Training Guide

Version 1

RENO 1 Training Guide Part Identification: RRE1S-TG-01 ReliaSoft Corporation Worldwide Headquarters 1450 South Eastside Loop Tucson, Arizona 85710-6703, USA Sales and Information: 1.888.886.0410 ReliaSoft@ReliaSoft.com http://www.ReliaSoft.com 2005-2009 ReliaSoft Corporation, ALL RIGHTS RESERVED. Notice of Rights No part of this document may be reproduced or transmitted, in any form or by any means, for any purpose, without the express written permission of ReliaSoft Corporation, Tucson, AZ, USA. Disclaimer Information in this document is subject to change without notice and does not represent a commitment on the part of ReliaSoft Corporation. Companies, names and data used herein are fictitious unless otherwise noted. Use of the software and this document are subject to the terms and conditions set forth in the accompanying License Agreement. This software and documentation were developed at private expense; no portion was developed with government funds. Trademarks ReliaSoft and RENO are trademarks of ReliaSoft Corporation. Product names and services identified in this document are trademarks of their respective trademark holders, and are used for illustration purposes. Their use in no way conveys endorsement or other affiliation with ReliaSoft Corporation. 10 9 8 7 6 5 4

IMPORTANT NOTE REGARDING REGIONAL SETTINGS


Examples in this document assume that you are using the USA regional settings where the decimal point is a period (.) and the list separator is a comma (,). RENO is regionally aware (i.e. it will work with your regional settings). Therefore, if your regional settings use a different decimal definition and list separator, the way that you enter values and functions will differ from the way presented in this manual. To reproduce the examples in this document, you must adjust the inputs accordingly. For example, under USA regional settings, the function f(10.3,2.7) is some function of f with two function arguments of 10.3 and 2.7. If you are using German regional settings, this function should be entered based on the German regional decimal definition (,) and list separator (;). That is, the function would be f(10,3;2,7).

Introduction

1.1 About this Training Guide


This training guide is intended to provide you with many examples to demonstrate the use of RENO. It begins with step-by-step examples and then proceeds into more advanced examples. At any time during the training, please feel free to ask the instructor(s) any questions you might have. The examples in this training guide are presented in files that have been shipped with the RENO application. These files are located in subfolders in the Examples folder in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples). The Examples folder is also accessible by clicking the Open Examples Folder... link in the What do you want to do? window or by selecting Open Examples Folder... from the Help menu. Each file contains the complete solution to the problem presented in the example. Note that the examples included in this guide are not necessarily the most efficient way of accomplishing the underlying task using RENO. Rather, they are designed to demonstrate how to use various features of RENO.

1.2 RENO Documentation


Like all of ReliaSoft's standard software products, RENO is shipped with detailed printed documentation on the product (RENO User's Guide). This training guide is intended to be a supplement to that reference.

1.3 Contacting ReliaSoft


ReliaSoft can be reached at: ReliaSoft Corporation Worldwide Headquarters 1450 South Eastside Loop Tucson, AZ 85710-6703 USA Phone: +1.520.886.0366 Fax: +1.520.886.0399 E-mail: Support@ReliaSoft.com For up-to-date product information, visit our Web site at: http://RENO.ReliaSoft.com

RENO Training Guide

Features Summary

The examples in this training guide have been designed to introduce you to the features available in RENO. This section presents a brief summary of these features. If you are already familiar with RENOs capabilities, you can proceed to Chapter 4, First Steps. You can think of RENO as a graphical stochastic event simulation tool. It is a powerful and flexible platform for visualizing and dynamically simulating nearly any kind of physical, financial or organizational system. Using the familiar flowcharting concept, you can build systems and/or scenarios and then have the software execute the model via simulation. You may also think of RENO as a visual spreadsheet that allows you to graphically create and manipulate data and equations, but with greater flexibility due to its ability to evaluate systems and scenarios that evolve over time.

2.1 Easy to Build Flowchart Models


With RENO, you will use the familiar and intuitive flowcharting concept to build models for the scenarios that you are trying to understand and/or quantify via simulation. The software provides a full array of building blocks for these Flowcharts (called Constructs) to serve different functions within the model. For example, Conditional Blocks allow you to define If/Then statements that trigger one response if the condition is met (TRUE) and another if it is not (FALSE). You can also define various types of global variables (called Definitions) that are available throughout the project. For example, Random Variables provide values based on a specified statistical distribution. You will employ simple point-and-click and drag-and-drop techniques to use these components to build simple or complex Flowchart models.

2.2 Flexible Interface to Organize the Analysis


RENOs flexible user interface makes it easy to enter and manage the information required to perform analyses. Using the intuitive, hierarchical "Project Explorer" approach that was introduced in ReliaSoft's BlockSim software, RENO makes it easy for you to manage one or many Flowchart models together with the Definitions and Constructs used to build them. The optional Template feature allows you to pre-define Constructs that can be used in multiple Flowcharts to save time and ensure consistency. Your projects can also include Excel-compatible spreadsheets for your own custom analyses. These spreadsheets provide complete in-cell formula support, over 140 built-in functions and a wizard to help you build your own custom graphical charts. In addition, the Attachments feature makes it easy to keep supporting documentation and other related files together with the analysis.

2.3 Item Properties Table to View/Edit Project Information in a Spreadsheet


The Item Properties Table allows you to view and edit the data in your project in an Excel-compatible spreadsheet format. This makes it easy to quickly update analysis properties without having to open and save each record individually. It also allows you to export or copy/paste this information to use in reports or your own custom analyses.

RENO Training Guide

2 Features Summary

2.4 Definitions Report to Manage Analysis Components


The Definitions Report provides a summary of the global variables that have been defined in your project. This report identifies the Flowcharts and other Definitions that reference each defined variable. The utility can also automatically remove unused Definitions from your project with the click of a button.

2.5 Intelligent Features to Help You Build Equations


All equation-enabled windows in RENO provide intelligent features to help you save time and avoid errors when building equations. These include:

Auto-Complete/Intelli-Sense: When you press Ctrl+Space while building an equation, RENO provides a list of recognized variables and functions. Color-Coding: As you type, RENO automatically color-codes recognized variables, functions and operands to make it easy for you to spot typing errors, undefined variables, unmatched parentheses, etc. Variable Preview: RENO provides a summary of the properties of each Definition that you use in your equations and allows you to view/edit the Definitions properties with the click of a button.

2.6 Integration with Weibull++ and ALTA


If ReliaSofts Weibull++ and/or ALTA software are installed on your computer, you can use them to define the distribution and parameters for Probabilities and Random Variables based on the distributional analysis for existing data sets. The Parameter Experimenter is also available.

2.7 More Than 100 Reserved Keywords and Built-In Functions


The integrated Function Wizard provides instant access to the reserved keywords, Definitions and built-in functions that you will use in the equations for your analyses. This includes:

Definitions: A list of the Constants, Tables, Storage Variables, Equation Variables, Functions, Probabilities and Random Variables defined in the project. Reserved Keywords: A list of keywords that instruct the software to insert specific information into the equation, such as the value passed from the previous Flowchart Construct (IN), the total number of simulations performed (SIMS_TOTAL), the maximum value in a table (MAX_TABLE), etc. Pre-Defined Functions: A list of built-in functions supported by the software. This includes:

Engineering functions such as Bessel, Error functions, etc. Math and Trigonometry functions such as Sine, Derivative, Integral, Logarithm, etc. Financial functions such as Future Value, Cumulative Interest Paid, Periodic Payment for an Annuity, etc. Statistical functions such as the Weibull distribution, the Fisher Transformation, the Chi-Squared distribution, etc. Logical functions such as IF statements and TRUE/FALSE statements.

2.8 Debugger Utility to Step Through Flowchart Simulations


RENO includes an integrated utility to help you validate and debug your Flowchart models. This feature allows you to move through each step in the simulation of a Flowchart and watch the values as each Construct is executed. You can also watch the progress as the software automatically performs a specified number of simulations in debug mode.

http://RENO.ReliaSoft.com

2.9 Flexible Array of Simulation Results with Multiple Display Options

2.9 Flexible Array of Simulation Results with Multiple Display Options


RENOs simulation engine can generate a wide variety of results for your analyses, including averages, sums, arrays, minimum values, maximum values, etc. Simply construct the Flowchart model to generate the metrics of interest to you and then perform the simulation. This information is presented by the software in a variety of ways, including:

During the simulation: You can configure the Simulation Console to display a specific variable of interest while the simulation is running and watch the variation as the simulation progresses. In the Simulation Results Explorer: The Simulation Results Explorer displays the full results of the simulation in Excel-compatible spreadsheets that present the data in an organized fashion and make it easy to copy/paste or export results of interest to your reports or customized analyses. In the Flowchart: After a Flowchart has been simulated, the final values for all Result Storage Constructs will be displayed directly within the chart. You also have the option to show the last values for other Constructs, if desired. In the Plot Sheet: RENOs integrated Plot Sheet provides a graphical display of your simulation results with the click of a button. You can choose to display the data for any Result Storage Construct in the Flowchart and control other display options, such as scaling, fonts, colors, etc. The utility provides both 2-dimensional and 3-dimensional plots to present analysis results in the most effective way to support decision-making. You can export plots as Windows metafile graphics that can be inserted into other documents and/or use the RS Draw metafile editor to annotate and customize the plot graphics.

2.10 Sensitivity Analysis to Vary Constants Across Simulation Runs


RENOs Sensitivity Analysis feature allows you to vary one or two constants across simulation runs. For example, if you are analyzing potential investment strategies, you may wish to vary the number of years that you will be investing and/or the percentage of your income that will be invested to see how different inputs will affect the final results. Likewise, you may wish to generate reliability or availability results for a range of times in order to examine the equipments behavior over time. Potential applications are limited only by your imagination! Simply enter the starting, ending and increment values for the variable constant(s) and then RENO automatically performs the specified number of simulations under each set of conditions.

2.11 Perform Multiple Runs to Automatically Estimate Optimum Values


The Multiple Runs feature takes the sensitivity analysis capability a step further by allowing you to configure the software to automatically vary the specified constant(s) in order to determine the value that minimizes or maximizes a specified result. For example, you could use this feature to automatically determine the optimum amount of inventory to maximize profits or the optimum preventive maintenance (PM) interval to minimize costs. The results of each analysis can be displayed in the Plot Sheet, with the optimum value marked on the plot.

RENO Training Guide

Basics

This chapter briefly covers the Definitions and Constructs used to build Flowcharts in RENO and the terminology used for simulation. For complete information on the properties and use of Definitions and Constructs and on simulation, please consult the RENO Users Guide.

3.1 Definitions
Definitions are global objects that can be called upon by any Flowchart within the project. They cannot, however, be placed directly into Flowcharts; instead, they are called by Constructs, which are placed into Flowcharts as blocks. Constructs are presented in detail in Section 3.2. Definitions serve to store or generate values used in Flowcharts. While the values of some Definitions may change during the simulation process, once simulation has been completed, each Definition contains only the original values that you entered in its properties window. If you wish to keep the value(s) of the Definition used during simulation, you must use a Result Storage Block to store the value(s). There are seven types of Definitions. A brief description of each is given next. The properties of each Definition can be specified in the properties window that appears when a new Definition is created, or you can access the properties window at any time by double-clicking the Definition. In addition, the properties of a Definition are displayed at the bottom of the Project Explorer when the Definition is selected. Each type of Definition has an identifier, or name. All identifiers must meet the following requirements.

Must be unique within the project. Must be text; cannot be a number or anything that evaluates to a number, such as Pi or reserved keywords. Cannot contain spaces or any of the following characters:

\ / : * ? < > | ~ ! @ # $ % ^ & ( ) ;

3.1.1 Constants
A Constant stores a fixed numerical value that can be reused. Constants cannot be changed during each simulation, but can be varied across runs based on your selections on the Sensitivity Analysis page of the Simulation Console. After simulation, the Constant returns to its original value. The values of the Constant used during simulation are available in the Simulation Results Explorer.

RENO Training Guide

3 Basics

3.1.2 Tables
A Table stores an array of values in rows and columns. Tables can have up to 64,000 rows and 256 columns. The data in a Table are available for both read and write during simulation by using reserved keywords. After simulation, the Table will contain its original data. If you wish to keep the values stored in the Table during simulation, you must use a Result Storage Block to store them.

3.1.3 Storage Variables


A Storage Variable stores a numerical value that is available for both read and write during simulation. After simulation, the Storage Variable returns to its original value. If you wish to keep the value(s) stored in the Storage Variable during simulation, you must use a Result Storage Block to store the value(s).

3.1.4 Equation Variables


An Equation Variable stores a string expression to be evaluated. The expression can include numerical values, standard operands (+, -, *, / ), intrinsic functions (exp, log, sin, etc.), certain reserved keywords,

http://RENO.ReliaSoft.com

3.1 Definitions

references to any other Definition(s) except for Functions and references to any Spreadsheets that are named in accordance with the naming conventions for Definitions.

Note that you must enter all required inputs for each part of the equation. For instance, a reference to a Table requires inputs for the column name/number and the row number. Table1(1,2) is a reference to the cell in the first column and second row of the Definition called Table1. References to Spreadsheets require inputs for the sheet number, column name/number and row number. Some reserved keywords also require inputs.

3.1.5 Functions
A Function stores a string expression to be evaluated. Functions are identical to Equation Variables except that a Function can contain arguments that are passed to it during simulation. For instance, the Function shown here finds the sum of the arguments X1, X2 and X3. An equation of the form Function1(1,2,3) would return 6.

RENO Training Guide

3 Basics

3.1.6 Probabilities
A Probability returns the probability that a random variable is observed by x. In other words, given x, the Probability returns F(x), where F(x) is the cumulative density function of the specified distribution. The returned probability will always be between 0 and 1.

3.1.7 Random Variables


A Random Variable is essentially the opposite of a Probability. Given F(x) (the probability), the Random Variable returns x, based on a probability distribution.

3.2 Constructs
RENOs Constructs are the building blocks with which you will create Flowcharts. Each Construct is represented by a block in the Flowchart and performs a step in the model. You can customize the appearance of each block to enhance the presentation of your Flowcharts. Note that the terms Construct and block are used interchangeably in this guide. In order to provide the flexibility required to create Flowcharts that model scenarios as realistically as possible, there are twelve different types of Constructs. A brief description of each is given next. The properties of each Construct can be specified in the properties window that appears when a new block is created or you can access the properties window at any time by double-clicking the block. In addition, the properties of a Construct are displayed in the Flowchart Information area when the block is selected.

10

http://RENO.ReliaSoft.com

3.2 Constructs

3.2.1 Standard Blocks


A Standard Block evaluates to a numerical value, based on the equation used in its Evaluates to input box. The expression can include numerical values, standard operands (+, -, *, / ), intrinsic functions (exp, log, sin, etc.), certain reserved keywords, references to Definitions and references to any Spreadsheets that are named in accordance with the naming conventions for Definitions. A Standard Block may accept up to one incoming path, and may have multiple outgoing paths. The properties window for a Standard Block has three tabs or pages. Note that these pages also apply to Subchart Blocks. 3.2.1.1 Item Page The Item page gives general characteristics of the block, including the equation used to evaluate the block.

Note that you must enter all required inputs for each part of the equation. For instance, a reference to a Table requires inputs for the column name/number and the row number. Table1(1,2) is a reference to the cell in the first column and second row of the Definition called Table1. References to Spreadsheets require inputs for the sheet number, column name/number and row number. Some reserved keywords also require inputs.

RENO Training Guide

11

3 Basics

3.2.1.2 Subchart Page The Subchart page is used to specify whether the block is a Standard Block or a Subchart Block. Subchart blocks are presented in detail in Section 3.2.12.

3.2.1.3 Attachments Page The Attachment page displays the attachments, if any, associated with the block. You can add, open or delete attachments here.

12

http://RENO.ReliaSoft.com

3.2 Constructs

3.2.2 Result Storage Blocks


A Result Storage Block stores numerical values passed to it during simulation. It will accept any number of incoming paths, and can have any number of outgoing paths. It can hold a single value or an array of values. If called during simulation, it will return the last value it holds.

The Required Number of Executed Paths field allows the simulation to continue when not all the incoming paths should/will be executed. The Required Number of Executed Paths field is presented in detail in Section 3.2.13.

3.2.3 Conditional Blocks


A Conditional Block functions as an "If" statement. That is, it checks the incoming value against a specified value or a Definition (except for a Function or Table) that evaluates to a numerical value. Possible outcomes are TRUE and FALSE. It accepts one incoming path and has up to two outgoing paths. The value(s) passed down the outgoing path(s) may consist of a numerical value, a Definition or a reserved keyword. A Conditional Block cannot be the final block in a Flowchart.

RENO Training Guide

13

3 Basics

If Continue execution on both paths is checked, execution will continue on both paths regardless of the conditional outcome. If this option is not checked, execution will continue only on the path corresponding to the conditional outcome.

3.2.4 Logic Gates


A Logic Gate accepts multiple incoming paths and has up to two outgoing paths. It checks incoming values against a specified value or a Definition (except for a Function or Table) that evaluates to a numerical value. Possible outcomes are TRUE and FALSE. The value(s) passed down the outgoing path(s) may consist of a numerical value, a Definition or a reserved keyword. A Logic Gate cannot be the final block in a Flowchart.

Gate Type dictates the conditions under which a TRUE or FALSE outcome will be returned. Possible types are:

AND: the condition is TRUE for all incoming paths. OR: the condition is TRUE for at least one incoming path. XOR: the condition is TRUE for exactly one incoming path. K-out-of-N: the condition is TRUE for at least K out of N incoming paths; K must be specified in the input box below.

If Continue execution on both paths is checked, execution will continue on both paths regardless of the conditional outcome (i.e. whether the conditions of the gate type are met). If this option is not checked, execution will continue only on the path corresponding to the conditional outcome.

14

http://RENO.ReliaSoft.com

3.2 Constructs

The Required Number of Executed Paths field allows the simulation to continue when not all the incoming paths should/will be executed. The Required Number of Executed Paths field is presented in detail in Section 3.2.13.

3.2.5 Branch Gates


A Branch Gate accepts one incoming path and has multiple outgoing paths. It checks an incoming value against a different condition for each outgoing path. The value(s) passed down the outgoing path(s) may consist of a numerical value, a Definition or a reserved keyword. A Branch Gate cannot be the final block in a Flowchart.

Each path is identified by the name of the next block in the path. If Check condition on every branch is selected, the incoming value will be checked against every outgoing branch. Execution continues down every path that evaluates to TRUE. If Continue execution on FALSE branch is checked below, execution continues down every path, with the value that is passed down the path determined by the conditional outcome. If Check condition until first branch is TRUE is selected, the incoming value will be checked against each branch sequentially, based on the order displayed, and continues only through the first TRUE branch. Execution will also continue on any branch for which Continue execution on FALSE branch is checked below, passing the Condition is FALSE value. You can use the arrows that appear when Check condition until first branch is TRUE is selected to change the order in which the paths are evaluated.

RENO Training Guide

15

3 Basics

3.2.6 Summing Gates


A Summing Gate can have multiple incoming paths and multiple outgoing paths. It performs a specified operation (addition, subtraction, multiplication or division) on all incoming values and returns a single value on all outgoing paths.

The order in which the incoming paths will be handled is managed in the Precedence field. The Required Number of Executed Paths field allows the simulation to continue when not all the incoming paths have been executed. The Required Number of Executed Paths field is presented in detail in Section 3.2.13.

3.2.7 Flag Markers


A Flag Marker marks a spot in the path of the Flowchart. It may have multiple paths in and out. This Construct is mainly intended to be used in conjunction with the Go to Flag Construct. A Go to Flag calls, or sets the simulation point to, a Flag Marker within the same Flowchart.

16

http://RENO.ReliaSoft.com

3.2 Constructs

3.2.8 Go to Flags
A Go to Flag sets the current simulation point to a named Flag Marker within the same Flowchart, thus allowing for loops inside the Flowchart. Note that it is up to you to avoid configurations that would create infinite loops and other unresolved issues, as RENO cannot check this for you. Since Construct names do not have to be unique, it is also up to you to avoid ambiguity in which Flag Marker the Go to Flag points to.

3.2.9 Counter Blocks


A Counter Block records the number of times the simulation has passed through it.

Three types of Counter Blocks are available:


Global Counter if selected, the counter is never reset. Simulation Counter if selected, the counter is reset after each simulation (i.e. after each single pass through the Flowchart). Run Counter if selected, the counter is reset after each run (i.e. after the specified number of simulations have been completed).

The Required Number of Executed Paths field allows the simulation to continue when not all the incoming paths should/will be executed. The Required Number of Executed Paths field is presented in detail in Section 3.2.13.

RENO Training Guide

17

3 Basics

3.2.10 Reset Blocks


Each time the Flowchart is simulated, RENO generates new values for any Random Variables and/or Probabilities in the project. While simulation is in progress, these values are constant. A Reset Block forces RENO to generate new values for Random Variables and Probabilities while simulation is in progress. Any other Definitions that are dependent on these values are also recalculated.

3.2.11 Stop Flags


A Stop Flag halts the simulation process when it is encountered. No further simulations, runs or analyses will be performed until you next simulate the Flowchart.

3.2.12 Subchart Blocks


A Subchart Block represents, in one block, the contents of a Flowchart. When inserting a Subchart Block, you must specify the Flowchart to which it refers. Circular references are not permitted (i.e. a Subchart Block cannot refer to the Flowchart in which it is placed). Subchart blocks are identical to Standard Blocks except for the fact that they represent the contents of a Flowchart rather than an expression to be evaluated.

18

http://RENO.ReliaSoft.com

3.2 Constructs

The first page of the properties window for a Subchart Block differs from that of a Standard Block, as shown next.

Note that any Flowchart used as a subchart must have a single starting point and a single ending point.

3.2.13 Required Number of Executed Paths


During a simulation, some paths may not be executed (e.g. a FALSE path following a Conditional Block when the condition has evaluated to TRUE). Entering the required number of executed paths allows the simulation to continue when not all of the incoming paths have been executed. As soon as the required number of paths have been executed, the outgoing paths will be executed and the memory of the Construct will be erased. An event will not be triggered again until the required number of executed paths is met again. In the example shown next, the Summing Gate will send the result of A+B+C+D to all its outgoing paths once A, B, C and D have been executed.

If the user had specified 2 as the required number of executed paths and A, B, C and D were executed in that order, the Summing Gate would send results to its outgoing paths twice: once with a value of A+B and once with a value of C+D. If there were only 3 incoming paths executed (A, B and C in that order) and the user had specified 2 as the required number of executed paths, the Summing Gate would send the result of A+B to its outgoing paths and would ignore C.

RENO Training Guide

19

3 Basics

This field is used by Result Storage Blocks, Logic Gates, Summing Gates and Counter Blocks.

3.3 Simulation Terminology


RENOs simulation process can involve several levels. The terminology for each level is as follows.

A simulation is a single pass through the Flowchart. Note that this may pass through blocks multiple times if your Flowchart includes one or more loops. A run is a set of simulations. The number of simulations in each run is set on the General page of the Simulation Console. An analysis is a set of runs. The number of runs in each analysis is determined by the settings on the Sensitivity Analysis page of the Simulation Console.

You can also choose to perform multiple analyses, using the settings on the Multiple Analyses page of the Simulation Console.

20

http://RENO.ReliaSoft.com

First Steps

In addition to information on starting RENO and a brief overview of the software's main interface, this section guides you through all of the steps involved in creating Flowchart models and obtaining results through simulation. Working through this example will help you to become familiar with the software quickly and easily.

4.1 Starting RENO


RENO is a 32-bit application that has been designed to work with Windows NT, 2000 and XP. The RENO internal screens and commands are identical regardless of which operating system you are using, and this training guide is equally applicable. To start RENO, from Start select Programs, ReliaSoft Office and then RENO.

4.2 Multiple Document Interface


Every time you begin a new session in RENO, the first window you will encounter is the Multiple Document Interface (MDI). The MDI is the manager for RENO. It contains the windows you use to create your project in RENO. The next figure displays the MDI of RENO and its components, which are explained

RENO Training Guide

21

4 First Steps

in detail next. The appearance of the MDI will vary depending on the window(s) that are currently open and the configuration of the Project Explorer and Template Panel.

The status bar in the MDI may not be visible the first time the application is opened. To make the status bar visible, go to the View menu and select Status Bar. The status bar will be located at the bottom of the MDI and displays the number of Flowcharts within the project, the name of the currently active window, the path and filename of the project and the amount of memory available on your computer. The MDI serves as the container for all Flowcharts, Spreadsheets, Attachments, the Template Panel and the Project Explorer and manages the different active windows. The MDI remains open until you close the program. Closing the MDI has the same effect as terminating the program.

4.3 Getting Help in the RENO Environment


ReliaSoft's RENO includes complete on-line help documentation. This help can be obtained at any time by pressing F1 or by selecting Contents from the Help menu.

4.4 A Note About Repeatability of Results Under Simulation


As you may be aware, results obtained through repeated simulations of the same model will exhibit some variability. The use of a seed in simulation forces the software to use the same sequence of random numbers in each simulation, resulting in repeatability. However, you need to be aware that when you use a seed, the same stream of random numbers is utilized, but the order of the utilizations of the stream may differ depending on the way the model was constructed. Two people constructing the same model in separate systems may add Constructs or create Definitions in a different sequence. In other words, two people may have the same Random Variables, A and B, defined in a project. If in one project A was created before B, A will take the first random value from the stream and B will take the second. If the other person (in the other project) defined the same model but created B before A, B will take the first random value from the stream and A will take the second, thus yielding slightly different answers, even though both persons may have used the same seed in simulation. Because of this, the results you obtain for the examples in this training guide may differ slightly from the results presented in the text. The illustrations and results in this guide are taken from the example files

22

http://RENO.ReliaSoft.com

4.5 First Steps Example

included with the application; a seed is used in these files for internal repeatability. You will not need to use a seed for your simulations.

4.5 First Steps Example


This example is presented in the RENO file Hinge Assembly.rnp located in the General subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\General). A hinge is made up of four components, A, B, C and D.

During manufacturing, each part has some variability in its dimensions. Assume that the dimensions (widths) of the parts are distributed as follows: A - Normal distribution with mean = 2 and std = .02 B - Normal distribution with mean = 2 and std = .02 C - Normal distribution with mean = 30 and std = .2 D - Normal distribution with mean = 34.5 and std = .5 Determine the number of items that will not fit within D, or the expected times that (A+B+C) will be greater than D. The following general flowchart shows one way that this problem could be solved using simulation.
Draw Random Values for A , B, C and D Compute A+B+C

NO

Repeat for N Simulations

Is A+B+C>D

Yes

Count= C ount +1

RENO Training Guide

23

4 First Steps

The steps necessary to solve this problem in RENO are presented in the sections that follow. At this time, we assume that you have started the application.

4.5.1 Create a New Project

To create a project, click Create a New Project in the What do you want to do? window that may appear at startup, select New Project from the File menu or click the New Project icon in the MDI toolbar.

The New Project Wizard will be displayed. On the first page, select Blank Project to create a new project from scratch, then click Next. On the second page, select A new blank Flowchart. You will not need a template for this example. Click Next. On the third page, click Finish to create the project. The MDI will look like the one shown next.

4.5.2 Define the Random Variables


First, you will need to create Random Variables, A, B, C and D, each of which will generate a value in the range specified by the distribution for each part.

24

http://RENO.ReliaSoft.com

4.5 First Steps Example

To add a new Random Variable, select Add New Definition then Add Random Variable from the Project menu. The properties window for the new Random Variable will appear, as shown next.

Change the Identifier to A, then select Normal from the Distribution drop-down menu. Input the parameters: 2 for Mean and .02 for Std, as given in the background information for the example. The properties window will look like the one shown next.

Click Save & New to save the current Random Variable and leave the window open to create a new one. Repeat this process to define the Random Variables B, C and D. When you have entered the information for Random Variable D, click OK to save the variable and close the window.

Defining these four Random Variables is equivalent to the first requirement in the general flowchart.

4.5.3 Create the Flowchart


The next step is to create a model of the problem. The RENO Flowchart is as follows:

It includes three steps executed sequentially from left to right (based on the direction of the arrows).

RENO Training Guide

25

4 First Steps

4.5.3.1 Use a Standard Block to Compute A+B+C To add a Standard Block to the Flowchart, click in the Flowchart window to make it active. Select Add Block from the Flowchart menu or click the Add New Block icon in the Flowchart Constructs toolbar.

Double-click the new block that appears in the Flowchart to open its properties window. Enter Compute A+B+C for the blocks name and (A+B+C) in the Evaluates to field. The properties window will look like the one shown next.

This block adds the values of A, B and C and passes the sum along its outgoing path.

Click OK. The blocks new name will appear below it in the Flowchart.

4.5.3.2 Use a Conditional Block to See if A+B+C Is Greater than D Add a Conditional Block to the Flowchart by selecting Add Block then Add Conditional Block from the Flowchart menu or by clicking the Add Conditional Block icon.

Double-click the new Conditional Block. In the properties window that appears, enter >D for the blocks name. Select > from the drop-down menu in the Condition field, then enter D in the field directly to the right of the conditional operator. This is the value against which the input will be checked.

26

http://RENO.ReliaSoft.com

4.5 First Steps Example

Enter 1 in the Condition is TRUE field. The properties window will look like the one shown next.

The input from the Standard Block (i.e. the sum of A+B+C) is passed to the Conditional, which checks it against the value of D. If the condition is met (i.e. the value of A+B+C is greater than the value of D), then the Conditional Block evaluates to True and it continues execution by passing 1 to the next Construct (as defined by the Condition is TRUE input). Note that there is no requirement to include a FALSE path. If a path is omitted, RENO will realize that there are no paths to continue down and thus terminate the current simulation.

Click OK.

4.5.3.3 Use Result Storage Block to Count the Number of Times that A+B+C > D Add a Result Storage Block to the Flowchart by selecting Add Block then Add Result Storage from the Flowchart menu or by clicking the Add Result Storage icon.

In the properties window for the Result Storage Block, enter No Fit for the name and select Sum of Results from the list of storage types. The properties window will look like the one shown next.

RENO Training Guide

27

4 First Steps

A Result Storage Block stores values passed to it across different simulations. In this case, the block will hold a sum of all the values passed to it; thus, at the end of N simulations, it will hold the number of times that the Conditional Block was true (i.e. the number of times A+B+C was greater than D).

Click OK. The Flowchart will now look like the one shown next.

4.5.3.4 Join the Blocks to Complete the Flowchart The final step in creating the Flowchart is joining the blocks to dictate the order in which information is passed between them.

To create a relationship line between blocks, you can hold down the Alt key, select Join Blocks from the Flowchart menu or click the Join Blocks icon.

The cursor will change to display a small cross hair. Click the Standard Block, hold down the left mouse button and drag a line to the Conditional Block. When the cross hair is located above the Conditional Block, release the mouse button to create a relationship line. Repeat this procedure to create a relationship line between the Conditional Block and the Result Storage Block. Note that this relationship is automatically labeled T. By default, RENO designates the first outgoing path drawn from a Conditional Block or Logic Gate as the TRUE path and the second outgoing path as the FALSE path. You can change these designations by double-clicking the relationship line, if desired. For this example, keep this path designated as the TRUE path.

28

http://RENO.ReliaSoft.com

4.5 First Steps Example

To stop adding relationships in the Flowchart and return the cursor to its normal mode, release the Alt key, right-click the Flowchart background or de-select the Join Blocks option. The Flowchart will look like the one shown next.

Note that it is not necessary to create a loop (i.e. an instruction to repeat the steps for N simulations) as shown in the general Flowchart, since RENO is designed to run multiple simulations of a Flowchart.

4.5.4 Simulate the Flowchart


Once the Flowchart has been created, you then instruct RENO to run a specified number of simulations. After simulation, you can view the results stored in any Result Storage Block.

To open the Simulation Console, select Simulate from the Tools menu or click the Simulate icon.

The Simulation Console will open, as shown next.

RENO Training Guide

29

4 First Steps

Enter 1000 for the Number of Simulations and click Simulate to run the simulations. The Simulation Status Display will appear, showing the progress as each simulation is performed. When simulation is complete, the Simulation Console will look like the one shown next.

Note that the current value of the Result Storage Block, No Fit, is displayed in the Display Variable Status area at the top of the window. Click Close to return to the Flowchart and note that the value is also displayed above the Result Storage Block, as shown next.

A+B+C exceeded D in 162 out of 1000 simulations, or 16.2% of the time. In this case, the answer is given not as a percentage but rather as a count. A minor modification to the Flowchart can create a model that returns results as a percentage, as described next.

4.5.5 Normalize the Results


One way to cause results to be returned as a percentage is to add an additional Standard Block to normalize the results. Rather than adding 1 to the Result Storage Block every time the condition is true, this block will allow us to add (1/(Number of Simulations))*100. This will produce results as a percentage based on all of the simulations.

30

http://RENO.ReliaSoft.com

4.5 First Steps Example

Add another Standard Block to the Flowchart and define it as follows:

This involves the use of two reserved keywords, IN and SIMS_TOTAL. IN represents the value passed to the block and SIMS_TOTAL evaluates to the total number of simulations that we are running.1 You can enter the equation manually or click the Function Wizard icon or the Build Equation link to use the Function Wizard to create the equation. You can also press Ctrl+Space to bring up a menu of Definitions and available keywords for use in the equation. Note that recognized Definitions and keywords are automatically color coded to assist in reading the equation.

In the Flowchart, select the relationship line between the Conditional Block and the Result Storage Block by clicking it. You can then delete the line by selecting Delete from the Edit menu or clicking the Delete icon.

Note that you can click and drag the relationship line to a new destination instead, if you prefer (i.e. click the relationship line and drag it to the Normalize block so that it connects the Conditional Block and the Standard Block).

1.

A complete list of reserved keywords is available in Chapter 4 of the RENO Users Guide.

RENO Training Guide

31

4 First Steps

Connect the blocks in the Flowchart as shown next, using the Join Blocks function described in Section 4.5.3.4.

Simulate the Flowchart again, using the settings specified previously. When simulation is complete, the Flowchart will look like the one shown next.

The Result Storage Block now displays the value as a percentage.

4.5.6 Save and Close the Project

If you are using a fully functional copy of the software (i.e. not a demonstration version), save the analysis. To do this, click the Save icon

32

http://RENO.ReliaSoft.com

4.5 First Steps Example

or select Save from the File menu. The Save As window will appear. Type Hinge Assembly as the file name and accept the default file type, RENO Project file (*.rnp). By default, RENO will save the file to your My Documents folder; you can select another location if you prefer.2

Click Save to save the file. Close the project by selecting Close from the File menu. You will now be looking at the MDI with no projects open.

Note that this example is based on the RENO file Hinge Assembly.rnp located in the General subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\General). If you are working with a demonstration version of the RENO software, you will not be able to save the file you created for this example, but you can view the file shipped with the application if you wish to refer to this example in the future.

2.

For the examples in this training guide, we have created a Files folder in the application directory.

RENO Training Guide

33

Step-by-Step Examples

This chapter provides the following step-by-step examples, designed to introduce you to the features of the RENO software:

Example 1 - Estimating Dice Roll Probabilities - page 35 Example 2 - Risk Analysis: Gym Lockers - page 41 Example 3 - Maximizing Profits: The Newspaper Boy Problem - page 49 Example 4 - Maximizing Profits: Airline Seat Allocation - page 55 Example 5 - Minimizing Costs: Preventive Maintenance - page 63 Example 6 - Reliability: Snow Blower - page 70 Example 7 - Simple Reliability and Availability Metrics - page 76 Example 8 - Stress-Strength Calculations - page 88 Example 9 - Failure and Usage Distributions: Washing Machine Usage - page 92 Example 10 - Risk Analysis: Suntan Lotion - page 99 Example 11 - Probability: Rain Prediction - page 102 Example 12 - Probability: Buffons Needle - page 108 Example 13 - Financial Analysis: Retirement Strategy - page 113

Each example is based on a RENO project file (*.rnp) that is shipped with the software, and the full solution is presented in that file. You may wish to view the file that is provided, or to create a new project for each example and work through the steps on your own. Keep in mind that if you are using a demonstration version of the software, you will not be able to save the files that you create.

5.1 Example 1 - Estimating Dice Roll Probabilities


This example is presented in the RENO file Dice Roll.rnp located in the Casino subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Casino). Consider two simple questions regarding the probabilities associated with a dice roll:

When you roll a single 6-sided die, what is the probability of rolling a 4? When you roll two 6-sided dice, what is the probability of rolling a pair of 4s?

RENO Training Guide

35

5 Step-by-Step Examples

5.1.1 Create the Definitions

Define two Random Variables to describe the possible results from rolling each die, as shown next for the first die.

5.1.2 Build the First Flowchart

To determine the probability of rolling a 4 with a single die, construct the Flowchart as follows:

Use a Standard Block to obtain the result of the dice roll from the DiceRoll1 Random Variable described above.

36

http://RENO.ReliaSoft.com

5.1 Example 1 - Estimating Dice Roll Probabilities

Use a Conditional Block to check whether the roll was a 4. If true, then a 1 is passed down the TRUE path. A FALSE path is not required for this example.

Use a Result Storage Block to keep a sum of the number of times that a 4 is rolled (across all simulations).

RENO Training Guide

37

5 Step-by-Step Examples

Use a Standard Block to convert the sum to a percentage.

In this equation, the reserved keyword IN represents the sum from the previous construct and the reserved keyword SIMS_TOTAL represents the total number of simulations.

Use another Result Storage Block to store the final percentage (given as a decimal).

Join the blocks by either holding down the Alt key, selecting Join Blocks from the Flowchart menu or clicking the Join Blocks icon. Click each source block and drag a relationship line to the destination block. Return the cursor to its normal mode by releasing the Alt key, right-clicking the Flowchart background or de-selecting the Join Blocks option.

38

http://RENO.ReliaSoft.com

5.1 Example 1 - Estimating Dice Roll Probabilities

5.1.3 Simulate the First Flowchart

In the Simulation Console, enter 5000 for the number of simulations.

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

The estimated probability of rolling a 4 is 16.26%.

5.1.4 Build the Second Flowchart


Add a new Flowchart to the project by selecting Add Flowchart from the Project menu. You can rename the new Flowchart by right-clicking the new Flowchart in the Project Explorer and selecting Rename Item from the shortcut menu that appears. In the text box, type Roll Pair of 4s and press Enter. To determine the probability of rolling a pair of 4s with two dice, construct the Flowchart as follows:

RENO Training Guide

39

5 Step-by-Step Examples

In this case, two Standard Blocks are required to obtain the result from each die and a Logic Gate is used instead of a Conditional Block. With AND selected for Gate Type, this construct requires that both paths meet the conditional requirement in order for the condition to be TRUE.

It is important to note that the Required Number of Executed Paths field in the Logic Gate must be set to 2. This ensures that both incoming paths are executed before the Logic Gate is executed. The rest of the Flowchart is identical to the one described above.

5.1.5 Simulate the Second Flowchart

In the Simulation Console, enter 10,000 for the number of simulations.

40

http://RENO.ReliaSoft.com

5.2 Example 2 - Risk Analysis: Gym Lockers

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

The probability of rolling a pair of 4s is 2.83%.

5.2 Example 2 - Risk Analysis: Gym Lockers


This example is presented in the RENO file Lockers.rnp located in the Risk Analysis subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Risk Analysis). Consider a gyms lockers that are used by members to store clothes and other valuables. The lockers themselves cannot be locked; however, locks can be purchased for the lockers. Suppose that:

The value of the items in the lockers is normally distributed with a mean of $500 and a standard deviation of 150. The possibility of a thief stealing the items from a given locker in a year is 5% if unlocked and 1% if locked. A lock costs $5. The lock can fail (according to a Weibull distribution with beta = 2 and eta = 900) and the member has to replace it. Members lose their keys (average time to key loss being 600 days), and it costs another $10 to break the lock whenever a key is lost.

Determine the expected cost in one year of buying vs. not buying a lock.

RENO Training Guide

41

5 Step-by-Step Examples

5.2.1 Create the Definitions


For this example, three Random Variables are needed:

The value of the lockers contents:

The time to lock failure:

The time to key loss (using an exponential distribution with Lambda = 1/Mean):

42

http://RENO.ReliaSoft.com

5.2 Example 2 - Risk Analysis: Gym Lockers

5.2.2 Build the Flowchart


There are two costs involved in this problem: the cost of the lost belongings and the cost of acquiring and maintaining a lock. We will begin with estimating the cost of lost belongings. Because this cost is present in both cases (with or without a lock), we will use a subchart to define this cost so that the effort is not duplicated. 5.2.2.1 Subchart: Cost of Lost Belongings The subchart is:

Note that there is a single starting point and a single ending point. This is a requirement for all subcharts. When you create the Flowchart, you can rename it to StolenCosts by right-clicking it in the Project Explorer and selecting Rename Item from the shortcut menu. Type the new name in the text box that appears, then press Enter. In building this subchart, it is important to keep in mind that there is a different probability of occurrence for each case (with lock or without lock). Therefore, the probability should not be defined in the subchart, but rather passed into the subchart from the main Flowchart. This in turn would then be accessible with the keyword IN.

A Flowchart cannot have a Conditional Block (or a Summing Gate, Logic Gate or Branch Gate) as a starting block. Therefore, begin this Flowchart with a Standard Block named Start, which evaluates to IN.

RENO Training Guide

43

5 Step-by-Step Examples

Define the Conditional Block as follows:

This Conditional Block draws a random number uniformly distributed from 0 to 100 and tests to see if it is less than or equal to the fixed probability of items being stolen from the locker (i.e. 5% if unlocked and 1% if locked). If true, this indicates that the items were stolen and the value of the loss is passed to the TRUE path. If false, then "0" is passed to the FALSE path. In order to exit the subchart without terminating the simulation, you will need to define paths for both the True and False situations that lead eventually to a single ending point. To do that, use two Standard Blocks, Stolen and Not Stolen, each evaluating to IN. These continue simulation by passing the values passed to them to the next Construct. To join the two paths you will need to utilize a Construct that is designed to accept multiple inputs. One option is to use a Summing Gate, since a Summing Gate outputs the sum of active inputs. In this case, only one input is possible, so the output will be either the value passed along the TRUE path (Value) or the value passed along the FALSE path (0).

Define the Summing Gate as follows:


Name: S Operation: +

Join the blocks by either holding down the Alt key, selecting Join Blocks from the Flowchart menu or clicking the Join Blocks icon. Click each source block and drag a relationship line to the destination block. Return the cursor to its normal mode by releasing the Alt key, right-clicking the Flowchart background or de-selecting the Join Blocks option. When you join blocks to the Summing Gate, their names appear in the Precedence field in the Summing Gate properties window. Since this Summing Gate is performing addition, the order of precedence is unimportant. Note that the order in which you create the relationship lines from the Conditional Block to the Stolen and Not Stolen blocks determines which is identified as the TRUE or FALSE path. By default, RENO designates the first outgoing path drawn from a Conditional Block or Logic Gate as the TRUE path and the second outgoing path as the FALSE path. You can change these designations by double-clicking the relationship line, if needed.

44

http://RENO.ReliaSoft.com

5.2 Example 2 - Risk Analysis: Gym Lockers

5.2.2.2 Main Flowchart You can now create the main Flowchart, Lock, containing models for both cases.

Add a new Flowchart to the project by selecting Add Flowchart from the Project menu, then rename the Flowchart to Lock.

When the Flowchart is complete, it will look like the one shown next. The steps that follow guide you in creating this Flowchart.

Note that the models for both cases are in the same Flowchart. RENO will simulate each part of a Flowchart, so you can have multiple cases or subroutines within one Flowchart. For the case where no lock is used, the Flowchart is:

Add a Standard Block that evaluates to the desired probability for this case (5%).

RENO Training Guide

45

5 Step-by-Step Examples

This will be passed to the subchart, represented in the Flowchart by the Subchart Block called Stolen Costs. The subchart will return either the value of the loss or 0 if there was no loss.

Add a Subchart Block to the Flowchart. In the window that appears, select the StolenCosts flowchart as the subchart that the block will represent. Name the Subchart Block Stolen Costs. Add a Result Storage Block named Expected Costs to store an average value of all the outcomes (including the zeroes).

Join the blocks by either holding down the Alt key, selecting Join Blocks from the Flowchart menu or clicking the Join Blocks icon. Click each source block and drag a relationship line to the destination block. Return the cursor to its normal mode by releasing the Alt key, right-clicking the Flowchart background or de-selecting the Join Blocks option.

For the case where a lock is used, the Flowchart is:

Because the two cases are so similar, you may wish to copy the model you have created in the previous step and then modify it, rather than recreating each of the Constructs. You can do this by clicking inside the Flowchart, holding down the left mouse button and dragging a box around the blocks to be selected, then selecting Copy from the Edit menu. Click in the Flowchart to return focus to it, then select Paste from the Edit menu. The copy will be placed in the Flowchart and will be selected. Click one of the blocks in the copy and drag the copy to the desired location.

For the Probability block, make sure it evaluates to 1, as the probability of theft in cases where a lock is used is 1%.

46

http://RENO.ReliaSoft.com

5.2 Example 2 - Risk Analysis: Gym Lockers

In this case, an additional block is added to include the additional costs of purchasing and maintaining a lock. A simple way to account for the additional costs is to create an Equation Variable to compute the additional costs.

The equation is derived as follows:

The following number of lock failures are expected over a year: (INT(365/LockFail)) where INT is a function intrinsic to RENO that rounds a function down to the nearest integer, since you cannot have a partial failure.

The following number of key losses are expected over a year: (INT(365/KeyLoss))

These numbers of events, multiplied by the cost of each respective type of event, will result in the additional expected costs over the year. Add a Standard Block as follows:

RENO Training Guide

47

5 Step-by-Step Examples

Note that if you did not use the Equation Variable and instead defined the equation directly in the Standard Block as follows, you would obtain identical results.

Join the blocks for this model. To include the new block in the copy of the original model, you can delete the relationship line between the Subchart Block Stolen Costs and the Result Storage Block Expected Costs by selecting it and selecting Delete from the Edit menu or clicking the Delete icon, then creating new relationship lines. If you prefer, you can click and drag the relationship line to a new destination instead (i.e. click the relationship line and drag it to the Total Costs block so that it connects the Subchart Block and the Standard Block), then create a new relationship line between Total Costs and Expected Costs.

5.2.3 Simulate the Flowchart


The next step is to simulate the Flowchart. In the Simulation Console, we enter 1000 for the number of simulations then click Simulate. Once simulated, the Flowchart looks like the one shown next.

Over 1000 simulations, the expected yearly cost of using a lock averaged $42.85, while the expected yearly cost of not using a lock averaged $22.72.

48

http://RENO.ReliaSoft.com

5.3 Example 3 - Maximizing Profits: The Newspaper Boy Problem

5.3 Example 3 - Maximizing Profits: The Newspaper Boy Problem


This example is presented in the RENO file Newspaper Boy.rnp located in the Optimization subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Optimization). A newsboy can purchase newspapers at 15 cents each and sell them for 25 cents. The demand is normally distributed with a mean of 100 and standard deviation of 25. The problem is to determine how many newspapers to buy, given that if he buys too many he will lose money on the ones he does not sell, while if he buys too few he will lose money by not having enough newspapers to sell. The exact algebraic solution to this problem is given by:

1-P(Q) = Cost/Sell = 0.6 Q = 93.67

The RENO solution is described next.

5.3.1 Create the Definitions

Define a Random Variable to describe the demand for newspapers.

Define a Constant that represents the number of papers that the newspaper boy buys. This will be varied during the simulation to determine the optimum quantity.

RENO Training Guide

49

5 Step-by-Step Examples

Define an Equation Variable to calculate the newspaper boys supply cost, which is the quantity of papers purchased (represented by the Quantity Constant) multiplied by 15 cents.

5.3.2 Build the Flowchart


Construct the Flowchart as follows:

Use a Standard Block to determine the demand for the newspapers based on the Random Variable called Demand.

Use a Conditional Block to check whether the amount of papers on hand (represented by the Constant called Quantity) is equal to or greater than the demand determined in the previous step. If true, then the quantity of papers sold is equal to the Random Variable Demand and this number is passed to the

50

http://RENO.ReliaSoft.com

5.3 Example 3 - Maximizing Profits: The Newspaper Boy Problem

TRUE path. If false, then the quantity of papers sold is equal to the Constant called Quantity and this number is passed to the FALSE path.

Use two Standard Blocks called Profit 1 and Profit 2 to calculate the amount of revenue from the TRUE and FALSE paths. When supply meets or exceeds demand, this is the demand quantity passed from the Conditional (represented in the equation by the reserved keyword IN) multiplied by the price (25 cents) less the supply cost (represented by the Equation Variable called Cost), as shown next. A similar equation is defined for the FALSE path, where the number of papers sold (IN) is equal to the Constant called Quantity.

RENO Training Guide

51

5 Step-by-Step Examples

Use a Result Storage Block to calculate and store the average profit from all simulations.

Join the blocks as shown in the Flowchart above, making sure that the TRUE and FALSE paths from the Conditional Block are correct.

5.3.3 Simulate the Flowchart


For this example, it is important to note that a single simulation run provides a single answer; thus, multiple runs will be needed to arrive at an optimum solution. This can be done using the Sensitivity Analysis page in the Simulation Console, which allows you to run the simulations multiple times and vary a constant with each run.

To first explore the area from 50 to 150, specify 500 simulations on the General page of the Simulation Console then set the Sensitivity Analysis page as shown next.

Click Simulate then, after the simulation completes, close the Simulation Console.

RENO will perform 500 simulations per run, with the Quantity set to 50 for the first run, 60 for the second run, and so on up to 150.

52

http://RENO.ReliaSoft.com

5.3 Example 3 - Maximizing Profits: The Newspaper Boy Problem

Click the Plot icon.

The plot indicates that the optimum value lies somewhere between 80 and 100.
ReliaSoft RENO - www.ReliaSoft.com

Average Profit vs. Quantity


Flowchart1 Average Profit

10.000

8.000

6.000

Average Profit
4.000 2.000

0.000 10.000

User's Name Company 10/17/2005 12:19:01 PM 48.000 86.000 124.000 162.000 200.000

Quantity
Flowchart: Flowchart1 - Simulations per run: 500 - Sensitivity Analysis (One Way): Quantity - Multiple Analyses Disabled

The next plot shows the results from repeating the simulation with the Quantity varied from 80 to 100 and incremented by 1.
ReliaSoft RENO - www.ReliaSoft.com

Average Profit vs. Quantity


Flowchart1 Average Profit

8.000

7.800

7.600

Average Profit
7.400 7.200

7.000 80.000

User's Name Company 10/17/2005 12:21:35 PM 84.000 88.000 92.000 96.000 100.000

Quantity
Flowchart: Flowchart1 - Simulations per run: 500 - Sensitivity Analysis (One Way): Quantity - Multiple Analyses Disabled

Given the small number of simulations (500), noise (variation due to simulation) is present. The next step is to increase the number of simulations to 50,000 and focus on the region between 90 and 96, incrementing by 1, as shown next. Note that the plot shown here has had its scaling changed. To make your plot look like this

RENO Training Guide

53

5 Step-by-Step Examples

one, de-select Automatic Scaling on the Control Panel and enter 7.4 for the Y-axis minimum and 7.7 for the Y-axis maximum. You can leave the values of 90 for the X-axis minimum and 96 for the X-axis maximum.
ReliaSoft RENO - www.ReliaSoft.com

Average Profit vs. Quantity


Flowchart1 Average Profit

7.700

7.640

7.580

Average Profit
7.520 7.460

7.400 90.000

User's Name Company 10/17/2005 1:10:00 PM 91.200 92.400 93.600 94.800 96.000

Quantity
Flowchart: Flowchart1 - Simulations per run: 50000 - Sensitivity Analysis (One Way): Quantity - Multiple Analyses Disabled

In addition to the manual technique described above, RENO can automatically perform multiple analyses designed to determine the quantity that will maximize revenue. To do this, specify 2000 simulations on the General page, specify 60 to 120 with an increment of 12 on the Sensitivity Analysis page and configure the Multiple Analyses page as shown next.

Based on these settings, RENO will perform up to 3 analyses (or fewer if the results converge to within 0.0001 of each other before 3 analyses are complete). Each analysis will consist of the number of runs specified on the Sensitivity Analysis page. In the first analysis, each run will consist of 2000 simulations. Because we have selected to increase the simulations by 2000 in each subsequent analysis, each run in the second analysis will consist of 4000 simulations and each run in the third analysis will consist of 6000 simulations.

54

http://RENO.ReliaSoft.com

5.4 Example 4 - Maximizing Profits: Airline Seat Allocation

The resulting plot of Average Profit vs. Quantity will include a marker and a line to identify the optimum value.
ReliaSoft RENO - www.ReliaSoft.com

Average Profit vs. Quantity


Flowchart1 Analyses Variable Maximum Analysis 1 Analysis 2 Analysis 3

7.689 7.633

7.329

6.969

Average Profit
6.608 6.248

5.888 60.000

72.000

84.000

94.000

108.000

User's Name Company 10/17/2005 10:14:22 AM 120.000

Quantity
Flowchart: Flowchart1 - Simulations per run: 2000 - Sensitivity Analysis (One Way): Quantity - Multiple Analyses (Maximize): Average Profit

From this plot, we can see that the optimum number of newspapers for the newsboy to buy is 94.

5.4 Example 4 - Maximizing Profits: Airline Seat Allocation


This example is presented in the RENO file Airline Seat Allocation.rnp located in the Optimization subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Optimization). A given aircraft can have a maximum of 100 coach seats. Two coach seats are removed for each first class seat that is included. For example, if 4 first class seats are included, then the maximum number of coach seats is 92. Assume the following:

Demand for coach tickets is based on a Weibull distribution with beta = 2 and eta = 45. Demand for first class tickets is based on a Weibull distribution with beta = 1.2 and eta = 15. Revenue for each coach ticket is $500. Revenue for each first class ticket is $1,500. Operating costs are fixed.

Determine the optimum allocation of first class seats, assuming that only increments of four seats are allowed.

RENO Training Guide

55

5 Step-by-Step Examples

5.4.1 Create the Definitions

Define two Random Variables to describe the demand for coach tickets and first class tickets.

Define a Constant to specify the number of first class seats. This will be varied during the simulation to estimate the optimum number.

Define an Equation Variable to calculate the number of coach seats, which depends on the number of first class seats.

56

http://RENO.ReliaSoft.com

5.4 Example 4 - Maximizing Profits: Airline Seat Allocation

5.4.2 Build the Flowchart


Construct the Flowchart as follows:

Use a Standard Block to obtain the demand for coach seats from the Random Variable.

Use a Conditional Block to check whether the demand for coach seats is less than the number of coach seats (which is calculated by the Equation Variable). If it is (i.e. the condition is True), then the number of coach seats sold will be equal to the demand, so the demand quantity is passed down the TRUE path. If demand is greater than or equal to the number of coach seats (i.e. the condition is False), then the

RENO Training Guide

57

5 Step-by-Step Examples

number of coach seats sold will be equal to the number of available coach seats, so the available quantity is passed down the FALSE path.

Use two Standard Blocks to calculate the revenue from the TRUE and FALSE paths, as shown next for the situation when supply exceeds demand.

In this equation, the reserved keyword IN represents the quantity of seats sold (passed from the Conditional Block), which is then multiplied by the $500 price of a coach ticket.

58

http://RENO.ReliaSoft.com

5.4 Example 4 - Maximizing Profits: Airline Seat Allocation

Join the blocks for this portion of the model, making sure that the TRUE and FALSE paths from the Conditional Block are correct.

Create a similar configuration to describe the revenue for first class seats. You will need:

A Standard Block that evaluates to DemandFirst.

A Conditional Block like the one shown next.

RENO Training Guide

59

5 Step-by-Step Examples

Two Standard Blocks to calculate the Revenue from the TRUE and FALSE paths, as shown next for the situation when supply exceeds demand.

Join the blocks for this portion of the model, making sure that the TRUE and FALSE paths from the Conditional Block are correct. Your flowchart will now look like the one shown next.

A Summing Gate collects the revenue values from all four incoming paths and performs a summation. Note that the Required Number of Executed Paths field in the Summing Gate must be set to 2. This ensures that both incoming paths are executed before the Summing Gate is executed.

60

http://RENO.ReliaSoft.com

5.4 Example 4 - Maximizing Profits: Airline Seat Allocation

The result is then passed to a Result Storage Block that stores the average total revenue.

Join the blocks for the remaining part of the model.

5.4.3 Simulate the Flowchart

On the General page of the Simulation Console, specify 2000 simulations. You may wish to specify YAxis limits of -40,000 to 40,000, as shown next, for the most informative display during simulation.

RENO Training Guide

61

5 Step-by-Step Examples

On the Sensitivity Analysis page of the Simulation Console, specify to vary the Constant FCSeats from 0 to 48, with an increment of 16, as shown next.

RENO will perform multiple runs of 2000 simulations each, with FCSeats equal to 0 in the first run, 20 in the second run, 40 in the third run, and so on. In this case, this comes to six runs. The Multiple Analyses feature in the Simulation Console allows you to perform the Sensitivity Analysis multiple times in order to maximize or minimize a Result Storage Block.

On the Multiple Analyses page of the Simulation Console, select to perform multiple analyses to determine the first class seat quantity that will maximize revenue. Choose Maximize for the Action and accept Total Revenue as the input for Result Storage. Specify 3 for Max. Analyses and 0.0001 for Std. Deviation. Enter 2000 in the Increase Simulations field and select Use Integers Only with a minimum increment of 4, as shown next.

Based on these settings, RENO will perform up to 3 analyses (or fewer if the results converge to within 0.0001 of each other before 3 analyses are complete). Each analysis will consist of the number of runs specified on the Sensitivity Analysis page (6 in this case). In the first analysis, each run will consist of 2000 simulations. Because we have selected to increase the simulations by 2000 in each subsequent analysis, each run in the second analysis will consist of 4000 simulations and each run in the third analysis will consist of

62

http://RENO.ReliaSoft.com

5.5 Example 5 - Minimizing Costs: Preventive Maintenance

6000 simulations. Note that by specifying to use only integers with a minimum increment of 4, we have ensured that only multiples of 4 are used as RENO narrows the value range of FCSeats over multiple analyses. This meets the specification that only increments of four seats are allowed.

Run the simulation, then close the Simulation Console.

5.4.4 Plot the Results

In the Flowchart Control Panel, click the Plot icon to plot the simulation results.

The plot that is created will look like the one shown next.
ReliaSoft RENO - www.ReliaSoft.com

Total Revenue vs. FCSeats


Seat Allocation Analyses Variable Maximum Analysis 1 Analysis 2 Analysis 3

36342.027

33041.444

29740.861

Total Revenue
26440.279 23139.696

19839.113 0.000

User's Name Company 10/17/2005 10:50:36 AM 9.600 19.200 24.000 28.800 38.400 48.000

FCSeats
Flowchart: Seat Allocation - Simulations per run: 2000 - Sensitivity Analysis (One Way): FCSeats - Multiple Analyses (Maximize): Total Revenue

The plot identifies 24 as the optimum quantity of first class seats.

5.5 Example 5 - Minimizing Costs: Preventive Maintenance


This example is presented in the RENO file Preventive Maintenance.rnp located in the Optimization subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Optimization). Consider a unit that operates for 10,000 hours and has a Weibull failure distribution (beta = 3, eta = 1000 hours) and a Weibull repair distribution (beta = 2, eta = 10 hours). The costs of downtime are based on the amount of time that the unit is down: $20 per hour. The preventive maintenance (PM) cost is fixed at $10 per instance. Determine the PM interval with the minimum cost.

RENO Training Guide

63

5 Step-by-Step Examples

5.5.1 Create the Definitions

Define a Random Variable called TTF to describe the failure distribution for the unit and another Random Variable called TTR to describe the repair distribution.

Define three Constants to describe the operating time for the equipment, the fixed cost for each PM and the cost per each hour of downtime.

Define another Constant called PM Time to specify the PM interval. This will be set to 1 by default and varied during the simulation in order to determine the optimum time.

64

http://RENO.ReliaSoft.com

5.5 Example 5 - Minimizing Costs: Preventive Maintenance

Define an Equation Variable to calculate the cost of corrective maintenance (CM), which is the cost per CM (Time to Repair x Downtime Cost per Hour) multiplied by the number of CMs (Operating Time / Time to Failure).

5.5.2 Build the Flowchart


Construct the Flowchart as follows:

Use a Standard Block to obtain the failure time from the TTF Random Variable.

Use a Conditional Block to determine whether the failure time is equal to or greater than the specified PM interval. If true, then pass 2 to the TRUE path. If false, then pass 3 to the FALSE path. Note that the

RENO Training Guide

65

5 Step-by-Step Examples

numbers passed are arbitrary since the blocks following do not use the values sent by the Conditional Block.

In the FALSE path (which indicates that the failure occurred before the PM), use a Standard Block to obtain the corrective maintenance cost from the CorrectiveCost Equation Variable.

66

http://RENO.ReliaSoft.com

5.5 Example 5 - Minimizing Costs: Preventive Maintenance

In the TRUE path (which indicates that the failure did not occur before the PM), use a Standard Block to calculate the preventive maintenance cost. This is the cost per PM multiplied by the number of PMs (Operating Time / Time to PM).

Use a Result Storage Block to store the average of the PM and CM costs from all simulations.

Join the blocks in the Flowchart. Be sure that the TRUE and FALSE paths from the Conditional Block are correct; note that in this Flowchart, FALSE is the top path.

RENO Training Guide

67

5 Step-by-Step Examples

5.5.3 Simulate the Flowchart

On the General page of the Simulation Console, specify 1000 simulations.

On the Sensitivity Analysis page of the Simulation Console, specify to vary the Constant PMTime from 100 to 500, with an increment of 100.

On the Multiple Analyses page of the Simulation Console, select to perform multiple analyses to determine the time that will minimize the costs. Choose Minimize for the Action and accept Cost as the

68

http://RENO.ReliaSoft.com

5.5 Example 5 - Minimizing Costs: Preventive Maintenance

input for Result Storage. Specify 5 for Max. Analyses and 0.001 for Std. Deviation. Enter 100 in the Increase Simulations field.

Run the simulation then close the Simulation Console.

5.5.4 Plot the Results

In the Flowchart Control Panel, click the Plot icon to plot the simulation results. The optimum value will be marked on the Costs vs. PMTime plot, as shown next.
ReliaSoft RENO - www.ReliaSoft.com

Costs vs. PMTime


Flowchart1 Analyses Variable Minimum Analysis 1 Analysis 2 Analysis 3 Analysis 4 Analysis 5

1000.000

893.631

787.263

Costs
680.894 574.525 518.676

468.156 100.000

180.000

260.000

337.500

420.000

User's Name Company 9/12/2005 9:58:07 AM 500.000

PMTime
Flowchart: Flowchart1 - Simulations per run: 1000 - Sensitivity Analysis (One Way): PMTime - Multiple Analyses (Minimize): Costs

To minimize costs, preventive maintenance should be performed at an interval of 337.5 hours.

RENO Training Guide

69

5 Step-by-Step Examples

5.6 Example 6 - Reliability: Snow Blower


This example is presented in the RENO file Snow Blower.rnp located in the Reliability subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Reliability). Reliability analysis on a certain snow blower yielded a Weibull life distribution with a beta of 2 and an eta of 400 hrs. The snow blower will be deployed in a part of the country where the probability that it will snow on any given winter day is 1 in 10. If it snows, then the snow depth is normally distributed with a mean of 6 inches and a standard deviation of 2. Furthermore, the area of the driveways in that region is also normally distributed with a mean of 300 square feet and a standard deviation of 40. If the snow blower clears 30 cubic feet an hour, what would the reliability of the blower be assuming 100 winter days?

5.6.1 Create the Definitions

Define a Probability called SnowProbability and a Constant called SnowThreshold to determine whether it will snow on a given day. If a random number uniformly distributed from 0 to 1 (generated by SnowProbability) is less than or equal to the fixed probability that it will snow on any given winter day (defined by SnowThreshold), this indicates that it snowed during the simulation.

70

http://RENO.ReliaSoft.com

5.6 Example 6 - Reliability: Snow Blower

Define a Random Variable called Snowfall_inches to describe the depth of the snow.

Define a Random Variable called Area_to_clean_ft2 to describe the area of the driveways.

Define an Equation Variable to describe the number of hours that the snow blower will be used based on the amount of snowfall and the area of the driveways.

The equation is derived as follows:

The expected depth of the snow, in feet, is:

Snowfall_inches/12

RENO Training Guide

71

5 Step-by-Step Examples

Multiplying this by the area of the driveways (Area_to_clean_ft2) gives the number of cubic feet of snow to be cleared. Divide this number by the number of cubic feet the snow blower can clear in an hour (30) to determine the number of hours it will take to clear the snow, then multiply that figure by the 100 winter days to determine the number of hours of usage for the winter.

5.6.2 Build the Flowchart


Construct the Flowchart as follows:

Use a Standard Block to generate a random number uniformly distributed from 0 to 1, based on the Probability called SnowProbability.

Use a Conditional Block to check whether the random number is less than or equal to the fixed probability of snow on any given winter day (based on the Constant called SnowThreshold). If true,

72

http://RENO.ReliaSoft.com

5.6 Example 6 - Reliability: Snow Blower

this indicates that it snowed and the value of the Equation Variable Usage_Hours is passed to the TRUE path. If false, this indicates that it did not snow and 0 is passed to the FALSE path.

Use Standard Blocks called Snow and No Snow, each evaluating to IN, to continue the TRUE and FALSE paths coming from the Conditional Block.

RENO Training Guide

73

5 Step-by-Step Examples

Use a Summing Gate to accept the two incoming paths and perform a summation on the snow blower usage information that is passed to the construct. The result is one outgoing path.

Use a Result Storage Block called Usage to store an average of the snow blower usage information that is passed to the construct.

Use a Standard Block called Reliability to calculate the snow blower reliability.

74

http://RENO.ReliaSoft.com

5.6 Example 6 - Reliability: Snow Blower

This equation uses RENOs intrinsic function, WEIBULL_REL, which returns the Weibull reliability at a given time. The inputs to this intrinsic function are (Time, Beta, Eta, Gamma). It is important to note here that RENO is regionally aware (i.e. it will work with your regional settings). Therefore, if your regional settings use a different decimal definition and list separator, the way that you enter values and functions will differ from the way presented here. For example, if you are using German regional settings, the inputs to this function should be entered based on the German regional decimal definition (,) and list separator (;). The use of the reserved keyword IN indicates that the daily usage time from the previous Usage construct will be inserted into the equation for Time.

Use another Result Storage Block called Snow Blower Reliability to store the last value.

5.6.3 Simulate the Flowchart

On the General page of the Simulation Console, specify 1000 simulations.

RENO Training Guide

75

5 Step-by-Step Examples

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

The reliability is 98.5975%.

5.7 Example 7 - Simple Reliability and Availability Metrics


This example is presented in the RENO file Compute Reliability (Simple).rnp located in the Reliability subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Reliability). Consider a unit with the following failure and repair distributions:

Failure: Weibull with beta = 2 and eta = 100 Repair: Weibull with beta = 2 and eta = 10

Use RENO to estimate the MTTF, Reliability, Availability and other results.

5.7.1 Create the Definitions

Create two Random Variables to describe the failure and repair distributions.

76

http://RENO.ReliaSoft.com

5.7 Example 7 - Simple Reliability and Availability Metrics

Create two Constants to describe the time of interest for the reliability and availability calculations.

5.7.2 Compute MTTF


5.7.2.1 Build the Flowchart To compute the MTTF, construct the Flowchart as follows:

Use a Standard Block to obtain the failure time from the distribution defined in the Random Variable called WeibullTTF.

Use a Result Storage Block to store the average result.

RENO Training Guide

77

5 Step-by-Step Examples

5.7.2.2 Simulate the Flowchart On the General Page of the Simulation Console, specify 5000 simulations.

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

The MTTF is 88.2032.

5.7.3 Compute Reliability Given Time


5.7.3.1 Build the Flowchart To compute the Reliability for a given time, construct the Flowchart as follows:

In this case, the time at which the Reliability is calculated is 20, based on the Constant called TimeForReliability.

78

http://RENO.ReliaSoft.com

5.7 Example 7 - Simple Reliability and Availability Metrics

Use a Standard Block to obtain the failure time from the distribution defined in the WeibullTTF Random Variable, as described above.

Use a Conditional Block to check whether the failure occurred before the time of interest. If false, then a 1 is passed to a Result Storage Block that stores a sum (i.e. the number of times, across all of the simulations, that the unit did not fail before the specified time). When you join the blocks, RENO automatically labels the first path as the TRUE path. Double-click the relationship line to change it to the FALSE path. A TRUE path is not required for this Flowchart.

Use a Standard Block to convert the sum to a percentage. In this equation, the reserved keyword IN represents the sum from the previous construct and the reserved keyword SIMS_CUR represents the

RENO Training Guide

79

5 Step-by-Step Examples

index for the current simulation. This fraction is multiplied by 100 to convert the results to a percentage. Another Result Storage Block is used to store and display the final result.

5.7.3.2 Simulate the Flowchart On the General page of the Simulation Console, specify 5000 simulations.

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

The reliability at the given time is 96.48%.

80

http://RENO.ReliaSoft.com

5.7 Example 7 - Simple Reliability and Availability Metrics

5.7.4 Create Reliability vs. Time Plot


You can also use the above Flowchart to create a plot of Reliability vs. Time. To do this, you will need to resimulate the Flowchart. 5.7.4.1 Simulate the Flowchart On the General page of the Simulation Console, specify 1000 simulations.

On the Sensitivity Analysis page of the Simulation Console, select to vary the TimeForReliability Constant from 0 to 200 with increments of 20, as shown next.

Run the simulation then close the Simulation Console.

RENO Training Guide

81

5 Step-by-Step Examples

5.7.4.2 Plot the Results In the Flowchart Control Panel, click the Plot icon to plot the simulation results.
ReliaSoft RENO - www.ReliaSoft.com

Reliability (%) vs. TimeForReliability


100.000 Simple Reliability Reliability (%)

80.000

60.000

Reliability (%)
40.000 20.000

0.000

User's Name Company 11/6/2006 3:36:01 PM 0.000 40.000 80.000 120.000 160.000 200.000

TimeForReliability
Flowchart: Simple Reliability - Simulations per run: 1000 - Sensitivity Analysis (One Way): TimeForReliability - Multiple Analyses Disabled

Note that this plot displays the Result Storage Block called Reliability plotted against the varied Constant, TimeForReliability. If desired, you can use the Select Result Storages area in the Control Panel to select the Result Storage Block called Survive to be plotted either instead of or along with Reliability.

5.7.5 Compute Instantaneous Availability Given Time


5.7.5.1 Build the Flowchart To compute the Instantaneous Availability for a given time, construct the Flowchart as follows:

82

http://RENO.ReliaSoft.com

5.7 Example 7 - Simple Reliability and Availability Metrics

Use a Standard Block to obtain the time to failure from the failure distribution defined in the WeibullTTF Random Variable, as described above.

Use a Conditional Block to check whether the unit is still operating at the time of interest, which is 100, based on the Constant called TimeForAvailability.

RENO Training Guide

83

5 Step-by-Step Examples

If true, then a 1 is passed to a Result Storage Block that stores a sum (i.e. the number of times, across all of the simulations, that the unit did not fail before the specified time).

If false, then the failure time is passed to a Standard Block that adds the repair time (based on the WeibullTTR Random Variable).

Your Flowchart so far will be configured as follows (note that the blocks have been joined in this figure to clarify the relationships).

For units that fail and are repaired (i.e. are on the FALSE path), use a Conditional Block to check whether repair is complete and the unit is back in operation at the time of interest. If true, pass the

84

http://RENO.ReliaSoft.com

5.7 Example 7 - Simple Reliability and Availability Metrics

incoming value (the sum of the failure time and the repair time, as calculated by the Standard Block Time Up) down the TRUE path. No FALSE path is needed.

Use a Reset Block to cause RENO to generate new values for the Random Variables. Use a Standard Block to add the new failure time (based on the WeibullTTF Random Variable) to the incoming value. This represents the time of the next failure for the unit that has failed and been repaired.

Use a Go to Flag to pass the value to a Flag Marker, which is placed before the first Conditional Block, creating a loop as follows.

Add a Flag Marker between Get TTF and UP.

RENO Training Guide

85

5 Step-by-Step Examples

Add a Go to Flag after Get New Failure Time and select the Flag Marker Time in the Go to Flag Marker field.

By checking the next failure time against the time of interest for the availability estimate, this configuration allows you to see whether the repaired unit is up at the time of interest, regardless of how many times it is repaired before that time. Your Flowchart so far will be configured as follows (note that the blocks have been joined in this figure to clarify the relationships).

As described above for the Reliability Flowchart, a Standard Block is placed after UP Count and used to convert the results to a percentage and a Result Storage Block is used to store the final result. When you join the blocks in the Flowchart, note that it is not necessary to draw a relationship line between the Go to Flag and the Flag Marker, as the path is specified by the Go to Flag, but you can draw the line to make the relationship visually clear, if desired.

86

http://RENO.ReliaSoft.com

5.7 Example 7 - Simple Reliability and Availability Metrics

5.7.5.2 Simulate the Flowchart On the General page of the Simulation Console, specify 5000 simulations.

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

RENO Training Guide

87

5 Step-by-Step Examples

5.7.6 Create Availability vs. Time Plot


You can use the same Sensitivity Analysis simulation procedure described in Section 5.7.4 to create an Availability vs. Time plot for this analysis, as shown next for times ranging from 10 to 100.
ReliaSoft RENO - www.ReliaSoft.com

Availability vs. TimeForAvailability


99.420 Simple Availability Plot Availability

97.640

95.860

Availability
94.080 92.300

90.520 10.000

28.000

46.000

64.000

82.000

User's Name Company 10/17/2005 2:38:42 PM 100.000

TimeForAvailability
Flowchart: Simple Availability Plot - Simulations per run: 5000 - Sensitivity Analysis (One Way): TimeForAvailability - Multiple Analyses Disabled

5.8 Example 8 - Stress-Strength Calculations


This example is presented in the RENO file Stress-Strength.rnp located in the Reliability subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Reliability). In this simple example, we explore stress-strength calculations. Given a stress distribution (Weibull with beta = 2 and eta = 200) and a strength distribution (Weibull with beta = 2 and eta = 500), determine the probability that stress will exceed strength (i.e. the unit will fail).

5.8.1 Create the Definitions

Define two Random Variables to describe the stress and strength distributions.

88

http://RENO.ReliaSoft.com

5.8 Example 8 - Stress-Strength Calculations

Define an Equation Variable to subtract stress from strength.

5.8.2 Build the Flowchart


Construct the Flowchart as follows:

Use a Standard Block and the Equation Variable to subtract stress from strength.

RENO Training Guide

89

5 Step-by-Step Examples

Use a Conditional Block to check whether (Strength Stress) is less than or equal to 0. If true, then stress exceeded strength, the unit failed, and a 1 is passed to the TRUE path. If false, then stress did not exceed strength and the unit did not fail. There is no need to continue on the FALSE path for this example.

Use a Result Storage Block to keep a summation of the number of times that the unit failed.

Use a Standard Block to normalize the results by converting them to a percentage that represents the number of failures out of all the simulations. In this equation, the reserved keyword IN represents the

90

http://RENO.ReliaSoft.com

5.8 Example 8 - Stress-Strength Calculations

sum from the previous construct and the reserved keyword SIMS_TOTAL represents the number of simulations. This fraction is multiplied by 100 to convert the results to a percentage.

Use a Result Storage Block to store the final calculated percentage.

5.8.3 Simulate the Flowchart

On the General page of the Simulation Console, specify 5000 simulations.

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

RENO Training Guide

91

5 Step-by-Step Examples

5.9 Example 9 - Failure and Usage Distributions: Washing Machine Usage


This example is presented in the RENO file Failure and Usage Distribution.rnp located in the Reliability subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Reliability). Consider the case of a washing machine that can have varied loads. Assume the times to failure of the washing machine follow a Weibull distribution. When it is being used under a 10 lb. load, the washing machine fails according to a Weibull distribution with beta = 3 and eta = 2,500 hr. When it is being used under a 5 lb. load, the washing machine fails according to a Weibull distribution with beta = 3 and eta = 10,000 hr. Assume that customer loads vary and are described by a normal distribution with mean = 5 and std = 1.

Determine the Reliability of the machine for 2000 hrs of operation. Obtain a plot of Reliability vs Time from 1000 hrs to 10,000 hrs (using 1000 hr increments). Generate a data set of times-to-failure for subsequent life data analysis.

5.9.1 Create the Definitions

Define an Equation Variable to describe the life-stress relationship, which is used to determine the scale parameter, eta, for each load. The equation refers to a Random Variable called Usage Load, which describes the distribution for customer loads.

In the LSR Equation Variable, an inverse power life-stress relationship is assumed to describe the effect of loading on life.

ReliaSofts Accelerated Life Testing Reference provides more information on this model.

92

http://RENO.ReliaSoft.com

5.9 Example 9 - Failure and Usage Distributions: Washing Machine Usage

The Constants k and n are the variables of that relationship obtained by solving this model for the given conditions, or for L(V=5)=10,000 and L(V=10)=2,500.

Define the Constant Life, which will be used to specify the time for which Reliability is estimated and also can be varied during the simulation to obtain reliability estimates for a range of times.

Define a Random Variable to describe the failure distribution for the washing machine.

RENO Training Guide

93

5 Step-by-Step Examples

5.9.2 Determine the Reliability at 2000 Hours


5.9.2.1 Build the Flowchart To estimate the reliability at 2000 hours, construct the Flowchart as follows:

Use a Standard Block to obtain the time-to-failure from the Random Variable called Failure Time.

The Conditional Block checks whether the failure time is less than or equal to 2000 hrs (defined with the Constant called Life). If true, then 100 is passed to the TRUE path and 0 is passed to the FALSE path. If false, then 100 is passed to the FALSE path and 0 is passed to the TRUE path1 To achieve this, be sure

This example shows another way to normalize results instead of using a Standard Block as shown in other examples. Here, normalization is achieved by passing 100 down each of the Conditional Blocks outgoing paths rather than passing 1.

1.

94

http://RENO.ReliaSoft.com

5.9 Example 9 - Failure and Usage Distributions: Washing Machine Usage

that Continue execution on both paths is checked, and that 0 is entered for both the Condition is TRUE - F Path and the Condition is FALSE - T Path fields.

It is important to note that this Conditional Block tests for product failure before the time of interest (Life). If the condition is true, the product has failed. Thus, results passed down the TRUE path refer to a probability of failure. When building this Flowchart, make sure that the T path and the F path go to the correct Result Storage Blocks. By default, RENO designates the first outgoing path drawn from a Conditional Block as the T path and the second outgoing path as the F path. You can change these designations by double-clicking the relationship line if necessary.

On the TRUE path, use a Result Storage Block to store an average of the failures (across all simulations). On the FALSE path, use a Result Storage Block to store an average of the successes. The Result Storage Block called Reliability, on the FALSE path, is shown next.

RENO Training Guide

95

5 Step-by-Step Examples

5.9.2.2 Simulate the Flowchart On the General page of the Simulation Console, specify 2000 simulations.

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

The reliability of the washing machine for 2000 hours of operation is 98.5%.

5.9.3 Create Reliability vs. Time Plot


You can also use the above Flowchart to create a plot of Reliability vs. Time. To do this, you will need to resimulate the Flowchart. 5.9.3.1 Simulate the Flowchart Keep the same settings on the General page of the Simulation Console.

96

http://RENO.ReliaSoft.com

5.9 Example 9 - Failure and Usage Distributions: Washing Machine Usage

On the Sensitivity Analysis page of the Simulation Console, select to vary the Life Constant from 1000 to 10,000 with increments of 1000, as shown next.

Run the simulation then close the Simulation Console.

5.9.3.2 Plot the Results In the Flowchart Control Panel, click the Plot icon to plot the simulation results.
ReliaSoft RENO - www.ReliaSoft.com

Reliability vs. Life


Reliability Plot Reliability

99.800

87.990

76.180

Reliability
64.370 52.560

40.750 1000.000

2800.000

4600.000

6400.000

8200.000

User's Name Company 8/19/2005 11:57:09 AM 10000.000

Life

Note that you may need to change the Result Storage Block in the Plot Sheet Control Panel from Probability of Failure to Reliability.

RENO Training Guide

97

5 Step-by-Step Examples

5.9.4 Generate Data Set for Life Data Analysis


5.9.4.1 Build the Flowchart To generate a set of times-to-failure that can be used for subsequent life data analysis, construct the Flowchart as follows:

The Time to Failure Standard Block is defined as described above for the previous Flowchart. Use a Result Storage Block to store an array of the failure times obtained by the Standard Block.

5.9.4.2 Simulate the Flowchart On the General page of the Simulation Console, specify 1000 simulations.

Click Simulate to run the simulation.

98

http://RENO.ReliaSoft.com

5.10 Example 10 - Risk Analysis: Suntan Lotion

When simulation is complete, click Details to display the table of results in the Simulation Results Explorer. When the Simulation Results Explorer opens, click the (+) beside Result Storages in the Control Panel, then select Time to Failure Array to display the Result Storage Block results, as shown next. Note that the Transpose Results command in the Tools menu may be required to place each result into a separate row (rather than a separate column), as shown here. Because the Simulation Results Explorer has only 256 columns, you must place the results in rows to view all of them. Only the first five results are displayed in the picture.

Close the Results Explorer when you have reviewed the results.

5.10 Example 10 - Risk Analysis: Suntan Lotion


This example is presented in the RENO file Sun Tan.rnp located in the Risk Analysis subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Risk Analysis). Assume that chemical X is added to a suntan lotion. The manufacturing process contains some minor variability. The concentration of chemical X is normally distributed with a mean of 0.005 and a standard deviation of 0.0001 ml of chemical X per ml of lotion. The amount of lotion applied by a person also varies and is known to be normally distributed with a mean of 100 ml and a standard deviation of 20 ml. It is suspected that 10% of the population may, depending on the amount used, have an allergic reaction to chemical X. From the 10% that are susceptible, the probability that somebody will have an allergic reaction is a function of the amount of the chemical applied. This probability is given by a Weibull distribution with beta = 2.5 and eta = 1.8. Determine the percentage of the population that is expected to experience an allergic reaction.

RENO Training Guide

99

5 Step-by-Step Examples

5.10.1 Create the Definitions

Define a Random Variable to describe the concentration of chemical X in the suntan lotion and a Random Variable to describe the users application of the lotion.

Define an Equation Variable to describe the amount of chemical X applied by the user, which is the amount of lotion applied multiplied by the concentration of chemical X in the lotion.

Define a Probability to describe the likelihood that a susceptible user will experience an allergic reaction.

This probability is based on the Weibull distribution and the amount of exposure calculated by the Chemical_Applied variable.

100

http://RENO.ReliaSoft.com

5.10 Example 10 - Risk Analysis: Suntan Lotion

5.10.2 Build the Flowchart


Construct the Flowchart as follows:

Use a Standard Block to calculate the percentage of the population affected based on the probability of a reaction.

This equation multiplies the value of the Probability by the percentage of the population that is susceptible (0.1) and by 100 to convert the figure into a percentage.

Use a Result Storage Block to store an average of the results.

RENO Training Guide

101

5 Step-by-Step Examples

5.10.3 Simulate the Flowchart

On the General page of the Simulation Console, specify 2000 simulations.

When simulation is complete, the results are displayed in the Simulation Results Explorer and in the Flowchart, as shown next.

Based on these results, 0.4203% of the population are expected to experience a reaction to the suntan lotion.

5.11 Example 11 - Probability: Rain Prediction


This example is presented in the RENO file Rain Prediction.rnp located in the Misc Fun subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Misc Fun). Suppose that whether or not it rains today depends on previous weather conditions over the last two days. Specifically, suppose that:

If it has rained for the past two days, then it will rain tomorrow with probability 0.8. If it rained today but not yesterday, then it will rain tomorrow with probability 0.4. If it rained yesterday but not today, then it will rain tomorrow with probability 0.3. If it has not rained in the past two days, then it will rain tomorrow with probability 0.2.

We can transform the above model into a Markov chain by saying that the state at any time is determined by the weather conditions during both that day and the previous day. In other words, we can say that the process is in:

State 0 if it rained both today and yesterday. State 1 if it rained today and but not yesterday. State 2 if it rained yesterday but not today.

102

http://RENO.ReliaSoft.com

5.11 Example 11 - Probability: Rain Prediction

State 3 if it did not rain either yesterday or today.

The preceding would then represent a four-state Markov chain having the following transition probability matrix:

The limiting probabilities for these states are found respectively to be 8/30, 4/30, 4/30 and 14/30. Therefore, we have: Proportion of Rain = 0.8 * 8 / 30 + 0.4 * 4/30 + 0.3 * 4/30 + 0.2 * 14/30 = 0.4 The RENO solution is presented next.

5.11.1 Create the Definitions

Define three Storage Variables to keep track of the weather conditions for Yesterday, Today and Tomorrow, as shown next for Today. At each iteration, Yesterday and Today are reset to reflect the new scenario, i.e. Today becomes Yesterday and Tomorrow becomes Today.

Define four Constants to represent the probability of rain tomorrow: if it rained for the last two days (R_R = .8); if it rained today but not yesterday (NR_R = .4); if it rained yesterday but not today (R_NR = .3); and if it has not rained today or yesterday (NR_NR = .2). The R_R Constant is shown next as an example.

RENO Training Guide

103

5 Step-by-Step Examples

Define a uniform Probability to determine the probability that it will rain on a given day.

Define a Constant called Loop to specify the number of loops that will be performed during a single simulation run.

In addition, define two Storage Variables called Probability and Rain Counter to hold the values that are passed during the simulation for the probability of rain tomorrow and the number of days that it rains, respectively. These should also be reset after each simulation.

104

http://RENO.ReliaSoft.com

5.11 Example 11 - Probability: Rain Prediction

5.11.2 Build the Flowchart


Construct the flowchart as follows:

The Start Flag that begins each loop of the simulation has ordered relations (identified with numbers over the lines) leading first to the Standard Block that indicates whether it rained Yesterday and then to the Standard Block that indicates whether it rained Today (based on the previous loop of the simulation). If the execution were to happen in the opposite order, the information on whether or not it rained today would be overwritten for the next loop. You can set the ordered relations by selecting the source block (i.e. the Flag Marker), choosing Ordered Relations, then drawing the relationship lines. The Standard Blocks are shown next.

A Logic Gate construct checks to see whether it has rained for the last two days. If true, then the R_R probability (.8) is passed to the Result Storage Block called Probabilities, which holds the last value passed to it and updates the Storage Variable called Probability. If false, then the simulation moves to a Conditional Block that checks to see whether it rained yesterday. If true, then the R_NR probability (.3) is passed. If false, then the simulation moves to another Conditional Block that checks to see whether it rained

RENO Training Guide

105

5 Step-by-Step Examples

today. If true, then the NR_R probability (.4) is passed and if false, then the NR_NR probability (.2) is passed. (The extra Standard Block, Didnt Rain For Two Days, in the FALSE path is just used to pass the NR_NR probability to the Result Storage Block, and evaluates to IN.)

Another Conditional Block uses the probability that is passed from the Result Storage Block (.8, .4, .3 or .2) and the uniform probability of rain, ProbabilityRain, to determine whether it will rain tomorrow.

Two Standard Blocks, Rain and No Rain, evaluate to IN and update the Storage Variable Tomorrow.

106

http://RENO.ReliaSoft.com

5.11 Example 11 - Probability: Rain Prediction

A Counter Block called Rain Counter keeps track of how many days it rains.

The loop that is required to solve this example is constructed by using a Counter Block called Day Counter that is reset after each simulation to keep track of how many days have been simulated. This value is passed to a Conditional Block called Done? that checks the Loop Constant to determine whether the specified number of days, 5000, have been simulated.

If the specified number of days have not yet been simulated, then the FALSE path leads to a Reset Block that points to a Go To Flag that points to the Start Flag, so that the simulation can move through the flowchart again.

RENO Training Guide

107

5 Step-by-Step Examples

Once the specified number of days have been simulated, the Standard Block Done calculates the number of days that it rained divided by the number of days simulated.

The Result Storage Rain Portion stores the last value passed to it.

5.11.3 Simulate the Flowchart


After performing 1 simulation (since the loop is included in the flowchart), the results are displayed in the Simulation Results Explorer and in the flowchart. The proportion of rainy days is found to be 40.34%, which is similar to the result from the Markov chain analysis.

5.12 Example 12 - Probability: Buffons Needle


This example is presented in the RENO file Buffons Needle.rnp located in the Misc Fun subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Misc Fun). More than 200 years before Metropolis coined the name Monte Carlo method, George Louis Leclerc, Comte de Buffon, proposed the following problem. If a needle of length l is dropped at random on the middle of a horizontal surface ruled with parallel lines a distance d > l apart, what is the probability that the needle will cross one of the lines? Buffon asked what was the probability that the needle would fall across one of the lines. That will occur only if A < lsin(). In this case, the distance from the end of the needle to the horizontal line (denoted as A) is randomly distributed [0, d). The angle at which the needle falls (denoted as theta, ) is also randomly distributed [0, 180). Even though this probability can be easily obtained, it is interesting to note that the great mathematician Laplace perceived an amusing approximation for pi, . Laplace argued that if Buffons experiment is performed with the needle being dropped N times, with M hits, then pi could be approximated by (2 * N / M). This example attempts to approximate this value.

108

http://RENO.ReliaSoft.com

5.12 Example 12 - Probability: Buffons Needle

5.12.1 Create the Definitions

Define two Constants to describe the distance between the two horizontal lines (d) and the length of the needle (l).

Define two Random Variables to describe the distance from the end of the needle to the horizontal line (A) and the angle at which the needle falls (Theta), as shown next.

Define an Equation Variable to determine the span of the needle based on the length of the needle and the angle at which it falls (lsin()). If this is greater than A, then the needle crossed the horizontal line. SIN and RADIANS are pre-defined functions in RENO that can be typed into equations or inserted via the Function Wizard.

RENO Training Guide

109

5 Step-by-Step Examples

5.12.2 Build the Flowchart


Construct the flowchart as follows:

Use a Standard Block to obtain the distance from the end of the needle to the horizontal line (A), based on the Random Variable.

Use a Conditional Block to determine whether the needle crossed the horizontal line. If the span of the needle (determined by the Equation Variable called Hit) is greater than or equal to the distance that was passed from the preceding Construct (A), then the needle crossed the horizontal line and a 1 is passed to the TRUE path. A FALSE path is not required for this example.

Use a Result Storage Block to store a sum of the number of times that the needle crossed the horizontal line (i.e. M in Laplaces equation to approximate ).

110

http://RENO.ReliaSoft.com

5.12 Example 12 - Probability: Buffons Needle

Use a Standard Block to enter Laplaces equation to approximate . In this equation, the reserved keyword IN represents the value of M passed from the previous construct and the reserved keyword SIMS_TOTAL represents the total number of simulations (i.e. N in Laplaces equation).

Use another Result Storage Block to store the final result.

RENO Training Guide

111

5 Step-by-Step Examples

5.12.3 Simulate the Flowchart

Specify to perform 1000 simulations and vary the seed from 1 to 10 with increments of 1, as shown next. This will result in 10 runs of 5000 simulations each, using a different set of randomly generated numbers for each run to give us a feel for the variation in the results.

112

http://RENO.ReliaSoft.com

5.13 Example 13 - Financial Analysis: Retirement Strategy

The results are displayed in the Simulation Results Explorer, as shown next.

The flowchart displays the last value of , corresponding to seed 10.

5.13 Example 13 - Financial Analysis: Retirement Strategy


This example is presented in the RENO file Retirement Strategy.rnp located in the Financial Analysis subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Financial Analysis). In planning for your retirement, you normally invest a percentage of your income in safe investments (bank) or in riskier investments (stock market). For this example, lets assume that you are choosing to invest some of your money in the bank and some in the stock market, lets say NASDAQ and tied to the NASDAQ Composite Index. First, you do your research on the two investment vehicles and determine the following:

The interest from the bank investment follows a generalized gamma distribution with mean = 1.7406, standard deviation = 0.1141 and lambda = 4.3106. The profit from NASDAQ investment follows a normal distribution with mean = 13 and standard deviation = 28.

RENO Training Guide

113

5 Step-by-Step Examples

Note that you can use the Weibull++ software to analyze data on average bank interest rates and NASDAQ annual returns to obtain the distribution and parameters for this analysis. You will choose to invest X% of your income per year for the next Y years. Assume that your current income is $40,000 per year and, based on past history, that your income will increase yearly by a percentage that is normally distributed with mean = 4 and standard deviation = 1.5. You will decide to put Z% of your investment money in the bank for the first year and the remainder in NASDAQ. Given the volatility of NASDAQ, the following strategy is applied for subsequent years:

Any profits made in the stock market at the end of each year will be transferred into the savings account for safe keeping. Thus, the amount invested in NASDAQ will be restricted to the initial amount put in plus annual contributions and minus any losses. The amount invested in NASDAQ will not increase as your income increases every year. It will always be equal to the first year investment.

You can use RENO to model this investment strategy and determine a variety of different results. For example, you may wish to:

Estimate your investment income over the next 20 years if you invest 5% of your yearly income with 50% going to savings. Compare your investment income after 20 years, varying the investment portion from 0% to 20% of your yearly income (with 50% going to savings). Compare your investment income after 20 years, varying the investment portion from 0% to 20% of your yearly income and varying the amount invested in savings from 0% to 100%.

5.13.1 Create the Definitions

Define two Random Variables to describe the returns from the BANK and NASDAQ investment vehicles.

114

http://RENO.ReliaSoft.com

5.13 Example 13 - Financial Analysis: Retirement Strategy

Define a third Random Variable to describe the yearly increase in your income.

Define three Constants to set the number of years that will be analyzed, the percentage of your yearly income that will be invested and the percentage of the investment that will go to NASDAQ each year. The values of these Constants can be varied during the simulation to determine specific results of interest.

(Note that in the example file shipped with the software, three separate constants are defined for Years. This is simply so that each flowchart uses a different constant, enabling the example file to display consistent simulated results for each flowchart.)

Define two Equation Variables to calculate the amount of money that will be invested in the bank each year. This is determined by calculating the investment amount for the year and then subtracting the amount that will be invested in NASDAQ.

RENO Training Guide

115

5 Step-by-Step Examples

Define a third Equation Variable to calculate the threshold that will be used to determine whether you earned money in the stock market during a given year (and will therefore move those earnings into the bank account).

Note that these Equation Variables refer to defined Storage Variables (i.e. CurrentSalary, StocksPortion and CurrentYear), which hold values obtained from the flowchart during simulation. You will also need to define three more Storage Variables for use during simulation: AdditionalEarnings, BankIncome and StocksIncome. CurrentSalary has a Start Value of 40,000, reflecting the salary you are starting at. All other Storage Variables have a Start Value of 0. All of the Storage Variables are reset after each simulation.

116

http://RENO.ReliaSoft.com

5.13 Example 13 - Financial Analysis: Retirement Strategy

5.13.2 Build the Flowchart


Construct the flowchart as follows:

Use a Standard Block to calculate the amount of money that will be invested in NASDAQ for the first year and place this value into the Storage Variable StocksPortion.

RENO Training Guide

117

5 Step-by-Step Examples

Use two Standard Blocks to calculate the amount of money in the bank and in NASDAQ at the end of the year and to store these values in the Storage Variables BankIncome and StocksIncome, respectively.

For the BANK investment vehicle, this is the amount invested in the bank for the given year (SavingsPortion) plus any NASDAQ earnings from the previous year (AdditionalEarnings) plus the amount of money in the bank account at the end of the previous year (BankIncome) multiplied by the interest earned during the year. (1+BankInterest/100). For the NASDAQ investment vehicle, this is the amount invested in stocks for the given year (StocksPortion) plus the amount of money in the NASDAQ account at the end of the previous year (StocksIncome) multiplied by the interest earned during the year (1+StockProfit/100).

Use a Conditional Block to check whether the value of "StocksIncome" exceeds the value of "SavingsThreshold" in order to determine whether you have earned or lost money in NASDAQ during the current year and pass the values required to update the storage variables accordingly.

118

http://RENO.ReliaSoft.com

5.13 Example 13 - Financial Analysis: Retirement Strategy

In the False path, a Standard Block called "Save Additional Earnings" calculates the amount of the earnings, if any, and updates the "AdditionalEarnings" storage variable. In the True path, a Standard Block called "Save Stocks Income" updates the "StocksIncome" storage variable.

Next, use a Standard Block to calculate next year's salary and update the "CurrentSalary" storage variable.

Once you have defined the model for the first year of investment, the next step is to create a loop in the flowchart to model each subsequent year until the specified number of years have been simulated. To do this, insert a Start flag and a Reset block before the Standard Blocks that calculate the amount of money in each investment vehicle at the end of a given year. The flag identifies the starting point for the loop and the Reset block regenerates the random variables for each year. Also insert a Go To Flag Marker after the "Save New Salary" block, which points to the Start flag and creates the loop. Within the loop, insert a Counter Block to track the number of loops that have been executed (i.e. number of years that have been simulated). Note that the Counter Block requires two paths in, which

RENO Training Guide

119

5 Step-by-Step Examples

keeps it from executing until both incoming paths have been executed, and that its value is stored in the Storage Variable CurrentYear.

Then insert a Conditional Block to check whether the required number of years have been simulated, as specified in the Constant "Years." If not, then the simulation continues to the "Earned Money" Conditional Block as described above and the simulation continues to loop through the flowchart.

120

http://RENO.ReliaSoft.com

5.13 Example 13 - Financial Analysis: Retirement Strategy

When the required number of years have been looped through, the simulation continues to a Summing Gate, which leads to two Standard Blocks that normalize the "BankIncome" and "StocksIncome" amounts across all simulations, as shown next for BankIncome.

A Result Storage block then stores the sum of the bank and stock incomes, which represents the total investment income for the given investment strategy.

5.13.3 Simulate the Flowchart


To estimate your investment income over the next 20 years if you invest 5% of your yearly income with 50% going to savings, perform 1,000 simulations and vary the Constant Years from 1 to 20 with an increment of 1. The results are displayed in the following plot:
ReliaSoft RENO - www.ReliaSoft.com

TOTAL vs. Years1


110243.340 1. 5% Invested - vary years TOTAL

88629.821

67016.303

TOTAL
45402.784 23789.265

2175.747 1.000

User's Name Company 10/17/2005 1:33:44 PM 4.800 8.600 12.400 16.200 20.000

Years1
Flowchart: 1. 5% Invested - vary years - Simulations per run: 1000 - Sensitivity Analysis (One Way): Years1 - Multiple Analyses Disabled

RENO Training Guide

121

5 Step-by-Step Examples

To compare your investment income after 20 years, varying the investment portion from 0% to 20% of your yearly income, configure the Sensitivity Analysis page of the Simulation console as follows and repeat the simulation.

The results are displayed in the following plot.


ReliaSoft RENO - www.ReliaSoft.com

TOTAL vs. InvestmentPercent


2. After 20 Years - vary investment TOTAL

436155.865

348924.692

261693.519

TOTAL
174462.346 87231.173

0.000 0.000

User's Name Company 10/17/2005 1:32:26 PM 4.000 8.000 12.000 16.000 20.000

InvestmentPercent
Flowchart: 2. After 20 Years - vary investment - Simulations per run: 1000 - Sensitivity Analysis (One Way): InvestmentPercent - Multiple Analyses Disabled

122

http://RENO.ReliaSoft.com

5.13 Example 13 - Financial Analysis: Retirement Strategy

To compare your investment income after 20 years, varying the investment portion and the amount invested in savings, configure the Sensitivity Analysis page as follows and repeat the simulation.

The results are displayed in the following three-dimensional plot.


TOTAL

482778 429136 375494 321852 268210 214568 160926 107284 53642

RENO Training Guide

123

Practice Questions

This chapter provides the following examples, designed to provide further practice in building RENO Flowcharts to model probabilistic scenarios:

Example 1 - Reliability and Availability: Aircraft Readiness - page 125 Example 2 - Risk Analysis: Complex Fuel System Risk Analysis - page 126 Example 3 - Probability: Blackjack - page 127 Example 4 - Probability: Buffys Mood - page 127 Example 5 - Probability: Lottery - page 128 Example 6 - Probability: Running Shoes - page 128 Example 7 - Probability: Roulette - page 129

Note that these examples are not covered in detail. Each example is based on a RENO project file (*.rnp) that is shipped with the software, and the full solution is presented in that file.

6.1 Example 1 - Reliability and Availability: Aircraft Readiness


This example is presented in the RENO file Aircraft Readiness.rnp located in the Reliability subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Reliability). Consider a fleet of aircraft in which each aircraft can be either ready to fly or failed. Assume an 85% probability of the aircraft being ready to fly. If an aircraft cannot fly, it is sent to the maintenance facility where it is repaired based on a lognormal repair distribution with mean = 2 hours and std = 0.7. Each sortie is 1.5 hours and it takes 30 minutes to refuel and check an aircraft before it can undertake another sortie. These sorties can take place only during a 6 hour period each day, 5 days a week. Also assume that an aircraft can fail during flight with a 30% probability. If the aircraft fails during flight, the sortie is considered to be successful; however, the aircraft must undergo repair before its next flight. Determine the expected number of successful sorties per day per aircraft.

RENO Training Guide

125

6 Practice Questions

6.2 Example 2 - Risk Analysis: Complex Fuel System Risk Analysis


This example is presented in the RENO file Complex Fuel System.rnp located in the Risk Analysis subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Risk Analysis). DISCLAIMER: This example does not represent any real system, nor are the values or logic used herein representative of any real world scenario. It uses arbitrary numbers, cases and logic to illustrate the use of RENO constructs. A complex fuel system is susceptible to leaks, as follows:

The leak failure mode is governed by a Weibull distribution with a shape parameter of 3 and a scale parameter of 1,000 days. Each leak can be classified as one of three types, with a specified fixed probability for each type:

Atomizing Leak 10% Minor Leak 20% Major Leak 70%

Atomizing Leak An atomizing leak is undetectable.

It is a risk issue if it fails to ventilate and an ignition source is present at the same time.

Assume a MTTF of 1000 days for the ventilation mechanism and a fixed probability of an ignition equal to 20%.

If an ignition occurs, a fire or an explosion may result 40% of the time.

If a fire occurs, an explosion will not occur. If a fire does not occur, an explosion will occur. The probability that it is a fire rather than an explosion is 80%.

Minor Leak A minor leak is undetectable.

It is a risk issue if it fails to ventilate and an ignition source is present at the same time.

Assume a MTTF of 1000 days for the ventilation mechanism and a fixed probability of an ignition equal to 20%. If ignited, it can cause a fire 80% of the time.

Major Leak A major leak is detectable 90% of the time.

It is a risk issue if it fails to ventilate and an ignition source is present at the same time.

Assume a MTTF of 1000 days for the ventilation mechanism and a fixed probability of an ignition equal to 20%. If ignited, it can cause a fire 99% of the time.

Regarding Personnel At any time, there is a 30% chance that personnel will be in the compartment.

The number of personnel in the compartment is normally distributed with mean of 5 and standard deviation of 1. If personnel are in the compartment, there is a 50% probability that they may be exposed/injured by the fire and a 99% probability that they may be exposed/injured by the explosion.

126

http://RENO.ReliaSoft.com

6.3 Example 3 - Probability: Blackjack

Determine the number of personnel who may be injured if 100 units operate for 3000 days, and what type of injury they will sustain.

6.3 Example 3 - Probability: Blackjack


This example is presented in the RENO file Blackjack.rnp located in the Casino subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Casino). Using a single deck that is reshuffled after every hand, play a game of blackjack against the dealer. The dealer stays at 17 and higher, while you play based on the strategy defined in the MyStrategy table. In the MyStrategy table, you hit (1) or stay (0) depending on what the dealer is showing (D1-D10) and your hand.

Note that in this simple example all hands payoff 1-1 (including a blackjack) and no splits or double downs are contemplated.

6.4 Example 4 - Probability: Buffys Mood


This example is presented in the RENO file Buffys Mood.rnp located in the Misc Fun subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Misc Fun). On any given day, Buffy is either cheerful (C), so-so (S) or gloomy (G).

If she is cheerful today, then she will be C, S or G tomorrow with respective probabilities of 0.7, 0.2, 0.1. If she is so-so today, then she will be C, S or G tomorrow with respective probabilities of 0.4, 0.3, 0.3.

RENO Training Guide

127

6 Practice Questions

If she is gloomy today, then she will be C, S or G tomorrow with respective probabilities 0.2, 0.4, 0.4.

What proportion of time is Buffy cheerful? An algebraic solution to this can be obtained using Markov chains where the transition matrix is:

with three states: cheerful, so-so and gloomy. The limiting probabilities for these states are found to be 30/ 59, 16/59 and 13/59, respectively. Therefore, Buffy is cheerful 30/59 or about 51% of the time. Use RENO to obtain a similar answer.

6.5 Example 5 - Probability: Lottery


This example is presented in the RENO file Lottery.rnp located in the Casino subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Casino). Consider a simple lottery game with a number of balls (possible outcomes) equal to MaxNumber (e.g. if MaxNumber is 10 then 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 are possible outcomes). Assume that the balls that are drawn are equal to the NumberOfBalls. Drawn balls are not replaced, so each number can only appear once. Determine the number of wins and losses that can be expected if there are 10 balls and your ticket has 6 numbers.

6.6 Example 6 - Probability: Running Shoes


This example is presented in the RENO file Running Shoes.rnp located in the Misc Fun subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Misc Fun). A man leaves his house each morning and goes for a run. He is equally likely to leave either from his front or back door. Upon leaving the house, he chooses a pair of running shoes from beside the door or goes running barefoot if there are no shoes at the door from which he leaves. On his return, he is equally likely to enter, and leave his running shoes, either by the front or back door. If he owns a total of k pairs of running shoes, what proportion of the time does he run barefoot? To find an algebraic solution, let Xn be the number of shoes at the front door on day n, then Xn is a Markov Chain with transition matrix :

which is doubly stochastic since row sums and column sums are 1. So i = 1 k + 1 for all i if our runner owns k pairs of shoes. Use RENO to obtain simulated results.

128

http://RENO.ReliaSoft.com

6.7 Example 7 - Probability: Roulette

6.7 Example 7 - Probability: Roulette


This example is presented in the RENO file Roulette.rnp located in the Casino subfolder of the Examples folder located in your application directory (e.g. C:\Program Files\ReliaSoft\RENO\Examples\Casino). The house edges on all possible bets for American roulette are described in the following table. It details expected gains and losses per 38 games for $1 bet. Each number has a probability of 1/38 of being a winner.

You can use RENO to simulate different bets, including:


Only Straight Up Bet Only Color Bet Etc.

Use RENO to analyze a straight up bet.

RENO Training Guide

129

Answers to Practice Questions


This chapter provides the answers to the Practice Questions presented in the previous chapter.

Note that these examples are not covered in detail. Each example is based on a RENO project file (*.rnp) that is shipped with the software, and the full solution is presented in that file.

7.1 Example 1 - Reliability and Availability: Aircraft Readiness


After running 10,000 simulations, the results are displayed in the Simulation Results Explorer and in the flowchart. The expected number of sorties per day per aircraft is 2.0375.

7.2 Example 2 - Risk Analysis: Complex Fuel System Risk Analysis


After performing 1000 simulations, the results are displayed in the Simulation Results Explorer and in the flowchart are as follows:

Injury Due to Explosion from Atomizing Leak 2.7857 Injury Due to Fire from Atomizing Leak 1.7999 Injury Due to Fire from Minor Leak 7.1932 Injury Due to Fire from Major Leak 3.2101

Total Injuries = 14.9889

7.3 Example 3 - Probability: Blackjack


Assuming that the player started with $100, after 1000 simulations, the players final balance is $99.96.

7.4 Example 4- Probability: Buffys Mood


After a single simulation (because the Flowchart includes a loop), the results are displayed in the Simulation Results Explorer and in the flowchart. Buffy is shown to be cheerful 51.56% of the time. Note that in order to approach the limiting probabilities, this scenario needs to be run multiple times. The dependence of a given scenario on the previous day is achieved by looping over the model while keeping track of Buffys mood on the previous day. Because the flowchart contains a loop, the example should be solved using a single simulation.

RENO Training Guide

131

7 Answers to Practice Questions

7.5 Example 5 - Probability: Lottery


After performing 500 simulations, the results are:

Wins: 4 Losses: 496

This can be repeated for different numbers of balls and winning numbers on the lottery ticket. Note that as the odds against winning get larger, you need to run the simulation longer in order to realize any winning outcomes.

7.6 Example 6 - Probability: Running Shoes


After a single simulation (because the Flowchart includes a loop), the results are displayed in the Simulation Results Explorer and in the flowchart. The man runs barefoot 14.89% of the time.

7.7 Example 7 - Probability: Roulette


After performing 1000 simulations, the results are displayed in the Simulation Results Explorer and in the flowchart, as shown next.

132

http://RENO.ReliaSoft.com