PIPING GENERAL ARRANGEMENT DRAWING CHECK LIST

Title Block.
North Arrow Orientation. Matchline Continuation. Line Continuation. Equipment Location To Grid. Equipment Nozzle Details (No., Size & Rating). Pipeline Location To Grid/Equipment. By Piping Or Valves). Structural Penetrations. Locations Of Item. Pipeline Elevations Shown. Dimensional Completion. Valve Orientation. (is enough space provided for:) Electrical And Instrument Cable Trays And Junction Boxes. Erection Of Equipment. Tube Bundles. Maintenance Space (Including Choke And Safety Valves). Equipment Removal. Operating Space. Manway Clearance. Davit Dropping. Overhead Clearance. Future Installation Area. Ducting And H.V.A.C. Equipment. Platforms And Walkways (I.E. Not Blocked By Piping Or Valves) Do Drawing Comply With Piping & Instrument Diagrams And Line List Direction Of Flow And Flow Arrows. Valve And Specialities In Each Line. Instrument Conn's In Lines And Equipment. Steam/Electric Tracing. Insulation. Equipment Numbers And Titles. Completeness Of Lines. Pipeline Numbers. Instrument Tag Numbers. Valve Tag Numbers. Vapour And Gas Lines Without Pockets. No Inverted Pocket In Suction Lines.

CARBON STEEL & STAINLESS STEEL GUIDE SPACING

CARBON STEEL & STAINLESS STEEL GUIDE SPACING PIPE MAXIMUM GUIDE SPACING SIZE (M) VERTICAL HORZINTAL NPS LINES LINES 2" 7.3 6 3" 8.2 12 4" 8.8 12 6" 10.1 12 8" 11.3 18 10" 12.5 18 12" 13.7 18 14" 14.3 18

16" 18" 20" 24"

15.3 16.2 17.1 18.3

24 24 24 24

Notes: 1. The above table is applicable to straight pipe runs 2. In locating guide full consideration must be given to the dangers of local increase in loads and stress within pipe or equipment. Tag: Pipe guide spacing, Pipe guide span, Guide span, guide location, pipe guide consideration

PIPING ISOMETRIC CHECK LIST


PIPING ISOMETRIC CHECK LIST Title block. North arrow orientation. Line continuation - Iso index. Matching isometrics and elevation. Equipment location to grid. Equipment terminal details. Location to grid/equipment. Structural penetrations. Locations of item . Line content. Flow arrow. Pipeline number and elevations. Fabrication type. Dimensional completion. Valve orientation. Fabrication limits. Field weld locations.

Make-up weld locations. Cut to fit dimensions. Spool number sequence. Pipe support locations. Hydrotest requirements. Flushing requirements. Insulation limits. Heat tracing limits. Piping bills of materials completeness. Piping insulation materials completeness. Specials list completeness. Assemblies list completeness. Tagged item list completeness. Fabrication requirements completeness.