SITE NAME:______________________

ACCEPTANCE MEMORANDUM
DESCRIPTION: To be performed by Contractors representative

CONTRACT NO : EQUIPMENT TYPE : SITE NAME : DATE :

REPRESENTANTS: Philko Ubins

WITNESSED BY XXX

TESTED BY XXX

Name:

Name:

Signature:

Signature:

WE DECLARE HERE THAT ALL TESTS IN THIS FORM WERE SUCCESSFULLY COMPLETED. REMARK:
______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________

Engineering and workmanship

T-1.1 Sub rack and Equipment Installation


Objective To check whether the installed equipment meets the installation requirements and standards. Network diagram None. Prerequisites Cabinet/Rack Installed Procedure After installing the device, check the device for the following: 1. 2. 3. 4. The rack chassis is securely fixed. No tools or other irrelevant matters are left in the installation site. The inside of the chassis is clean and no irrelevant matters are left in it. The surface of the rack chassis is clean and well painted. The signs on the surface are correct, clear and complete. The rack should have no dents and scratches. No extra or unauthorized labels are left in the chassis or on the boards. The ports in use are orderly to ease the future expansion Rubber boots are provided to protect unused optical ports. Expected result

.1

The tested items meet Clients installation requirements and standards.

5. 6. 7.

Test Result : Pass

Fail

NA

Remark

XXX Representative Signature :

XXX Representative Signature :

T-1.2 Signal Cables Installation and Grooming


Objective To check whether the installed signal cables of the equipment meets the installation requirements and standards. Network diagram None. Prerequisites Equipment has been installed. Procedure After installing cables, check for the following: Expected result

.1

.1 .2 .3 .4 .5 .6 .7 .8 .9 .10 .11

The practical construction of cable complies with the design. Layout of cables is easy for maintenance and capacity expansion in future. The cables are properly tightened. The signs on the both ends of a cable are clear. The label indicates FROM/TO where the cable is going. Extra cables are placed in order. The cables are arranged in good order and free of crossing. The cables are well bound. The cables are free of obvious damage or break. The cable ends and joints are securely connected. The cable ends made on site are nice and comply with the specification. The cabling location of cables in the rack complies with the specification. Fail NA

The tested items meet installation requirements .

Test Result : Pass

Remark

XXX Representative Signature :

XXX Representative Signature :

T 2Optical Power Measurements


T-2.1 Power Measurements
Objective To test if the Power Output of the FOC is normal and meets the customers Standards. Ensuring that the FOC is in good condition after the installation. Network diagram None. Prerequisites All the FOC cables are properly terminated. Procedure Expected result 1. 2. The measured output from the OTDR meets the clients requirements. The Measured output power from the OPM meets the clients requirements.

.1

Preparing the needed tools/equipment for testing:

.1 .2 .3 .2

OTDR Optical Power Source Optical Power Meter

Connect the OTDR on individual ports considering that the end port is covered with rubber boots. Then, measure the optical connector per port. Connect the Optical Power Source on the opposite end of the Cable and the Optical Power Meter on the other end.

.3

Test Result : Pass Actual Results:

Fail

NA

Remark

XXX Representative Signature :

XXX Representative Signature :

Appendix A:
Optical Power Measurement Result:
Link: Wavelength: *Loss Budget: Node A: Node B:

Slot # Node A

Fiber # Node A

Optical Measured Value, dB

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

THE END