Sunteți pe pagina 1din 2

NOTES :

01. ALL DIMENSIONS ARE IN MM. AND LEVELS ARE IN METERS UNLESS SPECIFIED OTHERWISE.
02. ALL THE DIMENSIONS SHOWN SHOULD BE VERIFIED AT SITE BEFORE TAKING UP DESIGN WORK IN HAND.
ANY DISCREPANCY NOTED SHOULD BE FORWARDED THROUGH ALTERATIONS DULY SIGNED.
03.PILE CAPACITY:-
VERTICAL = 350TON, HORIZONTAL = 40TON
04. MAXIMUM SAFE BEARING CAPACITY AT THE FOUNDING LEVEL WILL BE CONSIDERED AS PER GEOTECHNICAL REPORT.
IF IT IS LESS THAN THE BASE PRESSURE, THE FOUNDATION HAS TO BE REDESIGNED.
05. DRAINAGE SPOUT SHALL BE PROVIDED AS PER MOST SPECIFICATION. DESIGN CONSULTANT SHOULD
SUBMIT SEPARATE SHEET OF DRAINAGE SPOUTS AS PER LATEST MOST STANDARDS.
06. THE APPROACHES ARE RE WALL AT SOLID PORTION.
07. EXPOSURE CONDITION OF THE BRIDGE AND ITS COMPONENTS SHOULD BE DECLARED AS PER IRC 112 - 2011 /
IS : 456. ALL SPECIFICATION LAID DOWN IN IRC CODES / IS : 456 CODE FOR RELEVANT EXPOSURE
CONDITION SHALL BE FOLLOWED.
08. FOR DETAILS OF SUBSTRUCTURE REFER SEPARATE DRAWING DULY APPROVED BY RAILWAY.
09. WORK SHOULD BE CARRIED OUT BY THE PARTY UNDER THE SUPERVISION OF RAILWAY ENGINEERS WITHIN
RAILWAY LAND LIMIT.
10. SANCTION OF CRS SHOULD BE OBTAIN PRIOR TO EXECUTION OF PROPOSED WORK.
11. TYPE OF BEARING :- i) POT-PTFE FOR ROB, ii) ELASTOMERIC BEARING FOR VIADUCT.
12. SUITABLE UTILITY DUCTS IF REQUIRED, SHOULD BE PROVIDE BELOW FOOTPATH SLAB WITH THE
APPROVAL OF ENGINEER IN CHARGE.
13. R.C.C CRASH BARRIER OF 1.2 M & R.C.C RAILING 1.2 M HEIGHT IN RAILWAY PORTION WILL BE PROVIDED
DRAWING.
14. DESIGN SHALL BE AS PER LATEST RELEVANT CODE OF IRC INCLUDING SP-33 AND OTHER CODES AS PER
APPROVED BY M.O.S.T.
15. R.C.D. SHOULD ENSURE SAFETY DURING EXECUTION OF THE WORK , SO THAT MOVEMENT OF RAIL TRAFFIC MAY
NOT BE AFFECTED.
16. SUITABLE SR , IF REQUIRED SHOULD BE IMPOSED BEFORE TAKING UP THE EXECUTION OF WORK WITH THE
APPROVAL OF ENGINEER IN CHARGE.
17. TEMPORARY SIGNALLING ARRANGEMENT WILL BE DONE AS PER G.R. 15.09 (i) D & S.R. 15.09 (2) OR
GR 15.09(2) B & S.R. 15.09 (2) WHICHEVER IS ADOPTABLE IF REQUIRED.
18. LOADING STANDARD OF ROB AS PER IRC - 6 : 2014.
19. FULL FLEDGED LOAD TEST OF SUPERSTRUCTURE SHOULD BE DONE AS PER IRC : SP-5 TO ENSURE
QUALITY WORK.
20. DETAILS OF INSPECTION OF BEARING WILL BE SHOWN ON DETAILED STRUCTURAL DRAWING.
21. CONCRETE DESIGN MIX.
FOR ROB PORTION: R.C.C SUPERSTRUCTURE-M40 , R.C.C SUBSTRUCTURE-M35, PILE CAP-M35, RCC PILE M-35,
FOR VIA DUCT PORTION: R.C.C SUPERSTRUCTURE-M35 , R.C.C SUBSTRUCTURE-M30, PILE CAP-M30, RCC PILE M-35,
CRASH BARRIER-M40, APPROACH SLAB-M30 , PEDESTAL-M35, REACTION BLOCK-M35.
22. AS THE ROB HAS BEEN PROPOSED AT OTHER THAN LC LOCATION, DIVERSION ROAD IS NOT REQUIRED.
23. REINFORCEMENT BARS SHALL BE H.Y.S.D OF GRADE Fe-500 CONFIRM TO IS.1786.
24. PROVISION OF CLAMPS IN THE SUPERSTRUCTURE FOR SUPPORTING THE A.C TRACTION WIRE TO BE MADE
INVARIABLY IN CONSULTATION WITH THE CONCERNED AUTHORITIES BASED ON STANDARD TYPICAL DRAWING.
25. ALL R.C.C. / M.C.C. / P.C.C. WORK SHOULD CONFORM TO RELEVANT IS / IRC CODES & MOST SPECIFICATION.
26. FOR FABRICATION, WORKMANSHIP, INSPECTION & TESTING ,PROTECTION AGAINST CORROSION ETC.
RELEVANT PROVISION OF IRC-24-2001 SHALL BE FOLLOWED.
27. THE DEPTH OF FOUNDATION SHOWN IN THE DRAWING IS TENTATIVE & MAY CAN BE CHANGED
RCD AS PER ACTUAL SOIL PROPERTIES AND DESIGN CALCULATION.
28. BENT UP BARS (U-SHAPED) Ø 32 AT 150 C/C SHALL BE EMBEDDED IN PIER / PIER FOR
APPROACHING PIER / PIER CAP & BEARING FOR ROUTINE INSPECTION & MAINTENANCE.
29. REPRESENTATIVE OF TELECOM & SIGNALLING DEPARTMENTS SHOULD BE MADE AVAILABLE BEFORE
COMMENCEMENT OF PROPOSED WORK , IN THE VICINITY OF SIGNAL & TELECOM CABLE.
30. TEMPORARY ARRANGEMENT DRAWING OR METHODOLOGY OF LAUNCHING OF GIRDERS OVER RAILWAY
TRACK SHOULD BE GOT APPROVED FROM RAILWAY AUTHORITY BEFORE START THE WORK.
31. MoRTH SHALL SUBMIT RELEVANT CREDENTIALS REQUIRED FOR THE SELECTION OF PMC & EXECUTING
AGENCY TO Sr. DEN SHALL ACCORD APPROVAL FOR APPOINTING PMC & EXECUTING AGENCY.
32. DIMENSION GIVEN IN THIS DRAWING MUST BE RECONCILED AT SITE BEFORE START THE WORK FOR
FEASIBILITY.
33. PRECAUTIONARY MEASURES FOR CONSTRUCTION OF ROB ON DEPOSIT WORK / COST SHARING WORK WITH LIFE.
NHAI / STATE GOVT. AND PRIVATE AGENCY ISSUED BY ADVISOR CIVIL ENGINEERING RAILWAY BOARD
LETTER NO 97 / CE-1/BRO/158 (POLICY) PT.-II, DATED 16.07.2009 SHOULD BE STRICTLY FOLLOWED.
34. NO CONSTRUCTION JOINT SHALL BE NORMALLY ALLOWED IN CONCRETE WORKS WITHOUT SPECIAL
PRECAUTIONS AS PER THE RELEVANT BRIDGE CODES AND SUITABLE PROTECTION PAINTING OF APPROVED
MAKE SHOULD BE USED TO PAINT THE UNDERSIDE OF CONCRETE ROB GIRDERS ALSO TO ENSURE LONG
35. GUARD RAIL SHOULD BE PROVIDED IN THE TRACK NEAR ISOLATED PILLAR OF ROB.NO CONSTRUCTION JOINT
SHALL BE ALLOWED IN PSC OR RCC SLAB OR GIRDER AND CURING OF ALL CONCRETE AND MASONRY WORKS
AS PER THE RELEVANT CODES OF PRACTICE SHALL BE ENSURED BEFORE USE.
36. INSPECTION LADDER / STEPS SHOULD BE PROVIDED TO ENSURE PROPER INSPECTION ACCESSIBILITY OF ROB.
37. STRUCTURAL STEEL SHALL CONFORM TO IS:2062 (GRADE-B).
38. STRIP SEAL TYPE EXPANSION JOINTS SHALL BE PROVIDE AS PER LATEST MOST REQUIREMENT, CONTRACTOR
SHOULD FURNISHED DESIGN / DRAWING OF EXPANSION JOINTS FROM FIRMS APPROVED BY MOST AT
VARIOUS RELEVANT AMBIENT TEMPERATURES TO SUIT SITE CONDITIONS WITH WITH THE APPROVAL OF
ENGINEER IN CHIEF.
39. RCC CRASH BARRIER SHOULD BE PROVIDED UP TO 30M MINIMUM LENGTH ON EITHER SIDE OF
APPROACH EMBANKMENT AS PER MOST STANDARDS.
40. TO PROTECT THE CONCRETE FROM DAMAGE DUE TO SMOKE OF LOCOMOTIVES ,4.00 M WIDE STRIP WITH
POLYSULPHIDE PAINT PREFERABLY IN BLACK COLOUR SHALL BE PROVIDED IN SOFFIT OF THE DECK OVER
RUNNING TRACKS.
41. STANDARD MAINTENANCE AGREEMENT SHOULD BE EXECUTED WITH RAILWAY AND MoRTH.
FOR GRANT OF PERMISSION FOR CONSTRUCTION OF ROB IN RAILWAY PORTION.
42. MoRTH SHOULD ENSURE THAT BEFORE LAYING OF ANY NEW WEARING COAT IN FUTURE EXISTING
WEARING COAT SHOULD BE COMPLETELY REMOVED.
43. NO WORK SHOULD BE TAKEN UP IN HAND TILL PROOF CHECKED DESIGN AND DRAWING WITHIN RAILWAY
PORTION AREA APPROVED BY RAILWAY.
44. MAINTENANCE CHARGES (CAPITALIZED) AND WAY LEAVE CHARGES SHOULD BE DEPOSITED WITH RAILWAYS
AT THE TIME OF CRS APPLICATION IS FILED.
45. ALL STEEL STRUCTURE SHOULD HAVE ANTI-CORROSIVE PROTECTION OF LONG DURABILITY.
46. WAY - LEAVE FACILITIES / EASEMENT RIGHT ON RAILWAY LAND SHALL BE GOT APPROVED BY COMPETENT
RAILWAY AUTHORITY.
47. D & G (SUPERVISION) CHARGES SHOULD BE DEPOSITED WITH RAILWAYS AT THE TIME OF SUBMISSION OF
DETAIL DRAWING & DESIGN FOR APPROVAL.
48. QUALITY CONTROL AND SAFETY PRECAUTIONS AND MEASURES TO BE OBSERVED DURING EXECUTION OF
ROB THROUGH PMC (PROJECT MANAGEMENT CONSULTANCY).

49. METALLISING AND ALUMINIUM PAINTING SHOULD BE DONE ON GIRDER AS PER PROVISIONS OF PARA 218 OF IRBM.
50. RAILWAY BOUNDARY ARE MARKED HERE ON THE BASIS OF SITE INVESTIGATION
BUT NOT VERIFIED BY THE CONCERN AUTHORITY.
51. RECOMMENDED SAFE LOAD ON PILE TO BE CONFIRMED BY PILE LOAD TEST
(PLT).MAJOR DIFFERENCE IN RESULTS BETWEEN PLT & RECOMMENDED SAFE LOAD
MUST BE BROUGHT TO THE NOTICE OF E-INCHARGE IMMEDIATELY
52. AUTHORITY OF WORK - MORTH.

DATE REVISION NO. REVISION


CE'S/DRG.NO-
HQ.FILE NO-

INDIAN RARE EARTH LTD.


GAD FOR FOUR LANE ROB AT RAILWAY KM-6.0
BETWEEN RAILWAY STATION INDIAN RARE EARTH
PLANT, GOPALPUR TO CHATRAPUR ROAD ON 1.3 KM
OF NATIONAL HIGHWAY-217(PRESENTLY NH-516),
LEGEND : -
TO VILL BORA ARJIPALLI
TO CHATRAPUR
:
IN GOPALPUR,ODISHA.
BH-03
10
(GENERAL ARRANGEMENT DRAWING)
BH-02 R.L.=9.100M BH-04 :
09 BH-01 R.L.=8.540M 00.00 R.L.=8.450M
00.00 00.00 EGL
R.L.=7.730M
08 E G L 00.00 :

APPROVAL OF RAILWAY AUTHORITY


N=5
0
50

07 U1(slip)
N=18
1+

U1(slip) N=7 :
U1(slip) IA
SIGNATURE OF
N=18
SIGNATURE OF
06 N=8 Loose, yellowish
U1(slip) N=17 S.W.L.=3.90M brown / yellowsh N=8 :
05 S.W.L.=3.70M
DIV.OFFICER'S:- HQ.OFFICER'S:-
N=15 I S.W.L.=4.10M N=10 grey, silty fine sand.
04 S.W.L.=3.90M N=26 N=11
03 N=24 U2(slip) Medium dense, 06.00 N=21
yellowish grey to 06.00
C.B.E:
U2(slip) N=28 N=24
DRM/ :
02 yellowish brown, silty
N=26 07.00 fine sand. Obs. N=24 :
01 kankars. U2(slip)
07.00 N=84 N=23
00
-1
N=77
N=86 10.00
N=29 08.50
N=36 SR.DEN(Co-Ord.): DY.CE/BR/HQ:
N=76 N=34
-2 Dense to very dense, N=84 N=41
XEN/BR/D:
yellowish grey / yellowish
-3 N=79 N=44
SR.DEE/ :
0

brown / light greeish grey,


40

N>100 N=49
1+

-4 silty sand with kankars.


N=91 II N=56
-5 Obs. clay binder. N>100 N=60
-6 N>100 N=66 SR.DSTE/ : AEN/BR/D:
-7 N>100 N=70
N>100
-8 N=78
16.00 N=50/40 N>100 N=86
-9 R1 40/00 17.20
R1 36/00
N=50/40 18.00
R1 38/08
N=50/40
18.10
N>100
N=50/40
SR.DOM/
-10 R2 60/23
R2 26/00 R1 29/00
R3 42/16 R2 48/00
0

-11
30

R3 29/00 III R2 34/00


1+

-12 R4 38/00 R4 38/00 R3 50/00


R5 50/00 R3 33/00
-13 R5 53/00 R4 62/00 Highly to moderately
R6 60/30 IV weathered, grey, medium R4 61/10
-14 R6 60/10
R5 39/00 grained, fractured rock.
-15 R7 80/55 R7 46/08 R5 54/00 IV
-16 R6 47/00 R6 61/00
25.50 24.58
-17 IV Moderately to slightly weathered, grey, medium grained, fractured rock.
0
20

U means `UDS'
1+

-18
N means `N' value
N = X/Y means X blows required
for Y mm Penetration
CR/RQD %

CLIENT: GENERAL ARRANGEMENT DRAWING OF DPR CONSULTANT : DWG. NO.


SCALE :-
MINISTRY OF ROAD TRANSPORT & HIGHWAYS (MORT&H) PROPOSED ROB OF NH-217(PRESENTLY NH-516)
AS SHOWN
(CH -1.3KM)
CET/3362/P11/GP 1.3KM/PR/GAD-1
GOVERNMENT OF INDIA
PROJECT: CONSULTANCY SERVICES FOR PREPARATION OF PROJECT REPORT PROJECT ID:- C.E. TESTING COMPANY PVT. LTD. DRAWN BY CHEEKED BY APPROVED BY REV.
R0 JUNE, 2015 COMPRISING,DETAILED SURVEY/ INVESTIGATION, ALIGNMENT OPTION, PREPARATION OF
GENERAL ARRANGEMENT DRAWING AND ENGINEERING REPORT FOR CONSTRUCTION OF PROP.ROB AT ROADWAY CHAINAGE 1.3KM
( An ISO 9001 , 14001 & OHSAS 18001 Certified Company )
MKD. DESCRIPTION CHKD. APPRD. DATE:-
NOVEMBER,2015 PROPOSED ROB & THEIR APPROACHES IN REPLACEMENT OF EXISTING LEVEL CROSSINGS (PROP.ROB AT RAILWAY CHAINAGE KM 6.0) 124-A, N.S.C. Bose Road , Kolkata - 700092.
REVISIONS IN THE STATE OF ODISHA UNDER CONTRACT PACKAGE NO.-11 S.MONDAL P.DAS A. DEY R1
NOTES :

DATE REVISION NO. REVISION


CE'S/DRG.NO-
HQ.FILE NO-

INDIAN RARE EARTH LTD.

GAD FOR FOUR LANE ROB AT RAILWAY KM-6.0


BETWEEN RAILWAY STATION INDIAN RARE EARTH
PLANT, GOPALPUR TO CHATRAPUR ROAD ON 1.3 KM
OF NATIONAL HIGHWAY-217(PRESENTLY NH-516),
IN GOPALPUR,ODISHA.
(GENERAL ARRANGEMENT DRAWING)
APPROVAL OF RAILWAY AUTHORITY
SIGNATURE OF SIGNATURE OF
DIV.OFFICER'S:- HQ.OFFICER'S:-

DRM/ : C.B.E:

SR.DEN(Co-Ord.): DY.CE/BR/HQ:

SR.DEE/ : XEN/BR/D:

SR.DSTE/ : AEN/BR/D:

SR.DOM/

CLIENT: GENERAL ARRANGEMENT DRAWING OF DPR CONSULTANT :


SCALE :-
MINISTRY OF ROAD TRANSPORT & HIGHWAYS (MORT&H) PROPOSED ROB OF NH-217(PRESENTLY NH-516)
AS SHOWN
(CH -1.3KM)
CET/3362/P11/GP 1.3KM/PR/GAD-2
GOVERNMENT OF INDIA
PROJECT: CONSULTANCY SERVICES FOR PREPARATION OF PROJECT REPORT PROJECT ID:- C.E. TESTING COMPANY PVT. LTD. DRAWN BY CHEEKED BY APPROVED BY REV.
R0 JUNE, 2015 COMPRISING,DETAILED SURVEY/ INVESTIGATION, ALIGNMENT OPTION, PREPARATION OF
GENERAL ARRANGEMENT DRAWING AND ENGINEERING REPORT FOR CONSTRUCTION OF PROP.ROB AT ROADWAY CHAINAGE 1.3KM
( An ISO 9001 , 14001 & OHSAS 18001 Certified Company )
MKD. DESCRIPTION CHKD. APPRD. DATE:-
NOVEMBER,2015 PROPOSED ROB & THEIR APPROACHES IN REPLACEMENT OF EXISTING LEVEL CROSSINGS (PROP.ROB AT RAILWAY CHAINAGE KM 6.0) 124-A, N.S.C. Bose Road , Kolkata - 700092.
REVISIONS IN THE STATE OF ODISHA UNDER CONTRACT PACKAGE NO.-11 A.Kar P.DAS A. DEY R1