Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 1C3S BTS

Station Name:Bukhel
2.4 1C3S BTS Item Description Model No. Unit Qty. as per BOQ Qty. Used Status Qty. Left Remarks

Date of Installation : 2064/1/05

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 2.4.2 2.4.2.1 2.4.2.2 2.4.3 2.4.3.1 2.4.3.2 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 Wireless Channel Board(64) Wireless Channel Board(96) Wireless Channel Board(128) Site Alarm Board Communication Control Board E1 interface card for the BTS-lot Channel Data Service Unit(2E1) BDS mother Board(4E1) Radio subsystem-lot Radio Frequency Interface Board TRx Module TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V)

CHM32 CHM64 CHM96 CHM128 SAM CCM BTS-CDSU(2) BBDS(4) RFIM TxRxCIQUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece

0 1 0 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 CSMB in this board=128 channels 1 Installed 0 2 CSMB in this board=64 channels

Item

Description

Model No. PSMD BPOWER FDM TCM GPSTM

2.4.4.4 Power Distribution Board 2.4.4.5 PPM Mother Board 2.4.5 TFS Subsystem-lot 2.4.5.1 Frequency Distribution Board 2.4.5.2 Time Control Board 2.4.5.3 GPS Receiver 2.4.5.4 GPS Antenna,Feeder Cable BTS Power module lot 2.4.6 2.4.6.1 High Power Amplifier BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software 2.4.7.2 BTS Functional Software

Qty. as per BOQ Piece 1 Piece 1 Unit Piece Piece Set Set Set 1 1 1 1 3

Qty. Used 1 1 1 1 1 1 3

Status Installed Installed Installed Installed Installed Installed BTS Rack

Qty. Left 0 0 0 0 0 0 0

Remarks

HPA

Set Per Channel Set

1 192

1 192 Installed in CHM module

0 0

BOQ of BTS Installation Material 2.4.8 Installation Material-lot 2.4.8.1 S222 Installation Material(including Rack) 2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m

Set Piece Piece Piece

1 2 2 1

1 0 2 1

Installed Not Installed Installed Installed

0 2 0 0

2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 2.4.9.2 >=17dBi Antenna Feeder MOBILE set set 3 6 3 6 Installed Installed 0 0

7.4.4 7.4.4.1 7.4.4.2 7.4.4.3 7.4.4.4 Rectifier module

Power Supply System for 1C3S BTS ZXD2400 50A(V3.0) Set ZXDU500-CSU GFM-600 Set Set Set 8 1 1 2 8 1 1 2 Installed Installed Installed Installed 0 0 0 0

Centralized supervision unit Rectifier cabinet (include AC/DC distribution) Storage battery(inlcuding battery rack)

Item 7.4.4.5 7.5.2

Description

Model No.

Unit

Qty. as per BOQ 1 1

Qty. Used 1 0

Status Installed Not Installed

Qty. Left 0 1

Remarks

Three phase,classs-B type Lightning-arrestor with ZXDL01 T010 Set box Single Phase A/C for 2C3S BTS sites (5 KW) RCM20B/A4LC20B / Set

Central store, chauni

Installatiopn Material 15. BOQ of Installatiopn Material 1 AMS 2 Cable runway 3 Cable Ladder 4 5 DDF(BTS) Pole Tower 18 m

30cm*20m, Iron 30cm*6m, Aluminium

Set Set Set Set Set

1 1 1 0 1

1 0 1 0 1

installed Not Installed Installed

0 1 0

1 set = 3 pcs Central store, chauni Iron made ladder used

installed

17. BOQ of Grounding Materials 17.2 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 Grounding Materials BTS sites ZGD-II-1(30) set 1 1 installed 0 Central store, chauni

16 square mm BVV cable 16 square mm bareconnecting terminal

Installation Materials for ZXDU500 BVV-16*3 +10*1 m DT-1-16 BVR-25-98/0.58 DT-1-25 BVR-50-360/0.50 DT-1-50 BVR-50-360/0.50 BVR-50-360/0.51 DT-1-50 set m set m set set m m set

20 5 5 2 10 4 1 10 10 8

20 5 5 2 10 4 1 10 10 8

installed installed installed installed installed installed installed installed installed installed

25 square mm BVR cable (yellow & Green) 25 square mm bare connecting terminal 50sq.mm BVR cable (Red) 50 square mm bare connecting terminal Earthing bus bar 50 square mm BVR cable (red) 50 square mm BVR cable (Blue) 50 square mm bare connecting terminal

0 0 0 0 0 0 0 0 0

25 sq.mm *3.5, 35 sq.mm used

70 square mm BVR cable used 70 square mm bare connecting terminal used

Installed By: Narayan Prasad Kusi Engineer, DWT, NT

Checked By:

Approved By:

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 2C3S BTS
Station Name: Mahadevtar
1. 2C3S BTS Item Description Model No. Unit Qty. as per Qty. Used Status Qty. Left

Date of Installation : 2066-05-10

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 2.4.2 2.4.2.1 Wireless Channel Board(64) Wireless Channel Board(96) Wireless Channel Board(128) Site Alarm Board Communication Control Board E1 interface card for the BTS-lot Channel Data Service Unit(2E1)

CHM32 CHM64 CHM96 CHM128 SAM CCM BTSCDSU(2) BBDS(4) RFIM TxRxCI QUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER FDM TCM GPSTM

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Set Set

0 2 0 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6 Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed BTS Rack 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 Installed 0

2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 TRx Module 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 2.4.5 2.4.5.1 2.4.5.2 2.4.5.3 2.4.5.4 2.4.6 2.4.6.1 TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board TFS Subsystem-lot Frequency Distribution Board Time Control Board GPS Receiver GPS Antenna,Feeder Cable BTS Power module lot High Power Amplifier

HPA

BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software

Set

2.4.7.2 BTS Functional Software

Per Channel

Set

384

384

Installed in CHM module

BOQ of BTS Installation Material 2.4.8 Installation Material-lot S222 Installation Material(including 2.4.8.1 Rack) Digital Trunk Cable(BTS2.4.8.2 BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

Set Piece Piece Piece

1 4 2 1

1 4 2 1

Installed Installed Installed Installed

0 0 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 Antenna (65 degree), Gain >=17dBi 2.4.9.2 Antenna Feeder MOBILE set set 3 1 3 1 Installed Installed 0 0

BOQ of Installatiopn Material 1 Internal Ladder 2 3 4 5 4m Pole segment at top of 5m Tripod Tower Feeder window Modem Rack HDSL Modem( Realtime)

Set Set Set Set Pair

1 1 1 1 1

1 1 1 1 1

Installed Installed Installed Installed Installed

0 0 0 0 0

Power Supply System for 2C3S BTS 1 2 Storage Battery(inlcuding battery rack) MCB 63A GFM-600 Set Set 2 1 2 1 Installed Installed 0 0

1 2 3 4

Earthing Cable 35 mm2 Earthing Cable 16 mm2 Coaxial Cable 7/8 inch Load Cable (Blue and black)

Other Installation Materials Set 1 Set Set Set 1 1 1

1 1 1 1

Installed Installed Installed Installed

0 0 0 0

Note:

The BTS was installed in the GSM Station. The existing battery backup was of 2bank 400AH with ZXDU68 rectifier. For operati of CDMA BTS with common battery backup, the existing 2 bank 400AH was dismantled and 2 banks of 600AH battery was insta by DWT. The dismantled 400AH battery has been stored in the Chauni store.

Installed By:

Narayan Prasad Kusi Engineer, DWT, NT

: 2066-05-10
Remarks

2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

For mounting CDMA Antennas

For Modem 1 Pair=2set [1 set Installed at Mahadevtar station and 1 set at Gongabu Exchange]

Installed in Rectifier for CDMA BTS

H with ZXDU68 rectifier. For operation nd 2 banks of 600AH battery was installed

Checked By:

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 2C3S BTS
Station Name: Kamalnetra (Bhimsengola)
1. 2C3S BTS Item Description Model No. Unit Qty. as per Qty. Used Status Qty. Left Remarks

Date of Installation : 2066-

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 Wireless Channel Board(64) 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 2.4.2 2.4.2.1 Wireless Channel Board(96) Wireless Channel Board(128) Site Alarm Board Communication Control Board E1 interface card for the BTS-lot Channel Data Service Unit(2E1)

CHM32 CHM64 CHM96 CHM128 SAM CCM BTSCDSU(2) BBDS(4) RFIM TxRxCI QUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER FDM TCM GPSTM

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Set Set

0 0 2 0 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6

0 2 0 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6 Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed BTS Rack

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 CSMB in this board=96 channels

2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 TRx Module 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 2.4.5 2.4.5.1 2.4.5.2 2.4.5.3 2.4.5.4 2.4.6 2.4.6.1 TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board TFS Subsystem-lot Frequency Distribution Board Time Control Board GPS Receiver GPS Antenna,Feeder Cable BTS Power module lot High Power Amplifier

HPA

BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software 2.4.7.2 BTS Functional Software Per Channel

Set Set

1 384

1 384 Installed in CHM module

0 0

BOQ of BTS Installation Material 2.4.8 Installation Material-lot S222 Installation Material(including 2.4.8.1 Rack) Digital Trunk Cable(BTS2.4.8.2 BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

Set Piece Piece Piece

1 4 2 1

1 4 2 1

Installed Installed Installed Installed

0 0 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0

2.4.9.2 Antenna Feeder

set

Installed

BOQ of Installatiopn Material 1 Internal Ladder 2 3 4 Feeder Hole Modem Rack HDSL Modem

Set Set Set Pair

1 1 1 1

1 1 1 1

Installed Installed Installed Installed

0 0 0 0 For Modem 1 Pair=2set [1 set Installed at Kamalnetra station and 1 set at Chabahil Exchange]

Power Supply System for 2C3S BTS 1 MCB 63A Set 1 1 Installed 0 Installed in GSM Rectifier ZXDU68 for CDMA BTS

1 2 3 4

Earthing Cable 35 mm2 Earthing Cable 16 mm2 Coaxial Cable 7/8 inch Load Cable (Blue and black)

Other Installation Materials Set 1 Set Set Set 1 1 1

1 1 1 1

Installed Installed Installed Installed

0 0 0 0

E1 Information: Central office2-14-6 to chabahil 2-5-19 cabinet no:7; Primary Pair =26/72 Note: The power system with 800AH*2 banks battery and ZXDU68 rectifier of GSM Station is shared for operating this BTS station. Checked By:

Installed By: Narayan Prasad Kusi Engineer, DWT, NT

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 2C3S BTS
Station Name: Mangalbazar
1. 2C3S BTS Item Description Model No. Unit Qty. as per Qty. Used Status Qty. Left Remarks

Date of Installation : 2066-

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 2.4.2 2.4.2.1 Wireless Channel Board(64) Wireless Channel Board(96) Wireless Channel Board(128) Site Alarm Board Communication Control Board E1 interface card for the BTS-lot Channel Data Service Unit(2E1)

CHM32 CHM64 CHM96 CHM128 SAM CCM BTSCDSU(2) BBDS(4) RFIM TxRxCI QUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER FDM TCM GPSTM

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Set Set

0 2 0 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6 Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed BTS Rack 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 CSMB in this board=128 channels 2 Installed 0 2 CSMB in this board=64 channels

2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 TRx Module 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 2.4.5 2.4.5.1 2.4.5.2 2.4.5.3 2.4.5.4 2.4.6 2.4.6.1 TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board TFS Subsystem-lot Frequency Distribution Board Time Control Board GPS Receiver GPS Antenna,Feeder Cable BTS Power module lot High Power Amplifier

HPA

BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software 2.4.7.2 BTS Functional Software Per Channel

Set Set

1 384

1 384 Installed in CHM module

0 0

BOQ of BTS Installation Material 2.4.8 Installation Material-lot S222 Installation Material(including 2.4.8.1 Rack) Digital Trunk Cable(BTS2.4.8.2 BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

Set Piece Piece Piece

1 4 2 1

1 4 2 1

Installed Installed Installed Installed

0 0 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

2.4.9.1 Antenna (65 degree), Gain >=17dBi 2.4.9.2 Antenna Feeder

MOBILE

set set

3 1

3 1

Installed Installed

0 0

1 2 3 4

Earthing Cable 35 mm2 Earthing Cable 16 mm2 Coaxial Cable 7/8 inch Load Cable (Blue and black) Micro BTS Racks(2 Racks in 2C1O BTS) 48V LPU Omni Antennas GPS Antenna

Other Installation Materials Set 1 Set Set Set Dismantled Materials 1 1 1

1 1 1 1

Installed Installed Installed Installed

0 0 0 0

1 2 3 4 Note:

Set Set Set Set

2 2 1 1

2 2 1 1

Dismantled Dismantled Dismantled Dismantled

Stored at the Chauni office Stored at the Chauni office 1set = 2 omni Antennas Stored at the Chauni office

Before, CDMA 2C1O BTS was in operation in this station. Due to traffic overlaod and Coverage problem, the whole set of CDMA 2C1O Micro BTS has been dismantled and this 2C3S BTS was installed.

Installed By: Narayan Prasad Kusi Engineer, DWT, NT

Checked By:

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 2C3S BTS
Station Name: Hyumat
1. 2C3S BTS Item Description Model No. Unit Qty. as per Qty. Used Status Qty. Left

Date of Installation : 2066-

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 2.4.2 2.4.2.1 Wireless Channel Board(64) Wireless Channel Board(96) Wireless Channel Board(128) Site Alarm Board Communication Control Board E1 interface card for the BTS-lot Channel Data Service Unit(2E1)

CHM32 CHM64 CHM96 CHM128 SAM CCM BTSCDSU(2) BBDS(4) RFIM TxRxCI QUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER FDM TCM GPSTM

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Set Set

0 2 0 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6 Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed BTS Rack 2 Installed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 TRx Module 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 2.4.5 2.4.5.1 2.4.5.2 2.4.5.3 2.4.5.4 2.4.6 2.4.6.1 TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board TFS Subsystem-lot Frequency Distribution Board Time Control Board GPS Receiver GPS Antenna,Feeder Cable BTS Power module lot High Power Amplifier

HPA

BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software

Set

2.4.7.2 BTS Functional Software

Per Channel

Set

384

384

Installed in CHM module

BOQ of BTS Installation Material 2.4.8 Installation Material-lot S222 Installation Material(including 2.4.8.1 Rack) Digital Trunk Cable(BTS2.4.8.2 BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

Set Piece Piece Piece

1 4 2 1

1 4 2 1

Installed Installed Installed Installed

0 0 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 Antenna (65 degree), Gain >=17dBi 2.4.9.2 Antenna Feeder MOBILE set set 3 1 3 1 Installed Installed 0 0

BOQ of Installatiopn Material 1 Internal Ladder 2 3 4 Feeder Hole Modem Rack HDSL Modem

Set Set Set Pair

1 1 1 1

1 1 1 1

Installed Installed Installed Installed

0 0 0 0

Power Supply System for 2C3S BTS 1 MCB 63A Set 1 1 Installed 0

1 2 3 4

Earthing Cable 35 mm2 Earthing Cable 16 mm2 Coaxial Cable 7/8 inch Load Cable (Blue and black)

Other Installation Materials Set 1 Set Set Set 1 1 1

1 1 1 1

Installed Installed Installed Installed

0 0 0 0

E1 Information: Central office2-14-6 to chabahil 2-5-19 cabinet no:7; Primary Pair =26/72 Note: The power system with 800AH*2 banks battery and ZXDU68 rectifier of GSM Station is shared for operating this BTS station.

Installed By: Narayan Prasad Kusi

Engineer, DWT, NT

Remarks

2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

For Modem 1 Pair=2set [1 set Installed at Kamalnetra station and 1 set at Chabahil Exchange]

Installed in GSM Rectifier ZXDU68 for CDMA BTS

ared for operating this BTS station. Checked By:

Installation Report for 2C3S BTS


Station Name:
1. 2C3S BTS Item Description Model No. Unit Qty. as per BOQ Qty. Used Status Qty. Left Remarks

Date of Installation : 2010-12-13

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 Wireless Channel Board(64) 2.4.1.3 Wireless Channel Board(96) 2.4.1.4 Wireless Channel Board(128) 2.4.1.5 Site Alarm Board 2.4.1.6 Communication Control Board 2.4.2 E1 interface card for the BTS-lot 2.4.2.1 Channel Data Service Unit(2E1) 2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 TRx Module 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 2.4.5 2.4.5.1 2.4.5.2 2.4.5.3 2.4.5.4 2.4.6 2.4.6.1 TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board TFS Subsystem-lot Frequency Distribution Board Time Control Board GPS Receiver GPS Antenna,Feeder Cable BTS Power module lot High Power Amplifier

CHM32 CHM64 CHM96 CHM128 SAM CCM BTS-CDSU(2) BBDS(4) RFIM TxRxCIQUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER FDM TCM GPSTM

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Set Set

0 2 0 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6

2 2 1 2 1 1 2 6 1 6 0 0 1 2 5 2 1 1 1 1 1 1 6

Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed BTS Rack

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

HPA

BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software 2.4.7.2 BTS Functional Software Per Channel

Set Set

1 384

1 384 Installed in CHM module

0 0

BOQ of BTS Installation Material 2.4.8 Installation Material-lot 2.4.8.1 S222 Installation Material(including Rack) 2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m

Set Piece Piece Piece

1 4 2 1

1 4 2 1

Installed Installed Installed Installed

0 0 0 0

BOQ of Antenna & Feeder 2.4.9 Anttena System -lot 65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 2.4.9.2 Antenna Feeder set 1 Other Installation Materials 1 Earthing Cable 35 mm2 Set 1 2 3 4 Earthing Cable 16 mm2 Coaxial Cable 7/8 inch Load Cable (Blue and black) Set Set Set 1 1 1

3 1 1 1 1 1

Installed Installed Installed Installed Installed Installed

0 0

0 0 0 0

Installed By:

Checked By:

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 1C3S BTS
Station Name:Patan Dhoka
1. 1C3S BTS Item Description Model No. Unit Qty. as per Qty. Used Status Qty. Left Remarks

Date of Installation : 2066/08/01

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 2.4.2 2.4.2.1 Wireless Channel Board(64) Wireless Channel Board(96) Wireless Channel Board(128) Site Alarm Board Communication Control Board E1 interface card for the BTS-lot Channel Data Service Unit(2E1)

CHM32 CHM64 CHM96 CHM128 SAM CCM BTSCDSU(2) BBDS(4) RFIM TxRxCI QUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER FDM TCM GPSTM

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Set

0 1 0 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1 1 1 1 1 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1 1 1 1 1 Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 CSMB in this board=128 channels 1 Installed 0 2 CSMB in this board=64 channels

2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 TRx Module 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 2.4.5 2.4.5.1 2.4.5.2 2.4.5.3 2.4.5.4 2.4.6 TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board TFS Subsystem-lot Frequency Distribution Board Time Control Board GPS Receiver GPS Antenna,Feeder Cable BTS Power module lot

Item

Description

Model No. HPA

Unit Set

2.4.6.1 High Power Amplifier BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software 2.4.7.2 BTS Functional Software

Qty. as per 3

Qty. Status Qty. Left Used 3 BTS Rack 0

Remarks

Set Per Channel Set

1 192

1 192 Installed in CHM module

0 0

BOQ of BTS Installation Material 2.4.8 Installation Material-lot S222 Installation Material(including 2.4.8.1 Rack) Digital Trunk Cable(BTS2.4.8.2 BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

Set Piece Piece Piece

1 2 2 1

1 2 2 1

Installed Installed Installed Installed

0 0 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 Antenna (65 degree), Gain >=17dBi 2.4.9.2 Antenna Feeder MOBILE set set 3 1 3 1 Installed Installed 0 0

BOQ of Installatiopn Material 1 Internal Ladder 30cm*12m 2 Cable Ladder 30cm*6m, Iron 3 DDF(BTS) 4 Tripod Pole Tower 18 m with 3 set AMS 5 AMS 6 7 8 9 10 11 12 13 AC PDB MCB [32A] MCB [16A] MCB [10A] MCB [6] E1 Cable ( 8 core) 3-Phase power cable( Transmission line to Meter box) 100m

Set Set Set Set Set Set Set Set Set Set Set Set Set

1 1 2 1 1 2 4 2 2 2 1 1 1

1 1 2 1 1 2 4 2 2 2 1 1 1

Installed Installed Installed installed installed Installed Installed Installed Installed Installed Installed Installed Installed

0 0 0 0 0 0 0 0 0 0 0 0 0

Iron made ladder used For BTS room and ONU room 1 set = 3 pcs 1 For BTS Room and 1 for Main Supply Installed at two AC PDBs, for power distribution from main supply and for power distn for BTS and Internal wiring

3-Phase Power Cable( Meter box to BTS room) 0m 4 30m

Item

Description

Model No.

Unit

Qty. as per

Qty. Used

Status

Qty. Left

Remarks

Power Supply System for 1C3S BTS 1 2 3 4 5 6 Rectifier module Centralized supervision unit ZXD2400 Set 50A(V3.0) ZXDU500Set CSU Set Set Set Set 8 1 1 2 1 1 8 1 1 2 1 0 Installed Installed Installed Installed Installed Not 0 0 0 0 0 1 Central store, chauni

Rectifier cabinet (include AC/DC distribution) Storage battery(inlcuding battery rack) GFM-600 Three phase,classs-B type LightningZXDL01 arrestor with box T010 Single Phase A/C for 2C3S BTS sites (5 RCM20B/A4

1 2 3 4 5 6 7 8 9 10

Installation Materials for ZXDU500 BVV-16*3 16 square mm BVV cable m 20 +10*1 16 square mm bareconnecting terminal DT-1-16 set 5 25 square mm BVR cable (yellow & BVR-25m 5 Green) 98/0.58 25 square mm bare connecting terminal DT-1-25 set 2 BVR-5050sq.mm BVR cable (Red) m 10 360/0.50 50 square mm bare connecting terminal DT-1-50 set 4 Earthing bus bar 50 square mm BVR cable (red) 50 square mm BVR cable (Blue) 50 square mm bare connecting terminal BVR-50360/0.50 BVR-50360/0.51 DT-1-50 set m m set 1 10 10 8

20 5 5 2 10 4 1 10 10 8

installed installed installed installed installed installed installed installed installed installed

0 0 0 0

25 sq.mm *3.5,

35 sq.mm used

0 0 0 0 0
70 square mm BVR cable used 70 square mm bare connecting terminal used

Installed By: Narayan Prasad Kusi Engineer, DWT, NT

Checked By:

Approved By:

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Upgradation Report (Upgrade from 1C3S BTS to 2C3S BTS) Station Name:Patandhoka
Date of Upgradation : 2066/08/03
Qty. as Qty. per Status Used BOQ Installe d Installe d Installe d Installe d Installe d Installe d BTS Rack Installe d Installe d in CHM module

Item

Description

Model No. Unit

Qty. Left

Remarks

BTS Hardware Wireless Channel 1 Board(64) Wireless Channel 2 Board(128) Radio Frequency 3 Interface Board 4 5 6 7 8 TRx Module Radio Front End (Duplexer) Radio Power Board(+27V) High Power Amplifier BTS System Software

CHM64

Piece

1 1 1 3 3 2 3 1

1 1 1 3 3 2 3 1

0 0 0 0 0 0 0 0

CHM128 Piece RFIM TRX RFEDUP PPM HPA Piece Set Piece Piece Set Set Per Channel

2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

BTS Functional Software

Set

192

192

Installed By: Narayan Prasad Kusi Engineer, DWT, NT

Checked By:

Approved By:

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Upgradation Report


Station Name:Pardi (Upgrade from 1C3S BTS to 2C3S BTS)

Date of Upgradation : 2064/3/23


Item Description Model No. Unit Qty. as per BOQ Qty. Used Status Qty. Left Remarks BTS Hardware 1 Wireless Channel Board(64) Wireless Channel Board(128) Radio Frequency Interface Board TRx Module Radio Front End (Duplexer) Radio Power Board(+27V) High Power Amplifier BTS System Software BTS Functional Software CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

2 3 4 5 6 7 8 9

CHM128 RFIM TRX RFE-DUP PPM HPA

Piece Piece Set Piece Piece Set Set Set

1 1 3 3 2 3 1 192

1 1 3 3 2 3 1 192

Installed Installed Installed Installed Installed BTS Rack Installed in CHM module

0 0 0 0 0 0 0 0

Per Channel

Station Name:Rithepani(Upgrade from 1C3S BTS to 2C3S BTS)

Date of Upgradation : 2064/3/23


Item Description Model No. Unit Qty. as per BOQ Qty. Used Status Qty. Left Remarks BTS Hardware 1 Wireless Channel Board(64) Wireless Channel Board(128) Radio Frequency Interface Board TRx Module Radio Front End (Duplexer) Radio Power Board(+27V) High Power Amplifier BTS System Software BTS Functional Software CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

2 3 4 5 6 7 8 9

CHM128 RFIM TRX RFE-DUP PPM HPA

Piece Piece Set Piece Piece Set Set Set

1 1 3 3 2 3 1 192

1 1 3 3 2 3 1 192

Installed Installed Installed Installed Installed BTS Rack Installed in CHM module

0 0 0 0 0 0 0 0

Per Channel

Hardware Completion and BOQ Reference for BTS-Sanga


2.4 1C3S BTS Sanga Item Description Model No. Unit Qty. Site Qty. Qty. left Remarks

BOQ of BTS Hardware


2.4.1 2.4.1.1 2.4.1.2 2.4.1.3 2.4.1.4 2.4.1.5 2.4.1.6 Sub-Total 2.4.2 2.4.2.1 2.4.2.2 Sub-Total 2.4.3 2.4.3.1 Radio subsystem-lot
Radio Frequency Interface Board

Base band Sub system-lot


Wireless Channel Board(32)

CHM32 CHM64 CHM96 CHM128 SAM CCM

Piece

Wireless Channel Board(64)

Piece

BTS rack

Wireless Channel Board(96)

Piece

Wireless Channel Board(128)

Piece

BTS rack

Site Alarm Board Communication Control Board

Piece Piece

1 2

BTS rack BTS rack

1 2

0 0

E1 interface card for the BTS-lot


Channel Data Service Unit(4E1) BDS mother Board(4E1)

BTSPiece CDSU(4) BBDS(4)


Piece

1 1

BTS rack BTS rack

1 1

0 0

RFIM TxRx CIQUF SRFC M BTRX RFEDUP RFE-DIV RFECOM BRFE

Piece

BTS rack

2.4.3.2

TRx Module

Set

BTS rack

2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 Sub-Total 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3

TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board

Piece Piece Piece Piece Piece

1 3 3 0 1

BTS rack BTS rack BTS rack

1 3 3 0

0 0 0 0 0

BTS rack

power supply Subsystem-lot


Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V)

PSMB PPM PSMC

Piece Piece Piece

2 3 2

BTS rack BTS rack BTS rack

2 3 2

0 0 0

2.4.4.4 2.4.4.5 Sub-Total 2.4.5 2.4.5.1 2.4.5.2 2.4.5.3 2.4.5.4 Sub-Total 2.4.6 2.4.6.1 Sub-Total

Power Distribution Board PPM Mother Board

PSMD BPOWE R

Piece Piece

1 1

BTS rack BTS rack

1 1

0 0

TFS Subsystem-lot
Frequency Distribution Board Time Control Board GPS Receiver

FDM TCM GPSTM

Piece Piece Set

1 1 1

BTS rack BTS rack BTS rack

1 1 1

0 0 0 Refer to Annex for GPS Feeder Cable

GPS Antenna,Feeder Cable

Set

Installed

BTS Power module lot


High Power Amplifier

HPA

Set

BTS rack

BTS Hardware Total

BOQ of BTS Software


2.4.7 2.4.7.1 2.4.7.2 BTS Software-lot BTS System Software BTS Functional Software Set 1 192 Installed in CHM 1 192 0 0

Per Channel

Set

Sub-Total

BOQ of BTS Installation Material


2.4.8 2.4.8.1 Installation Material-lot S111 Installation Material(including Rack) Digital Trunk Cable(BTSBSC)75/20m Set 1 Installed 1 0 Refer to Annex for DT Cable Refer to Annex for DC Cable Refer to Annex for GND Cable

2.4.8.2

Piece

2 Installed

2.4.8.3

48V Power Cable BV-25/15m

Piece

2 Installed

2.4.8.4 Sub-Total

GND Power Cable BV-35/15m

Piece

1 Installed

BOQ of Antenna & Feeder


2.4.9 Anttena System -lot

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 >=17dBi MOBILE set 3 Installed 3 0 Refer to Annex for Feeder Cable

2.4.9.2

Antenna Feeder

set

Installed

Sub-Total Discount 1C3S BTS Total

erence for BTS-Sanga

Invoice

Package S/N(SN)

Remarks

Box No.

2 CSMB in ZTE20041213NP-1 CD0401888961(3) this board=64 channels

895

ZTE20041213NP-1 CD0401888961(3)

4 CSMB in this board=128 channels

895

ZTE20041213NP-1 CD0401888961(8) ZTE20041213NP-1 CD0401888961(11)

895 895

ZTE20041213NP-1 CD0401888961(9) ZTE20041213NP-1 CD0401888961(17)

895 895

ZTE20041213NP-1 CD0401888961(10)

895

ZTE20041213NP-1 CD0401888960(8)

ZTE20041213NP-1 CD0401888961(16) ZTE20041213NP-1 CD0401888960(5) ZTE20041213NP-1 CD0401888960(6)

895 921 921

ZTE20041213NP-1 CD0401888961(15)

895

ZTE20041213NP-1 CD0401888961(12) ZTE20041213NP-1 CD0401888960(9) ZTE20041213NP-1 CD0401888960(12)

895 921 921

ZTE20041213NP-1 CD0401888960(13) ZTE20041213NP-1 CD0401888961(14)

921 895

ZTE20041213NP-1 CD0401888961(6) ZTE20041213NP-1 CD0401888961(5) ZTE20041213NP-1 CD0401888961(7)

895 895 895

ZTE20041213NP-1 CD0401934170(3)

645

ZTE20041213NP-1 CD0401888960(7)

921

ZTE20041220NP-1 CD0401934170(18) ZTE20041220NP-1 CD0401934170(18)

645 645

ZTE20041213NP-1

CD0401888961(1)

895

ZTE20041213NP-1

CD0401954834

968

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 1C3S BTS
Station Name: Mangalapur
2.4 1C3S BTS Item Description Model No. Unit Qty. as per BOQ Qty. Used Status Qty. Left Remarks

Date of Installation : 2062/07/07 (2005 Oct. 24)

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 Wireless Channel Board(64) 2.4.1.3 Wireless Channel Board(96) 2.4.1.4 Wireless Channel Board(128) 2.4.1.5 Site Alarm Board 2.4.1.6 Communication Control Board 2.4.2 E1 interface card for the BTS-lot 2.4.2.1 Channel Data Service Unit(4E1) 2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 TRx Module TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board

CHM32 CHM64 CHM96 CHM128 SAM CCM BTS-CDSU(4) BBDS(4) RFIM TxRxCIQUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece

0 1 0 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1

1 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1

Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

Mangalapur

Page: 32 of 40

Item

Description

Model No.

Unit

Qty. as per BOQ 1 1 1 1 3

Qty. Used 1 1 1 1 3

Status

Qty. Left 0 0 0 0 0

Remarks

2.4.5 TFS Subsystem-lot 2.4.5.1 Frequency Distribution Board 2.4.5.2 Time Control Board 2.4.5.3 GPS Receiver 2.4.5.4 GPS Antenna,Feeder Cable BTS Power module lot 2.4.6 2.4.6.1 High Power Amplifier BOQ of BTS Software 2.4.7 BTS Software-lot 2.4.7.1 BTS System Software 2.4.7.2 BTS Functional Software

FDM TCM GPSTM

Piece Piece Set Set Set

Installed Installed Installed Installed BTS Rack

HPA

Set Per Channel Set

1 192

1 192 Installed in CHM module

0 0

BOQ of BTS Installation Material 2.4.8 Installation Material-lot 2.4.8.1 S222 Installation Material(including Rack) 2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

Set Piece Piece Piece

1 2 2 1

1 2 2 1

Installed Installed Installed Installed

0 0 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 2.4.9.2 7.4.4 7.4.4.1 7.4.4.2 7.4.4.3 7.4.4.4 7.4.4.5 Rectifier module Centralized supervision unit Rectifier cabinet (include AC/DC distribution) Storage battery(inlcuding battery rack) Three phase,classs-B type Lightning-arrestor with box GFM-600 ZXDL01 T010 >=17dBi Antenna Feeder Power Supply System for 1C3S BTS ZXD2400 50A(V3.0) ZXDU500-CSU Set Set Set Set Set 8 1 1 2 1 Installed By WDR, Bhairahawa MOBILE set set 3 6 3 6 Installed Installed 0 0

Mangalapur

Page: 33 of 40

Installed By WDR, Bhairahawa Qty. as per BOQ 1

Item 7.5.2

Description Single Phase A/C for 2C3S BTS sites (5 KW)

Model No. RCM20B/A4LC20B / Hilltake

Unit Set

Qty. Used

Status

Qty. Left

Remarks

Installatiopn Material 15. BOQ of Installatiopn Material 1 AMS 2 3 4 Cable runway Cable Ladder DDF(BTS) 30cm*20m, Iron 30cm*10m, Aluminium

Set Set Set Set

1 1 1 1

1 0 1 1

installed Not Installed Installed Installed

0 1 0 0

1 set = 3 pcs WDR Store , Bhairahawa Iron made ladder used

17. BOQ of Grounding Materials 17.2 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 16 square mm BVV cable 16 square mm bareconnecting terminal 25 square mm BVR cable (yellow & Green) 25 square mm bare connecting terminal 50sq.mm BVR cable (Red) 50 square mm bare connecting terminal Earthing bus bar 50 square mm BVR cable (red) 50 square mm BVR cable (Blue) 50 square mm bare connecting terminal Installed By: Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa

Installation Materials for ZXDU500 BVV-16*3 +10*1 DT-1-16 BVR-25-98/0.58 DT-1-25 BVR-50-360/0.50 DT-1-50 BVR-50-360/0.50 BVR-50-360/0.51 DT-1-50 m set m set m set set m m set 20 5 5 2 10 4 1 10 10 8

Installed By WDR, Bhairahawa

Surendra K. Karmacharya Engineer, DWT, NT

Mangalapur

Page: 34 of 40

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 1C3S BTS
Station Name: Chamere
2.4 1C3S BTS Item Description Model No. Unit Qty. as per BOQ Qty. Used Status Qty. Left Remarks

Date of Installation : 2063/11/17

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 Wireless Channel Board(64) 2.4.1.3 Wireless Channel Board(96) 2.4.1.4 Wireless Channel Board(128) 2.4.1.5 Site Alarm Board 2.4.1.6 Communication Control Board 2.4.2 E1 interface card for the BTS-lot 2.4.2.1 Channel Data Service Unit(2E1) 2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 2.4.5 TRx Module TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board Power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board TFS Subsystem-lot

CHM32 CHM64 CHM96 CHM128 SAM CCM BTS-CDSU(2) BBDS(4) RFIM TxRxCIQUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece

0 1 0 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1

1 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1

Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

Chamere

Page:35/40

Item

Description

Model No. FDM TCM GPSTM

2.4.5.1 Frequency Distribution Board 2.4.5.2 Time Control Board 2.4.5.3 GPS Receiver 2.4.5.4 GPS Antenna,Feeder Cable BTS Power module lot 2.4.6 2.4.6.1 High Power Amplifier BOQ of BTS Installation Material 2.4.8 Installation Material-lot 2.4.8.1 S222 Installation Material(including Rack) 2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

Qty. as per BOQ Piece 1 Piece 1 Set 1 Set 1 Unit Set 3

Qty. Used 1 1 1 1 3

Status Installed Installed Installed Installed BTS Rack

Qty. Left 0 0 0 0 0

Remarks

HPA

Set Piece Piece Piece

1 2 2 1

1 0 2 1

Installed Not Installed Installed Installed

0 2 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 2.4.9.2 7.4.4 7.4.4.1 7.4.4.2 7.4.4.3 7.4.4.4 7.4.4.5 7.5.2 Rectifier module Centralized supervision unit Rectifier cabinet (include AC/DC distribution) Storage battery(inlcuding battery rack) Three phase,classs-B type Lightning-arrestor with box Single Phase A/C for 2C3S BTS sites (5 KW) GFM-600 ZXDL01 T010 >=17dBi Antenna Feeder Power Supply System for 1C3S BTS ZXD2400 50A(V3.0) Set ZXDU500-CSU Set Set Set Set 8 1 1 2 1 1 8 1 1 2 1 0 Installed Installed Installed Installed Installed Not Installed 0 0 0 0 0 1 MWDR Store , Nepalgunj MOBILE set set 3 6 3 6 Installed Installed 0 0

RCM20B/A4LC20B / Set Hilltake

Installatiopn Material 15. BOQ of Installatiopn Material 1 AMS 2 3 Cable runway Cable Ladder 30cm*20m, Iron

Set Set 30cm*10m, Aluminium Set

1 1 1

1 0 1

installed Not Installed Installed

0 1 0

1 set = 3 pcs WDR store, Bhairahawa Iron made ladder used

Chamere

Page:36/40

Item 4 DDF(BTS)

Description

Model No.

Unit Set

Qty. as per BOQ 0

Qty. Used 0

Status

Qty. Left

Remarks

17. BOQ of Grounding Materials 17.2 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 16 square mm BVV cable 16 square mm bareconnecting terminal 25 square mm BVR cable (yellow & Green) 25 square mm bare connecting terminal 50sq.mm BVR cable (Red) 50 square mm bare connecting terminal Earthing bus bar 50 square mm BVR cable (red) 50 square mm BVR cable (Blue) 50 square mm bare connecting terminal Installed By: Sumit Thapa Engineer, DWT, NT BVR-50-360/0.50 BVR-50-360/0.51 DT-1-50 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa

Installation Materials for ZXDU500 BVV-16*3 +10*1 DT-1-16 BVR-25-98/0.58 DT-1-25 BVR-50-360/0.50 DT-1-50 m set m set m set set m m set 20 5 5 2 10 4 1 10 10 8 20 installed 5 5 2 0 4 0 10 10 8 installed installed installed Not Installed installed Not installed installed installed installed

0 0 0 0 10 0 0 0 0 0

25 sq.mm *3.5, 35 sq.mm used


WDR Store , Bhairahawa

MWDR store, Nepalgunj


70 square mm BVR cable used 70 square mm bare connecting terminal used

Chamere

Page:37/40

Nepal Telecom Directorate of Wireless Telephone Chhauni, Kathmandu Installation Report for 1C3S BTS
Station Name: Lalmatiya
2.4 1C3S BTS Item Description Model No. Unit Qty. as per BOQ Qty. Used Status Qty. Left Remarks

Date of Installation : 2063/11/08

BOQ of BTS Hardware 2.4.1 Base band Sub system-lot 2.4.1.1 Wireless Channel Board(32) 2.4.1.2 Wireless Channel Board(64) 2.4.1.3 Wireless Channel Board(96) 2.4.1.4 Wireless Channel Board(128) 2.4.1.5 Site Alarm Board 2.4.1.6 Communication Control Board 2.4.2 E1 interface card for the BTS-lot 2.4.2.1 Channel Data Service Unit(2E1) 2.4.2.2 BDS mother Board(4E1) 2.4.3 Radio subsystem-lot 2.4.3.1 Radio Frequency Interface Board 2.4.3.2 2.4.3.3 2.4.3.4 2.4.3.5 2.4.3.6 2.4.3.7 2.4.4 2.4.4.1 2.4.4.2 2.4.4.3 2.4.4.4 2.4.4.5 TRx Module TRx Mother Board Radio Front End (Duplexer) Radio Front End (Diversity) Radio Front End(Combiner) RFE Mother Board power supply Subsystem-lot Power Supply Module(B) Radio Power Board(+27V) Power Module (+/- 12V) Power Distribution Board PPM Mother Board

CHM32 CHM64 CHM96 CHM128 SAM CCM BTS-CDSU(2) BBDS(4) RFIM TxRxCIQUFS RFCM BTRX RFE-DUP RFE-DIV RFE-COM BRFE PSMB PPM PSMC PSMD BPOWER

Piece Piece Piece Piece Piece Piece Piece Piece Piece Set Piece Piece Piece Piece Piece Piece Piece Piece Piece Piece

0 1 0 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1

1 1 1 2 1 1 1 3 1 3 3 0 1 2 3 2 1 1

Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed Installed

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 CSMB in this board=64 channels 4 CSMB in this board=128 channels

Lalmatiya

Page:38/40

Item

Description

Model No.

Unit

Qty. as per BOQ 1 1 1 1 3

Qty. Used 1 1 1 1 3

Status

Qty. Left 0 0 0 0 0

Remarks

2.4.5 TFS Subsystem-lot 2.4.5.1 Frequency Distribution Board 2.4.5.2 Time Control Board 2.4.5.3 GPS Receiver 2.4.5.4 GPS Antenna,Feeder Cable BTS Power module lot 2.4.6 2.4.6.1 High Power Amplifier BOQ of BTS Installation Material 2.4.8 Installation Material-lot 2.4.8.1 S222 Installation Material(including Rack) 2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m 2.4.8.3 48V Power Cable BV-25/15m 2.4.8.4 GND Power Cable BV-35/15m BOQ of Antenna & Feeder 2.4.9 Anttena System -lot

FDM TCM GPSTM

Piece Piece Set Set Set

Installed Installed Installed Installed BTS Rack

HPA

Set Piece Piece Piece

1 0 2 1

1 0 2 1

Installed Installed Installed

0 0 0 0

65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list) 2.4.9.1 2.4.9.2 >=17dBi Antenna Feeder MOBILE set set 3 6 3 6 Installed Installed 0 0

Installatiopn Material 15. BOQ of Installatiopn Material 1 AMS 2 3 4 Cable runway Cable Ladder DDF(BTS) 30cm*20m, Iron 30cm*10m, Aluminium

Set Set Set Set

1 1 1 0

1 0 0 0

installed Not Installed Not Installed

0 1 1 0

1 set = 3 pcs WDR Store , Bhairahawa WDR Store , Bhairahawa

17. BOQ of Grounding Materials 17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa

Installed By: Sumit Thapa Engineer, DWT, NT

Lalmatiya

Page:39/40

Item

Description

Model No.

Unit

Qty. as per BOQ

Qty. Used

Status

Qty. Left

Remarks

Lalmatiya

Page:40/40

S-ar putea să vă placă și