J Pradeep Chytanya Asst. Engineer (Highway Designs) Egis India Consulting Engineers Pvt. Ltd.
Page 1
INTRODUCTION
CORRIDOR: CORRIDOR MANAGEMENT: MANAGEMENT . CORRIDOR PROBLEMS: PHV, VOR, ACCESS &
CONVINIENCE, CURRENT TRENDS, SAFETY, PEAK HOUR SIGNIFICANCE: SIGNIFICANCE INCREASED POPULATION, MISMATCH B/W FUNDING & NEED, A CMP IS A GOOD BACK BONE FOR CTTP OBJECTIVES: IDENTIFY, UNDERSTAND, EVALUATE MANAGE
Page 2
LITERATURE REVIEW
HAND BOOKS OF VARIOUS DOTS HAS BEEN REFERRED AMERIACN, EUROPEAN AND AUSTRALIAN METHODOLOGIES HAVE BEEN THROUGLY REVIEWED & BEST METHODOLOGY FOR INDIAN CONDITIONS WAS DRAWN
Page 3
US DOT METHODOLOGY GETTING ORGANIZED KNOW THE CORRIDOR DEVELOP THE CHOICES SELECT PREFFERED IMPLEMENTATION SUSTAIN THE VISION
EUROPEAN METHODOLOGY IDENTIFY CORRIDOR CONVEY TO PUBLIC REVIEW OF OPTIONS DRAFT CMP PUBLIC REVIEW &COMENTS FINAL CMP
AUSTRALIAN METHODOLOGY GETTING ORGANIZED EXISTING & FUTURE CONDITIONS DEVELOP VISION & STRATEGIES DEVELOP IMPLEMENTATION PLAN DRAFT CMP & PUBLIC ISSUE MONITOR PROGRESS Page 4
Page 5
Page 6
Page 7
AMEERPET - MYTHRIVANAM
Page 8
MYTHRIVANAM SR NAGAR
Page 9
SR NAGAR - ESI
Page 10
ESI - ERRAGADDA
Page 11
ERRAGADDA - KUKATPALLY
Page 12
DATA COLLECTION
INTERSECTIONS = 6 SEGMENTS = 5 CORRIDOR LENGTH = 6.1 Km
SEGMENT LENGTHS
Page 13
PHYSICAL INVENTORY
Page 14
Page 15
Ameerpet Jn to Mythrivanam Mythrivanam to SR Nagar SR Nagar to ESI ESI to Erragadda Erragadda to Kukatpally Y Jn.
11:30 am - 12:30 noon 11:00 am - 12:00 noon 6:00 pm 7:00 pm 4:45 pm 5:45 pm 9:30 am 10:30 am
Page 16
6:45 PM to 7:45 PM 10:15 AM to 11:15AM 10:00 AM to 11:00 AM 10:45 AM to 11:45 AM 7:00 PM to 8:00 PM 7:00 PM to 8:00 PM
16181
12740 8848 6721
Page 17
16182
13105
12741
8848
6721
4853
4845
4602
Srinagar Jn. Ameerpet - Mythrivanam Mythrivanam SR Nagar Jn. SR Nagar Mythrivanam Jn. - SRNagar ESI
ESI Jn
ESI Erradadda
Erragadda Jn.
Erragadda Kukatpally
MYTHRIVANAM - SR NAGAR
OTHERS 0% CARS 20%
BUS 5% TRUCKS 0%
2W 58%
Page 19
ERRAGADDA - KUKATPALLY
OTHERS 1% BUS 3% TRUCKS 1% AUTOS 17% 2W 59% CARS 19%
SRINAGAR JN
OTHERS 0%
CAR 24%
2W 52%
MYTHRIVANAM JN
OTHERS 0% CARS 23%
SR NAGAR JN
OTHERS 1%
TRUCKS 1%
BUS 4%
AUTOS 19%
Page 20
ESI Jn
OTHERS 0%
ERRAGADDA Jn
OTHERS 0%
BUS 2% TRUCKS 0%
CARS 20%
AUTOS 21%
KUKATPALLY "Y" Jn
OTHERS 0% CARS 22% 2W 50%
Page 21
Page 22
Capacity of Single Lane = Capacity * (100/(100 - % of SMV))..(1) Capacity of whole Segment = Capacity of single lane * 2..(2)
Page 23
SPEED FLOW CURVES = 6 LANE DIVIDED DELAY & LOS OF INTERSECTIONS BASED ON HCM 200 Controlled Delay = Stopped Delay +Acc/Dcc Delay3 dad = FVS * Correction Factor ...4 FVS = Fraction of vehicles stopping = Vstop / Vtot ....5
Free-Flow 7 vehicles Speed 60km/h +5 >60-71 km/h +7 >71 km/h +9 8-19 vehicles +2 +4 7 20-30 vehicles +1 +2 +5
Page 24
B D E C C D
Page 25
Ameerpet Jn to Mythrivanam Mythrivanam to SR Nagar SR Nagar to ESI ESI to Erragadda Erragadda to Kukatpally Y Jn.
C D C D C Page 26
Page 27
AMEERPET TO KUKATPALLY
ELEMENT PEAK
13.08
OFF PEAK
8.15
KUKATPALLY TO AMEERPET
ELEMENT PEAK
15.33
OFF PEAK
9.76 9.43 41.53 44.19 20 Page 29
BOTTLENECK ANALYSIS
DATA COLLECTED FLOATING CAR SURVEYS TIME/100m PLOTTED USING MINITAB 15 & D PLOT X AXIS = TIME Y AXIS = DISTANCE Z AXIS = SPEED RESULTS COMPARED
Page 30
Page 31
Page 32
COMPARISION OF BOTTLENECKS
Page 33
OBSERVATIONS
Page 34
SPEED PROFILES
RECORDED DURING FLOATING CAR SURVEYS SPEEDS COMPARED B/W PEAK AND OFF PEAK TIMES
Page 35
AMEERPET - KUKATPALLY
100
80
SPEED (Kmph)
60
50
40
30
20
10
DISTANCE (m)
Page 36
CAUSALITY ANALYSIS
CARRIED OUT DURING SURVEYS PROBLEMS IDENTIFIED MANAGEMENT MEASURES SUGGESTED
Page 37
AMEERPET - MYTHRIVANAM
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES
MYTHRIVANAM JN.
PEDESTRIAN CROSSING
MYTHRIVANAM JN.
Page 38
MYTHRIVANAM SR NAGAR
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES
SR NAGAR JN.
TYRE FLATTENING,
SR NAGAR JN.
DELAY AND QUEUE LENGTH ARE GETTING INCREASED FOR THE MINOR LEG
Page 39
SR NAGAR - ESI
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES
SLOWING DOWN OF SPEEDS BECAUSE IT WAS LOCATED VERY NEXT TO THE NARROWED ROAD AT DARGA.
ESI JN.
TYRE FLATTENING.
Page 40
ESI - ERRAGADDA
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES
FRUIT MARKET
FRUIT MARKET
ERRAGADDA JN.
MEDIAN HAS TO BE RAISED TO SOME HEIGHT SO THAT THE CROSSINGS WILL BE DONE AT THE ESI JN.
Page 41
ERRAGADDA - KUKATPALLY
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES
MOOSAPET
KUKATPALLY Y JN.
BUSES ARE STOPPING ON THE BUS STOP HAS TO BE PASSENGERS REQUEST AT THE JUNCTION RELOCATED AT A DISTANCE OF 250M FROM THE Y JN. INSTALL A SPEED HUMP JUST BEFORE THE INTERSECTION SO AS TO REDUCE THE SPEED OF THE THROUGH TRAFFIC.
Page 42
BULL BOUTS
Page 43
SPEED HUMPS
Page 44
CONCLUSIONS
PEAK HOUR VOLUME IS HIGH AT SR NAGAR Jn & SR NAGAR ESI MID BLOCK DELAY AT SR NAGAR IS HIGH & LESS AT SRINAGAR SR NAGAR ESI HAVE HIGHEST CAPACITY AMEERPET MYTHRIVANAM HAVE LESS CAPACITY KUKATPALLY ERRAGADDA HAVE MORE DELAY ESI SR NAGAR HAVE LESS DELAY 4 BOTTLENECKS IDENTIFIED WITH 2 ON EITHER SIDE
Page 45
OVERALL CORRIDOR PERFORMANCE CAN BE IMPROVED WHEN, PEDESTRAIN CROSSINGS IMPROVED ENCROACHMENTS CLEARED
Page 46
J Pradeep Chytanya