TABLE OF CONTENTS
6.0
1
1 1
1
3 3 3 4 4
2 3
6.5
5 5 9 10 11 11 12 13 13 18 18 21 23 24 25 25 26 26 27 27 28 30 30 31 31 31 33 33 34 34 35 36 36 38 44
6.6
12
6.7
25
6.8
33
Plot Setup Stage I CAD Standard Plan Set Preparation Special Projects
6.10.1 Stage I Project Directory Structure 6.10.2 Stage I External Reference Files 6.11.1 Plan Set Title Sheet 6.11.2 Plan Set Plot Sheets 6.12.1 Confidential and Privileged Projects
34 35 36 44
Page ii
6.13.1 Interim CAD Review 6.13.2 Construction Contract PA Wide CAD Review 6.13.3 Work Order CAD Review
45 45 45
Update and Revision Procedures Contact and Support Information Conclusion Appendix A Architectural Discipline
Content Preferences Layer Stratagem Linetypes Symbols Content Preferences Layer Stratagem Linetypes Symbols Civil 3D Content Preferences Layer Stratagem Linetypes Symbols Content Preferences Layer Stratagem Linetypes Symbols Content Preferences Layer Stratagem Linetypes Symbols Content Preferences Layer Stratagem Linetypes Symbols Content Preferences Layer Stratagem Linetypes Symbols Content Preferences Layer Stratagem Linetypes Symbols
6.17.1 6.17.2 6.17.3 6.17.4 6.18.1 6.18.2 6.18.3 6.18.4 6.18.5 6.19.1 6.19.2 6.19.3 6.19.4 6.20.1 6.20.2 6.20.3 6.20.4 6.21.1 6.21.2 6.21.3 6.21.4 6.22.1 6.22.2 6.22.3 6.22.4 6.23.1 6.23.2 6.23.3 6.23.4 6.24.1 6.24.2 6.24.3 6.24.4
50 51 70 72 86 87 95 96 99
49 49 49 50
6.18
86
6.19
100 101 108 109 143 144 150 151 153 154 157 158 161 162 191 192 225 226 240 241 243 244 253 254 282 283 284 285 286 287 288
100
6.20
143
6.21
153
6.22
161
6.23
225
6.24
243
6.25 6.26
6.25.1 Graphic Scale Bars 6.25.2 North Arrows 6.26.1 6.26.2 6.26.3 6.26.4 6.26.5
282
284
Page iii
6.27
292
6.28 6.29
6.29.1 2010 Q1
303 304
Page iv
6.0
6.1
The EAD CAD Standard outlined within this document was established to provide guidance for the preparation of the Engineering / Architecture (E/A) Design Division of the Port Authority of New York and New Jerseys (PANYNJ) contract documents. This document is intended for use by both in-house personnel as well as outside consultants involved in creating or updating PANYNJ facilities Computer Aided Drafting (CAD) data.
6.2
PURPOSE
This Standard establishes requirements and procedures for the preparation and submission of CAD based drawings throughout the project life cycle. Adherence to this standard insures that the E/A Design Division of the PANYNJ will receive and produce data in a consistent format. This consistency will improve the compatibility of this data within each discipline and the efficient exchange of data between disciplines. The role of an individual assigned to the project determines the level of understanding required of the EAD CAD Standard. For CAD operators, designers, and functional supervisors a thorough knowledge of all CAD related elements associated with a project is crucial. The project manager however only requires a general knowledge of the EAD CAD Standard and the means by which it is employed to create a project. Both levels of knowledge will be possible through the use of this manual. The CAD system adopted by the PANYNJ is comprised of several Autodesk products. Throughout this manual terminology and references will be made that are unique to Autodesk and primarily, different AutoCAD based software applications. 6.2.1 ABOUT THIS STANDARD
The chapters within this standard describe how the E/A Design Division uses AutoCAD and how to configure AutoCAD to support the E/A Design Division CAD Standard, which it has adopted. The appendices, which follow, support the chapters in several ways. Each discipline has been assigned an appendix to explain information specific to their functional group. In addition, appendices have been provided to support CAD related subject matter, which is common throughout all disciplines. Finally, some appendices have been created to support internal E/A Design Division staff only; these appendices will be for internal use; however, they have been supplied with the document for both in-house and consultant staff.
Page 1
6.3
The following are Acronyms and Abbreviations used throughout this document.
Page 2
6.4
The EAD CAD Standard adopts AutoCAD as the Standard CAD Software. Consultants are required to submit electronic CAD files in a format compatible with the current version of AutoCAD software in use by the E/A Design Division of the PANYNJ. In addition, all submitted files must conform and comply with the latest version of the EAD CAD Standard outlined in this document. Softcopy submittals (electronic CAD files) must include all information presented on the hardcopy submittals (plots). This precludes the use of sticky-backs, graphic tapes, hand lettering and anything else that is placed on the drawing after it is plotted excepting any signatures and seals. Consultants are required to submit CAD files accompanied with hardcopies every time a project reaches a submittal milestone. This includes, but is not limited to, PA Review Set, Law Review Set, Percent Submittal Set, Addendum Set, As Bid Set, PACC Set, Drawing of Record Set, etc. Refer to Section 6.7.10 titled Submissions for more information. 6.4.1 CAD FILE FORMATS
All electronic CAD files should be AutoCAD DWG files with binary compatibility with the current release of AutoCAD in use by the PANYNJ. When submitting files on electronic media, the AutoCAD drawing file version should be noted. If terrain model files are requested for the project, the consultant will submit these files in either Autodesk Land Desktop Digital Terrain Model format or XML format. If alignment files are requested for the project, the consultant will submit alignment files in either Autodesk Land Desktop Alignment format or XML format. If a coordinate geometry point database is requested for a project, the consultant will supply this database as either an Autodesk Land Desktop Point Database file (.mdb) or an XML file. When requested, these files will be submitted with the Autodesk Land Desktop project structure intact, as outlined in Section 6.5.4 titled AutoDesk Land Desktop Companion. If working on a Project using either AutoCAD Architecture (formerly Architectural Desktop - ADT) or AutoCAD MEP (formerly Building Systems - ABS), the consultant will submit the Project file (.apj) and the Sheet Set Data file (.dst). 6.4.2 SCHEDULE
DWG and DWF files are required for each milestone during both stage II and stage III. If the project does not have a milestone scheduled prior to the PA Wide Review submittal, DWG and DWF files will be submitted no later than 3 week prior to the PA Wide Review submittal. 6.4.3 MEDIA AND FORMAT
AutoCAD drawing files will be submitted on media CDs. All disks are to be delivered virus free. Final hard copies of drawings will be submitted as Mylar plots using the PANYNJ Contract Border identified in this standard.
Page 3
All CDs submitted to the E/A Design Division of the PANYNJ will be labeled with the following information: Consultants name and Project Identifier Number (PID) Contact name and phone number of consulting project manager Discipline-Facility (e.g. Civil-JFK) Submittal Date and Percent Completed Data Format (e.g. AutoCAD Version .dwg) File Name(s) on CD As much information as possible should be printed on both the CD label and the CD case. If all the information will not fit on either the CD label or the CD case, the information can be listed in an orderly manner in a text file that will be copied to the CD in electronic format. 6.4.5 PROJECT WEBSITES
The PANYNJ is in the process of developing a Project Extranet to enhance collaboration between inhouse designers and outside consultants, as well as with different departments and divisions throughout the agency. All Project Websites have a folder structure similar to that described in Section 6.6 titled Project Directory Structure and File Naming Convention of this standard. Please refer to the project specifics to determine if a Project Website is available for use. If so, all transfer of digital information should be made via the website. Transfer of data via email or CDs is not permitted if a project website is available. If a Project Website is available for the project the Project Website link will be provided along with a Username and a Password.
Page 4
6.5
The E/A Design Division CAD Standard includes a series of support files. All support files are provided in a folder named EAD_Standards, which is located on the root level of the L:\ drive of the PANYNJ network.
The EAD_Standards folder contains one general All Disciplines sub-folder and eight discipline specific sub-folders as illustrated in Figure 6-A.
Figure 6-A The All Disciplines sub-folder contains all cross discipline support files, including contract borders, stamps, fonts, layer key styles, page setups, plot stamps, plot styles, a sample project structure, support files, symbols and templates. The folder structure is illustrated in Figure 6-B.
Figure 6-B Each Discipline sub-folder is divided into four sub-folders which contain all the discipline specific support files including layer drawings, tool palettes, plotter files and tool palettes. An example of this folder structure is illustrated in Figure 6-C. The layer and symbol content within these folders can be accessed through the use of AutoCADs Design Center utility. Graphic depictions of the symbols for each discipline can be referenced in the appendices. Figure 6-C 6.5.1 USING THE STANDARD FILES
The EAD_Standards directory contains two primary types of files: files that do not require ongoing user interaction and files that do. The first type refers to support files accessed automatically by AutoCAD once they have been copied to the proper support folders. All E/A Design Division workstations have already been configured to access these files. Outside consultants should copy these files to the appropriate directories or create an AutoCAD profile pointing to the files as necessary. The second type refers to files such as title sheets, contract borders, drawing information blocks and stamps, which the user must configure within the project. For instructions on creating a title sheet or working with the contract borders, refer to Section 6.11 titled Plan Set Preparation. 6.5.2 DISTRIBUTION FILES Page 5
L:\EAD_Standards\All_Disciplines\Contract Borders\ Border - ANSI A - Horizontal.dwg Border - ANSI A - Vertical.dwg Border - ANSI B - Horizontal.dwg Border - ANSI B - Vertical.dwg Contract_Border - OS.dwg Contract_Border_PATH - OS.dwg Contract_Border_PATH.dwg Contract_Border.dwg Drawing_Info - OS.dwg Drawing_Info.dwg Title_Sheet - OS.dwg Title_Sheet - PATH - OS.dwg Title_Sheet - PATH.dwg Title_Sheet.dwg 8.5x11 landscape border for use in non-contract drawings. 8.5x11 portrait border for use in non-contract drawings. 11x17 landscape border for use in non-contract drawings. 11x17 portrait border for use in non-contract drawings. 34x56 border for contract drawings. 34x56 border for Port Authority Trans Hudson contract drawings. 22x34 border for Port Authority Trans Hudson contract drawings. 22x34 border for contract drawings. Drawing information block for use with 34x56 borders. Drawing information block for use with 22x34 borders. 34x56 title sheet for contract drawings. 34x56 title sheet for Port Authority Trans Hudson contract drawings. 22x34 title sheet for Port Authority Trans Hudson contract drawings. 22x34 title sheet for contract drawings.
L:\EAD_Standards\All_Disciplines\Contract Borders\Stamps\ Contract_Border Stamp_Law-Review.dwg Contract_Border Stamp_Law-Review - OS.dwg Contract_Border Stamp_Preliminary.dwg Contract_Border Stamp_Preliminary - OS.dwg Contract_Border Stamp_QA-Submission.dwg Contract_Border Stamp_QA-Submission - OS.dwg Contract_Border Stamp_Submission.dwg Contract_Border Stamp_Submission - OS.dwg Drawing_Info - Stamp_CPbar.dwg Drawing_Info Stamp_CPbar OS.dwg Drawing_Info Stamp_NJ&NY PE (one consultant) - OS.dwg Drawing_Info - Stamp_NJ&NY PE (one consultant).dwg Drawing_Info - Stamp_NJ&NY PE (two consultants) - OS.dwg Drawing_Info - Stamp_NJ&NY PE (two consultants).dwg Law Review submission stamp for use on 22x34 borders. Law Review submission stamp for use on 34x56 borders. Preliminary submission stamp for use on 22x34 borders. Preliminary submission stamp for use on 34x56 borders. Quality Assurance submission stamp for use on 22x34 borders for FTA projects. Quality Assurance submission stamp for use on 34x56 borders for FTA projects. Percent submission stamp for use on 22x34 borders. Percent submission stamp for use on 34x56 borders. Confidential and Privileged stamp for use on 22x34 borders for CP drawings. Confidential and Privileged stamp for use on 34x56 borders for CP drawings. One consultant company providing NJ & NY PE signatures on 34x56 drawings. One consultant company providing NJ & NY PE signatures on 22x34 drawings. Two consultant companies providing NJ & NY PE signatures on 34x56 drawings. Two consultant companies providing NJ & NY PE signatures on 22x34 drawings.
Page 6
L:\EAD_Standards\All_Disciplines\Layer Key Styles\ PA_LKS-ACA2010 - Architectural.dwg PA_LKS-ACA2010 - Structurall.dwg PA_LKS-MEP2010 - Electrical.dwg PA_LKS-MEP2010 - Mechanical.dwg L:\EAD_Standards\All_Disciplines\Page Setups\ 115Bway.dwg Architectural.dwg Civil.dwg Electrical.dwg Environmental.dwg Geotechnical.dwg Mechanical.dwg Structural.dwg Traffic.dwg L:\EAD_Standards\All_Disciplines\Palettes\ Generic Tool Palettes for use by all disciplines. Drawing file containing pre-configured page setups for plotting drawings to devices located at 115 Broadway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Architectural Plotter Room at 2 Gateway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Civil Plotter Room at 2 Gateway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Electrical Plotter Room at 2 Gateway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Environmental Plotter Room at 2 Gateway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Geotechnical Plotter Room at 2 Gateway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Mechanical Plotter Room at 2 Gateway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Structural Plotter Room at 2 Gateway. Drawing file containing pre-configured page setups for plotting drawings to devices located within the Traffic Plotter Room at 2 Gateway. Layer Key Style for use by the Architectural Discipline within ACA Layer Key Style for use by the Structural Discipline within ACA Layer Key Style for use by the Electrical Discipline within MEP Layer Key Style for use by the Mechanical Discipline within MEP
Page 7
L:\EAD_Standards\All_Disciplines\Sample Project Contains a Sample Folder Structure that mimics the Folder Structure used when new projects are created. L:\EAD_Standards\All_Disciplines\Support PA.shx PA - Design.lin L:\EAD_Standards\All_Disciplines\Symbols BS1-1_2in-1ft.dwg BS1_2in-1ft.dwg BS1_4in-1ft.dwg BS1_8in-1ft.dwg BS1_16in-1ft.dwg BS1_32in-1ft.dwg BS1in-1ft.dwg BS1in-1in.dwg BS1in-5ft.dwg BS1in-10ft.dwg BS1in-20ft.dwg BS1in-25ft.dwg BS1in-30ft.dwg BS1in-40ft.dwg BS1in-50ft.dwg BS1in-60ft.dwg BS1in-100ft.dwg BS1in-200ft.dwg BS1in-400ft.dwg BS1in-500ft.dwg BS3_4in-1ft.dwg BS3_8in-1ft.dwg BS3_16in-1ft.dwg BS3_32in-1ft.dwg BS3in-1ft.dwg BS6in-1ft.dwg 1 1/2 = 1 Bar Scale 1/2 = 1 Bar Scale 1/4 = 1 Bar Scale 1/8 = 1 Bar Scale 1/16 = 1 Bar Scale 1/32 = 1 Bar Scale 1 = 1 Bar Scale 1 = 1 Bar Scale 1 = 5 Bar Scale 1 = 10 Bar Scale 1 = 20 Bar Scale 1 = 25 Bar Scale 1 = 30 Bar Scale 1 = 40 Bar Scale 1 = 50 Bar Scale 1 = 60 Bar Scale 1 = 100 Bar Scale 1 = 200 Bar Scale 1 = 400 Bar Scale 1 = 500 Bar Scale 3/4 = 1 Bar Scale 3/8 = 1 Bar Scale 3/16 = 1 Bar Scale 3/32 = 1 Bar Scale 3 = 1 Bar Scale 6 = 1 Bar Scale Shape file used by certain line types. Line type definition file containing custom line types.
Page 8
6.5.3
The Project Navigator within ACA or MEP can only be used when AEC objects are used as part of the project. If the condition above is met, projects are to be created in the MODEL folder for the appropriate discipline. ACA and MEP will create and name a project folder automatically when the user sets up an ACA or an MEP project using the Project Navigator. The EAD CAD Standard requires that the user names the ACA and MEP project name after the PID Number. Once created, the project folder will contain at minimum the following 4 sub-folders: Constructs, Elements, Sheets and Views. In addition to the folders created an AutoDesk Project Information file (.apj) and a Sheet Set Data file (.dst) will be created. The .dst file is to be named after the PID Number as well. A sample project structure is shown in Figure 6-D. Files and folders created using Project Navigator are not to be edited, Figure 6-D moved or deleted by any means other than through Project Navigator. Using other means than the Project Navigator to edit or delete any project information will result in inconsistent project data.
Consultants are required to create their own Sheet Creation Template file and are responsible for matching the fields to the ones provided within the Contract Border and Drawing Information included with
Page 9
LDC project data will be stored in the Land Projects folder located on the L: drive of the PANYNJ network. Within the Land Projects folder are facility specific sub-folders. Within the facility folders are project specific sub-folders, each named using the Project Identifier Number (PID) for that particular project. LDC will create and name a PID folder automatically when the user sets up a Land Desktop Project. The EAD CAD Standard requires the user to name the LDC project after the PID, in order to ensure the folder is named correctly. Within the PID folder will be the standard LDC sub-folders containing project specific alignment files, digital terrain models, point database files, etc. Drawings should not be stored in any of these folders but should rather be stored according the directory described in Section 6.6 titled Project Directory Structure and File Naming Convention. A sample LDC project structure is shown in the image to the right. The entire LDC project structure will be archived and backed up with the project drawing information.
Figure 6-E
Page 10
When using C3D, project drawings and data should be stored in the MODEL folder of the appropriate discipline. M:\<Facility Name>\<PID Number>\<Discipline>\Model\ For a more in depth breakdown on how to use C3D within the PANYNJ reference the Civil 3D Standard which is included within Section 6.18.5 titled Civil 3D. 6.5.6 AUTODESK REVIT
The Port Authority of New York and New Jersey is moving towards the use of BIM (Building Information Model) technology.. Refer to the E/A Design Division BIM Standard for a description of the processes, procedures, and requirements that are to be followed for the preparation and submission of BIM Models and documents for E/A Design Division projects.
Page 11
6.6
The E/A Design Division CAD Standard provides a structure for the organization of CAD projects within the department. The primary goals of this structure are to improve coordination between functional groups of E/A Design Division and its consultants, as well as to develop CAD projects in a way that will facilitate the further use of the electronic information beyond the initial contract. 6.6.1 PROJECT DIRECTORY STRUCTURE
All EAD CAD projects are stored on the CAD volume of a central server, which has internally been mapped using the drive letter M:\ The M:\ drive contains a sub-directory for each facility named using its facility code as displayed in Table 6-A. Table 6-A
Facility Code AMT BB BRKMT EP EWR FERRY GB GWB HCMF HELI HH HT IPY JFK JSTC LGA LT MULTI NFC NJMT NLCC OBX PABT PACD PATC PATH PHQ Facility Name Automobile Marine Terminal Bayonne Bridge Brooklyn Port Authority Marine Terminal Elizabeth Port Authority Marine Terminal Newark Liberty International Airport Ferry Transportation Goethals Bridge George Washington Bridge and Bus Terminal Harrison Car Maintenance Facility Downtown Manhattan Heliport Howland Hook Marine Terminal Holland Tunnel Industrial Park at Yonkers John F. Kennedy International Airport Journal Square Transportation Center Laguardia Airport Lincoln Tunnel Multi Facility Projects Newport Financial Center New Jersey Marine Terminals Newark Legal and Communication Center Outerbridge Crossing Port Authority Bus Terminal Port Authority Police Academy Port Authority Technical Center Port Authority Trans-Hudson Corporation Police Headquarters
Page 12
6.6.2
The Project Identifier Number (PID) is a unique identifier assigned for all EAD projects. The LEA is responsible for getting the PID number from the Project Manager at the kick-off meeting and distributing it to all discipline task leaders involved in the project. The task leader is responsible for distributing the PID number to their outside consultants. The LEA will request the creation of the project folder structure through the use of the on-line form provided on EOL under the Engineering Tools / CAD Support and Training section or by selecting the following link Project Creation Request Form. Refer to Section 6.27.4 titled Request Project Folder Structure. The M:\ drive is divided into Facility Folders, each containing project specific sub-folders. These project folders are named using the eight (8) digit PID number. Figure 6-F illustrates this concept using a project at Goethals Bridge with a PID number of 01234567. 6.6.3 DISCIPLINE FOLDERS
Figure 6-F
Every discipline is provided with a folder in the project directory in which all design related data is to be stored. Each discipline folder has a series of standardized sub-folders which are to contain the various types of design data. Figure 6-G illustrates these standardized Architectural folder as an example. sub-folders using the
The Model, Plotsheet and Publish folders should always contain the current version of all CAD drawings related to the project. For more information on the usage of these folders refer to the section titled Discipline Folder Rules of this standard. For more information on the Plotsheets_CP and DWF_CP folders refer to section 6.12.1 titled Confidential and Privileged Projects of this standard.
Figure 6-G The Discipline folders are used to share files among all the different disciplines of the Engineering / Architectural Design Division. Sub-folders are not to be created within the discipline folder. The Discipline sub-folders have read-write permissions assigned to the owning discipline.
Page 13
Page 15
The Received folder will contain a dated archive of design information received from outside sources. This folder is intended as a record to identify exactly what information consultants provided on what date. Sub-folders are permitted within the Received folder (Refer to the Section 6.6.9 titled Folder Naming Convention for proper usage). The Received folder has read-write permissions assigned to the owning discipline. Other disciplines have no access to the Received folder. Last Updated: 3/21/2010 Page 16
The Released folder will contain a dated archive of design information provided to outside sources. This folder is intended as a record to identify exactly what information consultants were provided with and on what date. Sub-folders are permitted within the Released folder (Refer to the Section 6.6.9 titled Folder Naming Convention for proper usage). The Released folder has read-write permissions assigned to the owning discipline. Other disciplines have no access to the Released folder. The Released folder will not be archived with the project. 6.6.3.12 SCHEMES FOLDER RULES
The Schemes folder will contain various schemes of a design as well as any temporary design data. This folder provides the designer with an area in which to make trial changes to a design and a place to store temporary files. If a scheme is created and is later chosen as the final design version, the files stored under that scheme are to be copied to the Model folder. Sub-folders are permitted within the Schemes folder (Refer to the Section 6.6.9 titled Folder Naming Convention for proper usage). The Received folder has read-write permissions assigned to the owning discipline. Other disciplines have no access to the Received folder. The Shemes folder will not be archived with the project. 6.6.3.13 SUBMITTALS FOLDER RULES
The Submittals folder is a location for storing project information as it appears at each milestone of the project. While the root Model, Plotsheets and Publish folders contain the current versions of drawings which will change throughout the life cycle of the project, the Submittals folder will preserve the state of those drawings at the moment of each milestone. Sub-folders have been created for each submission milestone from Stage I through Stage IV, Figure 6-H displays the subfolders that have been created. Sub-folders are permitted within the StageIII_PAReview, StageIII_Addendum and StageIV_PACC folders, by replacing the XX with the proper submission number The Submittals folder has read-write permissions assigned to the owning discipline. Other disciplines have read permissions assigned to the Submittals folder. The Submittals folder will be archived with the project. Figure 6-H
For more information regarding the specific submittal milestones refer to Section 6.7.10 titled Submissions. Last Updated: 3/21/2010 Page 17
To simplify the exchange of information between the various PANYNJ departments, divisions and function groups as well as between consultants and contractors, every attempt will be made to adhere to both the drive mapping and directory structures defined within this section. A sample project folder structure has been provided with the EAD CAD Standard as shown in Figure 6-I. Consultants are required to use this project folder structure replacing the word Facility Name with the Facility Code provided in section 6.6.1 titled Project Directory Structure and the letters PID with the eight (8) digit Project Identifier Number proved by the LEA. A copy of the project folder structure can be found at: EAD_Standard\All Disciplines\Sample Project\
Figure 6-I 6.6.5 FILE NAMING CONVENTION All electronic project files such as DWG, DWF, Images and Office documents referenced by a contract drawing, will be named following the EAD CAD Standard File Naming Convention. 6.6.5.1 DISCIPLINE CODES There are eight (8) disciplines within the E/A Design Division of the PANYNJ. All files referenced by contract drawings will be named beginning with the appropriate Discipline Code. The only exception to this rule is the Contract Border file. Table 6-B
Code A C E N G M S T Discipline Architectural Civil Electrical Environmental Geotechnical Mechanical Structural Traffic
6.6.5.2 CONTRACT BORDER FILE The Contract Border file contains general information about the project. This drawing will be named using the eight (8) digit PID number followed by a dash (-) and then the initials CB. Since one Contract Border file is used by all disciplines of the project, no discipline code is used in its file name. The filename will also contain no spaces or description. The filename will take the form of: PID-CB.dwg
Page 18
For example, the Architectural discipline is the Lead Discipline for a project with a PID number of 01234567. The Contract Border shall be named as follows: 01234567-CB.dwg Consultants may create their own Contract Border file only if they are the Lead Discipline. Otherwise, they will request the Contract Border from their EAD Task Leader and will place it in the Lead Disciplines Publish folder. If new drawings are added to the Contract Set during a Stage III Addendum, the original Contract Border will be used and the new issue date will be included within the Revision Stamp. If new drawings are added to the Contract Set during a Stage IV PACC, a new Contract Border will be issued by the Lead Discipline. The new Contract Border will have a dash (-) followed by the date appended at the end of the file name in the form of -YYYY_MM_DD. The original Contract Border will remain un-changed and both files will co-exist within the Publish folder. For example, the Traffic discipline is the Lead Discipline for a project with a PID number of 01234567 and new drawings are to be added to the Contract Set for a Stage IV PACC occurring on November 21st, 2009. A new Contract Border will be issued and named as follows: 01234567-CB-2009_11_21.dwg 6.6.5.3 MODEL FILES Model files are working drawing files containing the actual design geometry and annotations; they may also include externally referenced files from either the disciplines own Model folder or other disciplines Publish folders. Model files will be named beginning with the Discipline Code, followed by the eight digit PID number, a Model File Plan Type, an optional Sequence modifier and an optional User Description. Refer to the list of approved Model File Plan Types listed in Table 6-C. Once defined a model files name will not change through the life of the project. This restriction is required due to the nature of externally referencing Model files. The filename will take the form of: DPID-FP01-UserDescription.dwg
Acronym D PID FP 01 UserDescription Description Discipline Code (Refer to Table 6-B) Eight Digit Project Identifier Number Model File Plan Type (Refer to Table 6-C) Sequence Modifier (If used will be two digits) A description of up to 24 characters, including spaces. The following characters are not permitted <>/\:;?*|,=&%
Table 6-C lists all allowable Model File Plan Types. For a listing of common Model File Plan Types for particular disciplines refer to that specific disciplines appendix. Last Updated: 3/21/2010 Page 19
Page 20
The Sequence Modifier is restricted to the following two options: Option 1 Without using the Sequence Modifier For Example: M01234567-SPK-Level 2 North Wing.dwg M01234567-SPK-Level 2 South Wing.dwg M01234567-SPK-Level 4 North Wing.dwg M01234567-SPK-Level 4 South Wing.dwg Option 2 Using the Sequence Modifier For Example: M01234567-SPK02-North Wing.dwg M01234567-SPK02-South Wing.dwg M01234567-SPK04-North Wing.dwg M01234567-SPK04-South Wing.dwg Note that each discipline can choose which of the options they will follow for the project. 6.6.6 PLOTSHEET FILES
Plotsheet files are drawings assembled as sheets for plotting consisting of an externally referenced Contract Border, an inserted Drawing_Info block and externally referenced Model files from either the disciplines own Model folder or other disciplines Publish folders. Plotsheet files will be named beginning with the Discipline Code, followed by the eight digit PID number, followed by a dash (-), followed by the Series Modifier and then the Sheet Number or Sheet Number Range. The Plotsheet file is not permitted to have a user description appended to its name. The filename will take the form of: DPID-PTXX01.dwg (For Plotsheet files containing a single layout) DPID-PTXX01_PTXX20.dwg (For Plotsheet files containing multiple layouts)
Page 21
6.6.6.1 PLOTSHEET PLAN TYPE Plotsheet Plan Types are categories used for organizing Contract Drawings and refer to the single or double letters that appear before the sheet number in the lower right hand corner of each Plotsheet. A listing of the Plotsheet Plan Types usable by specific discipline appears in Table 6-D. Table 6-D
Useable By All Disciplines Architectural Civil Description General Plan Architectural Plan Landscape Plan Civil Plan Construction Staging or Sequence Plan Maintenance of Traffic Electrical Electrical Plan Corrosion Protection Plan Electronics Plan Environmental Geotechnical Mechanical Environmental Plan Geotechnical Plan Mechanical Plan Baggage Handling Plan Fire Protection Plan Plumbing Plan Sprinkler Plan Vertical Transportation Plan Structural Traffic Structural Plan Traffic Plan Construction Staging or Sequence Plan Maintenance of Traffic Plan Signal Plan Plotsheet Plan Type G A LS C CS MT E CP ES N GT M B FP P SP VT S T CS MT SG
6.6.7
DWF FILES
A DWF file is a non-editable highly compressed file format created from a DWG file. DWF files will be named beginning with the Discipline Code, followed by the eight digit PID number, followed by a dash (-) and then the Sheet Number Range. The DWF file is not permitted to have a user description appended to its name. Two forms of DWF files can exist, Single Sheet and Multi Sheet. The DWF filename will take the form of: DPID-PTXX01.dwf (Single Sheet) DPID-PTXX01_PTXX20.dwf (Multi Sheet)
Acronym D PID PT XX 01 XX01_XX20 Description Discipline Code (Refer to Table 6-B) Eight Digit Project Identifier Number Plotsheet Plan Type (Refer to Table 6-D) Series Modifier (Refer to Section 6.6.8) Single Sheet Number Starting Sheet Number to Ending Sheet Number
DWF files will be submitted as multi-sheet files at every submittal milestone of the project and will be created: From the current set of PlotSheet files Full Size (either 22x34 or 34x56) In black and white In consecutive order Grouped together by Plotsheet Plan Type and by Series number (if used) When using Series, the DWF files will be named not only by grouping them together by Plotsheet Plan Type but also by their Series number. PDF files are not permitted as substitutions for DWF files. Option One (Without Series) For Example: T01234567-G001_G007.dwf T01234567-CS001_CS003.dwf T01234567-T001_T037.dwf Option Two (With Series Level One) For Example: T01234567-G101_G107.dwf T01234567-T101_T137.dwf T01234567-T201_T207.dwf Last Updated: March 2010 Page 23
A Series is a numbering code used to organize sheets in the Contract Drawing Set. A description of what each number in a series represents will be defined at the start of every project by each disciplines Task Leader. At the start of each project the LEA will determine whether a one or a two digit series is to be used for all disciplines of the project. For Example: The LEA on a project is from Structural and decides that only 9 or less series are needed. Structural would select option one. Electrical, however, decides that 10 or more series are needed. Electrical would select option two. Since the LEA is from the Structural discipline the determination for all disciplines is to be made by them if Electrical requires the two digit series option then they must request that the LEA use that option for all disciplines. These two formats cannot co-exist on the same project. Option One (One digit series Figure 6-J) For projects with nine or less series the sheet number format will include a one or two letter Plotsheet Plan Type followed by a one digit series number followed by a two digit sheet counter number. o o o Use digits 1 through 9 as the series numbers Series numbers can be skipped. Counter numbers must be consecutive numbers beginning at 01 for each series.
Option Two (Two digit series Figure 6-K) For projects with ten or more series the sheet number format will include a one or two letter Plotsheet Plan Type followed by a two digit series number followed by a two digit sheet counter number. o o o Use digits 01 through 99 as the series numbers Series numbers can be skipped Counter numbers must be consecutive numbers beginning at 01 for each series.
Option Three (Without Series Figure 6-L) For projects that are not using a series the sheet number format will include a one or two letter Plotsheet Plan Type followed by a three digit sheet counter number. o Counter numbers must be consecutive numbers beginning at 001.
Page 24
01
01
01
Figure 6-J
Figure 6-K
The following images display how the three options would appear on a Structural Plotsheet.
Option Two
Option Three
All sub-folders created within the pre-defined folder structure will be named using the date, followed by a dash (-), followed by a User Description and will take the form of: YYYY_MM_DD-User Description
Acronym YYYY MM DD User Description Description Four digit Year Two digit Month Two digit Day A description of up to 24 characters, including spaces. The following characters are not permitted <>/\:;?*|,=&%
6.7
CAD drawing files must be consistently formatted in order to provide an effective method of data dissemination and retrieval. To that end, these standards will guide the user in the requirements of layer naming, graphic symbology, lettering styles, drawing units and other drawing related features. 6.7.1 COORDINATE SYSTEMS
In an effort to organize, consolidate and standardize the information generated and consumed by all divisions within the agency, Coordinate Systems must be used on all projects. The objective of this requirement is to make the data files easier for users to identify and integrate in planning and design. The default horizontal systems are the State Plane NAD83 New York East and Long Island Foot systems and default vertical system is the State Plane NGVD88 system. If another Coordinate System is to be used on a project that determination must be made by the LEA at the beginning of the project.
Figure 6-L
Page 25
All layers contained within E/A Design Division drawings have been defined using variations of the TriServices and the AIA layer guidelines and standards. All disciplines use a layer standard that is similar. The major components of a standard layer name are defined as follows: Discipline-Major-Minor-Description-Phase
Acronym Discipline Major Minor Description Phase Description Discipline Code (Refer to Table 6-E) Major grouping of features that have common characteristics Sub grouping of Major category Extended description of layers for clarity Indication of the informations current Phase (Refer to Table 6-F)
Table 6-E
Code A L C E N G M F P S T GN Discipline Architectural Landscape Civil Electrical Environmental Geotechnical Mechanical Fire Protection Plumbing Structural Traffic General Code EXST OTHR RELO RMVL TEMP
Table 6-F
Phase Existing Work by Others Relocation Removal Temporary
Note that the discipline codes listed in Table 6-E are for layer definitions only and may not reflect the correct discipline codes for file naming. For Example: C-UTIL-STRM-IDEN or C-UTIL-STRM-SYMB-RELO or C-UTIL-STRM-SYMB-RMVL The E/A Design Division layering stratagem consists of eleven discipline groups and a general group that corresponds to spatial data layers to assist in the isolation of information for design purposes and for the translation and use with GIS. Although every attempt has been made to create an all-encompassing standard, reality dictates that additions will need to be made to the layer stratagem. In the case that additions are required, they will only be accepted as additions to minor or description categories. If an addition is required for the discipline or major categories then a Request to Change Standard Form is required. Refer to Section 6.28 titled Appendix L Request to Change Standard. 6.7.3 ENTITY AND LAYER LINETYPES
Standard E/A Design Division linetypes have been created for use with all design documents. These linetypes have been assigned to their respective layers in the <Layers.dwt> drawings, which have been provided for each discipline as part of this standard. Additional linetypes have been created for special circumstances when the lettering within a linetype needs to be rotated. Many of the linetypes supplied require the use of a textstyle named LINEFONT, starting a drawing with the template drawings provided as part of this standard will ensure that the linetypes are loaded correctly. All entities will have their Last Updated: March 2010 Page 26
All entities will be drawn on the specified layers and must have color assigned to bylayer and not byentity. Layer color assignments are included in the layer definitions provided. For discipline specific color usages refer to Sections 6.17 through 6.24. 6.7.5 SYMBOLOGY
A symbol is defined as a pre-arranged group of geometry that can be inserted at scale into a drawing. The AutoCAD term for a symbol by this definition is block. There are two (2) types of symbols provided in this standard, Scalable and Non-Scalable symbols. Standard E/A Design Division symbols have been provided as part of this standard. For discipline specific symbol definitions refer to Sections 6.17 through 6.24. 6.7.5.1 SCALABLE SYMBOLS Scalable symbols are created with the intent that they will appear the same size when plotted at different scales. Symbols are created on Layer 0 and will automatically take on the characteristics of the layer they are inserted on. All symbols will be inserted on the layer identified within this standard. For ease of use, the insertion scale factor of each scalable symbol will depend on the plot scale. For Example: If the scale of the viewport is 1:30, then each symbol inserted in the drawing will be scaled up by a factor of 30. If the scale of the viewport is 1/8=1-0, the symbol will be inserted into the drawing with a scale factor of 96. 6.7.5.2 NON-SCALABLE SYMBOLS Non-Scalable symbols are created with the intent that they will appear at true size for all plot scales. Symbols are created on Layer 0 and will automatically take on the characteristics of the layer they are inserted on. All symbols will be inserted on the layer identified within this standard. The insertion scale factor for all Non-Scalable symbols will be 1.
Page 27
The colors used in the layer definitions provided within this standard correspond to plotted pen weights. AutoCAD products make use of a CTB file to assign pen weights to object colors. All E/A Design Division Contract Drawings are to be plotted using the PA-Master.ctb file that is provided with this standard. Many variables within the CTB file remain constant throughout the pen assignments, these variables are defined in Table 6-G. The pen numbers, lineweights and percent screening assigned to the pens used in the PAMasterFull.ctb file are displayed in Table 6-H. The values displayed in Table 6-G and Table 6-H are for Contract Drawings, disciplines are permitted to use their own ctb files for presentation purposes.
Page 28
Page 29
To promote consistency in Contract Drawings as well as prevent the use of third-party un-licensed AutoCAD font files, only the Helv-2F.shx, Helv-M.shx , Romand.shx and Romans.shx fonts are permitted for use on E/A Design Division Contract Drawings. Nine Text Styles have been provided as part of this standard. Five of the Text Styles provided are used for Contract Border, Drawing Information or Linetype definitions and are not permitted for general use by the disciplines. The remaining four Text Styles provided, which are permitted for use by the disciplines are created as annotative styles. Annotative styles allow the AutoCAD product to scale the text heights appropriately based on the scale of the plotted drawing. The Text Styles provided are:
Text Style PA - 1-10th PA - 1.5-10th PA - 2-10th PA - 2.5-10th Linefont Helv-2F Helv-M RomanD RomanS Plotted Height 0.10 0.15 0.20 0.25 0.10 Varies Varies Varies Varies Annotative Yes Yes Yes Yes No No No No No Font Romans.shx Romans.shx Romans.shx Helv-M.shx Romans.shx Helv-2F.shx Helv-M.shx Romand.shx Romans.shx Description of Usage Normal Text Headings Titles Alternate Titles Linetype Definitions Contract Border and Drawing Info Contract Border and Drawing Info Contract Border and Drawing Info Contract Border and Drawing Info Usable by Disciplines Yes Yes Yes Yes No No No No No
6.7.8
To promote consistency in Contract Drawings only the Dimension and Leader Styles that have been provided as part of this standard are permitted for use. The Three Dimension Styles and eight MultiLeader Styles that have been provided are:
Dimension Style PA-Arrow PA-Arrow-Deci PA-Tick Arrow Head Closed Filled Arrow Closed Filled Arrow Tick Content 0.10 Mtext 0.10 Mtext 0.10 Mtext Unit Type Inches Feet Inches
Multi-Leader Style PA-Arrow PA-Loop PA-Circle PA-Dot PA-Integral PA-DOT-Keynote-Box PA-DOT-Keynote-Circle PA-DOT-Keynote-Hex
Arrow Head Closed Filled Arrow Open Loop Dot Blank Dot Integral Dot Dot Dot
Content 0.10 Mtext 0.10 Mtext 0.10 Mtext 0.10 Mtext 0.10 Mtext Box Circle Hexagon
Page 30
As with the text and dimension styles, the EAD CAD Standard has provided Table Styles as part of this standard in an attempt to promote consistency throughout the creation of Contract Drawings.
Table Style PA-Index PA-Legend Description of Usage Drawing Index General Legends
6.7.10 EXTERNAL REFERENCE FILES All external reference drawings will be attached as Overlays. By adhering to this process, all users will be able to use drawings within their own disciplines as well as drawings from other disciplines without concern for circular references and other potential problems. The path type will be set to Relative Path, for both, external reference drawings and external reference images, this process will ensure the proper exchange of drawings and/or images between in-house staff and outside consultants. 6.7.11 SUBMISSIONS CAD files in DWG and DWF format, accompanied with hardcopies are required at every Submittal Milestone. Until project completion, all current working drawings are saved in the MODEL, PLOTSHEETS and PUBLISH folders of each disciplines root directory. At every Submittal milestone, the working project information will be copied into the SUBMITTALS folder for archiving, in order to preserve the state of the drawings at the moment of that milestone. At the completion of every milestone, each discipline will copy its MODEL, PLOTSHEETS and PUBLISH folders, along with the MANAGEMENTDOCS and PHOTOS folders, into the appropriate milestone sub-folder within SUBMITTALS. Refer to Section 6.6.3.13 titled Submittals Folder Rules for a listing of Submittal Folders provided. Once the folders have been copied, the involved Task Leaders will notify the LEA, who will then notify the CAD Support Group by filling out the Project Archival Request Form on EOL. Refer to Section 6.27.2 titled Request Project Archival. Upon notification, the CAD Support Group will move the files to the Archive server, mapped internally as the N:\ drive, leaving behind a text file named ARCHIVED YYYYMM-DD.txt containing the exact location where the files can be found. The CAD Support Group will only move files from the disciplines SUBMITTALS folder to the ARCHIVE server. The SUBMITTALS folder is for internal use only. Consultants are required to submit the entire Project Folder Structure as outlined in Section 6.4 titled Digital Submittal Requirements, containing not only the Discipline folder in which their drawings are saved but also all other Discipline folders from which external references were made. Consultants will submit their folder structure directly to their own Disciplines Task Leader. The Task Leader will copy the consultants MODEL, PLOTSHEETS and PUBLISH folders, along with the MANAGEMENTDOCS and PHOTOS folders, into both the disciplines root directory and the appropriate milestone sub-folder within SUBMITTALS.
Page 31
Stage I (Conceptual Design) is necessary for some projects to develop design concepts, determine anticipated construction costs and schedules, and to compare alternatives before proceeding with Design Development (Stage II) or Final Design (Stage III). 6.7.11.2 STAGEII_100PERCENT
Stage II (Design Development) is necessary to develop the chosen design concept, further refine anticipated construction costs and schedules before proceeding with contract documents. 6.7.11.3 STAGEIII_PA-REVIEW
The Stage III (Final Design) effort includes preparation of contract documents that will be used for construction. The procedures vary for alternate delivery methods such as Quick Bid Contracts, Work Order Contracts, Design/Build Contracts and Design/Build/Operate/Maintain Contracts. PA Review usually happens when the project is between 90% to 95% complete, this may vary depending on the project specifics. When a project reaches PA-Review, drawings are required so the Electronic Review Process can begin. 6.7.11.4 STAGEIII_AS-ADVERTISED-SIGNED-SET
The As-Advertised-Signed-Set is when the project reaches 100% Submission and Mylars are plotted and signed. 6.7.11.5 STAGEIII_ADDENDUM
Addenda happen after the Mylar Set is plotted and signed. Some Addenda might not contain drawing modifications, some might only contain Specs, for this reason, the StageIII_Addendum Set might contain non-consecutive Addenda sub-folders. This folder should only contain the Addenda sub-folder in which drawings were required. This folder should not contain the entire set of CAD files it should only contain the Addenda files. 6.7.11.6 STAGEIII_AS-BID
The As-Bid Set is the Bid and Awarded Set of Drawings, which incorporates all the addenda that have been issued. 6.7.11.7 STAGEIV_PACC
The PACC Set (Post Award Contract Changes) contains drawings that have been modified or new drawings that have been issued after the Contract was awarded. 6.7.11.8 STAGEIV_DRAWING-OF-RECORD
The Drawing-of-Record Set is the set of drawings created after construction is completed.
Page 32
6.8
In order to plot successfully using this standard, some configuration of the AutoCAD environment will be necessary. This configuration will only need to be done once and will streamline plotting moving forward. 6.8.1 AUTOCAD 2010 CONFIGURATION (PLOTTING BY LAYOUT)
AutoCAD 2010 options must be modified to insure proper placement of the Contract Border in the paper space layout environment. To make the required modifications, right click within the drawing pane and select Options. From within the Options dialog, select the Display tab and make the changes shown in Figure 6-M to the Layout Elements portion of the tab and then select OK.
Figure 6-M The Layout Elements settings that were changed affect the workstation and will not need to be reconfigured in future sessions. 6.8.2 TEMPLATE DRAWING SETUP
For proper plotting and consistency, the EAD CAD Standard makes use of template drawing files. Supplied with this standard are two template files, PA-deci-units.dwt for Decimal units and PA-archunits.dwt for Architectural units. To install either of these template drawings, copy them to the appropriate Template directory in your AutoCAD environment install directory. Both templates are essentially blank drawings saved with the extension .dwt, that have been started from scratch, been assigned a unity type and make use of a CTB file. In addition both templates have the Text Style LINEFONT defined for use with the EAD CAD Standard linetypes. If you currently have a drawing template ensure that your template has the Use Color Dependant Plot Styles option selected and the Default plot style table set to PA-MasterFULL.ctb as shown in Figure 6-N. These options are found under the Plot Style Table Settings button of the Plot and Publish tab in the Options dialog box.
Figure 6-N
Page 33
Every object created is measured in drawing units. Before drawing can begin, the drawing units used will need to be decided based on the type of plan being drawn. All drawings will be created at actual size with the unit convention decided on. For Example: For a drawing with units assigned to inches a distance of one drawing unit represents one inch in realworld units. Template files have been provided for both, Architectural units (inches) and Decimal units (feet). These templates can be found at: EAD_Standars\All Disciplines\Template\ The creation of all drawings will be accomplished by using one of the two templates provided with the EAD CAD Standard. By adhering to this process problems will be avoided when loading custom EAD linetypes. For a listing of which templates are typically used by each discipline refer to Table 6-I. Table 6-I
Architectural Units Architectural Electrical Mechanical Structural Decimal Units Civil Environmental Geotechnical Traffic
6.8.4
PAGE SETUPS
Page Setups enable the user to save specific settings within the AutoCAD plotting environment. The Page Setups created for the in-house designers make use of PC3, PMP and CTB files as well as configuration changes. PC3 files are typically copied to the Plotters folder under the root AutoCAD installation directory. The Page Setups created for in-house use are located on the internal network at: L:\EAD_Standards\All Disciplines\Page Setups\
6.9
PLOT SETUP
All drawings will be plotted from a paper space layout tab. The tab will be named the same as the sheet number being plotted. Full size and Half size sheets may be plotted from a single layout by utilizing page setups. Multiple layouts are not to be used for Full size and Half size sheets. Multiple layouts may be used for the plotting of multiple sequential sheets. Refer to Section 6.29 titled Appendix M Page Setups and Plotter Configurations for more information.
Page 34
6.10
In an effort to streamline the CAD projects within the E/A Design Division a comprehensive CAD Standard has been developed. Although this standard was intended for use with projects that are at Stage II or beyond, many of the ideas are to be implemented during the Stage I effort. 6.10.1 STAGE I PROJECT DIRECTORY STRUCTURE The project directory structure, which resides on the M:\ drive and is described in Section 6.6 titled Project Directory Structure and File Naming Convention of this document will be maintained. 6.10.1.1 PROJECT IDENTIFIER NUMBER
A project identifier is assigned when the first charge code is developed. If a PID is available, a project folder with the PID will be created in the appropriate facility folder located on the M:\ drive. If a PID is not available, a project folder will be created within the Pre-Projects folder located on the M:\ drive. 6.10.1.2 FILE NAMING CONVENTION
If a PID is available, the project naming convention identified in Section 6.6.5 titled File Naming Convention will be maintained. If a PID is not available, a number generated by the CAD Support Group will temporarily substitute for the PID, until one is available. 6.10.1.3 LAYERING SCHEME
The layering scheme explained in Section 6.7.2 titled Layering Scheme Definition of this document will be maintained. The layer colors may be adjusted to suit the needs of any presentations being prepared. 6.10.1.4 ENTITY AND LAYER LINETYPES
Linetypes will be used as described in Section 6.7.3 titled Entity and Layer Linetypes of this document. If additional linetypes are created for illustration purposes, the linetype file must accompany the CAD file. The linetype file shall use the PID in the name. 6.10.1.5 ENTITY AND LAYER COLORS
All Entities and Layers will have their color assigned to bylayer. 6.10.1.6 SYMBOLOGY
The symbols provided with this standard will be used whenever possible. If a new symbol is created it will not have its colors assigned to byblock. To achieve multiple colors within a block, the creator will make use of multiple layers within the block definition. 6.10.1.7 TEXT STYLES AND HEIGHTS
It is understood that for presentation purposes a deviation from the standard text styles will occur. If third party fonts are used, those fonts must accompany the CAD file. Fonts that are not freely distributable or shareware are not to be used. 6.10.1.8 DIMENSION STYLES
If new dimension styles are created for presentation purposes, the names of the styles will be appropriate for the type of dimension being created. Also, all Text Styles created for use within the dimension style will have the prefix DIM_. Last Updated: March 2010 Page 35
All drawings will be plotted from paper space layout tabs as described in Section 6.9 titled Plot Setup of this standard. The lead discipline is responsible for creating and making available page setups necessary for plotting. Further, any CTB files used other that those provided with this standard will accompany the CAD file. If used, the CTB created will have the PID prefixed to the file name. 6.10.2.2 PLAN SET PREPARATION
It is the responsibility of the lead discipline to prepare and distribute the border for the Stage I effort. Whenever possible the ANSI borders provided with this standard are to be used.
6.11
6.11.1 PLAN SET TITLE SHEET The term Title Sheet refers to the top most sheet of the plan set. The Title Sheet border has undergone an extensive review by the CAD Committee. The use of block attributes will insure consistency between contracts and improve the appearance of all contract sets. It is important to maintain the integrity of the Title Sheet, therefore, the Title Sheet is never to be exploded. Illustrations of the Title Sheets can be found in Section 6.26 titled Appendix J Contract Borders and Title Sheets. 6.11.1.1 TITLE SHEET CONFIGURATION
The Title Sheet border drawing has purposely been created in paper space. As a result, this border drawing cannot be inserted as a block or externally referenced into other drawing files. The process for defining a Title Sheet is as follows. Begin by opening the Title_Sheet.dwg file located at: L:\EAD_Standards\All Disciplines\Contract Borders\ Once open Save the drawing to the appropriate project sub-folder. Enter the appropriate values for each attribute provided in the Title Sheet. 6.11.1.2 ENTERING TITLE SHEET INFORMATION
Each Title Sheet drawing file provided with the standard has three signature lines defined. They are: Deputy Director Engineering / Design Program Director XX or Sr. Program Manager / Program Manager Chief Engineer There are two possible options for the signature lines. Refer to Table 6-J to identify which option to use based on your contract type and cost and Table 6-K to determine which Layers are to be turned off for each option.
Page 36
Option 2
Option 1
Option 2
Table 6-K
Layer Name GN-ANNO-TTLB-CHIF GN-ANNO-TTLB-PDIR GN-ANNO-TTLB-PMAN Status for Option 1 OFF OFF ON Status for Option 2 ON ON OFF
Under no circumstance will the Title Sheet border be exploded or modified. Figure 6-O shows the default Title Sheet provided with the EAD CAD Standard. The WORK ORDER No. line has been turned off by default and layer GN-ANNO-TTLB-WRKO is to be turned on if a WORK ORDER No. needs to be entered.
6.11.1.3
A revision block named Drawing_Info Stamp_Revision.dwg has been provided with the EAD CAD Standard. When revisions are made this block is to be inserted using an endpoint snap to the upper left corner of the previous revision line. Figure 6-P displays where the revision stamp is to be inserted. The stamp is located on the network at: L:\EAD_Standards\All_Disciplines\Contract Borders\Stamps\ Once inserted the revision block will prompt the user for information pertaining to the revision. Under no circumstances will the revision block be exploded or modified.
6.11.1.4
Figure 6-P
The layout for the Title Sheet will be configured to use one of the page setups supplied within this standard. As previously stated, outside consultants will need to configure the page setups for their own use and for the particular environment they are working in. After importing an appropriate page setup the Title Sheet will be configured to plot by layout and use the PA-MasterFull.ctb plot style. 6.11.2 PLAN SET PLOT SHEETS Plotsheet files are drawing files assembled as sheets for printing. These drawings consist only of external reference files. No linework is permitted within Plotsheet drawings in either Model or Paper space with the following exceptions: North Arrows Last Updated: March 2010 Page 38
To create the project border, open the Contract_Border.dwg file provided with this standard fill in all attribute information requested and save it to your disciplines PUBLISH folder with the name following the format described in Section 6.6.5.2 titled Contract Border File. As with the Title Sheet, the WORK ORDER No. line has been turned off by default and layer GN-ANNOTTLB-WRKO is to be turned on if a WORK ORDER No. needs to be entered. For a listing of Contract Border files that have been provided with this standard refer to Section 6.5.2 titled Distribution Files. 6.11.2.2 REFERENCING THE CONTRACT BORDER
To create a Plotsheet file, begin by externally referencing the Contract Border that was configured in the previous section. The border is to be referenced into a paper space layout, that has been configured following the steps outlined in Section 6.9 titled Plot Setup, with an insertion point of 0,0. Under no circumstances will the contract border be exploded, renamed or modified. 6.11.2.3 INSERTING THE DRAWING INFORMATION
Once the Contract Border has been externally referenced the Drawing_Info.dwg block will need to be inserted. This block will be inserted with an insertion point of 0,0 and all attribute information is to be filled out. The Drawing_Info.dwg block contains a pair of lines that state Original Signed By and Original Signee. These lines of text are stored on the layer GN-ANNO-TTLB-SIGN, which by default is turned off. The Original_Signee attribute field is to be filled in using the name of the person that signed the mylars. The layer this information is on is to be turned on when DWF files are created for any Stage of the drawings beyond signature. Figure 6-Q and Figure 6-R display this text OFF and ON. Note, this attribute is only required for internal use and outside consultants need not turn on this layer. For information on the correct process for outside consultants refer to Section 6.11.2.9 titled Using the Signature Stamps.
Page 39
Figure 6-Q
Figure 6-R
When entering the Discipline Group and Discipline Sub-Group attribute fields users will need to refer to Table 6-M for the proper values to be used within these fields. Table 6-M
Discipline Group Architecture Landscape Civil Electrical Power Electronics Corrosion Protection Environmental General Geotechnical Mechanical Fire Protection HVAC Plumbing Structural Traffic Discipline Sub-Group
To promote consistency and easy identification of the people involved in the project the Designed By, Drawn By and Checked By attribute fields are to be filled out using the first initial, followed by a period and then the first ten characters of the last name. Note that a spaces before or after the period are not permitted. For Example: Filippo Brunelleschi would fill out the field as F.Brunellesc, truncating the last name at ten characters.
Page 40
The process used to create Contract Borders allows for flexibility in editing and updating information both at the project level as well as at the drawing level. If a project level change is required then the PIDCB.dwg file can be opened and modified and if a drawing level change is required then the individual drawing can be opened and modified. The benefit to working in this manner is that if a project level change is required only one drawing file needs to be edited and then the rest of the files will inherit the changes. 6.11.2.5 CREATING A VIEWPORT
Once the Contract Border has been externally referenced and the drawing information block has been inserted and filled out then a viewport must be created to display the drawing information that has been referenced into model space. When a viewport is created it is to be placed on the appropriate layer for that discipline, typically <discipline>-ANNO-VPRT. Once the viewport is created the zoom magnification or scale of the viewport must be set. All E/A Design Division files are created to be plotted with a scale of 1:1, which means that the viewports created will need to have a scale or magnification assigned to them. Once the viewport scale has been assigned and the drawing information has been centered within the view, the viewport display should be set to locked. 6.11.2.6 MAKING REVISIONS IN CONTRACT DRAWINGS
Two types of revisions can happen in a Contract Drawing Set, Partial Revisions and Complete Revisions. A partial revision is when only portions of the Contract Drawings have been changed and a complete revision is when a new Contract Drawing is created. Regardless of the revision type, users will required to place the Drawing_Info Stamp_Triangle.dwg block in the drawing pane, near the revised entities. A revision cloud is also to be placed around the area that is being revised. For Partial Revisions: A Revision Cloud will be placed either in Model Space or in Paper Space surrounding just the area of the drawing where changes were made. The Stamp Triangle will be placed right next to the Revision Cloud including the Revision Number. The Revision Block will be inserted including the Revision Number as well as the Date, the Description and the Initials of the person that approved the changes. For Complete Revisions: A Revision Cloud will be placed in Paper Space surrounding the entire drawing just outside the perimeter of the Contract Border. The Stamp Triangle will be placed in the lower right corner of the Plotsheet including the Revision Number. The Revision Block will be inserted including the Revision Number as well as the Date, the Description and the Initials of the person that approved the changes. For every Revision Triangle inserted into a Plotsheet a corresponding revision block is to be inserted within the border area as outlined in the following section.
Page 41
A revision block named Drawing_Info Stamp_Revision.dwg has been provided with the EAD CAD Standard. When revisions are made this block is to be inserted using an endpoint snap to the upper left corner of the previous revision line. Figure 6-S displays where the revision stamp is to be inserted. The stamp is located on the network at: L:\EAD_Standards\All_Disciplines\Contract Borders\Stamps\ Once inserted the revision block will prompt the user for information pertaining to the revision. Under no circumstances will the revision block be exploded or modified. Figure 6-S Submission stamps have been provided for both the Contract Border and Contract Border OS (oversize) sheets and can be found at: L:\EAD_Standards\All_Disciplines\Contract Borders\Stamps\ The submission stamps will be inserted as blocks within the Contract Border with an insertion point of 0,0. The following submission types have stamps provided with this standard: Law-Review Preliminary QA-Submission Percent Submission Figure 6-T displays how each of the four submission stamp types appear on the Contract Border. 6.11.2.8 USING THE SUBMISSION STAMPS
Figure 6-T
Page 42
Signature stamps have been provided for both the New York and New Jersey Professional Engineer and Registered Architect and are to be used by outside consultants in-lieu of Consultant Logos. The word Drawing_Info Stamp_ has been prefixed at the beginning of each stamp to indicate that these stamps are to be placed within the individual layout tabs and not directly into the Contract Border file. The signature stamps provided within this standard are located at: L:\EAD_Standards\All_Disciplines\Contract Borders\Stamps\ The use of the Signature stamps by outside consultants will require that the GN-ANNO-TTLB-PANU layer be turned off. This layer contains the signature lines for the in-house staff and is not needed when outside consultants are signing the sheets. Signature stamps are to be inserted with an insertion point of 0,0 and are required to have all appropriate attribute fields filled in. Note that when filling in the Consultant company information only the company name is to appear, not the address. If a sub-consultant is used then the primary consultant will fill in their company name using the Consultant1 and Consultant2 attribute fields and the sub-consultant will fill in their company name using the Sub-Consultant1 and Sub-Consultant2 attribute fields. On the left side of Figure 6-U the Contract Border with the GN-ANNO-TTLB-PANU layer for in-house use turned on is displayed and on the right side of Figure 6-U the Contract Border with that layer turned off and a signature stamp inserted is displayed.
Confidential and Privileged Stamps have been provided for both, the Contract Border and Contract Border - OS (oversize version). The word Drawing-Info - Stamp_ has been prefixed at the beginning of each Stamp to differentiate them from the Submission Stamps. The Confidential and Privileged Stamps are to be inserted as blocks with an insertion point of 0,0 on each individual sheet unless the entire project is considered Confidential and Privileged, in which case the stamps can be placed within the Contract Border. The Confidential and Privileged Stamps provided with this standard are located at: L:\EAD_Standards\All_Disciplines\Contract Borders\Stamps\ Figure 6-V illustrates a Contract Border with a Confidential and Privileged Stamp inserted.
Page 43
Figure 6-V
6.12
SPECIAL PROJECTS
Special Projects are those in which unique circumstances may require different guidelines be followed in order to comply with the EAD CAD Standards. The contents of this section will be followed in addition to the ones already specified in previous sections, unless specifically instructed otherwise within this section. 6.12.1 CONFIDENTIAL AND PRIVILEGED PROJECTS Security projects contain Confidential and Privileged information and their access within the E/A Design Division network is restricted to certain users. For that reason, if the project being worked on is considered a Confidential and Privileged (CP) project a PLOTSHEETS_CP folder will be used to store all CP Plotsheet drawings.
Page 44
6.13
In an effort to improve the usage of the EAD CAD Standard, the CAD Support Group has developed a form called the CAD Standards Review Report, which allows for the rating of CAD Standards compliance on every project worked on by each discipline. CAD Standards reviews are applicable to all projects, inhouse and/or consultant that are issued either for construction contracts or work orders. 6.13.1 INTERIM CAD REVIEW Review is mandatory for: o o Contract drawings prepared by one discipline and sets consisting of more than 25 sheets. Contract drawings prepared by two or more disciplines and sets consisting of more than 15 sheets.
Requirements o o Timeframe: Required at 50% milestone or as determined by the LEA if no official interim milestone prior to the 100% submission Initiated by the LEA via EOL request form
Report is issued to the Assistant Chiefs, Principals, LEA and Task Leaders. 6.13.2 CONSTRUCTION CONTRACT PA WIDE CAD REVIEW Review is mandatory for all Contract Drawings o Initial failures are issued to the LEA and Task Leaders 3 weeks are provided for the correction of the files o o At the end of the 3 weeks a Report is issued to the Assistant Chiefs, Principals, LEA and Task Leaders At the Pre-Mylar Review Date reviews will be performed for any failing disciplines and the FINAL pass/fail Report will be issued. Drawings will not be reviewed after the Pre-Mylar Review Date Requirements o o Timeframe: Required at the on-set of PA Wide Review Initiated by the LEA via EOL request form Upon receipt of the request the CAD Support Group is to upload the files to Live Link for electronic review and notify the Contract Engineer of the initiation of PA Wide Review. Final Report is issued the Assistant Chiefs, Principals, LEA and Task Leaders 6.13.3 WORK ORDER CAD REVIEW Review is mandatory for: o o Mandatory for all Contract Drawings. Initial failures are issued to the LEA and Task Leaders 3 weeks are provided for the correction of the files Last Updated: March 2010 Page 45
Requirements o Initiated by the LEA via EOL request form Upon receipt of the request the CAD Support Group is to upload the files to Live Link for electronic review and notify the Contract Engineer of the initiation of PA Wide Review. Report is issued to the Assistant Chiefs, Principals, LEA and Task Leaders at the end of the 3 week period. The CAD Standards Review Report is divided into 3 section; the first section contains all the Mandatory Fields for which compliance with EAD CAD Standards is required in order for the project to pass, the second section contains all the Non-Mandatory Fields followed by a third section that includes notes and comments pertaining to the review. Items included within this Report are: Filename and Folder Structure o Project drawings and files referenced within them must be named according to the EAD CAD Standard and must be located within the sub-folders defined in this standard.
Plan Set Preparation o All External Referenced files and\or images shall be contained within the PID Folder Structure. The Title Sheet, Contract Border and Drawing Information block along with the Professional Stamps provided within the EAD CAD Standard shall be used without any modifications and/or alterations.
CAD Practice o The layers provided within the EAD CAD Standard must be used in all drawing files. These layers are pre-configured to work in conjunction with each disciplines pen settings (CTB). All External Referenced files and\or images shall be set as Overlay and Relative Pathing.
Plot Setup o Drawings must be prepared using the PA-MasterFull.ctb file (pen settings). This will ensure consistency of plotting drawings from any workstation within Engineering.
Submittals Information o DWF files are required at each submittal. They are to be created in full size, multi-sheet and grouped together by Plotsheet Type and Series (if used).
Land Desktop Projects (Civil Only) o Data files for Land Desktop projects must be available for archiving. The Land Desktop project is essential for linking data to drawing objects.
This form will be reviewed on a regular basis and is subject to changes. If a change is approved, it will be posted on the E/A Design Division CAD Standard website http://www.panynj-cadstandards.com/ and incorporated into the next revision of this document. The following two pages illustrate the first two sections of the CAD Standards Review Report and are to be used as a checklist for checking CAD Standard compliance prior to submitting drawings.
Page 46
Mandatory Items
Page 47
Page 48
6.14
The dynamic nature of CAD technology and the engineering process dictates that this document will change over time. Changes to this document will be made by following strict procedures and guidelines. Changes may be made based on errors and omissions, as well as to enhance or update the standards based on changes in the CAD environment. All requested changes to this document must be accompanied by a Request to Change Standards form provided in Section 6.28 titled Appendix L Request to Change Standard. The Request to Change Standards form must be provided to the CAD Support Group. All Request to Change Standards forms will be reviewed on a periodic basis. If the change is approved, it will be incorporated into the next draft of this document and all support files will be modified. Updates to this document and the related support files will be made as required. Updates will be posted on http://www.panynj-cadstandards.com/
6.15
Questions regarding the standards provided within this document should be directed to the CAD Support Group at: 973-565-7510 or engcadd@panynj.gov
6.16
CONCLUSION
This document is a comprehensive standard for the creation of contract drawings for the PANYNJ, E/A Design Division. All drawings submitted to the E/A Design Division must adhere to the conventions documented here. The CAD Support Group will use automated procedures to verify compliance with this standard.
Page 49
6.17
Page 50
Description
Annotation A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A ANNO A A A A A A A A A A A A A A A A A ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO
_BUS BREK CARS CHNG CLIN COLS COLS DETL DIMS DIMS ELEV ELEV ELEV IDEN IDEN IDEN IDEN IDEN IDEN IDEN IDEN LGND LGND MLIN NOTE PEOP REDL SCUT SYMB SYMB SYMB SYMB SYMB SYMB TEXT TEXT TEXT TEXT TEXT TEXT TEXT
BUBL CLIN BUBL GUID FFLR GUID VERT DETL DOOR ELEV FURN GLAZ ROOM SCUT WALL DISC
Continuous Continuous Continuous DIVIDE4 CENTER5 Continuous CENTER5 DASHED5 Continuous DOT8 Continuous DOT8 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DIVIDE2 Continuous Continuous Continuous DOT8 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
GUID AROW MISC NPLT NRTH SCLE TEXT _CLL DATE ELEV LEDR MISC MLIN
Buses Break Line Cars Identification Of Updated Work General Plan/Elevation/Section Centerline Column Centerline Identification Column Centerline Extension Used With Notes Detail Bubble Outline (Indicate Blow-Up Or Detail) Dimensions Dimension Guide Line Spot Elevation Symbol (Or Block Insertion Layer) Vertical Elevation Symbol Line Vertical Elevation Symbol On Section/Elevation Detail Symbol And Extension Line To Bubble Door Number Symbol; Hardware Group Etc. Elevation Symbol (Or Block Insertion Layer) Furniture Identification Symbol Window Number Symbol Block Insertion Layer Room Identification (Shown As A Block) Section Cut Symbol (Or Block Insertion Layer) Partition Type Identification Symbol Legends And Symbols Associated With Legends Legend Disclaimer Match Line Blocks Of Miscellaneous Notes; Boiler Plate Notes And Frames People, Pedestrians Etc. Redline Section Cut Line Connecting Section Head And Tail Directional Arrow Miscellaneous Symbols Miscellaneous Symbols- Not Plotted North Arrow Scale Bar Text In Symbol Blocks Text (Generated By Leader; Quick Leader Or Multi-Leader) Contract Limit Line Text Presentation Date Elevation Symbol Text Text Leader Line (If Drawn Separately) Secondary Text Match Line Text
Page 51
Phase
Minor
Major
Color
Plots
Desc
Description
A A A A A A A A Area A
TEXT TEXT TEXT TRAN TRUK TTLB TTLB VPRT OTLN TEXT
PRES
1 212 8 8 8 51 5 200 255 212 212 5 1 1 5 1 1 8 1 5 212 1 1 51 3 5 8 5 8 8 8 51 1 212 5 5 3 5 212 212 212 1
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED5 Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN4 Continuous Continuous Continuous DASHED5 CENTER5 Continuous Continuous Continuous HIDDEN4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Property Line Text Right Of Way Text Street Name Text Trains, Subways & Monorails Trucks Drawing Title With Scale Bar Drawing Title On Presentation Border View Port Area Calculation Boundary Lines Area Calculation, Room Number, Tenant Identification Numbers (Shown As Text) Ceiling Grid - Tile Pattern Steel Beam In Rcp Plans Light Fixtures Or Block Insertion Layer Ceiling/Roof Penetrations Overhang Out-Line Shown On Reflected Ceiling Plan (Only) Return Air Diffusers Supply Diffusers Shaft Penetrations Overhead General Overhead Signage Skylight Out-Line Shown On Reflected Ceiling Plan (Only) Ceiling Soffit Edges Speaker Sprinkler Columns Or Block Insertion Layer Structural Steel For Columns Or Block Insertion Layer Structural Steel Elements Hidden Architectural Steel Columns In Stair Column Base Plate Structural Beam Elements Or Block Insertion Layer Structural Beam Elements Above Structural Column Centerline Concrete Columns Column Detail Column Enclosure Hidden Column Elements Miscellaneous Columns Elements Precast Concrete Columns Column Piles Full Height Door Or Block Insertion Layer Door Headers (Appear On Reflected Ceiling Plan (Only)S) Door Jamb Partial Height Door; Swing And Leaf
A AREA Ceiling A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG A CLNG Column A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS A COLS Door A DOOR A DOOR A DOOR A DOOR
BEAM LGHT OPNG OVHG RDFF SDFF SHFT SIGN SKLT SOFF SPKR SPRN
OVHD
_STL _STL _STL BASE BEAM BEAM CLIN CONC DETL ENCL HIDN MISC PCST PILE
Page 52
Phase
Minor
Major
Color
Plots
Desc
Description
A DOOR Elevation A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV
SWNG _STL _STL BALC BLDG BOLL BYND CNPY COLS COLS COLS COLS COLS COLS CURB DECK DOOR DOOR EQPM ESCL ESCL ESCL ESCL ESCL EVTR EVTR EVTR FASA FENC FGPN FURN FURN GLAZ GLAZ GRAL GRAL HRAL HRAL LGHT LGHT LUVR MECH MECH MECH RAMP RAMP
DASHED4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED5 DOT5 DASHED5 Continuous Continuous DOT5 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED4
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Door Swing (Only When Drawn As Linework) Steel Columns Elevation Steel Flange/Web In Elevation Elevation Of Balcony Elements Building Elevations In The Distance Security Bollard Elevation Materials Beyond Canopy Elevations Elevation Of Column Elements Architectural Steel Column Elevation Elevation Of Columns In The Distance Elevation Of Concrete Columns Column Enclosure Elevation Elevation Of Hidden Column Elements Curb Elevation Metal Deck In Elevation Door Elevation Door Elevation In The Distance Elevations Of Equipment Escalator Elevation Escalator Elevation In The Distance Escalator And Equipment Elevations Escalator Elevation Hidden Escalator Machinery Elevations (Non-Equipment) Elevator Elevation Elevator Elevation In The Distance Elevator Elevation Hidden Fascia Elevation Architectural Fence Elevation Fiberglass Wall Panels/Joints In Elevation Elevation Of Furniture Security Planter Elevation Window And/Or Glass Elevation Window Mullion Elevation Guardrail Elevation Guardrail Elevation In The Distance Handrail Elevation Handrail Elevation In The Distance Elevation Ceiling Mounted Light Fixture Elevation Wall Mounted Light Fixture Louvers In Elevation Elevation Of Mechanical Duct Elevation Of Miscellaneous Mechanical Elements Elevation Of Mechanical Registers Ramp Elevation In The Distance Ramp Elevation Hidden
DETL BYND
BYND
PLNT MULL BYND BYND CLNG SCON DUCT MISC REGI BYND HIDN
Page 53
Phase
Minor
Major
Color
Plots
Desc
Description
A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV A ELEV Equipment A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM A EQPM Escalator A ESCL A ESCL A ESCL A ESCL A ESCL A ESCL A ESCL A ESCL A ESCL Elevator A EVTR A EVTR A EVTR
ROOF ROOF ROOF ROOF SECU STRS STRS STRS STRS SWAL SWAL SWAL VENT WALL WALL WALL WALL WALL
212 253 251 8 8 8 8 253 8 1 8 8 212 3 5 8 8 1 212 5 251 5 51 1 5 8 1 212 5 5 212 212 1 8 8 1 5 8 8 1 255 212 8 3
Continuous Continuous Continuous HIDDEN4 Continuous Continuous Continuous DASHED4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN4 Continuous Continuous Continuous DOT2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED4 Continuous Continuous Continuous DASHED5 DOT4 Continuous Continuous Continuous DASHED5 Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes
Roof Elevation Elements Of Roof Elevations In The Distance Gutter And Leader - Beyond Hidden Roof Elements Elevation Security Elements Elevation Stair Elevation Stair Guardrail Elevation Stair Elevation Hidden Stair Handrail Elevation Slurry Wall Elevation Slurry Wall Elevation Miscellaneous Slurry Wall Tieback Elevation Vent Elevation Wall Outline/Perimeter Wall Elements Elevation Behind Wall Elements Elevation In The Distance Elements Behind Wall Plane Wall Elevation Equipment Block Insertion Layer Trash Compactor Trash Compactor Below Conveyor Belt Cogeneration Plant Fire Hose Cabinet Lavatories, Toilets, Urinals Car Lift Machines Mechanical Duct Equipment Air Conditioner/ Heating Unit Miscellaneous Equipment Equipment Not In Contract Substation Equipment Mechanical Vent Escalator Block Insertion Layer Escalator Above (Or Block Insertion Layer) Escalator Below (Or Block Insertion Layer) Escalator Body Outline Escalator Handrail Handrail Infill Panel Glass, Metal, Etc. Escalator Machinery Hidden Escalator Treads Escalator Working Points Elevator Block Insertion Layer Elevator Cab Elevator Structural Steel
CMPK CMPK CNVY COGN FHCB FIXT LIFT MECH MECH MISC NICN SSTA VENT
BLOW
DUCT HVAC
_CAB _STL
Page 54
Phase
Minor
Major
Color
Plots
Desc
Description
A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR A EVTR Floor Plan A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR A FLOR
_STL _STL _STL BOLS CALL CNWT CROS DOOR DOOR ENCL EQPM GLAZ HIDN HRAL HWAY HYDR LUVR MISC PANL PLFM SECU SHFT SHRD SILL SPKR STIL
MISC
EQPM CYLR
CMRA
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED5 Continuous Continuous DASHEDX2 Continuous Continuous DOT2 Continuous Continuous Continuous Continuous Continuous HIDDEN5 Continuous HIDDEN4 DASHED4 Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Elevator Steel Plate Elevator Steel Posts Elevator Steel Rods Elevator Bolster Channels Elevator Call Kiosk Elevator Counter Weights Elevator Cab Crosshead Elevator Door Miscellaneous Door Elements Elevator Enclosure Elevator Equipment Elevator Glass Hidden Elevator Elements Elevator Handrail Elevator Hoist Way Equipment Elevator Hydraulic Cylinder Elevator Vent Louvers Miscellaneous Elevator Related Elements Elevator Operating Panel Elevator Platform Elevator Security Camera Elevator Shaft Elevator Shroud Elevator Sill/Threshold Elevator Handsfree Speaker Phone Elevator Stiles Edge Of Slab: At Floor Opening, Outline Of Floor Floor Outline Above Floor Beam Floor Beam Below Floor Outline Below Casework (Manufactured Cabinets) Loading Dock Loading Dock Below Interior Decorative Fence Guardrails Not Attached To Stairs Handrails Not Attached To Stairs Handrails Below X Representing Floor Opening (Excluding Shafts) Floor Opening Above Floor Open To Below Overhead Items (Shelves, Etc.) Overhang Out-Line Shown On Floor Plan Platform Platform Edge Extension Of Platform Floor
ABVE BEAM BEAM BLOW CASE DOCK DOCK FENC GRAL HRAL HRAL OPNG OPNG OPNG OVHD OVHG PLFM PLFM PLFM
BLOW
BLOW ARCH
EDGE EXTN
Page 55
Phase
Minor
Major
Color
Plots
Desc
Description
A A A A A A A A A A A A A A A A A A A A A A
FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR FLOR
RAIS RAMP RAMP SCOR SCOR SECU SLAB SLAB SLAB SPCL STRS STRS STRS STRS STRS STRS STRS STRS STRS STRS TACT TPTN WDWK ABVE MAJR MINR
212 5 5 3 5 1 3 1 5 5 1 1 8 8 8 8 8 8 253 8 1 212 212 1 1 212 1 212 1 1 8 1 1 212 212 5 5 212 1 1 5 212 5
BLOW BYND
Continuous Continuous HIDDEN3_TO_3 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED2 Continuous DOT2 Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Raised Floors Ramp Ramp Above Control And/Or Expansion Joints Tooled Joints Security Floor Slab Edge Floor Slab Edge Below Floor Slab Edge Beyond (Viewed From Opening Above) Arch. Specialties (Toilet Room Access. Display Cases) Stairs Or Block Insertion Layer Stairs Above Stairs Beam Stairs Below Stairs Guardrail Stairs Hidden (Stair Structure Etc.) Stairs Handrail Ladder Stairs Miscellaneous Stair Stringer Tactile Strip Toilet Partitions Woodwork (Field - Built Cabinets & Counters - Usually Dash) Furniture - Desks, Etc. Chair And Other Seating Counters Heat Sink Info Kiosk Furniture Panels, Storage Components, Etc. Passimeter Reader Planter Ticket Vending Machines Turnstiles Windows,Window Walls,Glazed Partitions Curtain Walls Glass Door, Glass Pane Glazing Hardware Window Mullions Window Mullions Miscellaneous Partial Height Glazed Surface Windows Sill Exterior Windows Sill Interior Skylight Out-Line Shown On Floor Plan
A FLOR Furniture A FURN A FURN A FURN A FURN A FURN A FURN A FURN A FURN A FURN A FURN Glazing A GLAZ A GLAZ A GLAZ A GLAZ A GLAZ A GLAZ A GLAZ A GLAZ A GLAZ A GLAZ Graphics
Page 56
Phase
Minor
Major
Color
Plots
Desc
Description
A GRPH A GRPH A GRPH A GRPH Key Plan A KPLN A KPLN A KPLN A KPLN A KPLN A KPLN A KPLN A KPLN A KPLN Patterns A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT A PATT Reference A REFN A REFN A REFN A REFN A REFN A REFN A REFN A REFN A REFN A REFN
RENR SIGN
5 255 255 255 212 8 1 251 252 1 1 8 1 8 251 8 8 8 8 8 251 8 8 8 8 8 8 8 8 8 8 8 251 251 113 85 85 75 200 15 85 211 21 252
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous PHANTOM4 Continuous HIDDEN CENTER5 Continuous Continuous Continuous Continuous CENTER5 Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
3d Images Graphic Images I.E. (Billboards & Advertisements) Rendering And Watercolor Images Graphic Signage (Full Color - Using Pantone Colors) Key Plans Turnstiles In Key Plan Key Plan Miscellaneous Low Roof In Key Plan Roof Miscellaneous In Key Plan Text In Key Plan Main Walls In Key Plan Hidden Walls In Key Plan Miscellaneous Walls In Key Plan Textures Concrete Masonry Unit Textures Primary Steel Textures Miscellaneous, Steel, Metal Textures Area Cross Hatching, Miscellaneous Patterning, Poche Ceiling Textures Column Pattern Concrete Textures Fiberglass Textures Pavings, Tile, Carpet Patterns, Material Pattern Finish Patterns Grout Fill Textures Gypsum / Drywall Textures Foam Insulation Board Textures Batten Insulation Textures Miscellaneous Textures Protection Board Textures Roof Surface Patterns, Hatching Material Patterning, Wall Insulation, Hatching And Fill Concrete Wall Patterns Wood Pattern Reference Axial Alignment Reference Area Outline For Area Calculations Not Printed Reference Building Line Reference Centerline Reference Column Bubbles And/Or Identification Reference Dimensions Any Lines Used To Construct Escalators Reference Sheet Edge And Available Drawing Area Reference Grid For Details And/Or Drawing Layout Horizontal Construction Lines
HIDN MISC
_CMU _STL _STL AREA CLNG COLS CONC FGPN FLOR FURN GROT GYBD INSU INSU MISC PROT ROOF WALL WALL WOOD ALGN AREA BLDG CLIN COLS DIMS ESCL FRME GRID GUID
MISC
BATT
CONC
HORZ
Page 57
Phase
Minor
Major
Color
Plots
Desc
Description
A A A A A A A A A A A A
REFN REFN REFN REFN REFN REFN REFN REFN REFN REFN REFN REFN
GUID GUID KPLN NSRT STRS TEXT TEXT TEXT TEXT TRAK VPRT WPNT BUBL SYMB
151 143 201 255 15 15 222 222 15 93 1 255 4 3 4 212 8 51 1 8 1 5 8 3 5 212 1 8 1 8 8 8 8 212 255 51 8 5 4 212 212 1
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED5 Continuous Continuous Continuous Continuous Continuous DASHED4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN HIDDEN Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
A REVS A REVS Roof A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF A ROOF Room A ROOM Schedule A SCHD Sections A SECT A SECT A SECT A SECT A SECT A SECT A SECT
0001 0001
General Construction Lines Vertical Construction Lines Reference Key Plan Fixed Block Insertion Point Any Lines Use To Construct Stairs Reference Text Reference Text For Escalator Design Reference Text For Elevators Design Reference Text For Stair Design Reference Track Dynamic Envelope Polygon Representing The View Port Window Area Drawn In Model Space General Working Points Revision Cloud And Arc (Change Number With Each Revision) Revision Triangle (Change Number With Each Revision) Roof Outline, Roof Perimeter / Edge, Roof Geometry Roof Above Outline Roof Below Canopy Geometry - Main Canopy Geometry Secondary Roof Drain Roof Outline Gutter And Leader Gutter And Leader - Below High Roof View From The Top Level Changes, Pitch Directions And Cants Low Roof Stair Riser, Stair Handrail, Nosing, Guard Rail, Roof Furn. Roof Surface Patterns, Hatching Roof Parapet Roof Parapet Below Hidden Roof Ribs Roof Stairs Above Roof Stairs Drain Room Name (Shown As Text) Schedule Insertion Layer (Shown As Autocad Table) Structural Steel Cut By Section Section Through Miscellaneous Steel Shapes And Column Section Of Steel Column Section Of Concrete Beam Section Of Light Fixture In Ceiling Section Of Ceiling Panel Canopy In Section
ABVE BLOW CNPY CNPY DRAN EDGE GUTR GUTR HIGH LEVL LOWR MISC PATT PPET PPET RIBS STRS STRS NAME TABL _STL _STL BEAM BEAM CLNG CLNG CNPY
MISC
BLOW
Page 58
Phase
Minor
Major
Color
Plots
Desc
Description
A A A A A A A A A A A A A A A A A A A A A A A A A A A
SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT
COLS COLS COLS COLS COLS COLS COLS CONC CONC DECK DOOR DUCT DUCT DUCT ESCL ESCL ESCL FNDA GLAZ GLAZ GRAL HRAL JBAR MCUT MCUT MCUT MISC MISC PANL PIPE PIPE RAMP RIVR SEWR SKLT STRS STRS TRAN WALL WALL WALL WALL WALL WALL WDBL
Continuous Continuous Continuous Continuous Continuous DASHED4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED5 Continuous Continuous HIDDEN3_TO_3 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
HDWR
HIDN MISC
Steel Column Section Section Of Concrete Column Column Section Detail Column Enclosure Section Elements Associated With Securing Columns To Other Elements Like Nuts, Bolts, Screws, Etc. Hidden Column Section Section Of Precast Concrete Section Of Concrete Section Of Miscellaneous Concrete Metal Deck In Section Door In Section Section Thru Miscellaneous Mechanical Section Thru Mechanical Return Duct Section Thru Mechanical Supply Duct Escalator In Section Escalator Handrail In Section Escalator Machinery In Section Foundations In Section Windows Cut By Section Section Of Glazing Hardware Guardrail Section Section Of Handrail Section Of Jersey Barrier Main Material Cut By Section Section Of Hidden Material Secondary Material Cut In Section Miscellaneous Material Cut By Section Hidden Miscellaneous Material Cut In Section Section Of Stone Panel Section Thru Pipe Section Thru Miscellaneous Pipe Elements Section Of Ramp River Line In Section Sewer In Section Skylight Section Stairs In Section Section Of Stair Stringer Section Of Trains, Subways & Monorails Walls Cut By Section Fiber Glass Panel And/Or System In Section Gypsum Wall Board In Section Miscellaneous Wall Section Retaining Wall In Section Shaft Wall In Section Wood Blocking In Section
A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT A SECT Site Plan
STRG
Page 59
Phase
Minor
Major
Color
Plots
Desc
Description
A A A A A A A A A A A A A A A A A A
SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE SITE
AIRP ALGN ALGN ALGN BLDG BOLL CURB FENC FENC GRID GRID GRID GRID JBAR LGHT MISC PILE SIGN STRE STRE SWLK TBAK TRAF TRAK TRAK TUNL UNGR UNGR
A SITE A SITE A SITE A SITE A SITE A SITE A SITE A SITE A SITE A SITE Slurry Wall A SWAL A SWAL Tone A A A A A A A A A A A A A A TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE
SBAK STRP
Continuous PHANTOM4 DASHDOT4 PHANTOM5 DASHEDX2 Continuous Continuous Continuous Continuous Continuous DOT4 Continuous DOT4 Continuous Continuous Continuous Continuous Continuous HIDDEN3_TO_3 Continuous Continuous Continuous DASHED5 Continuous CENTER Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Airport Contract Limit Line Property Line Right Of Way Line Building Above Outline Security Bollard Curbs Exterior Fence Exterior Decorative Fence Primary X-Axis Coordinate Grid Secondary X-Axis Coordinate Grid Primary Y-Axis Coordinate Grid Secondary Y-Axis Coordinate Grid Jersey Barrier Street Light Miscellaneous Site Features Piles Site Signage Street Setbacks Traffic Street Striping Sidewalk Tiebacks Slope Tracks Track Centerlines Tunnel Underground Structure Or Xref/Block Insertion Layer Underground Utilities Or Xref/Block Insertion Layer Slurry Wall Slurry Wall Tieback Various Color Toning (Used For Presentation - Stage 1 Only) Sky Zone Fill Shading Of Airport Building Sections And Elevations Column Enclosure Fill Section/Elevation/Plan Ground Plane Mechanical Zone Fill Office Zone Fill Open To Below Zone Fill Outline Of Tone Fill Sky Fill Outline Building Sections And Elevations Outline Column Enclosure Fill Outline Section/Elevation/Plan Ground Plane Outline
TBAK
_SKY AIRP BLDG COLS GRND MECH OFCE OPNG OTLN OTLN OTLN OTLN OTLN
250 61 251 191 253 251 153 41 61 165 61 191 253 251
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Page 60
Phase
Minor
Major
Color
Plots
Desc
Description
A A A A A A A A A A A A A A A A A A Wall A A A A A A A A A A A A A A A A A A A A A A A A A A Xref
TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE TONE WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL WALL
OTLN OTLN OTLN OTLN OTLN OTLN OTLN OTLN OTLN OTLN OTLN PARK PUBL RETL RIVR SERV SWAL VCIR
MECH OFCE OPNG PARK PUBL RETL RIVR SECT SERV SWAL VCIR
153 41 61 254 40 21 153 255 141 253 30 254 40 21 153 141 253 30 4 5 1 5 5 212 1 5 1 1 8 1 1 4 4 3 1 3 3 3
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHEDX2 Continuous DASHED5 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DASHED2 DASHDOT Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Mechanical Fill Outline Office Fill Outline Open To Below Fill Outline Parking Fill Outline Public Fill Outline Retail Fill Outline River Fill Outline Shading Outlines Service Fill Outline Slurry Wall Outline Vertical Circulation Fill Outline Parking Zone Fill Public Zone Fill Retail Zone Fill River Zone Fill Service Zone Fill Shading Of Slurry Walls Vertical Circulation Zone Fill Full Height Walls, Stair And Shaft Walls, Walls To Structure Wall Above Wall Barrier Or Liner Wall Wall Below Booth Wall Wall Mounted Casework Canopy Wall Fiberglass Wall Panel Finishes, Woodwork, Trim Gypsum Wallboard Kalwall Infill Grid Kalwall Main Panel Miscellaneous Wall Movable Partitions Building Outlines Outline Of Wall Above Outline Of Wall Below Partial Height Walls (Dont Appear On Reflected Ceiling Plans) Shear Wall Shaft Wall X Representing Shaft Opening - Opening In Wall Related To Shafts, Etc Walls Around Stairs Walls Around Tracks Walls Around Tracks Below Hidden Walls Around Tracks Wall Vents
ABVE BARR BLOW BOTH CASE CNPY FGPN FNSH GYPB KWAL KWAL MISC MOVE OTLN OTLN OTLN PRHT SHER SHFT SHFT STRS TRAK TRAK TRAK VENT
NFIL OTLN
ABVE BLOW
OPNG
BLOW HIDN
Page 61
Phase
Minor
Major
Color
Plots
Desc
Description
A A A A A A A A A A A A A A A A A A A A A A A A A A A A
XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF XREF
_OLE BLDG BLDG BLDG BLDG BLDG BORD CLNG COLS COLS CURB CURB CURB ELEV ESCL ESCL FLOR GRID INDX KPLN LAND RAST SECT SGRD SGRD SITE TRAF TRAK
BLOW COOR
255 8 8 5 5 5 255 255 255 255 8 8 8 255 5 8 255 255 255 255 255 255 255 255 255 255 255 255
Continuous Continuous HIDDEN HIDDEN HIDDEN Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN HIDDEN Continuous Continuous DOT4 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Layer To Attach Ole Linked Files Onto (I.E. Excel, Access Or Word) Xref Building Onto Xref Building Above Onto Xref Building Below Onto Xref Building Details Onto Xref Building Entry Level Onto Xref Borders And Associated Attributes Onto Xref Rcp's Onto Xref Column Stl/Enclosure Onto Xref Column Grids Centerlines Onto Street Curbs Xref Street Curbs Above Onto Street Curbs Below Xref Elevations Onto Escalator Escalator Below Xref Floor Plan Onto Xref Coordinate Grid Onto Layer To Xref Drawing Index Onto Xref Key Plan Onto Xref Landscape Onto Raster Images Xref Sections Onto Xref Structural Sub Grade Onto Xref Sub Grade Utilities Onto Xref Site Plan Onto Xref Traffic Stripping Onto Xref Tracks Onto
6.17.2.2
Discipline Minor Major
Description
Annotation L ANNO L ANNO L ANNO L ANNO L ANNO L ANNO L ANNO L ANNO L ANNO L ANNO L ANNO
_BUS _CLL _CUT BREK CARS CLIN DIMS DIMS DETL GDLN LGND
5 4 8 5 8 8 1 1 3 113 1
Continuous Continuous Continuous Continuous Continuous CENTER5 DOT8 Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Buses Contract Limit Line Cut Line Break Line Cars Centerline Dimension Guide Line Dimensions Detail Symbol Guideline Legend Disclaimer
Page 62
L ANNO TEXT L ANNO TEXT L ANNO TEXT L ANNO TRAN L ANNO TRUK L ANNO TTLB L ANNO VPRT L ANNO VPRT Area - All Area Layers Are Non Plot L AREA IDEN L AREA OTLN L AREA PATT L AREA PLNT Chart L CHRT _BDR L CHRT LINE L CHRT TEXT L CHRT TITL Elevation L ELEV BYND L ELEV TREE L ELEV L ELEV Grading L GRAD L GRAD L GRAD Key Plan L KPLN L KPLN HIDN SHRB INDX INTR TEXT _BDR HTCH
Page 63
Page 64
Page 65
Page 66
6.17.2.3
Discipline Minor Major
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) L ____ ____ ANNOTATION L ANNO CLIN L ANNO DIMS ELEVATION L ELEV PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN SECTION L SECT SITE L SITE L SITE L SITE HIDN _ROW BLDG CNPY FENC FENC PROP SLFN SPAD WATR PROF BLDG LDSP LDSP ____ ____ ____ EXST EXST EXST 253 253 253 Continuous CENTER5 DOT8 Yes Yes Yes Existing Centerline Existing Dimension Guide Line Existing Elevation Or Section Objects Obscured By Foreground Objects Existing Right Of Way Line Existing Building Above Outline Existing Canopy Existing Chain Link Fence Existing Picket Fence Existing Property Line Existing Silt Fence Existing Spade Cut Edge Existing Water Edge Existing Profile Guidelines Existing Building Above Outline Existing Landscape Fill Existing Landscaped Area
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST
253 253 253 253 253 253 253 253 253 253 253 253 43 31
HIDDEN2 PHANTOM5 DASHED DASHED2 FENCE FENCE DASHDOT4 DASHDOT DASHED5 DASHEDX2 DOT2 DASHED Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
6.17.2.4
Discipline Minor Major
Description
Default Future Layer Properties (Unless Otherwise Noted Below) L ____ ____ ANNOTATION L ANNO CLIN L ANNO DIMS ELEVATION ____ ____ ____ FUTR FUTR FUTR 212 212 212 Continuous CENTER5 DOT8 Yes Yes Yes Future Centerline Future Dimension Guide Line
Page 67
L ELEV PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN SECTION L SECT SITE L SITE
HIDN _ROW BLDG CNPY FENC FENC PROP SLFN SPAD WATR PROF BLDG
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR
212 212 212 212 212 212 212 212 212 212 212 212
HIDDEN2 PHANTOM5 DASHED DASHED2 FENCE FENCE DASHDOT4 DASHDOT DASHED5 DASHEDX2 DOT2 DASHED
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
6.17.2.5
Discipline Major
Description
Default Relocate Layer Properties (Unless Otherwise Noted Below) L ____ ____ CLIN DIMS ____ ____ ____ RELO RELO RELO 212 212 212 Continuous CENTER5 DOT8 Yes Yes Yes Relocated Centerline Relocated Dimension Guide Line Relocated Elevation Or Section Objects Obscured By Foreground Objects Relocated Right Of Way Line Relocated Building Above Outline Relocated Canopy Relocated Chain Link Fence Relocated Picket Fence Relocated Property Line Relocated Silt Fence Relocated Spade Cut Edge Relocated Water Edge Relocated Profile Guidelines Relocated Building Above Outline ANNOTATION L ANNO L ANNO ELEVATION L ELEV PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN SECTION L SECT SITE L SITE
HIDN _ROW BLDG CNPY FENC FENC PROP SLFN SPAD WATR PROF BLDG
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO
212 212 212 212 212 212 212 212 212 212 212 212
HIDDEN2 PHANTOM5 DASHED DASHED2 FENCE FENCE DASHDOT4 DASHDOT DASHED5 DASHEDX2 DOT2 DASHED
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
6.17.2.6
Discipline Minor Major
Description
Page 68
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL
212 212 212 212 212 212 212 212 212 212 212
HIDDEN2 PHANTOM5 DASHED DASHED2 FENCE FENCE DASHDOT4 DASHDOT DASHED5 DOT2 DASHED
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
6.17.2.7
Discipline Minor Major
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) L ____ ____ ANNOTATION L ANNO CLIN L ANNO DIMS ELEVATION L ELEV PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN L PLAN SECTION L SECT SITE L SITE HIDN _ROW BLDG CNPY FENC FENC PROP SLFN SPAD WATR PROF BLDG ____ ____ ____ TEMP TEMP TEMP 212 212 212 Continuous CENTER5 DOT8 Yes Yes Yes Temporary Centerline Temporary Dimension Guide Line Temporary Elevation Or Section Objects Obscured By Foreground Objects Temporary Right Of Way Line Temporary Building Above Outline Temporary Canopy Temporary Chain Link Fence Temporary Picket Fence Temporary Property Line Temporary Silt Fence Temporary Spade Cut Edge Temporary Water Edge Temporary Profile Guidelines Temporary Building Above Outline
____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP
212 212 212 212 212 212 212 212 212 212 212 212
HIDDEN2 PHANTOM5 DASHED DASHED2 FENCE FENCE DASHDOT4 DASHDOT DASHED5 DASHEDX2 DOT2 DASHED
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Page 69
6.17.3 LINETYPES
Description Centerline (1x) Centerline (0.20x) Continuous Example
Name
CENTER
CENTER5
Continuous
DASHDOT
Dashdot (1x)
DASHDOT4
Dashdot (0.25x)
DASHED
Dashed (1x)
DASHED2
Dashed (0.50x)
DASHED4
Dashed (0.25x)
DASHED5
Dashed (0.20x)
DASHEDX2
Dashed (2x)
DIVIDE2
Divide (0.50x)
DIVIDE4
Divide (0.25x)
DOT2
Dot (0.50x)
DOT4
Dot (0.25x)
DOT5
Dot (0.20x)
DOT8 FENCE
Page 70
HIDDEN2
Hidden (0.50x)
HIDDEN4
Hidden (0.25x)
HIDDEN5 HIDDEN3_TO_3
Hidden (0.20x)
Hidden (1.5x)
HIDDENX2
Hidden (2x)
PHANTOM4
Phantom (0.25x)
PHANTOM5
Phantom (0.20x)
Page 71
Page 72
EXIT-DBL-1WAYDIR.dwg EXIT-DBL-2WAYDIR.dwg EXIT-DBL.dwg INSUL.dwg INT-ELEV.dwg LEVELINE.dwg LOCALSEC.dwg OUTLET.dwg PARTTYPE.dwg RETURN.dwg REV-NO.dwg RM-NO.dwg SPEAKER.dwg SPNKHD.dwg SUPPLY.dwg TARG1.dwg TARGELEV.dwg TARGSEC.dwg TARGSECHEAD.dwg TARGSECTAIL.dwg
Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies Varies
Double-Sided Directional Exit Sign Double-Sided Multi-Directional Exit Sign Double-Sided Exit Sign Insulation Interior Elevation Level Line Presentation Section Mark Electric Outlet Partition/Wall Type Mechanical Return Duct Symbol Revision Tag Room Number Speaker Sprinkler Head Mechanical Supply Duct Detail/Section/Elevation Label Elevation Symbol Complete Section Symbol Section Head Symbol Section Tail Symbol
Page 73
W-ARROW.dwg WIN-NO.dwg
Varies Varies
6.17.4.2
2D PEOPLE
Symbol Block Name Layer Name Description
MAN01.dwg
Varies
Man Standing
MAN02.dwg
Varies
Man Walking
MAN03.dwg
Varies
Man Sitting
MAN04.dwg
Varies
MAN05.dwg
Varies
MAN06.dwg
Varies
Man Walking 2
MAN07.dwg
Varies
Man Standing 2
MAN08.dwg
Varies
Man Outline
PEOPLE01.dwg
Varies
Page 74
PEOPLE02.dwg
Varies
PEOPLE03.dwg
Varies
PEOPLE04.dwg
Varies
PEOPLE05.dwg
Varies
PEOPLE06.dwg
Varies
PEOPLE07 dwg
Varies
PEOPLE08.dwg
Varies
PEOPLE09.dwg
Varies
PEOPLE10.dwg
Varies
WOMAN01.dwg
Varies
WOMAN02.dwg
Varies
Woman Walking
Page 75
WOMAN03.dwg
Varies
Woman Walking 2
WOMAN04.dwg
Varies
Woman Standing
WOMAN05.dwg
Varies
WOMAN06.dwg
Varies
Woman Outline 1
WOMAN07.dwg
Varies
Woman Outline 2
6.17.4.3
2D VEHICLES
Symbol Block Name 02EBUS01.dwg Layer Name Varies Description School Bus
02EBUS02.dwg
Varies
City Bus
02ECAR01.dwg
Varies
Hatchback Car
02ECAR02.dwg
Varies
Sedan Car
02ECAR04.dwg
Varies
Classic Car
02ECAR06.dwg
Varies
Page 76
02ECAR08.dwg
Varies
Porsche
02ECAR09.dwg
Varies
02ECAR10.dwg
Varies
Lotus Espirit
02ECAR11.dwg
Varies
Sports Car
02ECAR12.dwg
Varies
Car Sedan
02ECAR14.dwg
Varies
Old Car
02ECAR19.dwg
Varies
Lamborghini
02ECAR21.dwg
Varies
Eurovan
bus1.dwg
Varies
Minibus
bus03-cross-countrybus.dwg
Varies
Cross-Country Bus
BUS-2.DWG
Varies
City Bus 3
BUS.DWG
Varies
City Bus 2
BUS-F.dwg
Varies
BUS-pl.dwg
Varies
Page 77
car03-mercedes-benz.dwg
Varies
car05-station-wagon.dwg
Varies
Station Wagon
car07-vette.dwg
Varies
Chevrolet Corvette
car13-police-car.dwg
Varies
Police Cruiser
car20-bmw3251.dwg
Varies
BMW 325i
car22-sedan.dwg
Varies
Midsize Sedan
CARB.DWG
Varies
CAREL.DWG
Varies
CORSAIR2.DWG
Varies
Corsair Jet
mercedes-front.dwg
Varies
minibus.dwg
Varies
MOTORCY.dwg
Varies
Motorcycle
PTRUCK-2.DWG
Varies
TAXI-F.dwg
Varies
Taxi
Page 78
TRUCKPL.dwg
Varies
volkswagen.dwg
Varies
Volkswagen Beetle
6.17.4.4
3D SITE AMENITIES
Symbol Block Name 3DBENC1.dwg Layer Name Varies Description 3D Bench 1
3DBENC2.dwg
Varies
3D Bench 2
3DBENC3.dwg
Varies
3D Bench 3
3DBENC4.dwg
Varies
3D Bench 4
3DDECI1.dwg
Varies
3D Deciduous Tree 1
3DDECI2.dwg
Varies
3D Deciduous Tree 2
3DDECI3.dwg
Varies
3D Deciduous Tree 3
3DDECI4.dwg
Varies
3D Deciduous Tree 4
3DEVERG2.dwg
Varies
3D Evergreen Tree 1
3DEVERG.dwg
Varies
3D Evergreen Tree 2
lamppost.dwg
Varies
Lamppost
Page 79
SHRUB-1.dwg
Varies
Shrub 1
SHRUB-2.dwg
Varies
Shrub 2
SHRUB-3.dwg
Varies
Shrub 3
STLIGH-1.dwg
Varies
Street Light
TREE-1.dwg
Varies
Tree 1
TREE-1A.dwg
Varies
Tree 1a
TREE-3.dwg
Varies
Tree 3
TREE-4.dwg
Varies
Tree 4
TREE-5.dwg
Varies
Tree 5
TREE-6.dwg
Varies
Tree 6
TREESC-1.dwg
Varies
Tree 7
6.17.4.5
3D VEHICLES
Symbol Block Name 3DTRCK2.dwg Layer Name Varies Description 3D Truck
3DTRCK3.dwg
Varies
3D Truck 2
Page 80
3DTRCK4.dwg
Varies
3D Truck 3
3DTRCK5.dwg
Varies
3D Truck 4
3DTRCK.dwg
Varies
3D Truck 5
bus.dwg
Varies
Bus
ferry-boat.dwg
Varies
Ferry Boat
6.17.4.6
FIXTURES
Symbol Block Name LAV4-frt.dwg Layer Name A-EQPM-FIXT Description Four-Sink Lavatory Front View
LAV4-top.dwg
A-EQPM-FIXT
LAV-frt.dwg
A-EQPM-FIXT
LAV-sid.dwg
A-EQPM-FIXT
LAV-TOP.dwg
A-EQPM-FIXT
MIRR1.dwg
Varies
Horizontal Mirror
MIRR2.dwg
Varies
Vertical Mirror
NAP-FRT.dwg
Varies
Page 81
NURS-FRT.dwg
Varies
NURS-TOP.dwg
Varies
TOIL1-frt.dwg
A-EQPM-FIXT
TOIL1-sid.dwg
A-EQPM-FIXT
TOIL1-top.dwg
A-EQPM-FIXT
TOIL2-frt.dwg
A-EQPM-FIXT
TOIL2-sid.dwg
A-EQPM-FIXT
TOIL2-top.dwg
A-EQPM-FIXT
TOWEL.dwg
Varies
Towel Dispenser
URI-frt.dwg
A-EQPM-FIXT
URI-sid.dwg
A-EQPM-FIXT
URI-top.dwg
A-EQPM-FIXT
6.17.4.7
MATERIAL CONVENTIONS
Symbol Block Name CARPET.dwg Layer Name A-FLOR-PATT Description Carpe
Page 82
CEILING.dwg
Varies
Ceiling
CMU04.dwg
Varies
CMU06.dwg
Varies
CMU08.dwg
Varies
CMU10.dwg
Varies
COARSE.dwg
Varies
CONC01.dwg
Varies
Concrete
CONC02.dwg
Varies
4-Inch Concrete
DECKTOP2.dwg
Varies
DECKTOP.dwg
Varies
EARTH.dwg
Varies
Earth
FINE.dwg
Varies
GLAZE-B.dwg
Varies
GYPBD.dwg
Varies
Gypsum Board
Page 83
H-REIN.dwg
Varies
INSUL.dwg
Varies
BATT Insulation
MTLDECK.dwg
Varies
PARTICLE.dwg
Varies
Particleboard
PLASTER.dwg
Varies
PLYWOOD1.dwg
Varies
Millwork Plywood
PLYWOOD2.dwg
Varies
Plywood
PRECONC.dwg
Varies
Pre-Cast Concrete
RESIL.dwg
Varies
Resilient Flooring
RKTMP.dwg
Varies
???
STONE.dwg
Varies
Cut Stone
TERRAZZO.dwg
Varies
Terrazzo
TILE.dwg
Varies
Ceramic Tile
WDBLOCK.dwg
Varies
Wood Blocking
Page 84
WDSHIM.dwg
Varies
Wood Shim
WOOD.dwg
Varies
Wood
Page 85
6.18
Page 86
NEW WORK
Linetype Phase Color Plots Desc
Description
Alignment C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN Annotation C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO C ANNO Details C DETL C DETL C DETL Grading C GRAD C GRAD
BRNG COGO CRVE DIMS GAGE _HOR _HOR NOTE PCPT PROF PROP ROWL STAT SWCH TPRD TRAK TRAK TRAK TRAK VERT CHNG COGO CONS DIMS LGND MTCH NARW NOTE REVS SCLE TABL TEXT TITL VPRT
131 100 131 100 131 131 131 121 100 251 100 131 100 100 131 131 131 131 131 131 92 252 30 1 121 172 121 121 220 121 131 100 172 200 131 100 121 100 220
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Phantom2 Phantom Continuous Continuous Continuous RR RR RR RR Continuous Divide Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Bearings Coordinate Geometry Information Curve Numbers Alignment Dimensions Gauge Line, Track Road/Taxiway/Runway Edge Alignments Temporary Centerline, Horizontal Alignment Alignment Annotations And Notes Pc/Pt/Pcc/Prc/Poc Bubbles And Text Profile Grid Property Lines And Text Right Of Way Lines And Text Alignment Stations And Text Point Of Switch Temporary Road Alignments Track Alignment Gauge Line, Track Point Of Switch Top Of Rail Top At Rail Identification Of Updated Work Coordinate Geometry Grid Construction Lines Dimensions Legend Items Match Line North Arrow Notes Revision Bubble And Triangle Scale Bar Curve Data Table, Drainage Table, Etc Misc. Text & Callouts With Assoc. Leaderlines Titles View Port Detail Features Detail Dimensions Detail Notes And Annotations Grading Dimensions Index Contours
Page 87
Page 88
Page 89
EXISTING WORK
Linetype Phase Color Plots Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) C ____ Alignment C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN Utilities C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL C UTIL ____ PROP ROWL TRAK TRAK TRAK TRAK FIRE FUEL GASL SSWR STEM STEM STEM STRM WATR WATR WATR WATR WATR WATR ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 Continuous Phantom2 Phantom RR RR RR RR HPW FOS G SAN HPS LPS MPS ST CW HWS HPW C LPS MPS Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Existing Property Lines And Text Existing Right Of Way Lines And Text Existing Track Alignment Existing Gauge Line, Track Existing Point Of Switch Existing Top Of Rail Existing Fire ( High Pressure Water Line) Existing Fuel Line Existing Gas Line Existing Sanitary Sewer Existing High Pressure Steam Line Existing Low Pressure Steam Line Existing Medium Pressure Steam Line Existing Storm Drainage Line Existing Cold Water Line Existing Hot Water Line Existing High Pressure Water Line Existing Water Text Existing Low Pressure Water Line Existing Medium Pressure Water Line
6.18.2.3
Discipline Minor Major
FUTURE WORK
Linetype Phase Color Plots Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) C ____ ____ ____ FUTR 253 Continuous Yes Alignment C ALGN PROP ____ 253 Phantom2 Yes FUTR C ALGN ROWL ____ 253 Phantom Yes FUTR C ALGN TRAK ____ 253 RR Yes FUTR C ALGN TRAK ____ 253 RR Yes FUTR C ALGN TRAK ____ 253 RR Yes FUTR C ALGN TRAK ____ 253 RR Yes FUTR Utilities C UTIL FIRE ____ 253 HPW Yes FUTR C UTIL FUEL ____ 253 FOS Yes FUTR C UTIL GASL ____ 253 G Yes FUTR C UTIL SSWR ____ 253 SAN Yes FUTR
Future Property Lines And Text Future Right Of Way Lines And Text Future Track Alignment Future Gauge Line, Track Future Point Of Switch Future Top Of Rail Future Fire ( High Pressure Water Line) Future Fuel Line Future Gas Line Future Sanitary Sewer
Page 90
6.18.2.4
Discipline Minor Major
RELOCATE WORK
Linetype Phase Color Plots Desc
Description
Default Relocate Layer Properties (Unless Otherwise Noted Below) C ____ Alignment C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN C ALGN Annotation C ANNO C ANNO Details C DETL C DETL C DETL Grading C GRAD C GRAD C GRAD ____ BRNG COGO CRVE DIMS GAGE _HOR _HOR NOTE PCPT PROF PROP ROWL STAT SWCH TPRD TRAK TRAK TRAK TRAK VERT TEXT TITL ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO 4 131 100 131 100 131 131 121 121 100 251 100 131 100 100 131 131 131 131 131 131 100 172 131 100 121 100 220 92 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Phantom2 Phantom Continuous Continuous Continuous RR RR RR RR Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Relocated Bearings Relocated Coordinate Geometry Information Relocated Curve Numbers Relocated Alignment Dimensions Relocated Gauge Line, Track Relocated Road/Taxiway/Runway Edge Alignments Relocated Temporary Centerline, Horizontal Alignment Relocated Alignment Annotations And Notes Relocated Pc/Pt/Pcc/Prc/Poc Bubbles And Text Relocated Profile Grid Relocated Property Lines And Text Relocated Right Of Way Lines And Text Relocated Alignment Stations And Text Relocated Point Of Switch Relocated Temporary Road Alignments Relocated Track Alignment Relocated Gauge Line, Track Relocated Point Of Switch Relocated Top Of Rail Relocated Top At Rail Relocated Misc. Text & Callouts With Assoc. Leaderlines Relocated Titles Relocated Detail Features Relocated Detail Dimensions Relocated Detail Notes And Annotations Relocated Grading Dimensions Relocated Index Contours Relocated Intermediate Contours
Page 91
Pavement Markings C MARK AIRS C MARK NOTE C MARK PARK C MARK ROAD C MARK COGO C MARK TEXT ASPH COGO BRDR CONC CURB CURB GRAV JBAR JNTS NOTE Paving C PAVE C PAVE C PAVE C PAVE C PAVE C PAVE C PAVE C PAVE C PAVE C PAVE Profiles C PROF C PROF C PROF C PROF Sections C SECT C SECT Site Plans C SITE C SITE C SITE C SITE C SITE C SITE C SITE C SITE C SITE C SITE C SITE C SITE C SITE Utilities C UTIL C UTIL C UTIL C UTIL C UTIL
Page 92
6.18.2.5
Discipline Minor Major
REMOVAL WORK
Linetype Phase Color Plots Desc
Description
Default Removal Layer Properties (Unless Otherwise Noted Below) C ____ ____ ____ RMVL 253 Continuous Yes Alignment C ALGN TRAK RR Yes ____ RMVL 253 C ALGN TRAK RR Yes ____ RMVL 253 C ALGN TRAK RR Yes ____ RMVL 253 C ALGN TRAK RR Yes ____ RMVL 253 Paving C PAVE ASPH 1 Continuous Yes ____ RMVL C PAVE BRDR 1 Continuous Yes ____ RMVL C PAVE CONC 1 Continuous Yes ____ RMVL Site Plans C SITE TICK 7 Continuous Yes ____ RMVL Utilities C UTIL FIRE HPW Yes ____ RMVL 253
Removal Track Alignment Removal Gauge Line, Track Removal Point Of Switch Removal Top Of Rail Removal Road, Parking Lot And Airside Removal Pavement Hatch Borders Removal Road, Parking Lot And Airside Removal Tick Marks Removal Fire ( High Pressure Water Line)
Page 93
6.18.2.6
Discipline Minor Major
TEMPORARY WORK
Linetype Phase Color Plots Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) C ____ ____ ____ TEMP Continuous Yes Alignment C ALGN PROP ____ Phantom2 Yes TEMP 253 C ALGN ROWL ____ Phantom Yes TEMP 253 C ALGN TRAK ____ RR Yes TEMP 253 C ALGN TRAK ____ RR Yes TEMP 253 C ALGN TRAK ____ RR Yes TEMP 253 C ALGN TRAK ____ 253 RR Yes TEMP Utilities C UTIL FIRE ____ HPW Yes TEMP 253 C UTIL FUEL ____ FOS Yes TEMP 253 C UTIL GASL ____ G Yes TEMP 253 C UTIL SSWR ____ SAN Yes TEMP 253 C UTIL STEM ____ HPS Yes TEMP 253 C UTIL STEM ____ LPS Yes TEMP 253 C UTIL STEM ____ MPS Yes TEMP 253 C UTIL STRM ____ ST Yes TEMP 253 C UTIL WATR ____ CW Yes TEMP 253 C UTIL WATR ____ HWS Yes TEMP 253 C UTIL WATR ____ HPW Yes TEMP 253 C UTIL WATR ____ C Yes TEMP 253 C UTIL WATR ____ LPS Yes TEMP 253 C UTIL WATR ____ MPS Yes TEMP 253
Temporary Property Lines And Text Temporary Right Of Way Lines And Text Temporary Track Alignment Temporary Gauge Line, Track Temporary Point Of Switch Temporary Top Of Rail Temporary Fire ( High Pressure Water Line) Temporary Fuel Line Temporary Gas Line Temporary Sanitary Sewer Temporary High Pressure Steam Line Temporary Low Pressure Steam Line Temporary Medium Pressure Steam Line Temporary Storm Drainage Line Temporary Cold Water Line Temporary Hot Water Line Temporary High Pressure Water Line Temporary Water Text Temporary Low Pressure Water Line Temporary Medium Pressure Water Line
Page 94
Divide (1x) Fuel Line (1x) Gas Line (1) High Pressure Steam Line (1x) High Pressure Water Line (1x) Hot Water Line (1x) Low Pressure Water Line (1x) Medium Pressure Water Line (1x) Phantom (1x)
PHANTOM
PHANTOM2 RR SAN ST
Phantom (0.5x) Rail Road (1x) Sanitary Sewer Line (1x) Storm Drainage Line (1x)
Page 95
civ-DET-SYMB.dwg
Varies
CS_CURVE.dwg
C-ALGN-CRVE
CS_FG-POINT.dwg
C-GRAD-SPOT
CS_GRID.dwg
C-ANNO-COGOGRID
CS_PC.dwg
C-ALGN-CRVE
Bubble
CS_PITO.dwg
C-ALGN-CRVE
Revision Triangle
CS_PS.dwg
C-ALGN-CRVE
Grid Bubble
CS_REMTIC.dwg
C-RMVL-TICK
Removal Tic
CS_SECMARK1.dwg
C-PAVE-SECT
CS_SECMARK2.dwg
C-PAVE-SECT
CS_TWEDMKR.dwg
C-MARK-AIRS
Page 96
FG-POINT.dwg
C-GRAD-SPOT
POINT (old).DWG
C-GRAD-SPOT
Sec1.dwg
C-ANNO-SYMB
Sec2.dwg
C-ANNO-SYMB
Sec3.dwg
C-ANNO-SYMB
Sec4.dwg
C-ANNO-SYMB
Sec5.dwg
C-ANNO-SYMB
Sec6.dwg
C-ANNO-SYMB
Sec7.dwg
C-ANNO-SYMB
Sec8.dwg
C-ANNO-SYMB
Section Title.dwg
C-ANNO-SYMB
Section Title
6.18.4.2
UTILITIES
Symbol Block Name CS_CB.dwg Layer Name C-UTIL-CBSN Description Catch Basin
Page 97
CS-CBADJ.dwg
C-UTIL-CBSN
CS_CB-MH.dwg
C-UTIL-MANH
CS_EBOX.dwg
C-UTIL-MANH
CS_FLOW.dwg
Flow Arrow
CS_HYD.dwg
C-UTIL-HYDR
Utility Hydrant
CS_MH.dwg
C-UTIL-MANH
Manhole
CS_MGADJ.dwg
C-UTIL-MANH
CS_PIPEPLUG.dwg
C-UTIL-STRM
Pipe Plug
CS_VALVE.dwg
Page 98
Page 99
6.19
Page 100
NEW WORK
Linetype Phase Color Plots Desc
Description
ANNOTATION E ANNO E ANNO E ANNO E ANNO E ANNO E ANNO E ANNO E ANNO E ANNO E ANNO DETAIL E DETL E DETL E DETL E DETL E DETL E DETL E DETL FIRE E FIRE
BUBL CHNG DIMS IDEN MLIN NPLT TEXT TITL TTLB VPRT EXTR HDWR HIDN INTR MISC PATT TEXT ALDL
142 7 7 2 142 170 2 6 130 130 6 7 8 142 7 252 2 142 40 142 3 252 200 170 2 6 2 6 142 11 6 7 8 142 7 252
Continuous Continuous Continuous Continuous MATCHLINE Continuous Continuous Continuous Continuous Continuous Continuous Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Center Continuous Continuous Continuous Continuous Continuous Whip Continuous Continuous HIDDEN2 Continuous Continuous Continuous
Yes Yes Yes Yes Yes No Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Revision Bubble Identification of Updated Work Dimensions Identification Text Match Lines Construction and Reference Lines Annotations and Callouts Titles Contract Border View Port Exterior Detail Lines Hardware Detail Lines Hidden Detail Lines Interior Detail Lines Miscellaneous Detail Lines Detail Hatches Detail Annotations ALDL Devices - Smoke Detectors and Other Input Devices Fire System Speaker Fire System Strobes General Features General Background Features General Details Enclosures Identification Tags Corrosion Protection Features Corrosion Protection Annotations Light Fixtures Site Lighting Fixture Whip Connections Exterior Features Hardware Features Hidden Features Interior Features Miscellaneous Lines Lighting Hatches
E FIRE SPKR E FIRE STRB GENERAL E GNRL E GNRL BKGD E GNRL DETL E GNRL ENCL E GNRL IDEN CORROSION PROTECTION E CATH E CATH TEXT LIGHT E LITE FIXT E LITE SITE E LITE WHIP E LITE EXTR E LITE HDWR E LITE HIDN E LITE INTR E LITE MISC E LITE PATT
Page 101
6.19.2.2
Discipline Minor Major
EXISTING WORK
Linetype Phase Color Plots Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) E ____ ____ ____ EXST 253 Dashed Yes ANNOTATION E ANNO TEXT ____ EXST 2 Continuous Yes E ANNO DIMS ____ EXST 7 Continuous Yes E ANNO IDEN ____ EXST 2 Continuous Yes DETAIL E DETL EXTR ____ EXST 7 Continuous Yes E DETL HDWR ____ EXST 7 Continuous Yes E DETL HIDN ____ EXST 7 HIDDEN2 Yes E DETL INTR ____ EXST 7 Continuous Yes E DETL MISC ____ EXST 7 Continuous Yes E DETL PATT ____ EXST 252 Continuous Yes E DETL TEXT ____ EXST 2 Continuous Yes FIRE E FIRE ALDL SPKR STRB ____ ____ ____ ____ ____ ____ ____ EXST EXST EXST EXST EXST EXST EXST 7 7 7 7 7 7 2 Continuous Continuous Continuous Continuous Continuous Center Continuous Yes Yes Yes Yes Yes Yes Yes
Existing Annotations And Callouts Existing Dimensions Existing Identification Text Existing Exterior Detail Lines Existing Hardware Detail Lines Existing Hidden Detail Lines Existing Interior Detail Lines Existing Miscellaneous Detail Lines Existing Detail Hatches Existing Detail Annotations Existing Aldl Devices - Smoke Detectors And Other Input Devices Existing Fire System Speaker Existing Fire System Strobes Existing General Features Existing General Details Existing Enclosures Existing Identification Tags
Page 102
EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST
7 2 7 7 7 7 7 7 7 7 252 2 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Continuous Continuous Continuous Continuous Whip Continuous Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous HTRACE Continuous Center 13.8KV 27KV OS UGC Continuous FO FA GND PC P PSEG Continuous UGC UGE
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Existing Corrosion Protection Features Existing Corrosion Protection Annotations Existing Light Fixtures Existing Site Lighting Existing Fixture Whip Connections Existing Exterior Features Existing Hardware Features Existing Hidden Features Existing Interior Features Existing Miscellaneous Lines Existing Lighting Hatches Existing Lighting Annotations Existing Conduit And Wiring Existing Heat Trace Existing Electrical Devices Existing Under Floor Duct Existing Underground 13Kv Ductbank Existing Underground 27Kv Ductbank Existing Underground Out Of Service Items Existing Underground Communication Existing Underground Device Existing Underground Fiber Optic Existing Underground Fire Existing Underground Ground Conductor Existing Underground Power Communication Existing Underground Power Existing Underground PSE&G Ductbank Existing Underground Wire Existing Underground Communication Ductbank Existing Underground Power Ductbank
6.19.2.3
Discipline Minor Major
FUTURE WORK
Linetype Phase Color Plots Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) E ____ ____ ____ FUTR 6 Continuous Yes ANNOTATION E ANNO DIMS ____ FUTR 7 Continuous Yes E ANNO IDEN ____ FUTR 2 Continuous Yes E ANNO TEXT ____ FUTR 2 Continuous Yes DETAIL E DETL EXTR ____ FUTR 5 Continuous Yes E DETL HDWR ____ FUTR 5 Continuous Yes E DETL HIDN ____ FUTR 5 HIDDEN2 Yes
Future Dimensions Future Identification Text Future Annotations And Callouts Future Exterior Detail Lines Future Hardware Detail Lines Future Hidden Detail Lines
Page 103
E FIRE SPKR ____ E FIRE STRB ____ GENERAL E GNRL ____ E GNRL DETL ____ E GNRL ENCL ____ E GNRL IDEN ____ CORROSION PROTECTION E CATH ____ E CATH TEXT ____ LIGHT E LITE FIXT ____ E LITE SITE ____ E LITE WHIP ____ E LITE EXTR ____ E LITE HDWR ____ E LITE HIDN ____ E LITE INTR ____ E LITE MISC ____ E LITE PATT ____ E LITE TEXT ____ POWER E POWR CIRC ____ E POWR CIRC ____ E POWR DEVC ____ E POWR DUCT ____ UNDERGROUND E UGND 13KV ____ E UGND 27KV ____ E UGND OUTS ____ E UGND COMM ____ E UGND DEVC ____ E UGND FIBR ____ E UGND FIRE ____ E UGND GRND ____ E UGND PCOM ____ E UGND POWR ____ E UGND PSEG ____ E UGND WIRE ____ E UGND COMM ____ E UGND POWR ____
Page 104
RELOCATED WORK
Linetype Phase Color Plots Desc
Description
Default Relocated Layer Properties (Unless Otherwise Noted Below) E ____ ____ ____ RELO 6 Continuous ANNOTATION E ANNO BUBL ____ RELO 142 Continuous E ANNO CHNG ____ RELO 7 Continuous E ANNO DIMS ____ RELO 7 Continuous E ANNO IDEN ____ RELO 2 Continuous E ANNO MLIN ____ RELO 142 MATCHLINE E ANNO NPLT ____ RELO 170 Continuous E ANNO TEXT ____ RELO 2 Continuous E ANNO TTLB ____ RELO 130 Continuous E ANNO VPRT ____ RELO 130 Continuous DETAIL E DETL HDWR ____ RELO 7 Continuous E DETL HIDN ____ RELO 8 HIDDEN2 E DETL INTR ____ RELO 142 Continuous E DETL MISC ____ RELO 7 Continuous E DETL PATT ____ RELO 252 Continuous E DETL TEXT ____ RELO 2 Continuous FIRE E FIRE ALDL ____ RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO 142 40 142 3 252 200 170 2 6 2 142 11 7 8 142 7 252 2 3 3 142 Continuous Continuous Continuous Continuous Continuous Continuous Center Continuous Continuous Continuous Continuous Whip Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous HTRACE Continuous
Yes Yes Yes Yes Yes Yes No Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Relocate Revision Bubble Relocate Identification of Updated Work Relocate Dimensions Relocate Identification Text Relocate Match Lines Relocate Construction and Reference Lines Relocate Annotations and Callouts Relocate Contract Border Relocate View Port Relocate Hardware Detail Lines Relocate Hidden Detail Lines Relocate Interior Detail Lines Relocate Miscellaneous Detail Lines Relocate Detail Hatches Relocate Detail Annotations Relocate ALDL Devices - Smoke Detectors and Other Input Devices Relocate Fire System Speaker Relocate Fire System Strobes Relocate General Features Relocate General Background Features Relocate General Details Relocate Enclosures Relocate Identification Tags Relocate Corrosion Protection Features Relocate Corrosion Protection Annotations Relocate Site Lighting Relocate Fixture Whip Connections Relocate Hardware Features Relocate Hidden Features Relocate Interior Features Relocate Miscellaneous Lines Relocate Lighting Hatches Relocate Lighting Annotations Relocate Conduit and Wiring Relocate Heat Trace Relocate Electrical Devices
E FIRE SPKR ____ E FIRE STRB ____ GENERAL E GNRL ____ E GNRL BKGD ____ E GNRL DETL ____ E GNRL ENCL ____ E GNRL IDEN ____ CORROSION PROTECTION E CATH ____ E CATH TEXT ____ LIGHT E LITE SITE ____ E LITE WHIP ____ E LITE HDWR ____ E LITE HIDN ____ E LITE INTR ____ E LITE MISC ____ E LITE PATT ____ E LITE TEXT ____ POWER E POWR CIRC ____ E POWR CIRC ____ E POWR DEVC ____
Page 105
6.19.2.5
Discipline Minor Major
TEMPORARY WORK
Linetype Phase Color Plots Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) E ____ ____ ____ TEMP 6 Continuous Yes ANNOTATION E ANNO DIMS ____ TEMP 7 Continuous Yes E ANNO IDEN ____ TEMP 2 Continuous Yes E ANNO TEXT ____ TEMP 2 Continuous Yes DETAIL E DETL EXTR ____ TEMP 8 Continuous Yes E DETL HDWR ____ TEMP 8 Continuous Yes E DETL HIDN ____ TEMP 8 HIDDEN2 Yes E DETL INTR ____ TEMP 8 Continuous Yes E DETL MISC ____ TEMP 8 Continuous Yes E DETL PATT ____ TEMP 252 Continuous Yes E DETL TEXT ____ TEMP 2 Continuous Yes FIRE E FIRE ALDL ____ TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP 8 8 8 8 8 8 2 8 2 8 Continuous Continuous Continuous Continuous Continuous Center Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Temporary Dimensions Temporary Identification Text Temporary Annotations And Callouts Temporary Exterior Detail Lines Temporary Hardware Detail Lines Temporary Hidden Detail Lines Temporary Interior Detail Lines Temporary Miscellaneous Detail Lines Temporary Detail Hatches Temporary Detail Annotations Temporary Aldl Devices - Smoke Detectors And Other Input Devices Temporary Fire System Speaker Temporary Fire System Strobes Temporary General Features Temporary General Details Temporary Enclosures Temporary Identification Tags Temporary Corrosion Protection Features Temporary Corrosion Protection Annotations Temporary Light Fixtures
E FIRE SPKR ____ E FIRE STRB ____ GENERAL E GNRL ____ E GNRL DETL ____ E GNRL ENCL ____ E GNRL IDEN ____ CORROSION PROTECTION E CATH ____ E CATH TEXT ____ LIGHT E LITE FIXT ____
Page 106
Page 107
DASHED
Dashed (1x)
DIVIDE
Divide (1x)
Page 108
TSS002.dwg
E-GNRL-EXST
TSS04.dwg
E-LITE-SITE
TSS05.dwg
E-GNRL-EXST
TSS07.dwg
E-GNRL-DETL
TSS08.dwg
E-LITE-SITE
TSS09.dwg
E-GNRL-EXST
TSS11.dwg
E-LITE-SITE
TSS12.dwg
E-GNRL-EXST
TSS14.dwg
E-LITE-SITE
TSS15.dwg
E-POWR-DEVC
TSS15_1.dwg
E-POWR-DEVC
Page 109
TSS15_2.dwg
E-GNRL-DETL
Cabinet Identification
TSS16.dwg
E-GNRL-EXST
TSS18.dwg
E-POWR-DEVC
TSS19.dwg
E-GNRL-EXST
IR007.dwg
E-GNRL-DETL
IR015.dwg
E-POWR-CIRC
6.19.4.2
FIRE
Symbol Block Name FAS001.dwg Layer Name E-FIRE-ALDL Description Ceiling Mounted Smoke Detector
FAS001H.dwg
E-FIRE-ALDL
Heat Detector
FAS002.dwg
E-FIRE-ALDL
Duct Detector
FAS003.dwg
E-FIRE-ALDL
FAS004.dwg
E-FIRE-STRB
FAS004a.dwg
E-FIRE-ALDL
Fire Damper
Page 110
FAS005.dwg
E-FIRE-STRB
FAS005H.dwg
E-FIRE-STRB
Fire Strobe
FAS006.dwg
E-FIRE-SPKR
FAS007.dwg
E-FIRE-SPKR
FAS008.dwg
E-ANNO-TEXT
End of Line
FAS009.dwg
E-FIRE-ALDL
FAS010.dwg
E-FIRE-ALDL
Flow Switch
FAS011.dwg
E-FIRE-ALDL
Tamper Switch
FAS012.dwg
E-FIRE-ALDL
Warden Phone
FAS012_1.dwg
E-FIRE-ALDL
Warden Phone
FAS013.dwg
E-FIRE-ALDL
Tri-Interface Module
FAS013_1.dwg
E-FIRE-ALDL
Tri-Dual-Interface Module
FAS013_2.dwg
E-FIRE-ALDL
Page 111
FAS013_3.dwg
E-FIRE-ALDL
Interface Module
FAS014.dwg
E-FIRE-ALDL
FAS015.dwg
E-FIRE-ALDL
FAS016.dwg
E-FIRE-ALDL
FAS017.dwg
E-POWR-DEVC
Solenoid Valve
FAS018.dwg
E-FIRE-SPKR
FAS019.dwg
E-FIRE-ALDL
Strobe
FAS020.dwg
E-POWR-DEVC
FAS021.dwg
E-FIRE-ALDL
Flow Switch
FAS022.dwg
E-FIRE-ALDL
SO
FAS023.dwg
E-POWR-DEVC
Transformer
Fas024.dwg
E-FIRE-ALDL
TIB
FS010.dwg
E-FIRE-ALDL
Flow Switch
Page 112
Aer012.dwg
E-LITE-SITE
L-861-T Elevated Blue Taxiway Edge Light on Type I Marker Light Box Existing Elevated Blue Taxiway Edge Light to be Adjusted to Finished Grade Existing Runway/Taxiway Elevated Edge Light on Type I Marker Light Box L-852 Type IV Flush Taxiway Centerline Light Fed by Flexible Conduit in Existing Pavement L-852 Type IV Flush Taxiway Centerline Light Fed by Encased PVC Conduit L-852 Type IV Flush Taxiway Centerline Light Mounted on a L868 Double Section Base Can Fed by Grout Encased PVC-H Conduit in Pavement Existing Type IV Taxiway Centerline Lighting Fixture to be Adjusted to Finished Grade via a Variable Extension Can Omni-Directional Fixture Mounted on a L-868 Single Section Base Can in Existing or Overlay Pavement L-861-T Elevated Taxiway Edge Light Mounted on a L-867 Single Section Base Can
Aer013.dwg
E-GNRL-EXST
Aer014.dwg
E-GNRL-EXST
Aer015.dwg
E-LITE-SITE
Aer016.dwg
E-LITE-SITE
Aer017.dwg
E-LITE-SITE
Aer019.dwg
E-GNRL-EXST
Aer020.dwg
E-LITE-SITE
Aer021.dwg
E-LITE-SITE
Aer021_1.dwg
E-LITE-SITE
Centerline Light
Aer022.dwg
E-GNRL-EXST
Existing L-861-T Elevated Taxiway Edge Light Mounted on a L-867 Single Section Base Can
Page 113
Aer023.dwg
E-LITE-SITE
AER024.DWG
E-LITE-SITE
AER024_1.DWG
E-LITE-SITE
AER024_2.DWG
E-GNRL-DETL
AER025.DWG
E-LITE-SITE
Aer026.dwg
E-POWR-DEVC
AER027.DWG
E-LITE-SITE
Aer028.dwg
E-LITE-SITE
L-850C Flush Runway Edge Light Mounted on a L-868 SingleSection Base Can
Aer034.dwg
E-LITE-SITE
Runway/Taxiway Fixture
AER035.DWG
E-GNRL-EXST
Aer037.dwg
E-GNRL-EXST
Aer038.dwg
E-GNRL-EXST
AER040.DWG
E-GNRL-EXST
Page 114
Aer041.dwg
E-GNRL-EXST
AER042.DWG
E-GNRL-EXST
Existing Flush Taxiway Omnidirectional Fixture Removal Existing Type I Marker Light Box, Including Fixture, Transformers, and Base Plates Removals Existing Taxiway Centerline Fixture Removal
AER043.DWG
E-GNRL-RMVL
AER044.DWG
E-GNRL-RMVL
AER050.DWG
E-GNRL-DETL
Aer051.dwg
E-UGND-DEVC
AER053.DWG
E-UGND-DEVC
Aer055.dwg
E-GNRL-EXST
Aer056.dwg
E-GNRL-EXST
Aer057.dwg
E-LITE-SITE
Aer058.dwg
E-LITE-SITE
Aer059.dwg
E-POWR-DEVC
Wind Cone
Aer060.dwg
E-LITE-SITE
Page 115
Aer061.dwg
E-LITE-SITE
Runway Touchdown Zone Light Bar Adjust the Existing InternallyIlluminated Single-Face Taxiway Guidance Sign and Foundation to Finished Grade Existing Internally-Illuminated Double-Face Taxiway Guidance Sign Adjust the Existing InternallyIlluminated Double-Face Taxiway Guidance Sign and Foundation to Finished Grade
AER064.DWG
E-LITE-SITE
AER067.DWG
E-GNRL-EXST
AER068.DWG
E-LITE-SITE
6.19.4.4
LIGHTING FIXTURES
Symbol Block Name LTG001.DWG Layer Name E-LITE-FIXT Description Ceiling-Mounted 1x4 Fluorescent Lighting Fixture
LTG002.DWG
E-LITE-FIXT
Ceiling-Mounted 1x4 Emergency Fluorescent Lighting Fixture Ceiling-Mounted 1x4 Fluorescent Fixture with Internal Emergency Battery Wall-Mounted 1x4 Fluorescent Fixture
LTG003.DWG
E-LITE-FIXT
LTG004.DWG
E-LITE-FIXT
LTG005.DWG
E-LITE-FIXT
Wall-Mounted 1x4 Fluorescent Fixture Wall-Mounted 1x4Fluorescent Fixture with Internal Emergency Battery Ceiling-Mounted 1x8 Fluorescent Fixture
LTG006.DWG
E-LITE-FIXT
LTG007.DWG
E-LITE-FIXT
LTG008.DWG
E-LITE-FIXT
Page 116
LTG009.DWG
E-LITE-FIXT
LTG010.DWG
E-LITE-FIXT
LTG011.DWG
E-LITE-FIXT
LTG012.DWG
E-LITE-FIXT
LTG013.DWG
E-LITE-FIXT
Ceiling-Mounted 2x4 Emergency Fluorescent Fixture Ceiling-Mounted Fluorescent Fixture with Internal Emergency Battery Ceiling-Mounted 2x2 Fluorescent Fixture
LTG014.DWG
E-LITE-FIXT
LTG015.DWG
E-LITE-FIXT
LTG016.DWG
E-LITE-FIXT
Ceiling-Mounted 2x2 Emergency Fluorescent Fixture Ceiling-Mounted 2x2 Fluorescent Fixture with Internal Emergency Battery Ceiling-Mounted 1x2 Fluorescent Fixture
LTG017.DWG
E-LITE-FIXT
LTG018.DWG
E-LITE-FIXT
LTG019.DWG
E-LITE-FIXT
LTG020.DWG
E-LITE-FIXT
LTG021.DWG
E-LITE-FIXT
Page 117
LTG022.DWG
E-LITE-FIXT
Ceiling-Mounted 1x1 Compact Fluorescent Ceiling-Mounted 1x1 Compact Fluorescent Downlight with Internal Emergency Battery
LTG023.DWG h LTG024.DWG
E-LITE-FIXT
E-LITE-FIXT
Lighting Fixture
LTG025.DWG
E-LITE-FIXT
LTG026.DWG
E-LITE-FIXT
Lighting Fixture
LTG027.DWG
E-LITE-FIXT
LTG028.DWG
E-LITE-FIXT
LTG029.DWG
E-LITE-FIXT
LTG030.DWG
E-LITE-FIXT
Lighting Fixture
LTG031.DWG
E-LITE-FIXT
Lighting Fixture
LTG032.DWG
E-LITE-FIXT
LTG033.DWG
E-LITE-FIXT
LTG034.DWG
E-LITE-FIXT
Page 118
LTG035.DWG
E-LITE-FIXT
Fluorescent Strip
LTG036.DWG
E-LITE-FIXT
LTG037.DWG
E-LITE-FIXT
LTG038.DWG
E-LITE-FIXT
LTG039.DWG
E-LITE-FIXT
LTG040.DWG
E-LITE-FIXT
LTG041.DWG
E-LITE-FIXT
LTG042.DWG
E-LITE-FIXT
LTG043.DWG
E-LITE-FIXT
LTG044.DWG
E-LITE-FIXT
LTG045.DWG
E-LITE-FIXT
LTG046.DWG
E-LITE-FIXT
LTG047.DWG
E-LITE-FIXT
Page 119
LTG048.DWG
E-LITE-FIXT
LTG049.DWG
E-LITE-FIXT
LTG050.DWG
E-LITE-FIXT
LTG051.DWG
E-LITE-FIXT
LTG052.DWG
E-LITE-FIXT
Remove Single-Arm Roadway Standard Relocated Single-Arm Roadway Lighting Standard Existing Location Relocated Single-Arm Roadway Lighting Standard New Location
LTG053.DWG
E-LITE-FIXT
LTG054.DWG
E-LITE-FIXT
LTG055.DWG
E-LITE-FIXT
LTG056.DWG
E-LITE-FIXT
Remove Double-Arm Roadway Lighting Standard Relocate Double-Arm Roadway Lighting Standard Existing Location Relocated Double-Arm Roadway Lighting Standard New location
LTG057.DWG
E-LITE-FIXT
LTG058.DWG
E-LITE-FIXT
LTG059.DWG
E-LITE-FIXT
LTG060.DWG
E-LITE-FIXT
Page 120
LTG061.DWG
E-LITE-FIXT
LTG062.DWG
E-LITE-FIXT
LTG063.DWG
E-LITE-FIXT
LTG064.DWG
E-LITE-FIXT
Remove Double-Arm Roadway Lighting Standard Relocate Double-Arm Roadway Lighting Standard Existing Location Relocated Double-Arm Roadway Lighting Standard New Location
LTG065.DWG
E-LITE-FIXT
LTG066.DWG
E-LITE-FIXT
LTG067.DWG
E-LITE-FIXT
LTG068.DWG
E-LITE-FIXT
Remove Single-Arm PoleMounted Sharp Cut-Off Luminaire Relocate Single-Arm PoleMounted Sharp Cut-Off Luminaire (Existing Location) Relocated Single-Arm PoleMounted Sharp Cut-Off Luminaire (New Location) Single-Arm Pole-Mounted Sharp Cut-Off Luminaire
LTG069.DWG
E-LITE-FIXT
LTG070.DWG
E-LITE-FIXT
LTG071.DWG
E-LITE-FIXT
LTG072.DWG
E-LITE-FIXT
Remove Single-Arm PoleMounted Sharp Cut-Off Luminaire Relocate Single-Arm Pole Mounted Sharp Cut-Off Luminaire (Existing Location)
LTG073.DWG
E-LITE-FIXT
Page 121
LTG074.DWG
E-LITE-FIXT
LTG075.DWG
E-LITE-FIXT
LTG076.DWG
E-LITE-FIXT
Remove Single-Arm PoleMounted Sharp Cut-Off Luminaire Relocate Single-Arm PoleMounted Sharp Cut-Off Luminaire (Existing Location) Relocated Single-Arm PoleMounted Sharp Cut-Off Luminaire (New Location) Double-Arm Pole-Mounted Sharp Cut-Off Luminaire
LTG077.DWG
E-LITE-FIXT
LTG078.DWG
E-LITE-FIXT
LTG079.DWG
E-LITE-FIXT
LTG080.DWG
E-LITE-FIXT
Remove Double-Arm PoleMounted Sharp Cut-Off Luminaire Relocate Double-Arm PoleMounted Sharp Cut-Off Luminaire (Existing Location) Relocated Double-Arm PoleMounted Sharp Cut-Off Luminaire (New Location) Double-Arm Pole-Mounted Sharp Cut-Off Luminaire
LTG081.DWG
E-LITE-FIXT
LTG082.DWG
E-LITE-FIXT
LTG083.DWG
E-LITE-FIXT
LTG084.DWG
E-LITE-FIXT
Remove Double-Arm PoleMounted Sharp Cut-Off Luminaire Relocate Double-Arm PoleMounted Sharp Cut-Off Luminaire (Existing Location) Relocated Double-Arm PoleMounted Sharp Cut-Off Luminaire (New Location)
LTG085.DWG
E-LITE-FIXT
LTG086.DWG
E-LITE-FIXT
Page 122
LTG087.DWG
E-LITE-FIXT
LTG088.DWG
E-LITE-FIXT
Remove Double-Arm Pole Mounted Sharp Cut-Off Luminaire Relocate Double_Arm Pole Mounted Sharp Cut-Off Luminaire (Existing Location) Relocated Double-Arm PoleMounted Sharp Cut-Off Luminaire (New Location)
LTG089.DWG
E-LITE-FIXT
LTG090.DWG
E-LITE-FIXT
LTG091.DWG
E-LITE-FIXT
LTG092.DWG
E-LITE-FIXT
LTG093.DWG
E-LITE-FIXT
LTG101.DWG
E-LITE-FIXT
LTG102.DWG
E-LITE-FIXT
LTG103.DWG
E-LITE-FIXT
LTG104.DWG
E-LITE-FIXT
LTG105.DWG
E-LITE-FIXT
LTG106.DWG
E-LITE-FIXT
Page 123
LTG107.DWG
E-LITE-FIXT
LTG108.DWG
E-LITE-FIXT
LTG109.DWG
E-LITE-FIXT
6.19.4.5
SWITCHES
Symbol Block Name SWT001.DWG Layer Name E-POWR-DEVC Description Switch
SWT002.DWG
E-POWR-DEVC
3-Way Switch
SWT003.DWG
E-POWR-DEVC
4-Way Switch
SWT004.DWG
E-POWR-DEVC
Dimmer Switch
SWT005.DWG
E-POWR-DEVC
Switch
SWT006.DWG
E-POWR-DEVC
Switch
SWT007.DWG
E-POWR-DEVC
SWT008.DWG
E-POWR-DEVC
Manual Motor Starting Switch with Thermal Overload Protection and Pilot Light Manual Motor Starting Switch with Thermal Overload Protection
Swt009.DWG
E-POWR-DEVC
Page 124
Swt009A.DWG
E-POWR-DEVC
Switch
Swt009B.DWG
E-POWR-DEVC
Switch
Swt009C.DWG
E-POWR-DEVC
Switch
Swt009D.DWG
E-POWR-DEVC
Switch
Swt009E.DWG
E-POWR-DEVC
Switch
6.19.4.6
MISCELLANEOUS
Symbol Block Name Bubble2.dwg Layer Name E-ANNO-DIMS Description Leader Bubble
BUBBLE3.dwg
E-ANNO-DIMS
MIS011.DWG
E-RVSN-SYMB
Revision Tag
REVISION.DWG
E-ANNO-DIMS
Revision Table
Sign-p.dwg
E-ANNO-TTLB
Signature Stamp
Mis041.dwg
Mis042.dwg
Power Panel
Page 125
Mis043.dwg
Mis044.dwg
Distribution Panel
Mis045.dwg
Mis057.dwg
Transformer Schedule
Mis058.dwg
Mis059.dwg
Mis060.dwg
Mis061.dwg
ele-DET-SYMB.dwg
(Varies)
Detail Symbol
IR001.DWG
E-POWR-CIRC
Regulating Device
IR002.DWG
E-POWR-CIRC
Kilowatt-Hour Meter
IR003.DWG
E-POWR-CIRC
IR004.DWG
E-POWR-CIRC
Page 126
IR005.DWG
E-POWR-CIRC
IR006.DWG
E-POWR-CIRC
Time Overcurrent Ground Relay for All 50, 51, and 50/51 Relays.
IR007.DWG
E-POWR-CIRC
IR008.DWG
E-POWR-CIRC
IR010.DWG
E-POWR-CIRC
IR012.DWG
E-POWR-CIRC
IR013.DWG
E-POWR-CIRC
Indicator Light
IR014.DWG
E-POWR-CIRC
IR016.DWG
E-POWR-CIRC
IR017.DWG
E-POWR-CIRC
IR018.DWG
E-POWR-CIRC
Solid-State Metering
IR019.DWG
E-POWR-CIRC
Annunciator
IR020.DWG
E-POWR-CIRC
Instrument
Page 127
IR021.DWG
E-POWR-CIRC
Instrument
MIS001.DWG
E-GNRL-DETL
Equipment Designation
MIS004.DWG
E-POWR-DEVC
Pull Box
MIS005.DWG
E-POWR-DEVC
Push Button
MIS006.DWG
E-POWR-DEVC
Closed-Circuit TV Camera
MIS007.DWG
E-POWR-DEVC
Closed-Circuit TV Camera 2
MIS008.DWG
E-POWR-DEVC
MIS010.DWG
E-POWR-DEVC
Aqua Stat
MIS012.DWG
E-GNRL-DETL
MIS013.DWG
E-GNRL-DETL
Section Arrows
MIS023.DWG
E-POWR-DEVC
MIS024.DWG
E-POWR-DEVC
Mis035.dwg
E-ANNO-DIMS
Arrowhead
Page 128
Mis036.dwg
E-POWR-CIRC
Conduit/Line Break
Mis037.dwg
E-ANNO-DIMS
Bracket
Mis049.dwg
E-GNRL-DETL
Section
Mis050.dwg
E-ANNO-TTLB
Preliminary Stamp
Mis051.dwg
E-ANNO-TTLB
Submission Stamp
Mis052.dwg
E-ANNO-TTLB
As-Built Stamp
Mis053.dwg
E-GNRL-CIRC
Conduit Break
Mis056.dwg
E-GNRL-DETL
Section Title
MIS070.DWG
E-POWR-DEVC
TVSS
MIS071.DWG
E-POWR-DEVC
Reflector
WALLBREAK.dwg
E-GNRL-DETL
Wall Break
6.19.4.7
ONE LINE
Symbol Block Name CDS001.DWG Layer Name E-POWR-CIRC Description Instantaneous Contact, NO
Page 129
CDS002.DWG
E-POWR-CIRC
Instantaneous Contact, NC
CDS003.DWG
E-POWR-CIRC
CDS004.DWG
E-POWR-CIRC
CDS005.DWG
E-POWR-CIRC
CDS006.DWG
E-POWR-CIRC
CDS007.DWG
E-POWR-CIRC
CDS008.DWG
E-POWR-CIRC
CDS009.DWG
E-POWR-CIRC
CDS010.DWG
E-POWR-CIRC
CDS011.DWG
E-POWR-CIRC
CDS012.DWG
E-POWR-CIRC
CDS013.DWG
E-POWR-CIRC
CDS014.DWG
E-POWR-CIRC
Page 130
CDS015.DWG
E-POWR-CIRC
CDS016.DWG
E-POWR-CIRC
CDS017.DWG
E-POWR-CIRC
CDS018.DWG
E-POWR-CIRC
CDS019.DWG
E-POWR-CIRC
Temperature Switch, NO
CDS020.DWG
E-POWR-CIRC
Temperature Switch, NC
CDS021.DWG
E-POWR-CIRC
Solenoid
CDS022.DWG
E-POWR-CIRC
Operating Coil
CDS023.DWG
E-POWR-CIRC
CDS024.DWG
E-POWR-CIRC
CDS025.DWG
E-POWR-CIRC
Fuse
CDS027.DWG
E-POWR-CIRC
CDS028.DWG
E-POWR-CIRC
Transformer
Page 131
CDS029.DWG
E-POWR-CIRC
Circuit Breaker
CDS030.DWG
E-POWR-CIRC
Disconnect Switch
CDS031.DWG
E-POWR-CIRC
Diode
CDS032.DWG
E-POWR-CIRC
Pilot Light
CDS033.DWG
E-POWR-CIRC
Terminal Block
SLD001.DWG
E-POWR-CIRC
SLD002.DWG
E-POWR-CIRC
SLD003.DWG
E-POWR-CIRC
SLD005.DWG
E-POWR-CIRC
SLD006.DWG
E-POWR-CIRC
SLD007.DWG
E-POWR-CIRC
SLD010.DWG
E-POWR-CIRC
Power Transformer
SLD010_1.DWG
E-POWR-CIRC
Power Transformer
Page 132
SLD011.DWG
E-POWR-CIRC
SLD012.DWG
E-POWR-CIRC
Low Voltage 3-Pole AC Circuit Breaker Medium Voltage Fused Load Interrupter Switch Manually Operated
SLD013.DWG
E-POWR-CIRC
SLD014.DWG
E-POWR-CIRC
Ground Connection
SLD015.DWG
E-POWR-CIRC
Ground Connection
SLD016.DWG
E-POWR-CIRC
SLD017.DWG
E-POWR-CIRC
SLD018.DWG
E-POWR-CIRC
SLD019.DWG
E-POWR-CIRC
Fuse
SLD020.DWG
E-POWR-CIRC
SLD021.DWG
E-POWR-CIRC
Plug-in Device
SLD022.DWG
E-POWR-CIRC
Lightning Arrestor
SLD023.DWG
E-POWR-CIRC
Circuit Device
Page 133
SLD024.DWG
E-POWR-CIRC
SLD025.DWG
E-POWR-CIRC
Normally-Open Contact
SLD025_1.DWG
E-POWR-CIRC
Normally-Closed Contact
SLD025A.DWG
E-POWR-CIRC
Normally-Closed Contact
SLD026.DWG
E-POWR-CIRC
Current Transformer
SLD027.DWG
E-POWR-CIRC
SLD028.DWG
E-POWR-CIRC
Potential Transformer
SLD029.DWG
E-POWR-CIRC
SLD030.DWG
E-POWR-CIRC
SLD031.DWG
E-POWR-CIRC
SLD032.DWG
E-POWR-CIRC
SLD033.DWG
E-POWR-CIRC
Medium Voltage Motor Controller, Reduced Voltage, Non-Reversing Low Voltage Motor Controller, Full Voltage, Non-Reversing (FVNR), 3-Pole
SLD034.DWG
E-POWR-CIRC
Page 134
SLD035.DWG
E-POWR-CIRC
Low Voltage Motor Controller, Full Voltage, Reversing (FVR), 3-Pole Low Voltage Motor Controller, Full Voltage, Two Speed, NonReversing (FV-25-NR), 3-Pole
SLD036.DWG
E-POWR-CIRC
SLD037.DWG
E-POWR-CIRC
Induction Motor
SLD038.DWG
E-POWR-CIRC
SLD039.DWG
E-POWR-CIRC
Battery
SLD040.DWG
E-POWR-CIRC
Resistor
SLD041.DWG
E-POWR-CIRC
SLD042.DWG
E-POWR-CIRC
Emergency Generator
SLD043.DWG
E-POWR-CIRC
KI001.DWG
E-POWR-CIRC
KI002.DWG
E-POWR-CIRC
KI003.DWG
E-POWR-CIRC
KI004.DWG
E-POWR-CIRC
Transfer Interlock
Page 135
KI005.DWG
E-POWR-CIRC
KI006.DWG
E-POWR-CIRC
6.19.4.8
POWER
Symbol Block Name Pwr001.dwg Layer Name E-POWR-DEVC Description 480/277V, 3P, 4W Panelboard
Pwr001A.dwg
E-POWR-DEVC
Pwr002.dwg
E-POWR-DEVC
Pwr003.dwg
E-POWR-DEVC
PWR005.DWG
E-POWR-DEVC
PWR006.DWG
E-POWR-DEVC
PWR007.DWG
E-POWR-DEVC
Pwr008.dwg
E-POWR-DEVC
Page 136
PWR009.DWG
E-POWR-DEVC
Pwr010.dwg
E-POWR-DEVC
Motor Starter
PWR011.DWG
E-POWR-DEVC
Motor
PWR012.DWG
E-POWR-DEVC
Motorized Damper
PWR013.DWG
E-POWR-DEVC
PWR014.DWG
E-POWR-DEVC
Contactor
PWR015.DWG
E-POWR-DEVC
Transformer
Pwr016.dwg
E-POWR-DEVC
Pwr016A.dwg
E-POWR-DEVC
Generic Panel
Pwr017.dwg
E-POWR-DEVC
PWR018.DWG
E-POWR-DEVC
VAV
CAMERA.dwg
E-POWR-DEVC
Camera
Out001.dwg
E-POWR-DEVC
Wall-Mounted Telephone
Page 137
Out002.dwg
E-POWR-DEVC
Out002A.dwg
E-POWR-DEVC
Out003.dwg
E-POWR-DEVC
Wall-Mounted TV Outlet
OUT004.DWG
E-POWR-DEVC
Wall-Mounted Single Receptacle 20A, 125V, 3W Grounding Type Wall-Mounted Duplex Convenience Receptacle 15a, 125V, 3W Grounding Type Wall-Mounted Multiplex Receptacle Wall-Mounted Quadruplex Receptacle 15a, 125V, 3W Grounding Type Wall-Mounted Single SpecialPurpose Receptacle
OUT005.DWG
E-POWR-DEVC
OUT005_1.DWG
E-POWR-DEVC
OUT006.DWG
E-POWR-DEVC
OUT007.DWG
E-POWR-DEVC
OUT008.DWG
E-POWR-DEVC
OUT009.DWG
E-POWR-DEVC
Out010.dwg
E-POWR-DEVC
Out011.dwg
E-POWR-DEVC
Out011A.dwg
E-POWR-DEVC
Page 138
OUT012.DWG
E-POWR-DEVC
Floor Single Receptacle 20A, 125V, 3W Floor Duplex Convenience Receptacle 15A, 125V, 3W Grounding Type Unless Otherwise Noted Floor Duplex Convenience Receptacle 15A, 125V, 3W Grounding Type Unless Otherwise Noted Floor Duplex Convenience Receptacle 15A, 125V, 3W Grounding Type Unless Otherwise Noted Floor Single Special-Purpose Receptacle Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Unless Otherwise Noted Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Unless Otherwise Noted Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Unless Otherwise Noted Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Unless Otherwise Noted Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Unless Otherwise Noted Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Unless Otherwise Noted Two Gang Floor Duplex Receptacle 15A, 125V, 3W Grounding-Type Telephone Outlet Unless Otherwise Noted
OUT013.DWG
E-POWR-DEVC
Out013A.dwg
E-POWR-DEVC
Out13B.dwg
E-POWR-DEVC
OUT014.DWG
E-POWR-DEVC
OUT015.DWG
E-POWR-DEVC
Out016.dwg
E-POWR-DEVC
Out017.dwg
E-POWR-DEVC
Out018.dwg
E-POWR-DEVC
Out019.dwg
E-POWR-DEVC
Out020.dwg
E-POWR-DEVC
Out021.dwg
E-POWR-DEVC
Out022.dwg
E-POWR-DEVC
Page 139
Out023.dwg
E-POWR-DEVC
OUT041.dwg
E-POWR-DEVC
OUT0051.DWG
E-POWR-DEVC
Out051.dwg
E-POWR-DEVC
OUT0061.DWG
E-POWR-DEVC
Pb-desk.dwg
E-POWR-DEVC
6.19.4.9
UNDERGROUND
Symbol Block Name Ues100.dwg Layer Name E-GNRL-DETL Description Duct Bank Flag
Ues101_1.dwg
E-GNRL-DETL
Ues101_2.dwg
E-GNRL-DETL
Ues101_4.dwg
E-GNRL-DETL
Ues101_6.dwg
E-GNRL-DETL
Ues013.dwg
E-UGND-EXST
Power Manhole
Page 140
Ues014.dwg
E-UGND-EXST
Ues015.dwg
E-UGND-COMM
Communication Manhole
Ues016.dwg
E-UGND-EXST
Ues017.dwg
E-UGND-POWR
Power Manhole
Ues018.dwg
E-UGND-EXST
Ues019.dwg
E-UGND-COMM
Communication Handhole
6.19.4.10
WIRING
Symbol Block Name CC0010.DWG Layer Name E-POWR-CIRC Description Conduit Turn Up
CC0011.DWG
E-POWR-CIRC
CC00202.DWG
E-POWR-CIRC
2 #12
CC00203.DWG
E-POWR-CIRC
3 #12
CC00204.DWG
E-POWR-CIRC
4 #12
CC00205.DWG
E-POWR-CIRC
5 #12
Page 141
CC00206L.DWG
E-POWR-CIRC
CC00206R.DWG
E-POWR-CIRC
CC00207L.DWG
E-POWR-CIRC
CC00207R.DWG
E-POWR-CIRC
CC00208L.DWG
E-POWR-CIRC
CC00208R.DWG
E-POWR-CIRC
Page 142
6.20
Page 143
NEW WORK
Description Identification Of Updated Work Witness/Ext. Lines Dim. Arrowheads/Dots/Slashes, Dim. Text Keynotes With Associated Leaderlines And Arrowheads Key Plan Match Line General Notes And General Remarks Non-Plotting Graphics Misc. Symbols Misc.Text And Callouts With Assoc. Leaderlines And Arrowheads Border And Title Block Line Work View Port Acm Type #1 Acm Type #2 Acm Type #3 Acm Type #4 Acm Type #5 Acm Type #6 Airlock Isolation Barrier Construction Aids (Ladders, Scaffolding, Ec.) Containment Limits Critical Barrier Decontamination Unit Dimensions Equipment, (Nuas, Lights, F. Ext.) Flex Tube Exhaust Text Work Area Platform Symbols Work Area Limits Wire Waste Route Acm Type #1 Linetype
Phase
Minor
Major
Color
Annotation N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Detail N DETL ACM1 8 Continuous Yes ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB ASB CHNG DIMS KEYN KEYP MLIN NOTE NPLT SYMB TEXT TTLB VPRT ACM1 ACM2 ACM3 ACM4 ACM5 ACM6 AIRL BARR CNAD CONT CRIT DECN DIMS EQPM FLTB IDEN PLAT SYMB WARA WIRE WSRT 1 1 212 254 4 212 7 3 212 51 200 254 253 252 251 250 7 4 212 8 3 212 212 1 1 5 212 1 3 51 51 51 Continuous Continuous Continuous Continuous Matchline Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous DashDot2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Border2 Continuous Continuous Yes Yes Yes Yes Yes Yes No Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Asbestos
Plots
Desc
Page 144
General Environmental
Page 145
N REVS Sections N N N N N N N N N N N N N N N N N N SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT SECT XREF XREF
6.20.2.2
Discipline Minor Major
EXISTING WORK
Description Existing Witness/Ext. Lines Dim. Arrowheads/Dots/Slashes, Dim. Text Existing Keynotes With Associated Leaderlines And Arrowheads Existing General Notes And General Remarks Existing Misc. Symbols Existing Misc.Text And Callouts With Assoc. Leaderlines And Arrowheads Existing Dimensions Linetype Phase Color Plots Yes Yes Yes Yes Yes Yes Desc ____ ____ ____ ____ ____ ____
Default Existing Layer Properties (Unless Otherwise Noted Below) 253 N ____ ____ ____ EXST Dashed Yes Annotation N N N N N ANNO ANNO ANNO ANNO ANNO DIMS KEYN NOTE SYMB TEXT DIMS EXST EXST EXST EXST EXST EXST 253 253 253 253 253 253 Continuous Continuous Continuous Continuous Continuous Continuous
Asbestos N ASB
Page 146
6.20.2.3
Discipline Minor Major
FUTURE WORK
Description Future Witness/Ext. Lines Dim. Arrowheads/Dots/Slashes, Dim. Text Future Keynotes With Associated Leaderlines And Arrowheads Future General Notes And General Remarks Future Misc. Symbols Future Misc.Text And Callouts With Assoc. Leaderlines And Arrowheads Future Dimensions Future Text Future Symbols Future Dimensions Future Text Future Text Future Dimensions Future Text Future Dimensions Future Text Linetype Phase Color Plots Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Desc ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
Default Future Layer Properties (Unless Otherwise Noted Below) 253 N ____ ____ ____ FUTR Dashed Yes Annotation N N N N N ANNO ANNO ANNO ANNO ANNO DIMS KEYN NOTE SYMB TEXT FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR 253 253 253 253 253 253 253 253 253 253 253 253 253 253 253 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Asbestos N ASB DIMS N ASB IDEN N ASB SYMB Detail N DETL DIMS N DETL IDEN General Environmental N GENE IDEN Lead N LEAD DIMS N LEAD IDEN Sections N N SECT SECT DIMS IDEN
Page 147
RELOCATED WORK
Description Relocate Witness/Ext. Lines Dim. Arrowheads/Dots/Slashes, Dim. Text Relocate Keynotes With Associated Leaderlines And Arrowheads Relocate General Notes And General Remarks Relocate Misc. Symbols Relocate Misc.Text And Callouts With Assoc. Leaderlines And Arrowheads Relocate Dimensions Relocate Text Relocate Symbols Relocate Dimensions Relocate Text Relocate Text Relocate Dimensions Relocate Text Relocate Dimensions Relocate Text Removal Witness/Ext. Lines Dim. Arrowheads/Dots/Slashes, Dim. Text Removal Keynotes With Associated Leaderlines And Arrowheads Removal General Notes And General Remarks Removal Misc. Symbols Removal Misc.Text And Callouts With Assoc. Leaderlines And Arrowheads Removal Dimensions Removal Text Description Linetype Phase Color Plots Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Plots Desc ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
Default Relocate Layer Properties (Unless Otherwise Noted Below) 212 N ____ ____ ____ RELO Dashed Yes Annotation N N N N N ANNO ANNO ANNO ANNO ANNO DIMS KEYN NOTE SYMB TEXT RELO RELO RELO RELO RELO 212 212 212 212 212 212 212 212 212 212 212 212 212 212 212 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Asbestos N ASB DIMS N ASB IDEN N ASB SYMB Detail N DETL DIMS N DETL IDEN General Environmental N GENE IDEN Lead N LEAD DIMS N LEAD IDEN Sections N N SECT SECT DIMS IDEN
RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO
6.20.2.5
Discipline Minor Major
REMOVAL WORK
Linetype Continuous Continuous Continuous Continuous Continuous Continuous Continuous Phase Color 212 212 212 212 212 212 212 Desc ____ ____ ____ ____ ____ ____ ____
Default Removal Layer Properties (Unless Otherwise Noted Below) 212 N ____ ____ ____ RMVL Dashed Yes Annotation N N N N N ANNO ANNO ANNO ANNO ANNO DIMS KEYN NOTE SYMB TEXT DIMS IDEN RMVL RMVL RMVL RMVL RMVL RMVL RMVL
Page 148
6.20.2.6
Discipline Minor Major
TEMPORARY WORK
Description Temporary Witness/Ext. Lines Dim. Arrowheads/Dots/Slashes, Dim. Text Temporary Keynotes With Associated Leaderlines And Arrowheads Temporary General Notes And General Remarks Temporary Misc. Symbols Temporary Misc.Text And Callouts With Assoc. Leaderlines And Arrowheads Temporary Dimensions Temporary Text Temporary Symbols Temporary Dimensions Temporary Text Temporary Text Temporary Dimensions Temporary Text Temporary Dimensions Temporary Text Linetype Phase Color Plots Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Desc ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
Default Temporary Layer Properties (Unless Otherwise Noted Below) TEMP 212 N ____ ____ ____ Dashed Yes Annotation N N N N N ANNO ANNO ANNO ANNO ANNO DIMS KEYN NOTE SYMB TEXT TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP 212 212 212 212 212 212 212 212 212 212 212 212 212 212 212 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Asbestos N ASB DIMS N ASB IDEN N ASB SYMB Detail N DETL DIMS N DETL IDEN General Environmental N GENE IDEN Lead N LEAD DIMS N LEAD IDEN Sections N N SECT SECT DIMS IDEN
Page 149
DASHED
Dashed (1x)
DIVIDE
Divide (1x)
Page 150
env-DET-SYMB.dwg
(Varies)
Detail Symbol
env-SEC-MARK.dwg
(Varies)
NTS.dwg
(Varies)
Not-to-Scale
6.20.4.2
MISCELLANEOUS
Symbol Block Name ACM.dwg Layer Name (Varies) Description Asbestos-Containing Material
ContainmentLimits.dwg
(Varies)
Containment Limits
CRITICALBARRIER.dwg
(Varies)
Critical Barrier
EEXIT.dwg
(Varies)
Emergency Exit
ELECTRICSOURCE.dwg
(Varies)
EMERGENCYLITE.dwg
(Varies)
Emergency Light
Page 151
EXISTINGROOFPOINT.dwg
(Varies)
ISOLATIONBARRIER.dwg
(Varies)
Isolation Barrier
NAU.dwg
(Varies)
NAUEXHAUSTROUTE.dwg
(Varies)
VIF.dwg
(Varies)
Verify in Field
WATER&DRAIN.dwg
(Varies)
WorkArea1way.dwg
(Varies)
WorkArea2Way.dwg
(Varies)
WorkAreaLimits.dwg
(Varies)
Page 152
6.21
Page 153
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
ANNOTATION G ANNO CHNG G G G G G G ANNO ANNO ANNO ANNO ANNO ANNO DIMS KEYN MLIN NOTE NPLT SYMB TEXT TTLB TABL VPRT LINE LINE LINE BORE CONC ERTH FILL FLDN GNWD GNRL TEXT LABI PAVE SPCF STEL STRM SUBS INST SURF BORE GNRL GRID MONW SUBS
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes No Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
G ANNO G ANNO G ANNO G ANNO DETAILS G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL G DETL SITE G SITE G SITE G SITE G SITE G SITE
Identification of Updated Work Witness/Extension Lines, Dimension Lines, Arrowheads and Dimension Text Keynotes with Associated Leaderlines and Arrowheads Match Lines General Notes and Remarks Construction Lines/Reference Targets and Review Comments Miscellaneous Symbols Miscellaneous Text with Associated Leaderlines and Arrowheads Border and Title Block Linework Table and Schedule Linework Viewports Medium Weight Detail Linework Light Detail Linework Bold Detail Linework Borings/Perk Holes Concrete Earth/Soil Fill/Cover Material Field Information Ground Water General Features Text Laboratory Information Pavement Special Features Steel Storm Water Subsurface Areas Instrumentation Details Surface Areas Soil Boring Sample Locations General Grid Lines Monitoring Well Locations Subsurface
FINE HEVY
Page 154
RAST
6.21.2.2
Discipline
EXISTING WORK
Linetype Phase
Minor
Major
Color
Plots
Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) G ____ ____ ____ EXST 252 Continuous Yes
6.21.2.3
Discipline
FUTURE WORK
Linetype Phase
Minor
Major
Color
Plots
Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) G ____ ____ ____ FUTR 6 Continuous Yes
6.21.2.4
FUTURE WORK
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) G ____ ____ ____ RELO 6 Continuous Yes
6.21.2.5
REMOVAL WORK
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Removal Layer Properties (Unless Otherwise Noted Below) G ____ ____ ____ RMVL 6 Continuous Yes
Page 155
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) G ____ ____ ____ TEMP 6 Continuous Yes
Page 156
DASHED
Dashed (1x)
DIVIDE
Divide (1x)
Page 157
geo-DET-SYMB.dwg
(Varies)
Detail Symbol
geo-SEC-MARK.dwg
(Varies)
6.21.4.2
MISCELLANEOUS
Symbol Block Name Borehole.dwg Layer Name Description Bore Hole
(Varies)
Caisson.dwg
(Varies)
Caisson
ConePenetometer.dwg
(Varies)
HML.dwg
(Varies)
HML
H-Piles.dwg
(Varies)
H Piles
MonotubePiles.dwg
(Varies)
Monotube Piles
ObervationWell.dwg
(Varies)
Observation Well
Piezometer.dwg
(Varies)
Piezometer
Page 158
PipePiles.dwg
(Varies)
Pipe Piles
PrecastConcretePile.dwg
(Varies)
Precast Concrete
SecantPilesPerm.dwg
(Varies)
Secant Piles
SecantPilesTemp.dwg
(Varies)
Seismograph.dwg
(Varies)
Seisomograph
SettlementPlate.dwg
(Varies)
Settlement Plate
SlopeInclinometer.dwg
(Varies)
Slope Inclinometer
SteelSheetPiles.dwg
(Varies)
StrainGauge.dwg
(Varies)
Strain Gauge
SurfaceMonitoringPoint.dwg
(Varies)
TapeExtensometerSpan.dwg
(Varies)
Tapertubepiles.dwg
(Varies)
Tieback.dwg
(Varies)
Tie Back
Page 159
Timberpiles.dwg
(Varies)
Timber Piles
Page 160
6.22
Page 161
Description
ANNOTATION M ANNO CHNG M ANNO COLN M ANNO DIMS M ANNO KEYN M ANNO MLIN M ANNO NOTE M ANNO NPLT M ANNO SYMB M ANNO TEXT M ANNO TTLB M ANNO VPRT AVIATION FUEL M AVFL ABVE M AVFL BELW M AVFL EQPT M AVFL OUTS M AVFL TANK M AVFL VALV BACKGROUND M BKGD M BKGD TEXT CONDENSER WATER M CDWR RETN M CDWR RETN M CDWR SUPP M CDWR SUPP CONDENSATE M COND HPIP M COND HPIP M COND TEXT M COND LPIP M COND LPIP M COND MPIP M COND MPIP CHILLED WATER M CHWR RETN M CHWR RETN M CHWR SUPP M CHWR SUPP CONTROLS M CTRL DEVI M CTRL LINK
2 250 8 2 6 2 8 2 2 2 7 6 6 60 6 60 60 253 140 150 150 150 150 140 140 2 140 140 140 140 90 90 90 90 140 170
Continuous Center Continuous Continuous Divide Continuous Continuous Continuous Continuous Continuous Continuous AFS AFSU Continuous AFS Continuous Continuous Continuous Continuous HPC Continuous CHWS Continuous HPC Continuous Continuous LPC Continuous MPC Continuous CWR Continuous CWS Continuous Continuous Dashed
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Identification of Updated Work Column Line Dimensions Keynotes Match Lines General Notes and Remarks Construction and Reference Lines Miscellaneous Symbols Annotations Borders View Ports Jet Fuel Above Ground Jet Fuel Below Ground Jet Fuel Equipment Jet Fuel Out Of Service Jet Fuel Tanks Jet Fuel Valves Background Features Background Feature Annotations Condenser Water Piping Return (Schematic) Condenser Water Piping Return Condenser Water Piping Supply (Schematic) Condenser Water Piping Supply High Pressure Condensate Piping (Schematic) High Pressure Condensate Piping High Pressure Condensate Text Low Pressure Condensate Piping (Schematic) Low Pressure Condensate Piping Medium Pressure Condensate Piping (Schematic) Medium Pressure Condensate Piping Chilled Water Piping Return (Schematic) Chilled Water Piping Return Chilled Water Piping Supply (Schematic) Chilled Water Piping Supply Control Devices Control / Communication Link
DBLN DBLN
DBLN
DBLN DBLN
DBLN DBLN
Page 162
M FUEL FORU M FUEL FOSA M FUEL FOSU M FUEL FOVA M FUEL FOVU M FUEL TANK DUAL TEMPERATURE WATER SYSTEM M DTWS M DTWS M DTWS M DTWS HOT WATER M HTWR M HTWR M HTWR M HTWR HVAC RETN RETN SUPP SUPP RETN RETN SUPP SUPP DBLN DBLN
DBLN DBLN
M HVAC EQPM M HVAC PATT M HVAC TEXT HOT OIL - SNOW MELTING SYSTEM M M M M M HTOL HTOL HTOL HTOL HTOL COIL COIL RETN RETN SUPP DBLN DBLN
Page 163
Page 164
6.22.2.2
Discipline
Phase
Minor
Major
Color
Plots
Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) M ____ ____ ____ EXST Continuous Yes ANNOTATION M ANNO TEXT ____ EXST 2 Continuous Yes M ANNO COLN ____ EXST 180 Center Yes M ANNO DIMS ____ EXST 8 Continuous Yes M ANNO NOTE ____ EXST 2 Continuous Yes AVIATION FUEL M AVFL ABVE ____ EXST 212 AFS Yes M AVFL BELW ____ EXST 212 AFSU Yes M AVFL EQPT ____ EXST 72 Continuous Yes M AVFL OUTS ____ EXST 212 AFS Yes M AVFL TANK ____ EXST 72 Continuous Yes M AVFL VALV ____ EXST 72 Continuous Yes BACKGROUND M BKGD ____ EXST 253 Continuous Yes M BKGD TEXT ____ EXST 131 Continuous Yes CONDENSER WATER M CDWR RETN ____ EXST 152 HPC Yes M CDWR RETN DBLN EXST 152 Continuous Yes M CDWR SUPP ____ EXST 152 CHWS Yes M CDWR SUPP DBLN EXST 152 Continuous Yes CONDENSATE M COND HPIP ____ EXST 131 HPC Yes M COND HPIP DBLN EXST 131 Continuous Yes M COND TEXT ____ EXST 2 Continuous Yes M COND LPIP ____ EXST 131 LPC Yes M COND LPIP DBLN EXST 131 Continuous Yes M COND MPIP ____ DBLN ____ DBLN ____ DBLN ____ ____ ____ ____ EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST 131 131 92 92 92 92 131 191 2 249 MPC Continuous CWR Continuous CWS Continuous Continuous Dashed Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Existing Annotations Existing Column Line Existing Dimensions Existing General Notes And Remarks Existing Jet Fuel Above Ground Existing Jet Fuel Below Ground Existing Jet Fuel Equipment Existing Jet Fuel Out Of Service Existing Jet Fuel Tanks Existing Jet Fuel Valves Existing Background Features Existing Background Feature Annotations Existing Condenser Water Piping Return (Schematic) Existing Condenser Water Piping Return Existing Condenser Water Piping Supply (Schematic) Existing Condenser Water Piping Supply Existing High Pressure Condensate Piping (Schematic) Existing High Pressure Condensate Piping Existing High Pressure Condensate Text Existing Low Pressure Condensate Piping (Schematic) Existing Low Pressure Condensate Piping Existing Medium Pressure Condensate Piping (Schematic) Existing Medium Pressure Condensate Piping Existing Chilled Water Piping Return (Schematic) Existing Chilled Water Piping Return Existing Chilled Water Piping Supply (Schematic) Existing Chilled Water Piping Supply Existing Control Devices Existing Control / Communication Link Existing Control Text Existing Cabinets
M COND MPIP CHILLED WATER M CHWR RETN M CHWR RETN M CHWR SUPP M CHWR SUPP CONTROLS M CTRL DEVI M CTRL LINK M CTRL TEXT DETAIL M DETL CABS
Page 165
M FUEL FORU ____ EXST M FUEL FOSA ____ EXST M FUEL FOSU ____ EXST M FUEL FOVA ____ EXST M FUEL FOVU ____ EXST M FUEL TANK ____ EXST DUAL TEMPERATURE WATER SYSTEM M M DTWS DTWS RETN RETN SUPP SUPP RETN RETN SUPP SUPP ____ DBLN ____ DBLN ____ DBLN ____ DBLN EXST EXST EXST EXST EXST EXST EXST EXST
DTWR Continuous DTWS Continuous HWR Continuous HWS Continuous Continuous Continuous Continuous Continuous Continuous HOSMR Continuous HOSMS Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
M HVAC EQPM ____ EXST M HVAC PATT ____ EXST M HVAC TEXT ____ EXST HOT OIL - SNOW MELTING SYSTEM M M M M M M M HTOL HTOL HTOL HTOL HTOL HTOL HTOL COIL COIL RETN RETN SUPP SUPP VLBX ____ DBLN ____ DBLN ____ DBLN ____ EXST EXST EXST EXST EXST EXST EXST
Page 166
M HTHW SUPP ____ EXST M HTHW SUPP DBLN EXST MEDIUM TEMPERATURE HOT WATER M M MTHW MTHW RETN RETN ____ DBLN EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST
MTHWR Continuous MTHWS Continuous BBD Continuous A D MU Continuous RD RL RS Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous HPS Continuous LPS Continuous MPS Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
M MTHW SUPP ____ M MTHW SUPP DBLN MISCELLANEOUS PIPING M MISC BBDN M MISC BKGD M MISC CAIR M MISC DRAN M MISC MWTR PRESENTATION M PRES RED REFRIGERANT M REFG DISG M REFG LIQD M REFG SCTN RIVER WATER M RIVW BKGD M RIVW RETN M RIVW SUPP M RIVW TUNL SECTIONS M SECT TEXT M SECT MBND M SECT MCUT M SECT PATT STEAM M STEM HPIP M STEM HPIP M STEM LPIP M STEM LPIP M STEM MPIP M STEM MPIP ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ DBLN ____ DBLN ____ DBLN
6.22.2.3
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Page 167
AVIATION FUEL
BACKGROUND
CONDENSER WATER
CONDENSATE
CHILLED WATER
CONTROLS
DETAIL
Page 168
ELEVATIONS
M FUEL TANK _____ FUTR DUAL TEMPERATURE WATER SYSTEM M M M DTWS DTWS DTWS RETN RETN SUPP SUPP RETN RETN SUPP SUPP EQPM PATT _____ DBLN _____ DBLN _____ DBLN _____ DBLN _____ _____ FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR
Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
M HVAC TEXT _____ FUTR HOT OIL - SNOW MELTING SYSTEM M M M M M HTOL HTOL HTOL HTOL HTOL COIL COIL RETN RETN SUPP _____ DBLN _____ DBLN _____ FUTR FUTR FUTR FUTR FUTR
Page 169
M HTOL VLBX _____ FUTR HIGH TEMPERATURE HOT WATER M M M HTHW HTHW HTHW RETN RETN SUPP _____ DBLN _____ FUTR FUTR FUTR
M HTHW SUPP DBLN FUTR MEDIUM TEMPERATURE HOT WATER M M M MTHW MTHW MTHW RETN RETN SUPP _____ DBLN _____ FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR
Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Hidden2
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
M MTHW SUPP DBLN MISCELLANEOUS PIPING M M M M MISC MISC MISC MISC BBDN BKGD CAIR DRAN _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ DBLN _____ DBLN _____ DBLN
M MISC MWTR PRESENTATION M PRES RED REFRIGERANT M M REFG REFG DISG LIQD
M REFG SCTN RIVER WATER M M M RIVW RIVW RIVW BKGD RETN SUPP TUNL TEXT MBND MCUT PATT HPIP HPIP LPIP LPIP MPIP MPIP
Page 170
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Relocated Layer Properties (Unless Otherwise Noted Below) M ____ ____ ____ RELO 20 Continuous Yes GENERAL M M M M M PLAN PLAN DETL ELEV ELEV ____ FINE ____ ____ FINE ____ ____ ____ ____ ____ RELO RELO RELO RELO RELO 20 22 20 20 22 Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Relocated Elements in Plan Relocated Elements in Plan (Thin Line) Relocated Elements in Details Relocated Elements in Elevation or Section Relocated Elements in Plan (Thin Line)
6.22.2.5
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Removal Layer Properties (Unless Otherwise Noted Below) M ____ ____ ____ RMVL Continuous Yes X - REMOVALS M PLAN GRFX ____ SHRT _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ TEXT _____ RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL 170 170 250 8 2 2 6 6 60 6 60 60 253 140 MECHANICAL_ REMOVAL MECHANICAL_ REMOVAL_s Center Continuous Continuous Continuous AFS AFSU Continuous AFS Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Draw Over RMVL Linework Normal Spacing Draw Over RMVL Linework Short Spacing Removal Of Column Line Removal Of Dimensions Removal Of General Notes And Remarks Removal Of Annotations Removal Of Jet Fuel Above Ground Removal Of Jet Fuel Below Ground Removal Of Jet Fuel Equipment Removal Of Jet Fuel Out Of Service Removal Of Jet Fuel Tanks Removal Of Jet Fuel Valves Removal Of Background Features Removal Of Background Feature Annotations
M PLAN GRFX ANNOTATION M M M M ANNO ANNO ANNO ANNO COLN DIMS NOTE TEXT
AVIATION FUEL M AVFL ABVE M M M M M AVFL AVFL AVFL AVFL AVFL BELW EQPT OUTS TANK VALV
Page 171
CONDENSATE M M M M M M M COND COND COND COND COND COND COND HPIP HPIP TEXT LPIP LPIP MPIP MPIP _____ DBLN _____ _____ DBLN _____ DBLN RMVL RMVL RMVL RMVL RMVL RMVL RMVL 140 140 2 140 140 140 140 HPC Continuous Continuous LPC Continuous MPC Continuous Yes Yes Yes Yes Yes Yes Yes
CHILLED WATER M M M M CHWR CHWR CHWR CHWR RETN RETN SUPP SUPP DEVI LINK TEXT CABS DUCT EQPT GENF LVLE PATT PIPE STRC WIRE DAMP DETR EXHT RETN SUPL FIXT IDEN OTLN _____ DBLN _____ DBLN _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL 90 90 90 90 140 170 2 7 140 90 243 60 8 6 170 83 140 140 6 231 140 241 9 7 CWR Continuous CWS Continuous Continuous Dashed Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
DETAIL M DETL M M M M M M M M DETL DETL DETL DETL DETL DETL DETL DETL
Page 172
DUAL TEMPERATURE WATER SYSTEM M M M M M M M M M M M M M M M M M M DTWS DTWS DTWS DTWS HTWR HTWR HTWR HTWR HVAC HVAC HVAC HTOL HTOL HTOL HTOL HTOL HTOL HTOL RETN RETN SUPP SUPP RETN RETN SUPP SUPP EQPM PATT TEXT COIL COIL RETN RETN SUPP SUPP VLBX _____ DBLN _____ DBLN _____ DBLN _____ DBLN _____ _____ _____ _____ DBLN _____ DBLN _____ DBLN _____ RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL 90 90 90 90 231 231 231 231 90 8 2 140 140 90 90 231 231 2 DTWR Continuous DTWS Continuous HWR Continuous HWS Continuous Continuous Continuous Continuous Continuous Continuous HOSMR Continuous HOSMS Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
HOT WATER
HVAC
HIGH TEMPERATURE HOT WATER M M M M HTHW HTHW HTHW HTHW RETN RETN SUPP SUPP _____ DBLN _____ DBLN RMVL RMVL RMVL RMVL 43 43 43 43 HTHWR Continuous HTHWS Continuous Yes Yes Yes Yes
MEDIUM TEMPERATURE HOT WATER M M M M MTHW MTHW MTHW MTHW RETN RETN SUPP SUPP _____ DBLN _____ DBLN RMVL RMVL RMVL RMVL 231 231 231 231 MTHWR Continuous MTHWS Continuous Yes Yes Yes Yes
Page 173
PRESENTATION REFRIGERANT
RIVER WATER
SECTIONS
STEAM M M M M M M STEM STEM STEM STEM STEM STEM HPIP HPIP LPIP LPIP MPIP MPIP _____ DBLN _____ DBLN _____ DBLN RMVL RMVL RMVL RMVL RMVL RMVL 35 35 35 35 35 35 HPS Continuous LPS Continuous MPS Continuous Yes Yes Yes Yes Yes Yes
6.22.2.6
Discipline
Phase
Minor
Major
Color
Plots
Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) M TEMP ____ ____ ____ 20 Continuous Yes GENERAL M M M M M PLAN PLAN DETL ELEV ELEV ____ FINE ____ ____ FINE ____ ____ ____ ____ ____ TEMP TEMP TEMP TEMP TEMP 234 244 234 234 244 Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Temporary Elements in Plan Temporary Elements in Plan (Thin Line) Temporary Elements in Details Temporary Elements in Elevation or Sections Temporary Elements in Plan (Thin Line)
Page 174
6.22.2.7
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
ANNOTATION F F F F F F F F F F F F F F F F F F F F F F F F F F CO2 F F F F FM200 CO2_ CO2_ CO2_ CO2_ EQPM HEAD PIPE 231 231 231 131 Continuous Continuous Continuous CO2 Yes Yes Yes Yes CO2 System CO2 Equipment CO2 Head CO2 Sprinkler Piping ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO DETL DETL DETL DETL DETL DETL DETL DETL DETL DETL DETL ELEV ELEV ELEV ELEV ELEV CHNG DIMS KEYN MLIN NOTE NPLT SYMB TEXT TTLB VPRT CABS DUCT EQPT FANS GENF GRLS LVLE PUMP STRC VENT WIRE FIXT IDEN OTLN PATT PFIX 2 8 2 6 2 8 2 2 2 7 7 140 90 90 243 140 60 60 170 35 83 241 9 7 7 2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Dashed Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Identification of Updated Work Dimensions Keynotes Match Lines General Notes and Remarks Construction and Reference Lines Miscellaneous Symbols Miscellaneous Annotations Borders View Ports Hose Cabinets Ducts Equipment and Fixtures Fans General Features Grilles and Louvers Valves and Fittings Pumps and Compressors Structural Support Features Vents Electrical Wiring Miscellaneous Fixtures Component Identification Numbers Building Outlines Textures and Patterns Plumbing Fixtures
DETAIL
ELEVATIONS
Page 175
INERGEN
SECTIONS
SPRINKLER
Page 176
6.22.2.8
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) F F F F F F F F F F F ____ ANNO ANNO ANNO DETL DETL DETL DETL DETL DETL DETL ____ DIMS NOTE TEXT CABS DUCT EQPT FANS GENF GRLS LVLE ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST 8 2 2 249 131 92 92 234 131 72 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Existing Dimensions Existing General Notes And Remarks Existing Miscellaneous Annotations Existing Hose Cabinets Existing Ducts Existing Equipment And Fixtures Existing Fans Existing General Features Existing Grilles And Louvers Existing Valves And Fittings ANNOTATION
DETAIL
Page 177
ELEVATIONS
INERGEN
SECTIONS
SPRINKLER
Page 178
6.22.2.9
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) F ____ ____ ____ FUTR Continuous Yes
Page 179
DETAIL
ELEVATIONS
INERGEN
SECTIONS
SPRINKLER
Page 180
Page 181
6.22.2.10
Discipline Major
Plots
Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) F RELO ____ ____ ____ 20 Continuous Yes GENERAL F PLAN ____ ____ RELO 20 Continuous Yes F PLAN FINE ____ RELO 22 Continuous Yes F DETL ____ ____ RELO 20 Continuous Yes F ELEV ____ ____ RELO 20 Continuous Yes F ELEV FINE ____ RELO 22 Continuous Yes
Relocated Elements in Plan Relocated Elements in Plan (Thin Line) Relocated Elements in Details Relocated Elements in Elevation or Section Relocated Elements in Plan (Thin Line)
6.22.2.11
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Removal Layer Properties (Unless Otherwise Noted Below) F ____ ____ ____ RMVL Continuous X REMOVALS MECHANICAL_ F PLAN GRFX ____ RMVL 170 REMOVAL2 MECHANICAL_ F PLAN GRFX SHRT RMVL 170 REMOVAL2_s ANNOTATION F ANNO DIMS ____ RMVL 8 Continuous F ANNO NOTE ____ RMVL 2 Continuous F ANNO TEXT ____ RMVL 2 Continuous DETAIL F DETL CABS ____ RMVL 7 Continuous F DETL DUCT ____ RMVL 140 Continuous F DETL EQPT ____ RMVL 90 Continuous F DETL FANS ____ RMVL 90 Continuous F DETL GENF ____ RMVL 243 Continuous F DETL GRLS ____ RMVL 140 Continuous F DETL LVLE ____ RMVL 60 Continuous F DETL PUMP ____ RMVL 60 Continuous F DETL STRC ____ RMVL 170 Continuous F DETL VENT ____ RMVL 35 Dashed F DETL WIRE ____ RMVL 83 Continuous ELEVATIONS F ELEV FIXT ____ RMVL 241 Continuous F ELEV IDEN ____ RMVL 9 Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Draw Over RMVL Linework Normal Spacing Draw Over RMVL Linework Short Spacing Removal Of Dimensions Removal Of General Notes And Remarks Removal Of Miscellaneous Annotations Removal Of Hose Cabinets Removal Of Ducts Removal Of Equipment And Fixtures Removal Of Fans Removal Of General Features Removal Of Grilles And Louvers Removal Of Valves And Fittings Removal Of Pumps And Compressors Removal Of Structural Support Features Removal Of Vents Removal Of Electrical Wiring Removal Of Miscellaneous Fixtures Removal Of Component Identification Number
Page 182
EQPM HEAD PIPE IDEN MBND MCUT PATT EQUP HEAD HEAD HEAD HEAD HEAD HEAD PIPE EQUP HEAD HEAD HEAD HEAD HEAD HEAD PIPE EQUP HEAD HEAD HEAD HEAD HEAD HEAD PIPE EQUP HEAD HEAD
7 7 7 231 131 131 131 131 131 131 131 231 131 131 131 131 131 131 131 231 131 131 131 131 131 131 131 231 131 131
Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous SP Continuous Continuous Continuous Continuous Continuous Continuous Continuous DEL Continuous Continuous Continuous Continuous Continuous Continuous Continuous DRY_CHEM Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Removal Of Materials Beyond Section Cut Removal Of Materials Cut By Section Removal Of Textures And Patterns Removal Of Wet Sprinkler Equipment Removal Of Wet Sprinkler Heads Removal Of Wet Sprinkler Pendant Heads Removal Of Wet Sprinkler Concealed Heads Removal Of Wet Sprinkler Recessed Heads Removal Of Wet Sprinkler Sidewall Heads Removal Of Wet Sprinkler Upright Heads Removal Of Wet Sprinkler Piping Removal Of Deluge Sprinkler Equipment Removal Of Deluge Sprinkler Heads Removal Of Deluge Sprinkler Pendant Heads Removal Of Deluge Sprnk Concealed Heads Removal Of Deluge Sprinkler Recessed Heads Removal Of Deluge Sprinkler Sidewall Heads Removal Of Deluge Sprinkler Upright Heads Removal Of Deluge Sprinkler Piping Removal Of Dry Chemical Sprinkler Equipment Removal Of Dry Chemical Sprinkler Heads Removal Of Dry Chem. Sprnk. Pendant Heads Removal Of Dry Chem. Sprnk. Concealed Heads Removal Of Dry Chem. Sprnk. Recessed Heads Removal Of Dry Chem. Sprnk. Sidewall Heads Removal Of Dry Chem. Sprnk. Upright Heads Removal Of Dry Chemical Sprinkler Piping Removal Of Dry Sprinkler Equipment Removal Of Dry Sprinkler Heads Removal Of Dry Sprinkler Pendant Heads
Page 183
6.22.2.12
Discipline
Phase
Minor
Major
Color
Plots
Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) F TEMP ____ ____ ____ 234 Continuous Yes GENERAL F F F F F PLAN PLAN DETL ELEV ELEV ____ FINE ____ ____ FINE ____ ____ ____ ____ ____ TEMP TEMP TEMP TEMP TEMP 234 244 234 234 244 Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Temporary Elements in Plan Temporary Elements in Plan (Thin Line) Temporary Elements in Details Temporary Elements in Elevation or Sections Temporary Elements in Plan (Thin Line)
6.22.2.13
Discipline
Phase
Minor
Major
Color
Plots
Desc
Description
ACID P P
ACID ACID
EQPM PIPE
131 131
Continuous Acid
Yes Yes
Acid, Alkaline and Oil Waste Equipment Acid, Alkaline and Oil Waste Piping
Page 184
2 8 2 6 2 8 131 2 2 6 2 7 30 1 3 170 170 1 170 170 170 170 170 2 7 7 51 170 1 40 42 60 121 121 121 42 42 2 30 7 26
Divide Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous A Continuous Continuous Continuous DCW Continuous DHW Continuous Continuous DHWR T Continuous Continuous Continuous Continuous FSP Continuous G Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Hidden2 Continuous HTRACE
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Identification of Updated Work Dimensions Keynotes Match Lines General Notes and Remarks Construction and Reference Lines Subtitles Miscellaneous Symbols Miscellaneous Annotations Titles Borders View Ports Compressed Air Features Compressed Air Equipment Equipment and Fixtures Domestic Hot and Cold Water Systems Domestic Cold Water Piping Domestic Hot and Cold Water Equipment Domestic Hot Water Piping Domestic Water Piping (Schematic) Domestic Water Piping Domestic Hot Water Return Piping Domestic Water Tempered Water Component Identification Numbers Building Outlines Textures and Patterns Plumbing Fixtures Fire Standpipe Piping Gas Equipment Gas Piping Irrigation Coverage and Spray Distribution Patterns Irrigation Equipment Main Irrigation Pipe Line Irrigation Piping Sleeve Irrigation Piping Zone Sprinklers - Fixed Spray Sprinklers - Side Walk Irrigation Annotation Skid Pad Background Features Heat Tacing (Draw Over Linework)
DBLN
Page 185
BELW EQPM EQPM FIXT FLDR PIPE PIPE PIPE RISR IDEN MBND MCUT PATT
DBLN
SML_ LRG_
BELW EQPM EQPM PIPE PIPE PIPE RISR ROOF PIPE RISR
RAST
6.22.2.14
Discipline
Phase
Minor
Major
Color
Plots
Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) P ____ ____ ____ EXST Continuous Yes ACID P ACID P ACID ANNOTATION P ANNO P ANNO EQPM PIPE DIMS NOTE ____ ____ ____ ____ EXST EXST EXST EXST 130 130 8 2 Continuous ACID_EX Continuous Continuous Yes Yes Yes Yes Existing Acid, Alkaline And Oil Waste Equipment Existing Acid, Alkaline And Oil Waste Piping Existing Dimensions Existing General Notes And Remarks
Page 186
P IRRG EQPM P IRRG PIPE P IRRG PIPE P IRRG PIPE P IRRG SPKL P IRRG SPKL P IRRG TEXT MISCELLANEOUS P MISC SKID P MISC BKGD P MISC HTRC OIL P OIL_ EQPM P OIL_ PIPE SANITARY P SSWR P SSWR BELW P SSWR EQPM P SSWR EQPM P SSWR FIXT P SSWR FLDR P SSWR PIPE P SSWR PIPE
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Existing Oil Equipment Existing Oil Piping Existing Sanitary Sewer Systems Existing Sanitary Sewer Underground Existing Sanitary Sewer Equipment (Schematic) Existing Sanitary Sewer Equipment Existing Sanitary Sewer Plumbing Fixtures Existing Sanitary Sewer Floor Drains Existing Sanitary Sewer Piping (Schematic) Existing Sanitary Sewer Piping 4 Inch Or Under Diameter
Page 187
BELW EQPM EQPM PIPE PIPE PIPE RISR ROOF PIPE RISR
6.22.2.15
Discipline
Phase
Minor
Major
Color
Plots
Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) P ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ DBLN ____ ____ FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR 130 130 8 2 2 15 10 92 191 191 10 191 191 191 191 191 Continuous Continuous Acid Continuous Continuous Continuous A Continuous Continuous Continuous DCW Continuous DHW Continuous Continuous DHWR T Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Future Acid, Alkaline And Oil Waste Equipment Future Acid, Alkaline And Oil Waste Piping Future Dimensions Future General Notes And Remarks Future Miscellaneous Annotations Future Compressed Air Features Future Compressed Air Equipment Future Equipment And Fixtures Future Domestic Hot And Cold Water Systems Future Domestic Cold Water Piping Future Domestic Hot And Cold Water Equipment Future Domestic Hot Water Piping Future Domestic Water Piping (Schematic) Future Domestic Water Piping Future Domestic Hot Water Return Piping Future Domestic Water Tempered Water ACID P ACID EQPM P ACID PIPE ANNOTATION P ANNO DIMS P ANNO NOTE P ANNO TEXT AIR P CAIR ____ P CAIR EQPM DETAIL P DETL EQPM DOMESTIC WATER P DOMW ____ P DOMW COLD P DOMW EQPM P DOMW HOT_ P DOMW PIPE P DOMW PIPE P DOMW RETN P DOMW TEMP
Page 188
____ ____ ____ ____ ____ ____ ____ ____ ____ MAIN SLEV ZONE _FIX SIDE ____ ____ ____ ____ ____ ____ ____ ____ ____ DBLN ____ ____ ____ SML_ LRG_ ____ ____ ____ ____ ____ ____ ____ ____ DBLN ____ SML_ LRG_
FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR
Continuous Continuous Continuous Continuous FSP Continuous G Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Hidden2 Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Future Component Identification Numbers Future Building Outlines Future Textures And Patterns Future Plumbing Fixtures Future Fire Standpipe Piping Future Gas Equipment Future Gas Piping Future Irrigation Coverage And Spray Distribution Patterns Future Irrigation Equipment Future Main Irrigation Pipe Line Future Irrigation Piping Sleeve Future Irrigation Piping Zone Future Sprinklers - Fixed Spray Future Sprinklers - Side Walk Future Irrigation Annotation Future Skid Pad Future Background Features
P IRRG EQPM P IRRG PIPE P IRRG PIPE P IRRG PIPE P IRRG SPKL P IRRG SPKL P IRRG TEXT MISCELLANEOUS P MISC SKID P MISC BKGD P MISC HTRC OIL P OIL_ EQPM P OIL_ PIPE SANITARY P SSWR ____ P SSWR BELW P SSWR EQPM P SSWR EQPM P SSWR FIXT P SSWR FLDR P SSWR PIPE P SSWR PIPE P SSWR PIPE P SSWR RISR SECTIONS P SECT IDEN P SECT MBND P SECT MCUT P SECT PATT STORM P DRAN ____ P DRAN BELW P DRAN EQPM P DRAN EQPM P DRAN PIPE P DRAN PIPE P DRAN PIPE
10 41 142 142 240 240 53 10 142 53 53 53 2 249 249 249 142 142 240 240 142 53 53
Continuous OW SAN SANU Continuous Continuous Continuous Continuous SAN Continuous Continuous Continuous Continuous Continuous Continuous Continuous ST STU Continuous Continuous ST Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Future Oil Equipment Future Oil Piping Future Sanitary Sewer Systems Future Sanitary Sewer Underground Future Sanitary Sewer Equipment (Schematic) Future Sanitary Sewer Equipment Future Sanitary Sewer Plumbing Fixtures Future Sanitary Sewer Floor Drains Future Sanitary Sewer Piping (Schematic) Future Sanitary Sewer Piping 4 Inch Or Under Diameter Future Sanitary Sewer Piping Over 4 Inch Diameter Future Sanitary Sewer Risers Future Component Identification Numbers Future Materials Beyond Section Cut Future Materials Cut By Section Future Textures And Patterns Future Storm Drainage System Future Storm Drainage System Underground Future Storm Drainage Equipment (Schematic) Future Storm Drainage Equipment Future Storm Drainage Piping (Schematic) Future Storm Drainage Piping 4 Inch Or Under Diameter Future Storm Drainage Piping Over 4 Inch Diameter
Page 189
6.22.2.16
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Relocated Layer Properties (Unless Otherwise Noted Below) P P P P P P ____ PLAN PLAN DETL ELEV ELEV ____ ____ FINE ____ ____ FINE ____ ____ ____ ____ ____ ____ RELO RELO RELO RELO RELO RELO 20 20 20 20 20 20 Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Relocated Elements in Plan Relocated Elements in Plan (Thin Line) Relocated Elements in Details Relocated Elements in Elevation or Section Relocated Elements in Plan (Thin Line) GENERAL
6.22.2.17
Discipline
Minor
Major
Color
Plots
Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) P ____ GENERAL P P P P P PLAN PLAN DETL ELEV ELEV ____ ____ FINE ____ ____ FINE ____ ____ ____ ____ ____ ____ TEMP TEMP TEMP TEMP TEMP TEMP 234 20 20 20 20 20 Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Temporary Elements in Plan Temporary Elements in Plan (Thin Line) Temporary Elements in Details Temporary Elements in Elevation or Sections Temporary Elements in Plan (Thin Line)
Page 190
DASHED
Dashed (1x)
DIVIDE
Divide (1x)
Page 191
M-Diffuser-2_WAY.dwg
(Varies)
M-Diffuser2_WAY_CORNER.dwg
(Varies)
M-Diffuser-3_WAY.dwg
(Varies)
M-Diffuser-4_WAY.dwg
(Varies)
M-Diffuser-R-1x1.dwg
(Varies)
6.22.4.2
Symbol
FIRESTAT.dwg
(Varies)
Firestat
FLOW SWITCH.dwg
(Varies)
Flow Switch
FREEZESTAT.dwg
(Varies)
Freezstat
HEAT DETECTOR.dwg
(Varies)
Heat Detector
Page 192
HUMIDISTAT.dwg
(Varies)
Humidistat
M-FLOW_METER.dwg
(Varies)
Flow Meter
M-FLOW_TRNSMTR.dwg
(Varies)
Flow Transmitter
M-LEAK_DETECTOR.dwg
(Varies)
M-MOTOR.dwg
(Varies)
Motor
M-SMOKE_DETECTOR.dwg
(Varies)
M-STEAM_TRAP.dwg
(Varies)
Steam Trap
M-TEMP_SNSR.dwg
(Varies)
Temperature Sensor
M-TEMPERATURE_SENSOR.dwg
(Varies)
Temperature Sensor
M-THERMOSTAT.dwg
(Varies)
Thermostat
MTHERMST_HUMIDIST_SWITCH.dwg
(Varies)
Thermostat/Humidistat Switch
(Varies)
TEMPERATURE SENSOR.dwg
(Varies)
Temperature Sensor
Page 193
THERMOSTAT, ELECTRIC.dwg
(Varies)
Electric Thermostat
THERMOSTAT, PNEUMATIC.dwg
(Varies)
Pneumatic Thermostat
6.22.4.3
Symbol
M-ARROW_LEADER.dwg
(Varies)
M-BREAK.dwg
(Varies)
Duct Break
M-BREAK_LINE1.dwg
(Varies)
Break Line
M-BREAK_LINE2.dwg
(Varies)
M-CALLOUT.dwg
(Varies)
M-CALLOUT-SYM.DWG
(Varies)
M-CENTERLINE_SYM.DWG
(Varies)
Centerline Symbol
M-CUT2.dwg
(Varies)
M-CUT3.dwg
(Varies)
Section Head
Page 194
M-CUT4.dwg
(Varies)
Section Line
mec-CALLOUT.dwg
(Varies)
Callout
M-REMOVAL.dwg
(Varies)
Removal Marker
M-REVISION_TRIANGLE.dwg
(Varies)
Revision Triangle
M-SEC-DN-LEFT.dwg
(Varies)
M-SEC-DN-RIGHT.dwg
(Varies)
M-SEC-LEFT-BTM.dwg
(Varies)
M-SEC-LEFT-TOP.dwg
(Varies)
M-SEC-RIGHT-BTM.dwg
(Varies)
M-SEC-RIGHT-TOP.dwg
(Varies)
M-SECTION-MARK.dwg
(Varies)
Section
M-SEC-UP-LEFT.dwg
(Varies)
M-SEC-UP-RIGHT.dwg
(Varies)
Page 195
HVAC DUCTWORK
Block Name ACCESS DOOR IN DUCT.dwg Layer Name (Varies) Description Access Door in Duct
(Varies)
(Varies)
CONTROL.dwg
(Varies)
Control
(Varies)
FILTER.dwg
(Varies)
Filter
M-ACCESS_DOOR.dwg
(Varies)
M-AIR_VENT.dwg
(Varies)
Air Vent
M-COIL_COOLING.dwg
(Varies)
Cooling Coil
M-COIL_HEATING.dwg
(Varies)
Heating Coil
M-COIL_PRE_HT.dwg
(Varies)
Pre-Heating Coil
M-DUCT_FLEX_CONNECT2.dwg
(Varies)
Page 196
M-EXPN_JNT.dwg
(Varies)
M-FD.dwg
(Varies)
Fire Damper
M-FSD.dwg
(Varies)
M-FSD_FD.dwg
(Varies)
M-MEASUR_STATION.dwg
(Varies)
Measurement Station
M-SENS_RELAY.dwg
(Varies)
M-SIGHT_GLASS.dwg
(Varies)
Sight Glass
M-THERMOMETER.dwg
(Varies)
Thermometer
M-VFD.dwg
(Varies)
Variable-Frequency Drive
SIDE CONNECTED SUPPLY, RETURN OR EXHAUST DEVICE.dwg COMBINATION FIRE AND SMOKE DAMPER WITH DUCT ACCESS DOOR.dwg FUSIBLE LINK FIRE DAMPER WITH DUCT ACCESS DOOR.dwg
(Varies)
Side-Connected Supply
(Varies)
Fire and Smoke Damper Combination with Duct Access Door Fusible Link Fire Damper with Duct Access Door Multi-Blade Control Damper with Spring Opposed, Diaphragm Actuator w/o Positioner
(Varies)
M-M_B_CONTR_DAMP1.dwg
(Varies)
Page 197
M-M_B_CONTR_DAMP.dwg
(Varies)
M-MOTORIZED_DAMPER.dwg
(Varies)
Motorized Damper
MOTORIZED DAMPER.dwg
(Varies)
Motorized Damper
(Varies)
SPLITTER DAMPER.dwg
(Varies)
Splitter Damper
VOLUME DAMPER.dwg
(Varies)
Volume Damper
(Varies)
(Varies)
(Varies)
CONCENTRIC REDUCER.dwg
(Varies)
Concentric Reducer
ECCENTRIC REDUCER.dwg
(Varies)
Eccentric Reducer
(Varies)
(Varies)
Page 198
M-DOOR_LOUVERED.DWG
(Varies)
Louvered Door
M-DOOR_UNDERCUT.DWG
(Varies)
Undercut Door
M-DUCT_DN1.dwg
(Varies)
M-DUCT_DN.dwg
(Varies)
M-DUCT_FLEX_CONNECT1.dwg
(Varies)
Flexible Connection
M-DUCT_UP1.dwg
(Varies)
M-DUCT_UP.dwg
(Varies)
(Varies)
(Varies)
6.22.4.5
Symbol
M-FAN.dwg
(Varies)
M-FAN_PROP.dwg
(Varies)
Page 199
M-PUMP.dwg
(Varies)
Pump Symbol
M-PUMP_END_SUCT.dwg
(Varies)
M-PUMP_HORIZ_SPLIT.dwg
(Varies)
M-UNIT_HEATER.dwg
(Varies)
Unit Heater
PUMP.dwg
(Varies)
Pump
WALL HYDRANT.dwg
(Varies)
Wall-Mounted Hydrant
6.22.4.6
Symbol
HVAC MISCELLANEOUS
Block Name ARROW INDICATES DIRECTION OF FLOW.dwg Layer Name (Varies) Description Direction of Flow
BALL JOINTS.dwg
(Varies)
Ball Joints
(Varies)
(Varies)
Duct Size
(Varies)
M-AIRFLOW_RTN.DWG
(Varies)
Page 200
M-AIRFLOW_SUP.dwg
(Varies)
M-ARROW_1.dwg
(Varies)
M-ARROW_FLOW.dwg
(Varies)
M-CONNECT.dwg
(Varies)
Point of Connection
M-DDC_AI.dwg
(Varies)
M-DDC_AO.dwg
(Varies)
M-DDC_DI.dwg
(Varies)
M-DDC_DO.dwg
(Varies)
M-DDC_SIGNAL_SELECT.dwg
(Varies)
M-DIFF_PRS_SWTCH.dwg
(Varies)
M-DISCONNECT.dwg
(Varies)
Point of Disconnection
M-PIPE_BREAK.dwg
(Varies)
Pipe Break
M-PIPE_RISERBOX.dwg
(Varies)
Riser Box
Page 201
M-PIPE_SECTION.dwg
(Varies)
M-POINT_OF_CONNTECTION.dwg
(Varies)
M-POINT_OF_DISCONNECTION.dwg
(Varies)
Disconnection of Existing
M-PRS_TRNSMTR.dwg
(Varies)
Pressure Transmitter
M-TAG_EQUIP.dwg
(Varies)
Equipment Tag
(Varies)
(Varies)
6.22.4.7
Symbol
HVAC PIPING
Block Name CAPPED PIPE.dwg Layer Name (Varies) Description Capped Pipe
DIRT POCKET.dwg
(Varies)
Dirty Pocket
DRIP ASSEMBLY.dwg
(Varies)
Drip Assembly
(Varies)
M-PIPE_ANCHOR.dwg
(Varies)
Page 202
M-PIPE_STRAINER.dwg
(Varies)
M-PIPE_UNION.dwg
(Varies)
Pipe Union
M-PRESSURE_GAUGE.dwg
(Varies)
M-REDUCER.dwg
(Varies)
Reducer
PIPE ANCHOR.dwg
(Varies)
Pipe Anchor
(Varies)
(Varies)
PIPE GUIDE.dwg
(Varies)
Pipe Guide
(Varies)
(Varies)
(Varies)
(Varies)
UNION.dwg
(Varies)
Union
Page 203
VACUUM BREAKER.dwg
(Varies)
Vacuum Breaker
(Varies)
(Varies)
(Varies)
(Varies)
M-PIPE_DN.dwg
(Varies)
M-PIPE_TAP.dwg
(Varies)
M-PIPE_UP.dwg
(Varies)
PIPE DOWN.dwg
(Varies)
Pipe Down
PIPE UP.dwg
(Varies)
Pipe Up
BALL VALVE.dwg
(Varies)
Ball Valve
LOCK-SHIELD VALVE.dwg
(Varies)
Lock-Shield Valve
(Varies)
Page 204
M-VALVE_AUTO.dwg
(Varies)
Automatic Valve
M-VALVE_AUTO_3WAY.dwg
(Varies)
M-VALVE_BALL.dwg
(Varies)
Balancing Valve
M-VALVE_BUTTERFLY.dwg
(Varies)
Butterfly Valve
M-VALVE_CHECK1.dwg
(Varies)
M-VALVE_CHECK.dwg
(Varies)
M-VALVE_DIAPHRAGM.dwg
(Varies)
M-VALVE_GATE.dwg
(Varies)
Gate Valve
M-VALVE_GLOBE.dwg
(Varies)
Globe Valve
M-VALVE_LUBRICATION.dwg
(Varies)
Plug Valve
M-VALVE_MISC.dwg
(Varies)
EP Control Valve
M-VALVE_MOTORIZED.dwg
(Varies)
Motor-Operated Valve
M-VALVE_PRESSURE_RED.dwg
(Varies)
Pressure-Reducing Valve
Page 205
M-VALVE_SOLONOID.dwg
(Varies)
Solenoid Valve
(Varies)
Pressure-Reducing Valve
RELIEF VALVE.dwg
(Varies)
Relief Valve
6.22.4.8
Symbol
P-ALARM_HORN.dwg
(Varies)
Horn
P-AREA_DRAIN.dwg
(Varies)
Area Drain
P-BELL_STROBE.dwg
(Varies)
Bell Strobe
P-BWV.dwg
(Varies)
P-CLEANOUT.dwg
(Varies)
Cleanout
P-CLEANOUT_DECK_PLATE.dwg
(Varies)
P-CLEANOUT_ELEV.dwg
(Varies)
P-CONNECTION TEE.dwg
(Varies)
Tee Connection
Page 206
P-DOMCONT.dwg
(Varies)
Domestic Cont.
P-DRAIN_FLOOR.dwg
(Varies)
Floor Drain
P-DRAIN_FLOOR_RISER.dwg
(Varies)
P-DRAIN_FUNNEL.dwg
(Varies)
Funnel Drain
P-DRAIN_PTRAP_PRIMER.dwg
(Varies)
P-DRAIN_ROOF_RISER.dwg
(Varies)
Drain Riser
P-DRAIN_STANDPIPE.dwg
(Varies)
Drain Standpipe
P-FA_INLET.dwg
(Varies)
P-FA_INTAKE.dwg
(Varies)
P-FD.dwg
(Varies)
Floor Drain
P-FHC.dwg
(Varies)
P-FHC_PLAN.dwg
(Varies)
P-FHR.dwg
(Varies)
Page 207
P-FHR_PLAN.dwg
(Varies)
P-FIRE_HOSE_CABINET_PLAN.dwg
(Varies)
P-FIRE_HOSE_CABINET_ELEV.dwg
(Varies)
P-FIRE_HOSE_RACK_ELEV.dwg
(Varies)
P-FIRE_HOSE_RACK_PLAN.dwg
(Varies)
P-FLOOR_DRAIN.dwg
(Varies)
P-FLOW_METER.dwg
(Varies)
Flow Meter
P-FLOW_SWITCH.dwg
(Varies)
Flow Switch
P-FLUSH_WALL_MOUNTED_SIAME.dwg
(Varies)
P-FREE_STANDING_SIAME.dwg
(Varies)
P-FRESH_AIR_INTAKE.dwg
(Varies)
P-FRESH_AIR_INTAKE_PLATE.dwg
(Varies)
P-FUNDRAIN.dwg
(Varies)
Drain
Page 208
P-GASBOOSTER.dwg
(Varies)
Gas Booster
P-GAUGE_PRESSURE.dwg
(Varies)
Pressure Gauge
P-GAUGE_THERMOMETER.dwg
(Varies)
Gauge Thermometer
P-GREASE_INTERCEPTOR.dwg
(Varies)
Grease Interceptor
P-GREASEINTCPT.dwg
(Varies)
Grease Interceptor
P-HB.dwg
(Varies)
Hose Bibb
P-HORN.dwg
(Varies)
Horn
P-HOSE_BIB.dwg
(Varies)
Hose Bibb
P-HTRAP.dwg
(Varies)
P-HVC.dwg
(Varies)
P-HWATERHEAT.dwg
(Varies)
P-MISCPMPRISE.dwg
(Varies)
P-PIPE_CAP.dwg
(Varies)
Pipe Cap
Page 209
P-PIPE_TEE.dwg
(Varies)
Pipe Tee
P-PNEUTANK.dwg
(Varies)
Pneumatic Tank
P-PNEUTANKRISER.dwg
(Varies)
P-PREHEATRISER.dwg
(Varies)
Pre-Heater (Riser)
P-RD.dwg
(Varies)
Roof Drain
P-ROOF_MANIFOLD.dwg
(Varies)
Roof Manifold
P-RPZ.dwg
(Varies)
RPZ (Riser)
P-SHOWER.dwg
(Varies)
Shower
P-SIAMESE_FREE_STANDING.dwg
(Varies)
Free-Standing Siamese
P-SIAMESE_WALL_MOUNTED.dwg
(Varies)
P-SINK.dwg
(Varies)
Sink
P-SLAV.dwg
(Varies)
Lavatory (Riser)
P-STANDDRAIN.dwg
(Varies)
Standpipe Drain
Page 210
P-TANK_HOTWATER.dwg
(Varies)
P-TANK_PNEUMATIC.dwg
(Varies)
Pneumatic Tank
P-TANKFLOAT.dwg
(Varies)
Tank Float
P-THERMOMETER.dwg
(Varies)
Thermometer
P-THERMOSTAT.dwg
(Varies)
Thermostat
P-TR.dwg
(Varies)
P-TRPPRM_DRN.dwg
(Varies)
P-VACUUM_BREAKER.dwg
(Varies)
Vacuum Breaker
P-VACUUM_BREAKER_ASSEMBLY.dwg
(Varies)
P-VENTURBINPUMP.dwg
(Varies)
Turbine Pump
P-VFD.dwg
(Varies)
P-VOR.dwg
(Varies)
Variable
P-VRV.dwg
(Varies)
Variable Valve
Page 211
FP-AUTOFPMPCTRL.dwg
(Varies)
FP-FIRE_PUMP_CONTROL_PANEL.dwg
(Varies)
FP-FIRE_PUMP_JOCKEY.dwg
(Varies)
FP-FIRE_PUMP_MAIN_PAD.dwg
(Varies)
FP-FIRE_PUMP_PANEL.dwg
(Varies)
FP-HORIZSPLTCASEPMP.dwg
(Varies)
FP-JOCKEYPMP.dwg
(Varies)
Jockey Pump
FP-JOCKEYPMPCTRL-PA.dwg
(Varies)
FP-MANFIREPMP.dwg
(Varies)
FP-MANFIREPMPCONTROL.dwg
(Varies)
FP-MANUALFRPMP.dwg
(Varies)
Page 212
FP-PUMP_FIRE.dwg
(Varies)
Fire Pump
FP-PUMP_HORIZONTAL.dwg
(Varies)
Horizontal Pump
FP-PUMP_JOCKEY.dwg
(Varies)
P-DOMPUMP.dwg
(Varies)
P-FIRE_PUMP.dwg
(Varies)
Fire Pump
P-FIRE_PUMP_VERT.dwg
(Varies)
P-HWCIRCPMP.dwg
(Varies)
P-PUMP.dwg
(Varies)
Pump (Plan)
P-PUMP_DOMESTIC.dwg
(Varies)
Domestic Pump
P-DUPLEX_EJECTOR_SUMP.dwg
(Varies)
P-PUMP_GAS_BOOSTER.dwg
(Varies)
P-PUMP_HW_CIRC.dwg
(Varies)
P-PUMP_VERT_TURBINE.dwg
(Varies)
Page 213
MEC-CALLOUT.dwg
(Varies)
Mec-SEC-MARK.dwg
(Varies)
Section Mark
PA-BRK-PA.dwg
(Varies)
Break
P-ALARM_VALVE.dwg
(Varies)
Alarm Valve
P-B-671.dwg
(Varies)
P-BKFLWPREVENT.dwg
(Varies)
Backflow Preventer
P-BREAK_DUCT.dwg
(Varies)
Break Line
P-BREAK_DUCT_DOUBLE.dwg
(Varies)
P-BREAK_EQUIP.dwg
(Varies)
Break Line
P-BREAK_EQUIP_DOUBLE.dwg
(Varies)
P-BREAK_LINE2.dwg
(Varies)
Page 214
P-CEN.dwg
(Varies)
Point of Connection
P-CENLSYMB.dwg
(Varies)
P-CENTER_LINE.dwg
(Varies)
P-CUT2.dwg
(Varies)
P-CUT3.dwg
(Varies)
Section Head
P-CUT4.dwg
(Varies)
Section Line
P-CWBD.dwg
(Varies)
Cold Water
P-DELUGE_VALVE.dwg
(Varies)
Deluge Valve
P-DEN.dwg
(Varies)
Point of Disconnect
P-DRY_VALVE.dwg
(Varies)
Dry Valve
P-DUCT_BREAK.dwg
(Varies)
Duct Break
P-METER.dwg
(Varies)
Meter
P-MOTOR_OPERATED_VALVE.dwg
(Varies)
Motor-Operated Valve
Page 215
P-NCV.dwg
(Varies)
Check Valve
P-NTAG.dwg
(Varies)
Tag
P-POINT_OF_CONNECTION.dwg
(Varies)
P-POINT_OF_REMOVAL.dwg
(Varies)
Disconnection of Existing
P-PRE_ACTION_VALVE.dwg
(Varies)
Pre-Action Valve
P-PRESSURE_GAUGE.dwg
(Varies)
Pressure Gauge
P-PTAG.dwg
(Varies)
Plumbing Tag
P-PUMP_DISCHARGE.dwg
(Varies)
Pump Discharge
P-REM.dwg
(Varies)
Removal Marker
P-REMOVAL.dwg
(Varies)
Removal Marker
P-REV.dwg
(Varies)
Revision Tag
P-RISERBOX.dwg
(Varies)
Riser Box
P-SMOKE_DETECTOR_(DUCT).dwg
(Varies)
Page 216
P-SOLENOID_VALVE.dwg
(Varies)
Solenoid Valve
P-SPACE_THERMOSTAT_SENSOR.dwg
(Varies)
P-SPUMP.dwg
(Varies)
Supply Pump
P-SQF.dwg
(Varies)
Area Tag
P-SQUARE_FEET.dwg
(Varies)
Square Feet
P-SY.dwg
(Varies)
Plumbing Tag
P-SYM42.dwg
(Varies)
Tag
P-SYM43.dwg
(Varies)
Tag
P-SYM45.dwg
(Varies)
Tag
P-TAG.dwg
(Varies)
Plumbing Tag
P-TAG_CIRC1.dwg
(Varies)
Circle Tag
P-TAG_CIRC_2.dwg
(Varies)
Riser Tag
P-TAG_HEX.dwg
(Varies)
Hexagonal Tag
Page 217
P-TAG_SQU.dwg
(Varies)
Square Tag
P-TAG_EQUIP.dwg
(Varies)
Equipment Tag
P-VR.dwg
(Varies)
Pressure-Reducing Valve
P-XTAG.dwg
(Varies)
Number Tag
6.22.4.11
Symbol
P-2A.dwg
(Varies)
Double Cleanout
P-14A.dwg
(Varies)
Cleanout
P-CLEANOUT_RISER.dwg
(Varies)
Riser Cleanout
P-CLEANOUT_RISER_CONNECTION.dwg
(Varies)
P-LAVTRP.dwg
(Varies)
P-Trap
P-PIPE.dwg
(Varies)
P-PIPE_BREAK.dwg
(Varies)
Page 218
P-PIPE_BRK.dwg
(Varies)
P-PIPE_CONN.dwg
(Varies)
Pipe Connection
P-PIPE_CONNECTION.dwg
(Varies)
P-PIPE_DN.dwg
(Varies)
Elbow Down
P-PIPE_TEE_DN.dwg
(Varies)
Tee Down
P-PIPE_UP.dwg
(Varies)
Pipe Up
P-TEE_DN.dwg
(Varies)
Tee Down
P-UNDER.dwg
(Varies)
Sub-Surface Piping
6.22.4.12
Symbol
P-SIDEWALL_SPRINKLER.dwg
(Varies)
Sidewall Sprinkler
P-SPKARR.dwg
(Varies)
Sprinkler
P-SPKR.dwg
(Varies)
Sprinkler
Page 219
P-SPRINKLER_SIDEWALL.dwg
(Varies)
Sidewall Sprinkler
P-SPRINKLER_PENDANT.dwg
(Varies)
Pendant Sprinkler
P-SPRINKLER_RIG_ASSEMBLY.dwg
(Varies)
P-SPRINKLER_UPRIGHT.dwg
(Varies)
Upright Sprinkler
P-SPRINKLER_VALVE_FLOW.dwg
(Varies)
P-UPRIGHT_SPRINKLER.dwg
(Varies)
Upright Sprinkler
6.22.4.13
Symbol
P-BALL_VALVE.dwg
(Varies)
P-BUTTERFLY_VALVE.dwg
(Varies)
Butterfly Valve
P-CHECK_VALVE.dwg
(Varies)
Check Valve
P-DOUBLECV.dwg
(Varies)
P-FIRE_HOSE_VALVE.dwg
(Varies)
Page 220
P-GASVALVE.dwg
(Varies)
Gas Valve
P-GATE_VALVE.dwg
(Varies)
Gate Valve
P-GATE_VALVE_VERT.dwg
(Varies)
P-GLOBE_VALVE.dwg
(Varies)
Globe Valve
P-HOLBYVALVE.dwg
(Varies)
Holby Valve
P-LUBRICATION_VALVE.dwg
(Varies)
Lubrication Valve
P-OSY.dwg
(Varies)
OS&Y Valve
P-PRV.dwg
(Varies)
PRV
P-PRV_RISER.dwg
(Varies)
PRV (Riser)
P-PRVSERIES_PARR.dwg
(Varies)
PRV Series
P-P-VALVE_OSY_VERTICAL.dwg
(Varies)
OS&Y Valve
P-RV.dwg
(Varies)
PRV
P-THREE_WAY_AUTO_VALVE.dwg
(Varies)
Page 221
P-VALVE_3_WAY_AUTO.dwg
(Varies)
P-VALVE_MIXING.dwg
(Varies)
Mixing Valve
P-VALVE_ALARM.dwg
(Varies)
Alarm Valve
P-VALVE_AUTOMATIC.dwg
(Varies)
Automatic Valve
P-VALVE_BACK_WATER.dwg
(Varies)
P-VALVE_BALL_DRIP.dwg
(Varies)
P-VALVE_BUTTERFLY.dwg
(Varies)
Butterfly Valve
P-VALVE_CHECK.dwg
(Varies)
Check Valve
P-VALVE_DELUGE.dwg
(Varies)
Deluge Valve
P-VALVE_DOUBLE_GATE_CHECK.dwg
(Varies)
Double Gate & Check Valve Assembly Double Gate Valve with Double Check Valve Assembly
P-VALVE_DOUBLE_GATE_DOUBLE_CHECK.dwg
(Varies)
P-VALVE_DRY.dwg
(Varies)
Dry Valve
P-VALVE_FLOAT.dwg
(Varies)
Float Valve
Page 222
P-VALVE_GAS_CONTROL.dwg
(Varies)
P-VALVE_GATE_VERT.dwg
(Varies)
P-VALVE_GATE.dwg
(Varies)
Gate Valve
P-VALVE_GATE_CHECK.dwg
(Varies)
P-VALVE_GLOBE.dwg
(Varies)
Globe Valve
P-VALVE_LUBRICATION.dwg
(Varies)
Lubrication Valve
P-VALVE_MOTORIZED.dwg
(Varies)
Motor-Operated Valve
P-VALVE_NORMALLY_CLOSED.dwg
(Varies)
Normally-Closed Valve
P-VALVE_OSY.dwg
(Varies)
OS & Y Valve
P-VALVE_PRE-ACTION.dwg
(Varies)
Pre-Action Valve
P-VALVE_PRESSURE_RELEASE.dwg
(Varies)
Pressure-Release Valve
P-VALVE_PRV.dwg
(Varies)
Pressure-Regulating Valve
P-VALVE_SOLENOID.dwg
(Varies)
Solenoid Valve
Page 223
P-VALVE_VACUUM.dwg
(Varies)
Page 224
6.23
Page 225
NEW WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
ANNOTATION S S S S S S S S S S S S S S S S S S S S S S S S S ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO AREA AREA AREA AREA BEAM BEAM BEAM BEAM BEAM BEAM BEAM HIDN TEXT STL_ STL_ CONC TMBR STFN DIMS KEYN KPLN TEXT NOTE NPLT RVSN SYMB SCHD TITL TTBL VPRT MLIN WELD PATT CLIM TEXT 71 71 9 3 3 7 4 71 141 211 7 8 30 71 9 220 3 9 212 3 212 223 4 13 191 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous PHANTOM2 Continuous Continuous Continuous Continuous BORDER2 HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Structural Dimensions Keynote / leader Insertion Layer Key plan Graphic Drafting/ Insertion Layer Structural Annotation (with Leaders) Structural Block Notes, General Notes, Legends etc.. Non-Plotting Layer Revision Tags and Clouds Block Insertion Layer Schedules, Tables Linework and AutoCAD Table Insertion Layer Drawing Titles (Block) Project Contract Border Insertion Layer Viewport (Mview) Creation Layer/ XCLIP Boundaries Match line Graphics Structural Welding Symbology Hatch Demarking Area Contract Limit Line Area Total/Calculations Text Boundary Area Line Structural Beam Obscured By Foreground Objects Text Relating To Beams (Sizes) Structural Steel Beams Structural Beam Stiffener Structural Concrete Beams, Including Precast Structural Timber Beams Structural Beams Structural Bracing Element Obscured By Foreground Element Structural Steel Bracing Structural Timber Bracing Miscellaneous Structural Bracing Structural Bracing Column Analysis (BIM)
AREA
BEAM
BRACE S S S S S S BRCE BRCE BRCE BRCE BRCE COLS ANLY HIDN STL_ WOOD MISC 62 212 15 62 190 7 HIDDEN2 Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes No
COLUMNS
Page 226
DETAIL
EQUIPMENT S S S S S S S S S S S S S S S S EQPM EQPM FRAM FRAM FRAM FRAM FRAM FRAM FLOR FLOR FLOR FLOR FLOR FTNG FTNG FTNG BLOW HIDN ABVE BLOW DECK MCUT MAJR MINR SPAN HIDN STRS STRS HIDN TEXT 3 81 191 190 71 212 190 190 3 1 1 150 192 131 140 1 Continuous Continuous Continuous Continuous Continuous HIDDEN Continuous HIDDEN2 Continuous DASHED2 Continuous Continuous Continuous Continuous Continuous HIDDEN2 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
FRAMING
FLOOR/SLAB
FOOTING
HATCH PATTERNS
Page 227
JOIST
LOAD
MODELING/MASSING
PAVEMENT
PILES
REBAR
Page 228
REINFORCMENT
ROOF
TRUSS
WALL
XREF
6.23.2.2
Discipline
EXISTING WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) S EXST ____ ____ ____ Continuous Yes ANNOTATION S S S S S ANNO ANNO AREA AREA AREA DIMS TEXT PATT TEXT ____ ____ ____ ____ ____ EXST EXST EXST EXST EXST 71 3 252 3 252 Continuous Continuous Continuous Continuous BORDER2 Yes Yes Yes Yes Yes Existing Structural Dimensions Existing Structural Annotation (with Leaders) Existing Hatch Demarking Area Existing Area Total/Calculations Text Existing Boundary Area Line Existing Structural Beam Obscured By Foreground Objects
AREA
Page 229
BRACE S S S S S S S S S S S S S S S S S S S S S S S S S S BRCE BRCE BRCE BRCE BRCE COLS COLS COLS COLS COLS COLS COLS COLS COLS DETL DETL DETL DETL DETL DETL DETL DETL DETL DETL DETL DETL HEVY FINE XFIN TEXT ABLT FRAM STL_ STL_ CONC TMBR MSRY ANLY HIDN TEXT STL_ STL_ TMBR MSRY CONC HIDN STL_ WOOD MISC ____ ____ ____ ____ ____ ____ ____ ____ ____ BSPL ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ MISC ____ ____ ____ EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST 200 252 252 252 200 252 200 3 252 252 252 252 252 200 252 252 252 252 3 252 252 200 252 240 223 240 HIDDEN2 Continuous Continuous Continuous Continuous Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes No Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
COLUMNS
DETAIL
EQUIPMENT S S S S EQPM EQPM FRAM FRAM MAJR MINR TEXT ____ ____ ____ ____ EXST EXST EXST EXST 3 252 252 252 Continuous Continuous Continuous Continuous Yes Yes Yes Yes
FRAMING
Page 230
S S S S S S S S S S S S S S S S S S S S GRID S S S S S S S S S S S S S S S S
FRAM FRAM FRAM FRAM FLOR FLOR FLOR FLOR FLOR FTNG FTNG FTNG PATT PATT PATT PATT PATT PATT PATT PATT GRID GRID GRID JOIS JOIS LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD LOAD
EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST
252 252 252 252 9 8 8 252 252 110 252 110 8 8 252 252 252 252 252 8 140 8 252 8 8 252 252 252 252 252 252 252 252 252 252 252
Continuous HIDDEN Continuous HIDDEN2 Continuous DASHED2 Continuous Continuous Continuous Continuous Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous CENTER CENTER2 Continuous Continuous DASHED2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No No No No No No No No
FLOOR/SLAB ABVE BLOW DECK MCUT ____ ____ ____ ____ ____ BLOW HIDN STL_ CONC TMBR MSRY SCLN FILL GRVL ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ MINR SYMB ____ ____ ____ ABVE LINE AREA CALC DEAD LIVE POIN ROOF SEIS SNOW TEMP WIND ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____
FOOTING
HATCH PATTERNS
JOIST
LOAD
MODELING/MASSING
Page 231
PAVEMENT
PILES
REBAR
REINFORCMENT
ROOF
TRUSS
WALL
Page 232
FUTURE WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) S FUTR ____ ____ ____ Continuous Yes ANNOTATION S S S S S S S S S S S S ANNO ANNO AREA AREA AREA BEAM BEAM BEAM BEAM BEAM BEAM BEAM HIDN TEXT STL_ STL_ CONC TMBR DIMS TEXT PATT TEXT ____ ____ ____ ____ ____ ____ ____ ____ STFN ____ ____ ____ FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR 5 3 5 3 5 5 3 5 5 5 5 5 Continuous Continuous Continuous Continuous BORDER2 HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Future Structural Dimensions Future Structural Annotation (with Leaders) Future Hatch Demarking Area Future Area Total/Calculations Text Future Boundary Area Line Future Structural Beam Obscured By Foreground Objects Future Text Relating To Beams (Sizes) Future Structural Steel Beams Future Structural Beam Stiffener Future Structural Concrete Beams, Including Precast Future Structural Timber Beams Future Structural Beams Future Structural Bracing Element Obscured By Foreground Element Future Structural Steel Bracing Future Structural Timber Bracing Future Miscellaneous Structural Bracing Future Structural Bracing Future Column Analysis (BIM) Future Structural Columns Obscured By Foreground Objects Future Text Relating To Column (Sizes) Future Structural Steel Column or Post Future Baseplate For Structural Steel Column Future Timber Column Future Masonry Column/Pier Future Concrete Column Future Structural Column Future Structural Detail Line (Medium Lineweight) Future Structural Detail Line (Thick Lineweight) Future Structural Detail Line (Thin Lineweight) Future Structural Detail Line (Very Thin Lineweight)
AREA
BEAM
BRACE S S S S S S S S S S S S S S S S S S BRCE BRCE BRCE BRCE BRCE COLS COLS COLS COLS COLS COLS COLS COLS COLS DETL DETL DETL DETL HEVY FINE XFIN ANLY HIDN TEXT STL_ STL_ TMBR MSRY CONC HIDN STL_ WOOD MISC ____ ____ ____ ____ ____ ____ ____ ____ ____ BSPL ____ ____ ____ ____ ____ ____ ____ ____ FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR 5 5 5 5 5 5 5 3 5 5 5 5 5 5 5 5 5 5 HIDDEN2 Continuous Continuous Continuous Continuous Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes No Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
COLUMNS
DETAIL
Page 233
EQUIPMENT S S S S S S S S S S S S S S S S S S S S S S S S GRID S S GRID GRID MINR ____ ____ FUTR FUTR 5 5 CENTER CENTER2 Yes Yes EQPM EQPM FRAM FRAM FRAM FRAM FRAM FRAM FLOR FLOR FLOR FLOR FLOR FTNG FTNG FTNG PATT PATT PATT PATT PATT PATT PATT PATT BLOW HIDN STL_ CONC TMBR MSRY SCLN FILL GRVL ABVE BLOW DECK MCUT MAJR MINR SPAN HIDN STRS STRS TEXT ____ ____ ____ ____ ____ ____ ____ HIDN ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR FUTR 3 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Continuous Continuous Continuous Continuous Continuous HIDDEN Continuous HIDDEN2 Continuous DASHED2 Continuous Continuous Continuous Continuous Continuous HIDDEN2 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
FRAMING
FLOOR/SLAB
FOOTING
HATCH PATTERNS
Page 234
JOIST
LOAD
MODELING/MASSING
PAVEMENT
PILES
REBAR
REINFORCMENT
ROOF
Page 235
TRUSS
WALL
6.23.2.4
Discipline
RELOCATED WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Relocated Layer Properties (Unless Otherwise Noted Below) S RELO ____ ____ ____ 1 Continuous Yes ANNOTATION S S S S S ANNO AREA BEAM COLS DETL TEXT TEXT TEXT TEXT TEXT ____ ____ ____ ____ ____ RELO RELO RELO RELO RELO 3 3 3 3 3 Continuous Continuous Continuous Continuous Continuous Yes Yes No No Yes Relocated Structural Annotation (with Leaders) Relocated Area Total/Calculations Text Relocated Text Relating To Beams (Sizes) Relocated Text Relating To Column (Sizes) Relocated Text Related to Structural Details Relocated Text Associated With Equipment Appearing on Structural Plans, Details, Etc Relocated Structural Grid Relocated Structural Grid - Minor or Partial Grids Relocated Structural Joists Above Relocated Text Associated With Mass Objects Relocated Mass Elements Obscured by Foreground Elements AREA BEAM COLUMNS DETAIL EQUIPMENT S GRID S S S S S GRID GRID JOIS MASS MASS MINR ABVE TEXT HIDN ____ ____ ____ ____ ____ RELO RELO RELO RELO RELO 1 1 1 3 1 CENTER CENTER2 DASHED2 Continuous HIDDEN2 Yes Yes Yes Yes Yes EQPM TEXT ____ RELO 3 Continuous Yes
JOIST MODELING/MASSING
Page 236
PILES REINFORCMENT
6.23.2.5
Discipline
REMOVAL WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Removal Layer Properties (Unless Otherwise Noted Below) S RMVL ____ ____ ____ 15 Continuous Yes ANNOTATION S S S ANNO AREA AREA TEXT TEXT ____ ____ ____ RMVL RMVL RMVL 3 3 15 Continuous Continuous BORDER2 Yes Yes Yes Removal Of Structural Annotation (with Leaders) Removal Of Area Total/Calculations Text Removal Of Boundary Area Line Removal Of Structural Beam Obscured By Foreground Objects Removal Of Structural Bracing Element Obscured By Foreground Element Removal Of Structural Columns Obscured By Foreground Objects Removal Of Text Related to Structural Details Removal Of Text Associated With Equipment Appearing on Structural Plans, Details, Etc Removal Of Floor Framing Elements Obscured By Foreground Objects Removal Of Stairs Framing Components Obscured By Foreground Objects AREA
COLUMNS S S COLS DETL HIDN TEXT ____ ____ RMVL RMVL 15 3 HIDDEN2 Continuous Yes Yes
FRAMING S S FRAM FRAM HIDN STRS ____ HIDN RMVL RMVL 15 15 HIDDEN HIDDEN2 Yes Yes
FLOOR/SLAB
Page 237
FOOTING S GRID S S S S S GRID GRID JOIS MASS MASS MINR ABVE TEXT HIDN ____ ____ ____ ____ ____ RMVL RMVL RMVL RMVL RMVL 15 15 15 3 15 CENTER CENTER2 DASHED2 Continuous HIDDEN2 Yes Yes Yes Yes Yes FTNG HIDN ____ RMVL 15 HIDDEN2 Yes
JOIST MODELING/MASSING
PAVEMENT S S S S S S PAVM PILE RENF RENF ROOF TRUS HIDN HIDN HIDN WMSH ABVE ABVE ____ ____ ____ ____ ____ ____ RMVL RMVL RMVL RMVL RMVL RMVL 15 15 15 15 15 15 HIDDEN2 HIDDEN2 HIDDEN2 WWF DASHED2 DASHED2 Yes Yes Yes Yes Yes Yes
PILES REINFORCMENT
6.23.2.6
Discipline
TEMPORARY WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) S TEMP ____ ____ ____ 46 Continuous Yes ANNOTATION S S S S S ANNO AREA AREA BEAM BEAM HIDN TEXT TEXT TEXT ____ ____ ____ ____ ____ TEMP TEMP TEMP TEMP TEMP 3 3 46 46 3 Continuous Continuous BORDER2 HIDDEN2 Continuous Yes Yes Yes Yes No Temporary Structural Annotation (with Leaders) Temporary Area Total/Calculations Text Temporary Boundary Area Line Temporary Structural Beam Obscured By Foreground Temporary Text Relating To Beams (Sizes) Temporary Structural Bracing Element Obscured By Foreground Element AREA
BEAM
Page 238
FRAMING S S S FRAM FRAM FLOR HIDN STRS ABVE ____ HIDN ____ TEMP TEMP TEMP 46 46 46 HIDDEN HIDDEN2 DASHED2 Yes Yes Yes
FLOOR/SLAB FOOTING S GRID S S S S S GRID GRID JOIS MASS MASS MINR ABVE TEXT HIDN ____ ____ ____ ____ ____ TEMP TEMP TEMP TEMP TEMP 46 46 46 3 46 CENTER CENTER2 DASHED2 Continuous HIDDEN2 Yes Yes Yes Yes Yes FTNG HIDN ____ TEMP 46 HIDDEN2 Yes
JOIST MODELING/MASSING
PAVEMENT S S S S S S PAVM PILE RENF RENF ROOF TRUS HIDN HIDN HIDN WMSH ABVE ABVE ____ ____ ____ ____ ____ ____ TEMP TEMP TEMP TEMP TEMP TEMP 46 46 46 46 46 46 HIDDEN2 HIDDEN2 HIDDEN2 WWF DASHED2 DASHED2 Yes Yes Yes Yes Yes Yes
PILES REINFORCMENT
Page 239
DASHED
Dashed (1x)
DIVIDE
Divide (1x)
Page 240
MISCELLANEOUS
Block Name CALLOUT.dwg Layer Name (Varies) Description Callout Symbol
CLine.dwg
S-ANNO-SYMB
Center Line
Col-Bubble1.dwg
S-GNRL-BUBL
Column Bubble
Col-Bubble2.dwg
S-GNRL-BUBL
Column Bubble
DET-SYMB.dwg
S-ANNO-SYMB
Detail Callout
Legend1.dwg
S-ANNO-SYMB
Legend
N_Arrow.dwg
S-ANNO-SYMB
North Arrow
Plate.dwg
S-ANNO-SYMB
Plate
Rev-Tr.dwg
(Varies)
Revision Tag
Sec1.dwg
S-ANNO-SYMB
Sec2.dwg
S-ANNO-SYMB
Sec3.dwg
S-ANNO-SYMB
Page 241
Sec4.dwg
S-ANNO-SYMB
Sec5.dwg
S-ANNO-SYMB
Sec6.dwg
S-ANNO-SYMB
Sec7.dwg
S-ANNO-SYMB
Sec8.dwg
S-ANNO-SYMB
Sect-Mk_Detail.dwg
S-ANNO-SYMB
Stamp1.dwg
S-ANNO-SYMB
Sub-Title.dwg
S-ANNO-SUBT
Sub-Title
Title.dwg
S-ANNO-TITL
Title
WF.dwg
S-ANNO-SYMB
Page 242
6.24
Page 243
NEW WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
ANNOTATION T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO ANNO DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS MARK MARK MARK MARK MARK MARK MARK MARK MARK MARK HIDN _BLL _DOT NJTP DLLL DLLS DIMS SYMB TEXT ATTN BARR BARR BARR DIMS DLIN FENC GDRL GDRL GDRL TEXT _BOX _WBM THRI _WFB CONC TMBR DIMS MLIN NPLT SYMB TEXT TTLB REVS REVS VPRT 0001 TEXT 212 37 13 7 110 212 110 80 212 7 110 110 110 110 110 37 110 110 110 110 110 212 220 220 220 220 220 220 220 37 220 212 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Hidden BrokenLane NJDOT NJTPK DottedLane4 DottedLane2 Continuous Continuous Continuous Yes Yes Yes No Yes Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Generic Annotation Features Dimensions Match Lines Non Plot Features Generic Symbols Miscellaneous Annotations and Callouts Title Block and Contract Border Information Revision Cloud - PACC Revision Delta and Text in Drawing & Contract Border Viewport Generic Device Features Impact Attenuator Water Filled Barriers Concrete Barriers Timber Barriers Device Dimensions Delineator Fencing Box Beam Guide Rail W Beam Guide Rail Thrie Beam Guide Rail Device Annotations Generic Pavement Markings Pavement Markings Obscured by Other Objects Broken Lane Line - 15-25 NJ DOT - 10-30 NJ Turnpike Lane Line - 30-10 Dotted Lane Line - 2-4 Dotted Lane Line - 2-2 Pavement Marking Dimensions Marking Symbols - Directional Arrows Marking Annotations and Leaders
DEVICES
MARKINGS
Page 244
SIGNALS
SIGNS
PAVING
SITE PLANS
XREFS
Page 245
EXISTING WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Existing Layer Properties (Unless Otherwise Noted Below) T EXST 253 ____ ____ ____ Dashed Yes ANNOTATION T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T ANNO ANNO DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS MARK MARK MARK MARK MARK MARK MARK MARK MARK MARK MARK SGNL SGNL SGNL SGNL SGNL SGNL SGNL SGNL ABVE COND DIMS DIMS JBOX TEXT TEXT HIDN _BLL _DOT NJTP DLLL DLLS DIMS SYMB TEXT WORD ATTN BARR BARR BARR DIMS DLIN FENC GDRL GDRL GDRL TEXT DIMS TEXT ____ ____ ____ ____ _WFB CONC TMBR ____ ____ ____ _BOX _WBM THRI ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ POLE HEAD ____ ____ HEAD EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST EXST 37 212 253 253 253 253 253 37 253 253 253 253 253 212 253 253 253 253 253 253 253 37 253 212 253 253 253 253 37 37 253 212 212 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Hidden BrokenLane NJDOT NJTPK DottedLane4 DottedLane2 Continuous Continuous Continuous Continuous Continuous Continuous Dashed Continuous Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Existing Dimensions Existing Miscellaneous Annotations And Callouts Existing Generic Device Features Existing Impact Attenuator Existing Water Filled Barriers Existing Concrete Barriers Existing Timber Barriers Existing Device Dimensions Existing Delineator Existing Fencing Existing Box Beam Guide Rail Existing W Beam Guide Rail Existing Thrie Beam Guide Rail Existing Device Annotations Existing Generic Pavement Markings Existing Pavement Markings Obscured By Other Objects Existing Broken Lane Line - 15-25 Existing Nj Dot - 10-30 Existing Nj Turnpike Lane Line - 30-10 Existing Dotted Lane Line - 2-4 Existing Dotted Lane Line - 2-2 Existing Pavement Marking Dimensions Existing Marking Symbols - Directional Arrows Existing Marking Annotations And Leaders Existing Marking Words - Stop/Mph/Etc. Existing Generic Signal Features Existing Above Ground Signal Equipment Existing Signal Conduit Existing Signal Pole Location Dimensions Existing Signal Head Dimensions Existing Signal Junction Box Existing Signal Annotations Existing Signal Head Annotations
DEVICES
MARKINGS
SIGNALS
Page 246
PAVING
SITE PLANS
6.24.2.3
Discipline
FUTURE WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Future Layer Properties (Unless Otherwise Noted Below) T FUTR 21 ____ ____ ____ Continuous Yes MARKINGS 21 T MARK HIDN ____ FUTR Hidden Yes 21 T MARK _BLL ____ FUTR BrokenLane Yes 21 T MARK _DOT ____ FUTR NJDOT Yes 21 T MARK NJTP ____ FUTR NJTPK Yes 21 T MARK DLLL ____ FUTR DottedLane4 Yes 21 T MARK DLLS ____ FUTR DottedLane2 Yes
Future Pavement Markings Obscured By Other Objects Future Broken Lane Line - 15-25 Future Nj Dot - 10-30 Future Nj Turnpike Lane Line - 30-10 Future Dotted Lane Line - 2-4 Future Dotted Lane Line - 2-2
Page 247
21 21 21 21
Future Signal Conduit Future Signal Loop Or Video Zone Future Paving Limits Future Fence Lines
6.24.2.4
Discipline
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Maintenance of Traffic Layer Properties (Unless Otherwise Noted Below) T _MPT 21 ____ ____ ____ Continuous Yes ANNOTATION T T T T T T T T T T T T T T T T T T T T T T T T T ANNO ANNO DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS DVCS MARK MARK MARK MARK MARK MARK MARK MARK MARK MARK MARK HIDN _BLL _DOT NJTP DLLL DLLS DIMS SYMB TEXT WORD ATTN BARR BARR BARR DIMS DLIN FENC GDRL GDRL GDRL TEXT DIMS TEXT ____ ____ ____ ____ _WFB CONC TMBR ____ ____ ____ _BOX _WBM THRI ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT _MPT 37 212 110 110 110 110 110 37 110 110 110 110 110 212 220 220 220 220 220 220 220 37 220 212 220 Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Hidden BrokenLane NJDOT NJTPK DottedLane4 DottedLane2 Continuous Continuous Continuous Continuous Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Maintenance Of Traffic (MPT) Patterns Dimensions MPT Patterns Miscellaneous Annotations And Callouts MPT Patterns Generic Device Features MPT Patterns Impact Attenuator MPT Patterns Water Filled Barriers MPT Patterns Concrete Barriers MPT Patterns Timber Barriers MPT Patterns Device Dimensions MPT Patterns Delineator MPT Patterns Fencing MPT Patterns Box Beam Guide Rail MPT Patterns W Beam Guide Rail MPT Patterns Thrie Beam Guide Rail MPT Patterns Device Annotations MPT Patterns Generic Pavement Markings MPT Patterns Pavement Markings Obscured By Other MPT Patterns Broken Lane Line - 15-25 MPT Patterns Nj Dot - 10-30 MPT Patterns Nj Turnpike Lane Line - 30-10 MPT Patterns Dotted Lane Line - 2-4 MPT Patterns Dotted Lane Line - 2-2 MPT Patterns Pavement Marking Dimensions MPT Patterns Marking Symbols - Directional Arrows MPT Patterns Marking Annotations And Leaders MPT Patterns Marking Words - Stop/Mph/Etc.
DEVICES
MARKINGS
SIGNALS
Page 248
SIGNS
PAVING
SITE PLANS
Page 249
RELOCATED WORK
Linetype Phase Color
Plots
Desc
Description
Default Relocated Layer Properties (Unless Otherwise Noted Below) T RELO ____ ____ ____ 21 Continuous Yes ANNOTATION MARKINGS T T T T T T T T T T MARK MARK MARK MARK MARK MARK SGNL SGNL PAVE SITE HIDN _BLL _DOT NJTP DLLL DLLS COND LOOP LIMT FNCE ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ RELO RELO RELO RELO RELO RELO RELO RELO RELO RELO 21 21 21 21 21 21 21 21 21 21 Hidden BrokenLane NJDOT NJTPK DottedLane4 DottedLane2 Dashed Dashed Dashed FENCE Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Relocated Pavement Markings Obscured By Other Object Relocated Broken Lane Line - 15-25 Relocated Nj Dot - 10-30 Relocated Nj Turnpike Lane Line - 30-10 Relocated Dotted Lane Line - 2-4 Relocated Dotted Lane Line - 2-2 Relocated Signal Conduit Relocated Signal Loop Or Video Zone Relocated Paving Limits Relocated Fence Lines
SIGNALS
6.24.2.6
Discipline
REMOVAL WORK
Linetype
Phase
Minor
Major
Color
Plots
Desc
Description
Default Removal Layer Properties (Unless Otherwise Noted Below) T RMVL ____ ____ ____ 21 Continuous Yes ANNOTATION T ANNO T ANNO DEVICES T DVCS T DVCS T DVCS T DVCS T DVCS T DVCS T DVCS T DVCS T DVCS T DVCS T DVCS DIMS TEXT ____ ____ ____ ____ _WFB CONC TMBR ____ ____ ____ _BOX _WBM THRI RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL RMVL 37 212 21 21 21 21 21 37 21 21 21 21 21 Continuous Continuous Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Continuous Hidden2 Hidden2 Hidden2 Hidden2 Hidden2 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Removal Of Dimensions Removal Of Miscellaneous Annotations And Callouts Removal Of Generic Device Features Removal Of Impact Attenuator Removal Of Water Filled Barriers Removal Of Concrete Barriers Removal Of Timber Barriers Removal Of Device Dimensions Removal Of Delineator Removal Of Fencing Removal Of Box Beam Guide Rail Removal Of W Beam Guide Rail Removal Of Thrie Beam Guide Rail
ATTN BARR BARR BARR DIMS DLIN FENC GDRL GDRL GDRL
Page 250
T MARK T MARK T MARK T MARK T MARK T MARK T MARK T MARK T MARK SIGNALS T SGNL T SGNL T SGNL T SGNL T SGNL T SGNL T SGNL T SGNL SIGNS T SIGN T SIGN T SIGN T SIGN PAVING T PAVE T PAVE T PAVE T PAVE T PAVE T PAVE T PAVE T PAVE T PAVE T PAVE T PAVE SITE PLANS T SITE T SITE T SITE T SITE T SITE T SITE T SITE T SITE T SITE T SITE
ASPH BRDR CONC CURB CURB DIMS GRAV JBAR JNTS LIMT
Page 251
6.24.2.7
Discipline Minor Major
TEMPORARY WORK
Linetype Phase Color Plots Desc
Description
Default Temporary Layer Properties (Unless Otherwise Noted Below) T TEMP ____ ____ ____ 21 Continuous Yes MARKINGS T T T T T T T T T T MARK MARK MARK MARK MARK MARK SGNL SGNL PAVE SITE HIDN _BLL _DOT NJTP DLLL DLLS COND LOOP LIMT FNCE ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP TEMP 21 21 21 21 21 21 21 21 21 21 Hidden BrokenLane NJDOT NJTPK DottedLane4 DottedLane2 Dashed Dashed Dashed FENCE Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Temporary Pavement Markings Obscured By Other Objects Temporary Broken Lane Line - 15-25 Temporary NJ Dot - 10-30 Temporary NJ Turnpike Lane Line - 30-10 Temporary Dotted Lane Line - 2-4 Temporary Dotted Lane Line - 2-2 Temporary Signal Conduit Temporary Signal Loop Or Video Zone Temporary Paving Limits Temporary Fence Lines
SIGNALS
Page 252
DASHED
Dashed (1x)
DIVIDE
Divide (1x)
Page 253
EXISTING
Block Name CANTILEVER SIGN STRUCTURE WITH CHANGEABLE MESSAGE PANELEXISTING.dwg CANTILEVER SIGN STRUCTURE WITH FIXED MESSAGE-EXISTING.dwg Layer Name (Varies) Description Cantilever Sign Structure with Changeable Message Panel Cantilever Sign Structure with Fixed Message
(Varies)
CRASH CUSHION ATTENUATOREXISTING.dwg CURBED TRAFFIC GUIDE SYSTEM POSTS WITH BASE PLATE (WITHOUT C)-EXISTING.dwg DIRECTION OF TRAFFIC (PERMANENT CONDITIONS)-EXISTING.dwg DOUBLE POST MOUNTED SIGN WITH CHANGEABLE MESSAGE PANELEXISTING.dwg EXISTING SIGN PANEL TO BE MODIFIED-EXISTING.dwg
(Varies)
(Varies)
Curbed Traffic Guide System Posts with Base Plate (Without C) Direction of Traffic (Permanent Conditions) Double Post-Mounted Sign with Changeable Message Panel Existing Sign Panel to be Modified
(Varies)
(Varies)
(Varies)
FENCE MOUNTED SIGN WITH FIXED MESSAGE PANEL-EXISTING.dwg GANTRY SIGN STRUCTURE WITH CHANGEABLE MESSAGE PANELSEXISTING.dwg GANTRY SIGN STRUCTURE WITH FIXED MESSAGE PANELSEXISTING.dwg PAVEMENT MARKING ARROW SYMBOL (TYPE A-E)-EXISTING.dwg
(Varies)
Fence-Mounted Sign With Fixed Message Panel Gantry Sign Structure with Changeable Message Panels Gantry Sign Structure with Fixed Message Panels
(Varies)
(Varies)
(Varies)
(Varies)
Page 254
(Varies)
Pedestrian Push-Button Standard with Identifier Pole-Mounted Back-toBack Signs with Fixed Message Panels Pole-Mounted Right Angle Signs with Fixed Message Panels Pole-Mounted Sign with Fixed Message Panel Post-Mounted Back-toBack Signs with Fixed Message Panels Post-Mounted Right-Angle Signs with Fixed Message Panels Post-Mounted Sign with Fixed Message Panel
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
Sand-Barrel Array
(Varies)
(Varies)
(Varies)
Page 255
(Varies)
(Varies)
TRAFFIC POST TOP SIDE OF POLE MOUNTED SIGNAL-EXISTING.dwg TRAFFIC SIGNAL SPAN WIRE INSTALLATION WITH SPAN LENGTHEXISTING.dwg TRAFFIC SIGNAL STANDARD WITH IDENTIFIER-EXISTING.dwg
(Varies)
Traffic Post Top Side of Pole-Mounted Signal Traffic Signal Span Wire Installation with Span Length Traffic Signal Standard with Identifier
(Varies)
(Varies)
(Varies)
(Varies)
6.24.4.2
Symbol
GUIDE
Block Name D9-5.dwg Layer Name (Varies) Description Reserved Handicapped Parking
E5-1.dwg
(Varies)
E5-1L.dwg
(Varies)
E5-1Lx.dwg
(Varies)
E5-1R.dwg
(Varies)
Page 256
E5-1Rx.dwg
(Varies)
G20-1f.dwg
(Varies)
G20-2.DWG
(Varies)
M1-1.DWG
(Varies)
M1-4-3..DWG
(Varies)
M1-4.DWG
(Varies)
M1-5.DWG
(Varies)
M2-1.DWG
(Varies)
Juncture Sign
M3-1.DWG
(Varies)
North Sign
M3-2.DWG
(Varies)
East Sign
M3-3.DWG
(Varies)
South Sign
M3-4.DWG
(Varies)
West Sign
M4-1.DWG
(Varies)
Alternate Sign
Page 257
M4-1a.dwg
(Varies)
ALT Sign
M4-2.DWG
(Varies)
By-Pass Sign
M4-3.dwg
(Varies)
Business Sign
M4-4.dwg
(Varies)
Truck Sign
M4-5.dwg
(Varies)
To Sign
M4-6.dwg
(Varies)
End Sign
M4-7.dwg
(Varies)
Temporary Sign
M4-8.dwg
(Varies)
Detour Sign
M4-8a.dwg
(Varies)
M4-9l.dwg
(Varies)
Detour Left
M4-9lx.dwg
(Varies)
M4-9r.dwg
(Varies)
Detour Right
M4-9rx.dwg
(Varies)
Page 258
M4-9x.dwg
(Varies)
Detour Ahead
M4-10l.dwg
(Varies)
M4-10r.dwg
(Varies)
M5-1L.dwg
(Varies)
M5-1R.dwg
(Varies)
M5-2L.dwg
(Varies)
M5-2R.dwg
(Varies)
M6-1l.dwg
(Varies)
Turn Left
M6-1r.dwg
(Varies)
Turn Right
M6-2l.dwg
(Varies)
Merge Left
M6-2r.dwg
(Varies)
Merge Right
M6-3.dwg
(Varies)
Continue Straight
M6-4.dwg
(Varies)
Page 259
M6-5l.dwg
(Varies)
M6-5r.dwg
(Varies)
M6-6L.dwg
(Varies)
M6-6R.dwg
(Varies)
M6-7L.dwg
(Varies)
M6-7R.dwg
(Varies)
6.24.4.3
Symbol
MARKER
Block Name ERM-1818YY.dwg Layer Name (Varies) Description Diamond Reflector Sign Bright Color
OM-3L.DWG
(Varies)
Rectangular Reflector Sign Diagonals, Up to Left Rectangular Reflective Sign Diagonals, Up to Right Rectangular Reflective Sign Blank
OM-3R.DWG
(Varies)
OM-612-3.DWG
(Varies)
OM-612.DWG
(Varies)
OM-1818Y.DWG
(Varies)
Page 260
OM-1818YB.dwg
(Varies)
6.24.4.4
Symbol
MISCELLANEOUS
Block Name LIGHT.DWG Layer Name (Varies) Description Single Light Symbol
LIGHTS.DWG
(Varies)
S-3.DWG
(Varies)
S-4.DWG
(Varies)
6.24.4.5
Symbol
PROPOSED
Block Name BACK-UP VEHICLE WITH FLASHING LIGHTS ONLY-PROPOSED.dwg BACK-UP VEHICLE WITH IMPACT ATTENUATOR AND FASUPROPOSED.dwg BACK-UP VEHICLE WITH IMPACT ATTENUATOR WITHOUT FASUPROPOSED.dwg BREAKAWAY BARRICADES (TYPE III) WITH ATTACHED SIGNPROPOSED.dwg BREAKAWAY BARRICADES (TYPE III)PROPOSED.dwg CANTILEVER SIGN STRUCTURE WITH CHANGEABLE MESSAGE PANELPROPOSED.dwg Layer Name (Varies) Description Back-Up Vehicle with Flashing Lights Only Back-Up Vehicle with Impact Attenuator and FASU Back-Up Vehicle with Impact Attenuator without FASU Breakaway Barricades (Type III), with Attached Sign Breakaway Barricades (Type III) Cantilever Sign Structure with Changeable Message Panel
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
Page 261
(Varies)
CONTRACTORS VEHICLEPROPOSED.dwg
(Varies)
Contractors Vehicle
(Varies)
CURBED TRAFFIC GUIDE SYSTEM POSTS WITH BASE PLATE (WITHOUT C)-PROPOSED.dwg DIRECTION OF DETOUR (TEMPORARY TRAFFIC FLOW)-PROPOSED.dwg
(Varies)
Curbed Traffic Guide System Posts with Base Plate (Without C) Direction of Detour (Temporary Traffic Flow)
(Varies)
(Varies)
DIRECTION OF TRAFFIC (PERMANENT CONDITIONS)-PROPOSED.dwg DOUBLE POST MOUNTED SIGN WITH CHANGEABLE MESSAGE PANELPROPOSED.dwg FENCE MOUNTED SIGN WITH FIXED MESSAGE PANEL-PROPOSED.dwg
(Varies)
Direction of Traffic (Permanent Conditions) Double Post-Mounted Sign with Changeable Message Panel Fence-Mounted Sign with Fixed Message Panel
(Varies)
(Varies)
FLAGGER LOCATION-PROPOSED.dwg
(Varies)
Flagger Location
FLASHING ARROW SIGN UNIT (FASU) CAUTION MODE INDICATIONPROPOSED.dwg FLASHING ARROW SIGN UNIT (FASU) DOUBLE ARROW INDICATIONPROPOSED.dwg FLASHING ARROW SIGN UNIT (FASU) LEFT ARROW INDICATIONPROPOSED.dwg
(Varies)
Flashing Arrow Sign Unit (FASU) Caution Mode Indication Flashing Arrow Sign Unit (FASU) Double-Arrow Indication Flashing Arrow Sign Unit (FASU) Left Arrow Indication
(Varies)
(Varies)
Page 262
(Varies)
(Varies)
(Varies)
(Varies)
PAVEMENT MARKING LINEPROPOSED.dwg PEDESTRIAN PUSH BUTTON STANDARD WITH IDENTIFIERPROPOSED.dwg PEDESTRIAN SIGNAL HEAD WITH IDENTIFIER-PROPOSED.dwg PLASTIC DELINEATOR DRUMS WITH ATTACHED WARNING LIGHTSPROPOSED.dwg PLASTIC DELINEATOR DRUMSPROPOSED.dwg POLE MOUNTED BACK TO BACK SIGNS WITH FIXED MESSAGE PANELS-PROPOSED.dwg POLE MOUNTED RIGHT ANGLE SIGNS WITH FIXED MESSAGE PANELSPROPOSED.dwg POLE MOUNTED SIGN WITH FIXED MESSAGE PANEL-PROPOSED.dwg
(Varies)
(Varies)
(Varies)
Pedestrian Signal Head with Identifier Plastic Delineator Drums with Attached Warning Lights
(Varies)
(Varies)
(Varies)
Pole-Mounted Back-toBack Signs with Fixed Message Panels Pole Mounted Right-Angle Signs with Fixed Message Panels Pole-Mounted Sign with Fixed Message Panel
(Varies)
(Varies)
(Varies)
Page 263
(Varies)
(Varies)
Sand-Barrel Array
(Varies)
Sand-Filled Barriers
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
tra-CALLOUT.dwg
(Varies)
Callout Symbol
tra-DET-SYMB.dwg
(Varies)
Detail Symbol
TRAFFIC CONE-PROPOSED.dwg
(Varies)
Traffic Cone
Page 264
TRAFFIC CONES-PROPOSED.dwg
(Varies)
Traffic Cones
(Varies)
(Varies)
TRAFFIC POST TOP SIDE OF POLE MOUNTED SIGNAL-PROPOSED.dwg TRAFFIC SIGNAL SPAN WIRE INSTALLATION WITH SPAN LENGTHPROPOSED.dwg TRAFFIC SIGNAL STANDARD WITH IDENTIFIER-PROPOSED.dwg
(Varies)
Traffic Post Top Side of Pole-Mounted Signal Traffic Signal Span Wire Installation with Span Length Traffic Signal Standard with Identifier
(Varies)
(Varies)
TRAFFIC SIGNAL STANDARD WITH MAST ARM LENGTH-PROPOSED.dwg TRAILER MOUNTED FLASHING ARROW SIGN UNIT (FASU)PROPOSED.dwg TRAILER MOUNTED VARIABLE MESSAGE SIGN UNIT (VMSU)PROPOSED.dwg
(Varies)
(Varies)
Trailer-Mounted Flashing Arrow Sign Unit (FASU) Trailer-Mounted Flashing Variable Message Sign Unit (VMSU)
(Varies)
tra-SEC-MARK.dwg
(Varies)
Section Mark
(Varies)
(Varies)
(Varies)
Page 265
(Varies)
WORK AREA-PROPOSED.dwg
(Varies)
Work Area
6.24.4.6
Symbol
REGULATORY
Block Name E11-1.DWG Layer Name (Varies) Description Exit Only Sign
KR7-1016a.dwg
(Varies)
No Parking Sing
R1-1.DWG
(Varies)
Stop Sign
R1-2.DWG
(Varies)
Yield Sign
R2-1.DWG
(Varies)
R2-5a.dwg
(Varies)
R2-5b.dwg
(Varies)
R2-5c.dwg
(Varies)
R3-1.DWG
(Varies)
R3-2.DWG
(Varies)
Page 266
R3-3.DWG
(Varies)
No Turns Sign
R3-4.DWG
(Varies)
R3-5.DWG
(Varies)
R3-6.DWG
(Varies)
R3-7.DWG
(Varies)
Left Lane Must Turn Left Sign Two-Lane Sign for Left Turns and Proceeding Straight
R3-8.DWG
(Varies)
R3-21.DWG
(Varies)
U-Turn Sign
R3-23.DWG
(Varies)
R3-24.DWG
(Varies)
R3-26.DWG
(Varies)
R3-27.DWG
(Varies)
R3-28.DWG
(Varies)
R3-32.DWG
(Varies)
Page 267
R3-33.DWG
(Varies)
R3-34.DWG
(Varies)
R3-35.DWG
(Varies)
R4-1.DWG
(Varies)
R4-2.DWG
(Varies)
R4-5.DWG
(Varies)
R4-7.DWG
(Varies)
R4-8.DWG
(Varies)
R4-9.DWG
(Varies)
Stay in Lane
R5-1.DWG
(Varies)
R5-1a.dwg
(Varies)
R5-2.DWG
(Varies)
Trucks Prohibited
R5-6.DWG
(Varies)
Bicycles Prohibited
Page 268
R5-7.DWG
(Varies)
R5-8.DWG
(Varies)
Sidewalk Closed Sign Sidewalk Closed Alternative Crossing Location (Either Left or Right) Sidewalk Closed Alternative Crossing Location (Left) Sidewalk Closed Alternative Crossing Location (Right) Horizontal One Way to Left Sign
R5-9.DWG
(Varies)
R5-9a.dwg
(Varies)
R5-9b.dwg
(Varies)
R6-1L.DWG
(Varies)
R6-1R.DWG
(Varies)
R6-2L.DWG
(Varies)
R6-2R.DWG
(Varies)
R7-4.dwg
(Varies)
R7-4L.dwg
(Varies)
R7-4R.dwg
(Varies)
R7-201a.dwg
(Varies)
Page 269
R8-3a.dwg
(Varies)
R8-8.dwg
(Varies)
R9-3a.dwg
(Varies)
R11-2.DWG
(Varies)
R11-3.DWG
(Varies)
R11-4.DWG
(Varies)
R12-2.DWG
(Varies)
R15-1.DWG
(Varies)
Railroad Crossing
YIELD TO PEDESTRIAN.dwg
(Varies)
6.24.4.7
Symbol
REMOVAL
Block Name CANTILEVER SIGN STRUCTURE WITH CHANGEABLE MESSAGE PANELREMOVAL.dwg CANTILEVER SIGN STRUCTURE WITH FIXED MESSAGE-REMOVAL.dwg Layer Name (Varies) Description Cantilever Sign Structure with Changeable Message Panel Cantilever Sign Structure with Fixed Message
(Varies)
(Varies)
Page 270
(Varies)
(Varies)
(Varies)
FENCE MOUNTED SIGN WITH FIXED MESSAGE PANEL-REMOVAL.dwg GANTRY SIGN STRUCTURE WITH CHANGEABLE MESSAGE PANELSREMOVAL.dwg GANTRY SIGN STRUCTURE WITH FIXED MESSAGE PANELSREMOVAL.dwg PAVEMENT MARKING ARROW SYMBOL (TYPE A-E)-REMOVAL.dwg
(Varies)
Flagger Location
(Varies)
Gantry Sign Structure with Changeable Message Panels Gantry Sign Structure with Fixed Message Panels
(Varies)
(Varies)
PAVEMENT MARKING LINEREMOVAL.dwg PEDESTRIAN PUSH BUTTON STANDARD WITH IDENTIFIERREMOVAL.dwg PEDESTRIAN SIGNAL HEAD WITH IDENTIFIER-REMOVAL.dwg POLE MOUNTED BACK TO BACK SIGNS WITH FIXED MESSAGE PANELS-REMOVAL.dwg POLE MOUNTED RIGHT ANGLE SIGNS WITH FIXED MESSAGE PANELSREMOVAL.dwg POLE MOUNTED SIGN WITH FIXED MESSAGE PANEL-REMOVAL.dwg
(Varies)
(Varies)
(Varies)
Pedestrian Signal Head with Identifier Pole-Mounted Back-toBack Signs with Fixed Message Panels Pole Mounted Right-Angle Signs with Fixed Message Panels Pole-Mounted Sign with Fixed Message Panel
(Varies)
(Varies)
(Varies)
Page 271
(Varies)
(Varies)
(Varies)
Sand-Barrel Array
(Varies)
(Varies)
(Varies)
(Varies)
(Varies)
TRAFFIC POST TOP SIDE OF POLE MOUNTED SIGNAL-REMOVAL.dwg TRAFFIC SIGNAL SPAN WIRE INSTALLATION WITH SPAN LENGTHREMOVAL.dwg TRAFFIC SIGNAL STANDARD WITH IDENTIFIER-REMOVAL.dwg
(Varies)
Traffic Post Top Side of Pole-Mounted Signal Traffic Signal Span Wire Installation with Span Length Traffic Signal Standard with Identifier
(Varies)
(Varies)
(Varies)
(Varies)
Page 272
(Varies)
6.24.4.8
Symbol
WARNING
Block Name KW21-4.DWG Layer Name (Varies) Description Work Area Sign with Input Field
SupPlate.dwg
(Varies)
W1-1L.DWG
(Varies)
W1-1R.DWG
(Varies)
W1-2L.DWG
(Varies)
W1-2R.DWG
(Varies)
W1-3L.DWG
(Varies)
W1-3R.DWG
(Varies)
W1-4aL.dwg
(Varies)
W1-4aR.dwg
(Varies)
W1-4bL.dwg
(Varies)
Page 273
W1-4bR.dwg
(Varies)
W1-4cL.dwg
(Varies)
W1-4cR.dwg
(Varies)
W1-5L.DWG
(Varies)
W1-5R.DWG
(Varies)
W1-6L.DWG
(Varies)
W1-6R.DWG
(Varies)
W1-7.DWG
(Varies)
W1-8L.DWG
(Varies)
W1-8R.DWG
(Varies)
W2-1.DWG
(Varies)
W2-2L.DWG
(Varies)
W2-2R.DWG
(Varies)
Page 274
W2-3L.DWG
(Varies)
W2-3R.DWG
(Varies)
W2-4.DWG
(Varies)
Three-Way Intersection
W2-5.DWG
(Varies)
W2-7-NY.DWG
(Varies)
W2-8-NY.DWG
(Varies)
W2-10-NY.DWG
(Varies)
W2-11-NY.DWG
(Varies)
W2-14-NY.DWG
(Varies)
Traffic Circle
W3-1.DWG
(Varies)
W3-1a.dwg
(Varies)
Stop Ahead
W3-2.DWG
(Varies)
W3-2a.dwg
(Varies)
Yield Ahead
Page 275
W3-3.DWG
(Varies)
W3-4-NY.DWG
(Varies)
W3-11-NY.DWG
(Varies)
Road Narrows
W3-14-NY.DWG
(Varies)
W4-1L.DWG
(Varies)
W4-1R.DWG
(Varies)
W4-2L.DWG
(Varies)
W4-2R.DWG
(Varies)
W4-3L.DWG
(Varies)
W4-3R.DWG
(Varies)
W5-1.DWG
(Varies)
W5-2.DWG
(Varies)
W5-3.DWG
(Varies)
Page 276
W5-4.DWG
(Varies)
W6-1.DWG
(Varies)
Divergence of Lanes
W6-2.DWG
(Varies)
Convergence of Lanes
W6-3.DWG
(Varies)
Two-Way Traffic
W7-1.DWG
(Varies)
Decline
W7-1b.dwg
(Varies)
W8-1.DWG
(Varies)
Bump Sign
W8-2.DWG
(Varies)
Dip Sign
W8-3.DWG
(Varies)
W8-4.DWG
(Varies)
W8-5.dwg
(Varies)
W8-6.DWG
(Varies)
W8-7.DWG
(Varies)
Page 277
W8-9.DWG
(Varies)
W8-9a.dwg
(Varies)
Uneven Pavement
W9-1L.DWG
(Varies)
W9-1R.DWG
(Varies)
W9-2L.DWG
(Varies)
W9-2R.DWG
(Varies)
W9-3.DWG
(Varies)
W10-1.DWG
(Varies)
Railroad Crossing
W10-2.DWG
(Varies)
Railroad Crossing & Adjacent 4-Way Intersection Railroad Crossing & Adjacent 3-Way Intersection Railroad Crossing & Side Street Intersection
W10-3.DWG
(Varies)
W10-4.DWG
(Varies)
W11-1.DWG
(Varies)
Bicycle Area
W11-2.DWG
(Varies)
Pedestrian Crossing
Page 278
W11-3.DWG
(Varies)
Deer Area
W11-7.DWG
(Varies)
W11-9.DWG
(Varies)
Handicapped Zone
W11A-2.DWG
(Varies)
W12-1.DWG
(Varies)
Road Divides
W12-2.DWG
(Varies)
W13-1.DWG
(Varies)
W13-2.DWG
(Varies)
W13-3.DWG
(Varies)
W14-1.DWG
(Varies)
W14-2.DWG
(Varies)
No Outlet Sign
W14-3.DWG
(Varies)
W20-1.DWG
(Varies)
Page 279
W20-2.DWG
(Varies)
W20-3.DWG
(Varies)
W20-4.DWG
(Varies)
W20-5aL.dwg
(Varies)
W20-5aR.dwg
(Varies)
W20-5L.DWG
(Varies)
W20-5R.DWG
(Varies)
W20-7a.dwg
(Varies)
Flagger Ahead
W21-1.DWG
(Varies)
Workers Sign
W21-1a.dwg
(Varies)
Workers Ahead
W21-4.DWG
(Varies)
W21-5.DWG
(Varies)
W21-5a.dwg
(Varies)
Page 280
W21-5b.dwg
(Varies)
Page 281
6.25
The letter D under the Layer Name is to be replaced by the specific Disciplines Discipline Code.
Page 282
N_ARROW1.dwg
D-ANNO-SYMB
North Arrow
N_ARROW2.dwg
D-ANNO-SYMB
North Arrow
The letter D under the Layer Name is to be replaced by the specific Disciplines Discipline Code.
Page 283
6.26
Page 284
Page 285
Page 286
Page 287
Page 288
Page 289
Page 290
Page 291
6.27
6.27.1 PID SEARCH The PID Search can be used to find additional information pertaining to a project such as the Contract Number, PID, Title, Charge Code(s) and Facility name by searching based on either the PID, Contract Number or Project Title.
To use this form: 1. Pick the appropriate category that you want to search for, the options are PID, Contract Number or Title. 2. Type in the appropriate search information based on the category you are searching in. 3. Select Submit Once the query is finished a list of all projects matching your criteria will be displayed with the following information Contract Number, PID, Title, Charge Code and Facility Name.
Page 292
To use this form: 1. Requested By: Either the LEA or the Task Leader may request for an Archival. 2. Email: It is mandatory that you supply a valid email address to receive a confirmation of your request. This email will also be used to notify you as soon as the request has been processed. 3. Discipline: Pick which Discipline you belong to. 4. Upload to Livelink: Check this box if you would like files uploaded to a project website on Livelink. 5. Stage: Enter what stage the project is in, I, II, III or IV. Last Updated: March 2010 Page 293
Page 294
Page 295
Page 296
Page 297
Page 298
Page 299
Page 300
Page 301
Page 302
6.28
Page 303
6.29
6.29.1 2010 Q1
Page 304