NW:CONSTRUCTION OF PARAPET WALLS AND LAYING OF WBM ROAD ON THE TOP OF BUND FROM KM.5.250 TO 7.000 OF K.R.DAM
EST.Rs 1,01,95,887 LAKHS CE NO 93/2005-06 AGT NO 5SE/2006-07
NC:Sri A.SUDHAKAR REDDY
BILL ABSTRACT
Sl Description of Item
no unit REF UPTO DATE BILL AMOUNT DEDUCT PREVIOUS BILL AMOUNT SINCE LAST MEASUREMENTS
PAGE/M. REMARKS
QTY RATE AMOUNT BOOK QTY AMOUNT QTY AMOUNT
1 2 3 4 5 6 7 8 9 10 11
1 Earth work excavation in the HG soils with an
initial lead of 10 mts and lift of 2 mts for the
foundations of parapet walls.
1cum
2 Earth work excacation in H.G. Soils (Casing
soils) conveyed with a lead of 3km MR
including cost and conveyance of all
materials and labour charges etc,. complete.

1cum
3 Cement concrete (1:4:8) using 40mm HBG
Machine crushed metal 75% and 20mm HBG
machine crushed metal 25% for parapet wall
foundation and for steps including cost and
conveyance of cement and all other materials
and labour charges, machine mixing charges
and water lead of 0.50km over the initial lead
of 0.50km.
1cum
4 R.C.C ( 1:2:4) using 40mm MSA in 75% of
40mm and 25% 20mm HBG machine
crushed metal for parapet walls including
cost and conveyance of cement and all other
materials, labour charges, machine mixing
charges, centering charges, vibration
charges and water lead charges etc
complete for finished item of work.

1rmt
Page 2

5 R.C.C ( 1:2:4) using 20mm HBG Machine


crushed metal in 75% and 25% of 12mm
HBG machine crushed metal including cost
and conveyance of cement and all other
materials, labour charges for fixing, machine
mixing charges, centering charges, water
lead etc complete for the finished item of
work for Guide stones and kerb stones..

5a Guide Stones of size 225X225X1200mm.

5b Kerb stones size 450X600X150mm


each
6 R.R Masonry in CM (1:5) for panel walls
including cost and conveyance and all other
materials, labour charges etc complete.
KG
7 Plastering with CM( 1:4) 20mm thick for the
exposed faces of R.R masonry wall and
parapet wall Guide stones, Kerb stones and
for steps etc,. Complete.

SQM
8 Supplying ribbed tor steel of high yield
strength deformed bars of grade Fe.415
(TOR-40) IS1786-1989 grills including cost
and conveyance of steel for fabrication of
reinforcement and placing grills at site in
position inlcuding cost of binding wire, tyin
RMT
9 Refilling the foundations with excavated soils
and compacted with hand rammer including
cost and conveyance of all materials and
labour charges etc,. complete
1cum
10 Laying of filters behind the revetment with 20
to 80mm size Field Picked Metal of approved
quality including cost and conveyance of
materials, labour charges etc complete for
the finished item of work.
Page 3

11 Providing Revetment with 450mm size


Rough stone Dry packing including cost and
conveyance of stone and fixing charges etc
complete.

12 Supplying and fixing of mastic pad of


12.70mm thick including cost and
conveyance of all materials and labour
charges etc., complete.

13 Supplying and fixing of RCC. Pre-cast 1"


thick drainage half pipe including cost and
conveyance of all materials and labour etc.,
complete.

14 Coslidation of Bund with 8 to 10 Ton power


roller to 98% proctors density and all other
operations necessary to complete for the
finished item of work as per drawings or as
derected by the Engineering- Charge.

15 Coslidation of Bund with Neumatic rammers


and hand tapping to 90% proctors density
aned all other operations necessary to
complete for the finished item of work as per
drawings or as derected by the Engineering-
Charge.

16 Collection and Supply of Gr-II HBG metal


IRC size of approved quality including
stacking etc., complete.

17 Collection and Supply of Gr-III HBG metal


IRC size of approved quality including
stacking etc., complete.
Page 4

18 Collection supply of gravel from approved


quality including cost and conveyance of
gravel, seigniorage charges and stacking to
departemental gauge for premeasurements
etc, fro blindage of road for the finised item of
work as per drawing or as directed by

19 Extra watering and consoldation with 8 to 10


Ton power roller to 98% proctors density
including spreading the gravelly soils for
WBM Road including watering, breaking
clods,sectioning to the proper camber etc,
and hire & operational charges of power rolle

20 Spreading of Gr II & Gr-III metal 100mm


thick each layer compacted to 75mm
including spreading, watering and
consolidation with 8 to 10 T power roller.
21 Providing first class ornamental plastering
with CM (1:2) and CM (1:3) for the rear side
face of parapet wall above +89.400M
including cost and conveyance of all
meterials, labour charges, all incidental &
operational charges, curing,etc complete
finished

22 Painting with best enamel paint in two coats


for the exposed faces of ornamental
plastering including cost and conveyance of
materials. Labour,etc. and all other
operations required for finished item of work
as per drawings or as directed by the
Engineer-

23 Earth work excavation in the HG soils with an


initial lead of 10 mts and lift of 2 mts for
stripping the soils in the D/S stone portin of
bund including cost and conveyance of
materials, labour etc.,and all oher operations
required for finished item of w
Page 5

24 Dismantling the existing chutes on the D/S


slope portin of bund coming across
consolidation of bund including cost of labour
etc., and all other operations required for
finished item of work as per drawings or as
directed by the Engineer- in chage

TOTAL
Page 6

NAME OF WORK:- Formation of Ramp from Km.5.250 of K.R.Dam.

EST.Rs 892399 LAKHS DR NO 28/2006-07 AGT NO 4EE/2007-08


NC:M/S NELLAKANTHA REDDY
LS -III & Final BILL ABSTRACT
Sl no Description of Item
unit REF UPTO DATE BILL AMOUNT DEDUCT PREVIOUS BILL AMOUNT SINCE LAST MEASUREMENTS
PAGE/M.BOO
REMARKS
QTY RATE AMOUNT K QTY AMOUNT QTY AMOUNT
1 2 3 4 5 6 7 8 9 10 11
1 Earth Work Excavation in H.G.Soils and borrowed from
approved quarry including conveyance of earth including
loading and unloading charges, Seigniorage charges
and all other operations necessary to complete the
finished item of work as per drawings or as directed by
the Engineer-in-charge.

2 Watering and Consolidation of Ramp with 8 to 10Tonne


Power Roller to 98% proctors density and all other
operations necessary to complete the finished item of
work as per drawings or as directed by the Engineer-in-
charge.

3 V.C.C. (1:3:6) using 80% of 40mm and 20% of 20mm


machine crushed hard broken granite metal of approved
quality including cost and conveyance of all material
and labour charges, machine mixing charges, Vibrating
charges, seigniorage charges curing and all incidental
charges etc., complete for foundation of Catch drain and
under R.C.C.hume pipe for the finished item of work as
per drawings or as directed by the Engineer-in-Charge.

4 V.C.C. (1:3:6) using 80% of 40mm and 20% of 20mm


machine crushed hard broken granite metal of approved
quality including cost and conveyance of all material
and labour charges machine mixing charges, Centering,
Vibrating charges, Seigniorage charges, curing and all
incidental charges etc., complete for super structure of
catch drain and for head wall of R.C.C. hume pipe for
the finished item of work as per drawings or as directed
Page 7

4 V.C.C. (1:3:6) using 80% of 40mm and 20% of 20mm


machine crushed hard broken granite metal of approved
quality including cost and conveyance of all material
and labour charges machine mixing charges, Centering,
Vibrating charges, Seigniorage charges, curing and all
incidental charges etc., complete for super structure of
catch drain and for head wall of R.C.C. hume pipe for
the finished item of work as per drawings or as directed
by the Engineer-in-Charge.

5 Providing Rough Stone dry packing for revetment for


toe wall of ramp using rough stone of size 225mm thick
with approved quality including cost and conveyance of
all material loading and unloading, leads and lifts
charges and seigniorage charges complete with all
incidental charges and all other operations necessary for
the finished item of work as per drawings or as directed
by the Engineer-in-Charge.

6 Providing Rough Stone dry packing for revetment for


side slopes of ramp using rough stone of size 225mm
thick stone with approved quality including cost and
conveyance of all material, leads and lifts loading and
unloading charges and seigniorage charges complete
with all incidental charges and all other operations
necessary for the finished item of work as per drawings
or as directed by the Engineer-in-Charge.

7 Supplying Laying and fixing of the R.C.C. Hume pipes of


600mm dia NP3 class pipes laying them carefully in the
trench true to alignment and gradient joining
R.C.C.Hume pipes with Cement joints hump yarn etc.,
and twisting including filling and wiring and all material,
labour charges including all other operations necessary
to complete the work as per drawings or as directed by
the Engineer-in-Chief.
7 Supplying Laying and fixing of the R.C.C. Hume pipes of
600mm dia NP3 class pipes laying them carefully in the
trench true to alignment and gradient joining
R.C.C.Hume pipes with Cement joints hump yarn etc., Page 8
and twisting including filling and wiring and all material,
labour charges including all other operations necessary
to complete the work as per drawings or as directed by
the Engineer-in-Chief.

8 Dismantling the existing revetment at the


locations of disturbed places of rock toe and
carefully stacking for reuse.

9 Rough stone dry packing for slope revetment with


available useful stone at the locations of disturbed
rocktoe
Page 9

NAME OF WORK:- Providing Ballast weights and rubber seals to the service gates of Low Level Sluice at Km.7.550 of K.R.Dam.

EST.Rs 6,71,500 LAKHS DR NO 13/2007-08 AGT NO 5EE/2007-08


N/C: M/S HAZARATH FABRICATION., PRO: HAZARATHIAH
LS- AND PART BILL ABSTRACT
Sl no Description of Item
unit REF UPTO DATE BILL AMOUNT DEDUCT PREVIOUS BILL AMOUNT SINCE LAST MEASUREMENTS
PAGE/M.BOO REMARKS
QTY RATE AMOUNT K QTY AMOUNT QTY AMOUNT
1 2 3 4 5 6 7 8 9 10 11
1 Disassembling of gear boxes and stem rods and other
links to service gates including cost of welding ,skilled
labour etc and all other operations required to
complete the finished item of work as directed by the
Engineer-in-Charge.

2 Lifting of screw rods ,stem rods ,service gate including


cost of labour ,scoffolding charges,hire charges of
crane etc operations required for finished item of work
as directed by the Engineer-in-Charge.

3 Disassembling of side rollers,bearings, M S plates and


other links including cost of welding ,skilled labour etc
and all other operations required to complete the
finished item of work as directed by the Engineer-in-
Charge.

4 Supply and fixing of SKF ball bearings including cost


and conveyance ,cost of labour and all other
operations necessary to complete the finished item or
work as directed by the Engineer-in-Charge.
Page 10

Erection of side rollers with replaced bearings, M S


5 Plates for extention of lip angle including cost of
welding ,skilled labour etc and all other operations
required to complete the finished item of work as
directed by the Engineer-in-Charge.

6 Supply and fixing of rubber seals including aligniing


cost and conveyance ,cost of labour and all other
operations necessary to complete the finished item or
work as directed by the Engineer-in-Charge.

Bottom Seal

(a)
Top Seal

(b)
Side Seal

(c)
7 Checking and fixing alignment of service gate
including cost skilled labour ,instruments etc required
to complete the finished item of work as directed by
the Engineer-in-Charge.

8 Providing ballast weights of required quantity using


cast iron including cost of transportion fixing in
position etc all other operations necessary to complete
the finished item or work as directed by the Engineer-
in-Charge.
Page 11

9 Assembling of gear boxes and stem rods and other


links to service gates including cost of welding ,skilled
labour etc and all other operations required to
complete the finished item of work as directed by the
Engineer-in-Charge.

10 Replacement of damaged service wire and


reconnection to motors of gear boxes including cost of
materials, labour etc and all other operations required
to complete the finished item or work as directed by
the Engineer-in-Charge.

11 Labour charges for linking up of the stop log gate


( roght vent) to stemk rod requiring divers including the
required equipment like masks oxygen hoses and
consumable items like ropes wooden planks for
staging and lighting arrangement at below water
during the operation for removal of damaged batton
link etc., including the cost of hire charges for
generator for unineterrupted power supply and
compressors for oxygen for the day operation for
removing the bottom rod and conveyed the damaged
link to the work shop and rectified the same is to the
good condition including fabrication of cotter pin to the
required size and the same is to be conveyed to work
spot and refixing the same in position with 2nd
operation as above for linking up to the stop log gate
with required men for assistance to diverser complete
and all other operation s necessary to complete the
fiinished item of work
Page 12

12 Servicing the geat boxes including staightenning the


gear worm shaft by Hydraulic press and revoing
cleanning, greasing and fitted duly removal of wornout
washers and packing etc including converyance
charges from work spot to the workshop and back etc.
complete and all other operations necessary to
complete the finished item of work.

Total Rs. 0
Page 13
Page 14
Page 15
Page 16
Cirtificates

1) Cirtified that the work is completed in all respects


2) Cirtified that the work is not preffered and paid previously
3) Cirtified that the Contractor has engaged Technical Agent of Sri. B. Ravi,B.Tech (Civil)
4) Cirtified that the Contractor has engaged and Deployed of skilled labour
and meachinary at his own Agreement.
5) Cirtified that there is no i.r paras or court proceeding agnest this work
6) Cirtified that theExecutive Engineer has cheeck measeured 30% value of work
7) Cirtified that there are no 7-F transcations pending on this work
8) Cirtified that no seigniorage recovery required for this work.

Assistant Engineer Deputy Execuvive Engineer