ANDHRA PRADESH POLLUTION CONTROL BOARD

Regional Office, 1st Floor, Shankar Shopping Complex,Krishna Nagar Main Road, Kurnool – 518 002

P.NARSING RAO., Phone No. 08518 - 235800.


Environmental Engineer. Fax No. 08518 – 233619
E-mail: ro_knl@yahoo.com

Lr. No. 33-R-1079/PCB/RO/KNL/CFO & HWA/2007 Date: -04-2007

To

The Joint Chief Environmental Engineer


A.P.Pollution Control Board,
Zonal Office, Kurnool

Sir ,

Sub: PCB – RO – KNL – CDCC - CFO application of M/s Vakkal Impex Pvt. Ltd, unit-B,
Sy.No.78, Devarapalli(v), Hindupur(M), Anantapur Dist. – Verification report –
Regarding.

Ref: 1) CFE Order No. ATP – 102/PCB/ZOK/C Estt/2006 – 1267, dt: 24-02-2006
2) Lr.No.617/A1/2007, dt: 06-03-2007, received through General Manager,
District Industries Centre, Anantapur on 12-03-2007
3) Clarification sought on 12-03-2007
4) Industry letter dated: 11-04-2007
The details of the industry and inspection report are submitted as below:

General Details:
1 Name and Address of the industry M/s Vakkal Impex Pvt. Ltd, unit-B,
Sy.No.78, Devarapalli(v), Hindupur(M),
Anantapur Dist.
With Tel. No,
08556 – 329659
E-mail.
vakkal_aluminium@yahoo.com

2 Status of Consent and HWA.


I Fresh / Renewal Fresh
(Copy of CFE / CFO and HWA orders
shall be enclosed).
II Date of receipt of application / 12-03-2007 & 11-04-2007
Additional information if any.
III Details of Consent Fee paid. Rs. 18,400/- under Water & Air acts for the
period of one year i.e., from March 2006 to
(Period upto)
February 2007
3. Project cost.
(including modification / expansion without
Rs. 3.05 Crores
depreciation, as per balance sheet)
Total investment on pollution control
measures and recurring cost and
percentage.
Latitude & N 13044’01.7”
Longitude
E 077030’12.6”
Total Area of the plant: 8.69 acres
Extent of Greenbelt 0.25 acres

Surroundings of the Industry East – Agricultural lands


West – Vacant land
North – Vacant land
South – Vacant land followed by IDA,
Thumakunta
4. Date of commissioning. March 2006

Page 1 of 7
5 Status of E.C
I Line of Activity as per EIA Notification. N.A
II Environmental Clearance order No.
and date
(Copy shall be enclosed).
III Violations of EIA Notification, If any.
6 I Inspection conducted by A.E.E-II
II Representative of Industry present Mr. Acharya, Plant Incharge
III Date of Inspection 15-03-2007

CFO Details
7 Raw materials / Fuels required for production at Consented capacity per Day / Month.
Note : Should not be mentioned as “ enclosed with the application “
S.No Name of the Major Raw material / (Per / Month ) for each product
material used in the Activity
1 Aluminium scrap & Aluminium scrap with 35 TPD
Iron attachments

8 Products & By Products manufactured / Storage capacity of Petroleum products / Mining


capacity etc per Day / Month.
S.No Products / Line of Activity Consented capacity Applied
as per CFE order
(as per the
dt. 24-02-2006
application)
1 Aluminium Alloy Ingots 30 TPD 62.5 TPD
2 Aluminium Extruder & drawn sections 7 TPD

9 Water consumption.
I Source of water supply Borewell
(River / Bore wells / Public supply)
S. Purpose Quantity in KLD
no
1. Process / Scrubbing 2.0 KLD
2. Washings ---
3. Boiler Feed ---
4 Industrial Cooling (Makeup) / 2.0 KLD
Humidification / Water spraying).
5 Gardening / Irrigation. 1.0 KLD
6 Others (to be specified) ---
7 Domestic 2.0 KLD
Total: 7.0 KLD
II. Status of Functioning of Water Meters Not provided

10 Waste Water Generation:

S.No Effluents Quantity in KLD


1. Process & Washings
0.25 KLD
(specify stream wise i.e., LTDS, HTDS, High
COD etc.--- brake up shall be given)
2 Boiler Blow Down - ---
3 Cooling Blow Down - 0.75 KLD
4 Others (Please Specify) ---
5 Domestic 1.5 KLD
Total: 2.50 KLD

Page 2 of 7
11 Out let – as per CFE / CFO order dt.

Outlet No. Outlet Description Max Daily Discharge Point of Disposal


--- ---- --- ---

12. a) ETP Details & Mode of Disposal:

I. Outlet No. 1 ---


a. Stream Details:
b. Treatment units details.
c. Point of disposal

ii. Outlet No. 2 : ---


a. Stream Details:
b. Treatment units details.
c. Point of disposal

iii. For Domestic waste water: Septic tank followed by soak pit

b) Standards as per CFO / Board Monitoring Data


CFE.
--- ---

13 Water Cess
I Returns filed upto (Month & Year) February 2007
II Assessment issued upto (Month & ---
Year)
III Assessment paid upto (Month & Year) ---
IV Assessment amount due (In Rs.) ---

14 Air pollution:

S.No. Source of Pollution Control Flow rate in Stack


( Boiler / Furnace / Kiln / equipment m3/hr. height in
Cupola / Incinerator / provided Mts - above
Process emissions with GL
Characteristics / Fugitive
emissions with
Characteristics / DG set )
Note:
Capacity should be
mentioned for each unit
1 Reverbaratory type oil fired Wet scrubber --- 12 mt
furnace – 5 T/8hr.
2 Revertebratory type oil fire Not provided --- ---
furnace – 3T/8Hr.
3 D.G set – 500 KVA Nil --- 6mt
4 Coal fire4d crucibles – 6 Nil --- ---
Nos
5 Oil fired crucible – 1 No. Nil --- ---

15. Emissions from chimneys – as per CFE / CFO order dt.

Chimney No. Description of Quantity of Limiting Board


Chimney Emissions Standard Monitoring
at peak flow Data

--- --- --- --- ---

16 Hazardous chemicals used and their storage facilities: Furnace oil – 14 KL

Page 3 of 7
17 Inspection Officer’s Remarks: M/s Vakkal Impex Pvt. Ltd, unit-B, had obtained CFE
order of the Board on 24-02-2006 for establishment of alluminium Alloy Ingots &
Aluminium Extruder and drawn sections to the tune of 30 TPD & 7 TPD respectively. The
industry had commissioned the unit in the month of March 2006 (It was informed during
inspection on 08-11-2006). This office issued a notice on 09-11-2006 for operating the
industry without CFO of the Board and without providing necessary air pollution control
equipment. The industry has submitted a letter dt: 15-02-2007, stating that they have
taken Demand Draft or Rs. 18,400/- towards consent fee and will submit CFO application
within a week time. The industry has submitted CFO application at District Industries
Centre, Anantapur under Single Window Clearances on 06-03-2007 received in this office
on 12-03-2007. This office sought clarification on 12-03-2007 after scrutinizing on the
following points.

1. Details of air pollution control equipment attached to furnace


2. Total area of the plant, built up area and green belt area.
3. Month wise production details from the date of commissioning of the unit
4. Details of solid waste generation with breakup and their mode of disposal
methods.
5. Details of energy meters provided to the air pollution control equipment.
6. The industry shall submit an application in prescribed Form-I under HW(M&H)
Rules, 1989 and amended thereon.
7. Water consumption details from the date of commissioning of the uni

The industry has submitted part of information on 11-04-2007 sought vide


letter dt: 12-03-2007. The industry has not submitted the application for Hazardous
Waste Management Authorisation under HW(M&H) Rules, 1989.

During inspection on 15-03-2007, it was observed that the industry was


in operation. The industry is manufacturing Aluminium Alloy Ingots to the tune of
7.5 TPD (Avg. from March’06 to Feb’ 07). The main source of air pollution due to
this unit are oil fired furnace of capacity 5T/8hr & 3T/8hr. , 500 KVA D.G set, 63KVA
D.G set one No. of oil fired crucible, 6 Nos. of coal fired crucibles. But, the
industry has provided air pollution control equipment i.e., wet scrubber followed by
12mt stack to oil fire furnace of capacity – 5 T/8hr. only. The oil fire furnace of
capacity – 3T/8hr. is meant for Aluminium extruder & drawn section, which is yet to
be commission. The industry has not provided any control equipment for one oil
fired crucible and 6 Nos. of coal fired crucibles.

The main source of water pollution due to this unit are cooling section,
scrubbing section and domestic usage. The industry generates hazardous waste
i.e., waste oil from D.G sets and oil sludge from furnace oil storage tank and
proposed to dispose the same authorized parties. The industry generates 0.2 TPD
of iron waste & 0.45 TPD of dross as solid waste against production of 7.5 TPD. It
is reported that the industry is disposing the iron waste to the steel units and
disposing the dross as land filling.

During inspection, the stack monitoring was carried out at stack attached to
the oil fired furnace of capacity – 5 T/8hr. and the SPM concentration was found to
be 105.32 µg/Nm3.

I Maintenance of ETP / APC : Industry has provided wet scrubber as air pollution
control equipment attached to oil fired furnace of capacity – 5 T/8hr. and
operating at the time of inspection.
II Records Maintained
• ETP Log Book.
• Stack Monitoring Report.
• Ambient Air Quality Monitoring report.
• Energy consumption records.
• Water meter readings.

Page 4 of 7
18 Compliance of the industry on CFE (Schedule- A & B) Conditions for Fresh CFO
/ Schedule – B conditions for renewal.
CFE Order No. ATP – 102/PCB/ZOK/C Estt/2006 – 1267, dt: 24-02-2006

S.
Condition Compliance
No.
1 Industry shall install the air pollution : Industry has provided air pollution
control equipment as proposed to control equipment i.e., wet scrubber to
arrest air pollution in the surrounding oil fired furnace of capacity 5 T/8hr.
area. and proposed to provide air pollution
control equipment to 3T/8hr. furnace
before commissioning.
2 Industry shall meet the Boards AAQ : Complied for stack emissions
and stack monitoring standards.
3 Industry shall dispose the solid waste : Industry is storing the solid waste i.e.,
in scientific manner on their own iron & dross within the premises.
premises.

19 Compliance of the industry on EC Special conditions : N.A

S.
Condition Compliance
No.
---
---

20 Compliance of the industry on Task Force Directions : N.A

S.
Condition Compliance
No.
--- ---

21 Compliance of the industry on CREP Recommendations. N.A

S.
CREP Recommendations Compliance
No.
--- ---

(Signature of the Inspecting Officer)

22 Regional Officer’s Remarks:

I Compliance of the industry with


reference to Notifications under
E(P) Act & Rules.
a) Fly Ash Notification.
b) PLI Act Policy.
c) Environmental Statement in
Form – V.
d) Other if any.

II Complaint / Legal action taken ---


against the industry.

Page 5 of 7
III. Mitigation Measures (Where The industry has to operate air pollution
significant adverse effects are control equipment continuously and also they
identified, description of the should provide air pollution contril equipment
measures to be taken to avoid, to the oil fired furnace of capacity 3T/8hr. and
reduce or remedy those effects). for 7 crusibles. The industry should provide
ETP for treating the scrubbing water. The
industry should develop greenbelt in the
vacant places of the plant along with all
around the boundary. The industry has to
handle the hazardous waste in a safe manner.
The industry has not submitted the hazardous
waste application.

23 Recommendation (Specific comment whether to issue consent or not).


The issue of CFO to the unit may be considered after calling the
industry for personal presentation and respond to obtain undertaking for the above
mentioned points and after payment of required fee upto 30-9-2007.

24. HWA Details:


i) Particulars of Authorisation obtained under N.A
HW(M&H) Rules, 2003 (No. & Validity date)
ii) Authorization issued for N.A
(Transportation, reception, storage, treatment
and disposal)

*remarks shall be furnished if the industry is


receiving Haz.Waste at the site and using as a
raw material.
iii) Process in which the industry is covered ---
(Please give Sl. No of process as per HW
Rules)
iv) Description of Hazardous waste with quantities i) Waste oil – 50 trs/yr.
and Stream No. as per HWM Rules, 2003 ii) Oil sludge – 50Kg/yr.

v) Particulars of on-site Secured Storage ---


(Capacity with dimensions) and mention period
for which secured storage is sufficient.
vi) Quantity of Haz Waste stored on-site presently. Nil

*Furnish specific remarks on the storage of


Haz.waste for more than 90 days.
vii) Quantity of Hazardous waste disposed for last N.A
six months as per the following break-up:

Common TSDF –
Common HW Incinerator –
For recycle / reused -
viii) Whether industry has submitted annual N.A
returns, date of latest submission.

ix) Whether industry has installed incinerator or Not submitted


sending to common HW Incinerator

x) Particular of own incinerator (if applicable) ---

xi) Whether log books are maintained for ---


incinerator. (if applicable)

xii) Whether industry has taken adequate steps to ---


prevent contaminated runoff from storage
areas of Hazardous Waste.

Page 6 of 7
xiii) Steps taken by industry towards waste ---
minimization and cleaner production.

xiv) Future plan for waste minimization. ---

xv) Facilities available with, industry for waste ---


characterization.

xvi) Overall House Keeping within the factory ---


premises.
xviii) Details of disposal of lead acid batteries along ---
with nos and agencies to whom they are
disposed

25 Compliance of the industry on previous Hazardous Waste Authorisation


conditions. : N.A

26 Regional Officer’s Remarks: He may remark on case history of illegal dumping of


hazardous waste : No illegal dumping of Hazardous waste was observed

This is submitted for favour of kind information and taking necessary action.

Check List for CFO Enclosures:

1. CFO applications Y
along with enclosures
2. CFE/ CFO order copy N
3. Effluents analysis report N
4. Stack Emissions analysis Y
reports

5. Ambient Analysis reports Y


6 Ground water monitoring N
reports

Check List for HWA Enclosures:

1. Hazardous waste authorization application in Form-I. Not submitted

2. Analysis reports of the Hazardous Wastes (for individual streams). ---

3. Details of Hazardous waste generated and their method of disposal. ---

Details of hazardous waste sent to common TSDF, common ---


4. incinerator during the previous year.

List of agencies to whom recyclable waste disposed along with ---


5. quantities during the previous year..

Yours faithfully,

ENVIRONMENTAL ENGINEER

- Copy submitted to the JCEE (Cess & Planning) APPCB, Board Office, Hyderabad
for favour of kind information and for taking necessary action.
- Copy submitted to the GIS Section, APPCB, Board Office, Hyderabad for favour of
kind information and for taking necessary action.

Page 7 of 7