Sunteți pe pagina 1din 6

CURRICULUM VITAE

AIJAZ ASKARI Address:R-940, Block-20, Al-Noor F.B Area, Gulberg Town, Karachi 75950.

PERSONAL INFORMATION:
Fathers : Muhammad Askari 1st January 1953 42101-7643802-9 Pakistani Married Islam Engineering 0322-2219738, 0301-2970629

Date of Birth : N.I.C No Nationality : :

Marital Status : Religion Profession Contact : : :

CARRIER OBJECTIVE:
To serve a responsible position where my skills can be utilized properly and developed further.

ACADEMIC QUALIFICATION:

. Passed S.S.C from Secondary Board of Education Karachi in 1972.

. Passed Diploma of Associated Engineer (Mechanical) from Sindh of Technical Education in


1975 .

. Passed H.S.C from Higher Secondary Board of Intermediate (Private) in 1976 . . Certificate Course of Quantity Surveyor (Evening Program) .
From Sindh Board of Technical Education Karachi (Pakistan) in 1982 .

PRACTICAL EXPERIENCE:
For your kind knowledge that the total services experience given in my life 30 years, details are as under:-

.Worked as Ware House Man in Howard-P-Foley Company Saudia Arabia from December
1976 to 1978 .

.Worked as Site Supervisor in Air Conditioning Division


In Mushko & Company Karachi from July 1979 to 1982 .

.Worked as Assistant Engineer of Air Conditioning Division .


In M/s World Wide Refrigeration Company Ltd. Karachi . From April 1982 to January 1985.

.Worked as a Project Engineer in M/s Engineers & Contractor (Pvt) Ltd .


Karachi from May 1985 to September 1997 .

.Worked as a Project Engineer in AL Hassan Engineering & Construction (Pvt) Ltd. Karachi
Pakistan From September 1997 to December 1999 .

.Worked as a Site Incharge in Habib-Ullah Associated (Pvt) Ltd .


Karachi Pakistan from December 1999 to 2001 .

.Worked as a Petty- Contractor Air Conditioning Division in Trans World ELECTRO Mechanical
LLC Company in Dubai From December 2003 to April 2005 .

.Worked as Site Incharge in Habib-ULLAH Associated (Pvt) Ltd .


Karachi Pakistan from October to 2005 to 12th June 2007

.Worked as Project Engineer in Al-Hassan Technology & Engineering Services (Pvt) Ltd.
Karachi Pakistan From 13th June, 2007 to Till Date .

THE WORK ACCOMPLISHED MECHANICAL ERECTION


1.Wide Body (Isphani) Hanger Karachi. Installation of Centrifugal Compressor, Compressed Air Piping System, Vacuum Piping System, Start up of Complete Pneumatic Air System at Air Port
Responsibilty Consultant Supervision of Site Work Engineering Consultant Karachi

PLUMBING SYSTEM
1.Mandviwalla Plastic Industries Uthal Balochistan . Cold Water, Hot Water, & Sewerage Line With Complete System (Split Unit) Responsibility Consultant Supervision of Site Work . Engineering Consultant Karachi .

2.State Guest House Karachi. Air Conditioning & Ventilation System (Split Unit) Responsibilty Supervision of Site Work . 3.Radio Pakistan Peshawar. (NWFP) Air Conditioning & Ventilation System (Water Cooled Package Unit) Responsibilty Supervision of Site Work . -Measurement of Quantities with Drawings for Required Material at site Consultant A. Saddat & Co.Karachi .

4.National Bank Principal Office, Peshawar . Air Conditioning & Ventilation System (Water Cooled Package Unit) Responsibilty -Supervision of Site Work . -Measurement of Quantities with Drawings for Required Material at site Consultant A. Saddat & Co. Karachi .

5.Boots Pakistan Ltd, Karachi. (Pharmaceutical Company) Air Conditioning & Ventilation System

(Reciprocation Chillers, Cooling Tower, Air Handling Units Centrifugal Pumps, & Ventilation Fans ) Responsibilty -Supervision of Site Work. -Measurement of Quantities with Drawings for Required Material at site . Consultant -A. Saddat & Co. Karachi .

6. Finance Trade Center, Karachi . Sheet Metal Duct Work of Air Conditioning & Ventilation System, Kitchen, exhaust, M.S Duct, with Kitchen Hoods . Responsibilty -Supervision of Site Work -Measurement of Quantities with. Drawings for Required Material at site . Consultant -A.Saddat & Co. Karachi . -S.Mahboob & Co. Karachi . 7.Engine Overhaul Shop, Karachi Air Port. Air Conditioning Ventilation System (Renovation Installation of Absorption Chiller, Steam Boiler, Chilled Water, Condenser Water Piping etc) . Responsibilty -Supervision of Site Work -Measurement of Quantities with. Drawings for Required Material at site . -Preparation, Submition & Approvals of Running Bills from Owners / Consultant . -Quality Control of Material. -Co-ordination with Contractors, Consultants & Clients .

Consultant

International Consultant Karachi .

8.Pakistan Re-Insurance Corporation, Head Office Building Karachi Air conditioning & ventilation system (Absorption Chillers,Air Handling Units Centrifugal Pumps, Cooling Tower & Fans). Responsibilty -Supervision of Site Work . -Measurement of Quantities with Drawings for Required Material at Site . -Preparations, Submition & Approvals of Running. Bills from Owners / Consultant . -Quality Control of Material . -Co-Ordination with Constrictors, Consultants Clients. Consultant International Consultant Karachi

9.State Life Building No.2 Karachi. Renovation & installation of air conditioning & Ventilation system (Direct Fired Absorption Chillers, Air Handling