PPT-108
Macau Regulation
China Practice
External Drainage
Singapore Regulation
Podium
Floor Drain
Basin / Sink
Bathtub / Shower
Air Test
Without Trap --100mm w.g. for 5 minutes
Maximum drop 25mm w.g.
With Trap -- 38mm w.g. for 15 minutes
No drop allowed
xx
xx
Air/smoke can be
injected at any part
of the pipework
to be tested
x
Water Gauge
xx
Low zone soil stack
Vent stack
Water Gauge
xx
Low zone soil stack
Vent stack
Flow
Direction
Flow
Direction
Laying of
Before trenching
60 deg.
Concrete surrounding
Poor Practice
nt
e alignme
sur
ring to en
ed st
Tens
Poor ground
condition and
ground collapse
and debris Pipe mis-aligned
fallen into
trench
Open pipe
end without
proper cap
off
Poor Practice
Debris and
Ground water
collapse and accumulated
debris fallen in trench
into trench
• No trenching
• No waling
• No lean concrete
• No bedding
• Working platform stand on the pipe
• Pipe not laid in straight alignment
• Mirror test
End of PPT