Acergy Polaris - BP Shipping Status BPGP URF Project
READY TO ISSUE
ITEM ACTION BP COMMENTS Responsible STATUS
TO BP
As an alternative as we discussed in our
close out meeting we are prepared to
accept a BV preliminary T&S manual or BV
Bureau Veritas approved Final Trim and Stability Front pages signed by BV issued Dec. 8th.06 - Final
1 approved T&S load cases specifically Antoine Fandeux 12/8/2006
manual (including damage and intact conditions). document - hard available for review.
addressing the parameters of BP
operations. This is required before the
vessel begins work for BP.