Republic of the Philippines NATIONAL POWER CORPORATION Culion Diesel Power Plant

STRUCTURE LIST REPORT

WORK ORDER NO. E6BBAS1 ACCOUNT NO. LOCATION 311/321/331/341/252/390 - STRUCTURES AND IMPROVEMENT : SO. PILAPIL, CULION, PALAWAN

PROJECT / PLANT : CULION DIESEL POWER PLANT

A.) WAREHOUSE : Concrete and reinforced structure for storage of supplies/materials for Plant operation of Culion DPP. Walls of concrete hollow blocks properly reinsforced with reinforcing bars. Both sides of walls are finished with cement plaster. The floor dimensions are 3.7m length and 3.24m width. Located in the front side are the entrance door and window. Window is made of jalousy glass and aluminum casing attached to the wooden jamb. Floor finish is by porous concrete cement surface buildup. The walls were painted white with latex paint. Roof truss is made of hard wood assembled trusses, with gauge 26 galvanized corrugated sheets used in roofing. The project is located in the extreme right side of the Power Plant lot area.

B.) REMARKS : Date Completed : May 15, 2008

Certified Correct :

A. R. ZABALA Principal Engineer, Culion DPP Noted : J. MO. D. OLLERAS Manager, Palawan Area

n of Culion DPP.

the entrance door

gated sheets used

Republic of the Philippines NATIONAL POWER CORPORATION Culion Diesel Power Plant

STRUCTURE LIST REPORT

WORK ORDER NO. E6BAAS1 ACCOUNT NO. LOCATION 311/321/331/341/252/390 - STRUCTURES AND IMPROVEMENT : SO. PILAPIL, CULION, PALAWAN

PROJECT / PLANT : CULION DIESEL POWER PLANT

A.) MAINTENANCE WORKING SHED : Concrete and reinforced structure used as workshop. Front side walls are open, with just about 1M from the floor of reinforced concrete walls. The front is open with steel frame serving as steel gate. Floor area dimension is 7.70M x 3.6M. All exposed surfaces of concrete hollow blocks were finished with cement plaster. Floor finish is by porous concrete cement surface buildup with steel reinforcement. Roof is made of hardwood trusses with galvanized corrugated sheet used as roofing. The structure is adjacent and attached to one side of the Lube Oil Shed building.

B.) REMARKS : Date Completed : October 19, 2008

Certified Correct :

A. R. ZABALA Principal Engineer, Culion DPP Noted : J. MO. D. OLLERAS Manager, Palawan Area

ng as steel gate.

Republic of the Philippines NATIONAL POWER CORPORATION Culion Diesel Power Plant

STRUCTURE LIST REPORT

WORK ORDER NO. E6BDAS1 ACCOUNT NO. LOCATION 311/321/331/341/252/390 - STRUCTURES AND IMPROVEMENT : SO. PILAPIL, CULION, PALAWAN

PROJECT / PLANT : CULION DIESEL POWER PLANT

A.) LUBE OIL SHED : Concrete and reinforced structure for storage of Lubricating Oil drummings of Culion DPP. Walls of concrete hollow blocks properly reinsforced with reinforcing bars. Both sides of walls are finished with cement plaster. The building structure is in between and is attached to the Warehouse Building and Maintenance Working Shed structure The floor dimensions are 3.8 m length and 3.0 m width. The front side of the structure is fully open with steel gate frame. Floor finish is by porous concrete cement surface buildup, and the walls are painted white with latex paint/ Roof truss if made of hard wood assembled trusses, with gauge 26 galvanized corrugated sheet used as roofing. The project is located in the extreme right side of the Power Plant lot area.

B.) REMARKS : Date Completed : October 19, 2008

Certified Correct :

A. R. ZABALA Principal Engineer, Culion DPP Noted : J. MO. D. OLLERAS Manager, Palawan Area

e is fully open with

gated sheet used

Republic of the Philippines NATIONAL POWER CORPORATION Culion Diesel Power Plant

STRUCTURE LIST REPORT

WORK ORDER NO. E6CRAS1 ACCOUNT NO. LOCATION 342 - FUEL HOLDERS, PRODUCERS AND ACCESSORIES : SO. PILAPIL, CULION, PALAWAN

PROJECT / PLANT : CULION DIESEL POWER PLANT

A.) VERY SLOW FLOW METER : METER, Slow Flow Fuel Analog Registration in Liters, Flange ends ; Nominal Diameter Fuel Feed Pressure Max. Temp. Nominal Flow Rate Maximum Flow Rate Minimal Flow Rate Starting Flow Rate Safety Filter Mesh Size Dirt Filter Mesh Size : 1/2" : 15- 30 psi : 180 C : 400 ltr / hr : 600 ltr / hr : 10 ltr / hr : 4 ltr / hr : 0.400 mm : 0.250 mm

Volume of measuring Chamber : 12 m Weight with Flanges PN 25 : Approx. 3.8 kg

Installed on Fuel Daytank of unit no. 2 Generator Set B.) REMARKS : Date Completed : July 11, 2008

Certified Correct :

A. R. ZABALA Principal Engineer, Culion DPP Noted : J. MO. D. OLLERAS Manager, Palawan Area