Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

UPG-0005 Ver. 1.0 Power Balance Analysis 2/7

This is an electronically generated document which has been reviewed and approved in accordance with Acergy’s
Management System. An audit trail of review and approval is available within the electronic system and a master
approved copy is available from the HSEQ Department.

The screen version of this document is the CONTROLLED COPY at all times. When printed it is considered a FOR
INFORMATION ONLY copy, and it is the holder’s responsibility that he / she holds the latest valid version

TABLE OF CONTENTS

1. INTRODUCTION ................................................................................................ 3
1.1 GENERAL ........................................................................................................ 3
1.2 ABREVIATIONS & DEFINITIONS............................................................................... 3
1.3 REFERENCE DOCUMENTS ...................................................................................... 3
2. CONSUMERS ..................................................................................................... 3
2.1 GENERAL ........................................................................................................ 3
2.2 BARGE REQUIREMENTS ........................................................................................ 3
2.3 ROV REQUIREMENTS .......................................................................................... 3
2.4 J-LAY REQUIREMENTS ......................................................................................... 4
2.5 ELECTRICAL THRUSTERS REQUIREMENTS ................................................................... 4
3. POWER BALANCE ANALYSIS ............................................................................. 4
3.1 POWER AVAILABLE ON BOARD ................................................................................ 4
3.2 POWER CONSUMPTION ON THE BARGE ...................................................................... 5
4. POWER AVAILABLE FOR TUNNEL THRUSTERS................................................... 5

5. SUMMARY: POWER BALANCE ANALYSIS ........................................................... 6


Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

UPG-0005 Ver. 1.0 Power Balance Analysis 3/7

1. INTRODUCTION
1.1 GENERAL
Between September and November 2006, a modification phase took place on the
DLB Acergy Polaris. The main steps were :
- the installation of a new J-Lay Tower system
- the upgrade of the power generation.

Therefore the purpose of this document is to update the barge power balance
analysis.

1.2 ABREVIATIONS & DEFINITIONS


Abbreviation Definition
DJ Double Joint
DLB Derrick Lay Barge
JLTS J-LAY Tower Structure
PES Pipe Elevator System
POLARIS DLB Acergy Polaris

1.3 REFERENCE DOCUMENTS


Acergy document No Document description
NJL-0074 J-Lay Tower – Load Balance Analysis

2. CONSUMERS
2.1 GENERAL
A load analysis, which has been performed on the Polaris early 2004, can be
considered as the realistic load balance for the exposed modes of operation. From
this study and taking into account recent change on the barge, J-Lay has to be
considered as this mode, especially due to the new tower, is the biggest consumer.

So hereafter is a detail list of main consumers of the barge.

2.2 BARGE REQUIREMENTS


Basing on the load analysis performed on the barge in 2004, we can estimate the
electrical power required by the barge at 1 100 kW.

Barge Requirements
Equipment Power Comment
Barge Service 1 100 kW
TOTAL 1 100 kW

2.3 ROV REQUIREMENTS


Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

UPG-0005 Ver. 1.0 Power Balance Analysis 4/7

Two ROVs are currently in use on the Polaris. In normal use, electrical power needs
are the sum of the ROV requirement and of its HPU Winch, used to move ROV up
and down. Two winches are installed on the Polaris deck, one for each ROV.

In normal use, requirements are currently as follow:

ROV Electrical Requirements


Equipment Power Comment
ROV Scv29 400 kW ROV power + winch
(185kW+215kW)
ROV Scv30 185 kW ROV power only
TOTAL 585 kW

Notes:
- We generally do not use both winches at the same time
- When a ROV is moved up by a winch, it still need to be fed
- The installation of a third ROV in not confirmed yet

2.4 J-LAY REQUIREMENTS


The J-Lay Tower system (Huisman + Engineering Business manufactured) requires
the following power according to the operating mode :

J-lay Tower System Electrical Requirements


Equipment Power Comment
DJ hoisted with drawworks 1800kW

Catenary hoisted with drawworks 2250kW

Welding + FJC 1450kW

Abandonment with A&R winch 1100kW

Recovery with A&R winch 2250kW

The normal mode is the chain of DJ hoisted with drawworks, Catenary hoisted with
drawworks and welding and coating.

2.5 ELECTRICAL THRUSTERS REQUIREMENTS


The two tunnel thrusters require 1 700 kW each at 100%, i.e. 3 400 kW. They
cannot be used at 100% nowadays. So we need to see their percentage of possible
use depending on the Jlay Tower power consumption.

3. POWER BALANCE ANALYSIS


3.1 POWER AVAILABLE ON BOARD
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

UPG-0005 Ver. 1.0 Power Balance Analysis 5/7

The three new Wartsila generator sets installed in the generator room are of
1589kW type.
The two existing Caterpillar installed in the Crane tub are of 1440kW type.

The following table gathers the electrical power available on board depending on
the number of generator sets in use at the same.

GENERATOR SETS USE FOR GENSETS


DESIGNATION RATED POWER
Wartsila G1 1589kW 85% 85% 85% 100% 100% 100%
Wartsila G2 1589kW 85% 85% 85% 100% 100% 100%
Wartsila G3 1589kW 85% 0% 85% 100% 0% 100%
Caterpillar G4 1440kW 0% 70% 70% 0% 100% 100%
Caterpillar G5 1440kW 0% 0% 0% 0% 0% 0%
Power Available on board 4050kW 3700kW 5060kW 4770kW 4620kW 6210kW

3.2 POWER CONSUMPTION ON THE BARGE


The following table gather the information on power consumption aboard regarding
J-Lay tower requirements.
Catenary hoisted
Normal Pipe Lay

Normal Pipe Lay

with A&R winch

with A&R winch


Abandonment
DJ hoisted

Recovery
Welding

Coating
+

BARGE CONSUMPTION
Barge Service 1100kW 1100kW 1100kW 1100kW 1100kW
ROV CONSUMPTION
ROV scv29 400kW 400kW 400kW 400kW 400kW
ROV scv30 185kW 185kW 185kW 185kW 185kW
JLAY TOWER
Power consumption 1800kW 2250kW 1450kW 1100kW 2250kW
TOTAL 3485kW 3935kW 3135kW 3485kW 3935kW
With Active Gimballing 3985kW 4435kW 3635kW 3935kW 4435kW

4. POWER AVAILABLE FOR TUNNEL THRUSTERS


It has been fixed that 4 generator sets have to run when we want to use the tunnel
thrusters at a high level.
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

UPG-0005 Ver. 1.0 Power Balance Analysis 6/7

The following tables gather the electric power available for tunnel thrusters when J-
Laying depending on the number of generator sets available, including percentage
of use of only one thruster or two thrusters.

Normal Pipe Lay

Normal Pipe Lay

with A&R winch

with A&R winch


Abandonment
DJ hoisted

Recovery
Catenary

Welding

Coating
hoisted

+
POWER 3935kW 4435kW 3635kW 3935kW 4435kW
3 Wartsila @85% 4050kW NA NA NA NA NA

2 Wartsila @85% 3700kW NA NA NA NA NA


1 Caterpillar @70%
2 Wartsila @100% 4620kW 685kW NA 985kW 685kW NA
1Caterpillar @100% 1Th:40% 1Th:58% 1Th:40%
2Th:20% 2Th:29% 2Th:20%
3 Wartsila @100% 4770kW 835kW NA 1135kW 835kW NA
1Th:49% 1Th:66% 1Th:49%
2Th:49% 2Th:33% 2Th:49%
3 Wartsila @85% 5060kW 1125kW 625kW 1425kW 1125kW 625kW
1 Caterpillar @70% 1Th:66% 1Th:36% 1Th:83% 1Th:66% 1Th:36%
2Th:33% 2Th:18% 2Th:42% 2Th:33% 2Th:18%
3 Wartsila @100% 6210kW 2275kW 1775kW 2575kW 2275kW 1775kW
1Caterpillar @100% 1Th:100% 1Th:100% 1Th:75% 1Th:100% 1Th:100%
2Th:67% 2Th:52% 2Th:38% 2Th:67% 2Th:52%

5. SUMMARY: POWER BALANCE ANALYSIS


Catenary hoisted
Normal Pipe Lay

Normal Pipe Lay

with A&R winch

with A&R winch


Abandonment
DJ hoisted

Recovery
Welding

Coating
+

BARGE CONSUMPTION
Barge Service 1100kW 1100kW 1100kW 1100kW 1100kW
ROV CONSUMPTION
ROV scv29 400kW 400kW 400kW 400kW 400kW
ROV scv30 185kW 185kW 185kW 185kW 185kW
JLAY TOWER
Power consumption 1800kW 2250kW 1450kW 1100kW 2250kW
TOTAL 3485kW 3935kW 3135kW 3485kW 3935kW
With Active Gimballing 3985kW 4435kW 3635kW 3935kW 4435kW
Acergy Division Process Date of Issue

Acergy S.A. Acergy Polaris 30th Nov, 2006

Document No & Version Document Title Page

UPG-0005 Ver. 1.0 Power Balance Analysis 7/7

Note :
1. Active gimballing system is planned to be rarely used for Greater Plutonio Project
2. In case of reel need of thrusters, ROV winch are not going to be used
3. In case of thrusters, J-Lay Tower Power requirement can be lowered