Auxiliary power consumption - Indian perspective

Slide 2
8.44
8.29
8.17
8.34
8.33
8
8.1
8.2
8.3
8.4
8.5
2005-06 2006-07 2007-08 2008-09 2009-10
A
u
x
.

P
o
w
e
r

C
o
n
s
u
m
p
t
i
o
n

(
%
)
Auxiliary Power Consumption in Thermal Power stations
at i onal vg. i s bet ween . t o . f or l ast f i ve year s
our ce nnual r epor t
Slide 3
Auxiliary Power Consumption in Thermal Power stations
All India average auxiliary power consumption by the thermal stations was
8.34% for 2009-10.
APC Minimum for Central sector utilities was 7.12% & Maximum for Private
IPPs 9.44%
26 Stations were having auxiliary power consumption below national
average of 8.34%
Slide
Planning based on Cost Benefit Analysis
Philosophy
Up gradation
Innovation
Improvement
Obsolescence and End-Of-Life
Statutory requirement
Approach by Indian power sector
Slide
VFD for Condensate Extraction Pump (CEP) Motor
Benefits
Lower starting current
Reduced stress on pump and motor
Saving in energy 150 KW each unit.
Improvement Plant performance.
Improved efficiency of Equipments.
Reduction in Aux. Power.
Some of the initiatives taken
Slide
Vapour Absorption Machine (Air Conditioning System)
Reason
Reduction in steam consumption in APRDS system due to discontinued
use of HFO.
Existing vapor compression machines consume higher electricity.
Use CFC based refrigerants ( can damage ozone layer).
Benefits
The absorption system use steam as heat source with lithium bromide
as absorbent and water as refrigerant.
Noiseless and vibration less
Saving in energy 212 KW.
Slide
Some of the initiatives taken
epl acement of basket s
Reason for taking of project
Worn-out/choked heating elements
Improper seal clearances
Damaged sector plates and side sealing plates
Increased loading of ID fan and PA and FD fan.
Increase in auxiliary power consumption
Slide
Benefits achieved:
HPT module is available to meet the risk of major breakdown.
Improvement in Unit Heat Rate is 36 Kcal/kWh.
Reduction in Capital overhauling period by 5 days.
Avoided purchase of costly power by customer of DTPS.
Power purchase of RInfra-D (hence cost reduction to its consumers) by
`. 15.13 Cr. in FY10.
HPT Module Replacement
Slide
Variations in Auxiliary Power Consumption
mphasis on efficient generation r at her t han pl ant l oad f act or
egr adat i on of equi pment r esul t i ng i n l oss of capaci t y.
ver haul s wi t h f ocus on ener gy ef f i ci ency
i nanci al const r ai nt s l ead mpl ement i ng emer gi ng t echnol ogy
( devi at i on r epor t ) syst ems f or anal ysi s of f i nanci al i mpact of
var i ous oper at i ons
uel ef f i ci ency
edi cat ed gr oup or t ask f or ce t o t ar get ef f i ci ency i mpr ovement
Slide
e need nput s on
pt i mi zat i on of exi st i ng syst em and sub syst em.
ssi st ance f or onduct of i gh ual i t y ner gy udi t s
pt i mum ut i l i sat i on
ecommendat i on
f f ect i ve per at i on & ai nt enance pr act i ces.
st abl i shment of ener gy management syst em wi t h f ocus on ux
power
se of r eak t hr ough t ool s
ami l i ar i zat i on and i nt er change of best pr act i ces
ot ent i al f or r educi ng ener gy consumpt i on
Slide
Use of New technologies with cost economics to reduce Aux power
Development of electronic data base to analyze the findings of all
energy audit reports carried out in power plants
Make available recommendation of findings to all
Assessment of impacts with respect to energy conservation and
efficiency.
Potential for reducing energy consumption