Documente Academic
Documente Profesional
Documente Cultură
Instructions: This is the First hard covered Title page in black color
with all the text in silver color and embossed properly
ii
This internship report is submitted in partial fulfillment of the requirements for the degree of Master of Business Administration awarded by the Hazara University, Manshera. Note: (Use your own course in underlined sentence)
Session--------------
Note: First page after the hard binding, must be in plain white A4 size paper, with Black Text only. iii
Approval Sheet
.
Approval Committee 1. External Examiner
2. Supervisor
Mr. ____________________________________________ Signature_______________ Designation: _________________ 3. Head of Department Mr. ___________________________________________ Signature ________________ Designation: _________________ Note: Type Supervisor and Head of Department Names with Designation Note: Supervisor for MBA Section (A): Shakeel Ahmad Designation: Professor Supervisor for MBA Section (B): Zamin Khan Designation: Associate professor Supervisor for BBA: Sardar Ejaz Ahmed Designation: Assistant Professor
iv
CERTIFICATE
_______________ Bank Limited, Mansehra Road Abbottabad It is certified that Mr. _____________________________ s/o _____________________ has completed his internship at ..
vi
Abstract
1. The abstract is a prcis of the report, usually placed before table of contents. 2. The length of the abstract should be one page (A4), Font size 12 and line space 1.5 3. For the examiners or library readers it provides an overview, therefore, the abstract should provide a synopsis of every key aspects of the thesis. 4. The abstract usually includes the key points of methodology, data analysis and conclusions.
vii
Table of Contents
Acknowledgements Abbreviations Executive Summary
CHAPTER 1 Introduction and Research Design
1.1 1.2 1.3 1.4 1.5 Introduction Justification of Research Purpose and Aim of the Research Objective of Research Selection of the Project Area 1.5.1 Historical Background 1.5.2 Climate and Weather 1.5.3 Hydrology 1.5.4 Principal Sources of Pollution 1.6 1.7 1.8 Data Collection and Analysis Process Adopted for Plan Preparation Natural Hazard Selection and Analysis
xi xii xiii
Page No.
01 01 02 03 04
Note: This is just a sample for the guidance of the students, how to develop the table of contents, including page numbering, CHAPTER Numbering, Chapter Name, Topics/Subtopics supported by Bullets/Sub-bullets, etc.
2.2.1 Problems of High Density Population and Poor Construction Snowfall and Severe Winter Storms Heavy Rainfall 2.4.1 2.4.2 Rainfall Pattern over Pakistan Rainfall Pattern during Winter Season
viii
2.4.3 2.5
Land Slides / Mud Slides 2.5.1Landslides due to Deforestation 2.5.2 Landslides due to Soil / Rock structure 29
2.6
Fire in the Forested Areas as a Result of Drought 2.6.1 Types of Droughts 2.6.1.1 Meteorological Drought 2.6.1.2 Hydrological Drought 2.6.1.3 Agricultural Drought
32 32
Note: This is just a sample for the guidance of the students, how to develop the table of contents, including page numbering, CHAPTER Numbering, Chapter Name, Topics/Subtopics supported by Bullets/Sub-bullets, etc.
2.7
Disease Outbreak due to Water Pollution 2.7.1Principal Source of Water Pollution 2.7.1.1 Abbottabad City 2.7.1.2 Havelian 2.7.1.3 Nathiagali 2.7.2 Industrial Wastewater 2.7.3 Impact on Environment
2.8
Conclusion
ix
3.3 3.4
Severe Winter Snow Storms/ Heavy Rains Floods 3.4.1HAZUS-MH Flood Loss Estimation Models
61 64 67
Notes References
68 70
List of Tables
Table 1.1 Mean Monthly Temperature, Precipitation And Relative Humidity Recorded at Kakul Station, Abbottabad District. Table 2.1: Comparative Statement of Weighted Precipitation Over Different Provinces During Winter Period (Dec to Mar) (1961-90) Table 2.2: Comparative Statement of Weighted Precipitation Over Different Provinces During Summer Period (Jun to Sep) (1961-90)
List of Maps
Map 2.1: Map of NWFP Pakistan Map 2..2: Map 2..3: Map 2.4:
List of Annexes
Profile of District Abbottabad Union Council/ Village wise Distribution of Population Population Census District Abbottabad Abbottabad Conservation Strategy Annexure B Annexure C Annexure A
IUCN Report
Annexure D
Acknowledgements
God Almighty is worthy of all acknowledgments.. I have no words to express my heartiest sense of gratitude to my supervisor, Mr. , Government College of Management Sciences Abbottabad for his supervision, contribution, intellectual guidance, constructive suggestions, valuable time, patience and wise comments which make this research possible. I highly appreciate the help and cooperation of the Mr.___________ ABC Bank Limited Abbottabad for their support and collaboration. I also acknowledge the help of all government departments and public in collecting information / documents / data for this report. I wish to express my deepest and sincere appreciation to all my friends including for their help, cooperation, and moral support. The last but not least, I would feel incomplete without thanking to my parents who pray for my brilliant success and bright future.
xi
Abbreviations
PDM NWFP KKH TD IKSZ : : : : : Pre Disaster Mitigation North West Frontier Province Karakoram Highway Tarbela Dam Indus Kohistan Seismic Zone
xii
Executive Summary
1. Summary should be 2-3 pages. 2. Provide chapter wise detail, conclusion and suggestion.
xiii
CHAPTER 1
Introduction and Research Design
xiv