Abstract:
Purchasing executives are discovering that plant closures, outsourcing, and price
reductions gained from the supply base can only go so far in helping to improve the
bottom line. What many leaders are missing is that they may already have the tools
in place to automate their direct material procurement process. Recent studies have
shown that automating this process provides significant cost reductions for processing
purchase order data and also allows the procurement professionals to move away from
transactional processing to more strategic activities such as sourcing, building supplier
relationships, and performing purchasing analysis.

This paper will present an analysis of a plan-driven procurement process for direct
materials. This analysis includes not only the activities and steps in such a process,
but also the data sets associated with each activity. Automation of this process will be
explored to highlight where an organization can find process improvements that lead to
positive impact on the bottom line. Several recent studies are referenced to identify the
benefits companies have obtained by automating the plan-driven direct procurement
process. Purchasing executives can use this information to analyze their own direct
material procurement processes to determine what benefits might be obtained.
 Process Automation of Plan Driven Procurement for Direct Materials

This paper does not attempt to analyze best practices for material planning, but begins the direct material
process analysis with receiving a material requirement. Starting with the material requirement allows this
paper to focus on establishing a process framework for direct material procurement activities, and not with
the planning or sourcing process. Establishing this process framework is necessary, as there is not a true
industry standard for plan-driven procurement and most companies that implement such a process will
undoubtedly enhance and customize it to meet their own unique requirements.

A basic understanding of the fundamental process and data establishes the framework for this paper to
further explore the opportunities to automate and enhance the plan-driven direct material procurement
process. Ultimately organizations can use the information presented to aid in the analysis of their own
direct material procurement processes.

Scope of Paper
CIBER, Inc. 

For the past few years procurement organizations around the world have focused a significant
amount of time and resources on improving processes and applications to identify the best source
of supply for a material or service. Purchasing professionals have worked with their own IT
departments as well as software vendors to increase this sourcing functionality. The results of
these activities provided many benefits including material cost reductions, improved procurement
process efficiencies, and consolidated sources of supply.

Despite these improvements in the procurement Even companies with automated plan-driven
process, many organizations are missing out on procurement processes in place today can find
increased ROI and business benefits that can be improvement opportunities by reviewing the
obtained by reviewing their existing processes for technologies used to support these processes. New
direct material procurement. Today, the vast majority and improved applications now use service oriented
of manufacturing companies employ some type architecture (SOA) and common data standards such
of enterprise resource planning (ERP) system to as XML. These technology improvements include
support their purchasing and material management multiple data transmission methods, faster transmission
processes. Typically, these ERP systems offer the processes, and increased data validation capability.
functionality to automate a plan-driven procurement Additionally, these applications are making it easier
process. ERP systems are known for their ability to incorporate the supply base into the direct material
to support multiple threaded processes and vast procurement process. No longer is EDI the de facto
amounts of data and transactions. With the standard for data exchange between a company and
automation of the processes and transactions its supply base. With the introduction of internet-based
associated with the procurement of direct materials, applications and systems, such as portals, companies
companies can expect improvements to their bottom can now electronically exchange purchasing data with
line by driving down transaction costs, reducing the the majority of their supply base using the appropriate
amount of data and transactional errors associated data standard and transmission method. Supplier
with manual processing, and allowing their enablement, or the incorporation of the supply base
procurement professionals to move away from the into all aspects of the procurement process, is another
support of daily purchasing transactions to a more step in the direct material procurement process that if
strategic role such as sourcing. automated, will result in improved ROI.

Introduction
 Process Automation of Plan Driven Procurement for Direct Materials

The Process

Figure 1 represents a high level view of a direct material procurement process. It has purposefully been simplified in order to
facilitate the discussion of the various process activity steps and their associated data sets. While it is by no means a complete
end-to-end procure to pay process, the process flow contains enough activities to facilitate a high level presentation of what
the process is, and allows the inclusion of sub-processes where appropriate. Each activity is uniquely numbered to easily
identify it later in the paper

1 2 3 4
Material Purchase Purchase Purchase
Requirement Requisition Order Order
Generated Created Created Combine

5 6 7 8
Purchase Purchase Advanced
Goods
Order Order Shipping
Received
Delivery Response Notice Sent

9 10 11
3 Way Payment
Invoice Sent Match Data
Performed Generated

Figure 1 – Automated Plan Driven Procurement Process for Direct Materials

Step 1 - Material Requirement Generated The key concept to grasp for this activity is that even
with multiple systems or sources of requirements, it
Most manufacturing companies have deployed some
is still possible to automate this step to directly feed
ERP system that includes material resource planning
these requirements to a purchasing or ERP system.
(MRP) functionality. MRP is a complex process in and
Automating this activity not only ensures that the
of itself that takes into account existing inventory, sales
requirements are delivered in a timely and reliable
orders, work in process, and forecasted material needs.
manner, but also reduces the data errors associated
With MRP analysis and explanation beyond the scope of
with manually entering requirements.
this paper, we must assume that the output of this process
is a direct material requirement. An organization can
Middleware is one technology that can assist with
have multiple direct material requirement sub-processes
this process automation. Middleware is generally
and sources. Examples would include kanban systems,
defined as software that allows for data routing and
vendor managed inventory (VMI), and other alternative
transformation between two or more systems or
inventory systems.
applications.1 There are a number of middleware
software packages available, and many ERP systems
At a minimum the material requirement data set must
come already equipped with some form of middleware.
contain the material number, the quantity required,
Examples of middleware include IBM’s MQSeries,
and the due date. Typically most MRP systems add
Oracle’s Advanced Queuing, and SAP’s Process
additional data as determined by an organization’s
Integrator (PI).
unique requirements for this process.
CIBER, Inc. 

Step 2 - Purchase Requisition Created to reduce the amount of transactions and processing
time later in the process. During this step material
The second step of the direct material procurement requirements that do not have a determined source
process is to generate a purchase requisition. The of supply are identified and flagged for a sourcing
purpose of this step is to check for sourcing, and activity.
perform preliminary data validations and approvals
before creating a legally binding document such as Purchase requisitions can be created either in the
a purchase order. Material requirements without a ERP system or in a purchasing or supplier relationship
properly identified source of supply are held from management (SRM) system. Purchase requisitions
purchase orders until the proper source of supply is that are created in an SRM system may or may not
determined. Direct material purchase requisitions be transferred to an ERP system. The decision to
rarely require approvals since the prevalent thinking is perform this transfer is based upon several factors
the MRP process insures the requirement is legitimate. including the level of control required to support the
As such many ERP systems allow for automatic process, how much purchasing functionality is used in
approval of direct material requisitions. the ERP system, and how well the requisition process
is implemented in the organization.
The key data found in a purchase requisition includes
the material number, description, quantity, due date, Step 3 - Purchase Order Created
sourcing information, company code, cost center,
location code and address of the requesting plant or The purchase order (PO) creation is arguably the
department. Most organizations will add additional most important step in the direct material procurement
data to the purchase requisition depending on their process. This is a legally binding document between
requirements. With an automated process it is possible the buyer and the seller. The PO contains all of the
to combine multiple direct material requirements into data found in the purchase requisition and adds key
a single purchase requisition which ultimately helps data that is typically pulled from a contract. This data
 Process Automation of Plan Driven Procurement for Direct Materials

includes supplier information (name, number, address, order that might include multiple plants, departments,
contact person), prices, shipping methods and costs, and materials. Again, this is usually an automated
units of measure, and payment terms. feature of the SRM or purchasing application that will
require some up front effort to properly enable. Certain
The Importance of Contracts customs, tax, and legal requirements will restrict the
opportunity to combine PO’s but the benefit obtained
Contracts are extremely important in an automated
from a combination process can easily offset the effort
direct material procurement process as they provide a
required to develop and support such an activity.
reliable source of data that facilitates the generation
of the PO and insures the buying organization is
Step 5 - Purchase Order Delivery
getting the best negotiated price for the material.
The use of contracts increases an organization’s Key to automating the direct material plan-driven
compliance with purchasing policies while reducing the procurement process is the ability to exchange
amount of maverick buying. The Gartner Group also purchasing data electronically with your supply base.
emphasizes the use of contracts as a best practice. This activity, also known as supplier enablement,
“The identification and efficient management of all provides several benefits including reduced data
contracts with suppliers is an underrated process,” processing costs, improved processing time, and
it reports. “Although contracts are at the heart of the enhanced communication with the supply base. A 2005
supplier management activity, most enterprises have study to determine future procurement trends revealed
no formal systems in place to manage the contract that information sharing between the purchasing
lifecycle. This lack of visibility and control will often organization and its supply base was key to collaboration
cause an enterprise to fail to extract full value from the and cost reduction efforts.4 As the PO is one of the more
contract and the supplier relationship.”2 important purchasing data sets, logically it must be
included in any supplier enablement strategy.
Many software vendors that provide purchasing
applications are enhancing their contract and Electronic PO delivery generally falls into the following
sourcing functionality to meet the growing needs and methods: electronic data interchange (EDI), extensible
demands of their clients. Contract management was markup language (XML), FAX, or e-mail. Regardless
identified as a key strategic advantage for best-in- of the type of transmission method used, a standard
class direct material procurement in the 2007 Direct PO form must be developed to insure that the right
Material Sourcing Study by Aberdeen. Best-in-class data is consistently delivered to the supply base. While
procurement organizations had 98% of their direct one could debate that FAX and e-mail are not truly
materials under spend management which resulted in electronic, these transmission methods are typically
63% greater contract compliance.3 Clearly, contracts much faster than the traditional process of printing a
play a vital role to these best-in-class performers. hard copy PO and sending it via postal mail.

Step 4 - Purchase Order Combine Supplier Enablement Strategies

Purchase orders using the same vendor can be As in step 1 of this process, middleware can be used to
combined to reduce transactions and processing. enable the electronic sharing of purchasing data with
This allows a vendor to receive a single purchase the supply base. A key issue with this solution is the

...
Key to automating the direct material plan
driven procurement process is the ability to
exchange purchasing data electronically with
your supply base.
CIBER, Inc. 

amount of effort required to develop the connections Development effort and testing will be required to
(or interfaces) to each supplier. As the supply base enable new suppliers to join the network. Most supplier
grows, so do the number of connections and amount of networks charge a fee to join the network. This fee
resources required to support the process. is usually passed on to the supplier which in turn
receives the positive opportunity to perform electronic
Middleware is generally considered an acceptable transactions with any company that is on the network.
solution for EDI and XML transmission methods. Another added benefit to a procurement organization
However most SRM and ERP systems have built-in is that the company providing the supplier network
functionality that permit purchasing data to be sent via assumes the responsibility of ensuring that the proper
FAX or e-mail to the supply base. This will require the connections and transmission methods are made with
development of standard forms but the cost of enabling the supply base. For companies with a very large supply
this transmission method in an SRM or ERP system base this can become a significant time and resource
is typically less than the effort required to do it using savings. Procurement software vendors such as Ariba,
middleware. Perfect Commerce, Oracle, and SAP either offer their
own supplier network or have partnered with at least
Supplier portals can also be used to electronically one company that specializes in providing a supplier
transmit procurement data to and from the supply network.
base. Most SRM systems offer some form of supplier
portal to facilitate the electronic exchange of data and Regardless of the solution chosen it is important to
communications with the supply base. These portals establish one method of communication with each
can be configured to offer better electronic data supplier for all data sets. This reduces the amount of
processing for those suppliers that might not be able to maintenance effort for all parties and aids in developing
support EDI or XML transmission methods. a standard communication strategy with the supply
base.
A final strategy for supplier enablement is the use of a
third party company that specializes in providing access Step 6 - Purchase Order Response
to a supplier network. The supplier network is a pre-
The purchase order response (POR) is sent from the
existing organization of various suppliers and vendors
supplier to the buyer providing notification that the
that are electronically connected via an e-market
supplier has accepted the PO as is. A POR containing
software system. Procuring companies that join an
changes to the original PO may also be sent to the buyer.
existing supplier network receive an immediate benefit
This situation typically triggers a PO change request in
when their suppliers are already part of the network.
the buyer’s purchasing system that ultimately results in
 Process Automation of Plan Driven Procurement for Direct Materials

...

The advanced shipping notices are important


to the buyer as they provide notification as to
when to expect delivery of the goods ordered.

a new PO containing the changes being issued to the technology advances in radio frequency identification
supplier. Upon receipt of this new PO, the supplier (RFID) tags and advanced bar code reading systems
would then issue another POR to accept the new PO. are allowing some companies to automatically confirm
This can become an iterative process as the supplier received materials in the appropriate system.
attempts to address both the demands of the buyer
as well as their own inventory and production levels. A goods receipt contains much of the information
Automation of this process ensures that multiple found on the PO but also includes quantity delivered,
versions of the PO and POR can be simultaneously delivery address, date and time of receipt, recipient
supported without causing interruption to either identification, and supplier address and contact
business. information.

Step 7 - Advanced Shipping Notice Sent Step 9 - Invoice Sent


The advanced shipping notice (ASN) is sent from the The invoice is the process step where the supplier
supplier and/or freight company to the buyer when the requests payment from the buyer. In general an
order is ready to be shipped out. The ASN contains invoice is not issued until after the materials have
order information, shipping instructions, delivery been shipped. The reality of this activity is that many
methods, and due dates. ASN’s are important to times the buying organization can receive the invoice
the buyer as they provide notification as to when to before the materials arrive and are received into the
expect delivery of the goods ordered. This provides system. This can be due to logistical issues, shipping
the buyer with the necessary lead time to prepare for delays, and the fact that an electronic invoice can
the arrival of the material. be delivered in much less time than it actually takes
to ship the materials. Also, changes to the PO, the
Step 8 - Goods Received return of unwanted, unordered, or damaged goods,
and data errors found on the invoice leads to mistakes
Much like the POR activity in step 6, the goods receipt
in invoice processing, which ultimately results in either
step can initiate a multitude of sub-processes and
over or under payment to the supplier.
activities. In its most simple form, the goods receipt
is entered only once in the buying organization’s ERP
Invoices are generally processed by the accounts
or SRM system. This single entry would complete the
payable (AP) department of the finance organization.
order-to-confirmation sub-process. The reality of this
Given that the AP organization is very rarely aware of
activity is that many orders are delivered incomplete,
what is being procured by the purchasing organization,
or in multiple stages, or contain poor quality materials
and the renewed emphasis on auditing and spans of
that must be returned, or contain the wrong materials
control required by the Sarbanes-Oxley (SOX) act of
that must be returned. As such the goods receipt
2002, most invoices receive considerable scrutiny from
process typically is an iterative activity that continues
the AP department. As many companies can process
until all materials on the PO have been received.
upwards of thousands of invoices a day, there is a
While most SRM systems allow for a confirmation
tremendous benefit to be realized to both the supplier
document to be created ahead of the actual goods
and the buyer when invoices can be transmitted in a
receipt, the goods receipt is typically manually entered
standard electronic format. Electronic invoices benefit
by a receiving clerk when the materials arrive. New
suppliers by providing faster posting and transmission
CIBER, Inc. 

times, helping them to receive payments in a more Clearly this becomes a labor intensive process when
timely manner. Electronic invoices benefit the buying mismatches occur. While process automation and
organization by removing the manual process of electronic data transmission help insure that accurate
receiving the invoice and entering it into the system, data is reliably delivered in a timely manner, there is
and the associated data errors that occur with manual no process that can guarantee 100% three-way match
entry. success. A study published in 2005 commissioned by
the Commercial Solutions division of Visa revealed
As detailed in the Supplier Enablement Strategies that best practice organizations achieved automated
section, there are a number of systems and delivery payments on only 71% of their transactions.5
methods available for handling electronic invoices.
Regardless of the chosen solution, it must be able to The three-way match is not the only way to insure that
support a number of transmission techniques as not proper payments are scheduled and made. Many
all suppliers will be able to standardize on one or two companies perform some form of a two-way match
transmission methods. that includes variations of the data found on the PO,
the goods receipt, and the invoice. Additionally,
Step 10 - Three-Way Match Performed evaluated receipt settlement (ERS) offers another
alternative for generating payment information. ERS
The three-way match activity involves analyzing the
typically involves generating payment data after
data found on the purchase order, the goods receipt,
receipt of the materials; an invoice is not required.
and the invoice to determine that the quantities and
prices are within predetermined tolerances. Payment
Previously mentioned supplier enablement strategies
data is generated only when the evaluated data fields
such as middleware, supplier portals, and third party
are within the tolerances levels. Out of tolerance data
supplier networks all offer some form of electronic
flags the invoice for manual processing and an AP
invoice processing. Additionally, many of today’s ERP
clerk must manually determine why the match did not
systems have functionality in their finance modules to
occur and what steps can be taken to correct the issue.
facilitate electronic invoice processing. Finally, there
Usually this involves contacting the receiving clerk,
are a host of vendors that offer services for electronic
vendor, and/or buyer to understand the discrepancy.
10 Process Automation of Plan Driven Procurement for Direct Materials

invoice processing, paper invoice processing, and the or department as the supplier already knows how to
conversion of paper invoices to electronic invoices. interact with the new organization due to the standard
process. A key finding of the 2006 Aberdeen Direct
Companies that receive a large amount of paper Materials Sourcing Benchmark Report revealed
invoices that require significant resources to process that true direct material cost savings can only be
manually should consider the ROI that could be obtained with an enterprise wide process.6 Legal,
gained by moving to an electronic invoice process regulatory, and regional issues will impact process
solution. Not only will an electronic invoice solution standardization as customization must be performed
reduce the headcount required to process invoices, to meet these unique requirements. The key is to
but additional savings can be obtained by processing limit this amount of customization to address only the
the invoices in a more timely manner and taking pertinent issues.
advantage of improved payment terms.
Conclusions
Step 11 - Payment Data Generated
With most manufacturing companies today employing
The final step that we will address in this paper is the some form of ERP they clearly have the opportunity to
generation of the payment data. While this is not the automate their direct material procurement process.
final activity in an end-to-end procure-to-pay process, Given the advancements in functionality and ease of
it represents a logical termination point as this is a use of today’s web based SRM systems there is also
financial process and must be performed in a finance opportunity for significant ROI for the implementation
system. An ERP system will offer this functionality or increased use of an SRM system. In a March 2007
but an SRM system will not. However, there is article, Andrew Douglas, UK director of procurement
overlap in how ERP and SRM systems handle invoice at Oracle, estimates that most organizations with
processing. An SRM system can accept and process purchasing technology use only half of it, defeating
an invoice; however, it is not a financial system. The one of the key objectives for having it.7 SRM systems
SRM system flags the finance system for the actual were predominately known for supporting the indirect
payment to be scheduled. An ERP system can both material procurement process but with increased e-
process the invoice and generate the payment data. sourcing and direct material processing functionality,
The optimum process will depend on how the finance companies need to evaluate the cost benefits of using
and procurement organizations are structured and an SRM system in addition to their ERP system.
what SRM and ERP functionality has been deployed.
A shift to using more SRM functionality also correlates
Standardize, Standardize, Standardize! with a broader movement by many organizations to
It is important to note that as with any process, elevate the status of procurement to a strategic and
companies that employ a consistent, standard executive board level. With an increased focus on
process throughout their organization are more the bottom line many organizations are realizing that
likely to experience success. Standard procurement creating a chief procurement officer (CPO) leads to a
processes are effective in reducing maverick buying, strategic investment in the procurement organization.
improving compliance, and facilitating reporting on As a strategic function procurement can better drive
total spend. Additionally, standard processes make component and module standardization, and form
it is easier for a supplier to support a new division strategic partnerships with the supply base to better
support new product introductions.8

...

The key is to limit this amount of customization to


address only the pertinent issues.
CIBER, Inc. 11

An organization need not undertake a global, About the author


enterprise-wide software implementation to realize
noteworthy improvements in processing capability.
Each activity step in the plan-driven direct material
procurement process can be automated in some
fashion, either completely or partially, and more than
likely using existing applications and systems. An Dan Harmon
APQC study revealed that organizations which have Director of CIBER’s SAP SRM
an automated procurement process or which are in
the process of automating, have an average cost
Dan Harmon is Director of CIBER’s SAP Supplier
of $7.41 per PO versus a cost of $19.21 for those
Relationship Management (SRM) Practice, which
without automation. Additionally, companies with
specializes in project implementations and upgrades for
automation were found to be able to process $1
the SAP SRM suite of applications. Dan has more than
billion in procurement with 34.5 FTE’s, versus 74.6
13 years of IT experience and 10 years of SAP project
FTE’s per billion without automation.9 The automation
experience including multiple global rollouts of various
of key activities in this process can lead to reduced
SAP systems, modules and functionality.
process cycle time, increased data accuracy, and less
human interaction; all significant reasons to perform
Prior to joining CIBER in 2005, Dan worked for more
an evaluation of the present process. Consider the
than 20 years at the Motorola Semiconductor Products
following quote from a January 2006 AMI research
Division, which was later spun off into Freescale
alert:
Semiconductor. He held a variety of positions in
manufacturing, test engineering, QA, and IT. Dan’s
The automation of procurement execution as part of
broad experience gives him a unique perspective on
pull-based replenishment of direct materials is driving
system implementation and process automation. He has
true process collaboration between manufacturers
presented at numerous SAP conferences on different
and suppliers. With the aid of technology such as that
topics and has authored articles on Product Lifecycle
presented here, companies can expect to streamline
Management (PLM) processes and configuration
buyer productivity, eliminate non-value-added
management. He can be reached at 602-206-0244 or
activities, reduce direct material inventory across
at dharmon@ciber.com.
the supply chain, and improve the supply network’s
capability to meet customer demand as is required for
DDSN (demand driven supply network).10 1
http://www.middleware.org/
2
E-Business Best Practices. SupplyChainBrain.com.
Finally, today’s procurement organizations should September 2002.
consider updating their supplier enablement strategy 3.
Aberdeen Group. “Direct Materials Sourcing –
to take advantage of technological gains in this Living in a Material World.” May 2007.
4.
area. With an increased focus on core processes Ogden, Jeffrey A., Peterson, Kenneth J., Carter, Joseph R.,
Monczka, Robert M. “Supply Management Strategies for
and strategic initiatives, manufacturing organizations
the Future – A Delphi Study.” Journal of Supply Chain
presently supporting their own internal supplier Management, Summer 2005, p. 36.
enablement strategy should decide if they are in the 5
“Procure to Pay Best Practices.” Visa Commercial
business of making a product or supporting a complex, Solutions. February 2006.
point-to-point interface system with their suppliers. 6
Bharadwaj, Sudy. Aberdeen Direct Materials Sourcing
Many companies will discover that today’s supplier Benchmark Report. March 2006.
7
enablement solutions offer increased functionality, Parker, Robin. Tomorrow’s World. Supply Management,
March 29, 2007, p. 22.
ease of use, and quick on-boarding for their suppliers. 8
“Procurement Benchmarks Show Wide Variation between
The costs for such a project can easily be justified Top and Bottom Performers.” Supply Chain Digest.
given the returns of automated direct material October 4, 2006.
9
procurement and improved communication with the Loftus, Paul. “Procurement Practices for High
supply base. Performance.” FAO Today. November 2006.
10
Aimi, Greg, Rizza, Mickey, and Swanton, Bill. “Supplier
Collaboration Streamlines Direct Material Procurement.”
AMI Research Alert. 1/19/2006.
CIBER, Inc. (NYSE: CBR) is a pure-play international system integration
consultancy with superior value-priced services for both private and
government sector clients. CIBER’s global delivery services are offered
on a project or strategic staffing basis, in both custom and enterprise
resource planning (ERP) package environments, and across all
technology platforms, operating systems and infrastructures.

Founded in 1974 and headquartered in Greenwood Village, Colo., the


company now serves client businesses from over 60 U.S. offices, 22
European offices and five offices in Asia. Operating in 18 countries, with
over 8,000 employees and annual revenue of nearly $1 billion, CIBER
and its IT specialists continuously build and upgrade clients’ systems to
“competitive advantage status.” CIBER is included in the Russell 2000
Index and the S&P Small Cap 600 Index.

www.ciber.com

CIBER, Inc. • 5251 DTC Parkway • Suite 1400 • Greenwood Village, CO 80111 • 800.242.3799
© 2007 CIBER, Inc. All rights reserved. CIBER and the CIBER logo are registered trademarks of CIBER, Inc.
CIBER stock is publicly traded under the symbol “CBR” on the NYSE.

S-ar putea să vă placă și