Oil Collector #1 i.e. Old Oil Collector and to re-direct and gather both flows from South Kumkol Gathering Stations SKGS-01 and SKGS-02 directly to TDE Unit and to the inlet manifold prior to reaching the Kumkol CPF Vessels.

Project name: LPG Bottom Loading Facility at Shymkent Refinery Service: Engineering Year: 2003. AFE amount: $ 400,000 Brief Description: The Project included upgrading of the existing LPG top loading system by providing bottom loading to railway containers. The complexity of the project is aggravated by hazardous conditions and reconstruction of the old Russian-made piping arrangement and its modification to the ANSI standards. After upgrading, the new installation provides non-simultaneous top or bottom LPG loading at the same loading spot. The complete work, from design and equipment purchase to the first loading was completed in four months. Project name: CPF Inlet Manifold Debottlenecking Service: Engineering, Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 400,000 Brief Description: Due to a great pressure drop at the Kumkol CPF incoming inlet collectors, and the resulting vibrations, fluctuations and pumps operating problems, all piping at the CPF inlet was upgraded. The most important attribute for this project is installation of a new piping arrangement in the existing system without closing of the facility.

32 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: KAM Fields Development - Aryskum TOLF - Aryskum Booster 6 Pipeline Service: Engineering, Construction Supp. Year: 2003. AFE amount: $ 650,000 Brief Description: The treated, on-spec, oil from Aryskum TOLF is pumped to the Aryskum Booster Station through 6 buried oil pipeline in the length of 22.5 km. The capacity of pipeline is 4,000 m3/d. At the outlet from the 0 Aryskum TOLF pump station the temperature is 45 C and at the inlet of 0 the Aryskum Booster Station is 20 C. Maximum operating pressure at Aryskum TOLF pump station is 94 bars (Pressure rating is #600). Project name: BAGA Terminal Tank Farm Extension Service: Engineering Year: 2003. AFE amount: $ 1.0 million Brief Description: The design includes conversion of four existing 3,000 m3 diesel and gasoline storage tanks to crude oil service. The conversion required capital expenditures, both on the BAGA terminal and PKOP refinery. Conceptual and detailed engineering of upgraded facility, including piping modifications on the PKOP and BAGA sites, were provided within the Project. The Project resolved heating technology of the crude oil tanks by installing both oil heater and circulation pump, as well as crude oil transportation through 1,500 m long pipeline between the Terminal and Refinery in Shymkent in both directions and flushing of the pipeline by diesel during winter period. Project name: Mini FWKO at GS-24 Service: Engineering, Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 1.5 million

Brief Description: For the purpose of removing the increased quantity of produced water from the Gathering Station 24, a new water separation facility was installed, with a new 100 m3 separator installed between the existing sputnik equipped with spider valve and the existing group separator. Oil and gas return to the existing separator and the produced water is pumped to the water injection facility. The facility is designed to handle 3,500 m3/d of Oil, 8,000 m3/d of Water and 350,000 Sm3/d of gas. Eigenvalue equipment: 100 m3 three phase separator, produced water transfer pumps, 400 produced water break tank, upgraded flare system, chemical injection skid packages, drain vessel, etc. Project name: Mini FWKO at GS-04 Service: Engineering, Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 1.5 million

Brief Description: With the aim to remove the increased quantity of produced water from the Gathering Station 04, a new water separation facility was installed, with a new 100 m3 separator installed between the existing sputnik equipped with spider valve and the existing group separator. Oil and gas return to the existing separator and the produced water is pumped to the water injection facility. The facility is designed to handle 3,500 m3/d of Oil, 5,000 m3/d of Water and 250,000 Sm3/d of gas. Eigenvalue equipment: 100 m3 three phase separator, produced water transfer pumps, 400 produced water break tank, upgraded flare system, chemical injection skid packages, drain vessel, etc.

33 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: KAM Fields Development - Main Kumkol Pump Station Service: Engineering, Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 2.5 million Brief Description: Two centrifugal serial pumps were installed with the capacity of 1260 m3/h at differential pressure from 38 bars. The main task is to enable crude oil shipment from Kumkol Tank Farm to Dzushaly Terminal.

Project name: KAM Fields Development - Kyzylkia CPF to Aryskum TOLF 6 Pipeline Service: Engineering, Construction Supp. Year: 2003. AFE amount: $ 2.5 million Brief Description: The treated oil from Kyzylkia is pumped to the Aryskum TOLF through 6 buried oil pipeline in the length of 28 km. The capacity of pipeline is 2,000 m3/d. At the inlet of the pump station the temperature is 0 0 45 C and at the inlet of the Aryskum TOLF is 20 C. Maximum operation pressure at Kyzylkia pump station is 94 bars (Pressure rating is #600). Project name: South Kumkol Free Water Knock Out Service: Engineering, Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 2.5 million Brief Description: To remove the increased quantity of produced water from the Gathering Stations, a new FWKO facility on the Central Plant Facility (CPF) oil inlet collector was installed. Produced water is pumped to the Water Injection Facility while oil is pumped to the CPF. The facility is designed to handle 6,100 m3/d of Oil, 11,000 m3/d of Water and 13,000 sm3/d of gas. Eigenvalue equipment: 200 m3 three phase separator, crude oil transfer pumps, produced water transfer pumps, 400 produced water break tank, flare system including flare stack, arrestor and flare knock out drum, chemical injection skid packages, drain vessel, etc. Project name: KAM Fields Development - Kumkol 28,000 tones Crude Oil Storage (CPF Tank Farm Expansion) Service: Engineering, Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 3.0 million Brief Description: Kumkol Central Production Facility (CPF) is the main supply source for shipment of crude oil in the new NPS 16 KAM pipeline from Kumkol to Dzhusaly. The Kumkol CPF tank farm consisted at that time of 6 large oil storage tanks feeding the KTO pipeline. All crude oil from these tanks is shipped to Shymkent. New tanks were added to increase oil storage capacity at Kumkol and allow shipment of crude oil in both the KTO and KAM pipelines at the same time without breaking normal daily operations. The main task is to allow crude oil shipments to the KAM pipeline and determine and design facilities necessary for recycling off-spec oil from any of these tanks to the existing onsite process separator (TDE). The initial design flow rate for the KAM pipeline is 900 m3/h. The Facility was designed for a nominal flow rate of 1260 m3/hr.

34 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: KAM Fields Development - Aryskum Booster Pump Station Service:Engineering Supp., Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 3.5 million Brief Description: Two centrifugal serial pumps were installed with the capacity of 1260 m3/h at differential pressure of 48 bars. The main task is to allow crude oil shipment from Aryskum Pump Station to the Dzushaly Terminal. Project name: KAM Fields Development - Aryskum Truck Off Loading Facility Service:Engineering Supp., Commissioning Supp., Construction Supp. Year: 2003. AFE amount: $ 6.0 million Brief Description: Aryskum TOLF is the central process facility for the KAM Oil Field. Oil from Kyzylkia oil field coming through 6 oil pipeline, oil gathered at Aryskum oil field and oil trucked off from all KAM field single wells is processed at this facility. Besides inlet manifold and truck off loading station, the facility includes 100 m3 three phase separator, storage settling 2 x 1,000 m3 oil tanks, flare and drain system, production heaters, glycol system for oil and fire water tank heating. Project name: KAM Fields Development - KAM Main 16 Oil Pipeline (Kumkol - Aryskum Booster Station - Dhuzaly Terminal Pipeline) Service: Engineering Support Year: 2003. AFE amount: $ 80 million Brief Description: The oil from the Kumkol CPF storage tanks is pumped to the Dhuzaly Terminal through 16 buried pipeline, length of 176 km. Capacity of pipeline is 5 - 6,6 million tones per year. Inlet temperature is 0 0 50 C and outlet at Dhuzaly is 19 C. Maximum working pressure at Kumkol and Aryskum pump stations is 63 bars. Pressure at the pipeline end is 2,8 bars. The pipeline is protected by cathode protection stations along the pipeline. Project name: Electrical Submersible Pump Installation Phase 1 & 2 Service: Engineering, Commissioning Supp., Construction Supp. Year: 2002. - 2003. AFE amount: $ 500,000 Brief Description: The Customer, according to the business schedule, planed to apply ESP Artificial Lift System on certain numbers of main production field wells, instead of the existing artificial lift methods (PCP). This substitution is followed by a significant production increase, requiring adequate updated and modified gathering station piping arrangement.

35 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: KAM Fields Development Oil Gatherings Service: Engineering, Commissioning Supp., Construction Supp. Year: 2002. AFE amount: $ 500,000 Brief Description: Crude oil from specific well heads is gathered through the system of flow lines from production wells to the manifolds of the gathering stations or trucked off as done at Aryskum and Maibulakh Oil fields. Design includes installation of line heaters and pigging devices.

Project name: KAM Fields Development - Maibulakh Water injection System Service: Engineering Support Year: 2002. AFE amount: $ 1.7 million Brief Description: Produced water from Kyzylkia CPF is transported by trucks to Maibulakh Water Injection Facility. The facility consists of 40 m3 Off Loading Break Tank, 1,000 m3 produced water storage tank and skid mounted high pressure pump station. The pump station includes booster and high pressure produced water injection pumps (capacity of 3 x 21 m3/h @ 115 bars). Make up water is provided by raw water well and submersible electrical pump. From this pumps station the water is taken by four discharge high pressure produced water flow lines to water injection wells. Project name: KAM Fields Development - Kyzylkia CPF Upgrade for Water and additional Gas Separation Service: Engineering, Commissioning Supp., Construction Supp. Year: 2002. AFE amount: $ 1.5 million Brief Description: Previously designed EOPF facility was upgraded by installing one 43 m3 gas separator and additional 6 flare stack due to the increased GOR. Inlet pig manifold was upgraded to accomodate emulsion incoming from specific oil wells. Eigenvalue equipment: 400 m3 produced water tank with pertaining truck loading facility.

Project name: Mini FWKO at GS-14 Service: Engineering, Commissioning Supp., Construction Supp. Year: 2002. AFE amount: $ 1.5 million Brief Description: With the aim to remove the increased quantity of produced water from the Gathering Station 14, a new water separation facility was installed, with a new 100 m3 separator installed between the existing sputnik, equipped with spider valve, and the existing group separator. Oil and gas return to the existing separator and produced water is pumped to the water injection facility. The facility is designed for maximum oil production of 2,600 m3/d through the facility, 1,750 m3/d of water and 120,00 sm3/d of gas. Eigenvalue equipment: 100 m3 three phase separator, produced water transfer pumps, 400 m3 produced water break tank, upgraded flare system, chemical injection skid packages, drain vessel, etc.

36 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Free Water Knock Out 02 Service: Engineering, Commissioning Supp., Construction Supp. Year: 2002. AFE amount: $ 2.5 million Brief Description: The Facility was designed to handle production flows from the existing gathering stations upstream in most economical and effective way. It was intended to remove as much water as possible from GSs and take the produced water through a pipeline to the existing water injection facility at the Kumkol oil field. As it is installed on the existing oil collector, the oil is pumped back into the downstream section of the collector. The facility was designed to handle 10,000 m3/d of fluid (water and oil) and 8,000 m3/d of water. Produced water is pumped to the Water Injection Facility while oil is pumped to the CPF. Eigenvalue equipment: 200 m3 three phase separator, crude oil transfer pumps, produced water transfer pumps, 1,000 m3 produced water break tank, flare system including flare stack, arrestor and flare knock out drum, chemical injection skid packages, drain vessel, etc.

Project name: Reconstruction of Gathering System at South Kumkol Service: Engineering, Construction Supp. Year: 2001. AFE amount: $ 1.5 million Brief Description: Flow lines were re-routed due to synchronous work of two existing gathering stations at South Kumkol Oil Field. Apart from rerouted flow lines, an 8 oil pipeline was installed, as well. Project name: Kumkol Water Injection System Upgrade Service: Engineering Supp., Commissioning Supp., Construction Supp. Year: 2001. AFE amount: $ 2.0 million Brief Description: According to the previously made study, water injection line to the specific water injection wells or oil wells, converted to the water injection wells was designed and installed. Injection capacity is 23,000 m3/d of produced water. Injection pump station includes one produced and raw water tank, raw water well with pertaining submersible pump, 4+2 booster (223 m3/h @ 3 bar) and 4+5 main injection pumps (137 m3/h @ 120 bars). Project name: Kyzylkia Early Oil Production Facility (EOPF) Service: Engineering, Commissioning Supp., Construction Supp. Year: 2001. AFE amount: $ 2.5 million Brief Description: The Facility for handling 1,200 m3/d of oil was installed; design water cut 25% and GOR 75. The facility consists of eight flow lines, pig manifold, test separation unit, 100 m3 production separator, test heater 0,7 MW, production heater 1,8 MW, oil storage tank 1000 m3, crude oil loading facility 50 m3/h, glycol water heating system, fire suppression system, flare system, draining system, etc.

37 of 39

PM Lucas Enterprises Limited


www.pmlucas.com Project name: Free Water Knock Out 01 Service: Construction Support Year: 2001. AFE amount: $ 2.5 million Brief Description This Facility was designed to handle production flows from the existing gathering stations upstream in most economical and effective way. It was intended to remove as much water as possible from GSs and the produced water to be taken through a pipeline to the existing water injection facility at the Kumkol oil field. As it is installed on the existing oil collector, the oil is pumped back into the downstream section of the collector. The facility was designed to handle 12,500 m3/d of fluid (water and oil) and 7,500 m3/d of water. Produced water is pumped to the Water Injection Facility and oil is pumped to the CPF. Eigenvalue equipment: 200 m3 three phase separator, crude oil transfer pumps, produced water transfer pumps, 3,000 m3 produced water break tank, flare system including flare stack, arrestor and flare knock out drum, chemical injection skid packages, drain vessel, etc.

38 of 39

S-ar putea să vă placă și