Date : 07/08/07
Quotation : DT/07/2027
As requested, I am herewith to submit our quotation for your further details and consideration as mentioned as
below
4,800.00
NO DESCRIPTION QTY AMOUNT (RM)
To supply material & construct wet work extension LUMP SUM
new kitchen & 1st floor bedroom
1 Ground floor
- soil work
- frame work (moulding)
- iron work (y – 12 & R 6)
- concreted work (grade 25)
- to construct pad footing, ground beam, pilar & roof
beam ready to receive roof truss & roof tiles.
- Roof truss hard wood frame 2x6 main runner,
1x2 cross runner.
Roof tiles (existing roof tiles)
- R.C slad
Wet kitchen
- concrete top 10x8
New basin area L/S
- concrete top 3x2
Plumbing work
- wet kitchen : floor tap
- new bath room (grd flr) : 2 no in & out let (shower, pitat)
: floor tap, w/c outlet 6”
- basin area (grd flr) : in & outlet
- bath 2 ( 1st flr) : 3 nos in & outlet for shower, sink &
pitat, floor tap, w/c outlet 6”
- bath 3 (1st flr) : 3 nos in & outlet for shower , sink &
pitat, floor tap, w/c outlet 6”
- new laundry : 3 nos in & outlet for tap, sink & pitat ,
floor tap
- Living
- Curtain moulding
- down light opening
- down light
- Flourescent tube (hidden light)
- existing light point (loping 6 nos point)
- new light point (hidden light)
- new light point (staircase 3 eye bowl with dimmer)
- installation light
- installation fan
16,800.00
NO DESCRIPTION QTY AMOUNT (RM)
To supply & install plaster ceiling 9mm thk & LUMP SUM
G.I metal bar (as per proposed)
- Living 304sf
- Curtain moulding 15.2fr
- down light opening 8
- down light 8 Supply by owner
- Flourescent tube (hidden light) 4
- existing light point (loping 6 nos point) 2+6
- new light point (hidden light) 1+3
- new light point (staircase 3 eye bowl with dimmer) 1+2
- installation light 15
- installation fan 1
- Dining 148sf
- Curtain moulding 8.6fr
- special moulding 45.5fr
- down light opening 3
- down light 3 Supply by owner
- Flourescent tube (hidden light) -
- existing light point (for haging light / relocated) 1
- new light point (3 nos s.moulding) 3
- installation light 4
- installation fan -
- conceal aircond piping & point 1 lot
-Bedroom 4 114sf
- down light opening 4
- down light 4 Supply by owner
- ext. light point (4 nos down lightloping) 4
- installation light 4
- installation fan 1
- conceal aircond piping & point 1 lot
3,300.00
NO DESCRIPTION QTY AMOUNT (RM)
- New bath room 34.3sf LUMP SUM
- down light opening 2
- down light 2 Supply by owner
- new light point (2 nos down lightloping) 4
- installation light 4
- installation fan -
- water heater point 1
-Master Bath -
- down light opening 2
- down light 2 Supply by owner
- ext. 1 light point (2 nos down lightloping) 1+1
- installation light 2
-Room 2 -
-down light opening 6
- down light 6 Supply by owner
- ext. 1 light point (4 nos down lightloping) 1+3
- installation light 4
- installation fan 1
- conceal aircond piping & point 1 lot
- ceiling exhaust fan point 1
-Room 3 -
- down light opening 4
- down light 4 Supply by owner
- ext. 1 light point (4 nos down lightloping) 1+3
- installation light 4
- installation fan 1
- conceal aircond piping & point 1 lot
- ceiling exhaust fan point 1
1,440.00