Documente Academic
Documente Profesional
Documente Cultură
D NXUMALO ENGINEERING TECHNICIAN Employee SAP Number Port/BU & Department FFV490T/52034 INFRA TECHNICAL SUPPORT
S. JACOBS Date To TO render technical support by the exucution of various duties and assignment in the field of signal Engineering with the main focus an all maintenance Manager Date: Signature:
Note: Press "Alt+Enter" to type the following sentence in the next line.
Weight Strategic Performance Objective (SPO) (Performance incentive bonus / Reward allocation) Performance Indicators Decreased from 2009/2010 in safety incidents (Near misses, loss incidents vehicle accidents,Infrastructuer DIFR) Manage standby plants lifting Equipment Special projects Sum of weight Manager Consensus & rating Rating
SPO
Target (rating) 1.Increase in safety incidents 2. No reduction 3. 3-5% reduction 4. 6- and above reduction 1 2 3 4 < 80% 80% - 90% 90% > 90%
Evidence
Self
Improve TFR safety performance to enable improved performance and ensure sustainable growth
20%
0.4
20%
0.6
20%
1 < 80% Machinery and Equipment 2 80% - 90% reliability and availability 3 90% Quality assurance 4 > 90% Asset verification Engineering Support Technical admin supplied to workshop staff & clients Compile and arrange stats,info,graphs ect Job observation 1 2 3 4 1 2 3 4 Targets Targets Targets Targets not achieved partialy achieved achieved consistently exceeded
0.6
20%
Relevant reports
0.6
20%
Presented data
0.6
2.8
Page 1 of 2
OPERATING DIVISION: Employee's Surname & Initials Position Title M.D NXUMALO ENGINEERING TECHNICIAN Employee SAP Number Port/BU & Department FFV490T/52034 INFRA TECHNICAL SUPPORT
S. JACOBS Date To TO render technical support by the exucution of various duties and assignment in the field of signal Engineering with the main focus an all maintenance Manager Date: Signature: INDIVIDUAL LEARNING PLAN
Note: Press "Alt+Enter" to type the following sentence in the next line.
Suggested development activities(self study, on-the-job, formal, coaching, etc.)
Support Required
Suggested timeframes
Opportunit y for application of Opportunity for application learning/s of learning/skills (supply kills detail) (supply
ADVANCED
FORMAL
Sep-10
BASIC
Page 2 of 2