Sunteți pe pagina 1din 13

Experiences Details of Engineers :

MEC-01: MD. HAFIJUR RAHMAN Worked about 14 years on Power System Erection, Operation and Maintenance for BPDB(The Electric Ltd. And China international Water & Electric Corp Consortium at 210 MW. Ghorashal Thermal power Station Extension Project (6th Unit), The Bengal Electric Ltd (Baghabari 100 MW. Gas Turbine, Shirajganj, Bangladesh Under Bharat Heavy Electric Ltd. India.), The Bengal Electric Ltd. At 210 MW. Siddhirgonj Thermal Power Station Erection Project, BPDB, Siddhirgonj, Narayangonj, Bangladesh Under TECHNOPROMEXPORT (TPE), Russia, The Bengal Electric Ltd at Cooling Tower Addition Project, 90 MW. Combined Cycle Power Plant, Fenchuganj Sylhet, Under Sumitomo Corporation, Japan, Shah Cement Power Ltd. (a company of MAC CATTERPILLER)(11.6 MW. Gas Engine power plant.) Unique Power Plant Ltd (Under the Westine Hotel & Resorts Ltd.(04 MW. Gas Engine power plant.) BDC-BDCC-HAM Consortium Embankment Project, Patenga, Chittagong, Bangladesh. MEC-02:MD. SHAJALAL KABIR Worked as a sub assistant Engineer in 210MW Ghorasal Thermal Power Station Extension Project (6th unit) under The BANGLE ELCTRIC LTD from First January 1996 to February 2000. Worked as an Assistant Engineer in 210MW Siddirgonj Thermal Power Station Project (1st Unit) under The BANGLE ELCTRIC LTD from February 2000 to 20 May 2002. Worked as an Erection chief 7.5 MW Two Tempest Turbine in PHP COLD ROOLING MILL Under the ALSTOM & SIEMENS Damage Delivered Equipment Service ltd From 20 May 2002 to 21 July 2004. Worked as an Erection chief 20 Ton capacity two Poultry feed mill structure & Machineries, 1.5MW gas engine, 4 ton capacity Boiler,10 bar Compressor in KAZI FARMS GROUP Gogaria Munshigonj From October 2004 to march 2005. Working as an Maintenance Engineer 20 Ton capacity two Poultry feed mill, 1.5MW Gas Engine, 4 ton capacity Boiler,10 bar compressor etc in KAZI FARMS GROUP Gogaria Munshigonj From march 2005 to till date. ______________________________________________________________________ __ MEC-03: MD. MONIRUL ALAM

Served as a Sub-assistant Engineer (Bioler) in the Bangal Electric

and China water Electrice Group. Consortium in G.T.P.S. 210 MW (6th Unit) project from 01-08-96to 22-02-99. Assistant Engineer in the Power Trade Engineering Ltd & Rangpur Dairy Firm. Join in 22-03-2004. Till now working in 110x2 MW in Siddirgonj. ________________________________________________________________________ MEC-04: ENGR. MD. HEDHAYETULLAH KHAN Fenchuganj Combined Ccle Power Plant, BPDB, Fenchuganj, Sylhet. Associated with erection & Commissioning of Gas Turbine(s) (Frame 6, Model 6581, Mk-VI; GE) ; HRSG(s) ; Steam Turbine (NANJING) ; Total Capacity: 105 MW. ________________________________________________________________________ MEC-05: SAMAR KUMAR TALUKDER: 90 MWCCPP, BPDB, Fencuganj, Sylhet, Bangladesh. ________________________________________________________________________ MEC-06: ENGR. MD. ABDUS SALAM MIAH O & M of the Port Utility Services viz. Central AC System, Diesel Power Station, Desalination Plant, Electrical Sub-Stations, Port fire Fighting System, Mechanical & Automobile Workshop etc. Air Conditioning & Ventilating System of Cosmopolitan Industries (Pvt) Ltd. (CIPL) Factory at Bara Ashulia, Savar, Dhaka, Bangladesh. ________________________________________________________________________ MEC-07: A.S.M. MIJANUR RAHMAN Ghorashal 950 MW Steam Turbine Power Plant Palash, Norshingdi, Bangladesh. From September 2005 to till now (March-2008) Bheramara 20 MW x 3 = 60 MW Gas Turbine (Diesel Fuel) Power Station. ________________________________________________________________________ MEC-08: MD. SHAHIDUL ISLAM 90 MWCCPP, BPDB, Sub Assistant Engineer, Fenchuganj, Sylhet, Bangladesh. Worked as a Sub assistant engineer (shift) in Khulna Thermal Power Plant, BPDB, Khulna, Bangladesh for seven years. Worked as a Sub assistant engineer (shift) in 132/33 kv Grid SubStation, BPDB, Jessore, Bangladesh for four years. Worked as a Sub assistant engineer (shift) in Karnafuli Hydro Electric Power Plant, BPDB, Kaptai, Bangladesh for two years. ________________________________________________________________________ MEC-09: MD. HOSSAIN SHOHIED MONZURUL HOQ Industrial training at 420MW Raozan Thermal power plant. Assistant Manager GPH Power generation, Chittagong. Ecperience in installation & operation & maintenance of 12 MW Gas Generator & 24 MW substation. ________________________________________________________________________

MEC-10: MD. HASSAN MORSHED MW (4MW X 6nos.) Maintenance Engineer (Mechanical) GBB Power Limited, Bogra. From 1st November 2007 to till date. GBB Power Ltd. (Bogra) as a Shift Engineer. During this period involved plant Erection, Commissioning, Operation, Maintenance and trouble shooting etc. ________________________________________________________________________ MEC-12: MD. MOHIUDDIN (SOHAG) 27.65M.W. Gas Engine Power Plant (which is extension from 10.8 M.W.) of Unique Power Plant Ltd. (An Enterprise Engineer (Shift) from 18th November 2004 to till now. ________________________________________________________________________ MEC-13: GOUTOM MONDOL Unique Power Plant Ltd, (An Enterprise of Meghna Group of industries). As an Asst Shift Engineer From 6th May 2006 To Till Now. ________________________________________________________________________ MEC-14: A.K.M ZAHID HOSSAIN Asst. Manager Power Generation and Distribution Beximco Textile Ltd. Sarabo, Karabo, Kashimpur, Gazipur, Bangladesh. For reular preventive & predictive maintenance & trouble shooting for smooth operation of 9 MW. Wartsila gas generator. France: 0.5 MW Scania Diesel generator, 4.2 MW Gas turbine Power Plant of Tuma-Turbo SA of Switzerland. 0.5 MW Waukesha, USA. ________________________________________________________________________ MEC-15: MD. HMAYU KABIR Maintenance Manager Power Generation. 1st June 2008 to till date. Energy Prima Ltd. Shagibazar, Hobigonj. Energy Prima Ltd. is the biggest (170 MW) rental power plant in Bangladesh. Energy Prima Ltd. gives 100% power to the national grid by 132 kv sub-station. It is a sister concern of Hosaf Group of Company, leading in manufacturing of electric meter, garments, pharmaceuticals and also in trade business of real estate etc. Coordination of erecting and commission work of 54 MW (27 nos. engine) power plant and substation. Responsible for regular preventive & predictive maintenance & trouble shooting for smooth operation of 54 MW, Cater Pillar gas generator, USA. ________________________________________________________________________ MEC-15: MOHAMMED AMIR HOSSAIN. Service Engineer Tradevision Limited. Supervising Operation and Maintenance Gas Generator base various MW Power plant our customer. Installation, Commissioning & Trouble Shooting CHIDONG Gas Generator.

Top and Minor Overhauling CHIDONG Gas Generator (500 KW & 700KW) To Corrispondence with customer for sales Generator and their spare parts. Installation, Commissioning, Overhauling & Schedule maintenance BROADCROWN Diesel Generator ( DEUTZ, VOLVO, JHON DEERE, PERKINS, YANMAR & CUMMINS Generator) Supervising new building work the ship of KEARI Sinbad and modification KEARI Karnafully under WESTERN MARINE SHIPYARD Chittagong. Installation Marine Engine, Generator, Air conditioning, Fire fighting system and all types of pipe line the ship of KEARI Sinbad and KEARI Karnafully. Correspondence with the contractors, Marine engineers and Naval Architecture for Ship building purpose. Supervising installation central Air condition, Lift, Generator and all types of mechanical works Keari Limited Real Estate project. ________________________________________________________________________ MEC-17: MOZAMMEL HOQ Rahim Energy limited. This is the 62 MW (30 MW thermal and 32 MW gas engine generator set) power generation company in the private sector of Bangladesh. Which is a sister concern of Rahim Steel Mills. From December 02, 2004 to till now. Erecting (8/4 MW) 32 MW Power plants of Deutz TCG 2032V 16 Model Gas Generator sets. Examine & forwarding layout plans submitted from local agent of Deutz Power System. 180-tons/day capacitates hot-rolled rolling mill. ________________________________________________________________________ MEC-19: UHLA SAN Chittagong City Corporation Gas Turbine Power Plant Project. Under consttuction by Jubilee Traders, 188 Jubilee Road, Chittagong-4000, Bangladesh. ( Five Generators=5MW) & Utility Department ( Steam Boiler & Air compressors). A Concern of Clifton Group, Chittagong, Bangladesh. ________________________________________________________________________ MEC-20: MD. SHAHADOT HOSSAIN Gas Generator, Diesel Generator, Chiller A/C Compressor, Boiler maintenance & Supervision. ________________________________________________________________________ MEC-21: MUJIBUR RAHMAN 24 Years. From 1982 to 2007 _____________________________________________________________________ MEC-22: MD. SK. ABDUL AWAL

Working as an Asst. Manager (Electrical) from 1st August, 2006 to

till now in Meghna Group of Industries Ltd. Up dated knowledge in installation, maintenance and supervision of following machines: a) Generator (Gas) 900 KW. Waukesha, USA one unit. b) Programmable Logic Control, SIEMENS. C) Water Treatment Plant, Prominent, Germany. MEC-23: MAZHARUL ALAM Working as an Assistant Engineer (Power Plant), maintenance of mechanical side in (5.25x2=10.50 MW.-11 KV ) 10.50 MW. ROLLS ROYCE MARINE AS, BERGIN NORWAY lean burn gas Generator Engine. Working as an Assistant Engineer (Power Plant), Operation, maintenance, Trouble shooting top overhauling experience in Caterpillar Model no G-3520, (02MWx2=04 MW) MEC-24: MOHAMMAD MASUM MIA Training program from 22nd July 2001 to 20th September 2001 under SHIKALBAHA POWER STATION. Karnafully, Chittaging. (60 MW. Steam Turbine & 28+28=56 MW. Gas Turbine) Assistant Engineer (Mechanical) in ASM Chemical Industries Limited. a concern of AZIZ group from 02-01-2008 to till date. Responsibilityis maintenance & operation of (5.25x2=10.50 MW.11 KV Rolls Roycwe Marine as, Bergin Norway. ________________________________________________________________________ MEC-25: MOHAMMED MAHBUB PATHAN ASM chemical Industries Limited, a concern of ASM AZIZ Group. Assistant Engineer (Electrical). From 10th December, 2006 up to date. Responsibility is periodically maintenance & operation of (5.25x2=10.50MW-11KV) ROLLS ROYCE MARINE AS, BERGIN NORWAY lean burn gas generator which is well furnished with PCL control based opened by INTERACTIVE GRAPHICAL SCADA SYSTEM, Model no: B 35-40V12AG, Diesel generator 456 KW 570 KVA, Model-Type-BF-V625A VOLVO PENTA. 40 KW Diesel Generator (Model: TD226B-4D). ________________________________________________________________________ MEC-26: MD. MASUD PARVEZ Working in ASM Chemical industries Ltd from 2nd May, 2007. This is a sister concern of Aziz Group. 10MW gas generator, (Rolls-Royce, Norway) 12.5 Ton/hr steam boiler 120 TR chillier ( VAM) DCS system (Microcon) Control & Signal cable laying & connection. Plastic drum factory ETP ________________________________________________________________________

MEC-27: MD. SHAIFUL ISLAM MOZUMDAR Operation and maintenance of a 9 MW. Power Plant (DEUTZ-TG620V16 Gas Engine) with Total Electronic Management (TEM) control System. 12 MW Power Plant (DEUTZ-TCG-2023V16 Gas Engine) with Total Electronic Management (TEM). ________________________________________________________________________ MEC-28: MD. JAIN UDDIN Northern Energy with foreign experts. 210 MW 5th and 6th unit of Ghorashal Thermal Power Station. Siddhirganj 50 MW Thermal Power Station. Rehabilitation and Modernization project of unit No 1 & 2 of Ghorashal Thermal Power Station, Palash, Narsingdi. Capacity of each Steam Turbine Unit 55MW. Repairing of turbine, Pumps, Boiler, Oil circulating system, Condenser, Deaerator, Regenerative systems including pipe lines and other accessories of the machine house, revision of valves, Hydraulic test of boiler, Leakage test of draught system Unit no. 1 & 2 Rehabilitation and Modernization Project. Ghorashal Termal Power Station, Palash, Narsingdi. ________________________________________________________________________ MEC-29: MOHAMMAD GIASUDDIN Work in HSE (Health, safety and environment) department and studied a lots of safety manual on operations. ________________________________________________________________________ MEC-31: SHEIKH NAZMUL TARIQ Power generation 1MW Gas generator, 750 KW Diesel Generator. 4.4 MW Power Generation System. 2 Nos X 1.6 MW Gas Generator (CATERPILLAR, USA). 1 Nos X 1.2 MW Diesel Generator (CATERPILLAR, USA). 1 Nos X 800 KW Diesel Generator (Cummings, USA). ________________________________________________________________________ MEC-36: MD. ANWARUL HOQUE Workshop Maintenance Engineer (Heavy Duty Vehicle) AL-OBAIDALY Construction Company, Doha, Qater. Served as Workshop in-charge for 10 years from 1983 to 1994 (HDV) Served as Workshop Mechanic for 01 year (Heavy Duty Vehicle) ________________________________________________________________________ MEC-42: MONIRUZZAMAN MIDHA Quality control Course. Installation engineer of 8.75 MW Wartsila Generator at Ruby Cement CTG. Project engineer (Mechanical) of Nasir Glass Industries Ltd, Gazipur. Prlject Engineer Smmit power Plant Chandina 15 MW Wartsila

Generator. Project Engineer Summit Power Plant Ashulia 35 MW Wartsila Generator. Summit Power Plant Rupgonj 35 MW Wartsila Generator. Summit Power Plant Ullapara 12 MW Jenbacher Generator.

________________________________________________________________________ MEC-43: MOHAMMAD ABUL HOSSAIN Summit Power Plant, Madhabdi, Narsingdi/Udeco Ltd. UDECO Ltd. a sister concern of Summit Group. As a sit Engineer (Mechanical) of Summit power Plant, Madhabdi, Narsingdi. Erection, Fabrication & Installation with the foreign experts of Wartsila OY, finland. For last one year. Mechanical Installation Engineer in UDECO Ltd since June 2005. Two power plant installation work under the supervision of Finland experts. Good knowledge on Fabrication, Installation and Layout drawing. During installation with different types of equipments procured from different countries like India, Singapore, Germany and Finland. In this regards fitted fabricated and installed Ducts, Pipes, Supports, Stairs, Platforms, Adopters, Flanges, Tanks, Pumps, Silencer, Radiators, Ventilation Units, Compressor, Engine Generator, Sets etc/ ________________________________________________________________________ MEC-44: MOHAMMAD YOUSUF KAMAL Working as Mechanical Engineer in UDECO Ltd. Summit center (6th floor), 18 Kawran Bazar C/A, Dhaka-1215. Working as a Mechanical Installation Engineer in UDECO Ltd since June 2005. Two power plant installation work under the supervision of Finland experts. Knowledge on Fabrication, Installation and Layout drawing. During installation work with different types of equipments procured from different countries like India, Singapore, Germany and Finland. In this regards he fitted fabricated and installed Ducts, Pipes, Supports, Stairs, Platforms, Adopters, Flanges, Tanks, Pumps, Silencer, Radiators, Ventilation Units, Compressor, Engine Generator Sets etc. ________________________________________________________________________ MEC-45: MOHAMMED ABDUL GOFUR Have been serving as Maintenance technician in Solid handling system (Bagging) section from 14.07.1986 to 01.07.1992 and Plant Maintenance (urea) section from 02.07.1992 to 08.02.2003. At present, working in Plant Maintenance Section (Urea) as SubAssistant Engineer in Maintenance Technical Service department from 09.02.2003 to till date. Have gathered sufficient technical

knowledge in maintenance of Mechanical equipments such as Valves, Vessels, Blowers, Gear box and all types of Conveyor system, Joining and Valves, Vessels, Blowers, Gear box and all types of Conveyor system, Joining and volkanizing of conveyor belts and maintenance of Crushers and other auxiliaries. ________________________________________________________________________ MEC-46: MD. SHAHREER KABIR 10 MW gas generator, (Rolls-Royce,, Norway) ________________________________________________________________________ MEC-47: MD. MOAZZEM HOSSAIN BHUIYAN Assistant Engineer (Shift In-charge) (DCS. PLC Operation & Maintenance Boiler, Turbine) An Enterprise of MEGHNA Group of Industries. From 1st December,2007 to till now. Assistant Engineer (Shift In-charge) (DCS PLC Operation & Maintenance Boiler, Turbine) Partex Energy Ltd. Rupganj, Naraghangoj. From 1st August, 2006 to 30th November, 2007. Assistant Engineer (Shift In-charge), (DCS, PLC Operation & Maintenance Boiler, Turbine), Unique Power Plant Ltd. from 1st May, 2005 to 29th July, 2006. Junior Shift Engineer (PLC Operation & Maintenance Turbine), Rahim Energy Ltd. from 1st January, 2001 to 30th April, 2005. Junior Engineer (PLC Operation & Maintenance Turbine), Ghorashal 210 MW Tharmal Power Station Extension 6 Unit Project from 20th February, 1998 to 30th December, 2000. ________________________________________________________________________ MEC-48: MD. ABUL KHAIR

Fabrication, Erection of various type and dimensional of Tank, Crystallizer, Vacuum Pan, Carbonator, Dust Scrubber, Gas Scrubber, Surface Condenser, Dryer-Cooler, Rotary Pressure Filter, Filter Press etc. Fabrication, Erection of CO2 gas plant structure including machine installation and piping system. Fabrication, Erection of Water Treatment Plant, Lime & Salt House, Structure with machine installation and all piping work. Fabrication, Erection of various type of high pressure and low pressure (High pressure vacuum line, Compressed air line, Steam line, Water line) pipe making in the plant. Alignment, Levelling, Coupling and Grouting of all Centrifugal Pumps and Vacuum Pump, Injection Pump, ID Fan, FD Fan, Screw Conveyor, Air Compressor, Belt Conveyor, Bucket Elevator etc. Fabrication, Erection of two Jetties with two Mechanical Cranes, One Hydraulic Crane. Erection and Commissioning of 60 Ton/hr capacity Natural circulation, Water tube, Natural Gas fired Steam Boiler. i) Fabrication, Erection of DM Plant structure with machine

installation. ii) Fabrication, Erection of Boiler Steam Line, Gas Line, Water Line, Water Line Pipe making in the plant. iii) Alignment, Levelling, Coupling and Grouting of Feed Pumps and FD Fan. Alignment, Levelling, Coupling and Grouting of 6 MW Back Pressure Turbine and alternator. Good Knowledge in drawing analysis. _____________________________________________________________________ MEC-49: MOHAMMED AMIR HOSSAIN Supervising Operation and Maintenance Gas Generator base various MW Power plant customer. Installation, Commissioning & Trouble Shooting CHIDONG Gas Generator. ________________________________________________________________________ MEC-50: MD. IMDADUL HAQUE Five years experience in the field of Project Management as a Mechanical Engineer such as fabrication work, erection, commissioning maintenance. Erection, commissioning, maintenance, trouble shooting of different types of machineries etc. Review and checking of the P & ID, Isometric drawing, piping layout drawing, G A drawing supervision of piping work etc. Supervising the fabrication work of pipe line, tanks and Steel Structure etc. Review and checking of piping layouts, isometrics, piping general arrangement drawings etc. Vendor drawings of Equipments like storage tanks, Fabricated vessels. Quality control of welding, DPT, Hydro Test, sand blasting Industrial Painting etc. Prepare BOQ according to the Isometric drawing. Planning the mechanical engineering jobs. Time scheduling and leading supervisors. ________________________________________________________________________ MEC-51: MD. ABDUL HAFIZ Supervision of Maintenance, Inspection, Rectification, modification, Troubleshooting of various Aircrafts such as GOUGA CM-170 Trainer aircraft, F-6 & MIG-21 fighter aircrafts and Common and Specialized Automobiles, Air conditioner, Generators, Distilled Water Plant, Power Distribution, Transformer, Battery Manufacturing, various types of Electrical & Test Equipments. Also skills in Personnel & Store Management. Successfully, completed the 03 expansion projects of summit Power Ltd. with the experts of Wartsila Finland by on Gas Engine at the sites of following. Summit Power Plant, Madhabdi,

Narsingdi.27MW. Summit Power Plant, Ashulia, Savar, Dhaka. 36MW. Summit Power Plant, Chandina, Comilla 14MW. ________________________________________________________________________ MEC-52: MONIRUZZAMAN MRIDHA Installation engineer of 8.75 MW Wartsila Generator at Ruby Cement CTG. Project engineer (Mechanical) of Nasir Glass Industries Ltd. Gazipur. Project Engineer Summit Power Plant Chandina 15 MW Wartsila Generator. Project Engineer Summit Power Plant Ashulia 35 MW Wartsila Generator. On going assignment as a Project Manager. Summit Power Plant Rupgonj 36 MW Wartsila Generator. Summit Power Plant Ullapara 12 MW Jenbacher Generator. ________________________________________________________________________ MEC-53: HASAN KHURSHAD Executive Engineer, Power Plant In-charge, Unique Power Plant-2. From 10th January 2006 to till now. 6 MW Turbo-Genertor Set. Administration, Operaton, maintenance & trouble shooting of Power plant. ________________________________________________________________________ MEC-58: MOHAMMED SIDDIQUR RAHMAN Sub-Assistant Engineer (Mechanical) under Maintenance Section at 210 MW GTPSE (Unit-5), DME, BWDB, Palash, Narsingdi, Bangladesh from 18.06.0988 to 20.10.2000. PIP-01: MD. ABU ARIF Sub Assistant Engineer (Mechanical) 210 MW Siddhirgonj Thermal Power Station (Unit-1), Technoprom export Moscow, Russia from 15.04.2001 to 25.02.2005. Site Engineer (Site In charge) to Energy Pac Power Generation Ltd. Rolls-Royce Marin as Gas Engine Bergen, Norway from 01.03.2005 to 30.11.2007. Maintenance Engineer to Unique Power Plant Ltd. (27.6 MW R.R.C.) from 01.12.2007 to till now. Worked 210 MW. Siddhirgonj Thermal Power Station (Unit-1), 5.2 MW. City Power Generation Co. (Pvt.) Ltd., 10.4 MW. Shun Shing Power Ltd. 3.6 MW. Crown Power Generation Ltd., 6.7 MW. Akij Cement Power Ltd., 16.8 MW. Unique Power Plant Ltd.

PIP-02: MD. ABU SALEH

Normal maintenance, operation and trouble shooting of Power

Plant. Has been served as an Assistant Mechanical Engineer at 10 MW Steam Power Plant of Lina Paper Mills Ltd. from 30/11/04 to till now. Successfully participanted in the erection & commissioning of above Power Plant with European and American experts. During this period he was assigned to look-after operation & maintenance of 2.5 MW power plant. Worked as a Sub-Assistant Engineer(Power) from 13th April2001 to 30th September2004 at 210 MW Siddhirgonj Thermal Power Station1(st Unit) under Bangladesh Power Development Board was awarded to The Bengal Electric Ltd.. Performed Erection of High Pressure Pipe Line, C.W. Pipe Line, Feed Pumps. Oil Pumps with Auxiliary equipment, hydraulic test, and acid washing and operation of Machine House. J_________________________________________________________________________ PIPE-03: ANWAR HOSHEN Engineer of M.D.E 210mw Ghurasal thermal power station extension project (5th Unit), Palash Narsingdi, From 01/12/93 to 30/11/95. 210MW Ghurasal thermal power station extension project (6th Unit), Palash Narsingdi, from 230/08/96 90MW Thermal Power Station. PIPE-04: DEBBROTO BISWAS Sub-Assistant Engineer. From 28th December 2006 to till now. Pran RFL Group Ltd. Palash, Narsingdi. Sub- Assistant Engineer. 3rd March, 2001 to 30th September 2006. Ghorashal Power Station BPDB. QLTY-02: MD. ABUL KALAM 110 MW. Erection Work Khulna from 11-06-1982 to 25-09-1983. Under The Directorate of Mechanical Equipment, Bangladesh Water Development Board. 210 MW. Erection Work Ghorasal from 26-09-1983 to 08-10-1986. Under the Directorate of Mechinical Equipment, Bangladesh Water Development Board. 210 MW. Erection Work Ghorasal from 10-02-1987 to 30-04-1989. Under The Directorate of Mechanical Equipment, Bangladesh Water Development Board. 210 MW. Erection Work Ghorasal from 23-03-1992 to 15-01-1995. Under The Directorate of Mechanical Equipment, Bangladesh Water Development Board. 210 MW. Erection Work Ghorasal from 28-02-1996 to 16-08-1998. Under The Bengal Electric Ltd. China International Water and Electric Corp. Consortium. 210 MW. Erection Work Siddhirgonj as a Asst. Engineer from 2101-2001 to 17-03-2005. Under The Electric Corp. Consortium.

QLTY-01: LAKSHAN CHANDRA DEBNATH Sub-Assistant Engineer in 210 MW. Ghorasal TPSE Project (3rd & 4th Unit) BPDB Palash, Narsingdi, Bangladesh under Directorate of Mechanical Equipment from 15.11.84 to 3004.89. Sub-Assistant Engineer in 210 MW. Ghorasal TPSE Project (5th Unit) BPDB Palash, Narsingdi, Bangladesh under Directorate of Mechanical Equipment from 03.06.92 to 13.11.94. Assistant Engineer (Welding In Charge) in Boiler and Machine House under the Bengal Electric Crop. Consortium from 17th January 1996 to 13th April, 1999 for the erection of 210 MW. Ghorasal Thermal Power Station Erection Project (6th Unit) BPDB Palash, Narsingdi, Bangladesh. Senior Engineer in Boiler and machine house from 27.06.2001 to 12.10.2004 at 210 MW. Siddhirgonj Thermal Power station Erection Project (Unit 1) the Bengal Electric Ltd. for the erection of 210 MW. STPS erection project Siddhirgonj, Narayangonj, Bangladesh. PLAN 02: MD. MOKBUL HOSSAIN Around 13 years working experience in Installation and Maintenance works of followings: Rotary compressors ( Receprocating, screw type and Lope Type), Centrifugal Compressors with Inter-cooler & after cooler. Pumps, Boiler, Turbine, Generators, Heat exchangers etc. KAESER(TE91, 141 GERMANY) ELGI AIRMATE AND FRIULAIR DRYERS(PLS160). NIHON SPINDLE INDUCED DRAFT CROSS FLOW COOLING TOWER (GTA 175UK, CAPACITY175 HRT, DESIGNED FLOW RATE 51 M3/hr. TEMPARATURE 38.1 C in and 30.8 C out, FAN MOTOR 5.5 K.W. made in Japan.) WAUKESHA(1150 & 1125 KVA USA.) GAUSCOR FGDL-540 (952 KW.) PLANING 03: MD. KAMAL PASHA WAUKESHA (1150 & 1125 KVA USA) GENERATOR GAUSCOR FGDL-540 ( 952 KW). Installation and Maintenance works of the followings: KAESER (BSD 72, AS 44, AS 31, BS-61, GERMANY) COMPRESSOR ELGI (E-30, E-11, E-22, INDIA) COMPRESSOR KAESER (TE 91, 141 GERMANY) DRYER ELGI AIRMATE AND FRIULAIR DRYER ( PLS 160) NIHON SPINDLE INDUCED DRAFT CROSS FLOW COOKING TOWER ( GTA 175 UK, CAPACITY 175 HRT, DESIGNED FLOW RATE 51 M3/hr. TEMPARATURE 38.1 C OUT, FAN MOTOR 5.5 KW, MADE IN JAPAN. LUWA, SWITZSCHERLAND. LTG, GERMANY

ENSURE THE QUALITY OF MECHANICAL ITEMS OF CORRESPONDING MACHINES. QUALITY CONTROL, GENERATOR. LUWA, SWITZSCHERLAND. LTG, GERMANY

PLAN-08: ENG. MD. REZAUL HASAN KHAN General Electricity Company, Tripoli, libya. Tripoli West Power Station. Maintenance Engineer (Mechanical) Demineralization Plant, Fire Fighting and Compressed Air system equipment of 2x120 MW+5x65 MW Thermal Power Station. Also responsible for supervision, maintenance and overhauling of Boiler and its accessories, Evaporator and auxiliaries, Brine Heater, Ejector, Steam pipelines, Air Conditioning Plant and Chemical Dosing equipment etc. of the 2x12,250 ton/ day capacity Desalination Plant.